diff --git a/evaluation_examples/examples/insert_chart_data/chart_0001_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0001_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..4384692d0fbe4bd599ab9ee4633cdd55573559fd
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0001_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0001_bar_q1",
+ "instruction": "Among the three cities, which has the greatest number of Sunny days and how many Sunny days does it have?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/bar/chart_0001_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among the three cities, which has the greatest number of Sunny days and how many Sunny days does it have?",
+ "expected": "City Gamma has the greatest number of Sunny days with 220 days.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0001_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0001_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..51633cc62c722883f92e41c7eb0175b19ad4ab6c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0001_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0001_heatmap_q1",
+ "instruction": "What is the minimum and maximum possible numeric value that any single day’s data point can take in this heatmap?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0001_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the minimum and maximum possible numeric value that any single day’s data point can take in this heatmap?",
+ "expected": "Each day’s value is an integer from 0 to 999 inclusive, so the minimum possible value is 0 and the maximum possible value is 999.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0001_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0001_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..c84ac8472901ea729dfb0d9e0cbd5cd5812fc563
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0001_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0001_line_q3",
+ "instruction": "From Monday to Sunday, does the Search Engine channel show an overall increase or decrease, and by how much in total?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/line/chart_0001_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "From Monday to Sunday, does the Search Engine channel show an overall increase or decrease, and by how much in total?",
+ "expected": "An overall increase, rising by 500 (from 820 to 1320).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0001_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0001_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..6ab79d67014e5ac0a78b24640d2f86216247ffed
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0001_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0001_scatter_q2",
+ "instruction": "On Monday, how many commits are there in total from 12p through 5p inclusive?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/scatter/chart_0001_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "On Monday, how many commits are there in total from 12p through 5p inclusive?",
+ "expected": "On Monday from 12p through 5p inclusive, there are 44 commits in total (5 + 10 + 5 + 7 + 11 + 6).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0001_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0001_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..1d90102c718945334849731e2d61575ae13c2f75
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0001_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0001_scatter_q3",
+ "instruction": "At 7p, which day has the highest number of commits and what is that number?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/scatter/chart_0001_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "At 7p, which day has the highest number of commits and what is that number?",
+ "expected": "At 7p, Friday has the highest number of commits with 12 commits.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0002_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0002_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..01fa893165790e6100d8a42b1a077a6e790a09c0
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0002_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0002_box_q1",
+ "instruction": "Across all five groups in the dataset, what is the highest recorded measurement, and in which group does it appear?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/box/chart_0002_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all five groups in the dataset, what is the highest recorded measurement, and in which group does it appear?",
+ "expected": "The highest recorded measurement is 1070, and it appears in the first group.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0002_heatmap_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0002_heatmap_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..2709d68f173d82ae7e259700172d29780cd145cd
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0002_heatmap_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0002_heatmap_q3",
+ "instruction": "Does the way the daily step counts are generated introduce any built-in increasing or decreasing trend over the year, or are the values for different days independent pseudo-random draws?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0002_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Does the way the daily step counts are generated introduce any built-in increasing or decreasing trend over the year, or are the values for different days independent pseudo-random draws?",
+ "expected": "The values are independent pseudo-random draws for each day with no built-in increasing or decreasing trend over the year.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0002_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0002_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..1e7ff7991ad430b9e76662610eb516bc1653cb25
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0002_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0002_line_q1",
+ "instruction": "What is the value at 13:18 on April 9, 2024?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/line/chart_0002_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the value at 13:18 on April 9, 2024?",
+ "expected": "1658.75",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0002_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0002_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..5f6cb904461ca4058ad500eda5c96c6fc71eca50
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0002_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0002_line_q3",
+ "instruction": "There is a highest spike between 9:30 and 10:00 in the morning on April 9. What is its value, and when does it appear?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/line/chart_0002_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "There is a highest spike between 9:30 and 10:00 in the morning on April 9. What is its value, and when does it appear?",
+ "expected": "The value is 1731.78, appearing at 9:52.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0002_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0002_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..1b3b6369343f2b224e7e03139193c29f465940a0
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0002_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0002_scatter_q2",
+ "instruction": "Comparing the two chocolate instant breakfast powders, by how many units is the sugars value lower in the sugar-free product than in the regular product?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/scatter/chart_0002_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Comparing the two chocolate instant breakfast powders, by how many units is the sugars value lower in the sugar-free product than in the regular product?",
+ "expected": "The sugar-free chocolate instant breakfast powder has 26.8 units less sugars than the regular chocolate instant breakfast powder (65.8 − 39 = 26.8).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0002_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0002_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..86d5f962b5d9c5ebb2ead8f4bc910c731318c06e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0002_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0002_scatter_q3",
+ "instruction": "Which of the listed products has both carbohydrate and sugars equal to 0 after data normalization?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/scatter/chart_0002_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which of the listed products has both carbohydrate and sugars equal to 0 after data normalization?",
+ "expected": "“Butter oil, anhydrous” has both carbohydrate and sugars equal to 0 after normalization.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0003_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0003_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..1874098915def5591618ffe177421ccdc0f35310
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0003_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0003_bar_q1",
+ "instruction": "What is the highest budget value in the 2012 data series?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/bar/chart_0003_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the highest budget value in the 2012 data series?",
+ "expected": "The highest budget value in the 2012 data series is 1226629000.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0003_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0003_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..9c9217c2dda180aaff5589fbbb536eb744feda78
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0003_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0003_bar_q3",
+ "instruction": "In the 2012 data series, how many data points have a budget value of at least 1000000000, and what are those values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/bar/chart_0003_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the 2012 data series, how many data points have a budget value of at least 1000000000, and what are those values?",
+ "expected": "There are 2 such data points in 2012, with values 1105220000 and 1226629000.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0003_heatmap_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0003_heatmap_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..1602f7c2af29d2b6cd3a50ac858f4dc980162a16
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0003_heatmap_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0003_heatmap_q3",
+ "instruction": "What is the range of data values used by the visualMap to color the heatmap?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0003_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the range of data values used by the visualMap to color the heatmap?",
+ "expected": "The visualMap colors the heatmap for values from 0 to 1.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0003_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0003_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..1d1012ca1b156593f8e1303fa3cb47eb51691089
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0003_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0003_line_q1",
+ "instruction": "What is the highest value of the low temperature?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/line/chart_0003_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the highest value of the low temperature?",
+ "expected": "5 degrees on Thursday.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0003_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0003_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..fd186aca2aa4837ad0936be890ea47447882f5ce
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0003_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0003_line_q2",
+ "instruction": "On which day is the difference between the 'Highest' and 'Lowest' temperatures the largest, and what is that difference?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/line/chart_0003_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "On which day is the difference between the 'Highest' and 'Lowest' temperatures the largest, and what is that difference?",
+ "expected": "The largest difference is on Tuesday, with a gap of 13 °C between the 'Highest' (11 °C) and 'Lowest' (-2 °C) temperatures.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0004_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0004_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..12ec764b048de2618142bfdf0a92d9b966e88b14
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0004_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0004_heatmap_q2",
+ "instruction": "What is the range of x indices shown on the heatmap’s horizontal axis?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0004_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the range of x indices shown on the heatmap’s horizontal axis?",
+ "expected": "The x indices range from 0 to 200 inclusive.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0004_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0004_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..9a6ed7cf8f4a04548163fdafa35b145c6e8e1bca
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0004_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0004_other_q1",
+ "instruction": "What is the rainfall on the 20th day of the lunar month?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/other/chart_0004_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the rainfall on the 20th day of the lunar month?",
+ "expected": "288.80",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0004_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0004_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..13eb57b48de42103c0f3b49fed4582ff27fadfc2
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0004_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0004_other_q3",
+ "instruction": "Which has greater rainfall, the 8th or the 24th, and by how much?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/other/chart_0004_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which has greater rainfall, the 8th or the 24th, and by how much?",
+ "expected": "The rainfall on the 8th is greater, by 208.88.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0005_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0005_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..ec01c14b3404aa4b140c619a8353eba642fc7852
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0005_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0005_bar_q1",
+ "instruction": "For the series 'Data B', on which day is the value highest, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/bar/chart_0005_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For the series 'Data B', on which day is the value highest, and what is that value?",
+ "expected": "The highest value of 'Data B' is on Saturday, with a value of 2300.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0005_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0005_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..50bb13f8118eb12bf52d13364eebe7929cc4966c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0005_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0005_box_q1",
+ "instruction": "During December 2015 in the data shown, on which date did the index have its highest closing value, and what was that closing value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/box/chart_0005_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "During December 2015 in the data shown, on which date did the index have its highest closing value, and what was that closing value?",
+ "expected": "The highest closing value in December 2015 was on 2015/12/22, with a close of 3651.77.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0005_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0005_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..526110e135e44529ad57f3d4dec0f7a420cfd0a5
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0005_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0005_box_q2",
+ "instruction": "Comparing 2015/8/24 and 2015/8/25, which day had the larger percentage decline in closing price, and what were the percentage changes on those two days?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/box/chart_0005_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Comparing 2015/8/24 and 2015/8/25, which day had the larger percentage decline in closing price, and what were the percentage changes on those two days?",
+ "expected": "2015/8/24 had the larger percentage decline, with -8.49% versus -7.63% on 2015/8/25.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0005_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0005_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..a83a42cafe77cd05d533400cd45425c048b05d1a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0005_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0005_heatmap_q2",
+ "instruction": "If you sum all values across the entire day, which has the larger total: Monday or Sunday, and by how many units?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0005_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "If you sum all values across the entire day, which has the larger total: Monday or Sunday, and by how many units?",
+ "expected": "Monday has the larger total by 48 units (71 on Monday versus 23 on Sunday).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0005_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0005_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..07fd7f9aa0559cd64a00d88b6b68ed7bb1b7bedd
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0005_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0005_line_q3",
+ "instruction": "Which items never ranked No. 1 in any year?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/line/chart_0005_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which items never ranked No. 1 in any year?",
+ "expected": "Apple, Sakana, and Iwashi.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0005_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0005_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..d7af4f3208e87545c99dacc1c578ff31b673577e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0005_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0005_other_q1",
+ "instruction": "In the top bar histogram dataHistogram, what is the maximum y value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/other/chart_0005_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the top bar histogram dataHistogram, what is the maximum y value?",
+ "expected": "39",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0005_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0005_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..c1055df3a045e8fcaf31f516d1a17d18d3c30a95
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0005_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0005_other_q3",
+ "instruction": "How many type C points are there in the scatter data dataScatter?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/other/chart_0005_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many type C points are there in the scatter data dataScatter?",
+ "expected": "8",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0005_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0005_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..3f8fce0f8e18d6a42812dcd469da64bf324c3f7c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0005_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0005_pie_q1",
+ "instruction": "Which category has the highest value in the chart, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/pie/chart_0005_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which category has the highest value in the chart, and what is that value?",
+ "expected": "The category 'rose 1' has the highest value, which is 40.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0005_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0005_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..4b69ea78b84165b64a81cb19537ff02097929825
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0005_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0005_pie_q3",
+ "instruction": "What is the difference between the total value of 'rose 1' to 'rose 4' combined and 'rose 5' to 'rose 8' combined?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/pie/chart_0005_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the difference between the total value of 'rose 1' to 'rose 4' combined and 'rose 5' to 'rose 8' combined?",
+ "expected": "The total for 'rose 1' to 'rose 4' is 140 and for 'rose 5' to 'rose 8' is 94, so the difference is 46.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0005_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0005_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..87e3ba8eb6ca1dfbfd418f350b96f23acc5284d3
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0005_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0005_scatter_q1",
+ "instruction": "Across both the Female and Male datasets, what is the highest recorded weight, which gender does it belong to, and what are that person's height and weight?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/scatter/chart_0005_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across both the Female and Male datasets, what is the highest recorded weight, which gender does it belong to, and what are that person's height and weight?",
+ "expected": "The highest recorded weight is 116.4 kg, belonging to a Male at a height of 177.8 cm.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0005_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0005_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..ba9b15e183d2ce05144b179d485035816d86a233
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0005_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0005_scatter_q3",
+ "instruction": "Comparing the female data point at 175.0 cm and the male data point at 175.0 cm, whose weight is higher and by how many kilograms?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/scatter/chart_0005_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Comparing the female data point at 175.0 cm and the male data point at 175.0 cm, whose weight is higher and by how many kilograms?",
+ "expected": "The female at 175.0 cm is heavier, weighing 82.5 kg versus the male’s 62.0 kg, a difference of 20.5 kg.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0006_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0006_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..c3c32bfc0c37cecf62c3f622f11484aad4f36f33
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0006_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0006_box_q2",
+ "instruction": "Considering the dates 2004-06-18, 2004-06-25, and 2004-07-14, which day had the highest trading volume and what was that volume?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/box/chart_0006_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Considering the dates 2004-06-18, 2004-06-25, and 2004-07-14, which day had the highest trading volume and what was that volume?",
+ "expected": "2004-06-25 had the highest trading volume, at 308,250,000.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0006_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0006_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..3a74c1b0ee7106f6eb944cc8379fbb4483829c6b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0006_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0006_heatmap_q1",
+ "instruction": "What is the completion percentage for Bridge Engineering Quality Inspection in segment TJ-02?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0006_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the completion percentage for Bridge Engineering Quality Inspection in segment TJ-02?",
+ "expected": "20%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0006_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0006_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..0143cb5777469c89fa1b0a74d479053ab829769b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0006_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0006_line_q1",
+ "instruction": "What is the value of the blue line at 4 PM on August 3, 2009?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/line/chart_0006_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the value of the blue line at 4 PM on August 3, 2009?",
+ "expected": "226",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0006_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0006_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..ba873341183960953c4109a32801d1bbe80c39fc
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0006_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0006_pie_q1",
+ "instruction": "In the 'Radius Mode' series, which rose category has the smallest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/pie/chart_0006_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the 'Radius Mode' series, which rose category has the smallest value, and what is that value?",
+ "expected": "In the 'Radius Mode' series, 'rose 8' has the smallest value, which is 10.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0006_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0006_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..cdd767aa30f1930f0ee910247fbba848552428ce
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0006_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0006_pie_q3",
+ "instruction": "What percentage of the total 'Radius Mode' value is contributed by 'rose 1'?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/pie/chart_0006_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What percentage of the total 'Radius Mode' value is contributed by 'rose 1'?",
+ "expected": "'rose 1' contributes 40 out of 180 in 'Radius Mode', which is approximately 22.2% of the total.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0006_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0006_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..dc8debf62f7cd43eb108f2ca0d654cd240ee0a9e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0006_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0006_scatter_q1",
+ "instruction": "What is the highest value shown in the chart, and on which days and hours does this maximum occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/scatter/chart_0006_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the highest value shown in the chart, and on which days and hours does this maximum occur?",
+ "expected": "The highest value is 14, and it occurs on Wednesday at 1p and on Tuesday at 3p.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0007_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0007_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..769ecad2526438201c84a9b34ca5c899f8b07fe5
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0007_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0007_bar_q2",
+ "instruction": "Between 2011 and 2012, which had a larger increase in value, India or USA, and what was the increase for each?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/bar/chart_0007_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between 2011 and 2012, which had a larger increase in value, India or USA, and what was the increase for each?",
+ "expected": "India had a larger increase. India increased by 16,624 (from 104,970 to 121,594), while the USA increased by 1,966 (from 29,034 to 31,000).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0007_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0007_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..776b3f912bf5a47e43fbbf2baf95d043874abf8f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0007_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0007_box_q1",
+ "instruction": "In the candlestick data, on which date does the highest high price occur, and what is that highest price?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/box/chart_0007_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the candlestick data, on which date does the highest high price occur, and what is that highest price?",
+ "expected": "The highest high price occurs on 2013/2/18, with a high of 2444.80.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0007_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0007_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..67bc0d61dc2a4610dc6deb288d6350ca209ed3da
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0007_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0007_heatmap_q2",
+ "instruction": "Compare the defense value of Cao Cao and Xiang Yu. Which hero has higher defense?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0007_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Compare the defense value of Cao Cao and Xiang Yu. Which hero has higher defense?",
+ "expected": "Cao Cao has a higher defense value of 10, while Xiang Yu has 8.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0007_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0007_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..f6fbdb6eec44e8c565bdca227bf1ace9df0d9c38
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0007_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0007_pie_q2",
+ "instruction": "What numerical value is assigned to any slice in the pie chart according to the provided source?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/pie/chart_0007_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What numerical value is assigned to any slice in the pie chart according to the provided source?",
+ "expected": "Search Engine:1048;Direct 735;Email:580;Union Ads:484;Video Ads:300",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0007_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0007_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..fc388c3b548b0046108949975ad93f6ee59761c4
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0007_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0007_pie_q3",
+ "instruction": "From the information given in the chart source, which category accounts for the largest proportion of the pie chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/pie/chart_0007_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "From the information given in the chart source, which category accounts for the largest proportion of the pie chart?",
+ "expected": "Search Engine",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0007_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0007_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..44adc74a28d81a078a9d9a5c2d329297c1e7347a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0007_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0007_scatter_q1",
+ "instruction": "On Wednesday, at which hour is the number of commits highest, and how many commits occur then?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/scatter/chart_0007_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "On Wednesday, at which hour is the number of commits highest, and how many commits occur then?",
+ "expected": "On Wednesday, the highest number of commits is at 1p, with 14 commits.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0007_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0007_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..dec17923984698327142e2a378bc3405668899b9
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0007_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0007_scatter_q3",
+ "instruction": "Across the whole week, which day has the highest total number of commits, and what is that total?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/scatter/chart_0007_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across the whole week, which day has the highest total number of commits, and what is that total?",
+ "expected": "Wednesday has the highest total number of commits, with 110 commits.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0008_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0008_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..f9afcd4bb2591027847077d5ec54c3555b81e876
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0008_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0008_bar_q2",
+ "instruction": "Between categories a and c, which one has the larger value and by how much?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/bar/chart_0008_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between categories a and c, which one has the larger value and by how much?",
+ "expected": "Category c is larger than category a by 0.4 (2.4 minus 2).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0008_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0008_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..4b558808833018028f0d3b07ea23d5298d499778
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0008_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0008_line_q2",
+ "instruction": "What is Beijing's AQI value on 2000-11-04?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/line/chart_0008_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is Beijing's AQI value on 2000-11-04?",
+ "expected": "306",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0008_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0008_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..b16e9be81a566b23f1264cf6ff3159b66bcc2030
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0008_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0008_line_q3",
+ "instruction": "How much did Beijing's AQI change from 2000-11-03 to 2000-11-04, and what was the trend?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/line/chart_0008_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How much did Beijing's AQI change from 2000-11-03 to 2000-11-04, and what was the trend?",
+ "expected": "It increased by 99 (from 207 to 306).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0008_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0008_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..681846e7489cfe1c0b3c23776cbdb5d6cac48f5b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0008_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0008_other_q3",
+ "instruction": "How many metrics in the radar chart have a value of 5?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/other/chart_0008_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many metrics in the radar chart have a value of 5?",
+ "expected": "5",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0009_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0009_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..a147facf6aca5578ee94f488adb70c9e294a8f26
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0009_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0009_bar_q3",
+ "instruction": "How many categories have bar values greater than 2?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/bar/chart_0009_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many categories have bar values greater than 2?",
+ "expected": "Two categories (c and d) have values greater than 2.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0009_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0009_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..71c8843634f4fb6b1a936dee23db4ac7f23290fa
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0009_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0009_box_q2",
+ "instruction": "What is the median discount strength for Midea?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/box/chart_0009_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the median discount strength for Midea?",
+ "expected": "65.79.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0009_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0009_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..62f47c37c988d60a7a5ccfbcc903c1bf49f01336
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0009_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0009_heatmap_q1",
+ "instruction": "Within the 2012 data shown, which date has the highest recorded value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0009_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Within the 2012 data shown, which date has the highest recorded value, and what is that value?",
+ "expected": "The highest 2012 value is on 2012-10-19, with a value of 24.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0009_heatmap_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0009_heatmap_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..1f8713d390521f7af071513b00fe4a68c8ac4d2b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0009_heatmap_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0009_heatmap_q3",
+ "instruction": "For the dates 2011-12-16 through 2011-12-19, what are the values on each date and what is the overall change from 2011-12-16 to 2011-12-19?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0009_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For the dates 2011-12-16 through 2011-12-19, what are the values on each date and what is the overall change from 2011-12-16 to 2011-12-19?",
+ "expected": "The values are 10 on 2011-12-16, 10 on 2011-12-17, 9 on 2011-12-18, and 7 on 2011-12-19, giving an overall decrease of 3 from 10 to 7.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0009_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0009_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..8feb7d2249c4836f87bef5e133074636568011e9
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0009_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0009_line_q2",
+ "instruction": "What is the rainfall at 4:00 on August 3?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/line/chart_0009_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the rainfall at 4:00 on August 3?",
+ "expected": "4.786",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0009_other_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0009_other_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..08433de27bcac6c814722178e4c23752f4fb4e20
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0009_other_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0009_other_q2",
+ "instruction": "How many of the first ten plotted hours have a forecast temperature of at least 2.5 °C?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/other/chart_0009_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many of the first ten plotted hours have a forecast temperature of at least 2.5 °C?",
+ "expected": "3",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0009_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0009_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..a432f422395a9172aca327aaef77b253cf247219
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0009_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0009_scatter_q2",
+ "instruction": "By how much is the y-value at x = 0.427?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/scatter/chart_0009_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how much is the y-value at x = 0.427?",
+ "expected": "The y-value at x = 0.427 is 3.743365.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0009_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0009_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..5f4760241a5d2041440c97863b3c3444eb371618
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0009_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0009_scatter_q3",
+ "instruction": "Considering the scatter data as a whole, as x increases from low values (around 0.02–0.1) to high values (around 0.9–1.0), does y generally increase, decrease, or remain roughly constant?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/scatter/chart_0009_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Considering the scatter data as a whole, as x increases from low values (around 0.02–0.1) to high values (around 0.9–1.0), does y generally increase, decrease, or remain roughly constant?",
+ "expected": "As x increases from low to high values, y generally increases, indicating a positive relationship between x and y.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0010_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0010_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..40ca857f34b27dbe642f08fc544e02e904fd4ea8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0010_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0010_bar_q1",
+ "instruction": "Which category has the highest cost value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/bar/chart_0010_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which category has the highest cost value, and what is that value?",
+ "expected": "The category 'three' has the highest cost value, which is 0.47.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0010_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0010_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..37ec088b59380a3cc82977b2964995a73b484988
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0010_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0010_bar_q3",
+ "instruction": "What is the difference between the cost of category 'three' and category 'two'?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/bar/chart_0010_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the difference between the cost of category 'three' and category 'two'?",
+ "expected": "The cost of 'three' is 0.83 higher than that of 'two' (0.47 minus -0.36 equals 0.83).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0010_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0010_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..cbabe41eda61f991f6c58ebee71e958b2ada0413
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0010_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0010_heatmap_q1",
+ "instruction": "What is the highest crowding level value in the heatmap, and at which time interval and place(s) does it occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0010_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the highest crowding level value in the heatmap, and at which time interval and place(s) does it occur?",
+ "expected": "The highest crowding level is 8, occurring at time '18-20' for both Toilet and Gas Station.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0010_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0010_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..6c190f134246b19b3bd41e35af1c84a6f39b1240
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0010_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0010_line_q3",
+ "instruction": "Between the dates 2012-10-09 and 2012-10-12 in the data, which date has the smaller ?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/line/chart_0010_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between the dates 2012-10-09 and 2012-10-12 in the data, which date has the smaller ?",
+ "expected": "10-12.10-09 is 24.3,and 10-12 is -4.6",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0010_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0010_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..99f797c2f0bad0acb8d7f125d135eb946f7ed650
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0010_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0010_pie_q2",
+ "instruction": "How many more accesses come from Search Engine than from Direct?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/pie/chart_0010_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many more accesses come from Search Engine than from Direct?",
+ "expected": "There are 313 more accesses from Search Engine than from Direct (1048 − 735 = 313).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0011_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0011_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..040f0fc2bdd847893369bb7f76158c7b11a25a54
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0011_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0011_heatmap_q2",
+ "instruction": "From 2014-08-13 to 2018-08-17 inclusive, does the value end higher or lower than it starts, and by how much does it change?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0011_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "From 2014-08-13 to 2018-08-17 inclusive, does the value end higher or lower than it starts, and by how much does it change?",
+ "expected": "It ends higher by 8, increasing from 2 on 2014-08-13 to 10 on 2014-08-17.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0011_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0011_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..d0057f78ef4e190e27ce7af4cab268fa884c4139
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0011_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0011_other_q1",
+ "instruction": "In the chart, which labeled month has the maximum Rainfall value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/other/chart_0011_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the chart, which labeled month has the maximum Rainfall value, and what is that value?",
+ "expected": "It reaches its maximum in Sep, at 216.4 mm.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0011_other_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0011_other_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..bb85032fd93792365b85d21c1cbde794a2f7bc6e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0011_other_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0011_other_q2",
+ "instruction": "In the month labeled Jun, what are the values of Temperature and Sea-Level Pressure, respectively?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/other/chart_0011_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the month labeled Jun, what are the values of Temperature and Sea-Level Pressure, respectively?",
+ "expected": "In Jun, Temperature is 21.5 °C and Sea-Level Pressure is 1009.5 mb.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0011_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0011_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..0cacce964b270612b278bdfe46c60553ffcaf542
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0011_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0011_pie_q2",
+ "instruction": "How many more visits come from Search Engine than from Video Ads?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/pie/chart_0011_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many more visits come from Search Engine than from Video Ads?",
+ "expected": "Search Engine has 748 more visits than Video Ads (1048 − 300 = 748).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0011_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0011_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..cfa616427ae4612ac1fd6427f338d9eb446a9906
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0011_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0011_pie_q3",
+ "instruction": "Approximately what percentage of the total traffic comes from Search Engine?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/pie/chart_0011_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Approximately what percentage of the total traffic comes from Search Engine?",
+ "expected": "Search Engine accounts for about 33.3% of the total traffic (1048 out of 3147).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0012_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0012_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..2ecb8221d4611819f948a39af41dd290344f5463
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0012_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0012_bar_q2",
+ "instruction": "By how much does the Direct value change from Wednesday to Thursday?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/bar/chart_0012_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how much does the Direct value change from Wednesday to Thursday?",
+ "expected": "It increases by 134, from 200 on Wednesday to 334 on Thursday.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0012_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0012_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..ca13add27d746dbb8aaff6b49dbadca21157fc44
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0012_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0012_bar_q3",
+ "instruction": "What percentage of the Direct value on Friday is the Direct value on Monday? Give the answer to one decimal place.",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/bar/chart_0012_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What percentage of the Direct value on Friday is the Direct value on Monday? Give the answer to one decimal place.",
+ "expected": "The Direct value on Monday is 2.6% of the Direct value on Friday.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0012_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0012_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..fabb0d2131337d7597db4ce9e7cc367407ff323b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0012_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0012_box_q2",
+ "instruction": "In the candlestick series, which time has the largest spread between its smallest and largest of the four values, and what is that spread?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/box/chart_0012_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the candlestick series, which time has the largest spread between its smallest and largest of the four values, and what is that spread?",
+ "expected": "13:00 has the largest spread, with a difference of 40 between its smallest (40) and largest (80) values.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0012_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0012_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..ce2dac9f52f09fbe4c3707e5293070be8266e636
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0012_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0012_heatmap_q1",
+ "instruction": "What is the highest electricity usage value shown in the heatmap, and in which town and month does it occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0012_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the highest electricity usage value shown in the heatmap, and in which town and month does it occur?",
+ "expected": "The highest electricity usage is 132, occurring in Minzhong Town in February.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0013_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0013_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..2a22baa5e1c1cafa75bf16a0e22d9a12e233dec1
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0013_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0013_bar_q1",
+ "instruction": "Which product has the highest amount, and what is that amount?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/bar/chart_0013_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which product has the highest amount, and what is that amount?",
+ "expected": "Lemon Juice has the highest amount with 101,852.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0013_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0013_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..00d798c44de481886cce996c3e630144353e5840
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0013_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0013_box_q2",
+ "instruction": "How many of the plotted days have a closing price higher than the opening price?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/box/chart_0013_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many of the plotted days have a closing price higher than the opening price?",
+ "expected": "Five days have a closing price higher than the opening price.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0013_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0013_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..0fabbb72bc86c0e1737b78f8d568a2fa23dd8ff9
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0013_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0013_heatmap_q1",
+ "instruction": "On which date in January 2018 does the heatmap show the highest AQI value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0013_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "On which date in January 2018 does the heatmap show the highest AQI value, and what is that value?",
+ "expected": "The highest AQI value is 406 on 2018-01-18.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0013_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0013_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..68fcec5663d285c5397b4063330d99edd735ef70
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0013_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0013_heatmap_q2",
+ "instruction": "How many days in January 2018 have an AQI value greater than or equal to 300 according to the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0013_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many days in January 2018 have an AQI value greater than or equal to 300 according to the chart?",
+ "expected": "There are 4 days with an AQI value greater than or equal to 300: 2018-01-15, 2018-01-16, 2018-01-17, and 2018-01-18.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0013_heatmap_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0013_heatmap_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..854cacf9c9b794970d0f14dab02b95959292f05e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0013_heatmap_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0013_heatmap_q3",
+ "instruction": "By how many units did the AQI increase from 2018-01-15 to 2018-01-18?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/heatmap/chart_0013_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how many units did the AQI increase from 2018-01-15 to 2018-01-18?",
+ "expected": "The AQI increased by 94 units, from 312 on 2018-01-15 to 406 on 2018-01-18.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0013_other_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0013_other_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..1e7d6ef1cabd154bb6f705de4cdad8c4d70847da
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0013_other_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0013_other_q2",
+ "instruction": "Among the years 2020, 2021, and 2022, which year has the highest total sales in the pie series, and what is that total in million liters?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/other/chart_0013_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among the years 2020, 2021, and 2022, which year has the highest total sales in the pie series, and what is that total in million liters?",
+ "expected": "2022, with a total of 647 million liters.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0013_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0013_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..832c807a3c7ba8914ea26aa17fa9edda8afd7266
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0013_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0013_pie_q1",
+ "instruction": "Which referer source has the highest number of accesses, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/pie/chart_0013_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which referer source has the highest number of accesses, and what is that value?",
+ "expected": "Search Engine has the highest number of accesses with a value of 1048.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0013_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0013_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..f4770721b6f70c959a0f024ab8890970035a82b8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0013_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0013_pie_q2",
+ "instruction": "Approximately what percentage of total accesses come from Direct traffic?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/pie/chart_0013_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Approximately what percentage of total accesses come from Direct traffic?",
+ "expected": "Direct traffic accounts for about 23.4% of total accesses (735 out of 3147).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0013_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0013_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..6b44edb4980aa063ea30e5a3020ae42b4a095abb
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0013_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0013_pie_q3",
+ "instruction": "Do Search Engine and Direct combined account for more accesses than Email, Union Ads, and Video Ads combined, and by how many accesses?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/pie/chart_0013_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Do Search Engine and Direct combined account for more accesses than Email, Union Ads, and Video Ads combined, and by how many accesses?",
+ "expected": "Yes. Search Engine and Direct total 1783 accesses, while Email, Union Ads, and Video Ads total 1364, so the first group has 419 more accesses.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0013_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0013_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..740095ebf50690afb89e44702c1ad4d4a7141e8d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0013_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0013_scatter_q2",
+ "instruction": "In Group IV, what are the coordinates of the single point whose x-value is different from all the other points in that group?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Apache ECharts/scatter/chart_0013_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In Group IV, what are the coordinates of the single point whose x-value is different from all the other points in that group?",
+ "expected": "In Group IV, the outlier point has coordinates (19.0, 12.5).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0014_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0014_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..31a2fa04691d0d102826c50d6d31ad13ebae662f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0014_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0014_bar_q2",
+ "instruction": "What is the difference in sales between Friday and Tuesday?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0014_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the difference in sales between Friday and Tuesday?",
+ "expected": "The difference in sales between Friday and Tuesday is 25.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0014_box_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0014_box_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..3848a1f97267b169488a5c51c8625e3f9d40e850
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0014_box_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0014_box_q3",
+ "instruction": "Among all low income groups, which region has the highest median (y3) value and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/box/chart_0014_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among all low income groups, which region has the highest median (y3) value and what is that value?",
+ "expected": "The South Asia low income group has the highest median value, which is 10.94903493.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0014_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0014_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..3cdb48999572c01dc68394bb9f5dd4ca7f0e0b21
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0014_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0014_line_q2",
+ "instruction": "For the product type \"Lipstick\", which country has the lowest sales value and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/line/chart_0014_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For the product type \"Lipstick\", which country has the lowest sales value and what is that value?",
+ "expected": "The EU has the lowest Lipstick sales value, which is 4376.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0015_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0015_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..ba2911bd229b91a71a1a47fd05c4d53213056bfc
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0015_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0015_bar_q2",
+ "instruction": "For the 70–75 age group in 2000, which sex has more people and by how many?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0015_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For the 70–75 age group in 2000, which sex has more people and by how many?",
+ "expected": "Males have more people; there are 1,392,710 more males (5,184,855 males vs 3,792,145 females).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0015_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0015_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..206af7258f108a93e681419027bc662701fee508
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0015_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0015_box_q2",
+ "instruction": "In the Sub-Saharan Africa region, which income group has the higher median y3, High income or Low income?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/box/chart_0015_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the Sub-Saharan Africa region, which income group has the higher median y3, High income or Low income?",
+ "expected": "Low income has the higher median y3.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0015_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0015_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..adb433630a9a5c06f9cc3f2190a6e2e92bc2f5a6
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0015_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0015_heatmap_q1",
+ "instruction": "On Monday at 12 a.m. (12a), what is the heatmap value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/heatmap/chart_0015_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "On Monday at 12 a.m. (12a), what is the heatmap value?",
+ "expected": "53",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0015_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0015_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..d5146700b3a9369a41b7b749ee5811e72d19ee14
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0015_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0015_heatmap_q2",
+ "instruction": "At 8 a.m. (8a), between Thursday and Friday, which day has the higher value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/heatmap/chart_0015_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "At 8 a.m. (8a), between Thursday and Friday, which day has the higher value?",
+ "expected": "Thursday, with a value of 620, which is higher than Friday's 508.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0015_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0015_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..3124fbe5bcf85df0347668c597f21c4045231e94
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0015_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0015_line_q1",
+ "instruction": "Among types A, B, and C, which type has the highest maximum value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/line/chart_0015_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among types A, B, and C, which type has the highest maximum value?",
+ "expected": "Type B, with a maximum value of 8500.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0015_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0015_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..cb37468c05b72179904f0773cbd3cf5f7e0c3f05
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0015_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0015_line_q3",
+ "instruction": "At what time do Type A and Type B have the same value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/line/chart_0015_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "At what time do Type A and Type B have the same value?",
+ "expected": "5:00",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0015_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0015_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..3b325ed3ce6af4a317035da86e30b7ff31f26870
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0015_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0015_pie_q1",
+ "instruction": "Which country has the highest cost in this chart, and what is that cost value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0015_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which country has the highest cost in this chart, and what is that cost value?",
+ "expected": "Australia, with a cost of 130.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0015_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0015_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..bee792cd7f92fec4cca8842e1a0f174e56cd288d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0015_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0015_pie_q3",
+ "instruction": "What is the difference between the highest and lowest cost values among all countries shown?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0015_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the difference between the highest and lowest cost values among all countries shown?",
+ "expected": "47 (130 minus 83).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0015_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0015_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..c52df3ed7d89f6aea8f39b27d7ea75d1a36b7170
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0015_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0015_scatter_q1",
+ "instruction": "In the scatter data, what is the y value of the point where x equals 5.76046299337587?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/scatter/chart_0015_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the scatter data, what is the y value of the point where x equals 5.76046299337587?",
+ "expected": "0",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0015_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0015_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..c0a863fb24eaaba04167d060c88938efb8cf7e0a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0015_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0015_scatter_q2",
+ "instruction": "In the scatter data, what are the minimum and maximum values of y?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/scatter/chart_0015_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the scatter data, what are the minimum and maximum values of y?",
+ "expected": "The minimum value is -9.81410286951023, and the maximum value is 9.952683366073803.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0016_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0016_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..cb40174dc3eabed3b7ecdf684f69ea540eb52e4f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0016_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0016_bar_q1",
+ "instruction": "How many profit intervals (bars) are included in the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0016_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many profit intervals (bars) are included in the chart?",
+ "expected": "7 intervals",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0016_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0016_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..92af1ecc190430f673e8c007210308d726155917
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0016_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0016_box_q2",
+ "instruction": "What is the median (y3) value for the Middle East & North Africa region?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/box/chart_0016_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the median (y3) value for the Middle East & North Africa region?",
+ "expected": "The median value for Middle East & North Africa is 11.05.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0016_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0016_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..6b0125848a415ba0bc1e52092df0654524ad9a2f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0016_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0016_heatmap_q2",
+ "instruction": "On Friday, who sells more items, Lukas or Maria, and by how many items?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/heatmap/chart_0016_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "On Friday, who sells more items, Lukas or Maria, and by how many items?",
+ "expected": "Maria sells more, with 120 items versus Lukas’s 115, a difference of 5 items.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0016_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0016_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..be1074304501aac44f17e039701b5c199394f505
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0016_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0016_other_q1",
+ "instruction": "In the 'Project 1' series, which task has the highest completed.amount value and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/other/chart_0016_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the 'Project 1' series, which task has the highest completed.amount value and what is that value?",
+ "expected": "The task 'Prototyping' has the highest completed.amount value, which is 0.95.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0016_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0016_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..8109949401dd8e9350219b3e4ed212e57b3c1d7b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0016_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0016_pie_q1",
+ "instruction": "According to the chart, which element has the highest surface content percentage and what is that percentage?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0016_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the chart, which element has the highest surface content percentage and what is that percentage?",
+ "expected": "Oxygen has the highest surface content at 46.60%.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0017_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0017_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..b2c2fb525c1bcfaecabf866133510bcd55f58593
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0017_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0017_bar_q2",
+ "instruction": "For the product Lipstick in China, is the value of the line series larger or smaller than the bar series? What are the respective values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0017_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For the product Lipstick in China, is the value of the line series larger or smaller than the bar series? What are the respective values?",
+ "expected": "The line series value is larger; the bar series is 9054, and the line series is 13054.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0017_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0017_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..7fdbdb18dec190ac73ac3f4339a475ef0075383f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0017_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0017_bar_q3",
+ "instruction": "In the line chart data, for the product Eyeshadows, which region has the largest value among the four regions, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0017_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the line chart data, for the product Eyeshadows, which region has the largest value among the four regions, and what is that value?",
+ "expected": "For Eyeshadows, the largest line value among the four regions is in USA, at 18998.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0017_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0017_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..9ae3aef0e20e10c33700aba867de4bb47ee28a68
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0017_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0017_line_q3",
+ "instruction": "Which x category has the lowest y value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/line/chart_0017_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which x category has the lowest y value, and what is that value?",
+ "expected": "The lowest y value is -0.01 at x = '2th'.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0017_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0017_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..785f4ec10705223e40aea776991160977b99290d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0017_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0017_pie_q2",
+ "instruction": "By how many percentage points does NVDA exceed JAWS?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0017_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how many percentage points does NVDA exceed JAWS?",
+ "expected": "NVDA exceeds JAWS by 0.5 percentage points.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0017_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0017_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..e47c81fd1921617536f358385c4ac0d264bcbd68
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0017_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0017_scatter_q2",
+ "instruction": "How many points have a negative y value in the chart data?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/scatter/chart_0017_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many points have a negative y value in the chart data?",
+ "expected": "7 points have a negative y value.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0018_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0018_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..83e7c33b36eeb5d2e8c1dc420db0c0dfac7045ad
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0018_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0018_bar_q1",
+ "instruction": "Across all years and categories, which year-category combination has the largest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0018_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all years and categories, which year-category combination has the largest value, and what is that value?",
+ "expected": "Category B in 2010, with a value of 32.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0018_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0018_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..4d0de5c18c88c9189285c058639741313721ff8c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0018_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0018_box_q1",
+ "instruction": "In 2023, which series has the highest high monthly earnings value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/box/chart_0018_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 2023, which series has the highest high monthly earnings value, and what is that value?",
+ "expected": "In 2023, Hospital activities has the highest high monthly earnings value at 107100 NOK.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0018_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0018_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..11c62ff9642bc7139d5949510083e95c681365a9
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0018_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0018_box_q2",
+ "instruction": "Did the median monthly earnings for Fire service activities increase every year from 2017 to 2023?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/box/chart_0018_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Did the median monthly earnings for Fire service activities increase every year from 2017 to 2023?",
+ "expected": "No, they did not; the median decreased from 53860 NOK in 2018 to 51830 NOK in 2019.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0018_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0018_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..438efd2a68d5b5bf1fbd43b042440aea3bcef02e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0018_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0018_heatmap_q1",
+ "instruction": "What was the highest recorded day temperature in Oslo in July 2023 according to the heatmap, and on which date did it occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/heatmap/chart_0018_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What was the highest recorded day temperature in Oslo in July 2023 according to the heatmap, and on which date did it occur?",
+ "expected": "25.1 °C on July 10, 2023.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0018_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0018_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..90f3f3cbb405009a7139abb18d4fa335c4499dfd
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0018_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0018_other_q3",
+ "instruction": "In the series 'Project 1', how many tasks have a completed field defined?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/other/chart_0018_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the series 'Project 1', how many tasks have a completed field defined?",
+ "expected": "4",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0018_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0018_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..18456c078605c6a29722ed4223f4575b4256a278
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0018_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0018_pie_q3",
+ "instruction": "How many categories have values less than 5?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0018_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many categories have values less than 5?",
+ "expected": "3",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0018_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0018_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..50f0df6d16d0024479c84e29544f297a63d1bced
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0018_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0018_scatter_q3",
+ "instruction": "What is the content of the auxiliary text below the horizontal axis (x-axis description)?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/scatter/chart_0018_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the content of the auxiliary text below the horizontal axis (x-axis description)?",
+ "expected": "COMPLETENESS OF VISION",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0019_box_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0019_box_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..3dc965c6d5b8202f32a167afc885150749d64905
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0019_box_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0019_box_q3",
+ "instruction": "Comparing the median values of January and March, which one is larger, and by how much?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/box/chart_0019_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Comparing the median values of January and March, which one is larger, and by how much?",
+ "expected": "January has the larger median value, at 848, which is 31 higher than March's 817.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0019_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0019_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..900bf8e1b1503450cda08c8ce1ec09e6698eddcf
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0019_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0019_heatmap_q2",
+ "instruction": "What is the name of the top-level region to which Viken belongs?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/heatmap/chart_0019_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the name of the top-level region to which Viken belongs?",
+ "expected": "Østlandet",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0019_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0019_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..a811c8845f45849f4d20bc3aeb27bb28ba82f283
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0019_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0019_line_q2",
+ "instruction": "At how many time points is the value greater than 60?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/line/chart_0019_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "At how many time points is the value greater than 60?",
+ "expected": "3",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0019_other_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0019_other_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..7bfa3496899bb51254849fcf2756c9b987d8ef28
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0019_other_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0019_other_q2",
+ "instruction": "How many tasks have 'design' as their parent?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/other/chart_0019_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many tasks have 'design' as their parent?",
+ "expected": "2 tasks: 'Layout' and 'Graphics'.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0019_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0019_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..86cda14fe7e16504a54fe0c8d0db46dc10ce0821
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0019_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0019_pie_q3",
+ "instruction": "Which category has the largest value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0019_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which category has the largest value?",
+ "expected": "This is a long Auto-Ellipsis Category Text for Category1",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0020_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0020_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..7d69c89a8da6bd87f15ad902966261be567464a0
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0020_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0020_bar_q1",
+ "instruction": "In this population pyramid, which male age group has the largest population? What is the corresponding population?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0020_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In this population pyramid, which male age group has the largest population? What is the corresponding population?",
+ "expected": "Among males, the 0-4 age group has the largest population, at 432671 people.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0020_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0020_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..979d0895a71965712aa7472195ba9e6227852289
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0020_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0020_bar_q3",
+ "instruction": "In the 80-84 age group, what are the female population and its proportion of the total population, respectively?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0020_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the 80-84 age group, what are the female population and its proportion of the total population, respectively?",
+ "expected": "For females aged 80-84, the population is 7482, accounting for 0.0012251799534228568 of the total population.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0020_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0020_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..a939d8ef0655856d6594740af827ebf1edc17705
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0020_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0020_box_q2",
+ "instruction": "Which region has the largest median delay time?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/box/chart_0020_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which region has the largest median delay time?",
+ "expected": "North America",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0020_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0020_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..bf2f178f385a654be921d7f96ad1abdaf7d23e6f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0020_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0020_pie_q2",
+ "instruction": "Which element has the highest content percentage in the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0020_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which element has the highest content percentage in the chart?",
+ "expected": "oxygen, with 46.60%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0020_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0020_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..a6c5121f6e2f5ad251bafe61aa7f8cd90092b007
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0020_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0020_pie_q3",
+ "instruction": "Among all the elements shown, which one has the smallest percentage value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0020_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among all the elements shown, which one has the smallest percentage value?",
+ "expected": "potassium, with 2.59%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0021_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0021_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..ae2d7b81043118d94a17b360fd4a708b25d5ea74
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0021_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0021_bar_q1",
+ "instruction": "Among all dates, on which day does Cake have the highest value? What is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0021_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among all dates, on which day does Cake have the highest value? What is that value?",
+ "expected": "Cake reaches its highest value on 2019-09-02, at 997.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0021_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0021_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..b60ab73134255a48b7dd054e6148e1ccb8dcc7e5
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0021_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0021_bar_q2",
+ "instruction": "On 2019-09-01, how much higher is Tea than Coffee?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0021_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "On 2019-09-01, how much higher is Tea than Coffee?",
+ "expected": "Tea is 944 and Coffee is 298, so Tea is higher by 646.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0021_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0021_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..17b22b779cbda261fa2dc87d5edba9dc36ce62d7
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0021_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0021_box_q2",
+ "instruction": "What is the high value for May in the data?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/box/chart_0021_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the high value for May in the data?",
+ "expected": "May's high value is 9000.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0021_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0021_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..48164037ee524119dbaa52e24a60aae51d3872c4
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0021_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0021_heatmap_q2",
+ "instruction": "Which states have population values above 20 million, and what are those values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/heatmap/chart_0021_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which states have population values above 20 million, and what are those values?",
+ "expected": "California: 38,965,193; Texas: 30,503,301; Florida: 22,610,726.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0021_heatmap_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0021_heatmap_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..3300862905fa7551cf1cccf991dd09cd51b553bb
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0021_heatmap_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0021_heatmap_q3",
+ "instruction": "According to the series data, which state has the lowest population value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/heatmap/chart_0021_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the series data, which state has the lowest population value, and what is that value?",
+ "expected": "Wyoming has the lowest population, with 584,057.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0021_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0021_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..335d874d5000334136282be7116be6e8261a0280
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0021_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0021_pie_q1",
+ "instruction": "In this pie chart, which type has the largest value, and what is it?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0021_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In this pie chart, which type has the largest value, and what is it?",
+ "expected": "oxygen, 46.60",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0021_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0021_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..d3bf68824c088886352d954fee92e8219c29530c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0021_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0021_pie_q2",
+ "instruction": "Between sodium and potassium, which has the larger value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0021_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between sodium and potassium, which has the larger value?",
+ "expected": "sodium is larger, at 2.83, while potassium is 2.59.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0021_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0021_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..456e33fc0fe8fda12644b9f3edc4726a28515090
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0021_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0021_pie_q3",
+ "instruction": "What is the sum of the values of all types?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0021_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the sum of the values of all types?",
+ "expected": "100",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0021_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0021_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..2e0318ae5f4ab138939055ad730699ca1ff0c1b8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0021_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0021_scatter_q3",
+ "instruction": "In the chart, which region has the largest difference in LifeExpectancy among its data points? What is the difference?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/scatter/chart_0021_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the chart, which region has the largest difference in LifeExpectancy among its data points? What is the difference?",
+ "expected": "Asia, with a LifeExpectancy difference of 15.306.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0022_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0022_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..78e0e01ae6b6ec64e79fc37aa5dfad0d9b428fda
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0022_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0022_bar_q3",
+ "instruction": "How many states are represented in this chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0022_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many states are represented in this chart?",
+ "expected": "5 states (WY, DC, VT, ND, AK).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0022_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0022_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..40f248de805699645ecd2242b99ce8f2c323e0b4
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0022_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0022_line_q3",
+ "instruction": "For the product type 'Lip gloss', which country has the highest sales share?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/line/chart_0022_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For the product type 'Lip gloss', which country has the highest sales share?",
+ "expected": "USA, 52.72%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0022_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0022_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..3da3c53a1d1d4a03998c4742c832adeb63b2e300
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0022_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0022_other_q1",
+ "instruction": "What is the highest value in the calendar data, and on which date does it occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/other/chart_0022_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the highest value in the calendar data, and on which date does it occur?",
+ "expected": "The highest value is 9, occurring on 2020-02-19.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0022_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0022_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..fb5f210792a251220dd2d8abd5b838f06d2fd41d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0022_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0022_pie_q3",
+ "instruction": "Between the 20~29 and 60~69 age groups, which has the larger population value and what are their values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0022_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between the 20~29 and 60~69 age groups, which has the larger population value and what are their values?",
+ "expected": "The 20~29 age group is larger with 43.91, compared to 39.63 for the 60~69 age group.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0023_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0023_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..893285b2f08b117008d038cd95b7e0a3f67f5656
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0023_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0023_bar_q1",
+ "instruction": "What is the total population of ND across all age groups shown in the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0023_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the total population of ND across all age groups shown in the chart?",
+ "expected": "ND has a total population of 138,048 across all listed age groups.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0023_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0023_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..42cba721f3e67d191acba690c5f841b7d2c3c059
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0023_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0023_line_q1",
+ "instruction": "Which baby name had the most births in the US in 1950?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/line/chart_0023_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which baby name had the most births in the US in 1950?",
+ "expected": "Linda",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0023_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0023_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..1d9ed33d549787b1c781a6a50e04e5b3c856aedd
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0023_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0023_line_q2",
+ "instruction": "Which baby name had the most births in the US in 2015?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/line/chart_0023_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which baby name had the most births in the US in 2015?",
+ "expected": "Ashley",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0023_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0023_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..4d397e908d8f39f10de9461529475f72b7698ec0
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0023_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0023_scatter_q1",
+ "instruction": "In the given data, what is the maximum height?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/scatter/chart_0023_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the given data, what is the maximum height?",
+ "expected": "198.1",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0024_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0024_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..5bab2dbb293e8d75ebce0b97717dfc45cd643f9c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0024_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0024_bar_q3",
+ "instruction": "Does the chart's y-axis display absolute population numbers or percentages?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0024_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Does the chart's y-axis display absolute population numbers or percentages?",
+ "expected": "The y-axis shows percentages.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0024_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0024_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..62f39a9dadc51b1ee432eb1d4fade5643d893142
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0024_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0024_line_q2",
+ "instruction": "What is the total number of medals (Gold, Silver, and Bronze combined) in 2008?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/line/chart_0024_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the total number of medals (Gold, Silver, and Bronze combined) in 2008?",
+ "expected": "The total number of medals in 2008 is 110 (36 Gold, 38 Silver, 36 Bronze).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0024_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0024_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..17e20a012456eff3b89135a2df4b49333fc53bf1
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0024_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0024_line_q3",
+ "instruction": "In which year are the counts for all three medal types (Gold, Silver, and Bronze) recorded as null?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/line/chart_0024_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In which year are the counts for all three medal types (Gold, Silver, and Bronze) recorded as null?",
+ "expected": "All three medal types have null counts in 1980.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0024_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0024_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..9ec4b018b9c19127b4d70e45e7d461f1005ce210
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0024_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0024_pie_q2",
+ "instruction": "How many element types are displayed in the pie chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0024_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many element types are displayed in the pie chart?",
+ "expected": "8",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0024_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0024_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..b74db3374e9518f9f883b56499d1d61a56b500a4
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0024_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0024_scatter_q1",
+ "instruction": "In the data, how many cylinders does category 5 have?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/scatter/chart_0024_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the data, how many cylinders does category 5 have?",
+ "expected": "3",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0025_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0025_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..6fe19d8442d26191d12a094a8d946624a9017eb4
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0025_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0025_bar_q2",
+ "instruction": "Among the listed states, which state has the smallest population of people Under 5 Years, and what is that population?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0025_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among the listed states, which state has the smallest population of people Under 5 Years, and what is that population?",
+ "expected": "AK has the smallest Under 5 Years population, with 52,083 people.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0025_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0025_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..c909d58cb1d683835740e728c3361ac1038fbd55
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0025_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0025_box_q1",
+ "instruction": "Which month has the highest median value in the box chart, and what is that median?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/box/chart_0025_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which month has the highest median value in the box chart, and what is that median?",
+ "expected": "May has the highest median value, which is 8500.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0025_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0025_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..ffe81eaec1ac2f016c45791ca7b7bc2bf1700766
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0025_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0025_box_q2",
+ "instruction": "What is the low value for March in the chart data?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/box/chart_0025_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the low value for March in the chart data?",
+ "expected": "The low value for March is 2000.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0025_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0025_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..e074a5ca84e42dba0f433f61ef5262b1f4bf03aa
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0025_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0025_scatter_q2",
+ "instruction": "Among all regions, which region has the highest LifeExpectancy, and what is its value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/scatter/chart_0025_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among all regions, which region has the highest LifeExpectancy, and what is its value?",
+ "expected": "Asia has the highest LifeExpectancy, at 82.603.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0025_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0025_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..4e2acd67c02b82842bf86d18644e285f7222e0f7
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0025_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0025_scatter_q3",
+ "instruction": "Which region has the highest GDP in the chart? What is its GDP?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/scatter/chart_0025_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which region has the highest GDP in the chart? What is its GDP?",
+ "expected": "Europe, with a GDP of 49357.19017.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0026_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0026_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..b360bc9399272b4fa161e01cdc61e578f6d617ea
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0026_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0026_bar_q2",
+ "instruction": "What is the highest recorded number of Democracies in the data, and in which year does it occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/bar/chart_0026_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the highest recorded number of Democracies in the data, and in which year does it occur?",
+ "expected": "The highest recorded number of Democracies is 99 in 2018.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0026_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0026_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..71fdaf0cfa371395e1f5f5b36d67b43a6740c32a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0026_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0026_line_q3",
+ "instruction": "Between 1932 and 1935, in which years did France reach the highest value, and what was it?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/line/chart_0026_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between 1932 and 1935, in which years did France reach the highest value, and what was it?",
+ "expected": "France reached the highest value in 1932 and 1933, both at 1.6.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0026_other_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0026_other_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..9de10aac66e8be4264b133bb880b75beb88e1729
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0026_other_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0026_other_q2",
+ "instruction": "Which task has the same actual start date and actual end date?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/other/chart_0026_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which task has the same actual start date and actual end date?",
+ "expected": "The task \"Meeting\" has the same actual start and end date, both on 2018-02-05.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0026_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0026_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..bf590b5da0d8989b92c02b186f5c57e3755f6338
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0026_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0026_pie_q1",
+ "instruction": "Between iron and aluminum, which element has a lower content and by how many percentage points?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/pie/chart_0026_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between iron and aluminum, which element has a lower content and by how many percentage points?",
+ "expected": "Iron is lower than aluminum by 3.13 percentage points",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0026_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0026_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..9fceef2afec7fcc32cd145cb4468f0576a367659
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0026_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0026_scatter_q1",
+ "instruction": "In the given car dataset, what is the highest horsepower? What is the corresponding miles per gallon?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Vchart/scatter/chart_0026_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the given car dataset, what is the highest horsepower? What is the corresponding miles per gallon?",
+ "expected": "The highest horsepower is 230, and the corresponding miles per gallon is 16.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0027_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0027_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..0ba8efc3adf7c2813641658d278b1141519db587
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0027_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0027_bar_q2",
+ "instruction": "By how many millions did Africa's population increase from 1990 to 2000?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0027_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how many millions did Africa's population increase from 1990 to 2000?",
+ "expected": "182 million",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0027_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0027_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..b747fc7b126678d32e3ec85314613ae1a52179be
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0027_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0027_bar_q3",
+ "instruction": "Across all regions and years shown, what is the highest population value and which region and year does it correspond to?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0027_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all regions and years shown, what is the highest population value and which region and year does it correspond to?",
+ "expected": "4695 million in Asia in 2021",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0027_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0027_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..8ccfc9c82ebe54b17affa47a6d13c8c67013048a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0027_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0027_line_q1",
+ "instruction": "In 2014, which job category has the lowest number of employees among those with data, and what is that number?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/line/chart_0027_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 2014, which job category has the lowest number of employees among those with data, and what is that number?",
+ "expected": "In 2014, the 'Other' category has the lowest number of employees, with 8,989 employees.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0027_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0027_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..635276d1b5382e40065ac8b36400700a72a0e49f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0027_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0027_line_q3",
+ "instruction": "Across all job categories and years shown, what is the maximum number of employees, and which category and year does it correspond to?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/line/chart_0027_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all job categories and years shown, what is the maximum number of employees, and which category and year does it correspond to?",
+ "expected": "The maximum is 171,558 employees in the 'Installation & Developers' category in 2022.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0028_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0028_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..975af30b2b53d28564223b3b7625aaa0acad1442
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0028_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0028_bar_q1",
+ "instruction": "Which country has the highest estimated corn production in 2023, and what is its value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0028_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which country has the highest estimated corn production in 2023, and what is its value?",
+ "expected": "The USA has the highest estimated corn production at 387749 (1000 MT).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0028_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0028_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..51aac7f6dd8cb199690f891687202913aa1f149e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0028_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0028_box_q2",
+ "instruction": "Which month has the highest 'high' value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/box/chart_0028_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which month has the highest 'high' value, and what is that value?",
+ "expected": "February, 1080",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0029_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0029_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..493e507d3e167ffe8f4ca3da57e9e981bae27da4
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0029_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0029_box_q1",
+ "instruction": "Which month has the highest 'high' value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/box/chart_0029_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which month has the highest 'high' value, and what is that value?",
+ "expected": "February, 1080",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0029_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0029_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..540ee5e3c98f83d7d5168118ad6bfefad6f740cf
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0029_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0029_line_q1",
+ "instruction": "In the chart, how many Internet users (in millions) are shown for the year 2010?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/line/chart_0029_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the chart, how many Internet users (in millions) are shown for the year 2010?",
+ "expected": "2025 million",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0029_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0029_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..7ed53bdf328375fa7d44076b55b9eee4d6018618
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0029_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0029_line_q2",
+ "instruction": "According to the chart data, which year has the smallest number of Internet users?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/line/chart_0029_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the chart data, which year has the smallest number of Internet users?",
+ "expected": "1995",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0029_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0029_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..18746fc1ac68e7d0dd383e259f50af02fb6ab694
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0029_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0029_pie_q1",
+ "instruction": "According to the chart, what is Chrome's browser market share in January 2022?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/pie/chart_0029_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the chart, what is Chrome's browser market share in January 2022?",
+ "expected": "61.04%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0030_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0030_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..259f71bee824bc49f4faaf9b3385b5f8805ca9f0
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0030_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0030_bar_q3",
+ "instruction": "What is the total number of medals (gold, silver, and bronze combined) for Canada shown in the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0030_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the total number of medals (gold, silver, and bronze combined) for Canada shown in the chart?",
+ "expected": "Canada has a total of 229 medals.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0030_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0030_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..295f918774e4b322c2004768310aa677fd2cf8ba
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0030_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0030_line_q1",
+ "instruction": "In the chart, what is the atmospheric temperature at an altitude of 40 km?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/line/chart_0030_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the chart, what is the atmospheric temperature at an altitude of 40 km?",
+ "expected": "-22.1°C",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0030_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0030_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..e6519da2d06d0fa91e3f17f02e57d9a76fd6dfcd
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0030_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0030_pie_q2",
+ "instruction": "How many departments are represented in the pie chart data?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/pie/chart_0030_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many departments are represented in the pie chart data?",
+ "expected": "Five departments are represented.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0030_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0030_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..1b7a51296480191dbb667bb489ccc576948a8bb3
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0030_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0030_pie_q3",
+ "instruction": "What is the percentage value for the Sales department?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/pie/chart_0030_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the percentage value for the Sales department?",
+ "expected": "20.2%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0030_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0030_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..8bdf0057ff2912e8f1110a4dc004082290691a84
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0030_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0030_scatter_q1",
+ "instruction": "Which country in the chart has the highest carbon emissions in 2022, and what is its value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/scatter/chart_0030_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which country in the chart has the highest carbon emissions in 2022, and what is its value?",
+ "expected": "China, with 12667.4m CO₂.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0031_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0031_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..11f432b40df68f5cdaf250ff013ede10b4b135bf
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0031_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0031_bar_q3",
+ "instruction": "Which month has the smallest temperature range?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0031_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which month has the smallest temperature range?",
+ "expected": "August with a range of 13.4°C",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0031_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0031_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..e6aa36bf2bde3702038af9ce78d44fcf4680854d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0031_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0031_pie_q3",
+ "instruction": "Which browser has the highest market share in February 2022?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/pie/chart_0031_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which browser has the highest market share in February 2022?",
+ "expected": "Chrome",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0031_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0031_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..e827eab119b64dc0f465a3e2968fd5039d140bd2
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0031_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0031_scatter_q3",
+ "instruction": "How many light-years from Earth is Proxima Centauri b in this chart’s data table?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/scatter/chart_0031_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many light-years from Earth is Proxima Centauri b in this chart’s data table?",
+ "expected": "4 light-years",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0032_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0032_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..4a0958fbb6e3b3edc216aa8f9ac541850ab794b5
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0032_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0032_heatmap_q2",
+ "instruction": "At 11am, which weekday from Sunday to Wednesday has the highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/heatmap/chart_0032_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "At 11am, which weekday from Sunday to Wednesday has the highest value, and what is that value?",
+ "expected": "At 11am, Tuesday has the highest value, which is 10,425.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0032_heatmap_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0032_heatmap_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..b9208d0e1d0f8d5483cece7c1c7c857bb7ab6fea
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0032_heatmap_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0032_heatmap_q3",
+ "instruction": "According to the chart configuration, do higher data values correspond to the start or the end of the horizontal heat legend?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/heatmap/chart_0032_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the chart configuration, do higher data values correspond to the start or the end of the horizontal heat legend?",
+ "expected": "Higher data values correspond to the start of the horizontal heat legend.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0032_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0032_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..949dd64597b079cb370ca063cea03d109e58ba78
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0032_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0032_line_q1",
+ "instruction": "Between 1960 and 2023, in which year does the 'Inflation' series reach its highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/line/chart_0032_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between 1960 and 2023, in which year does the 'Inflation' series reach its highest value, and what is that value?",
+ "expected": "In 1980, with an inflation rate of 13.5492019749685%.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0033_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0033_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..047ce679530e5ad061f161f2cd6114a2f6f53873
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0033_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0033_bar_q1",
+ "instruction": "In Jane's data, which fruit has the lowest value? What is the value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0033_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In Jane's data, which fruit has the lowest value? What is the value?",
+ "expected": "Pears, with a value of -3",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0033_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0033_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..395dd978bbe6d8e5692b6806650f75e981151ebc
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0033_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0033_box_q1",
+ "instruction": "Which position has the highest median yearly gross salary, and what is that median value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/box/chart_0033_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which position has the highest median yearly gross salary, and what is that median value?",
+ "expected": "Engineering Manager has the highest median salary at 85000.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0033_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0033_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..8b7e65b2798baab7ad6cb9dda38d1ebc84335c73
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0033_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0033_line_q3",
+ "instruction": "Among the plotted data points, at what time does the air temperature first become negative?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/line/chart_0033_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among the plotted data points, at what time does the air temperature first become negative?",
+ "expected": "It first becomes negative at 2026-02-24T15:00:00Z, when the temperature is -0.2°C.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0033_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0033_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..ed9d9980a8b2345613d5363e2f5301e2f2d8e3e5
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0033_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0033_other_q1",
+ "instruction": "Which activity has the highest value on the radar chart, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/other/chart_0033_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which activity has the highest value on the radar chart, and what is that value?",
+ "expected": "Sleeping has the highest value, at 90.68715706.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0033_other_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0033_other_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..a76e5a81bc5a25fff186d8bdb9adc0980a8db19d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0033_other_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0033_other_q2",
+ "instruction": "By how much does the value for Running exceed the value for Coding?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/other/chart_0033_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how much does the value for Running exceed the value for Coding?",
+ "expected": "Running exceeds Coding by 43.73628258.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0033_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0033_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..cc2b825dc730a87295c746f83d512662ce048740
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0033_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0033_other_q3",
+ "instruction": "How many activities have values greater than 50, and which activities are they?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/other/chart_0033_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many activities have values greater than 50, and which activities are they?",
+ "expected": "Four activities have values greater than 50: Eating Dinner, Sleeping, Designing Graphics, and Running.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0033_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0033_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..72a34dcd1bbf294d659b3b37da0b473ca0a1b885
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0033_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0033_pie_q3",
+ "instruction": "Among Safari, Internet Explorer, and Other, which browser category has the smallest market share, and what is its value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/pie/chart_0033_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among Safari, Internet Explorer, and Other, which browser category has the smallest market share, and what is its value?",
+ "expected": "Internet Explorer with 2.02%.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0034_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0034_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..75c8007e620a890405a43eb961b4a634c2714d6b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0034_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0034_bar_q1",
+ "instruction": "What is the total percent market share of Chrome in January 2022?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0034_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the total percent market share of Chrome in January 2022?",
+ "expected": "63.06% (rounded to 63.1%)",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0034_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0034_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..98d681cc107b486bd5673030f6b4e2c40a805709
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0034_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0034_bar_q2",
+ "instruction": "Which browser has the smallest market share among Chrome, Safari, Firefox, Edge, Opera, Internet Explorer, and Other, and what is that share?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0034_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which browser has the smallest market share among Chrome, Safari, Firefox, Edge, Opera, Internet Explorer, and Other, and what is that share?",
+ "expected": "Internet Explorer with 0.45% (rounded to 0.5%)",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0034_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0034_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..184953d231861536f0977bc0dad299d5d63627c0
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0034_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0034_heatmap_q2",
+ "instruction": "Comparing the y-axis categories \"Critical\" and \"Very good\", which has the higher total value across all x-axis categories, and by how much?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/heatmap/chart_0034_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Comparing the y-axis categories \"Critical\" and \"Very good\", which has the higher total value across all x-axis categories, and by how much?",
+ "expected": "The \"Critical\" row has the higher total value. Its total is 126 compared to 96 for \"Very good\", so it is higher by 30.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0034_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0034_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..35823075dfd5c04e565c8f57fe1c7839b7941f94
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0034_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0034_pie_q1",
+ "instruction": "Among privately registered vehicles in Norway in 2020, which fuel type had the most vehicles?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/pie/chart_0034_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among privately registered vehicles in Norway in 2020, which fuel type had the most vehicles?",
+ "expected": "Diesel (1229600 vehicles)",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0034_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0034_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..18b4d4f6124eacb18a178edf3b346cfb41c596d2
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0034_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0034_scatter_q1",
+ "instruction": "Among all tasks, which task has the smallest value? What is its value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/scatter/chart_0034_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among all tasks, which task has the smallest value? What is its value?",
+ "expected": "The task 'Bike trip' has the smallest value, at 1.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0034_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0034_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..62f58cca7bdd1960119e61e00d0cfad982e22f70
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0034_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0034_scatter_q3",
+ "instruction": "Between the tasks 'Develop an android App' and 'Document the API', which task has the larger value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/scatter/chart_0034_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between the tasks 'Develop an android App' and 'Document the API', which task has the larger value?",
+ "expected": "The task 'Develop an android App' has the larger value, at 9 ('Document the API' is 7).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0035_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0035_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..899c0d2f22910f4e60b0f41e2372f9f0ed943d43
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0035_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0035_bar_q1",
+ "instruction": "Which branch has the highest value in the \"Profit Optimized\" series, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0035_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which branch has the highest value in the \"Profit Optimized\" series, and what is that value?",
+ "expected": "Tokyo, with a profit optimized value of 208.5 million.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0035_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0035_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..071dc2fd903519addab8bf7eeabb04d77838ec71
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0035_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0035_bar_q3",
+ "instruction": "Among all branches in the \"Profit\" series, which branch has the lowest profit, and what is the profit value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0035_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among all branches in the \"Profit\" series, which branch has the lowest profit, and what is the profit value?",
+ "expected": "San Francisco, with a profit of 178.8 million.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0035_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0035_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..89a4e5ca26eb43508ca612008277b72016aa717b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0035_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0035_box_q2",
+ "instruction": "What is the median value of category \"MBL1-HaeIII-C?\" in the data?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/box/chart_0035_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the median value of category \"MBL1-HaeIII-C?\" in the data?",
+ "expected": "The median value of category \"MBL1-HaeIII-C?\" is 384.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0035_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0035_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..308f3b71425feb1fc1787ddfa565df444cceca05
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0035_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0035_pie_q1",
+ "instruction": "Which country shown has the largest total area, and what is that area?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/pie/chart_0035_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which country shown has the largest total area, and what is that area?",
+ "expected": "France, with an area of 551,695 square km.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0035_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0035_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..3506d5478f2b4332da7644a69737d82926a3a71d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0035_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0035_pie_q3",
+ "instruction": "List all the countries in the chart ordered by increasing population density.",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/pie/chart_0035_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "List all the countries in the chart ordered by increasing population density.",
+ "expected": "Spain (95), France (118), Poland (131), Czech Republic (136), Italy (198), Switzerland (224), Germany (238) people per square km.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0036_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0036_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..af2c39f92a5d1308cb5ab36036dec5ddc315d4b3
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0036_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0036_other_q1",
+ "instruction": "According to the chord chart data, what is the flow value from London to Paris?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/other/chart_0036_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the chord chart data, what is the flow value from London to Paris?",
+ "expected": "The flow value from London to Paris is 41.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0036_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0036_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..3ea5e1c9a26f63f6f7fd5a082482c184d0ea2f40
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0036_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0036_pie_q1",
+ "instruction": "What is the browser share percentage of Firefox in January 2022?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/pie/chart_0036_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the browser share percentage of Firefox in January 2022?",
+ "expected": "5.52%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0036_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0036_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..8251a8511d1a32d17d1a2d788a7492b8187a8df6
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0036_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0036_pie_q2",
+ "instruction": "Which browser has the largest share in January 2022, and what is that share?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/pie/chart_0036_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which browser has the largest share in January 2022, and what is that share?",
+ "expected": "Chrome with 73.86%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0036_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0036_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..b5666e62ac090281cc4b6022dd234e9bc78466a1
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0036_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0036_pie_q3",
+ "instruction": "Is Edge's share larger than the combined share of Safari and Internet Explorer?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/pie/chart_0036_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Is Edge's share larger than the combined share of Safari and Internet Explorer?",
+ "expected": "Yes, Edge has 11.97% while Safari and Internet Explorer together have 4.88%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0037_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0037_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..2ef34f4666106ecd01c2102b2cd387f6114ec496
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0037_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0037_bar_q2",
+ "instruction": "Which two teams have the same total number of major trophies, and what is that total?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0037_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which two teams have the same total number of major trophies, and what is that total?",
+ "expected": "Chelsea and Liverpool, both with 15 trophies.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0037_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0037_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..7c919a5ffbbb4cbebcdefeaddd2966710b4d99f4
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0037_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0037_bar_q3",
+ "instruction": "By how many does Arsenal's FA Cup trophy count exceed its BPL trophy count?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0037_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how many does Arsenal's FA Cup trophy count exceed its BPL trophy count?",
+ "expected": "By 11 trophies.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0037_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0037_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..81babfdf3e52d936766cb2fc26e8b7c56d104428
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0037_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0037_heatmap_q1",
+ "instruction": "Which leaf node has the highest value in the treemap, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/heatmap/chart_0037_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which leaf node has the highest value in the treemap, and what is that value?",
+ "expected": "The leaf node E1 has the highest value, which is 687.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0037_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0037_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..5f53823e22c1a54bae2fe80d42c781cceeacbbcf
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0037_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0037_other_q3",
+ "instruction": "What is the difference between the value of Rachel's connection to Ross and her connection to Joey?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/other/chart_0037_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the difference between the value of Rachel's connection to Ross and her connection to Joey?",
+ "expected": "Rachel's connection to Ross has a value of 80 and to Joey 30, so the difference is 50.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0037_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0037_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..10eb55261ff3b7a2dbb67445e13a01d7a766502d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0037_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0037_pie_q3",
+ "instruction": "Is the share of EV registrations larger or smaller than petrol registrations, and by how many percentage points?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/pie/chart_0037_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Is the share of EV registrations larger or smaller than petrol registrations, and by how many percentage points?",
+ "expected": "The EV share is smaller than petrol by 2.5 percentage points.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0037_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0037_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..9e6f16a124773fde3f9ae80f521233af17e10e17
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0037_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0037_scatter_q2",
+ "instruction": "In the year 2000, which bubble series has higher sales?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/scatter/chart_0037_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the year 2000, which bubble series has higher sales?",
+ "expected": "The 0th bubble series has higher sales (1100 is higher than 900).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0037_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0037_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..6c52ed3aeca60e0c19be753c8dd1f7410d6aa673
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0037_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0037_scatter_q3",
+ "instruction": "Which bubble series uses a hatchFill effect in the normal state?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/scatter/chart_0037_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which bubble series uses a hatchFill effect in the normal state?",
+ "expected": "The 1st bubble series.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0038_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0038_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..cf98eb66ddef4e1d515b14225847e5ed97374149
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0038_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0038_bar_q3",
+ "instruction": "How many cities in the chart have a 2021 population greater than 20 million?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0038_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many cities in the chart have a 2021 population greater than 20 million?",
+ "expected": "9",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0038_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0038_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..7c81837d3f29349c6142f2b7255bc1da92870c07
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0038_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0038_box_q2",
+ "instruction": "Which professions have the highest 'high' salary value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/box/chart_0038_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which professions have the highest 'high' salary value, and what is that value?",
+ "expected": "ML Engineer and Product Manager, both with a high value of 120000.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0038_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0038_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..aa656c9ed8db6a08b30bbb1c5c6c3d68a6d9c36d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0038_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0038_other_q1",
+ "instruction": "Which connection in the chord chart has the highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/other/chart_0038_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which connection in the chord chart has the highest value, and what is that value?",
+ "expected": "The connection from C to E has the highest value, which is 14.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0039_box_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0039_box_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..b930739ca59172526a595524bec0f47eb1d7f121
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0039_box_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0039_box_q3",
+ "instruction": "Which types of plots are combined in this chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0039_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which types of plots are combined in this chart?",
+ "expected": "The chart combines a scatter plot of sepal_length vs sepal_width, a histogram of sepal_length, and a box plot of sepal_width.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0039_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0039_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..5a88685b37df51f8f923b6dedb399b6fc0c2174e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0039_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0039_pie_q2",
+ "instruction": "What is the total sum of the values of all slices A to E?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/pie/chart_0039_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the total sum of the values of all slices A to E?",
+ "expected": "The total sum of the values is 1676120.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0040_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0040_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..f8d53bcd386de97172d8c99d451e41971343dbcc
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0040_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0040_bar_q1",
+ "instruction": "Among these top five countries, which country has the highest total number of Winter Olympic medals, and what is the total?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0040_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among these top five countries, which country has the highest total number of Winter Olympic medals, and what is the total?",
+ "expected": "Norway has the most, with a total of 385 medals.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0040_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0040_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..59813ecc5b72150e3f1ed5b48dbd42c205dbbc7f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0040_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0040_bar_q3",
+ "instruction": "Did the United States win more silver medals than gold medals at the Winter Olympics, and by how many?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0040_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Did the United States win more silver medals than gold medals at the Winter Olympics, and by how many?",
+ "expected": "Yes, silver medals exceed gold medals by 9.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0040_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0040_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..4f36db2cdb37c7c4f88ed4e8a3f65656261be84d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0040_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0040_heatmap_q2",
+ "instruction": "According to the hover template, which three fields are shown when hovering over a bin, and in what order are they displayed?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/heatmap/chart_0040_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the hover template, which three fields are shown when hovering over a bin, and in what order are they displayed?",
+ "expected": "The hover template displays the fields in this order: total_bill, tip, and then count.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0040_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0040_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..ff4601d60450f1e469c2f9b63fce5c33c47e5e3c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0040_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0040_line_q2",
+ "instruction": "What is the interest rate value for Q4 2016?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/line/chart_0040_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the interest rate value for Q4 2016?",
+ "expected": "4%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0040_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0040_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..85cde1057b554f76844165ce42bb50e718341f08
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0040_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0040_pie_q1",
+ "instruction": "Which category has the largest value in the pie chart, and what is its value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/pie/chart_0040_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which category has the largest value in the pie chart, and what is its value?",
+ "expected": "Category B, with a value of 721630.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0041_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0041_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..26b91a18d7a87c30758c2ff30969e0dd97f59fba
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0041_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0041_bar_q2",
+ "instruction": "Does the number of conventional vehicles increase every month from January to May, and what are the values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0041_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Does the number of conventional vehicles increase every month from January to May, and what are the values?",
+ "expected": "Yes; the numbers are 12,213 in January, 12,721 in February, 15,242 in March, 16,518 in April, and 25,037 in May.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0041_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0041_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..3e052f58f745aab89f091482ee0eacd0ba0de1dd
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0041_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0041_box_q2",
+ "instruction": "How many total_bill values are greater than 42 in this chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0041_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many total_bill values are greater than 42 in this chart?",
+ "expected": "There are 7 total_bill values greater than 42.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0041_box_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0041_box_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..d26884db5d83d33ca863138f20f32c53cb6f6a4e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0041_box_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0041_box_q3",
+ "instruction": "What is the label of the y-axis in this chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0041_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the label of the y-axis in this chart?",
+ "expected": "The y-axis is labeled \"total_bill.\"",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0041_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0041_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..9d9a466e4c0cb3570efceae388a73a63614e3423
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0041_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0041_line_q1",
+ "instruction": "Which month has the highest value in the chart, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/line/chart_0041_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which month has the highest value in the chart, and what is that value?",
+ "expected": "March has the highest value, which is 18000.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0041_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0041_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..f91a4c22a479890abeb74a6dfae8ed1d5b466512
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0041_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0041_line_q2",
+ "instruction": "What is the difference between the highest and lowest values shown in the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/line/chart_0041_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the difference between the highest and lowest values shown in the chart?",
+ "expected": "The difference is 9000.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0041_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0041_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..77955fd0c4a3c1cc30a266185c005fa2c6389ce8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0041_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0041_line_q3",
+ "instruction": "Is the value in April greater or less than in February, and by how much?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/line/chart_0041_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Is the value in April greater or less than in February, and by how much?",
+ "expected": "The value in April is 1000 less than in February.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0041_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0041_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..58e70185dbe8d063df93b3d1af859f9da3f79ed1
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0041_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0041_other_q1",
+ "instruction": "Which task has the longest duration, and what is its duration value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/other/chart_0041_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which task has the longest duration, and what is its duration value?",
+ "expected": "The task 'Testing' has the longest duration with a duration of 5.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0041_other_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0041_other_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..a3444737e88897413b1422ce3bf4b9ea9e486f46
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0041_other_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0041_other_q2",
+ "instruction": "Among tasks that have non-zero progress, which task shows the lowest progress value and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/other/chart_0041_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among tasks that have non-zero progress, which task shows the lowest progress value and what is that value?",
+ "expected": "The task 'Planning' has the lowest non-zero progress, with a progress value of 0.2.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0041_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0041_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..3e542ee8a0b41550e919a4163e554b1db2c20ec7
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0041_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0041_other_q3",
+ "instruction": "How many tasks have a duration of 0, and what are their names?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/other/chart_0041_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many tasks have a duration of 0, and what are their names?",
+ "expected": "Two tasks have a duration of 0: 'Idea' and 'Finalization'.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0041_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0041_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..d7e0300f96da7518ca0a8dcaa4d7316df3212726
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0041_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0041_pie_q1",
+ "instruction": "Which category has the smallest value in the pie chart, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/pie/chart_0041_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which category has the smallest value in the pie chart, and what is that value?",
+ "expected": "Category D has the smallest value, which is 78662.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0041_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0041_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..51d8306939965faf521a2250fb0d6277e31489d2
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0041_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0041_scatter_q1",
+ "instruction": "In the second bubble series (series_1), what is the largest data value and which region codes have this value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/scatter/chart_0041_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the second bubble series (series_1), what is the largest data value and which region codes have this value?",
+ "expected": "The largest value is 3.5, for regions GB.RT and GB.IW.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0042_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0042_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..4d9ed5dc7ee9a30bfd41445267e78483aa8e8efe
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0042_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0042_bar_q2",
+ "instruction": "How did the domestic passenger volume for Air change from 2019 to 2021?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0042_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How did the domestic passenger volume for Air change from 2019 to 2021?",
+ "expected": "It fell from 13 in 2019 to 8 in 2021, a decrease of 5.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0042_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0042_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..8520f2b1c3cee8560213820ca1071d9142b4525b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0042_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0042_bar_q3",
+ "instruction": "In 2021, how are the transport modes ranked from highest to lowest by domestic passenger volume?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0042_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 2021, how are the transport modes ranked from highest to lowest by domestic passenger volume?",
+ "expected": "In 2021, from largest to smallest: Road (307), Rail (156), Sea (41), Air (8).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0042_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0042_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..14297790668b85f92d91c3390642cf7543354c66
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0042_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0042_box_q2",
+ "instruction": "What is the maximum total_bill value shown in the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0042_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the maximum total_bill value shown in the chart?",
+ "expected": "The maximum total_bill value is 50.81.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0042_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0042_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..c8475e478760cde1521758d89af0075138668db8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0042_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0042_other_q1",
+ "instruction": "Which phase has the longest duration, and what is that duration?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/other/chart_0042_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which phase has the longest duration, and what is that duration?",
+ "expected": "The Testing phase has the longest duration, with a duration of 5.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0042_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0042_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..8c751896fbeed4a4c820d9f817c759aeaa2f894b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0042_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0042_other_q3",
+ "instruction": "According to the linkTo dependencies, which phase is directly linked to start after Testing?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/other/chart_0042_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the linkTo dependencies, which phase is directly linked to start after Testing?",
+ "expected": "Finalization is directly linked to start after Testing.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0043_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0043_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..b0e18ebb698a1813520b3b1465fa6dfd733d8d66
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0043_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0043_line_q1",
+ "instruction": "According to the chart data, what is the Debt-To-Income ratio for Beechum County in 2006?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/line/chart_0043_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the chart data, what is the Debt-To-Income ratio for Beechum County in 2006?",
+ "expected": "In 2006, Beechum County has a Debt-To-Income ratio of 62%.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0043_other_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0043_other_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..166d666713beca2e2fa3ce8adad61522f9215f0a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0043_other_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0043_other_q2",
+ "instruction": "What is the value on 2026-06-27?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/other/chart_0043_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the value on 2026-06-27?",
+ "expected": "109",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0043_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0043_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..4ac2abc3a878c040eebc9e676fafc90a58dca55c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0043_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0043_scatter_q1",
+ "instruction": "What is the maximum 'value' among all points in the scatter bubble chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/scatter/chart_0043_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the maximum 'value' among all points in the scatter bubble chart?",
+ "expected": "637",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0043_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0043_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..24922931c3f9823fe3c8fcc8b71a658065f5908c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0043_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0043_scatter_q3",
+ "instruction": "Between the points at x = 2.5 and x = 3.2, which one has the larger bubble size?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/scatter/chart_0043_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between the points at x = 2.5 and x = 3.2, which one has the larger bubble size?",
+ "expected": "The point at x = 2.5 has the larger bubble size.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0044_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0044_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..b346a84f5d19bcf2be8a158b1715af7be48a4ff2
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0044_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0044_bar_q1",
+ "instruction": "Which individual force has the largest decelerating effect (most negative value), and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0044_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which individual force has the largest decelerating effect (most negative value), and what is that value?",
+ "expected": "Atmospheric Drag (Re-entry), with a value of -9.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0044_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0044_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..ae2f12341e6064141f5898012102ac53d3709274
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0044_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0044_bar_q2",
+ "instruction": "What are the total positive and total negative forces shown in the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0044_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What are the total positive and total negative forces shown in the chart?",
+ "expected": "The total positive force is 18 and the total negative force is -19.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0044_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0044_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..f4a1c28bf512c9d3b81dbee1a88654da2caae6be
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0044_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0044_bar_q3",
+ "instruction": "What is the maximum positive force value shown in the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Highcharts/bar/chart_0044_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the maximum positive force value shown in the chart?",
+ "expected": "15",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0044_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0044_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..97f25c4f720304ef7d85b0ae196cbe7eb6d233b5
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0044_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0044_box_q1",
+ "instruction": "According to the chart data, which smoker group ('Yes' or 'No') has the higher maximum total_bill value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0044_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the chart data, which smoker group ('Yes' or 'No') has the higher maximum total_bill value, and what is that value?",
+ "expected": "The 'Yes' smoker group has the higher maximum total_bill, with a value of 50.81.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0044_box_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0044_box_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..fcee9d53d45198c410a9d8dd1014b8ec2674ec06
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0044_box_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0044_box_q3",
+ "instruction": "Considering all data points in the chart, which distinct day categories appear on the x-axis?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0044_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Considering all data points in the chart, which distinct day categories appear on the x-axis?",
+ "expected": "The distinct day categories are Thur, Fri, Sat, and Sun.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0044_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0044_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..cf17bf6f85da04ef064db83fd2c8b3c29b473c50
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0044_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0044_heatmap_q2",
+ "instruction": "According to the colorbar title, what does the color in the heatmap represent?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/heatmap/chart_0044_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the colorbar title, what does the color in the heatmap represent?",
+ "expected": "The color represents the \"count\" of observations in each bin.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0044_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0044_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..a1ceba6fd02a1a84a7d24f3e5f6c5c8d72e55bb8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0044_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0044_line_q3",
+ "instruction": "How many months in the chart have profit growth rates greater than or equal to 60%?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/line/chart_0044_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many months in the chart have profit growth rates greater than or equal to 60%?",
+ "expected": "There are 3 months in total (May, Jun, and Aug) with profit growth rates greater than or equal to 60%.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0044_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0044_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..58e245e76c4fea4334ed1da9acd0b60f3247185d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0044_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0044_other_q1",
+ "instruction": "What is the minimum value shown in the series, and at which date (timestamp) does it occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/other/chart_0044_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the minimum value shown in the series, and at which date (timestamp) does it occur?",
+ "expected": "The minimum value is 81, and it occurs at date 2022-5-24.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0044_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0044_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..6a6dd6a5cd4e3946d96b22dcf87ffbb8e5960d91
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0044_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0044_pie_q1",
+ "instruction": "In this pie chart, which category corresponds to the sector with the largest value, and what is its value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/pie/chart_0044_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In this pie chart, which category corresponds to the sector with the largest value, and what is its value?",
+ "expected": "Category B, with a value of 721630.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0044_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0044_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..1147377788e7e2e7bc2ae430c89e56c2fb27ae26
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0044_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0044_scatter_q2",
+ "instruction": "In which year is the data value the smallest among the plotted points?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/scatter/chart_0044_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In which year is the data value the smallest among the plotted points?",
+ "expected": "2003",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0044_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0044_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..962814dc575c22f8a17eb2806911baa185bf51eb
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0044_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0044_scatter_q3",
+ "instruction": "How many data points (bubbles) are plotted in this vertical bubble chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/scatter/chart_0044_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many data points (bubbles) are plotted in this vertical bubble chart?",
+ "expected": "5",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0045_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0045_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..fd5eb92568b97d4b4e3605b9f88c231e3bde33ef
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0045_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0045_bar_q1",
+ "instruction": "Which categories have the highest initial value and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/bar/chart_0045_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which categories have the highest initial value and what is that value?",
+ "expected": "P3 and P5 both have the highest initial value of 15.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0045_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0045_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..1d8d9bf8bf859761fdb6f26580c0e90ad4791e3a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0045_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0045_bar_q2",
+ "instruction": "According to the chart’s click behavior, how does a column’s value change when it is clicked once?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/bar/chart_0045_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the chart’s click behavior, how does a column’s value change when it is clicked once?",
+ "expected": "Each click increases that column’s value by 5.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0045_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0045_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..b6e9c04952d3f4d0e6c979a0074c77bc1b919afa
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0045_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0045_box_q1",
+ "instruction": "What is the title of the legend that groups the three box plots?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0045_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the title of the legend that groups the three box plots?",
+ "expected": "The legend title is \"quartilemethod\".",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0046_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0046_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..1ab81712f765aa84d503629f7092b286832551b5
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0046_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0046_heatmap_q2",
+ "instruction": "How many cells have values greater than or equal to 15?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/heatmap/chart_0046_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many cells have values greater than or equal to 15?",
+ "expected": "7",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0047_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0047_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..0c209b99d379b509850a819a4643a8521bd14966
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0047_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0047_bar_q2",
+ "instruction": "By how much are John's sales higher than Mary's?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/bar/chart_0047_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how much are John's sales higher than Mary's?",
+ "expected": "1000",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0048_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0048_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..a3721d9107ffc21f869e416079e38a499bdf8cf4
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0048_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0048_box_q2",
+ "instruction": "What is the maximum x value displayed across both box plots, and in which box plot does it occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0048_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the maximum x value displayed across both box plots, and in which box plot does it occur?",
+ "expected": "The maximum x value is 3.895889, and it occurs in the second box plot.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0048_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0048_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..4e46e7c71c0eb0020459fa9008fc378f27ce3a9a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0048_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0048_heatmap_q1",
+ "instruction": "In the top-left heatmap (using xaxis \"x\" and yaxis \"y\"), how many data points have x=2 and y between 2 and 3?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/heatmap/chart_0048_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the top-left heatmap (using xaxis \"x\" and yaxis \"y\"), how many data points have x=2 and y between 2 and 3?",
+ "expected": "There are 2 data points.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0048_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0048_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..7ad25fc89e7dc7f436f71f514e238a010eba6d7c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0048_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0048_scatter_q3",
+ "instruction": "Which data point has the largest bubble size, and what is that maximum size?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/scatter/chart_0048_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which data point has the largest bubble size, and what is that maximum size?",
+ "expected": "The data point at x = 3, y = 7 has the largest bubble size, which is 208.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0049_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0049_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..510da36dc35c4cb248d88bacfc96ffa20c4acc34
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0049_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0049_line_q2",
+ "instruction": "During which hour is the highest number of total support requests recorded, and what is that number?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/line/chart_0049_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "During which hour is the highest number of total support requests recorded, and what is that number?",
+ "expected": "At 18:00 with 64 support requests",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0049_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0049_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..40abc3d09232fecc98ecb6ba7f1de4044e853cf6
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0049_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0049_scatter_q1",
+ "instruction": "Among these data, what is the title of the video with the highest Views?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/scatter/chart_0049_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among these data, what is the title of the video with the highest Views?",
+ "expected": "Baby Shark Dance | #babyshark Most Viewed Video | Animal Songs | PINKFONG Songs for Children",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0049_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0049_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..d9ac7c46528570f91265f5ba0c70b0ea21ac5a8f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0049_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0049_scatter_q3",
+ "instruction": "What is the tick interval set for the Y-axis (Views) in the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/scatter/chart_0049_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the tick interval set for the Y-axis (Views) in the chart?",
+ "expected": "2000000000",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0050_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0050_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..446e985b89407d4be4a0c8887148fc71c35ef143
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0050_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0050_bar_q1",
+ "instruction": "Which manager has the highest sales in 2016 and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/bar/chart_0050_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which manager has the highest sales in 2016 and what is that value?",
+ "expected": "Peter has the highest sales in 2016 with 16500.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0050_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0050_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..2be14228ef81ec52910c30ba7ec65d78c69e29b1
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0050_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0050_box_q1",
+ "instruction": "How many box plot traces are displayed in the chart, and what are their names?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0050_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many box plot traces are displayed in the chart, and what are their names?",
+ "expected": "There are three box plot traces: \"Linear Quartile Mode\", \"Inclusive Quartile Mode\", and \"Exclusive Quartile Mode\".",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0050_box_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0050_box_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..bc0b455c104c12a1f704cff070c6308ea515f5b4
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0050_box_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0050_box_q3",
+ "instruction": "What is the median value displayed in the 'Exclusive Quartile Mode' box plot?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0050_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the median value displayed in the 'Exclusive Quartile Mode' box plot?",
+ "expected": "5",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0050_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0050_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..0e2358e7ffb2bc10309f777951590d8d26bab7e3
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0050_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0050_line_q1",
+ "instruction": "In which month does the '2017 (Forecast)' series reach its highest temperature, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/line/chart_0050_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In which month does the '2017 (Forecast)' series reach its highest temperature, and what is that value?",
+ "expected": "In July, with a value of 33.5.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0051_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0051_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..49c92f4fc58441c781a3cc82865bf6f664dbc0e6
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0051_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0051_box_q2",
+ "instruction": "Comparing Sample A and Sample B, which sample has more data points greater than 2?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0051_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Comparing Sample A and Sample B, which sample has more data points greater than 2?",
+ "expected": "Sample B has more data points greater than 2.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0051_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0051_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..2a8173f14e07acf8ede2526153f3692200ccd106
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0051_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0051_other_q3",
+ "instruction": "What is the combined population of Nigeria, Ethiopia, and Egypt as listed in the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/other/chart_0051_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the combined population of Nigeria, Ethiopia, and Egypt as listed in the chart?",
+ "expected": "The combined population of Nigeria, Ethiopia, and Egypt is 380,643,086.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0052_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0052_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..1578a88368b0529396787e412c4cb0ed98a5d8ad
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0052_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0052_box_q1",
+ "instruction": "What is the minimum y-value used in the 'Only Mean' box trace?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0052_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the minimum y-value used in the 'Only Mean' box trace?",
+ "expected": "The minimum y-value is 0.11.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0052_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0052_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..5eacaa47095759da62dd8ca9f5ff0b4c8b226027
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0052_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0052_scatter_q2",
+ "instruction": "In Dataset 1, how many points have both x > 60 and y > 60?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/scatter/chart_0052_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In Dataset 1, how many points have both x > 60 and y > 60?",
+ "expected": "Dataset 1 has 2 points with both x > 60 and y > 60.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0053_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0053_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..86e45bbffde89e926c1302bf82a615db981f7b63
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0053_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0053_heatmap_q1",
+ "instruction": "What percentage of all cells have index value 7?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/heatmap/chart_0053_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What percentage of all cells have index value 7?",
+ "expected": "There are 22 cells with index 7 out of 100 total cells, so 22% of the cells have index value 7.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0053_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0053_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..46094d9b485cf546d0b60d63f7d87fab034c66ee
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0053_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0053_heatmap_q2",
+ "instruction": "Which index value occurs most frequently, and by how many cells does it exceed the second most frequent index value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/heatmap/chart_0053_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which index value occurs most frequently, and by how many cells does it exceed the second most frequent index value?",
+ "expected": "Index value 7 occurs most frequently with 22 cells, exceeding the second most frequent value 3, which has 15 cells, by 7 cells.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0053_heatmap_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0053_heatmap_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..54de6cdb5af2eaa55e115ec650b1a68ab178233c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0053_heatmap_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0053_heatmap_q3",
+ "instruction": "From y = 9 down to y = 0 at x = 0, what is the sequence of index values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/heatmap/chart_0053_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "From y = 9 down to y = 0 at x = 0, what is the sequence of index values?",
+ "expected": "At x = 0, the index values from y = 9 down to y = 0 are 0, 1, 2, 3, 4, 5, 6, 7, 7, and 8.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0053_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0053_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..9d374764f2fa2fb2f5115f3fec49a808d3d79f98
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0053_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0053_pie_q2",
+ "instruction": "What percentage of the total votes did Red receive?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/pie/chart_0053_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What percentage of the total votes did Red receive?",
+ "expected": "Red received 12 out of 44 total votes, which is approximately 27.3%.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0053_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0053_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..f27849e1c3ce816264cde103cf9ca2ab7bd0e5fb
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0053_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0053_scatter_q1",
+ "instruction": "Across both Dataset 1 and Dataset 2, what is the highest y-value plotted, and which dataset does that point belong to?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/scatter/chart_0053_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across both Dataset 1 and Dataset 2, what is the highest y-value plotted, and which dataset does that point belong to?",
+ "expected": "The highest y-value is 92.90552126, and it belongs to Dataset 2.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0053_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0053_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..6c93116460809975e145e90cf9831a79fa620caa
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0053_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0053_scatter_q2",
+ "instruction": "How many points in Dataset 1 lie in the top-right quadrant (both x and y positive)?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/scatter/chart_0053_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many points in Dataset 1 lie in the top-right quadrant (both x and y positive)?",
+ "expected": "Dataset 1 has 2 points in the top-right quadrant.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0054_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0054_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..5d073bc70e1488c045e5c92dab5edb509a22b1ea
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0054_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0054_bar_q3",
+ "instruction": "What is the numerical difference between the total stacked values of Winter and Spring?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/bar/chart_0054_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the numerical difference between the total stacked values of Winter and Spring?",
+ "expected": "6",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0054_box_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0054_box_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..eaab63ef2402d1413828036c061832ac15cff89d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0054_box_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0054_box_q3",
+ "instruction": "What is the title of the y-axis on this chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0054_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the title of the y-axis on this chart?",
+ "expected": "The y-axis is titled \"normalized moisture\".",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0054_heatmap_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0054_heatmap_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..91ea9f179f4f0bd0d8106e5c60985b7f4132ae5c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0054_heatmap_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0054_heatmap_q3",
+ "instruction": "Among the points (g = 352, l = 343), (g = 394, l = 210), and (g = 377, l = 363), which has the largest tmp value and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/heatmap/chart_0054_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among the points (g = 352, l = 343), (g = 394, l = 210), and (g = 377, l = 363), which has the largest tmp value and what is that value?",
+ "expected": "The point (g = 377, l = 363) has the largest tmp value, which is 979.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0054_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0054_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..0f78d28f3fcb936818e6c2cf161692b9cba89971
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0054_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0054_other_q3",
+ "instruction": "Between Enos and Azura, who has the higher value and by how much?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0054_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between Enos and Azura, who has the higher value and by how much?",
+ "expected": "Enos has the higher value by 6 (Enos 10, Azura 4).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0055_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0055_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..0df82dcd1eab39130072ddfba33e23260f7c8f35
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0055_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0055_bar_q1",
+ "instruction": "Which month has the highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/bar/chart_0055_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which month has the highest value, and what is that value?",
+ "expected": "August has the highest value, which is 357.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0055_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0055_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..5c7f7f977f330826d09809635f3537c89e04c75a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0055_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0055_bar_q2",
+ "instruction": "How many months have values below 245?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/bar/chart_0055_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many months have values below 245?",
+ "expected": "4 months have values below 245.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0055_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0055_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..4ffff354532c5add9c5ae2327411354dfe9f5a81
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0055_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0055_box_q1",
+ "instruction": "Which vegetable has a measurement with normalized moisture equal to 0, and on which day does that occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0055_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which vegetable has a measurement with normalized moisture equal to 0, and on which day does that occur?",
+ "expected": "Radishes have a measurement of normalized moisture 0, and it occurs on day 1.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0055_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0055_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..9c621c3ae2c5d4a7f0ce7c0f0889f05a355bb3a7
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0055_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0055_heatmap_q1",
+ "instruction": "Which cell in the heatmap (identify by column and row number) has the highest salary value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/heatmap/chart_0055_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which cell in the heatmap (identify by column and row number) has the highest salary value, and what is that value?",
+ "expected": "The highest salary value is 300577, located at column 11, row 1.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0055_other_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0055_other_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..16ded018b54adb0b17341c22bf0795b1c6555b19
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0055_other_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0055_other_q2",
+ "instruction": "For Thursday lunch, by how much does the male total_bill exceed the female total_bill?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0055_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For Thursday lunch, by how much does the male total_bill exceed the female total_bill?",
+ "expected": "For Thursday lunch, the male total_bill exceeds the female total_bill by 45.33 (561.44 − 516.11).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0055_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0055_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..beedf7c58d7ef2d992615e1510224f6e48e25284
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0055_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0055_other_q3",
+ "instruction": "Which day, meal, and gender combination has the lowest gender-specific total_bill, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0055_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which day, meal, and gender combination has the lowest gender-specific total_bill, and what is that value?",
+ "expected": "Female customers at Thursday dinner have the lowest gender-specific total_bill, with a value of 18.78.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0055_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0055_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..22fad254834be18d1d9449ae2c811899f1f3e366
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0055_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0055_pie_q1",
+ "instruction": "What is the data value for Group B Nay?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/pie/chart_0055_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the data value for Group B Nay?",
+ "expected": "Group B Nay has a value of 80.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0055_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0055_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..7d5491f17937bfbd080e1ed700fd92e937e91250
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0055_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0055_scatter_q1",
+ "instruction": "Across both datasets in the bubble chart, which bubble has the largest size (v), and what are its x, y, and v values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/scatter/chart_0055_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across both datasets in the bubble chart, which bubble has the largest size (v), and what are its x, y, and v values?",
+ "expected": "The largest bubble is in the dataset B at x ≈ 74.72, y ≈ −3.63, with v ≈ 929.28.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0055_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0055_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..9dba664adf8b88ebb6945467ae659be5e5e88c03
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0055_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0055_scatter_q2",
+ "instruction": "In dataset A, which region defined by the signs of x and y (x<0 & y>0, x<0 & y<0, x>0 & y<0, x>0 & y>0) contains the most bubbles, and how many bubbles are in that region?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/scatter/chart_0055_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In dataset A, which region defined by the signs of x and y (x<0 & y>0, x<0 & y<0, x>0 & y<0, x>0 & y>0) contains the most bubbles, and how many bubbles are in that region?",
+ "expected": "In the dataset A, the x<0 & y>0 region contains the most bubbles, with 6 bubbles.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0056_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0056_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..6c6213fd11777b8712fa302291140beec2864a12
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0056_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0056_bar_q2",
+ "instruction": "By how many kw does the 'Cladire Aditionala' value change from Septembrie to Octombrie?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/bar/chart_0056_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how many kw does the 'Cladire Aditionala' value change from Septembrie to Octombrie?",
+ "expected": "It increases by 7000 kw, from 18712 kw to 25712 kw.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0056_heatmap_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0056_heatmap_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..5213657524d8cc0526483cf102e76f00ab06beff
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0056_heatmap_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0056_heatmap_q1",
+ "instruction": "What is the highest salary value displayed in the heatmap?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/heatmap/chart_0056_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the highest salary value displayed in the heatmap?",
+ "expected": "The highest salary value is 300577.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0056_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0056_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..981491894312624422fd3c2482bc813ffa4b9bcf
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0056_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0056_heatmap_q2",
+ "instruction": "What percentage of the 100 heatmap cells have a salary value of exactly 0?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/heatmap/chart_0056_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What percentage of the 100 heatmap cells have a salary value of exactly 0?",
+ "expected": "3% of the cells, since 3 out of 100 values are zero.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0056_other_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0056_other_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..7b5c6c37b5ad9d3d7554f86e30183c2f04fd930b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0056_other_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0056_other_q2",
+ "instruction": "Between Afghanistan and Japan, which country has the higher life expectancy, and by how many years do they differ?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0056_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between Afghanistan and Japan, which country has the higher life expectancy, and by how many years do they differ?",
+ "expected": "Japan has the higher life expectancy; it exceeds Afghanistan’s by 38.775 years (82.603 − 43.828).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0056_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0056_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..b4333d9aafc202a7742d190aa033b9cc8e85e106
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0056_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0056_pie_q3",
+ "instruction": "What is the total sum of all data values in the pie chart across all categories?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/pie/chart_0056_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the total sum of all data values in the pie chart across all categories?",
+ "expected": "The total sum of all values is 361.58479081.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0057_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0057_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..d764f3693109940fc1684b421ca00c2c4f2c5851
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0057_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0057_bar_q2",
+ "instruction": "In 2029, how much higher is 'segment2 item1' than 'segment2 item4' (unit: US$ Millions)?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/bar/chart_0057_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 2029, how much higher is 'segment2 item1' than 'segment2 item4' (unit: US$ Millions)?",
+ "expected": "In 2029, 'segment2 item1' is 7,192 and 'segment2 item4' is 3,258, so it is higher by 3,934 US$ Millions.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0057_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0057_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..b2aaa242ddcc8c8dff157703c91481b119715c0f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0057_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0057_box_q2",
+ "instruction": "Which player recorded a game with 0 points, and what was that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/box/chart_0057_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which player recorded a game with 0 points, and what was that value?",
+ "expected": "Damian Lillard recorded a game with 0 points.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0057_heatmap_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0057_heatmap_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..822b62e2021230628e58fd3f03071daa0d1ff162
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0057_heatmap_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0057_heatmap_q2",
+ "instruction": "What percentage of the cells in the heatmap show a salary of exactly 0?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/heatmap/chart_0057_heatmap.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What percentage of the cells in the heatmap show a salary of exactly 0?",
+ "expected": "3% of the cells show a salary of exactly 0.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0057_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0057_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..c9380617c9c246374b6615d580f229c9eb744d2b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0057_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0057_line_q3",
+ "instruction": "In Dataset 1, by how much does the value change from February to March?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0057_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In Dataset 1, by how much does the value change from February to March?",
+ "expected": "The value increases by 122.43998628 from February (−68.86574074) to March (53.57424554).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0057_other_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0057_other_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..354d54b04182ccac047c121a6b89e8ccc460572f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0057_other_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0057_other_q2",
+ "instruction": "For Male customers, on which day is the total_bill highest and on which day is it lowest, and what are those values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0057_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For Male customers, on which day is the total_bill highest and on which day is it lowest, and what are those values?",
+ "expected": "For Male customers, the total_bill is highest on Sun at 1269.46 and lowest on Fri at 198.57.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0057_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0057_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..e9043a9884f7f868c0f20870c77f851a04ca954d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0057_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0057_other_q3",
+ "instruction": "For Female customers on Thursday, what are the total_bill amounts for Lunch and for Dinner, and which is larger?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0057_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For Female customers on Thursday, what are the total_bill amounts for Lunch and for Dinner, and which is larger?",
+ "expected": "For Female on Thursday, Lunch totals 516.11 and Dinner totals 18.78; Lunch is much larger than Dinner.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0057_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0057_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..d34f4f02cf758fb9c7dcbf7f8416ac41ab24208c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0057_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0057_pie_q1",
+ "instruction": "Which color has the highest value in the dataset, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/pie/chart_0057_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which color has the highest value in the dataset, and what is that value?",
+ "expected": "Green has the highest value, which is 94.22153635.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0058_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0058_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..dceb4216702caf37281eab8c025aa71a28536edb
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0058_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0058_bar_q3",
+ "instruction": "By how much does the Incremental Cost Savings in Dec-2022 exceed that in Jan-2022?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/bar/chart_0058_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how much does the Incremental Cost Savings in Dec-2022 exceed that in Jan-2022?",
+ "expected": "93,578",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0058_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0058_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..9997e9f56bad9b84948f02b9a6b061e568ed7d72
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0058_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0058_box_q1",
+ "instruction": "Among all regions, which region has the highest maximum value (max)? What is that maximum value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/box/chart_0058_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among all regions, which region has the highest maximum value (max)? What is that maximum value?",
+ "expected": "North America has the highest max, which is 30.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0058_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0058_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..b95c219f0d097e985f76456b143278232880e8f9
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0058_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0058_box_q2",
+ "instruction": "What are the five box plot statistics (min, q1, q2, q3, max) for South America?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/box/chart_0058_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What are the five box plot statistics (min, q1, q2, q3, max) for South America?",
+ "expected": "The values for South America are min=2, q1=8, q2=12, q3=21, max=28.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0058_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0058_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..a4d1378125898de0ca8d96a9a5c2a135fefc8015
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0058_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0058_other_q3",
+ "instruction": "Comparing overall totals, which gender has the higher total and by how much does it exceed the other?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0058_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Comparing overall totals, which gender has the higher total and by how much does it exceed the other?",
+ "expected": "Male has the higher total at 3256.82, exceeding Female’s 1570.95 by 1685.87.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0058_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0058_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..e19061fda87d080763e616866696f37c5741676b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0058_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0058_pie_q3",
+ "instruction": "Which two categories have the closest values to each other in this chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/pie/chart_0058_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which two categories have the closest values to each other in this chart?",
+ "expected": "Green and Blue have the closest values to each other.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0058_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0058_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..a21569ed8eca430d3ff84216aaa9b78fdb5191f3
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0058_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0058_scatter_q3",
+ "instruction": "What happens when the user scrolls the mouse wheel vertically over the chart area?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/scatter/chart_0058_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What happens when the user scrolls the mouse wheel vertically over the chart area?",
+ "expected": "Vertical mouse wheel scrolling zooms the chart along the X-axis (wheelY is set to \"zoomX\").",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0059_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0059_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..73314af58519aa7828df3abf026a38be4faf02e1
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0059_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0059_box_q1",
+ "instruction": "What is the maximum PetalWidth value (the upper whisker) for I. virginica?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/box/chart_0059_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the maximum PetalWidth value (the upper whisker) for I. virginica?",
+ "expected": "The maximum PetalWidth value for I. virginica is 2.5.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0059_box_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0059_box_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..7b6dc62dc54ec8a4306af3713572e3fccb797cfe
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0059_box_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0059_box_q3",
+ "instruction": "For SepalWidth, which species has the smallest minimum (lower whisker) value, and what is that minimum?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/box/chart_0059_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For SepalWidth, which species has the smallest minimum (lower whisker) value, and what is that minimum?",
+ "expected": "I. versicolor has the smallest minimum SepalWidth value, which is 2.0.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0059_other_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0059_other_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..28530cb662e0c33806b2b7bb81639a95995d7690
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0059_other_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0059_other_q2",
+ "instruction": "Comparing Thursday Lunch totals, do Males or Females have a higher total_bill, and by how much?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0059_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Comparing Thursday Lunch totals, do Males or Females have a higher total_bill, and by how much?",
+ "expected": "Males have a higher total_bill at Thursday Lunch by 45.33 (561.44 for Males vs. 516.11 for Females).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0059_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0059_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..32d467557fa638980bef69fc0c7398a135a0bd65
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0059_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0059_pie_q3",
+ "instruction": "What is the total sum of all five data values represented in the pie chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/pie/chart_0059_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the total sum of all five data values represented in the pie chart?",
+ "expected": "The total sum of all five data values is -8.97205075.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0060_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0060_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..1f61b3be300009e61811f6351dc896ea33ece881
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0060_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0060_bar_q1",
+ "instruction": "Which product category has the highest balance (column series value) in the chart, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/bar/chart_0060_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which product category has the highest balance (column series value) in the chart, and what is that value?",
+ "expected": "Retail & Wholesale Short Term Loans with a value of 8066.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0060_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0060_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..c6d82c478f0330aba72d4ffebf0226399df34f63
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0060_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0060_bar_q2",
+ "instruction": "For the category \"Term Deposits\", what is the base case percentage change (perChangeBase) used for the jump line?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AnyChart/bar/chart_0060_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For the category \"Term Deposits\", what is the base case percentage change (perChangeBase) used for the jump line?",
+ "expected": "1.63%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0060_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0060_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..5aea807c59a3593f8d902379b772718962ef84e6
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0060_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0060_box_q1",
+ "instruction": "Which experiment has the lowest minimum Speed value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/box/chart_0060_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which experiment has the lowest minimum Speed value, and what is that value?",
+ "expected": "Experiment 3 has the lowest minimum Speed, at 620.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0060_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0060_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..fd553c413ed51128f0744e545be6775381ae825e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0060_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0060_other_q1",
+ "instruction": "Between the North and South regions, which has higher total sales, and by how much?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0060_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between the North and South regions, which has higher total sales, and by how much?",
+ "expected": "North has higher total sales than South by 1 unit (North: 11, South: 10).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0060_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0060_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..4254d7df30e35a9d7ea17e9b82e5368df404eda9
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0060_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0060_other_q3",
+ "instruction": "Within the South region, what percentage of South’s total sales comes from Finance?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0060_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Within the South region, what percentage of South’s total sales comes from Finance?",
+ "expected": "Finance accounts for 50% of South’s total sales (5 out of 10 units).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0060_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0060_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..837aa9c56362a042c0732063607faf8ee8b25462
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0060_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0060_pie_q1",
+ "instruction": "Which month has the highest data value in the polar area chart, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/pie/chart_0060_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which month has the highest data value in the polar area chart, and what is that value?",
+ "expected": "March has the highest data value, which is 90.68715706.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0061_box_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0061_box_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..578139d857721c6455badc8ef2a2858b285d0ea0
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0061_box_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0061_box_q3",
+ "instruction": "Between experiments 1 and 3, which has the larger interquartile range (Q3−Q1), and what are their respective IQR values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/box/chart_0061_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between experiments 1 and 3, which has the larger interquartile range (Q3−Q1), and what are their respective IQR values?",
+ "expected": "Experiment 1 has the larger interquartile range; its IQR is 130, while Experiment 3’s IQR is 40.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0061_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0061_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..a40f8229f15d79e644526450a9aebb3779398037
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0061_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0061_line_q1",
+ "instruction": "Which month has the highest data value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0061_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which month has the highest data value, and what is that value?",
+ "expected": "June has the highest value, which is 72.6.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0061_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0061_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..c0ae8f34bb72b12126f78d7915b0ab5add9e9ca2
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0061_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0061_line_q3",
+ "instruction": "How many months have negative data values, and are there more negative months than positive months?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0061_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many months have negative data values, and are there more negative months than positive months?",
+ "expected": "There are 5 months with negative values, which is more than the 3 months with positive values.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0061_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0061_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..07c9718566af41912eeb91ae3d1e1b03a3c72c9b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0061_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0061_scatter_q3",
+ "instruction": "At 10am, which weekday from Sunday to Friday has the highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/scatter/chart_0061_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "At 10am, which weekday from Sunday to Friday has the highest value, and what is that value?",
+ "expected": "At 10am, Wednesday has the highest value, with a value of 9388.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0062_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0062_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..d88a891beed50df4ad5fbb73d2b39469b5c4ac17
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0062_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0062_line_q2",
+ "instruction": "Among all datasets D0 through D9, which dataset has the highest value in March, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0062_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among all datasets D0 through D9, which dataset has the highest value in March, and what is that value?",
+ "expected": "In March, dataset D5 has the highest value, which is 65.71.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0062_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0062_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..f8c2d6290c028ac2949719e58fc5bb49669e839f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0062_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0062_other_q1",
+ "instruction": "Which label has the smallest value in the chart, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0062_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which label has the smallest value in the chart, and what is that value?",
+ "expected": "Noam has the smallest value, which is 2.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0062_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0062_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..c644ed6e4af9042cc7ae676adf6104aac23fa61b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0062_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0062_other_q3",
+ "instruction": "What percentage of Eve’s total value is accounted for by Cain and Seth together?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0062_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What percentage of Eve’s total value is accounted for by Cain and Seth together?",
+ "expected": "Cain and Seth together account for 40% of Eve’s total value (26 out of 65).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0063_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0063_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..3e54610262f7897f3d9051042aad1c623994cf18
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0063_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0063_bar_q2",
+ "instruction": "In how many months does Dataset 1 have a positive value while Dataset 2 has a negative value, and which months are these?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/bar/chart_0063_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In how many months does Dataset 1 have a positive value while Dataset 2 has a negative value, and which months are these?",
+ "expected": "There are 3 such months: February, March, and May.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0063_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0063_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..292add7e963e36cfa6f8910432f1d1b5a6f07b3f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0063_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0063_box_q1",
+ "instruction": "What is the minimum Speed value for Expt 1 represented in the box plot?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/box/chart_0063_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the minimum Speed value for Expt 1 represented in the box plot?",
+ "expected": "The minimum Speed for Expt 1 is 650.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0063_box_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0063_box_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..0b92a2a1269258f6dcc9abedf3829587a3051341
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0063_box_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0063_box_q2",
+ "instruction": "By how many units does the third quartile (Q3) exceed the first quartile (Q1) of Speed for Expt 1?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/box/chart_0063_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how many units does the third quartile (Q3) exceed the first quartile (Q1) of Speed for Expt 1?",
+ "expected": "Q3 exceeds Q1 by 130 units (980 − 850 = 130).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0064_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0064_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..ee04193e5fca2d97655075fd19871dd9b256e186
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0064_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0064_bar_q3",
+ "instruction": "What's the value of the point in dataset3 in March?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/bar/chart_0064_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What's the value of the point in dataset3 in March?",
+ "expected": "40.577",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0064_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0064_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..c2965a43d1f3655619409e30841d17a7f57ea22b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0064_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0064_box_q1",
+ "instruction": "Which region has the highest maximum y value in the box plots, and what is that maximum value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/box/chart_0064_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which region has the highest maximum y value in the box plots, and what is that maximum value?",
+ "expected": "North America has the highest maximum y value, which is 30.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0064_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0064_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..7e84bf430e6a92650ddb6509c9102a66d1e54988
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0064_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0064_line_q2",
+ "instruction": "Across all four datasets combined (stacked), which month has the highest total value and approximately what is that total?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0064_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all four datasets combined (stacked), which month has the highest total value and approximately what is that total?",
+ "expected": "July has the highest combined total, at approximately 208.04.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0064_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0064_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..fe16fd9bb8aa1ac802054bf6a11bea67a6aca861
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0064_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0064_other_q1",
+ "instruction": "In the sunburst chart data, how many id entries correspond to 'Pungent' subcategories (ids that start with 'Pungent-')?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0064_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the sunburst chart data, how many id entries correspond to 'Pungent' subcategories (ids that start with 'Pungent-')?",
+ "expected": "There are 4 id entries that start with 'Pungent-'.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0065_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0065_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..26e9bf32128c9436f359fc90f0de7d433a400ce1
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0065_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0065_bar_q3",
+ "instruction": "In how many months do both the Fully Rounded and Small Radius datasets have positive values simultaneously?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/bar/chart_0065_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In how many months do both the Fully Rounded and Small Radius datasets have positive values simultaneously?",
+ "expected": "In zero months; there is no month where both datasets are positive at the same time.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0065_other_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0065_other_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..0615ccf0a9db25d339df6680a37c63013f29ffb3
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0065_other_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0065_other_q1",
+ "instruction": "How many immediate subcategories does the top-level category 'Tastes' have, and how many does 'Aromas' have?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0065_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many immediate subcategories does the top-level category 'Tastes' have, and how many does 'Aromas' have?",
+ "expected": "'Tastes' has 4 immediate subcategories (Bitter, Salt, Sweet, Sour), while 'Aromas' has 3 immediate subcategories (Enzymatic, Sugar Browning, Dry Distillation).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0065_other_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0065_other_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..60e6a820d758d40065d232acbd20cc13e0611a86
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0065_other_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0065_other_q3",
+ "instruction": "Among the four main taste branches under 'Tastes' (Bitter, Salt, Sweet, Sour), what fraction of them split into exactly two immediate subcategories at the next level?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/other/chart_0065_other.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among the four main taste branches under 'Tastes' (Bitter, Salt, Sweet, Sour), what fraction of them split into exactly two immediate subcategories at the next level?",
+ "expected": "All four main taste branches split into exactly two immediate subcategories, so the fraction is 4 out of 4 (100%).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0066_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0066_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..31a409c48d9339cf4a596e932bb012fb0a1579ad
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0066_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0066_bar_q1",
+ "instruction": "Across both datasets and all months, which dataset and month have the widest floating bar (largest distance between its two endpoints), and what is that distance?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/bar/chart_0066_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across both datasets and all months, which dataset and month have the widest floating bar (largest distance between its two endpoints), and what is that distance?",
+ "expected": "Dataset 1 in March has the widest floating bar, with a distance of about 166.17 units between 92.32 and -73.85.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0066_box_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0066_box_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..8647830067b106e03f2677f9b114aa7c84405fa4
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0066_box_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0066_box_q1",
+ "instruction": "According to the chart data, what is q1 of the first data point in the dataset, where species is 'I. setosa' and x is 'PetalWidth'?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/box/chart_0066_box.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the chart data, what is q1 of the first data point in the dataset, where species is 'I. setosa' and x is 'PetalWidth'?",
+ "expected": "0.2.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0066_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0066_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..2db23490a0def4aa6da734cdb98aa763f7868fd7
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0066_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0066_line_q2",
+ "instruction": "In Dataset 1, by how much does the value change from April to May, and is this an increase or a decrease?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0066_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In Dataset 1, by how much does the value change from April to May, and is this an increase or a decrease?",
+ "expected": "From April to May, the value increases by 118.53052126 (from -98.7611454 to 19.76937586).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0066_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0066_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..8e3f2a0de12c0d65419a8c2e9c6bfe47cee54cf8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0066_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0066_scatter_q2",
+ "instruction": "At x = 6, what are the y-values of the first series (ay) and the second series (by), and what is their difference?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/scatter/chart_0066_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "At x = 6, what are the y-values of the first series (ay) and the second series (by), and what is their difference?",
+ "expected": "At x = 6, the first series has y = 5.1 and the second series has y = 8.3, so the difference is 3.2.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0067_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0067_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..2968926fa74f3508d84402214f4e705e2f7407a8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0067_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0067_bar_q2",
+ "instruction": "For Dataset 2, how many months have positive values, and which months are they?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/bar/chart_0067_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For Dataset 2, how many months have positive values, and which months are they?",
+ "expected": "Dataset 2 has positive values in 3 months: February, March, and June.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0067_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0067_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..a03b9eb7be1de9a608ecb6bbfea5fe29d896812a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0067_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0067_bar_q3",
+ "instruction": "During which month is the difference between Dataset 1 and Dataset 2 values largest in magnitude, and what is the value of that difference?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/bar/chart_0067_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "During which month is the difference between Dataset 1 and Dataset 2 values largest in magnitude, and what is the value of that difference?",
+ "expected": "The largest difference occurs in May, with a magnitude of 155.67729767 between Dataset 1 and Dataset 2.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0067_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0067_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..7e37d802c3dfc7925aa64d2b5534d3539bc806af
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0067_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0067_line_q3",
+ "instruction": "How many months have positive values in the dataset, and which months are they?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0067_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many months have positive values in the dataset, and which months are they?",
+ "expected": "There are 2 months with positive values: March (6.32030178) and April (7.05246914).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0067_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0067_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..7fd23411dc82a24a10620b97f8df75d6727c977a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0067_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0067_scatter_q3",
+ "instruction": "How does y change as x increases from 0 to 4 in the scatter plot?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0067_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How does y change as x increases from 0 to 4 in the scatter plot?",
+ "expected": "y increases from 0 to 16, and the increases become larger with each step in x.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0068_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0068_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..15cd4eac78483998ef1c05a9397e3d9692847a25
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0068_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0068_line_q1",
+ "instruction": "In Dataset 1, which month has the lowest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0068_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In Dataset 1, which month has the lowest value, and what is that value?",
+ "expected": "April has the lowest value, at -87.13391632.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0068_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0068_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..4d5bff9b0bce399921755244099b6748e92b3d8f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0068_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0068_line_q2",
+ "instruction": "For Dataset 1, between which two consecutive months does the value increase the most, and by how much does it increase?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0068_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For Dataset 1, between which two consecutive months does the value increase the most, and by how much does it increase?",
+ "expected": "The largest increase is between May and June, where the value rises by 82.31652949.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0068_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0068_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..fcb7b5694c6033205b4cdd51b07f59a70c50070d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0068_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0068_line_q3",
+ "instruction": "In Dataset 1, how many of the seven months have positive values, and which months are they?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0068_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In Dataset 1, how many of the seven months have positive values, and which months are they?",
+ "expected": "Two months have positive values: June and July.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0068_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0068_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..64ff5db3622c23204ea4290f5dae9bba84c6e6e1
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0068_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0068_scatter_q2",
+ "instruction": "What is the maximum sepal_width value among the plotted points?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0068_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the maximum sepal_width value among the plotted points?",
+ "expected": "The maximum sepal_width value is 4.4.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0069_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0069_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..165ddfa5377be088b183e753677a0a222f38e12d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0069_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0069_bar_q2",
+ "instruction": "Considering the sum of all three datasets in each month (the total stacked value), which month has the highest total and which has the lowest total, and what are those totals?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/bar/chart_0069_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Considering the sum of all three datasets in each month (the total stacked value), which month has the highest total and which has the lowest total, and what are those totals?",
+ "expected": "April has the highest total stacked value at 103.75257201, and May has the lowest total at -119.05092593.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0069_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0069_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..5365894e94b2dd377213b6a64c23e97676f011de
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0069_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0069_bar_q3",
+ "instruction": "For each dataset, how many of the seven months show a positive value and how many show a negative value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/bar/chart_0069_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For each dataset, how many of the seven months show a positive value and how many show a negative value?",
+ "expected": "Dataset 1 has positive values in 2 months and negative values in 5 months. Dataset 2 has positive values in 3 months and negative values in 4 months. Dataset 3 has positive values in 3 months and negative values in 4 months.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0069_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0069_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..19f3511e97acb3a8c7896e6f3f00cc5c4a627343
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0069_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0069_line_q2",
+ "instruction": "How many data points in the series have a value of 60?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0069_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many data points in the series have a value of 60?",
+ "expected": "There are 2 data points with a value of 60.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0069_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0069_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..2e9936dab5122987584b61f1a53d3130f235dca3
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0069_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0069_line_q3",
+ "instruction": "From label \"0\" to label \"5\", by how much does the data value change overall?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0069_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "From label \"0\" to label \"5\", by how much does the data value change overall?",
+ "expected": "The value increases by 120, from 0 at label \"0\" to 120 at label \"5\".",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0069_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0069_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..d73bb005c98653a1f01c104e2b3157d076639f45
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0069_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0069_scatter_q3",
+ "instruction": "Across all species in the chart, which species has the data point with the largest petal_length (marker size), and what is that petal_length value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0069_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all species in the chart, which species has the data point with the largest petal_length (marker size), and what is that petal_length value?",
+ "expected": "Virginica has the data point with the largest petal_length, which is 7.9.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0070_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0070_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..6fdc4a0e16231cffa663ae2f4b5802157fd87c0d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0070_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0070_bar_q1",
+ "instruction": "What is the highest value in Dataset 2, and in which month does it occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/bar/chart_0070_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the highest value in Dataset 2, and in which month does it occur?",
+ "expected": "The highest value in Dataset 2 is 77.7451989, occurring in July.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0070_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0070_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..8b3ad4db62608993272405c0e84268bf762b9df1
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0070_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0070_bar_q2",
+ "instruction": "During which month is the absolute difference between Dataset 1 and Dataset 2 values the largest, and what is that difference?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/bar/chart_0070_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "During which month is the absolute difference between Dataset 1 and Dataset 2 values the largest, and what is that difference?",
+ "expected": "The largest absolute difference is in January, with a difference of 97.92352537.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0070_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0070_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..87e1988f72b9d294f941853e9f15d9980656aac9
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0070_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0070_line_q2",
+ "instruction": "In March, which dataset has the higher value, and by how much does it exceed the other?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0070_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In March, which dataset has the higher value, and by how much does it exceed the other?",
+ "expected": "In March, Dataset 2 is higher than Dataset 1 by 60.989369 (35.05915638 − (−25.93021262)).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0071_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0071_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..1c413a6288c7d873d21bc2db8c82f692c0d3de29
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0071_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0071_scatter_q1",
+ "instruction": "Which species is represented by square markers in the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0071_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which species is represented by square markers in the chart?",
+ "expected": "The species virginica is represented by square markers.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0071_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0071_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..bfa273cf30fd84a3ab0f8eab4ade208acb481a05
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0071_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0071_scatter_q2",
+ "instruction": "Across all species in the chart, what is the highest sepal_length value, and which species and sepal_width does it correspond to?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0071_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all species in the chart, what is the highest sepal_length value, and which species and sepal_width does it correspond to?",
+ "expected": "The highest sepal_length is 7.9, which belongs to the species virginica at sepal_width 3.8.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0071_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0071_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..81c76a9191bb8fbaf455eff8538ec8be4c6efd4b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0071_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0071_scatter_q3",
+ "instruction": "Which species has the widest range of sepal_length values (maximum minus minimum) among the three species, and what is that range?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0071_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which species has the widest range of sepal_length values (maximum minus minimum) among the three species, and what is that range?",
+ "expected": "Virginica has the widest sepal_length range, from 4.9 to 7.9, giving a range of 3.0.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0072_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0072_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..239e9e67acfc7725daf6f5e061b5adceecc23c40
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0072_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0072_bar_q1",
+ "instruction": "Which month on the chart has the lowest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/bar/chart_0072_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which month on the chart has the lowest value, and what is that value?",
+ "expected": "December has the lowest value, at approximately -98.15.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0072_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0072_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..41582b86ea2ae2a0f334d5407b709c04a5278b78
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0072_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0072_line_q3",
+ "instruction": "By how much does the dataset value increase from Day 4 to Day 6?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0072_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how much does the dataset value increase from Day 4 to Day 6?",
+ "expected": "It increases by 154.13923182 (from -63.87945816 on Day 4 to 90.25977366 on Day 6).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0072_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0072_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..7ce53cc2a9126e41bf32ae71b4fe1514ac9d9439
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0072_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0072_pie_q1",
+ "instruction": "In the initial pie chart view, which category has a higher percentage, Fossil Energy or Green Energy, and by how many percentage points?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/pie/chart_0072_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the initial pie chart view, which category has a higher percentage, Fossil Energy or Green Energy, and by how many percentage points?",
+ "expected": "Fossil Energy has a higher percentage than Green Energy by 40 percentage points (70% vs 30%).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0072_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0072_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..5ec4acf7f62849ee7f1d00970cf754cce113a823
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0072_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0072_pie_q2",
+ "instruction": "Among the subcategories of Fossil Energy (Oil, Coal, Nuclear), which one has the smallest percentage, and how many percentage points less is it than the largest Fossil Energy subcategory?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/pie/chart_0072_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among the subcategories of Fossil Energy (Oil, Coal, Nuclear), which one has the smallest percentage, and how many percentage points less is it than the largest Fossil Energy subcategory?",
+ "expected": "Oil is the smallest Fossil Energy subcategory at 15%, which is 20 percentage points less than Coal, the largest at 35%.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0072_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0072_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..66373cb3930524429a86ba994c987ff1ff165f64
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0072_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0072_pie_q3",
+ "instruction": "Do the percentages of the Green Energy subcategories (Hydro, Wind, Other) add up to the total percentage of Green Energy shown in the main chart, and what is that total?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/pie/chart_0072_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Do the percentages of the Green Energy subcategories (Hydro, Wind, Other) add up to the total percentage of Green Energy shown in the main chart, and what is that total?",
+ "expected": "Yes. The Green Energy subcategories sum to 30% (Hydro 15% + Wind 10% + Other 5%), which matches the 30% Green Energy total in the main chart.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0072_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0072_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..143386e462e78b6c665d4d077733edb29caa5331
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0072_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0072_scatter_q2",
+ "instruction": "For China, which type of medal has the highest count, and what is that count?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0072_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For China, which type of medal has the highest count, and what is that count?",
+ "expected": "Silver medals, with a count of 15.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0073_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0073_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..29d095fe10c5c203e575ae3c19598feab3b6b1ea
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0073_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0073_bar_q1",
+ "instruction": "What is the earliest start date among all intervals and which category does it belong to?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0073_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the earliest start date among all intervals and which category does it belong to?",
+ "expected": "The earliest start date is 2021-01-01 and it belongs to category \"One\".",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0073_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0073_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..44ad53b2e0f8114113afd0af09f1b00b63fb1c2b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0073_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0073_line_q3",
+ "instruction": "During which month is the data value missing (not a number) in the dataset?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0073_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "During which month is the data value missing (not a number) in the dataset?",
+ "expected": "The data value is missing in March.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0073_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0073_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..c4452649212479b4d4b7d9abb557b02dee1c63d5
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0073_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0073_scatter_q1",
+ "instruction": "Which nation has the highest silver medal count, and what is that count?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0073_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which nation has the highest silver medal count, and what is that count?",
+ "expected": "China has the highest silver medal count with 15.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0073_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0073_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..723c4c2e927d22795f0dbc1bfe573004d981fe45
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0073_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0073_scatter_q2",
+ "instruction": "What is the total medal count for South Korea, and how many more medals is that than Canada’s total?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0073_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the total medal count for South Korea, and how many more medals is that than Canada’s total?",
+ "expected": "South Korea has a total of 48 medals, which is 15 more than Canada’s 33 medals.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0073_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0073_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..1ecda228a0ed9c5c4043c786b2f98b9ca40a7b0b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0073_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0073_scatter_q3",
+ "instruction": "Across all nations and medal types, which combination has the highest count and which has the lowest count?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0073_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all nations and medal types, which combination has the highest count and which has the lowest count?",
+ "expected": "The highest count is South Korea’s gold medals with 24, and the lowest count is China’s bronze medals with 8.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0074_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0074_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..6d1878ffa35bc5b8cbd97522d801308d9655cb63
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0074_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0074_bar_q1",
+ "instruction": "In 2023, which region has the largest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0074_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 2023, which region has the largest value, and what is that value?",
+ "expected": "In 2023, North America has the largest value at 28.6%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0074_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0074_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..9f2015d9dff55c00da40f5d524a6e58112c6f106
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0074_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0074_scatter_q2",
+ "instruction": "What is the total number of medals (gold, silver, and bronze combined) for South Korea?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0074_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the total number of medals (gold, silver, and bronze combined) for South Korea?",
+ "expected": "South Korea has a total of 48 medals (24 gold, 13 silver, and 11 bronze).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0075_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0075_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..ac75246fcebb0758bc7fc0225d52851ccfadb2e0
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0075_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0075_bar_q1",
+ "instruction": "In 2022, which region has the highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0075_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 2022, which region has the highest value, and what is that value?",
+ "expected": "In 2022, North America has the highest value at 2.7.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0075_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0075_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..601243b8f8bceb6c4f58e7de07e75f4b7fecd0d9
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0075_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0075_line_q1",
+ "instruction": "In the Filled dataset, during which month is the value lowest, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0075_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the Filled dataset, during which month is the value lowest, and what is that value?",
+ "expected": "The lowest value in the Filled dataset is in June, with a value of -84.51817558.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0075_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0075_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..eb3c3d1bdf606df631897c6f970112c396ab5053
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0075_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0075_line_q2",
+ "instruction": "For the month of May, order the three datasets (Unfilled, Dashed, Filled) from highest to lowest value.",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0075_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For the month of May, order the three datasets (Unfilled, Dashed, Filled) from highest to lowest value.",
+ "expected": "In May, from highest to lowest: Dashed (75.05658436), Unfilled (65.61042524), Filled (-4.59190672).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0075_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0075_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..7a2b5143ddec8bbc86e6d09930ea0430cd16a63c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0075_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0075_line_q3",
+ "instruction": "In the Dashed dataset, between which two consecutive months does the largest increase occur, and what is the size of this increase?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0075_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the Dashed dataset, between which two consecutive months does the largest increase occur, and what is the size of this increase?",
+ "expected": "The largest increase in the Dashed dataset occurs between April and May, with an increase of 77.27537723.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0075_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0075_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..583318546f7d03263279c892cb0102fb4d1fef7e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0075_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0075_scatter_q2",
+ "instruction": "Which species has the smallest sepal_width value in the chart, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0075_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which species has the smallest sepal_width value in the chart, and what is that value?",
+ "expected": "Versicolor has the smallest sepal_width value, which is 2.0.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0076_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0076_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..c2c30ba39274756012f4e5401491e08ca63caa4b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0076_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0076_line_q3",
+ "instruction": "Between which two consecutive months does Dataset 2 show its largest decrease, and by approximately how much does it decrease?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0076_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between which two consecutive months does Dataset 2 show its largest decrease, and by approximately how much does it decrease?",
+ "expected": "Dataset 2 shows its largest decrease between March and April, dropping by about 32.25.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0076_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0076_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..64e66b37c8f3d9e26c5adaf054a6ea177856373f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0076_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0076_pie_q2",
+ "instruction": "What are the minimum and maximum tip values represented in the pie chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/pie/chart_0076_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What are the minimum and maximum tip values represented in the pie chart?",
+ "expected": "The minimum tip value is 51.96 and the maximum tip value is 260.4.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0076_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0076_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..ab37df1c20f338b2d7008d08f96f273755ec1f0a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0076_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0076_pie_q3",
+ "instruction": "Which distinct day labels appear in the pie chart data?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/pie/chart_0076_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which distinct day labels appear in the pie chart data?",
+ "expected": "The distinct day labels are \"Sun\", \"Sat\", \"Thur\", and \"Fri\".",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0076_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0076_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..2cc64ea3869404ec7f1b831ef559bf2a5c3ae0f7
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0076_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0076_scatter_q3",
+ "instruction": "For male customers at Lunch, how many total_bill observations are there for smokers and for non-smokers?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0076_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For male customers at Lunch, how many total_bill observations are there for smokers and for non-smokers?",
+ "expected": "For male lunch customers, there are 13 observations for smokers and 20 observations for non-smokers.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0077_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0077_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..4386b5a6c1380ea22c4359940722b5deaf5a0b64
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0077_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0077_bar_q1",
+ "instruction": "In 2022, what was Asia's value and how did it compare to Europe's value in the same year?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0077_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 2022, what was Asia's value and how did it compare to Europe's value in the same year?",
+ "expected": "In 2022, Asia had a value of 2.2, while Europe had 2.6, so Europe was higher by 0.4.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0077_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0077_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..1c1909f813954d81901cc97fc306a4f846c950ab
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0077_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0077_bar_q3",
+ "instruction": "In 2023, what is the total value of the stacked regions (North America, Latin America, Middle East, and Africa) combined?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0077_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 2023, what is the total value of the stacked regions (North America, Latin America, Middle East, and Africa) combined?",
+ "expected": "In 2023, the total of the stacked regions is 2.9 + 0.3 + 0.9 + 0.5 = 4.6.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0077_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0077_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..ddc83a976e1118169f80880538a3c6df56de848a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0077_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0077_line_q2",
+ "instruction": "During which months does Dataset 1 have a higher value than Dataset 2?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0077_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "During which months does Dataset 1 have a higher value than Dataset 2?",
+ "expected": "Dataset 1 is higher than Dataset 2 in January and June.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0077_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0077_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..729292f4b5f8b9d4b80c4df3c765b419b060065f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0077_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0077_pie_q3",
+ "instruction": "How many countries in the chart have a life expectancy greater than 78 years, and which countries are they?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/pie/chart_0077_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many countries in the chart have a life expectancy greater than 78 years, and which countries are they?",
+ "expected": "Six countries have a life expectancy greater than 78 years: Canada, Chile, Costa Rica, Cuba, Puerto Rico, and the United States.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0078_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0078_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..930742c18ba20d187b4b927bd2a4a1b7bac4f6cb
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0078_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0078_bar_q1",
+ "instruction": "In which year is the total stacked value (sum of all regions) the highest, and what is that total?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0078_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In which year is the total stacked value (sum of all regions) the highest, and what is that total?",
+ "expected": "The total stacked value is highest in 2023, with a total of 9.8 (2.8 Europe + 2.9 North America + 2.4 Asia + 0.3 Latin America + 0.9 Middle East + 0.5 Africa).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0078_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0078_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..e64ae710ddf5eac60ca9eaf25b4e973359e7883b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0078_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0078_bar_q2",
+ "instruction": "By how much does Europe’s value increase from 2021 to 2023?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0078_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how much does Europe’s value increase from 2021 to 2023?",
+ "expected": "Europe’s value increases from 2.5 in 2021 to 2.8 in 2023, an increase of 0.3.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0078_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0078_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..fe4262e90d59bb7edca45c63f098b1433a753727
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0078_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0078_scatter_q1",
+ "instruction": "What is the minimum y-value in the plotted data, and at which x-value does it occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0078_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the minimum y-value in the plotted data, and at which x-value does it occur?",
+ "expected": "The minimum y-value is -0.999385, occurring at x = 4.747475.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0078_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0078_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..29d5aa33f5f04c3ee9941b80df30dd145f1213f8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0078_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0078_scatter_q2",
+ "instruction": "What is the y-value at x = 7.272727?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0078_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the y-value at x = 7.272727?",
+ "expected": "At x = 7.272727, the y-value is 0.8357746.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0079_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0079_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..369071a71a111c63411273cd4a186143f489629f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0079_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0079_bar_q1",
+ "instruction": "Which country has the highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0079_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which country has the highest value, and what is that value?",
+ "expected": "The USA has the highest value, which is 2025.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0079_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0079_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..f6fc521718fc3d3d74cff8b5f44d3a0f1f39048d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0079_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0079_line_q1",
+ "instruction": "For Dataset 2, during which month is the highest value observed, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0079_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For Dataset 2, during which month is the highest value observed, and what is that value?",
+ "expected": "Dataset 2 reaches its highest value in April 2016, with a value of 99.12465706.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0079_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0079_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..09aa1a8b3234d4866c3f0d9359244f78b7fb8d5a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0079_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0079_pie_q2",
+ "instruction": "Which country label has the largest single population value in the pie chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/pie/chart_0079_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which country label has the largest single population value in the pie chart?",
+ "expected": "China has the largest single population value.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0079_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0079_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..ab54fa6fa1e15388eb01e90c5959a6017381de11
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0079_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0079_scatter_q1",
+ "instruction": "What is the y-value of the point with the largest marker size?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0079_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the y-value of the point with the largest marker size?",
+ "expected": "13",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0080_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0080_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..664f66860811624a35ae3773a90d048c3937dd31
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0080_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0080_bar_q1",
+ "instruction": "Which country has the highest number of visits and how many visits does it have?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0080_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which country has the highest number of visits and how many visits does it have?",
+ "expected": "The US has the highest number of visits with 725 visits.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0080_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0080_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..5b49387bf83975ebdf31f06e324f90ac3e054674
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0080_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0080_bar_q2",
+ "instruction": "Between the UK and Germany, which country has more visits and by how many?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0080_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between the UK and Germany, which country has more visits and by how many?",
+ "expected": "The UK has more visits than Germany by 303 visits (625 vs 322).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0080_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0080_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..cbc068d6f89592688addaef70a9b573339d4328d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0080_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0080_line_q3",
+ "instruction": "In how many months is the value of Dataset 1 greater than the value of Dataset 2?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0080_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In how many months is the value of Dataset 1 greater than the value of Dataset 2?",
+ "expected": "Dataset 1 is greater than Dataset 2 in 3 months (January, April, and June).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0080_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0080_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..06bae79bbe632ad62590359ba1e7800432954baa
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0080_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0080_pie_q2",
+ "instruction": "What is the total of all values represented in the pie chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/pie/chart_0080_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the total of all values represented in the pie chart?",
+ "expected": "The total of all values is 8553.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0081_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0081_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..a2bcde0d3aa66badca2939b604aa167e070e87a5
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0081_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0081_pie_q2",
+ "instruction": "How many more units of Oxygen are there than Hydrogen in the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/pie/chart_0081_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many more units of Oxygen are there than Hydrogen in the chart?",
+ "expected": "There are 2000 more units of Oxygen than Hydrogen (4500 minus 2500).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0081_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0081_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..62b3f59562802cd7860533c77501eacd043e4f62
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0081_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0081_pie_q3",
+ "instruction": "Which gas slice is pulled out from the pie chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/pie/chart_0081_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which gas slice is pulled out from the pie chart?",
+ "expected": "The Carbon_Dioxide slice is pulled out.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0082_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0082_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..c2c880811ea9aa29f8a1e1daf8416e8a0bb3898b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0082_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0082_bar_q2",
+ "instruction": "How did expenses change from 2017 to 2021?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0082_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How did expenses change from 2017 to 2021?",
+ "expected": "Expenses increased from 18.1 in 2017 to 25 in 2021.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0082_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0082_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..781da71008419baa7631578238ba5279d1a7830c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0082_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0082_line_q2",
+ "instruction": "Across both datasets and all months, which data point is the highest, and what are its dataset and month?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0082_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across both datasets and all months, which data point is the highest, and what are its dataset and month?",
+ "expected": "The highest data point is 100 in Dataset 2 for January.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0082_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0082_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..c464d81364cac8e596fbe0e5c04261ac7b98f8f0
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0082_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0082_pie_q1",
+ "instruction": "According to the chart, what is the percentage for 'Rest of World' in GHG Emissions?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/pie/chart_0082_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the chart, what is the percentage for 'Rest of World' in GHG Emissions?",
+ "expected": "42%",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0082_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0082_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..b8718b0588f01af1fbed16c674f434c82765850b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0082_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0082_scatter_q2",
+ "instruction": "At which x-value does the scatter plot reach its maximum y-value, and what is that maximum y-value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0082_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "At which x-value does the scatter plot reach its maximum y-value, and what is that maximum y-value?",
+ "expected": "The maximum y-value is 81, occurring at x = 9.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0082_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0082_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..5fc068e5b65068017c72903b1d32f024c91d2f02
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0082_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0082_scatter_q3",
+ "instruction": "Is the increase in y between x = 1 and x = 2 larger or smaller than the increase in y between x = 4 and x = 5?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/scatter/chart_0082_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Is the increase in y between x = 1 and x = 2 larger or smaller than the increase in y between x = 4 and x = 5?",
+ "expected": "The increase in y between x = 1 and x = 2 is smaller (3) than between x = 4 and x = 5 (9).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0083_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0083_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..ffd89974c538ec3f91a55a03f160e2d2e3ed0b5a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0083_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0083_line_q1",
+ "instruction": "In which month does Dataset 1 reach its highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0083_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In which month does Dataset 1 reach its highest value, and what is that value?",
+ "expected": "Dataset 1 reaches its highest value in March, at 91.90757888.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0083_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0083_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..33889f9bd45f9b90226cd852689d4ca5f2d3f2d8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0083_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0083_line_q3",
+ "instruction": "Between which two consecutive months does Dataset 2 experience its largest decrease, and what is the size of this decrease?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0083_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between which two consecutive months does Dataset 2 experience its largest decrease, and what is the size of this decrease?",
+ "expected": "Dataset 2 has its largest decrease between May and June, dropping by 40.99194101.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0084_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0084_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..4ed3974315e3386d5452e36aec9a446c4b770ce5
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0084_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0084_line_q3",
+ "instruction": "Between which two consecutive months does Dataset 1 show its largest decrease, and what is the size of that decrease?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0084_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between which two consecutive months does Dataset 1 show its largest decrease, and what is the size of that decrease?",
+ "expected": "The largest decrease in Dataset 1 is between June and July, dropping by 54 units (from 44 to -10).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0084_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0084_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..cf2e4b11ac60ce0f1bbe377f89aa30e0c442b538
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0084_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0084_pie_q2",
+ "instruction": "By what factor did Asia’s GDP value change from 1980 to 2007 according to the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/pie/chart_0084_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By what factor did Asia’s GDP value change from 1980 to 2007 according to the chart?",
+ "expected": "Asia’s GDP value increased from 4 in 1980 to 21 in 2007, which is a factor of 5.25 (21 ÷ 4).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0084_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0084_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..1be4fbb40312ddaa35f8509708ed644fa7f34a88
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0084_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0084_pie_q3",
+ "instruction": "In the 2007 World GDP pie chart, which regions have GDP values greater than 10 and what are their values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/pie/chart_0084_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the 2007 World GDP pie chart, which regions have GDP values greater than 10 and what are their values?",
+ "expected": "In 2007, Asia (21), Europe (15), and the Americas (19) each have GDP values greater than 10.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0085_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0085_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..4c99ded80483f9ebddfa41283a59f28a8642aefd
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0085_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0085_bar_q3",
+ "instruction": "Across all categories, which single category-year has the highest combined stacked total of its two series, and what is that total?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0085_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all categories, which single category-year has the highest combined stacked total of its two series, and what is that total?",
+ "expected": "The category g1-2021 has the highest combined total with 32 (20 from s10 and 12 from s11).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0085_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0085_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..2651338f46bd9257e4b71f04c47aeacac10f091d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0085_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0085_pie_q3",
+ "instruction": "What is the ratio of the value of Oxygen to Nitrogen in the chart, simplified to the smallest whole numbers?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/pie/chart_0085_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the ratio of the value of Oxygen to Nitrogen in the chart, simplified to the smallest whole numbers?",
+ "expected": "The ratio of Oxygen to Nitrogen is 9:1 (4500:500).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0085_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0085_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..546e5a299b9c5256336f6f54a1c1332cd33ec0e1
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0085_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0085_scatter_q3",
+ "instruction": "Within the female data shown on the chart, what is the maximum recorded weight value and the corresponding height?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0085_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Within the female data shown on the chart, what is the maximum recorded weight value and the corresponding height?",
+ "expected": "The maximum recorded weight is 105.2 at height 172.7.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0086_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0086_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..64c51fbd891436bed2ea9d2043d90a160b4ed431
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0086_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0086_bar_q1",
+ "instruction": "On which date was the highest step count recorded, and what was that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0086_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "On which date was the highest step count recorded, and what was that value?",
+ "expected": "The highest step count was recorded on 2021-01-25 with 16,457 steps.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0086_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0086_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..cd31cbef3d32b7a37403fa9382a19e37ec5271ea
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0086_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0086_line_q3",
+ "instruction": "By how much does 'My First dataset' change between 2021-01-01 and 2021-01-06?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0086_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how much does 'My First dataset' change between 2021-01-01 and 2021-01-06?",
+ "expected": "'My First dataset' increases by 30.7398834, from 56.81498628 on 2021-01-01 to 87.55486968 on 2021-01-06.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0086_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0086_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..45bdf9a3b93b947fc34e34410091fd7fdfbb7c2c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0086_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0086_pie_q1",
+ "instruction": "What is the combined percentage of all items whose individual percentage is less than 20%?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0086_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the combined percentage of all items whose individual percentage is less than 20%?",
+ "expected": "The combined percentage is 39% (17% + 13% + 9%).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0086_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0086_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..36e00d15839fbf8a220e988efb8675ecdd8eb847
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0086_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0086_pie_q3",
+ "instruction": "How much larger is the share of Case One compared to Case Three?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0086_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How much larger is the share of Case One compared to Case Three?",
+ "expected": "Case One is 23 percentage points larger than Case Three.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0086_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0086_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..bde6345ddc23b4269f5d5268e5ca115907380299
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0086_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0086_scatter_q1",
+ "instruction": "In which month does Tokyo reach its highest temperature, and what is that temperature?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0086_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In which month does Tokyo reach its highest temperature, and what is that temperature?",
+ "expected": "Tokyo reaches its highest temperature in August, at 26.5°C.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0086_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0086_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..033613030d7e69ffefcb8ceb53d70442e2f03691
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0086_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0086_scatter_q2",
+ "instruction": "In March, which city is warmer, Tokyo or London, and by how many degrees Celsius?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0086_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In March, which city is warmer, Tokyo or London, and by how many degrees Celsius?",
+ "expected": "In March, Tokyo is warmer than London by 3.8°C (9.5°C vs 5.7°C).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0086_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0086_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..3a661d4d0cb8b4196ab7394be53a12d58eda0e5e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0086_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0086_scatter_q3",
+ "instruction": "For London, by how many degrees Celsius does the temperature increase from January to July?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0086_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For London, by how many degrees Celsius does the temperature increase from January to July?",
+ "expected": "London’s temperature increases by 13.1°C from January (3.9°C) to July (17°C).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0087_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0087_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..aef55567d58e1d8a02e7ad4940ebc2122308ceae
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0087_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0087_bar_q2",
+ "instruction": "How many buildings in the chart have a height greater than 500 metres?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0087_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many buildings in the chart have a height greater than 500 metres?",
+ "expected": "Three buildings have a height greater than 500 metres.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0087_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0087_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..9ebd1c7b27639868c3b652fe428cb020f741271d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0087_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0087_line_q1",
+ "instruction": "Across both datasets, which data point has the highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0087_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across both datasets, which data point has the highest value, and what is that value?",
+ "expected": "The highest value is 86.14454732510288 from the dataset with date object point data on 2021-01-07.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0087_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0087_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..9a2c660bf945bd1b94845960fb9b45adaae8d1a7
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0087_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0087_line_q3",
+ "instruction": "For the dataset with date object point data, by how much does the value change between 2021-01-03 and 2021-01-06?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0087_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For the dataset with date object point data, by how much does the value change between 2021-01-03 and 2021-01-06?",
+ "expected": "It decreases by 79.89669067215364, from 85.16117969821674 on 2021-01-03 to 5.2644890260631 on 2021-01-06.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0087_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0087_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..6fda8cd04541a83b75be829351bf27c8d262a65c
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0087_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0087_pie_q2",
+ "instruction": "What is the difference in percentage points between Example Two and Example Four?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0087_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the difference in percentage points between Example Two and Example Four?",
+ "expected": "The difference is 8 percentage points, with Example Two at 21% and Example Four at 13%.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0088_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0088_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..f88fe5633ed002b782445d4b122dca4db891c3a1
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0088_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0088_bar_q1",
+ "instruction": "Which age groups have the highest female value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0088_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which age groups have the highest female value, and what is that value?",
+ "expected": "The age groups 25-29 and 20-24 have the highest female value, which is 5.1.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0088_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0088_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..b3658adfff5f73f999b9147e2a6a63f365c28f03
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0088_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0088_bar_q2",
+ "instruction": "In which age group is the male value closest to zero (least negative), and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0088_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In which age group is the male value closest to zero (least negative), and what is that value?",
+ "expected": "The male value is closest to zero in the 85+ age group, with a value of 0.1.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0088_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0088_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..b537626983debeed74b02f3e3fd21187c4b606a6
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0088_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0088_bar_q3",
+ "instruction": "Which age group has the smallest absolute difference between male and female values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0088_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which age group has the smallest absolute difference between male and female values?",
+ "expected": "Age group 20-24 & 15-19 have the smallest absolute difference of 0.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0088_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0088_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..35ae55fc50437ab90b49a367391fdfa5b99c4c02
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0088_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0088_line_q3",
+ "instruction": "Between which two consecutive months does the largest increase in value occur, and what is the size of this increase?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0088_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between which two consecutive months does the largest increase in value occur, and what is the size of this increase?",
+ "expected": "The largest increase occurs between February and March, with an increase of 85.19118655 units.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0089_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0089_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..899c8cf19aec73ca49b12436bd0402e64bc35822
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0089_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0089_bar_q2",
+ "instruction": "Which country’s value decreased from 2004 to 2005, and what are those two values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0089_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which country’s value decreased from 2004 to 2005, and what are those two values?",
+ "expected": "Japan’s value decreased from 2.6 in 2004 to 2.3 in 2005.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0089_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0089_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..30f305db4aa56adc5ce660823afc8da0d0464bd8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0089_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0089_bar_q3",
+ "instruction": "What is Brazil’s 2005 value, and how much higher is it than the USA’s 2005 value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/bar/chart_0089_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is Brazil’s 2005 value, and how much higher is it than the USA’s 2005 value?",
+ "expected": "Brazil’s 2005 value is 4.9, which is 0.7 higher than the USA’s 2005 value of 4.2.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0089_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0089_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..678017db9a1ac85f99124c04741ccfef0bc39fe9
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0089_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0089_line_q2",
+ "instruction": "How many of the seven months have negative values in Dataset 1, and which months are they?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0089_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many of the seven months have negative values in Dataset 1, and which months are they?",
+ "expected": "Three months have negative values: March, May, and July.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0089_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0089_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..8c766ca59123ed3b8178d09b69bea72fed397abf
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0089_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0089_pie_q1",
+ "instruction": "What is the total value across all age groups in the pie chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0089_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the total value across all age groups in the pie chart?",
+ "expected": "The total value across all age groups is 316,515,021.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0089_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0089_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..ded9db22218aa6864af0224640336811d99538a2
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0089_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0089_scatter_q3",
+ "instruction": "How many cars on the chart have horsepower of at least 200 hp?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0089_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many cars on the chart have horsepower of at least 200 hp?",
+ "expected": "There are 7 cars with horsepower of at least 200 hp.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0090_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0090_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..8a2aef6b1d41923c3c9680805815fbadf472e056
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0090_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0090_line_q1",
+ "instruction": "In which month does Dataset 1 reach its highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0090_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In which month does Dataset 1 reach its highest value, and what is that value?",
+ "expected": "Dataset 1 reaches its highest value in May, with a value of 88.32561728.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0090_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0090_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..10a6c6c1f1e39712fb09344d3a3fd61eb693d949
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0090_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0090_pie_q1",
+ "instruction": "Which age group has the largest value in the pie chart, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0090_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which age group has the largest value in the pie chart, and what is that value?",
+ "expected": "The 20-24 age group has the largest value, which is 22,604,232.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0090_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0090_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..5bf1c5cd291d3ce61dc2d5090252eb2fe2c64711
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0090_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0090_scatter_q3",
+ "instruction": "How many data points in the setosa category have x-values greater than 5.5?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0090_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many data points in the setosa category have x-values greater than 5.5?",
+ "expected": "There are 3 setosa data points with x-values greater than 5.5.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0091_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0091_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..17d2b7d31d3269e0902eb823dcd5bccd04bfff4a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0091_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0091_scatter_q1",
+ "instruction": "Which complaint category has the fewest complaints, and how many complaints does it have?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0091_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which complaint category has the fewest complaints, and how many complaints does it have?",
+ "expected": "“Clothing Shrank” has the fewest complaints, with 18 complaints.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0091_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0091_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..07528eaad12d5e4cd4e0a7e777b3337f5e60ea74
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0091_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0091_scatter_q2",
+ "instruction": "What percentage of the total complaints are due to the “Sales Rep was Rude” category?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0091_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What percentage of the total complaints are due to the “Sales Rep was Rude” category?",
+ "expected": "“Sales Rep was Rude” accounts for about 19.2% of the total complaints.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0092_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0092_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..381b63092a368bac8fd945187bc6fc1510d9a9ac
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0092_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0092_bar_q3",
+ "instruction": "Across all three nations combined, what is the total number of bronze medals, and how does this total compare to the total number of gold medals?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/bar/chart_0092_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all three nations combined, what is the total number of bronze medals, and how does this total compare to the total number of gold medals?",
+ "expected": "Across all three nations, the total number of bronze medals is 31, which is 12 fewer than the total number of gold medals, which is 43.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0092_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0092_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..535adabe53faafa0581afd1dddb75cce6a0faa45
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0092_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0092_line_q2",
+ "instruction": "During which month is the absolute difference between Dataset 1 and Dataset 2 the largest, and what is the magnitude of this difference?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0092_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "During which month is the absolute difference between Dataset 1 and Dataset 2 the largest, and what is the magnitude of this difference?",
+ "expected": "The largest absolute difference occurs in March, with a magnitude of 175.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0092_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0092_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..5de8fb9cc6f19f1acb642bdce5b68443b5fd0a3a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0092_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0092_pie_q1",
+ "instruction": "Which category has the largest value in the pie chart, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0092_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which category has the largest value in the pie chart, and what is that value?",
+ "expected": "The category \"elixir\" has the largest value, which is 561.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0092_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0092_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..955b6833e16848483b31359badde755cce3da1c7
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0092_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0092_pie_q3",
+ "instruction": "Approximately what percentage of the total value is contributed by \"rust\"?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0092_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Approximately what percentage of the total value is contributed by \"rust\"?",
+ "expected": "Rust contributes about 3.2% of the total value (54 out of 1686).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0092_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0092_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..fd5d257bc67f12472a426a46c948ba17a0791113
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0092_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0092_scatter_q1",
+ "instruction": "What is the plotted value for the date 1890-07-01?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0092_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the plotted value for the date 1890-07-01?",
+ "expected": "The value for 1890-07-01 is -0.30.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0092_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0092_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..91794534c97bc0d913329c094af038e6abf6c2e3
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0092_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0092_scatter_q2",
+ "instruction": "Within the year 1888, which month has the highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0092_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Within the year 1888, which month has the highest value, and what is that value?",
+ "expected": "October 1888 has the highest value, which is 0.01.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0093_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0093_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..da7732057a7f0fc7b4b3fe8f10f01889569acb73
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0093_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0093_line_q1",
+ "instruction": "In which month does Dataset 1 reach its highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0093_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In which month does Dataset 1 reach its highest value, and what is that value?",
+ "expected": "Dataset 1 reaches its highest value in June, with a value of 75.73731139.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0093_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0093_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..122fc54c7ec0248936f188005dfaca22ada21851
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0093_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0093_line_q3",
+ "instruction": "In how many of the seven months is the value of Dataset 2 greater than the value of Dataset 1?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0093_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In how many of the seven months is the value of Dataset 2 greater than the value of Dataset 1?",
+ "expected": "Dataset 2 is greater than Dataset 1 in 6 out of the 7 months.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0093_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0093_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..775c361e9bd9f9e2ce36fa05de3bb4c874b18948
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0093_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0093_pie_q2",
+ "instruction": "What are the three smallest values and their corresponding types?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0093_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What are the three smallest values and their corresponding types?",
+ "expected": "The three smallest values are Newspaper (0.17), Blog (0.37), and Video (0.39).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0094_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0094_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..78cfe8a4051c65183362928344e2de5bb73ed811
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0094_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0094_bar_q2",
+ "instruction": "In 1997, by how many people did Australia's population exceed New Zealand's population?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/bar/chart_0094_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 1997, by how many people did Australia's population exceed New Zealand's population?",
+ "expected": "In 1997, Australia's population exceeded New Zealand's by 14,889,053 people (18,565,240 minus 3,676,187).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0094_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0094_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..b40541ae953b422c0b11a834668324145a1b3c6b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0094_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0094_line_q1",
+ "instruction": "Across all datasets and months, which data point has the highest value, and what are its dataset, month, and value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0094_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all datasets and months, which data point has the highest value, and what are its dataset, month, and value?",
+ "expected": "The highest value is in the Stars dataset in June, with a value of 81.71896433.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0094_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0094_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..686db1a591e8b41c35df84bb7b7c67a457398b76
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0094_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0094_line_q2",
+ "instruction": "In which months are both Triangles and Circles negative while Stars is positive?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0094_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In which months are both Triangles and Circles negative while Stars is positive?",
+ "expected": "This occurs in May and July.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0094_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0094_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..0c01b30ac854c821c2f3f3ce3deeae2ce906fead
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0094_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0094_scatter_q2",
+ "instruction": "In May, which city has the higher average rainfall, and by how much more than the other city?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0094_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In May, which city has the higher average rainfall, and by how much more than the other city?",
+ "expected": "In May, Berlin has the higher average rainfall, with 52.6 compared to London’s 47, which is 5.6 units more.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0095_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0095_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..7f64effaf643b6d2cfb8c4e31a638dc3b17ea120
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0095_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0095_line_q2",
+ "instruction": "In March, which dataset has the higher value, and by how much does it exceed the other?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0095_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In March, which dataset has the higher value, and by how much does it exceed the other?",
+ "expected": "In March, Dataset 1 is higher than Dataset 2 by 88.08470507 units (90.31207133 minus 2.22736626).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0095_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0095_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..7930c7b632140299d8e8eb07e451675e9d1e9672
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0095_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0095_line_q3",
+ "instruction": "For Dataset 2, what is the overall change from January to July, and is it an increase or a decrease?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Chart.js/line/chart_0095_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For Dataset 2, what is the overall change from January to July, and is it an increase or a decrease?",
+ "expected": "Dataset 2 decreases by 148.07613169 units from January (86.97702332) to July (-61.09910837).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0095_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0095_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..89f2e5e020474e2b6e9b8a5ff1b57376767f75ce
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0095_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0095_pie_q1",
+ "instruction": "Which case has the largest share in the pie chart, and what is its percentage?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0095_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which case has the largest share in the pie chart, and what is its percentage?",
+ "expected": "Case 1 has the largest share with 40%.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0095_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0095_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..04886c75afdc9e7809e5900c2635e5c09cfac088
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0095_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0095_scatter_q1",
+ "instruction": "How many males are aged 90 or above?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0095_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many males are aged 90 or above?",
+ "expected": "14",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0095_scatter_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0095_scatter_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..ddd081f09501bd39383ac67465b82de7c8c27944
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0095_scatter_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0095_scatter_q3",
+ "instruction": "At age 84, which group has more people, males or females, and how many are there in each group?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0095_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "At age 84, which group has more people, males or females, and how many are there in each group?",
+ "expected": "They are the same, with 4 people each.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0097_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0097_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..25038ae6cc0f63ab102e54016dc4f15443a492ec
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0097_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0097_scatter_q1",
+ "instruction": "Across all countries shown in the chart, which one has the highest GDP value, and what are its GDP and life expectancy?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0097_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all countries shown in the chart, which one has the highest GDP value, and what are its GDP and life expectancy?",
+ "expected": "Norway has the highest GDP value, with a GDP of 49357.19017 and a life expectancy of 80.196.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0098_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0098_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..f6d932c9d109f5f95d5cbd00e1fd1bfdd9f53377
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0098_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0098_pie_q1",
+ "instruction": "Between 1850 and 1920, which year has the highest number of males aged 10, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0098_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between 1850 and 1920, which year has the highest number of males aged 10, and what is that value?",
+ "expected": "The highest number of males aged 10 is in 1920, with 5,401,156 people.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0098_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0098_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..e75834251a311f9033f1e9923dfee2745403cb31
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0098_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0098_pie_q2",
+ "instruction": "How did the number of males aged 0 change from 1850 to 1910, in terms of absolute increase?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0098_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How did the number of males aged 0 change from 1850 to 1910, in terms of absolute increase?",
+ "expected": "The number of males aged 0 increased from 1,483,789 in 1850 to 5,296,823 in 1910, an absolute increase of 3,813,034 people.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0098_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0098_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..c1508aa75f31d2f9429291da0e1cb3a2eba98803
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0098_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0098_scatter_q1",
+ "instruction": "What is the 'count' value at time 2015-01-06T22:00:00.000Z in the dataset?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0098_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the 'count' value at time 2015-01-06T22:00:00.000Z in the dataset?",
+ "expected": "The 'count' at 2015-01-06T22:00:00.000Z is 1.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0099_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0099_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..f0f6d221f84a47f0d7a14e5dff1492e168d9517b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0099_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0099_bar_q3",
+ "instruction": "Among Denmark, Finland, Norway, and Sweden, which country has the smallest population and what is its population?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/bar/chart_0099_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among Denmark, Finland, Norway, and Sweden, which country has the smallest population and what is its population?",
+ "expected": "Norway has the smallest population among those four, with 4,627,926 people.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0099_pie_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0099_pie_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..994445f74da0b127c6c18acadbdd66da2f4f0e3f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0099_pie_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0099_pie_q1",
+ "instruction": "For the direction SE, which wind speed level has the highest value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0099_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For the direction SE, which wind speed level has the highest value, and what is that value?",
+ "expected": "For SE, the 0.5-2 m/s level has the highest value at 3.06.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0099_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0099_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..000aa474344c91ec326de577c6df350052f2b134
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0099_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0099_scatter_q2",
+ "instruction": "For Jordan, which statistic has the lowest value and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0099_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For Jordan, which statistic has the lowest value and what is that value?",
+ "expected": "Jordan’s lowest statistic is Blocks, with a value of 0.8.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0101_pie_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0101_pie_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..38ee776a84d7da1dc35908f46f1a9444e2ee620d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0101_pie_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0101_pie_q2",
+ "instruction": "How many years had a population greater than 40, and which years were they?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0101_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many years had a population greater than 40, and which years were they?",
+ "expected": "Three years had a population greater than 40: 2001 (41.8), 2008 (46.0), and 2011 (42.5).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0101_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0101_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..0a89708718244c39446c5454b52f99a059bd8d49
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0101_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0101_pie_q3",
+ "instruction": "What is the highest population value and in which year does it occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0101_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the highest population value and in which year does it occur?",
+ "expected": "The highest population is 46, which occurs in the year 2008.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0101_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0101_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..cd03df5caf3bda76d747a6150b2a5a3a4df40db3
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0101_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0101_scatter_q1",
+ "instruction": "Which item has the lowest score for type 'a', and what is that score?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0101_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which item has the lowest score for type 'a', and what is that score?",
+ "expected": "Support has the lowest score for type 'a', with a score of 30.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0102_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0102_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..8b7dad42d1f46c708abf29d3f26e88f452181b87
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0102_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0102_bar_q1",
+ "instruction": "For Dinner on Friday, comparing smokers and non-smokers, what is the highest total_bill recorded, and does it belong to a smoker or a non-smoker?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/bar/chart_0102_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For Dinner on Friday, comparing smokers and non-smokers, what is the highest total_bill recorded, and does it belong to a smoker or a non-smoker?",
+ "expected": "The highest Dinner Friday total_bill is 40.17 and it belongs to a smoker (Yes).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0102_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0102_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..8778356a9b292d098b490ab94652c6263951aeb6
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0102_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0102_bar_q2",
+ "instruction": "Among Friday Lunch bills for smokers (Yes), how many individual total_bill values are greater than 13?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/bar/chart_0102_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among Friday Lunch bills for smokers (Yes), how many individual total_bill values are greater than 13?",
+ "expected": "There are 3 Friday Lunch smoker (Yes) bills greater than 13.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0102_pie_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0102_pie_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..ec254d784eab3bae6de8f0beaceb7536f58b623d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0102_pie_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0102_pie_q3",
+ "instruction": "In 2013, what are the values of Type A, Type B, and Type C in descending order?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/pie/chart_0102_pie.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 2013, what are the values of Type A, Type B, and Type C in descending order?",
+ "expected": "In 2013, Type A is 33.3, Type B is 16.7, and Type C is 12, in descending order.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0102_scatter_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0102_scatter_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..ec94310fb2f0e00539b9070db56f09d436ceeeed
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0102_scatter_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0102_scatter_q1",
+ "instruction": "For which item is the difference between type a and type b scores the largest, and what is that difference?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0102_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For which item is the difference between type a and type b scores the largest, and what is that difference?",
+ "expected": "Design has the largest difference, with type a at 70 and type b at 30, a difference of 40 points.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0102_scatter_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0102_scatter_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..e91026f98744bfa956e98f7f302ee9dcd1d7f237
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0102_scatter_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0102_scatter_q2",
+ "instruction": "Among all items, which item has the lowest score for type a and what is that score?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/scatter/chart_0102_scatter.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among all items, which item has the lowest score for type a and what is that score?",
+ "expected": "Support has the lowest type a score, which is 30.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0106_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0106_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..85542474e9f4764a97adafbc9d5b6895bea82354
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0106_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0106_line_q3",
+ "instruction": "On what date does event 'E' on the timeline occur?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/line/chart_0106_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "On what date does event 'E' on the timeline occur?",
+ "expected": "Event 'E' occurs on 2019-03-06.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0107_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0107_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..5b9f95419337b79d745c65b9456ab1a7ddc874f1
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0107_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0107_bar_q1",
+ "instruction": "Which city has the lowest total sales across all four quarters, and what is that total?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/bar/chart_0107_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which city has the lowest total sales across all four quarters, and what is that total?",
+ "expected": "Montreal has the lowest total sales with 770 units (130 + 170 + 210 + 260).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0107_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0107_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..115b8a336af47fa158d9fb8b0e5e8cffb89d3193
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0107_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0107_bar_q2",
+ "instruction": "By how much did Toronto's sales increase from Q1 to Q4?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/bar/chart_0107_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how much did Toronto's sales increase from Q1 to Q4?",
+ "expected": "Toronto's sales increased by 150 units from Q1 (160) to Q4 (310).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0108_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0108_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..22f9fff3497c901549275fecf21cb399f24e8b14
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0108_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0108_bar_q1",
+ "instruction": "Which region has the largest share of the world population, and what is that percentage?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/bar/chart_0108_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which region has the largest share of the world population, and what is that percentage?",
+ "expected": "Asia has the largest share of the world population at 60.98137562413224%.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0108_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0108_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..f1a9cf941688966290ffdc63c27ee5dd081b1832
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0108_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0108_bar_q2",
+ "instruction": "For Oceania, what percentage of the world’s population does it account for?\n",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/bar/chart_0108_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For Oceania, what percentage of the world’s population does it account for?\n",
+ "expected": "0.3927355",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0108_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0108_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..474b9a2942305594f67af6ad1d3e8d5957e665c0
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0108_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0108_line_q1",
+ "instruction": "For Module #2, when is the task start time?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/line/chart_0108_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For Module #2, when is the task start time?",
+ "expected": "2019.01.08",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0109_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0109_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..50494a034e414f3047408206e08c7611ce8f5364
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0109_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0109_bar_q1",
+ "instruction": "Which product has the highest sales value, and what is that value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/bar/chart_0109_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which product has the highest sales value, and what is that value?",
+ "expected": "Product C has the highest sales value with 23 units.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0109_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0109_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..29466b8235d5941ae5388bb8b81c961a86f82cba
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0109_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0109_line_q1",
+ "instruction": "For module #1, when is the task end time?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/amCharts/line/chart_0109_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For module #1, when is the task end time?",
+ "expected": "2019.04.18",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0110_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0110_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..4f1f9aa76e0fa965e6b0f39a9c865400bd159cce
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0110_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0110_bar_q1",
+ "instruction": "In this dataset, which letter has the highest frequency? What is the corresponding value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0110_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In this dataset, which letter has the highest frequency? What is the corresponding value?",
+ "expected": "The letter E has the highest frequency, at 0.12702.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0110_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0110_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..94c7b34c3fe88b959826e90039d6eea968e9a08d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0110_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0110_bar_q2",
+ "instruction": "Which letters have frequency greater than 0.09? What are their specific values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0110_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which letters have frequency greater than 0.09? What are their specific values?",
+ "expected": "The letters E and T, at 0.12702 and 0.09056 respectively.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0111_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0111_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..27503df916aa3eaac0ef231a9a0b241812646cb6
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0111_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0111_bar_q1",
+ "instruction": "In this simple bar chart, which year has the highest sales? What is the sales value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0111_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In this simple bar chart, which year has the highest sales? What is the sales value?",
+ "expected": "1957 has the highest sales, at 145.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0112_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0112_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..1536331103287531077c838c17f0a92e0e66ede6
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0112_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0112_bar_q2",
+ "instruction": "In Aug., which city has the higher average monthly rainfall, and what are their values?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0112_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In Aug., which city has the higher average monthly rainfall, and what are their values?",
+ "expected": "Berlin is higher; Berlin is 42.4 and London is 35.6.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0112_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0112_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..9dab31758c9f365ffc60f1e2e2343957ce7bc9e9
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0112_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0112_line_q1",
+ "instruction": "According to the chart data, what is the value of cos(t) when t = 1.586663, and is this value positive or negative?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0112_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "According to the chart data, what is the value of cos(t) when t = 1.586663, and is this value positive or negative?",
+ "expected": "When t = 1.586663, cos(t) = -0.01586596, which is negative.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0113_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0113_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..332872d1cdca51b40728a78fff6209497122d04f
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0113_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0113_bar_q3",
+ "instruction": "Across all months shown in the chart, what are the total average monthly rainfall values for London and Berlin respectively, and which city has the greater total?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0113_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Across all months shown in the chart, what are the total average monthly rainfall values for London and Berlin respectively, and which city has the greater total?",
+ "expected": "London's total average monthly rainfall is 295.3, Berlin's is 337.7, and Berlin's total is greater.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0113_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0113_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..740d0352a76b8bd827111c21c47907791cb2df42
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0113_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0113_line_q2",
+ "instruction": "By how many years did Australia’s life expectancy increase from 1952 to 2007 according to the chart?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0113_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "By how many years did Australia’s life expectancy increase from 1952 to 2007 according to the chart?",
+ "expected": "Australia’s life expectancy increased by 12.115 years, from 69.12 in 1952 to 81.235 in 2007.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0114_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0114_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..7c843e5bf87097149c7720acdad399d76868b2f8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0114_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0114_bar_q1",
+ "instruction": "Which letter has the highest frequency, and what is its value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0114_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which letter has the highest frequency, and what is its value?",
+ "expected": "The letter E, with a frequency of 0.12702.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0114_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0114_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..2381fbbcc2708968795e713bba55b04adcce4a79
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0114_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0114_line_q1",
+ "instruction": "In 1972, which country had the higher life expectancy, and by how many years did it exceed the other?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0114_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 1972, which country had the higher life expectancy, and by how many years did it exceed the other?",
+ "expected": "In 1972, Australia had the higher life expectancy, exceeding New Zealand by 0.04 years (71.93 vs 71.89).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0115_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0115_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..e513ba66f897a89b6b29247f3b6a9056f8482659
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0115_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0115_bar_q1",
+ "instruction": "In the chart, which country has the highest value? What is its value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0115_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the chart, which country has the highest value? What is its value?",
+ "expected": "Norway, with a value of 50.2.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0115_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0115_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..34340ad7eab02fe8c3c96bf96e01f43a99ca5b19
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0115_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0115_bar_q3",
+ "instruction": "How many countries in the chart have a value greater than 40?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0115_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many countries in the chart have a value greater than 40?",
+ "expected": "2 countries.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0115_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0115_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..442285cceb000c6dbb9d195540283b20acb547b4
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0115_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0115_line_q3",
+ "instruction": "Which date has the higher GOOG value, 2018-01-01 or 2018-12-31, and by how much (in absolute terms)?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0115_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Which date has the higher GOOG value, 2018-01-01 or 2018-12-31, and by how much (in absolute terms)?",
+ "expected": "2018-01-01 has the higher GOOG value. It is 1.000 compared with about 0.971 on 2018-12-31, higher by roughly 0.029.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0116_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0116_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..63ba445591cee20e0234569fe085d8a3aba56316
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0116_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0116_bar_q2",
+ "instruction": "What is the sold value for the Sports genre?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0116_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the sold value for the Sports genre?",
+ "expected": "80",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0116_bar_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0116_bar_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..7cfed94465a7a8d832cd8222b6e674a21238fe9b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0116_bar_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0116_bar_q3",
+ "instruction": "Among Strategy, Action, and Other, which genre has the highest sales?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0116_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among Strategy, Action, and Other, which genre has the highest sales?",
+ "expected": "Other",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0117_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0117_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..411500919a81ea682f6e9aedd8e4bb1e4733613d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0117_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0117_bar_q2",
+ "instruction": "Compared with activity3, is activity2's percent larger, smaller, or the same?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0117_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Compared with activity3, is activity2's percent larger, smaller, or the same?",
+ "expected": "activity2 has a smaller percent; activity2 is 0.2 and activity3 is 0.3",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0118_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0118_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..a33335c18da2efbbe4a776ffd552201add66ce50
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0118_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0118_line_q2",
+ "instruction": "In 1992, which country has the higher gdpPercap and by how much is it higher than the other country?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0118_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 1992, which country has the higher gdpPercap and by how much is it higher than the other country?",
+ "expected": "In 1992, Canada has the higher gdpPercap; it exceeds Botswana’s gdpPercap by 18,388.772615 (26342.88426 − 7954.111645).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0119_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0119_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..4873a5e722bb55637b04aeff2236f28c13a8f6d8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0119_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0119_line_q2",
+ "instruction": "What is the y-value of the 'lines+markers' series at x = 0.19191919191919193?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0119_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the y-value of the 'lines+markers' series at x = 0.19191919191919193?",
+ "expected": "At x = 0.19191919191919193, the 'lines+markers' series has a y-value of 0.4089005379368278.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0120_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0120_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..dbed3203c9351375fdb32520c7fc65bf53d1c35d
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0120_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0120_line_q1",
+ "instruction": "In 1967, which country had the highest life expectancy, and what was its value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0120_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 1967, which country had the highest life expectancy, and what was its value?",
+ "expected": "In 1967, France had the highest life expectancy at 71.55 years.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0120_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0120_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..c91c9a346d3229e11455ff99dc4599bde425aead
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0120_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0120_line_q3",
+ "instruction": "In 1952, by how many years did France’s life expectancy exceed Spain’s life expectancy?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0120_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 1952, by how many years did France’s life expectancy exceed Spain’s life expectancy?",
+ "expected": "In 1952, France’s life expectancy exceeded Spain’s by 2.47 years (67.41 minus 64.94).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0122_bar_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0122_bar_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..dda6ce3cebd34d5b4d92c5892021b732f38e6f4b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0122_bar_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0122_bar_q1",
+ "instruction": "For task0, how many microseconds does the interval with status '0' last?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0122_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For task0, how many microseconds does the interval with status '0' last?",
+ "expected": "555 microseconds",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0122_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0122_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..36cf8b284b9903aee992289c247827c04b328072
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0122_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0122_bar_q2",
+ "instruction": "For task0, which status has a longer time interval, '0' or '1'?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0122_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For task0, which status has a longer time interval, '0' or '1'?",
+ "expected": "The time interval with status '1' is longer.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0122_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0122_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..54f9643f59e121ef1a1d1cc4cf1373bf0fc59c2e
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0122_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0122_line_q2",
+ "instruction": "At x = 0.5050505050505051, what are the y-values of the 'lines', 'lines+markers', and 'markers' traces, and which trace has the highest y-value there?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0122_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "At x = 0.5050505050505051, what are the y-values of the 'lines', 'lines+markers', and 'markers' traces, and which trace has the highest y-value there?",
+ "expected": "At x = 0.5050505050505051, 'lines' has y = 5.300170319955828, 'lines+markers' has y = -0.31011677351806, and 'markers' has y = -5.344987210154979; the 'lines' trace has the highest y-value at this x.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0122_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0122_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..b74e2ae0ee76a41e7dddd23afb02072d82399812
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0122_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0122_line_q3",
+ "instruction": "Among the three traces, which one has the largest range of y-values (maximum minus minimum), and what is that range approximately?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0122_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among the three traces, which one has the largest range of y-values (maximum minus minimum), and what is that range approximately?",
+ "expected": "The 'markers' trace has the largest y-range, with a range of approximately 5.2425 (from about -7.7931 to -2.5506).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0123_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0123_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..f06b4e3276fbc5254868218a1cd8a0501b31f6a5
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0123_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0123_line_q1",
+ "instruction": "Between 2001 and 2013, which news source experienced the largest increase in usage as the main source for news, and by how many percentage points did it change?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0123_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between 2001 and 2013, which news source experienced the largest increase in usage as the main source for news, and by how many percentage points did it change?",
+ "expected": "The Internet experienced the largest increase, rising by 37 percentage points (from 13% in 2001 to 50% in 2013).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0123_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0123_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..c74b822a123154737107ab9b249eca1d51a00247
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0123_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0123_line_q2",
+ "instruction": "In 2008, by how many percentage points did the share of people using the Internet as their main news source exceed those using Newspapers?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0123_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In 2008, by how many percentage points did the share of people using the Internet as their main news source exceed those using Newspapers?",
+ "expected": "In 2008, the Internet exceeded Newspapers by 5 percentage points (40% vs. 35%).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0124_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0124_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..871835c86ec36aceed6956fa6178caa849ad8b86
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0124_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0124_bar_q2",
+ "instruction": "In the \"<10\" age group, which state has the smallest population? What is the population?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0124_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "In the \"<10\" age group, which state has the smallest population? What is the population?",
+ "expected": "Vermont (VT), 63768",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0124_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0124_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..73445b6d7ffe0a814558102f66f4145304549c18
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0124_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0124_line_q2",
+ "instruction": "At x = 3, rank the Fair, Premium, and Ideal series by their y-values from highest to lowest.",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0124_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "At x = 3, rank the Fair, Premium, and Ideal series by their y-values from highest to lowest.",
+ "expected": "At x = 3, the ranking from highest to lowest is: Ideal (6), Premium (5), Fair (3).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0127_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0127_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..4964c639112bbe899e2daaa0f4de0c49bf8ad0da
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0127_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0127_line_q1",
+ "instruction": "For the data series with y-values 3, 4, 8, 3, at which x-value does it reach its maximum y-value, and what is that maximum?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0127_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "For the data series with y-values 3, 4, 8, 3, at which x-value does it reach its maximum y-value, and what is that maximum?",
+ "expected": "It reaches its maximum at x = 3 with a y-value of 8.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0127_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0127_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..00c154c48d4ff8098ea2e9d20a844775d4d2f7fe
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0127_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0127_line_q2",
+ "instruction": "At x = 2, which data series has the higher y-value, and by how much does it exceed the other series?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0127_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "At x = 2, which data series has the higher y-value, and by how much does it exceed the other series?",
+ "expected": "At x = 2, the series with y-values 1, 6, 2, 6 is higher, with y = 6, exceeding the other series (y = 4) by 2 units.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0128_bar_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0128_bar_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..9cef4773d84ca0b1b84f6c0e574b5fedb6967702
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0128_bar_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0128_bar_q2",
+ "instruction": "Comparing the first and last days chronologically (2015-10-22 to 2015-11-19), did the closing price (end) overall rise or fall? Specifically, from what value to what value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/bar/chart_0128_bar.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Comparing the first and last days chronologically (2015-10-22 to 2015-11-19), did the closing price (end) overall rise or fall? Specifically, from what value to what value?",
+ "expected": "The closing price overall increased, from 6.65 to 8.32.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0128_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0128_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..4796c1a4fe637e13439c7b5a29eda499583201bf
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0128_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0128_line_q3",
+ "instruction": "What is the difference between the values of the first and third data series in Winter?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/Plotly/line/chart_0128_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the difference between the values of the first and third data series in Winter?",
+ "expected": "In Winter, both the first and third data series have a value of 40, so the difference is 0.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0129_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0129_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..3898796e6ec9089d5f637e2cb3bb8f87b3eb9d1b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0129_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0129_line_q3",
+ "instruction": "How many months in the chart have values not less than 90?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/line/chart_0129_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many months in the chart have values not less than 90?",
+ "expected": "There are 3: Feb (91), Sep (99), and Oct (106).",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0130_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0130_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..0b4998173cf77b9d19729b81c65b97bd39809391
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0130_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0130_line_q2",
+ "instruction": "How many years have a count value less than 5000, and which years are they?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/line/chart_0130_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "How many years have a count value less than 5000, and which years are they?",
+ "expected": "There are 3 years: 1998, 2010, and 2012.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0132_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0132_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..d92d627b5c6d088d53a65f44970d791706d196ef
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0132_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0132_line_q2",
+ "instruction": "Among the four days from 2007-04-23 to 2007-04-26 (inclusive), on which day was the close value the highest? What was the highest value?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/line/chart_0132_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among the four days from 2007-04-23 to 2007-04-26 (inclusive), on which day was the close value the highest? What was the highest value?",
+ "expected": "2007-04-26, with a close of 99.92",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0132_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0132_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..32537a43ed5975f2950dd5e3b8bc09ad10027b3b
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0132_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0132_line_q3",
+ "instruction": "What is the difference in close value between 2007-12-12 and 2007-12-27? (Use the latter day minus the former day)",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/line/chart_0132_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the difference in close value between 2007-12-12 and 2007-12-27? (Use the latter day minus the former day)",
+ "expected": "The difference is 8 (199.83 - 191.83)",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0139_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0139_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..8c3a57c614ed3a65f027b80e042c32a97fa1b46a
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0139_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0139_line_q1",
+ "instruction": "Among all items, which item with type 'a' has the lowest score, and what is that score?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/line/chart_0139_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Among all items, which item with type 'a' has the lowest score, and what is that score?",
+ "expected": "Support, with a score of 30.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0139_line_q3.json b/evaluation_examples/examples/insert_chart_data/chart_0139_line_q3.json
new file mode 100644
index 0000000000000000000000000000000000000000..739baeb6b360151cb60d5fb5b33766ec08dd5fd8
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0139_line_q3.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0139_line_q3",
+ "instruction": "What is the highest score in the entire dataset, and for which items and types does it appear?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/line/chart_0139_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the highest score in the entire dataset, and for which items and types does it appear?",
+ "expected": "The highest score is 70, appearing for Design type 'a', Development type 'b', Test type 'b', and Language type 'a'.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0142_line_q2.json b/evaluation_examples/examples/insert_chart_data/chart_0142_line_q2.json
new file mode 100644
index 0000000000000000000000000000000000000000..81ca5be5a418735cbf882181340b412d681cc6bb
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0142_line_q2.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0142_line_q2",
+ "instruction": "Between 2011-10-01 and 2011-11-01, on which day is the value higher?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/line/chart_0142_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "Between 2011-10-01 and 2011-11-01, on which day is the value higher?",
+ "expected": "The value on 2011-10-01 is higher, at 62.7, which is higher than 57.9 on 2011-11-01.",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/evaluation_examples/examples/insert_chart_data/chart_0143_line_q1.json b/evaluation_examples/examples/insert_chart_data/chart_0143_line_q1.json
new file mode 100644
index 0000000000000000000000000000000000000000..9cd9a13061a5f892e5552175eac7b0839ed60f32
--- /dev/null
+++ b/evaluation_examples/examples/insert_chart_data/chart_0143_line_q1.json
@@ -0,0 +1,59 @@
+{
+ "id": "chart_0143_line_q1",
+ "instruction": "What is the maximum value of y in this line's data?",
+ "config": [
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "google-chrome",
+ "--remote-debugging-port=1337"
+ ]
+ }
+ },
+ {
+ "type": "launch",
+ "parameters": {
+ "command": [
+ "socat",
+ "tcp-listen:9222,fork",
+ "tcp:localhost:1337"
+ ]
+ }
+ },
+ {
+ "type": "sleep",
+ "parameters": {
+ "seconds": 2
+ }
+ },
+ {
+ "type": "chrome_open_tabs",
+ "parameters": {
+ "urls_to_open": [
+ "http://202.117.43.20:8772/web_insert/AntV G2/line/chart_0143_line.html"
+ ]
+ }
+ },
+ {
+ "type": "activate_window",
+ "parameters": {
+ "window_name": "Google Chrome"
+ }
+ }
+ ],
+ "evaluator": {
+ "func": "llm_judge",
+ "result": {
+ "type": "agent_answer"
+ },
+ "expected": {
+ "type": "rule",
+ "rules": {
+ "question": "What is the maximum value of y in this line's data?",
+ "expected": "1.5",
+ "rubric": "真实评判"
+ }
+ }
+ }
+}
diff --git a/web_insert/AntV G2/bar/chart_0110_bar.html b/web_insert/AntV G2/bar/chart_0110_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..d44568d54d3a8f914477c2f1b663a2cf522e1746
--- /dev/null
+++ b/web_insert/AntV G2/bar/chart_0110_bar.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T38 User Operations Console
+
+
+
+
+
+
+
+
+
+
Live queuePriority reviewRetention focus
Review account health, retention risk, and pending interventions for active customer segments.
+
+
+
+ Loading view
+ Active user case flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current queue reflects a concentrated effort to retain users who showed intent but encountered friction during critical account steps. Teams are expected to document every outreach attempt, confirm ownership before escalation, and close only when the account is either stable or formally transferred for continued monitoring.
+
+
+
+
+
+
+
+
+
+
Case Activity
+
Recent decisions and follow-up movement
+
+
+
+
+
+
+
+
High-value account awaiting decisionNo final disposition recorded after manual review
High
Outreach backlog risingFollow-up queue has crossed internal response target
Medium
Exception note incompletePolicy-sensitive case missing approval rationale
Medium
+
Confirm owner coverage for priority cases7 cases without confirmed handoff
In progress
Complete callback verificationPending contact outcomes need final status
Queued
Close resolved onboarding reviewsCases meet closure conditions after successful recovery
Ready
+
Owner updated on priority reviewRouting changed after shift handoff
Manual decision recordedCase moved from hold to monitor
Risk flag clearedActivity recovered after intervention
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Queue clearance72%
Handled against current intake
Outreach completion64%
Priority contacts sent and logged
Approval coverage89%
Cases with complete decision trail
+
+
+
Operational Notes
+
Current activity is centered on a rise in support-linked retention risk. Several accounts were routed into manual review after repeated onboarding exits, failed self-service recovery, or policy-sensitive changes that require a documented decision.
+
High-priority cases are routed to named owners before outreach begins.
Accounts with repeat friction stay in review until next-step evidence is recorded.
Policy exceptions require a reason code and final approval note.
+
Active owners16
Cases on hold12
Recovered users31
+
Review Signals
Escalation rate11%
Policy exceptions9
Pending callbacks22
Risk rule triggered
Account entered review after repeated drop-off behavior
Operations review started
Owner assigned and contact path confirmed
User contacted
Follow-up sent with recovery guidance and next action
Decision logged
Case moved to monitor, close, or escalate
+
+
+
Access, contact history, and policy decisions are recorded for audit review.
+
+
+
+
diff --git a/web_insert/AntV G2/bar/chart_0111_bar.html b/web_insert/AntV G2/bar/chart_0111_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..9803b0f6d4f51625676c571c26b2b1903c44c7f6
--- /dev/null
+++ b/web_insert/AntV G2/bar/chart_0111_bar.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
Track specimen intake, instrument readiness, review holds, and release validated results from one controlled queue.
+
+
+
+ Loading view
+ Specimen flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Current delays are not caused by intake volume but by a narrow cluster of held results that need repeat confirmation and signed reviewer rationale. Once those cases are closed, the release queue should return to normal pace.
+
+
+
+
+
+
+
+
+
+
Validation Activity
+
Latest laboratory actions and review updates
+
+
+
+
+
+
+
+
Quality hold threshold reachedChemistry lane 7 held results
High
Instrument maintenance window dueHematology bench service reminder
Complete supervisory sign-off for held chemistry cases24 items in review queue
In progress
Verify rerun documentation before release5 specimens require note completion
Pending
Confirm analyzer readiness after resetPost-interruption checks still open
Waiting confirmation
+
Accession team cleared label exceptionMatched specimen and order records
Reviewer added comment to held electrolyte panelAwaiting repeat outcome
Bench lead reassigned overflow workCapacity balanced across active stations
Final result packet released to care teamAudit trail completed
+
+
Throughput Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Accessioning completion92%
Most inbound samples logged and routed
Validation review68%
Routine cases moving faster than held work
Quality documentation81%
Remaining notes tied to reruns and holds
+
+
+
Escalation Notes
+
Supervisors are balancing turnaround targets with quality controls, making sure reruns, delta checks, and documentation updates are completed before any final authorization.
+
Priority samples are routed directly to staffed benches.
Held results require either repeat testing or reviewer comment.
Release activity is limited to validated work with complete audit notes.
+
Released today143
Open holds7
Assigned reviewers9
+
Bench Signals
Pending accession checks12
Benches at capacity2
Reruns in progress5
Intake batch reconciled
Analyzer lane reset
Senior review started
Release queue narrowed
+
+
+
All releases must include reviewer confirmation and complete traceability.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
+
+
+
+
diff --git a/web_insert/AntV G2/bar/chart_0117_bar.html b/web_insert/AntV G2/bar/chart_0117_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..d27fa8aef7607d1d0e520bb447d21736a3163b6c
--- /dev/null
+++ b/web_insert/AntV G2/bar/chart_0117_bar.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T34 Water Operations Control
+
+
+
+
+
+
+
+
+
+
Live networkShift handoffPriority review
Monitor plant output, service pressure, and field response from one operating view.
+
+
+
+ Loading view
+ Network status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Control Note
+
The active case is no longer expanding, but the team is holding controls in place until all dependent checks are complete. Field, dispatch, and service desk updates should stay aligned so closures do not outpace verified operating conditions.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Operational updates and required follow-up
+
+
+
+
+
+
+
+
Restricted pressure in east zoneCustomer impact limited; monitoring remains active
High
Booster station follow-up duePost-adjustment verification pending from field lead
Medium
Closure approval waitingSupervisor sign-off required on 3 linked work orders
Medium
+
Confirm downstream pressure readingsAssigned to east response crew
In progress
Validate temporary routing planRequired before restriction release
Pending review
Close resolved customer casesService desk waiting on operations note
Ready
+
Dispatch logged stable readings from sector valve setRecent field update
Plant control confirmed output remains on targetOperations note
Service desk tagged 4 cases for combined closureQueue update
Depot issued replacement fittings to mobile crewSupply confirmation
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident containment82%
Awaiting final field confirmation
Work order completion64%
Linked repairs moving through review
Case closure readiness71%
Service notes partially complete
+
+
+
Supervisor Notes
+
The current focus is to keep supply steady across high-demand zones, clear outstanding field confirmations, and close service cases that no longer need escalation. Supervisors are reviewing exceptions before the next handoff.
+
East transmission line remains in controlled operation with no new loss reports.
Two booster stations are running under temporary observation after overnight adjustment.
Customer-facing updates are limited to affected service pockets only.
Repair stock for seals and isolation fittings is available at primary depot.
+
Crews deployed9
Sites under watch4
Pending approvals6
+
Operational Signals
Reservoir balanceNormal
Pump readinessHigh
Field backlogModerate
Pressure deviation flagged
Network monitoring raised an east line variance and opened incident review.
Field isolation confirmed
Local crew secured the affected segment and reported stable downstream flow.
Supervisor review in progress
Operations lead is validating closure conditions before releasing restrictions.
+
+
+
Use confirmed field updates before changing service classification or closing a case.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
Operational summary for site load, steam demand, and utility variance across active production lines.
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
+
+
+ Loading view
+ Consumption overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operating Note
+
The current review is centered on whether the elevated water draw should be recorded as expected support usage or escalated as a controllable loss. Early checks support the first view, but the decision will remain open until sanitation records and supervisor confirmation are complete.
+
+
+
+
+
+
+
+
Supervisor Support
+
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
Base electrical load improved after non-process fans were isolated during idle periods.
Compressed air demand stayed even, with no signs of sustained leakage during the late run.
Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
Water variance should be rechecked once final sanitation logs are posted.
+
Open exceptions2
Lines reviewed6/6
Actions due3
+
+
+
+
Completion Progress
+
Status of review and follow-up
+
+
+
+
+
+
+
+
Water use above expected bandPackaging area support services
Medium
Line idle shutdown not confirmedTwo areas missing end-run verification
Low
Final sanitation log still pendingRequired to close variance review
Medium
+
Confirm restart-related water drawOperations supervisor to validate against log entries
In progress
Verify non-process equipment shutdownUtilities team to spot-check idle periods
Queued
Complete site approvalRequired before report closeout
Pending
+
Meter reconciliation completed for main supplyLogged by utilities desk
Maintenance confirmed no active steam issueInspection note added
Cost allocation refreshed for final reviewFinance rule set applied
+
+
+
Assessment
+
No immediate escalation is required, but the site energy lead has asked line supervisors to confirm idle-time shutdown discipline before the next reporting cycle is closed.
+
Meter validation100%
All core readings matched
Variance review68%
Awaiting supporting logs
Management sign-off35%
Ready for supervisor action
+
Key Signals
Load balanceSteady
Utility riskModerate
Approval statePending sign-off
Water intake exceeded the normal operating band during cleaning and restart activity. Review remains open until line notes and final meter confirmation are attached.
+
+
Use this report to confirm variances, assign follow-up, and complete site-level review before closeout.
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
Monitor enrollment flow, review teaching requests, and keep campus services within response targets.
+
+
+
+ Loading view
+ Enrollment workload
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main pressure point is not overall volume but the number of cases waiting on a second team to confirm eligibility, roster placement, or account release. Clearing those handoffs will reduce repeat contacts and keep approvals moving in the right order.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Recent updates across admissions, scheduling, and support
+
+
+
+
+
+
+
+
Identity check queue exceeded review target14 learner files are outside normal handling time
Access provisioning paused for one intake groupRoster confirmation is still pending from registry
Medium
+
Approve seat exception requestsOwned by academic operations
In progress
Confirm account release listWaiting on final learner verification
Blocked
Close duplicate support casesMerge requests from advising and registry
Ready
+
Registry completed a priority batch reviewOpen count reduced after document validation
Scheduling submitted a conflict noteOne instructor assigned to overlapping sessions
Support added an access exceptionLearner record needs manual activation
Advising returned a hold for correctionProgram selection does not match approved path
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Enrollment validation74%
Most records reviewed; exceptions remain
Teaching assignment approval61%
Conflict cases still under review
Account activation release83%
Waiting on final roster handoff
+
+
+
Support Notes
+
Most exceptions are tied to incomplete learner records and overlapping instructor availability. Team leads are using the queue to clear blocked cases before they affect course readiness and support response times.
+
Admissions is prioritizing records with missing identity checks.
Scheduling is reviewing instructor conflicts before room release.
Support is holding account activation until final roster approval.
Policy notices were updated to reflect new escalation ownership.
+
Escalations7
Owners online12
Blocked cases19
+
Operational Signals
Validation backlogModerate
Seat release paceStable
Access turnaroundAt risk
Intake review opened
Registry triage assigned the latest submission batch
Faculty request escalated
Teaching load conflict moved to academic operations
Roster lock cleared
Student services approved the final exception set
+
+
+
Use this view to coordinate approvals, confirm handoffs, and clear blockers before escalation windows are breached.
Reporting cycle activeEvidence under reviewSite coverage completeApproval pending
+
+
+
Reporting Summary
Consolidated operational view for facility emissions, evidence readiness, and approval progress across the reporting cycle.
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
+
+
+ Loading view
+ Emissions view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Reporting Note
+
Most reporting work is complete, but the team is holding release until the last boundary clarification and control statement are fully documented. Once those items are closed, the submission can move through approval without further operational changes.
+
+
+
+
+
+
+
+
Reporting Support
+
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
All operated facilities submitted activity data within the active reporting window.
Boundary assumptions were updated after internal control review.
Evidence coverage is complete for direct fuel use and purchased electricity.
Final sign-off is blocked only by unresolved exception responses.
+
Facilities in scope14
Evidence files linked128
Approvers assigned5
+
+
+
+
Review Activity
+
Recent actions tied to the current reporting cycle
+
+
+
+
+
+
+
+
Boundary note requires confirmationShared support load treatment updated by operations
Medium
Exception owner response overdueOne facility comment has not been returned
High
Approval pack awaiting final attachmentControl statement must be added before routing
Low
+
Validate revised allocation methodCheck consistency against facility evidence
In progress
Close open exception itemsCollect responses from assigned owners
Blocked
Route package for sign-offRelease once control statement is attached
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
Editorial interpretation, policy check, and release readiness for a high-traffic article package.
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
+
+
+ Loading view
+ Article review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
The item remains on hold because reviewers want the final article to state only what can be supported directly in the reporting record. Once the headline and two interpretive passages are revised, the last policy note can be closed and the release team can complete handoff without reopening the brief.
+
+
+
+
+
+
+
+
Editorial Support Notes
+
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
Tighten the headline so it reflects verified reporting only
Rework two interpretive lines in the middle section
Confirm attribution order in the closing paragraph
Keep the release hold in place until policy notes are cleared
+
Linked notes12
Required edits3
Approvals2/3
+
+
+
+
Recent Activity
+
Latest actions across review, policy, and release handling.
+
+
+
+
+
+
+
+
Policy sign-off still openRelease cannot proceed until the final comment is resolved
High
Headline wording exceeds source certaintyDesk requested a narrower phrasing pass
Medium
Closing attribution order changedLatest revision needs reviewer confirmation
Low
+
Apply marked language editsThree passages require direct revision
Prepare release handoffQueue placement is ready once approval lands
Queued
+
Desk review updated with narrowed wording requestAdded by editorial review
Policy note linked to middle section passageMapped to required edit
Release hold confirmed by operationsQueue position preserved
Final pass assigned to senior reviewerAwaiting consolidated response
+
+
+
Reading Insight
+
Operations has held the item in the final queue so the desk can complete one coordinated pass rather than resolve comments in isolation. this workflow is intended to keep editors, policy reviewers, and release staff on the same record while the article moves through its last approval step.
+
Editorial review88%
Most text decisions are settled
Policy clearance67%
One required note remains
Release handoff54%
Prepared but not cleared
+
Release Signals
Attribution strengthNeeds tightening
Headline alignmentUnder revision
Release readinessPending approval
Final release depends on one policy approval and completion of marked language edits.
+
+
Use the same review record when updating wording, approvals, and release handling to avoid duplicate decisions.
+ Active portfolioReview in progressFunding controlsCompliance watch
+
+
+
+
+
+
+
+
Managed
Monitor active studies, pending approvals, funding usage, and cross-team follow-up from one operational view.
The office is managing a mixed portfolio of faculty-led studies, lab collaborations, and student research initiatives. Most work is progressing within approved scope, but a small set of submissions requires administrative response before funds or participant activity can proceed.
Dr. Elaine PorterDirector, Research Administration
+
Open Projects
48
6 awaiting formal approval
Active Funding
$12.4M
Within approved allocation range
Pending Reviews
17
4 require principal investigator response
Policy Exceptions
3
All assigned for follow-up
+
+
+
+ Loading view
+ Project activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Several projects are close to activation, but progress depends on small administrative corrections. Clearing incomplete files and confirming ownership will reduce delay, improve audit readiness, and allow the office to release approved work without further escalation.
+
+
+
+
+
+
+
+
Office Notes
+
Current attention is focused on review completion, documentation quality, and timely coordination between academic units and the central research office. Team leads are using this view to resolve blockers, confirm ownership, and keep each project aligned with internal policy.
+
Approval backlog is concentrated in new submissions with incomplete ethics attachments.
Two high-value projects are waiting on revised budget justification before release.
Records cleanup reduced duplicate sponsor entries across several departments.
Escalations are being routed to unit coordinators for direct follow-up.
+
Units involved11
Cases reassigned5
Records updated23
+
+
+
+
Recent Office Activity
+
Latest updates across approvals, records, and funding control.
+
+
+
+
+
+
+
+
Budget release on holdMissing approval note from finance control
High
Ethics file incompleteParticipant consent language requires revision
Medium
Sponsor record mismatchDepartment entry differs from central register
Low
+
Confirm unit reviewer for pending submissions7 projects without final reviewer assignment
Open
Release approved funding batch2 projects cleared after documentation check
Ready
Close duplicate sponsor recordsFollow-up required across 3 departments
In progress
+
Policy team returned one exception case for clarificationNeeds updated risk statement
Finance control cleared restricted spending lineRelease can proceed after office sign-off
Graduate coordinator added missing investigator credentialsSubmission now eligible for formal review
Unit office confirmed lead contact changeRecords updated for future notices
+
+
+
Portfolio Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Initial screening92%
Most submissions validated
Formal review68%
Backlog concentrated in exception cases
Funding release74%
Delayed by final approval checks
+
Recent Milestones
Portfolio intake closed
New submissions moved to initial screening
Compliance review updated
Exception cases reassigned to policy team
Funding release prepared
Awaiting final sign-off from finance control
Units involved11
Cases reassigned5
Records updated23
+
+
+
Internal use only. Funding, review, and compliance actions must be recorded before project status is changed.
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
Coordinate active equipment work, parts readiness, and technician handoff for the current plant queue.
+
+
+
+ Loading view
+ Asset service status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
The main risk is not the volume of open work but the overlap between recurring faults, shared spare parts, and incomplete close-out records. The coordinator is prioritizing jobs that restore stable operation fastest while making sure each completed repair can pass inspection without rework.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest maintenance coordination updates
+
+
+
+
+
+
+
+
Repeat fault on feeder motor requires supervisor reviewLinked to two prior corrective orders
Close-out blocked by missing isolation recordInspection will not release final status
High
+
Approve repair scope for Press Line 2 feederCost review attached by area lead
Pending approval
Confirm staged parts for conveyor coupling replacementMechanical crew waiting at access point
In progress
Return corrected close-out notes to inspectionPhoto evidence and isolation steps required
Needs update
+
Mechanical crew reported safe access at feeder bayField note added 14 min ago
Parts desk reserved seal kit for linked ordersReservation confirmed against active queue
Area lead raised priority on conveyor drive caseOperational impact now classified as elevated
Inspection returned one closure package for revisionMissing verification note in final step
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Priority repairs completed62%
8 of 13 cleared
Parts staging readiness73%
Most critical kits available
Close-out compliance81%
Several packages awaiting final note
+
+
+
Coordination Notes
+
The current focus is keeping high-use assets in service while clearing overdue follow-up work from earlier interventions. Notes, queue status, and technician updates are aligned here so handoff decisions can be made without opening separate records.
+
Three priority jobs share the same hydraulic seal kit and must be sequenced carefully.
Inspection has requested photo confirmation before closing two repeat-failure orders.
One conveyor drive can remain in service under reduced load until replacement stock is issued.
Electrical support is available for lockout review on escalated jobs.
+
On-site crews4
Locked out assets3
Rush requests2
+
Support Readiness
Critical assets online9/10
Awaiting approval4 orders
Parts shortfall2 items
Failure review completed for press feeder
Supervisor approved immediate repair path
Seal kit released from parts crib
Reserved against two linked work orders
Field update posted by mechanical crew
Access cleared and unit isolated
Close-out package returned for correction
Inspection note required before final release
+
+
+
All updates shown here are operational records and must match the approved work order before closure.
+
+
+
+
diff --git a/web_insert/AntV G2/box/chart_0060_box.html b/web_insert/AntV G2/box/chart_0060_box.html
new file mode 100644
index 0000000000000000000000000000000000000000..e4486b506d628974d28e208f32a47417820e3ed2
--- /dev/null
+++ b/web_insert/AntV G2/box/chart_0060_box.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T14 Store Stock Control
+
+
+
+
+
+
+
+
+
+
Live stockReplenishment reviewHold resolution
Track replenishment risk, release held inventory, and keep shelf availability aligned across active locations.
+
+
+
+ Loading view
+ Location stock position
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main concern is not total network stock but timing. Several locations can return to normal selling levels once held units are cleared and transfer approvals are issued in the right order. Teams are using this view to keep store demand, receiving capacity, and release controls aligned.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Latest stock handling and release steps
+
+
+
+
+
+
+
+
Count mismatch blocking release12 item lines remain held after store recount
High
Priority location below cover targetReplenishment risk increased across 4 stores
Medium
Receiving backlog nearing thresholdInbound confirmation lag may delay availability updates
Medium
+
Approve transfer batch for thin-cover stores29 lines prepared by distribution planning
Ready
Confirm held quantities against recount notes74 units waiting on store validation
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Hold review completion68%
Most flagged lines have first-pass decisions
Transfer approval completion54%
Awaiting release order from control lead
Count reconciliation73%
Repeat variance stores still under review
+
+
+
Operational Notes
+
this workflow supports the daily decision flow: identify where cover is too thin, confirm whether held stock can be released, and route transfer lines to the locations with the highest service risk. Notes and queue items below reflect the current handoff between store control, distribution, and floor operations.
+
Prioritize releases for locations with same-day shelf risk.
Delay nonessential transfers until held quantities are verified.
Escalate repeated count mismatches to store control leads.
Keep transfer approvals aligned with receiving capacity.
+
Priority stores11
Open holds18
Ready transfers7
+
Network Signals
Service riskElevated
Receiving pressureModerate
Approval backlogContained
Cycle count exceptions reviewed
Store control completed first-pass review on flagged lines.
Transfer requests consolidated
Low-cover locations were grouped for a single approval pass.
Held stock release pending
Distribution is waiting for final quantity confirmation.
+
+
+
Use release actions only after count confirmation is recorded in the item note.
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
Post-run assessment for the last completed checkout messaging experiment, including impact, rollout decision, and follow-up actions.
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
+
+
+ Loading view
+ Experiment results
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Analyst Note
+
The result is not only statistically reliable but also operationally clean. Teams reviewing payment quality, support demand, and buyer behavior did not identify a counter-signal large enough to block release, which makes this a suitable candidate for default rollout with normal monitoring.
+
+
+
+
+
+
+
+
Review Notes
+
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
Primary goal was improved checkout completion.
Guardrails covered payment success, cancellation intent, and support contact rate.
Result supports rollout with standard monitoring.
Follow-up work should focus on first-time buyer reassurance.
+
Control share50%
Variant share50%
Guardrails passed3/3
+
+
+
+
Recent Activity
+
Latest review updates and decision steps
+
+
+
+
+
+
+
+
Release approval pendingRequires product and operations sign-off
Medium
Follow-up test not yet scopedFirst-time buyer segment showed the strongest response
Low
Monitoring handoff requiredPost-release checks must be assigned before launch
Medium
+
Confirm rollout ownerRelease coordination for default experience
Open
Document final decisionAdd rationale to the experiment record
In progress
Prepare follow-up briefDraft next test for delivery reassurance
Not started
+
Data review completed by analyticsNo variance issues found in conversion events
Support lead confirmed stable contact volumeNo increase tied to variant exposure
Product owner attached final recommendationPromote Variant B with standard guardrails
Release coordinator requested approval windowDecision needed before deployment planning
+
+
+
Key Insight
+
The operational recommendation is to promote Variant B to the default experience, keep the current guardrails in place, and open a follow-up test on supporting text near delivery expectations.
+
Review completion92%
Only final approval remains
Release readiness84%
Monitoring and ownership still being confirmed
Follow-up planning36%
Next hypothesis not fully defined
+
Quality Signals
Audience balanceWithin tolerance
Tracking integrityVerified
Release readinessApproved pending sign-off
Control used the existing confirmation message. Variant B used shorter supporting language focused on confidence before purchase.
+
+
Rollout should begin with standard monitoring and a hold point if payment reliability moves outside normal range.
Post-route summary for the latest dispatch cycle, focusing on late handoff recovery, depot coordination, and proof-of-delivery completion.
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
+
+
+ Loading view
+ Route performance view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
This review is being used to decide whether dispatch should adopt a standard delay-recovery playbook for mixed-stop runs. The current response relied on experienced staff making quick route adjustments, which worked in this case but may not scale without clearer depot release rules and a required outreach log for affected stops.
+
+
+
+
+
+
+
+
Support Notes
+
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
Departure drift started at the depot gate after loading lane congestion.
Manual reprioritization reduced missed arrival commitments on dense urban segments.
Proof-of-delivery capture improved after drivers were reminded to close stops before returning.
Two exception cases remain open pending package condition review.
+
Resequenced routes7
Support calls placed23
Returns held2
+
+
+
+
Recent Activity
+
Updates recorded during issue containment and closure review.
+
+
+
+
+
+
+
+
Proof mismatch on return scan2 consignments need depot confirmation
Medium
Loading lane congestion repeatedObserved across early dispatch wave
High
Customer contact note missing1 delayed stop closed without outreach log
Low
+
Validate open claims with depot supervisorAttach condition notes and return scans
In progress
Document route resequencing rulePrepare for dispatch handbook update
Pending
Close driver note reviewConfirm repeated gate delay comments
Ready
+
Driver team acknowledged revised stop orderField update logged by support desk
Depot supervisor added lane usage noteRoot cause linked to overlap during loading release
Customer service cleared outreach backlogAll affected recipients received status calls
The review focus is on whether the corrective actions used by the team should become standard practice for future mixed-stop routes with tight loading turnover.
+
Exception closure78%
Most delivery issues resolved in the same cycle
Driver note review64%
Comments grouped by route segment
Depot corrective action41%
Lane balancing plan awaiting sign-off
+
Field Signals
Route adherenceStable after intervention
Depot readinessNeeds lane balancing
Customer contact coverageAbove target
Opened after repeated departure slippage affected downstream stop timing and closure quality.
+
+
Internal review record for route performance follow-up and process adjustment.
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
Receiving activePutaway constrainedDispatch on hold
Monitor inbound receipts, putaway flow, and outbound release from one operating view.
+
+
+
+ Loading view
+ Facility activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main risk is not total volume but timing. Inbound receipts, reserve storage, and outbound release are all connected, so a short delay at dock assignment or packing review quickly affects the rest of the floor. Clearing blocked pallets and reallocating lift coverage should return the site to a steadier operating rhythm.
+
+
+
+
+
+
+
+
+
+
Floor Activity
+
Updated as teams complete receiving, storage, and release steps.
+
+
+
+
+
+
+
+
Dock queue above working limit6 loads waiting longer than target
High
Bulk zone capacity nearing thresholdReserve slots at 93% use
+ Live ControlDispatch ReadyStorage BalancedField Review Open
+
+
+
+
+
+
+
+
Operational
Track site output, storage readiness, dispatch commitments, and field actions across the active hub.
The hub is operating within target limits, with solar and wind assets sharing load as expected and storage carrying the balancing role for short fluctuations. Dispatch obligations remain intact, and no station is currently outside its approved operating envelope.
Elena MorrisRegional Hub Supervisor
+
Net Output
428 MW
Holding above committed delivery band
Available Storage
81%
Reserve margin kept for evening handoff
Curtailment Risk
Low
No immediate restriction notices in scope
Open Field Actions
7
Two require supervisor review
+
+
+
+ Loading view
+ Hub performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Output remains dependable across the hub, but the team is keeping close watch on the inland station until restart behavior is fully verified. Supervisors should clear the pending reserve note and confirm the inspection window so field and control actions stay aligned.
+
+
+
+
+
+
+
+
Operations Notes
+
Operations staff are watching one inland station where inverter recovery is slower than normal after a brief protective trip. The condition is stable, but the team has kept a local inspection open until the restart pattern returns to baseline.
+
Primary dispatch commitment remains fully covered by live generation and stored reserve.
One site review is waiting on field confirmation before the maintenance note can be closed.
Remote control authority is active for all stations in the current hub scope.
No compliance holds are blocking routine switching or battery balancing actions.
+
Stations Online14
Open Reviews3
Active Crews2
+
+
+
+
Shift Activity
+
Recorded actions and follow-up items for the active operating window.
+
+
+
+
+
+
+
+
Inland station restart varianceRecovery sequence exceeded normal duration
Medium
Storage reserve floor nearing handoff targetBalancing plan may need minor adjustment
Low
Field confirmation pending on breaker inspectionClosure blocked until site response is logged
Medium
+
Approve reserve adjustment noteSubmitted by shift operator
Pending approval
Confirm inland site inspection windowCrew lead requested access hold
Waiting
Close completed switching logControl steps verified by second reviewer
Ready
+
Grid desk accepted updated export positionAcknowledgement logged by dispatch coordinator
Battery balancing sequence completed without exceptionAutomatic control remained within approved limits
Field crew checked access route to inland stationTravel and handoff conditions confirmed
Remote link health check passed across all active sitesNo communication degradation recorded
+
+
+
Readiness Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Dispatch coverage96%
Committed export supported
Storage readiness81%
Reserve held for balancing
Field action closure68%
Open reviews moving toward sign-off
+
Recent Activity
Hub entered balanced operating mode
Control room update
Storage reserve floor adjusted for dispatch window
Shift approval recorded
Inverter restart review opened at inland station
Field follow-up assigned
Export commitment reconfirmed with grid desk
Acknowledgement received
Stations Online14
Open Reviews3
Active Crews2
+
+
+
Use this view to confirm readiness before approving dispatch changes or closing field actions.
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
+
+
+
+
diff --git a/web_insert/AntV G2/heatmap/chart_0053_heatmap.html b/web_insert/AntV G2/heatmap/chart_0053_heatmap.html
new file mode 100644
index 0000000000000000000000000000000000000000..fa859379485c05ab6de1a55bee109d70dc6d3ae0
--- /dev/null
+++ b/web_insert/AntV G2/heatmap/chart_0053_heatmap.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T19 Fulfillment Control Center
+
+
+
+
+
+
Monitor outbound flow, clear held orders, and keep dock activity aligned with carrier cutoff commitments.
Outbound volume is moving at a healthy pace, but a growing cluster of held orders is starting to compress the final release window. Most exceptions are concentrated in a small number of picking zones, which means the team can recover service if reviews are completed before the next carrier handoff cycle.
Maya ChenFulfillment Operations Lead
+
Orders ready to release
1,284
Stable after the last verification pass
Orders on hold
73
Most require address or stock confirmation
Dock lanes active
18 / 22
Two lanes reserved for late priority loads
On-time dispatch
96.4%
Holding above internal service target
+
+
+
+ Loading view
+ Outbound release status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most outbound risk is not coming from overall volume; it is coming from a manageable set of held orders that can delay the final handoff sequence if left unresolved. Clearing those exceptions now protects both dock capacity and on-time dispatch.
+
+
+
+
+
+
+
+
Operational Notes
+
Dock activity remains balanced across active lanes, and release discipline is preventing unnecessary trailer dwell. The current focus is to resolve shipment holds in the queue, confirm a small set of short picks, and protect the late priority wave from congestion near final staging.
+
Address validation holds account for the largest share of delayed releases
Priority orders should be cleared before standard replenishment checks resume
Lane reassignment is available if staging volume exceeds the current threshold
Carrier handoff timing remains achievable with active exception review
+
Rush orders146
Review desks open5
Average hold age42m
+
+
+
+
Recent Actions
+
Latest fulfillment events and reviews
+
+
+
+
+
+
+
+
Held orders above control threshold73 orders pending review across three zones
High
Lane 12 staging nearing limitOverflow risk if the next release is not staggered
Medium
Carrier cutoff buffer tighteningPriority loads need final confirmation soon
Medium
+
Clear address validation holdsAssigned to order review desk
In progress
Confirm short pick substitutionsAwaiting floor lead approval
Pending
Protect late priority lane capacityReserve space before final handoff
Scheduled
+
Verification team cleared 22 held ordersQueue pressure eased in the last review cycle
Dock supervisor opened two backup positionsStaging congestion reduced near outbound lanes
Carrier desk confirmed on-time intakeNo change to active handoff sequence
Packing lead flagged repeat scan failuresIssue isolated to one station for follow-up
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Order release completion78%
Released against current outbound plan
Exception resolution63%
Held orders cleared or reassigned
Dock preparation87%
Lanes staffed and staged for handoff
+
Release Activity
Wave release completed
Primary outbound batch moved to final staging
Exception queue escalated
Held orders above review target triggered supervisor attention
Dock lanes rebalanced
Two lanes opened for priority handoff protection
Final verification in progress
Pack confirmation and label checks underway
Rush orders146
Review desks open5
Average hold age42m
+
+
+
Use this view to clear blockers early, protect release timing, and keep dock flow aligned with service commitments.
+ Live DispatchPriority LoadsDriver CoverageGate Readiness
+
+
+
+
+
+
+
Active monitoring
+
Coordinate active routes, rebalance drivers, and clear open exceptions from one operating view.
+
Dispatch is managing a tight operating window with several outbound runs stacked behind the same gate sequence. The team has already reallocated available units to protect higher-priority moves and reduce idle time at the yard.
+
+
+
Maya BennettFleet Dispatch Lead
+
+
+
+
Units in motion
148
12 reassigned during the current shift
Open route holds
9
Most tied to late gate release
Coverage gap
4
Backfill requested for long-haul lanes
On-time departure
93%
Holding steady after yard balancing
+
+
+
+
+ Loading view
+ Route coordination
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Most unresolved issues now sit between driver readiness and release timing. Supervisors are using this panel to confirm who can be reassigned, which routes need escalation, and where a short delay will create a downstream coverage gap.
+
Three priority loads were moved to alternate tractors to avoid missed departure targets.
Driver check-in compliance improved after direct follow-up from the shift desk.
Yard staging remains constrained near outbound lanes with refrigerated equipment.
+
Standby drivers6
Held departures9
Ready tractors22
+
+
+
+
+
Recent Activity
+
Latest dispatch actions and route decisions
+
+
+
+
+
+
+
+
Gate release delay affecting priority runLane B12 Waiting 18 min
High
Driver rest window blocks reassignmentLong-haul pool 2 units impacted
Medium
Trailer pairing mismatch in yard queueOutbound side Manual check required
Medium
+
Confirm backup operator for north corridor runDispatch desk request
In progress
Approve swap for delayed refrigerated unitRequires lead signoff
Pending
Close completed hold after gate clearanceRoute ready for release
Ready
+
Yard team confirmed two lanes cleared for outbound stagingPosted by yard control
Driver support updated availability for standby poolCoverage adjusted
Priority load reassignment accepted by route supervisorNo further approval needed
Fuel stop exception removed from active reviewDispatch note closed
+
+
+
Lead Note
+
The team is working through a compressed release window where small delays at the yard can quickly reduce route coverage. This view helps dispatch leads decide where to reassign equipment, push approvals, and keep priority movements on schedule.
+
Dispatch healthStable with exceptions
Driver readinessNear full coverage
Yard congestionElevated at outbound side
+
Priority lanes are protected, but remaining open holds need confirmation from yard and driver teams before release.
+
+ Open note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
Operating Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Route release completion78%
Based on active outbound plan
Driver assignment coverage91%
Remaining gap on long-haul lanes
Exception clearance64%
Open holds trending down
+
+
+
Use route reassignment only after confirming gate availability and driver hours.
Coordinate intake, review, and resolution for active public service requests across district teams.
+
+
+
+ Loading view
+ Request handling
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Demand remains manageable overall, but manual verification is creating uneven wait times between offices. Supervisors are prioritizing clean approvals, redirecting exception work to trained reviewers, and keeping resident communication tied closely to documented case decisions.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest actions across intake, review, and approval teams.
+
+
+
+
+
+
+
+
Approval queue nearing response limit8 requests need supervisor action within the service window
High
Identity mismatch rate increasedManual checks are slowing intake clearance in two offices
Medium
Returned submissions require follow-upResidents have not responded on 14 incomplete requests
Low
+
Clear specialist review backlogReassign exception cases from general intake
In progress
Approve release batchDecision notes are complete and ready for sign-off
Ready
Validate returned documentsCheck corrected records before reopening requests
Queued
+
North district accepted three escalated casesOwnership transferred from central review
Resident notice batch released after approvalNotifications sent for completed decisions
Compliance note added to exception handling rulesReview teams must record reason codes on manual overrides
Intake team cleared duplicate submissionsMerged records reduced queue noise for active requests
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Intake review72%
Most new submissions screened and routed
Eligibility verification54%
Manual checks remain the slowest step
Decision release81%
Approved cases moving out on schedule
+
+
+
Supervisor Notes
+
A review backlog has formed around eligibility checks that require manual confirmation. Supervisors are balancing faster routing with compliance controls so straightforward requests can move forward while exceptions remain documented and ready for audit.
+
Priority requests are held for direct supervisor review when identity or address records do not match.
Field offices can return incomplete submissions to intake without closing the case.
Resident notifications are released only after decision notes and supporting checks are complete.
Escalated items remain visible until ownership is accepted by the receiving team.
+
Avg. handling time2.8h
Returned to intake27
Supervisor holds11
+
Queue Health
Service levelStable
Review capacityTight
Escalation loadModerate
Intake queue reviewed
Initial screening completed for newly received submissions
Eligibility exceptions routed
Cases with missing verification moved to specialist review
Supervisor approvals issued
Approved requests released for resident notice and fulfillment
+
+
+
Access, routing, and decision history are logged for compliance review.
+
+
+
+
diff --git a/web_insert/AntV G2/heatmap/chart_0056_heatmap.html b/web_insert/AntV G2/heatmap/chart_0056_heatmap.html
new file mode 100644
index 0000000000000000000000000000000000000000..e157aa2ee9857063994e7eeeca12269fe86c9a0b
--- /dev/null
+++ b/web_insert/AntV G2/heatmap/chart_0056_heatmap.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T28 Municipal Service Bulletin
+
+
+
+
+
+
+
+
Internal circulationT28
+
Municipal Service Bulletin
+
Streetlight outage follow-up
+
Open bulletinCross-departmentAction required
+
+
+
Bulletin Summary
Operational notice and response summary for active public service issues requiring coordinated review.
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
+
+
+ Loading view
+ Service handling overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
Several matters remain open not because field action has stopped, but because the written record is incomplete or inconsistent across offices. Staff should treat documentation quality, ownership clarity, and response accuracy as equal to operational completion before moving any item to closed status.
+
+
+
+
+
+
+
+
Review Support
+
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
Confirm that each accepted notice has one accountable handling unit.
Reconcile field completion remarks with the official reply draft.
Flag cases where repeat contact suggests ineffective local closure.
Hold final release for items lacking signed verification.
+
Escalated3
Awaiting reply5
Returned for revision4
+
+
+
+
Recent Activity
+
Latest handling updates across the bulletin
+
+
+
+
+
+
+
+
Repeated contact on one closed itemClosure note conflicts with latest resident submission
High
Verification file missing from district replyEvidence not attached to the handling record
Medium
Approval wording exceeds service standardReply language requires simplification before release
Low
+
Confirm ownership for unresolved site restoration itemAwaiting district office acknowledgment
Open
Complete evidence check for resolved service interruption caseField note submitted without signed confirmation
In review
Approve final reply language for public releaseDraft prepared by coordination desk
Pending approval
+
District office updated handling noteOwnership confirmed and local follow-up arranged
Service unit returned revised reply draftLanguage adjusted to match verified field action
Supervisory office requested clarificationAsked whether the item meets closure conditions
Coordination desk logged resident repeat contactMatter retained in active bulletin
+
+
+
Review Insight
+
Teams are asked to confirm ownership, update response wording, and close record gaps before the next routing step. Any item with unresolved accountability or incomplete evidence should remain in controlled review rather than be marked complete.
+
Case verification76%
Most evidence checks completed
Reply drafting68%
Several items still under wording review
Final clearance41%
Held until all high-priority issues are confirmed
+
Coordination Signals
Priority routeJoint review
Public impactModerate
Release stateHeld for clearance
Local office reported restoration, but resident contact records indicate the issue may persist at the reported location.
+
+
Use this bulletin as the working record for approvals, response checks, and inter-office follow-up until all listed matters are either cleared or formally transferred.
+ Active shiftRelease pendingLab verifiedEscalation open
+
+
+
+
+
+
+
+
Review in progress
Monitor active inspections, isolate nonconforming lots, and keep release decisions aligned across line, lab, and dispatch teams.
This overview is used by inspection leads to track open quality cases from first check through release decision. It brings together line findings, lab confirmation, hold status, and reviewer actions so each lot can move forward with a clear record.
Erin ColeQuality Assurance Lead
+
Lots under review
18
4 require supervisor sign-off
Pass rate
96.8%
Stable against control threshold
Items on hold
7
Awaiting disposition or retest
Average closure time
2.6h
Down after revised sampling steps
+
+
+
+ Loading view
+ Inspection activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A narrow group of nonconforming lots is driving most of the queue. The team has already isolated affected stock and limited release access, so the immediate focus is on finishing lab confirmation, recording final disposition, and clearing unaffected material without breaking traceability.
+
+
+
+
+
+
+
+
Coordination Notes
+
The current workload is concentrated on final assembly output where a small group of lots failed appearance and torque checks. Most cases are moving normally, but a limited set remains blocked while the team confirms whether rework is acceptable or a full containment action is needed.
+
Two lots were moved from routine review to controlled hold after repeat defects were confirmed at receiving check.
Lab confirmation has cleared one previously blocked lot for release with added inspection notes.
Dispatch has been asked not to allocate stock from any case marked pending disposition.
+
Open holds7
Retests due3
Approved releases11
+
+
+
+
Recent Actions
+
Latest updates across inspection, hold, and release handling.
+
+
+
+
+
+
+
+
Repeat defect pattern detectedThree related cases linked to the same source batch
High
Approval waiting on lab noteRelease decision cannot close until confirmation is attached
Medium
Containment nearing limitReserved hold area is close to capacity
Medium
+
Review pending disposition cases7 cases require lead decision
In progress
Confirm retest sampling planApplies to two blocked lots
Queued
Close cleared release recordsDocumentation ready for final update
Ready
+
Line inspector added a deviation noteAttached to lot under controlled hold
Lab result accepted by reviewerCase moved back to release check
Containment list updatedStock location confirmed for isolated units
Dispatch restriction acknowledgedOutbound allocation blocked for pending lots
+
+
+
Inspection Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion82%
Most scheduled checks are recorded
Disposition closure61%
Open exceptions still under review
Release documentation74%
Awaiting final sign-off on held lots
+
Case Progress
Inbound sample logged
Initial inspection record created
Deviation confirmed
Case routed to quality lead
Containment applied
Affected stock isolated from release
Disposition pending
Awaiting final approval
Open holds7
Retests due3
Approved releases11
+
+
+
Only approved dispositions can clear held material for release.
Post-run assessment for the last completed checkout messaging experiment, including impact, rollout decision, and follow-up actions.
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
+
+
+ Loading view
+ Experiment results
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Analyst Note
+
The result is not only statistically reliable but also operationally clean. Teams reviewing payment quality, support demand, and buyer behavior did not identify a counter-signal large enough to block release, which makes this a suitable candidate for default rollout with normal monitoring.
+
+
+
+
+
+
+
+
Review Notes
+
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
Primary goal was improved checkout completion.
Guardrails covered payment success, cancellation intent, and support contact rate.
Result supports rollout with standard monitoring.
Follow-up work should focus on first-time buyer reassurance.
+
Control share50%
Variant share50%
Guardrails passed3/3
+
+
+
+
Recent Activity
+
Latest review updates and decision steps
+
+
+
+
+
+
+
+
Release approval pendingRequires product and operations sign-off
Medium
Follow-up test not yet scopedFirst-time buyer segment showed the strongest response
Low
Monitoring handoff requiredPost-release checks must be assigned before launch
Medium
+
Confirm rollout ownerRelease coordination for default experience
Open
Document final decisionAdd rationale to the experiment record
In progress
Prepare follow-up briefDraft next test for delivery reassurance
Not started
+
Data review completed by analyticsNo variance issues found in conversion events
Support lead confirmed stable contact volumeNo increase tied to variant exposure
Product owner attached final recommendationPromote Variant B with standard guardrails
Release coordinator requested approval windowDecision needed before deployment planning
+
+
+
Key Insight
+
The operational recommendation is to promote Variant B to the default experience, keep the current guardrails in place, and open a follow-up test on supporting text near delivery expectations.
+
Review completion92%
Only final approval remains
Release readiness84%
Monitoring and ownership still being confirmed
Follow-up planning36%
Next hypothesis not fully defined
+
Quality Signals
Audience balanceWithin tolerance
Tracking integrityVerified
Release readinessApproved pending sign-off
Control used the existing confirmation message. Variant B used shorter supporting language focused on confidence before purchase.
+
+
Rollout should begin with standard monitoring and a hold point if payment reliability moves outside normal range.
Execution in focusControl review activeApproval queue open
Track release pacing, exception handling, and approval readiness across active cost centers.
+
+
+
+ Loading view
+ Execution overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
Release performance is broadly on plan, but the remaining blocked amount sits in cases that need manual confirmation. Resolving those records quickly will reduce queue pressure and allow controllers to close the cycle without extending approval coverage.
+
+
+
+
+
+
+
+
+
+
Recent Actions
+
Latest updates from controllers and approvers
+
+
+
+
+
+
+
+
High-value release held for documentation$220K requires source support
Manual adjustment exceeds local thresholdController comment attached
Medium
+
Clear blocked release requests12 records awaiting evidence
In progress
Confirm revised control notes4 items edited by reviewers
Pending
Close approved carryover actions7 ready for posting
Ready
+
Policy exception comment added to release caseBy regional controller
Approval path updated for restricted fundingRouting changed automatically
Supporting file accepted after validationBlocked amount reduced
Commitment request returned for correctionAccount line mismatch found
+
+
Execution Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Release completion92%
Against approved plan
Approval completion81%
All levels combined
Exception clearance64%
Policy and document checks
+
+
+
Controller Notes
+
Most exceptions are tied to account mapping and supporting documentation rather than overspend risk. Teams are being asked to resolve these items before release authority is expanded.
+
Release pacing remains healthy across core operating lines.
Exception volume is concentrated in a small set of manual adjustments.
Senior approval capacity is the main constraint on final clearance.
Control notes have been attached to all blocked items above threshold.
+
Open cases43
Needs review11
Cleared today19
+
Exception Signals
Control postureStable
Approval loadElevated
Release riskManaged
Initial allocation confirmed
Control baseline recorded
Mid-cycle release adjusted
Carryover request applied
Exception review escalated
Policy evidence requested
Final approval window opened
Queue routing updated
+
+
+
Only approved adjustments can move to release. Blocked items remain visible until evidence and sign-off are complete.
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
Operational summary for site load, steam demand, and utility variance across active production lines.
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
+
+
+ Loading view
+ Consumption overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operating Note
+
The current review is centered on whether the elevated water draw should be recorded as expected support usage or escalated as a controllable loss. Early checks support the first view, but the decision will remain open until sanitation records and supervisor confirmation are complete.
+
+
+
+
+
+
+
+
Supervisor Support
+
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
Base electrical load improved after non-process fans were isolated during idle periods.
Compressed air demand stayed even, with no signs of sustained leakage during the late run.
Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
Water variance should be rechecked once final sanitation logs are posted.
+
Open exceptions2
Lines reviewed6/6
Actions due3
+
+
+
+
Completion Progress
+
Status of review and follow-up
+
+
+
+
+
+
+
+
Water use above expected bandPackaging area support services
Medium
Line idle shutdown not confirmedTwo areas missing end-run verification
Low
Final sanitation log still pendingRequired to close variance review
Medium
+
Confirm restart-related water drawOperations supervisor to validate against log entries
In progress
Verify non-process equipment shutdownUtilities team to spot-check idle periods
Queued
Complete site approvalRequired before report closeout
Pending
+
Meter reconciliation completed for main supplyLogged by utilities desk
Maintenance confirmed no active steam issueInspection note added
Cost allocation refreshed for final reviewFinance rule set applied
+
+
+
Assessment
+
No immediate escalation is required, but the site energy lead has asked line supervisors to confirm idle-time shutdown discipline before the next reporting cycle is closed.
+
Meter validation100%
All core readings matched
Variance review68%
Awaiting supporting logs
Management sign-off35%
Ready for supervisor action
+
Key Signals
Load balanceSteady
Utility riskModerate
Approval statePending sign-off
Water intake exceeded the normal operating band during cleaning and restart activity. Review remains open until line notes and final meter confirmation are attached.
+
+
Use this report to confirm variances, assign follow-up, and complete site-level review before closeout.
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
Post-route summary for the latest dispatch cycle, focusing on late handoff recovery, depot coordination, and proof-of-delivery completion.
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
+
+
+ Loading view
+ Route performance view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
This review is being used to decide whether dispatch should adopt a standard delay-recovery playbook for mixed-stop runs. The current response relied on experienced staff making quick route adjustments, which worked in this case but may not scale without clearer depot release rules and a required outreach log for affected stops.
+
+
+
+
+
+
+
+
Support Notes
+
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
Departure drift started at the depot gate after loading lane congestion.
Manual reprioritization reduced missed arrival commitments on dense urban segments.
Proof-of-delivery capture improved after drivers were reminded to close stops before returning.
Two exception cases remain open pending package condition review.
+
Resequenced routes7
Support calls placed23
Returns held2
+
+
+
+
Recent Activity
+
Updates recorded during issue containment and closure review.
+
+
+
+
+
+
+
+
Proof mismatch on return scan2 consignments need depot confirmation
Medium
Loading lane congestion repeatedObserved across early dispatch wave
High
Customer contact note missing1 delayed stop closed without outreach log
Low
+
Validate open claims with depot supervisorAttach condition notes and return scans
In progress
Document route resequencing rulePrepare for dispatch handbook update
Pending
Close driver note reviewConfirm repeated gate delay comments
Ready
+
Driver team acknowledged revised stop orderField update logged by support desk
Depot supervisor added lane usage noteRoot cause linked to overlap during loading release
Customer service cleared outreach backlogAll affected recipients received status calls
The review focus is on whether the corrective actions used by the team should become standard practice for future mixed-stop routes with tight loading turnover.
+
Exception closure78%
Most delivery issues resolved in the same cycle
Driver note review64%
Comments grouped by route segment
Depot corrective action41%
Lane balancing plan awaiting sign-off
+
Field Signals
Route adherenceStable after intervention
Depot readinessNeeds lane balancing
Customer contact coverageAbove target
Opened after repeated departure slippage affected downstream stop timing and closure quality.
+
+
Internal review record for route performance follow-up and process adjustment.
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
Receiving activePutaway constrainedDispatch on hold
Monitor inbound receipts, putaway flow, and outbound release from one operating view.
+
+
+
+ Loading view
+ Facility activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main risk is not total volume but timing. Inbound receipts, reserve storage, and outbound release are all connected, so a short delay at dock assignment or packing review quickly affects the rest of the floor. Clearing blocked pallets and reallocating lift coverage should return the site to a steadier operating rhythm.
+
+
+
+
+
+
+
+
+
+
Floor Activity
+
Updated as teams complete receiving, storage, and release steps.
+
+
+
+
+
+
+
+
Dock queue above working limit6 loads waiting longer than target
High
Bulk zone capacity nearing thresholdReserve slots at 93% use
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
Review account health, retention risk, and pending interventions for active customer segments.
+
+
+
+ Loading view
+ Active user case flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current queue reflects a concentrated effort to retain users who showed intent but encountered friction during critical account steps. Teams are expected to document every outreach attempt, confirm ownership before escalation, and close only when the account is either stable or formally transferred for continued monitoring.
+
+
+
+
+
+
+
+
+
+
Case Activity
+
Recent decisions and follow-up movement
+
+
+
+
+
+
+
+
High-value account awaiting decisionNo final disposition recorded after manual review
High
Outreach backlog risingFollow-up queue has crossed internal response target
Medium
Exception note incompletePolicy-sensitive case missing approval rationale
Medium
+
Confirm owner coverage for priority cases7 cases without confirmed handoff
In progress
Complete callback verificationPending contact outcomes need final status
Queued
Close resolved onboarding reviewsCases meet closure conditions after successful recovery
Ready
+
Owner updated on priority reviewRouting changed after shift handoff
Manual decision recordedCase moved from hold to monitor
Risk flag clearedActivity recovered after intervention
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Queue clearance72%
Handled against current intake
Outreach completion64%
Priority contacts sent and logged
Approval coverage89%
Cases with complete decision trail
+
+
+
Operational Notes
+
Current activity is centered on a rise in support-linked retention risk. Several accounts were routed into manual review after repeated onboarding exits, failed self-service recovery, or policy-sensitive changes that require a documented decision.
+
High-priority cases are routed to named owners before outreach begins.
Accounts with repeat friction stay in review until next-step evidence is recorded.
Policy exceptions require a reason code and final approval note.
+
Active owners16
Cases on hold12
Recovered users31
+
Review Signals
Escalation rate11%
Policy exceptions9
Pending callbacks22
Risk rule triggered
Account entered review after repeated drop-off behavior
Operations review started
Owner assigned and contact path confirmed
User contacted
Follow-up sent with recovery guidance and next action
Decision logged
Case moved to monitor, close, or escalate
+
+
+
Access, contact history, and policy decisions are recorded for audit review.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
+ Live TradingStore NetworkPriority Follow-upRevenue Focus
+
+
+
+
+
+
+
Active Oversight
+
Monitor store execution, revenue pacing, stock pressure, and pending actions across the active trading cycle.
+
Trading performance is holding above plan, but momentum is uneven across the network. Flagship locations are carrying the result while several mid-tier stores are slipping on conversion after early demand spikes cleared core inventory.
+
+
+
Maya ChenSales Operations Lead
+
+
+
+
Net Sales
$4.8M
Running ahead of internal target with stronger in-store conversion.
Orders Closed
18,240
Order completion remains stable despite heavier queue volume.
Low Stock SKUs
126
Concentrated in top-selling lines requiring rapid replenishment.
Pending Exceptions
37
Most cases are tied to price overrides and fulfillment holds.
+
+
+
+
+ Loading view
+ Sales command view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Operations leads are using this board to coordinate price checks, stock transfers, and field follow-up. The immediate goal is to protect sell-through on priority lines without creating avoidable margin leakage or unresolved service cases.
+
Price override approvals increased after local markdown requests were reopened.
Transfer requests are highest in stores with strong accessory attachment rates.
Frontline teams need confirmed replenishment windows before issuing customer callbacks.
Regional managers have been asked to clear overdue store notes before next review.
+
Stores Flagged21
Cases Reassigned14
Open Callbacks89
+
+
+
+
+
Execution Activity
+
Store actions and approval movement
+
+
+
+
+
+
+
+
Override approvals approaching threshold12 stores exceeded normal approval volume
High
Core item coverage at riskTop stores reporting low back-room availability
Medium
Store callback backlog buildingCustomer follow-up notes remain open past target
Medium
+
Approve urgent pricing exceptionsSenior review required for margin-sensitive requests
In progress
Confirm transfer receipt with destination storesFollow up on high-demand replenishment moves
Pending
Close unresolved field notesSeveral stores have not updated execution status
Blocked
+
North region cleared three high-value exceptionsApproval cycle shortened after reassignment
Accessory attachment improved in premium storesStore coaching appears to be holding
Transfer requests stabilized after stock releaseMost urgent moves have been acknowledged
Customer callback queue remains unevenService follow-through needs local management review
+
+
+
Lead Note
+
This board supports the daily operating rhythm for sales control, exception handling, and store coordination across the retail network.
+
Conversion PressureElevated
Stock Transfer LoadHigh
Approval ResponseWithin SLA
+
Investigate sales pacing, confirm stock position, and clear open approvals before escalation.
+
+ View note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
Focus Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval clearance78%
Cleared against open exception volume
Transfer completion64%
Confirmed store-to-store movements
Field note closure52%
Resolved execution updates from stores
+
+
+
Use approved actions only. Store-facing updates must match pricing, stock, and service policy before release.
+
+
+
+
diff --git a/web_insert/AntV G2/line/chart_0144_line.html b/web_insert/AntV G2/line/chart_0144_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..6513295614fe8474c059f5b08b1e8f724218249c
--- /dev/null
+++ b/web_insert/AntV G2/line/chart_0144_line.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T28 Municipal Service Bulletin
+
+
+
+
+
+
+
+
Internal circulationT28
+
Municipal Service Bulletin
+
Streetlight outage follow-up
+
Open bulletinCross-departmentAction required
+
+
+
Bulletin Summary
Operational notice and response summary for active public service issues requiring coordinated review.
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
+
+
+ Loading view
+ Service handling overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
Several matters remain open not because field action has stopped, but because the written record is incomplete or inconsistent across offices. Staff should treat documentation quality, ownership clarity, and response accuracy as equal to operational completion before moving any item to closed status.
+
+
+
+
+
+
+
+
Review Support
+
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
Confirm that each accepted notice has one accountable handling unit.
Reconcile field completion remarks with the official reply draft.
Flag cases where repeat contact suggests ineffective local closure.
Hold final release for items lacking signed verification.
+
Escalated3
Awaiting reply5
Returned for revision4
+
+
+
+
Recent Activity
+
Latest handling updates across the bulletin
+
+
+
+
+
+
+
+
Repeated contact on one closed itemClosure note conflicts with latest resident submission
High
Verification file missing from district replyEvidence not attached to the handling record
Medium
Approval wording exceeds service standardReply language requires simplification before release
Low
+
Confirm ownership for unresolved site restoration itemAwaiting district office acknowledgment
Open
Complete evidence check for resolved service interruption caseField note submitted without signed confirmation
In review
Approve final reply language for public releaseDraft prepared by coordination desk
Pending approval
+
District office updated handling noteOwnership confirmed and local follow-up arranged
Service unit returned revised reply draftLanguage adjusted to match verified field action
Supervisory office requested clarificationAsked whether the item meets closure conditions
Coordination desk logged resident repeat contactMatter retained in active bulletin
+
+
+
Review Insight
+
Teams are asked to confirm ownership, update response wording, and close record gaps before the next routing step. Any item with unresolved accountability or incomplete evidence should remain in controlled review rather than be marked complete.
+
Case verification76%
Most evidence checks completed
Reply drafting68%
Several items still under wording review
Final clearance41%
Held until all high-priority issues are confirmed
+
Coordination Signals
Priority routeJoint review
Public impactModerate
Release stateHeld for clearance
Local office reported restoration, but resident contact records indicate the issue may persist at the reported location.
+
+
Use this bulletin as the working record for approvals, response checks, and inter-office follow-up until all listed matters are either cleared or formally transferred.
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
+
+
+
+
diff --git a/web_insert/AntV G2/line/chart_0146_line.html b/web_insert/AntV G2/line/chart_0146_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..7c3d5da52956d39ec7c710565007d3a2ac98f5be
--- /dev/null
+++ b/web_insert/AntV G2/line/chart_0146_line.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T19 Fulfillment Control Center
+
+
+
+
+
+
Monitor outbound flow, clear held orders, and keep dock activity aligned with carrier cutoff commitments.
Outbound volume is moving at a healthy pace, but a growing cluster of held orders is starting to compress the final release window. Most exceptions are concentrated in a small number of picking zones, which means the team can recover service if reviews are completed before the next carrier handoff cycle.
Maya ChenFulfillment Operations Lead
+
Orders ready to release
1,284
Stable after the last verification pass
Orders on hold
73
Most require address or stock confirmation
Dock lanes active
18 / 22
Two lanes reserved for late priority loads
On-time dispatch
96.4%
Holding above internal service target
+
+
+
+ Loading view
+ Outbound release status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most outbound risk is not coming from overall volume; it is coming from a manageable set of held orders that can delay the final handoff sequence if left unresolved. Clearing those exceptions now protects both dock capacity and on-time dispatch.
+
+
+
+
+
+
+
+
Operational Notes
+
Dock activity remains balanced across active lanes, and release discipline is preventing unnecessary trailer dwell. The current focus is to resolve shipment holds in the queue, confirm a small set of short picks, and protect the late priority wave from congestion near final staging.
+
Address validation holds account for the largest share of delayed releases
Priority orders should be cleared before standard replenishment checks resume
Lane reassignment is available if staging volume exceeds the current threshold
Carrier handoff timing remains achievable with active exception review
+
Rush orders146
Review desks open5
Average hold age42m
+
+
+
+
Recent Actions
+
Latest fulfillment events and reviews
+
+
+
+
+
+
+
+
Held orders above control threshold73 orders pending review across three zones
High
Lane 12 staging nearing limitOverflow risk if the next release is not staggered
Medium
Carrier cutoff buffer tighteningPriority loads need final confirmation soon
Medium
+
Clear address validation holdsAssigned to order review desk
In progress
Confirm short pick substitutionsAwaiting floor lead approval
Pending
Protect late priority lane capacityReserve space before final handoff
Scheduled
+
Verification team cleared 22 held ordersQueue pressure eased in the last review cycle
Dock supervisor opened two backup positionsStaging congestion reduced near outbound lanes
Carrier desk confirmed on-time intakeNo change to active handoff sequence
Packing lead flagged repeat scan failuresIssue isolated to one station for follow-up
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Order release completion78%
Released against current outbound plan
Exception resolution63%
Held orders cleared or reassigned
Dock preparation87%
Lanes staffed and staged for handoff
+
Release Activity
Wave release completed
Primary outbound batch moved to final staging
Exception queue escalated
Held orders above review target triggered supervisor attention
Dock lanes rebalanced
Two lanes opened for priority handoff protection
Final verification in progress
Pack confirmation and label checks underway
Rush orders146
Review desks open5
Average hold age42m
+
+
+
Use this view to clear blockers early, protect release timing, and keep dock flow aligned with service commitments.
Editorial interpretation, policy check, and release readiness for a high-traffic article package.
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
+
+
+ Loading view
+ Article review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
The item remains on hold because reviewers want the final article to state only what can be supported directly in the reporting record. Once the headline and two interpretive passages are revised, the last policy note can be closed and the release team can complete handoff without reopening the brief.
+
+
+
+
+
+
+
+
Editorial Support Notes
+
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
Tighten the headline so it reflects verified reporting only
Rework two interpretive lines in the middle section
Confirm attribution order in the closing paragraph
Keep the release hold in place until policy notes are cleared
+
Linked notes12
Required edits3
Approvals2/3
+
+
+
+
Recent Activity
+
Latest actions across review, policy, and release handling.
+
+
+
+
+
+
+
+
Policy sign-off still openRelease cannot proceed until the final comment is resolved
High
Headline wording exceeds source certaintyDesk requested a narrower phrasing pass
Medium
Closing attribution order changedLatest revision needs reviewer confirmation
Low
+
Apply marked language editsThree passages require direct revision
Prepare release handoffQueue placement is ready once approval lands
Queued
+
Desk review updated with narrowed wording requestAdded by editorial review
Policy note linked to middle section passageMapped to required edit
Release hold confirmed by operationsQueue position preserved
Final pass assigned to senior reviewerAwaiting consolidated response
+
+
+
Reading Insight
+
Operations has held the item in the final queue so the desk can complete one coordinated pass rather than resolve comments in isolation. this workflow is intended to keep editors, policy reviewers, and release staff on the same record while the article moves through its last approval step.
+
Editorial review88%
Most text decisions are settled
Policy clearance67%
One required note remains
Release handoff54%
Prepared but not cleared
+
Release Signals
Attribution strengthNeeds tightening
Headline alignmentUnder revision
Release readinessPending approval
Final release depends on one policy approval and completion of marked language edits.
+
+
Use the same review record when updating wording, approvals, and release handling to avoid duplicate decisions.
+ Active shiftRelease pendingLab verifiedEscalation open
+
+
+
+
+
+
+
+
Review in progress
Monitor active inspections, isolate nonconforming lots, and keep release decisions aligned across line, lab, and dispatch teams.
This overview is used by inspection leads to track open quality cases from first check through release decision. It brings together line findings, lab confirmation, hold status, and reviewer actions so each lot can move forward with a clear record.
Erin ColeQuality Assurance Lead
+
Lots under review
18
4 require supervisor sign-off
Pass rate
96.8%
Stable against control threshold
Items on hold
7
Awaiting disposition or retest
Average closure time
2.6h
Down after revised sampling steps
+
+
+
+ Loading view
+ Inspection activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A narrow group of nonconforming lots is driving most of the queue. The team has already isolated affected stock and limited release access, so the immediate focus is on finishing lab confirmation, recording final disposition, and clearing unaffected material without breaking traceability.
+
+
+
+
+
+
+
+
Coordination Notes
+
The current workload is concentrated on final assembly output where a small group of lots failed appearance and torque checks. Most cases are moving normally, but a limited set remains blocked while the team confirms whether rework is acceptable or a full containment action is needed.
+
Two lots were moved from routine review to controlled hold after repeat defects were confirmed at receiving check.
Lab confirmation has cleared one previously blocked lot for release with added inspection notes.
Dispatch has been asked not to allocate stock from any case marked pending disposition.
+
Open holds7
Retests due3
Approved releases11
+
+
+
+
Recent Actions
+
Latest updates across inspection, hold, and release handling.
+
+
+
+
+
+
+
+
Repeat defect pattern detectedThree related cases linked to the same source batch
High
Approval waiting on lab noteRelease decision cannot close until confirmation is attached
Medium
Containment nearing limitReserved hold area is close to capacity
Medium
+
Review pending disposition cases7 cases require lead decision
In progress
Confirm retest sampling planApplies to two blocked lots
Queued
Close cleared release recordsDocumentation ready for final update
Ready
+
Line inspector added a deviation noteAttached to lot under controlled hold
Lab result accepted by reviewerCase moved back to release check
Containment list updatedStock location confirmed for isolated units
Dispatch restriction acknowledgedOutbound allocation blocked for pending lots
+
+
+
Inspection Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion82%
Most scheduled checks are recorded
Disposition closure61%
Open exceptions still under review
Release documentation74%
Awaiting final sign-off on held lots
+
Case Progress
Inbound sample logged
Initial inspection record created
Deviation confirmed
Case routed to quality lead
Containment applied
Affected stock isolated from release
Disposition pending
Awaiting final approval
Open holds7
Retests due3
Approved releases11
+
+
+
Only approved dispositions can clear held material for release.
Coordinate intake, review, and resolution for active public service requests across district teams.
+
+
+
+ Loading view
+ Request handling
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Demand remains manageable overall, but manual verification is creating uneven wait times between offices. Supervisors are prioritizing clean approvals, redirecting exception work to trained reviewers, and keeping resident communication tied closely to documented case decisions.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest actions across intake, review, and approval teams.
+
+
+
+
+
+
+
+
Approval queue nearing response limit8 requests need supervisor action within the service window
High
Identity mismatch rate increasedManual checks are slowing intake clearance in two offices
Medium
Returned submissions require follow-upResidents have not responded on 14 incomplete requests
Low
+
Clear specialist review backlogReassign exception cases from general intake
In progress
Approve release batchDecision notes are complete and ready for sign-off
Ready
Validate returned documentsCheck corrected records before reopening requests
Queued
+
North district accepted three escalated casesOwnership transferred from central review
Resident notice batch released after approvalNotifications sent for completed decisions
Compliance note added to exception handling rulesReview teams must record reason codes on manual overrides
Intake team cleared duplicate submissionsMerged records reduced queue noise for active requests
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Intake review72%
Most new submissions screened and routed
Eligibility verification54%
Manual checks remain the slowest step
Decision release81%
Approved cases moving out on schedule
+
+
+
Supervisor Notes
+
A review backlog has formed around eligibility checks that require manual confirmation. Supervisors are balancing faster routing with compliance controls so straightforward requests can move forward while exceptions remain documented and ready for audit.
+
Priority requests are held for direct supervisor review when identity or address records do not match.
Field offices can return incomplete submissions to intake without closing the case.
Resident notifications are released only after decision notes and supporting checks are complete.
Escalated items remain visible until ownership is accepted by the receiving team.
+
Avg. handling time2.8h
Returned to intake27
Supervisor holds11
+
Queue Health
Service levelStable
Review capacityTight
Escalation loadModerate
Intake queue reviewed
Initial screening completed for newly received submissions
Eligibility exceptions routed
Cases with missing verification moved to specialist review
Supervisor approvals issued
Approved requests released for resident notice and fulfillment
+
+
+
Access, routing, and decision history are logged for compliance review.
+ Live ControlDispatch ReadyStorage BalancedField Review Open
+
+
+
+
+
+
+
+
Operational
Track site output, storage readiness, dispatch commitments, and field actions across the active hub.
The hub is operating within target limits, with solar and wind assets sharing load as expected and storage carrying the balancing role for short fluctuations. Dispatch obligations remain intact, and no station is currently outside its approved operating envelope.
Elena MorrisRegional Hub Supervisor
+
Net Output
428 MW
Holding above committed delivery band
Available Storage
81%
Reserve margin kept for evening handoff
Curtailment Risk
Low
No immediate restriction notices in scope
Open Field Actions
7
Two require supervisor review
+
+
+
+ Loading view
+ Hub performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Output remains dependable across the hub, but the team is keeping close watch on the inland station until restart behavior is fully verified. Supervisors should clear the pending reserve note and confirm the inspection window so field and control actions stay aligned.
+
+
+
+
+
+
+
+
Operations Notes
+
Operations staff are watching one inland station where inverter recovery is slower than normal after a brief protective trip. The condition is stable, but the team has kept a local inspection open until the restart pattern returns to baseline.
+
Primary dispatch commitment remains fully covered by live generation and stored reserve.
One site review is waiting on field confirmation before the maintenance note can be closed.
Remote control authority is active for all stations in the current hub scope.
No compliance holds are blocking routine switching or battery balancing actions.
+
Stations Online14
Open Reviews3
Active Crews2
+
+
+
+
Shift Activity
+
Recorded actions and follow-up items for the active operating window.
+
+
+
+
+
+
+
+
Inland station restart varianceRecovery sequence exceeded normal duration
Medium
Storage reserve floor nearing handoff targetBalancing plan may need minor adjustment
Low
Field confirmation pending on breaker inspectionClosure blocked until site response is logged
Medium
+
Approve reserve adjustment noteSubmitted by shift operator
Pending approval
Confirm inland site inspection windowCrew lead requested access hold
Waiting
Close completed switching logControl steps verified by second reviewer
Ready
+
Grid desk accepted updated export positionAcknowledgement logged by dispatch coordinator
Battery balancing sequence completed without exceptionAutomatic control remained within approved limits
Field crew checked access route to inland stationTravel and handoff conditions confirmed
Remote link health check passed across all active sitesNo communication degradation recorded
+
+
+
Readiness Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Dispatch coverage96%
Committed export supported
Storage readiness81%
Reserve held for balancing
Field action closure68%
Open reviews moving toward sign-off
+
Recent Activity
Hub entered balanced operating mode
Control room update
Storage reserve floor adjusted for dispatch window
Shift approval recorded
Inverter restart review opened at inland station
Field follow-up assigned
Export commitment reconfirmed with grid desk
Acknowledgement received
Stations Online14
Open Reviews3
Active Crews2
+
+
+
Use this view to confirm readiness before approving dispatch changes or closing field actions.
+
+
+
+
diff --git a/web_insert/AntV G2/pie/chart_0089_pie.html b/web_insert/AntV G2/pie/chart_0089_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..c5af23201110bac7facab0c0fdf59135ce2875ab
--- /dev/null
+++ b/web_insert/AntV G2/pie/chart_0089_pie.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T14 Store Stock Control
+
+
+
+
+
+
+
+
+
+
Live stockReplenishment reviewHold resolution
Track replenishment risk, release held inventory, and keep shelf availability aligned across active locations.
+
+
+
+ Loading view
+ Location stock position
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main concern is not total network stock but timing. Several locations can return to normal selling levels once held units are cleared and transfer approvals are issued in the right order. Teams are using this view to keep store demand, receiving capacity, and release controls aligned.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Latest stock handling and release steps
+
+
+
+
+
+
+
+
Count mismatch blocking release12 item lines remain held after store recount
High
Priority location below cover targetReplenishment risk increased across 4 stores
Medium
Receiving backlog nearing thresholdInbound confirmation lag may delay availability updates
Medium
+
Approve transfer batch for thin-cover stores29 lines prepared by distribution planning
Ready
Confirm held quantities against recount notes74 units waiting on store validation
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Hold review completion68%
Most flagged lines have first-pass decisions
Transfer approval completion54%
Awaiting release order from control lead
Count reconciliation73%
Repeat variance stores still under review
+
+
+
Operational Notes
+
this workflow supports the daily decision flow: identify where cover is too thin, confirm whether held stock can be released, and route transfer lines to the locations with the highest service risk. Notes and queue items below reflect the current handoff between store control, distribution, and floor operations.
+
Prioritize releases for locations with same-day shelf risk.
Delay nonessential transfers until held quantities are verified.
Escalate repeated count mismatches to store control leads.
Keep transfer approvals aligned with receiving capacity.
+
Priority stores11
Open holds18
Ready transfers7
+
Network Signals
Service riskElevated
Receiving pressureModerate
Approval backlogContained
Cycle count exceptions reviewed
Store control completed first-pass review on flagged lines.
Transfer requests consolidated
Low-cover locations were grouped for a single approval pass.
Held stock release pending
Distribution is waiting for final quantity confirmation.
+
+
+
Use release actions only after count confirmation is recorded in the item note.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
+
+
+
+
diff --git a/web_insert/AntV G2/pie/chart_0091_pie.html b/web_insert/AntV G2/pie/chart_0091_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..9735bf61842040d9eb6bf98e67856ab9b0256eae
--- /dev/null
+++ b/web_insert/AntV G2/pie/chart_0091_pie.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
+ Active flightPriority reviewShared budgetStore traffic
+
+
+
+
+
+
+
+
Needs review
Track active retail promotions, review pacing risks, and keep launch approvals moving across paid channels.
This overview brings campaign owners, channel leads, and reviewers into one operating view for retail promotion activity. The focus is on release readiness, pacing discipline, and fast resolution when a campaign drifts outside its approved plan.
Avery NolanMarketing Operations Lead
+
Active campaigns
18
3 awaiting final release
Planned spend
$426K
Within current budget guardrail
Projected return
4.8x
Lift driven by repeat buyer segments
Creative compliance
92%
Remaining items need legal copy review
+
+
+
+ Loading view
+ Campaign performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
Current risk is concentrated in a small number of high-visibility promotions that are close to release but still depend on approval cleanup. Clearing those items will allow the team to open budget safely without creating rework for channel operations or compliance.
+
+
+
+
+
+
+
+
Operational Notes
+
Most campaigns are moving as expected, but a small group requires attention before budget can be fully opened. The current work centers on copy approval, audience overlap checks, and confirming that regional exclusions are applied before wider rollout.
+
Priority campaigns are grouped for same-day review by channel operations.
Budget adjustments require owner confirmation and finance-safe pacing limits.
Audience rule changes remain blocked until compliance notes are cleared.
Store traffic campaigns receive higher escalation when release windows narrow.
+
Queued reviews9
Open exceptions4
Released today5
+
+
+
+
Team Activity
+
Recent decisions and release changes
+
+
+
+
+
+
+
+
Copy exception still open for priority placementOwner response pending
High
Audience overlap exceeds internal thresholdShared budget campaign group
Medium
Regional exclusion missing from one launch setStore traffic promotion
Medium
+
Approve revised launch copyAssigned to compliance reviewer
In progress
Confirm pacing cap for shared budget groupRequested by channel lead
Pending
Validate excluded regions before releaseRequired for final activation
Ready
+
Budget guardrail updated for priority promotionRecorded by finance operations
Audience rule revision submittedWaiting for approval
Channel owner added release noteEscalation removed after review
Compliance returned one asset for editsCopy needs location disclaimer
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval completion74%
Most high-spend items already reviewed
Budget allocation68%
Remaining spend held behind final checks
Release readiness81%
Operational setup nearly complete
+
Release Flow
Intake completed
Briefs and spend limits confirmed
Review in progress
Compliance and audience checks underway
Release window
Approved campaigns move to channel activation
Queued reviews9
Open exceptions4
Released today5
+
+
+
Use this view to resolve blockers before expanding spend or opening additional channel coverage.
Reporting cycle activeEvidence under reviewSite coverage completeApproval pending
+
+
+
Reporting Summary
Consolidated operational view for facility emissions, evidence readiness, and approval progress across the reporting cycle.
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
+
+
+ Loading view
+ Emissions view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Reporting Note
+
Most reporting work is complete, but the team is holding release until the last boundary clarification and control statement are fully documented. Once those items are closed, the submission can move through approval without further operational changes.
+
+
+
+
+
+
+
+
Reporting Support
+
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
All operated facilities submitted activity data within the active reporting window.
Boundary assumptions were updated after internal control review.
Evidence coverage is complete for direct fuel use and purchased electricity.
Final sign-off is blocked only by unresolved exception responses.
+
Facilities in scope14
Evidence files linked128
Approvers assigned5
+
+
+
+
Review Activity
+
Recent actions tied to the current reporting cycle
+
+
+
+
+
+
+
+
Boundary note requires confirmationShared support load treatment updated by operations
Medium
Exception owner response overdueOne facility comment has not been returned
High
Approval pack awaiting final attachmentControl statement must be added before routing
Low
+
Validate revised allocation methodCheck consistency against facility evidence
In progress
Close open exception itemsCollect responses from assigned owners
Blocked
Route package for sign-offRelease once control statement is attached
Track specimen intake, instrument readiness, review holds, and release validated results from one controlled queue.
+
+
+
+ Loading view
+ Specimen flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Current delays are not caused by intake volume but by a narrow cluster of held results that need repeat confirmation and signed reviewer rationale. Once those cases are closed, the release queue should return to normal pace.
+
+
+
+
+
+
+
+
+
+
Validation Activity
+
Latest laboratory actions and review updates
+
+
+
+
+
+
+
+
Quality hold threshold reachedChemistry lane 7 held results
High
Instrument maintenance window dueHematology bench service reminder
Complete supervisory sign-off for held chemistry cases24 items in review queue
In progress
Verify rerun documentation before release5 specimens require note completion
Pending
Confirm analyzer readiness after resetPost-interruption checks still open
Waiting confirmation
+
Accession team cleared label exceptionMatched specimen and order records
Reviewer added comment to held electrolyte panelAwaiting repeat outcome
Bench lead reassigned overflow workCapacity balanced across active stations
Final result packet released to care teamAudit trail completed
+
+
Throughput Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Accessioning completion92%
Most inbound samples logged and routed
Validation review68%
Routine cases moving faster than held work
Quality documentation81%
Remaining notes tied to reruns and holds
+
+
+
Escalation Notes
+
Supervisors are balancing turnaround targets with quality controls, making sure reruns, delta checks, and documentation updates are completed before any final authorization.
+
Priority samples are routed directly to staffed benches.
Held results require either repeat testing or reviewer comment.
Release activity is limited to validated work with complete audit notes.
+
Released today143
Open holds7
Assigned reviewers9
+
Bench Signals
Pending accession checks12
Benches at capacity2
Reruns in progress5
Intake batch reconciled
Analyzer lane reset
Senior review started
Release queue narrowed
+
+
+
All releases must include reviewer confirmation and complete traceability.
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
+ Active portfolioReview in progressFunding controlsCompliance watch
+
+
+
+
+
+
+
+
Managed
Monitor active studies, pending approvals, funding usage, and cross-team follow-up from one operational view.
The office is managing a mixed portfolio of faculty-led studies, lab collaborations, and student research initiatives. Most work is progressing within approved scope, but a small set of submissions requires administrative response before funds or participant activity can proceed.
Dr. Elaine PorterDirector, Research Administration
+
Open Projects
48
6 awaiting formal approval
Active Funding
$12.4M
Within approved allocation range
Pending Reviews
17
4 require principal investigator response
Policy Exceptions
3
All assigned for follow-up
+
+
+
+ Loading view
+ Project activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Several projects are close to activation, but progress depends on small administrative corrections. Clearing incomplete files and confirming ownership will reduce delay, improve audit readiness, and allow the office to release approved work without further escalation.
+
+
+
+
+
+
+
+
Office Notes
+
Current attention is focused on review completion, documentation quality, and timely coordination between academic units and the central research office. Team leads are using this view to resolve blockers, confirm ownership, and keep each project aligned with internal policy.
+
Approval backlog is concentrated in new submissions with incomplete ethics attachments.
Two high-value projects are waiting on revised budget justification before release.
Records cleanup reduced duplicate sponsor entries across several departments.
Escalations are being routed to unit coordinators for direct follow-up.
+
Units involved11
Cases reassigned5
Records updated23
+
+
+
+
Recent Office Activity
+
Latest updates across approvals, records, and funding control.
+
+
+
+
+
+
+
+
Budget release on holdMissing approval note from finance control
High
Ethics file incompleteParticipant consent language requires revision
Medium
Sponsor record mismatchDepartment entry differs from central register
Low
+
Confirm unit reviewer for pending submissions7 projects without final reviewer assignment
Open
Release approved funding batch2 projects cleared after documentation check
Ready
Close duplicate sponsor recordsFollow-up required across 3 departments
In progress
+
Policy team returned one exception case for clarificationNeeds updated risk statement
Finance control cleared restricted spending lineRelease can proceed after office sign-off
Graduate coordinator added missing investigator credentialsSubmission now eligible for formal review
Unit office confirmed lead contact changeRecords updated for future notices
+
+
+
Portfolio Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Initial screening92%
Most submissions validated
Formal review68%
Backlog concentrated in exception cases
Funding release74%
Delayed by final approval checks
+
Recent Milestones
Portfolio intake closed
New submissions moved to initial screening
Compliance review updated
Exception cases reassigned to policy team
Funding release prepared
Awaiting final sign-off from finance control
Units involved11
Cases reassigned5
Records updated23
+
+
+
Internal use only. Funding, review, and compliance actions must be recorded before project status is changed.
+ Live DispatchPriority LoadsDriver CoverageGate Readiness
+
+
+
+
+
+
+
Active monitoring
+
Coordinate active routes, rebalance drivers, and clear open exceptions from one operating view.
+
Dispatch is managing a tight operating window with several outbound runs stacked behind the same gate sequence. The team has already reallocated available units to protect higher-priority moves and reduce idle time at the yard.
+
+
+
Maya BennettFleet Dispatch Lead
+
+
+
+
Units in motion
148
12 reassigned during the current shift
Open route holds
9
Most tied to late gate release
Coverage gap
4
Backfill requested for long-haul lanes
On-time departure
93%
Holding steady after yard balancing
+
+
+
+
+ Loading view
+ Route coordination
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Most unresolved issues now sit between driver readiness and release timing. Supervisors are using this panel to confirm who can be reassigned, which routes need escalation, and where a short delay will create a downstream coverage gap.
+
Three priority loads were moved to alternate tractors to avoid missed departure targets.
Driver check-in compliance improved after direct follow-up from the shift desk.
Yard staging remains constrained near outbound lanes with refrigerated equipment.
+
Standby drivers6
Held departures9
Ready tractors22
+
+
+
+
+
Recent Activity
+
Latest dispatch actions and route decisions
+
+
+
+
+
+
+
+
Gate release delay affecting priority runLane B12 Waiting 18 min
High
Driver rest window blocks reassignmentLong-haul pool 2 units impacted
Medium
Trailer pairing mismatch in yard queueOutbound side Manual check required
Medium
+
Confirm backup operator for north corridor runDispatch desk request
In progress
Approve swap for delayed refrigerated unitRequires lead signoff
Pending
Close completed hold after gate clearanceRoute ready for release
Ready
+
Yard team confirmed two lanes cleared for outbound stagingPosted by yard control
Driver support updated availability for standby poolCoverage adjusted
Priority load reassignment accepted by route supervisorNo further approval needed
Fuel stop exception removed from active reviewDispatch note closed
+
+
+
Lead Note
+
The team is working through a compressed release window where small delays at the yard can quickly reduce route coverage. This view helps dispatch leads decide where to reassign equipment, push approvals, and keep priority movements on schedule.
+
Dispatch healthStable with exceptions
Driver readinessNear full coverage
Yard congestionElevated at outbound side
+
Priority lanes are protected, but remaining open holds need confirmation from yard and driver teams before release.
+
+ Open note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
Operating Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Route release completion78%
Based on active outbound plan
Driver assignment coverage91%
Remaining gap on long-haul lanes
Exception clearance64%
Open holds trending down
+
+
+
Use route reassignment only after confirming gate availability and driver hours.
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
Review inbound pitches, assign editorial follow-up, and keep the publication queue moving with clear ownership.
+
+
+
+ Loading view
+ Selection queue
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
Several strong submissions are moving forward at the same time, but the desk is losing time when ownership is unclear after approval. Tightening assignment rules here will reduce back-and-forth, speed contributor replies, and help section editors focus on pieces they are ready to develop.
+
+
+
+
+
+
+
+
+
+
Desk Activity
+
Latest review and assignment actions
+
+
+
+
+
+
+
+
Two approved pitches still have no ownerCleared in review but not accepted by a section editor
High
Standards check requested on a sensitive angleHold response until review note is returned
Medium
Contributor waiting on revision guidanceInitial feedback sent without a named follow-up editor
Medium
+
Confirm final owner for the education feature pitchShared interest across two sections
In progress
Send decline notes for out-of-scope submissionsReady after lead review
Ready
Close duplicate entry group and keep strongest versionThree related submissions from separate contributors
Blocked
+
Lead editor requested a tighter angle before commissionAdded to the top priority pitch
Assignment returned after capacity check failedSection owner asked for reassignment
Contributor replied with revised framing noteReady for second pass
Duplicate tag removed after manual comparisonSubmission can continue through normal review
+
+
Operational Insight
+
The current operating goal is simple: reduce duplicate review, assign one accountable editor to each viable pitch, and keep contributors informed before follow-up goes cold.
+
First-pass review78%
Most inbound items have initial editorial tags
Ownership assignment61%
Several approved pitches still need a named editor
Contributor replies84%
Outcome messages are nearly caught up
+
+
+
Contributor Support
+
Most delays are no longer in intake. The main bottleneck is editorial ownership after a pitch passes first review, especially when more than one section wants to claim the same idea.
+
Flag near-duplicate submissions before they reach senior review.
Move approved ideas into one owner queue with a clear response deadline.
Keep contributor communication consistent when a pitch is held, revised, or declined.
Surface sensitive topics for legal or standards review before commissioning.
+
Held11
Revisions requested14
Declines sent32
+
Operational Signals
Duplicate riskModerate
Standards review3 items pending
Editor capacityTight
Intake sweep completed
New submissions were normalized, deduplicated, and tagged by desk.
Senior review pass
Borderline pitches were escalated for direction on fit and urgency.
Assignment round
Approved items were matched to editors with open capacity.
Contributor follow-up
Reply notes were prepared for hold, revise, and decline outcomes.
+
+
+
Use one final outcome per pitch so downstream assignment and contributor replies stay aligned.
+
+
+
+
diff --git a/web_insert/AntV G2/pie/chart_0101_pie.html b/web_insert/AntV G2/pie/chart_0101_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..cd03fe81799e4c685ba8f300068f9f92e7b64e23
--- /dev/null
+++ b/web_insert/AntV G2/pie/chart_0101_pie.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T34 Water Operations Control
+
+
+
+
+
+
+
+
+
+
Live networkShift handoffPriority review
Monitor plant output, service pressure, and field response from one operating view.
+
+
+
+ Loading view
+ Network status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Control Note
+
The active case is no longer expanding, but the team is holding controls in place until all dependent checks are complete. Field, dispatch, and service desk updates should stay aligned so closures do not outpace verified operating conditions.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Operational updates and required follow-up
+
+
+
+
+
+
+
+
Restricted pressure in east zoneCustomer impact limited; monitoring remains active
High
Booster station follow-up duePost-adjustment verification pending from field lead
Medium
Closure approval waitingSupervisor sign-off required on 3 linked work orders
Medium
+
Confirm downstream pressure readingsAssigned to east response crew
In progress
Validate temporary routing planRequired before restriction release
Pending review
Close resolved customer casesService desk waiting on operations note
Ready
+
Dispatch logged stable readings from sector valve setRecent field update
Plant control confirmed output remains on targetOperations note
Service desk tagged 4 cases for combined closureQueue update
Depot issued replacement fittings to mobile crewSupply confirmation
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident containment82%
Awaiting final field confirmation
Work order completion64%
Linked repairs moving through review
Case closure readiness71%
Service notes partially complete
+
+
+
Supervisor Notes
+
The current focus is to keep supply steady across high-demand zones, clear outstanding field confirmations, and close service cases that no longer need escalation. Supervisors are reviewing exceptions before the next handoff.
+
East transmission line remains in controlled operation with no new loss reports.
Two booster stations are running under temporary observation after overnight adjustment.
Customer-facing updates are limited to affected service pockets only.
Repair stock for seals and isolation fittings is available at primary depot.
+
Crews deployed9
Sites under watch4
Pending approvals6
+
Operational Signals
Reservoir balanceNormal
Pump readinessHigh
Field backlogModerate
Pressure deviation flagged
Network monitoring raised an east line variance and opened incident review.
Field isolation confirmed
Local crew secured the affected segment and reported stable downstream flow.
Supervisor review in progress
Operations lead is validating closure conditions before releasing restrictions.
+
+
+
Use confirmed field updates before changing service classification or closing a case.
Monitor enrollment flow, review teaching requests, and keep campus services within response targets.
+
+
+
+ Loading view
+ Enrollment workload
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main pressure point is not overall volume but the number of cases waiting on a second team to confirm eligibility, roster placement, or account release. Clearing those handoffs will reduce repeat contacts and keep approvals moving in the right order.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Recent updates across admissions, scheduling, and support
+
+
+
+
+
+
+
+
Identity check queue exceeded review target14 learner files are outside normal handling time
Access provisioning paused for one intake groupRoster confirmation is still pending from registry
Medium
+
Approve seat exception requestsOwned by academic operations
In progress
Confirm account release listWaiting on final learner verification
Blocked
Close duplicate support casesMerge requests from advising and registry
Ready
+
Registry completed a priority batch reviewOpen count reduced after document validation
Scheduling submitted a conflict noteOne instructor assigned to overlapping sessions
Support added an access exceptionLearner record needs manual activation
Advising returned a hold for correctionProgram selection does not match approved path
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Enrollment validation74%
Most records reviewed; exceptions remain
Teaching assignment approval61%
Conflict cases still under review
Account activation release83%
Waiting on final roster handoff
+
+
+
Support Notes
+
Most exceptions are tied to incomplete learner records and overlapping instructor availability. Team leads are using the queue to clear blocked cases before they affect course readiness and support response times.
+
Admissions is prioritizing records with missing identity checks.
Scheduling is reviewing instructor conflicts before room release.
Support is holding account activation until final roster approval.
Policy notices were updated to reflect new escalation ownership.
+
Escalations7
Owners online12
Blocked cases19
+
Operational Signals
Validation backlogModerate
Seat release paceStable
Access turnaroundAt risk
Intake review opened
Registry triage assigned the latest submission batch
Faculty request escalated
Teaching load conflict moved to academic operations
Roster lock cleared
Student services approved the final exception set
+
+
+
Use this view to coordinate approvals, confirm handoffs, and clear blockers before escalation windows are breached.
Coordinate active equipment work, parts readiness, and technician handoff for the current plant queue.
+
+
+
+ Loading view
+ Asset service status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
The main risk is not the volume of open work but the overlap between recurring faults, shared spare parts, and incomplete close-out records. The coordinator is prioritizing jobs that restore stable operation fastest while making sure each completed repair can pass inspection without rework.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest maintenance coordination updates
+
+
+
+
+
+
+
+
Repeat fault on feeder motor requires supervisor reviewLinked to two prior corrective orders
Close-out blocked by missing isolation recordInspection will not release final status
High
+
Approve repair scope for Press Line 2 feederCost review attached by area lead
Pending approval
Confirm staged parts for conveyor coupling replacementMechanical crew waiting at access point
In progress
Return corrected close-out notes to inspectionPhoto evidence and isolation steps required
Needs update
+
Mechanical crew reported safe access at feeder bayField note added 14 min ago
Parts desk reserved seal kit for linked ordersReservation confirmed against active queue
Area lead raised priority on conveyor drive caseOperational impact now classified as elevated
Inspection returned one closure package for revisionMissing verification note in final step
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Priority repairs completed62%
8 of 13 cleared
Parts staging readiness73%
Most critical kits available
Close-out compliance81%
Several packages awaiting final note
+
+
+
Coordination Notes
+
The current focus is keeping high-use assets in service while clearing overdue follow-up work from earlier interventions. Notes, queue status, and technician updates are aligned here so handoff decisions can be made without opening separate records.
+
Three priority jobs share the same hydraulic seal kit and must be sequenced carefully.
Inspection has requested photo confirmation before closing two repeat-failure orders.
One conveyor drive can remain in service under reduced load until replacement stock is issued.
Electrical support is available for lockout review on escalated jobs.
+
On-site crews4
Locked out assets3
Rush requests2
+
Support Readiness
Critical assets online9/10
Awaiting approval4 orders
Parts shortfall2 items
Failure review completed for press feeder
Supervisor approved immediate repair path
Seal kit released from parts crib
Reserved against two linked work orders
Field update posted by mechanical crew
Access cleared and unit isolated
Close-out package returned for correction
Inspection note required before final release
+
+
+
All updates shown here are operational records and must match the approved work order before closure.
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
+ Active flightPriority reviewShared budgetStore traffic
+
+
+
+
+
+
+
+
Needs review
Track active retail promotions, review pacing risks, and keep launch approvals moving across paid channels.
This overview brings campaign owners, channel leads, and reviewers into one operating view for retail promotion activity. The focus is on release readiness, pacing discipline, and fast resolution when a campaign drifts outside its approved plan.
Avery NolanMarketing Operations Lead
+
Active campaigns
18
3 awaiting final release
Planned spend
$426K
Within current budget guardrail
Projected return
4.8x
Lift driven by repeat buyer segments
Creative compliance
92%
Remaining items need legal copy review
+
+
+
+ Loading view
+ Campaign performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
Current risk is concentrated in a small number of high-visibility promotions that are close to release but still depend on approval cleanup. Clearing those items will allow the team to open budget safely without creating rework for channel operations or compliance.
+
+
+
+
+
+
+
+
Operational Notes
+
Most campaigns are moving as expected, but a small group requires attention before budget can be fully opened. The current work centers on copy approval, audience overlap checks, and confirming that regional exclusions are applied before wider rollout.
+
Priority campaigns are grouped for same-day review by channel operations.
Budget adjustments require owner confirmation and finance-safe pacing limits.
Audience rule changes remain blocked until compliance notes are cleared.
Store traffic campaigns receive higher escalation when release windows narrow.
+
Queued reviews9
Open exceptions4
Released today5
+
+
+
+
Team Activity
+
Recent decisions and release changes
+
+
+
+
+
+
+
+
Copy exception still open for priority placementOwner response pending
High
Audience overlap exceeds internal thresholdShared budget campaign group
Medium
Regional exclusion missing from one launch setStore traffic promotion
Medium
+
Approve revised launch copyAssigned to compliance reviewer
In progress
Confirm pacing cap for shared budget groupRequested by channel lead
Pending
Validate excluded regions before releaseRequired for final activation
Ready
+
Budget guardrail updated for priority promotionRecorded by finance operations
Audience rule revision submittedWaiting for approval
Channel owner added release noteEscalation removed after review
Compliance returned one asset for editsCopy needs location disclaimer
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval completion74%
Most high-spend items already reviewed
Budget allocation68%
Remaining spend held behind final checks
Release readiness81%
Operational setup nearly complete
+
Release Flow
Intake completed
Briefs and spend limits confirmed
Review in progress
Compliance and audience checks underway
Release window
Approved campaigns move to channel activation
Queued reviews9
Open exceptions4
Released today5
+
+
+
Use this view to resolve blockers before expanding spend or opening additional channel coverage.
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.
+ Active portfolioReview in progressFunding controlsCompliance watch
+
+
+
+
+
+
+
+
Managed
Monitor active studies, pending approvals, funding usage, and cross-team follow-up from one operational view.
The office is managing a mixed portfolio of faculty-led studies, lab collaborations, and student research initiatives. Most work is progressing within approved scope, but a small set of submissions requires administrative response before funds or participant activity can proceed.
Dr. Elaine PorterDirector, Research Administration
+
Open Projects
48
6 awaiting formal approval
Active Funding
$12.4M
Within approved allocation range
Pending Reviews
17
4 require principal investigator response
Policy Exceptions
3
All assigned for follow-up
+
+
+
+ Loading view
+ Project activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Several projects are close to activation, but progress depends on small administrative corrections. Clearing incomplete files and confirming ownership will reduce delay, improve audit readiness, and allow the office to release approved work without further escalation.
+
+
+
+
+
+
+
+
Office Notes
+
Current attention is focused on review completion, documentation quality, and timely coordination between academic units and the central research office. Team leads are using this view to resolve blockers, confirm ownership, and keep each project aligned with internal policy.
+
Approval backlog is concentrated in new submissions with incomplete ethics attachments.
Two high-value projects are waiting on revised budget justification before release.
Records cleanup reduced duplicate sponsor entries across several departments.
Escalations are being routed to unit coordinators for direct follow-up.
+
Units involved11
Cases reassigned5
Records updated23
+
+
+
+
Recent Office Activity
+
Latest updates across approvals, records, and funding control.
+
+
+
+
+
+
+
+
Budget release on holdMissing approval note from finance control
High
Ethics file incompleteParticipant consent language requires revision
Medium
Sponsor record mismatchDepartment entry differs from central register
Low
+
Confirm unit reviewer for pending submissions7 projects without final reviewer assignment
Open
Release approved funding batch2 projects cleared after documentation check
Ready
Close duplicate sponsor recordsFollow-up required across 3 departments
In progress
+
Policy team returned one exception case for clarificationNeeds updated risk statement
Finance control cleared restricted spending lineRelease can proceed after office sign-off
Graduate coordinator added missing investigator credentialsSubmission now eligible for formal review
Unit office confirmed lead contact changeRecords updated for future notices
+
+
+
Portfolio Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Initial screening92%
Most submissions validated
Formal review68%
Backlog concentrated in exception cases
Funding release74%
Delayed by final approval checks
+
Recent Milestones
Portfolio intake closed
New submissions moved to initial screening
Compliance review updated
Exception cases reassigned to policy team
Funding release prepared
Awaiting final sign-off from finance control
Units involved11
Cases reassigned5
Records updated23
+
+
+
Internal use only. Funding, review, and compliance actions must be recorded before project status is changed.
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
+
+
+
+
diff --git a/web_insert/AntV G2/scatter/chart_0094_scatter.html b/web_insert/AntV G2/scatter/chart_0094_scatter.html
new file mode 100644
index 0000000000000000000000000000000000000000..3a4ebf73246684d5c9d52d5bd836b78c328d2eff
--- /dev/null
+++ b/web_insert/AntV G2/scatter/chart_0094_scatter.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
Coordinate active equipment work, parts readiness, and technician handoff for the current plant queue.
+
+
+
+ Loading view
+ Asset service status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
The main risk is not the volume of open work but the overlap between recurring faults, shared spare parts, and incomplete close-out records. The coordinator is prioritizing jobs that restore stable operation fastest while making sure each completed repair can pass inspection without rework.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest maintenance coordination updates
+
+
+
+
+
+
+
+
Repeat fault on feeder motor requires supervisor reviewLinked to two prior corrective orders
Close-out blocked by missing isolation recordInspection will not release final status
High
+
Approve repair scope for Press Line 2 feederCost review attached by area lead
Pending approval
Confirm staged parts for conveyor coupling replacementMechanical crew waiting at access point
In progress
Return corrected close-out notes to inspectionPhoto evidence and isolation steps required
Needs update
+
Mechanical crew reported safe access at feeder bayField note added 14 min ago
Parts desk reserved seal kit for linked ordersReservation confirmed against active queue
Area lead raised priority on conveyor drive caseOperational impact now classified as elevated
Inspection returned one closure package for revisionMissing verification note in final step
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Priority repairs completed62%
8 of 13 cleared
Parts staging readiness73%
Most critical kits available
Close-out compliance81%
Several packages awaiting final note
+
+
+
Coordination Notes
+
The current focus is keeping high-use assets in service while clearing overdue follow-up work from earlier interventions. Notes, queue status, and technician updates are aligned here so handoff decisions can be made without opening separate records.
+
Three priority jobs share the same hydraulic seal kit and must be sequenced carefully.
Inspection has requested photo confirmation before closing two repeat-failure orders.
One conveyor drive can remain in service under reduced load until replacement stock is issued.
Electrical support is available for lockout review on escalated jobs.
+
On-site crews4
Locked out assets3
Rush requests2
+
Support Readiness
Critical assets online9/10
Awaiting approval4 orders
Parts shortfall2 items
Failure review completed for press feeder
Supervisor approved immediate repair path
Seal kit released from parts crib
Reserved against two linked work orders
Field update posted by mechanical crew
Access cleared and unit isolated
Close-out package returned for correction
Inspection note required before final release
+
+
+
All updates shown here are operational records and must match the approved work order before closure.
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
+
+
+
+
diff --git a/web_insert/AnyChart/scatter/chart_0036_scatter.html b/web_insert/AnyChart/scatter/chart_0036_scatter.html
new file mode 100644
index 0000000000000000000000000000000000000000..90c30bb0de1144eb9b2bed6a15856b63874a9af1
--- /dev/null
+++ b/web_insert/AnyChart/scatter/chart_0036_scatter.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
+ Live ControlDispatch ReadyStorage BalancedField Review Open
+
+
+
+
+
+
+
+
Operational
Track site output, storage readiness, dispatch commitments, and field actions across the active hub.
The hub is operating within target limits, with solar and wind assets sharing load as expected and storage carrying the balancing role for short fluctuations. Dispatch obligations remain intact, and no station is currently outside its approved operating envelope.
Elena MorrisRegional Hub Supervisor
+
Net Output
428 MW
Holding above committed delivery band
Available Storage
81%
Reserve margin kept for evening handoff
Curtailment Risk
Low
No immediate restriction notices in scope
Open Field Actions
7
Two require supervisor review
+
+
+
+ Loading view
+ Hub performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Output remains dependable across the hub, but the team is keeping close watch on the inland station until restart behavior is fully verified. Supervisors should clear the pending reserve note and confirm the inspection window so field and control actions stay aligned.
+
+
+
+
+
+
+
+
Operations Notes
+
Operations staff are watching one inland station where inverter recovery is slower than normal after a brief protective trip. The condition is stable, but the team has kept a local inspection open until the restart pattern returns to baseline.
+
Primary dispatch commitment remains fully covered by live generation and stored reserve.
One site review is waiting on field confirmation before the maintenance note can be closed.
Remote control authority is active for all stations in the current hub scope.
No compliance holds are blocking routine switching or battery balancing actions.
+
Stations Online14
Open Reviews3
Active Crews2
+
+
+
+
Shift Activity
+
Recorded actions and follow-up items for the active operating window.
+
+
+
+
+
+
+
+
Inland station restart varianceRecovery sequence exceeded normal duration
Medium
Storage reserve floor nearing handoff targetBalancing plan may need minor adjustment
Low
Field confirmation pending on breaker inspectionClosure blocked until site response is logged
Medium
+
Approve reserve adjustment noteSubmitted by shift operator
Pending approval
Confirm inland site inspection windowCrew lead requested access hold
Waiting
Close completed switching logControl steps verified by second reviewer
Ready
+
Grid desk accepted updated export positionAcknowledgement logged by dispatch coordinator
Battery balancing sequence completed without exceptionAutomatic control remained within approved limits
Field crew checked access route to inland stationTravel and handoff conditions confirmed
Remote link health check passed across all active sitesNo communication degradation recorded
+
+
+
Readiness Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Dispatch coverage96%
Committed export supported
Storage readiness81%
Reserve held for balancing
Field action closure68%
Open reviews moving toward sign-off
+
Recent Activity
Hub entered balanced operating mode
Control room update
Storage reserve floor adjusted for dispatch window
Shift approval recorded
Inverter restart review opened at inland station
Field follow-up assigned
Export commitment reconfirmed with grid desk
Acknowledgement received
Stations Online14
Open Reviews3
Active Crews2
+
+
+
Use this view to confirm readiness before approving dispatch changes or closing field actions.
+
+
+
+
diff --git a/web_insert/Apache ECharts/bar/chart_0003_bar.html b/web_insert/Apache ECharts/bar/chart_0003_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..62b81989ffde25dec6436afe699bd875954ef81a
--- /dev/null
+++ b/web_insert/Apache ECharts/bar/chart_0003_bar.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T14 Store Stock Control
+
+
+
+
+
+
+
+
+
+
Live stockReplenishment reviewHold resolution
Track replenishment risk, release held inventory, and keep shelf availability aligned across active locations.
+
+
+
+ Loading view
+ Location stock position
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main concern is not total network stock but timing. Several locations can return to normal selling levels once held units are cleared and transfer approvals are issued in the right order. Teams are using this view to keep store demand, receiving capacity, and release controls aligned.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Latest stock handling and release steps
+
+
+
+
+
+
+
+
Count mismatch blocking release12 item lines remain held after store recount
High
Priority location below cover targetReplenishment risk increased across 4 stores
Medium
Receiving backlog nearing thresholdInbound confirmation lag may delay availability updates
Medium
+
Approve transfer batch for thin-cover stores29 lines prepared by distribution planning
Ready
Confirm held quantities against recount notes74 units waiting on store validation
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Hold review completion68%
Most flagged lines have first-pass decisions
Transfer approval completion54%
Awaiting release order from control lead
Count reconciliation73%
Repeat variance stores still under review
+
+
+
Operational Notes
+
this workflow supports the daily decision flow: identify where cover is too thin, confirm whether held stock can be released, and route transfer lines to the locations with the highest service risk. Notes and queue items below reflect the current handoff between store control, distribution, and floor operations.
+
Prioritize releases for locations with same-day shelf risk.
Delay nonessential transfers until held quantities are verified.
Escalate repeated count mismatches to store control leads.
Keep transfer approvals aligned with receiving capacity.
+
Priority stores11
Open holds18
Ready transfers7
+
Network Signals
Service riskElevated
Receiving pressureModerate
Approval backlogContained
Cycle count exceptions reviewed
Store control completed first-pass review on flagged lines.
Transfer requests consolidated
Low-cover locations were grouped for a single approval pass.
Held stock release pending
Distribution is waiting for final quantity confirmation.
+
+
+
Use release actions only after count confirmation is recorded in the item note.
Editorial interpretation, policy check, and release readiness for a high-traffic article package.
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
+
+
+ Loading view
+ Article review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
The item remains on hold because reviewers want the final article to state only what can be supported directly in the reporting record. Once the headline and two interpretive passages are revised, the last policy note can be closed and the release team can complete handoff without reopening the brief.
+
+
+
+
+
+
+
+
Editorial Support Notes
+
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
Tighten the headline so it reflects verified reporting only
Rework two interpretive lines in the middle section
Confirm attribution order in the closing paragraph
Keep the release hold in place until policy notes are cleared
+
Linked notes12
Required edits3
Approvals2/3
+
+
+
+
Recent Activity
+
Latest actions across review, policy, and release handling.
+
+
+
+
+
+
+
+
Policy sign-off still openRelease cannot proceed until the final comment is resolved
High
Headline wording exceeds source certaintyDesk requested a narrower phrasing pass
Medium
Closing attribution order changedLatest revision needs reviewer confirmation
Low
+
Apply marked language editsThree passages require direct revision
Prepare release handoffQueue placement is ready once approval lands
Queued
+
Desk review updated with narrowed wording requestAdded by editorial review
Policy note linked to middle section passageMapped to required edit
Release hold confirmed by operationsQueue position preserved
Final pass assigned to senior reviewerAwaiting consolidated response
+
+
+
Reading Insight
+
Operations has held the item in the final queue so the desk can complete one coordinated pass rather than resolve comments in isolation. this workflow is intended to keep editors, policy reviewers, and release staff on the same record while the article moves through its last approval step.
+
Editorial review88%
Most text decisions are settled
Policy clearance67%
One required note remains
Release handoff54%
Prepared but not cleared
+
Release Signals
Attribution strengthNeeds tightening
Headline alignmentUnder revision
Release readinessPending approval
Final release depends on one policy approval and completion of marked language edits.
+
+
Use the same review record when updating wording, approvals, and release handling to avoid duplicate decisions.
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
Review inbound pitches, assign editorial follow-up, and keep the publication queue moving with clear ownership.
+
+
+
+ Loading view
+ Selection queue
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
Several strong submissions are moving forward at the same time, but the desk is losing time when ownership is unclear after approval. Tightening assignment rules here will reduce back-and-forth, speed contributor replies, and help section editors focus on pieces they are ready to develop.
+
+
+
+
+
+
+
+
+
+
Desk Activity
+
Latest review and assignment actions
+
+
+
+
+
+
+
+
Two approved pitches still have no ownerCleared in review but not accepted by a section editor
High
Standards check requested on a sensitive angleHold response until review note is returned
Medium
Contributor waiting on revision guidanceInitial feedback sent without a named follow-up editor
Medium
+
Confirm final owner for the education feature pitchShared interest across two sections
In progress
Send decline notes for out-of-scope submissionsReady after lead review
Ready
Close duplicate entry group and keep strongest versionThree related submissions from separate contributors
Blocked
+
Lead editor requested a tighter angle before commissionAdded to the top priority pitch
Assignment returned after capacity check failedSection owner asked for reassignment
Contributor replied with revised framing noteReady for second pass
Duplicate tag removed after manual comparisonSubmission can continue through normal review
+
+
Operational Insight
+
The current operating goal is simple: reduce duplicate review, assign one accountable editor to each viable pitch, and keep contributors informed before follow-up goes cold.
+
First-pass review78%
Most inbound items have initial editorial tags
Ownership assignment61%
Several approved pitches still need a named editor
Contributor replies84%
Outcome messages are nearly caught up
+
+
+
Contributor Support
+
Most delays are no longer in intake. The main bottleneck is editorial ownership after a pitch passes first review, especially when more than one section wants to claim the same idea.
+
Flag near-duplicate submissions before they reach senior review.
Move approved ideas into one owner queue with a clear response deadline.
Keep contributor communication consistent when a pitch is held, revised, or declined.
Surface sensitive topics for legal or standards review before commissioning.
+
Held11
Revisions requested14
Declines sent32
+
Operational Signals
Duplicate riskModerate
Standards review3 items pending
Editor capacityTight
Intake sweep completed
New submissions were normalized, deduplicated, and tagged by desk.
Senior review pass
Borderline pitches were escalated for direction on fit and urgency.
Assignment round
Approved items were matched to editors with open capacity.
Contributor follow-up
Reply notes were prepared for hold, revise, and decline outcomes.
+
+
+
Use one final outcome per pitch so downstream assignment and contributor replies stay aligned.
Reporting cycle activeEvidence under reviewSite coverage completeApproval pending
+
+
+
Reporting Summary
Consolidated operational view for facility emissions, evidence readiness, and approval progress across the reporting cycle.
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
+
+
+ Loading view
+ Emissions view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Reporting Note
+
Most reporting work is complete, but the team is holding release until the last boundary clarification and control statement are fully documented. Once those items are closed, the submission can move through approval without further operational changes.
+
+
+
+
+
+
+
+
Reporting Support
+
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
All operated facilities submitted activity data within the active reporting window.
Boundary assumptions were updated after internal control review.
Evidence coverage is complete for direct fuel use and purchased electricity.
Final sign-off is blocked only by unresolved exception responses.
+
Facilities in scope14
Evidence files linked128
Approvers assigned5
+
+
+
+
Review Activity
+
Recent actions tied to the current reporting cycle
+
+
+
+
+
+
+
+
Boundary note requires confirmationShared support load treatment updated by operations
Medium
Exception owner response overdueOne facility comment has not been returned
High
Approval pack awaiting final attachmentControl statement must be added before routing
Low
+
Validate revised allocation methodCheck consistency against facility evidence
In progress
Close open exception itemsCollect responses from assigned owners
Blocked
Route package for sign-offRelease once control statement is attached
Coordinate intake, review, and resolution for active public service requests across district teams.
+
+
+
+ Loading view
+ Request handling
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Demand remains manageable overall, but manual verification is creating uneven wait times between offices. Supervisors are prioritizing clean approvals, redirecting exception work to trained reviewers, and keeping resident communication tied closely to documented case decisions.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest actions across intake, review, and approval teams.
+
+
+
+
+
+
+
+
Approval queue nearing response limit8 requests need supervisor action within the service window
High
Identity mismatch rate increasedManual checks are slowing intake clearance in two offices
Medium
Returned submissions require follow-upResidents have not responded on 14 incomplete requests
Low
+
Clear specialist review backlogReassign exception cases from general intake
In progress
Approve release batchDecision notes are complete and ready for sign-off
Ready
Validate returned documentsCheck corrected records before reopening requests
Queued
+
North district accepted three escalated casesOwnership transferred from central review
Resident notice batch released after approvalNotifications sent for completed decisions
Compliance note added to exception handling rulesReview teams must record reason codes on manual overrides
Intake team cleared duplicate submissionsMerged records reduced queue noise for active requests
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Intake review72%
Most new submissions screened and routed
Eligibility verification54%
Manual checks remain the slowest step
Decision release81%
Approved cases moving out on schedule
+
+
+
Supervisor Notes
+
A review backlog has formed around eligibility checks that require manual confirmation. Supervisors are balancing faster routing with compliance controls so straightforward requests can move forward while exceptions remain documented and ready for audit.
+
Priority requests are held for direct supervisor review when identity or address records do not match.
Field offices can return incomplete submissions to intake without closing the case.
Resident notifications are released only after decision notes and supporting checks are complete.
Escalated items remain visible until ownership is accepted by the receiving team.
+
Avg. handling time2.8h
Returned to intake27
Supervisor holds11
+
Queue Health
Service levelStable
Review capacityTight
Escalation loadModerate
Intake queue reviewed
Initial screening completed for newly received submissions
Eligibility exceptions routed
Cases with missing verification moved to specialist review
Supervisor approvals issued
Approved requests released for resident notice and fulfillment
+
+
+
Access, routing, and decision history are logged for compliance review.
+
+
+
+
diff --git a/web_insert/Apache ECharts/bar/chart_0009_bar.html b/web_insert/Apache ECharts/bar/chart_0009_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..24b1c69d0466838d0d8c3d62c63dc4a4169bce90
--- /dev/null
+++ b/web_insert/Apache ECharts/bar/chart_0009_bar.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T34 Water Operations Control
+
+
+
+
+
+
+
+
+
+
Live networkShift handoffPriority review
Monitor plant output, service pressure, and field response from one operating view.
+
+
+
+ Loading view
+ Network status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Control Note
+
The active case is no longer expanding, but the team is holding controls in place until all dependent checks are complete. Field, dispatch, and service desk updates should stay aligned so closures do not outpace verified operating conditions.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Operational updates and required follow-up
+
+
+
+
+
+
+
+
Restricted pressure in east zoneCustomer impact limited; monitoring remains active
High
Booster station follow-up duePost-adjustment verification pending from field lead
Medium
Closure approval waitingSupervisor sign-off required on 3 linked work orders
Medium
+
Confirm downstream pressure readingsAssigned to east response crew
In progress
Validate temporary routing planRequired before restriction release
Pending review
Close resolved customer casesService desk waiting on operations note
Ready
+
Dispatch logged stable readings from sector valve setRecent field update
Plant control confirmed output remains on targetOperations note
Service desk tagged 4 cases for combined closureQueue update
Depot issued replacement fittings to mobile crewSupply confirmation
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident containment82%
Awaiting final field confirmation
Work order completion64%
Linked repairs moving through review
Case closure readiness71%
Service notes partially complete
+
+
+
Supervisor Notes
+
The current focus is to keep supply steady across high-demand zones, clear outstanding field confirmations, and close service cases that no longer need escalation. Supervisors are reviewing exceptions before the next handoff.
+
East transmission line remains in controlled operation with no new loss reports.
Two booster stations are running under temporary observation after overnight adjustment.
Customer-facing updates are limited to affected service pockets only.
Repair stock for seals and isolation fittings is available at primary depot.
+
Crews deployed9
Sites under watch4
Pending approvals6
+
Operational Signals
Reservoir balanceNormal
Pump readinessHigh
Field backlogModerate
Pressure deviation flagged
Network monitoring raised an east line variance and opened incident review.
Field isolation confirmed
Local crew secured the affected segment and reported stable downstream flow.
Supervisor review in progress
Operations lead is validating closure conditions before releasing restrictions.
+
+
+
Use confirmed field updates before changing service classification or closing a case.
+ Active flightPriority reviewShared budgetStore traffic
+
+
+
+
+
+
+
+
Needs review
Track active retail promotions, review pacing risks, and keep launch approvals moving across paid channels.
This overview brings campaign owners, channel leads, and reviewers into one operating view for retail promotion activity. The focus is on release readiness, pacing discipline, and fast resolution when a campaign drifts outside its approved plan.
Avery NolanMarketing Operations Lead
+
Active campaigns
18
3 awaiting final release
Planned spend
$426K
Within current budget guardrail
Projected return
4.8x
Lift driven by repeat buyer segments
Creative compliance
92%
Remaining items need legal copy review
+
+
+
+ Loading view
+ Campaign performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
Current risk is concentrated in a small number of high-visibility promotions that are close to release but still depend on approval cleanup. Clearing those items will allow the team to open budget safely without creating rework for channel operations or compliance.
+
+
+
+
+
+
+
+
Operational Notes
+
Most campaigns are moving as expected, but a small group requires attention before budget can be fully opened. The current work centers on copy approval, audience overlap checks, and confirming that regional exclusions are applied before wider rollout.
+
Priority campaigns are grouped for same-day review by channel operations.
Budget adjustments require owner confirmation and finance-safe pacing limits.
Audience rule changes remain blocked until compliance notes are cleared.
Store traffic campaigns receive higher escalation when release windows narrow.
+
Queued reviews9
Open exceptions4
Released today5
+
+
+
+
Team Activity
+
Recent decisions and release changes
+
+
+
+
+
+
+
+
Copy exception still open for priority placementOwner response pending
High
Audience overlap exceeds internal thresholdShared budget campaign group
Medium
Regional exclusion missing from one launch setStore traffic promotion
Medium
+
Approve revised launch copyAssigned to compliance reviewer
In progress
Confirm pacing cap for shared budget groupRequested by channel lead
Pending
Validate excluded regions before releaseRequired for final activation
Ready
+
Budget guardrail updated for priority promotionRecorded by finance operations
Audience rule revision submittedWaiting for approval
Channel owner added release noteEscalation removed after review
Compliance returned one asset for editsCopy needs location disclaimer
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval completion74%
Most high-spend items already reviewed
Budget allocation68%
Remaining spend held behind final checks
Release readiness81%
Operational setup nearly complete
+
Release Flow
Intake completed
Briefs and spend limits confirmed
Review in progress
Compliance and audience checks underway
Release window
Approved campaigns move to channel activation
Queued reviews9
Open exceptions4
Released today5
+
+
+
Use this view to resolve blockers before expanding spend or opening additional channel coverage.
Review account health, retention risk, and pending interventions for active customer segments.
+
+
+
+ Loading view
+ Active user case flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current queue reflects a concentrated effort to retain users who showed intent but encountered friction during critical account steps. Teams are expected to document every outreach attempt, confirm ownership before escalation, and close only when the account is either stable or formally transferred for continued monitoring.
+
+
+
+
+
+
+
+
+
+
Case Activity
+
Recent decisions and follow-up movement
+
+
+
+
+
+
+
+
High-value account awaiting decisionNo final disposition recorded after manual review
High
Outreach backlog risingFollow-up queue has crossed internal response target
Medium
Exception note incompletePolicy-sensitive case missing approval rationale
Medium
+
Confirm owner coverage for priority cases7 cases without confirmed handoff
In progress
Complete callback verificationPending contact outcomes need final status
Queued
Close resolved onboarding reviewsCases meet closure conditions after successful recovery
Ready
+
Owner updated on priority reviewRouting changed after shift handoff
Manual decision recordedCase moved from hold to monitor
Risk flag clearedActivity recovered after intervention
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Queue clearance72%
Handled against current intake
Outreach completion64%
Priority contacts sent and logged
Approval coverage89%
Cases with complete decision trail
+
+
+
Operational Notes
+
Current activity is centered on a rise in support-linked retention risk. Several accounts were routed into manual review after repeated onboarding exits, failed self-service recovery, or policy-sensitive changes that require a documented decision.
+
High-priority cases are routed to named owners before outreach begins.
Accounts with repeat friction stay in review until next-step evidence is recorded.
Policy exceptions require a reason code and final approval note.
+
Active owners16
Cases on hold12
Recovered users31
+
Review Signals
Escalation rate11%
Policy exceptions9
Pending callbacks22
Risk rule triggered
Account entered review after repeated drop-off behavior
Operations review started
Owner assigned and contact path confirmed
User contacted
Follow-up sent with recovery guidance and next action
Decision logged
Case moved to monitor, close, or escalate
+
+
+
Access, contact history, and policy decisions are recorded for audit review.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
+ Active portfolioReview in progressFunding controlsCompliance watch
+
+
+
+
+
+
+
+
Managed
Monitor active studies, pending approvals, funding usage, and cross-team follow-up from one operational view.
The office is managing a mixed portfolio of faculty-led studies, lab collaborations, and student research initiatives. Most work is progressing within approved scope, but a small set of submissions requires administrative response before funds or participant activity can proceed.
Dr. Elaine PorterDirector, Research Administration
+
Open Projects
48
6 awaiting formal approval
Active Funding
$12.4M
Within approved allocation range
Pending Reviews
17
4 require principal investigator response
Policy Exceptions
3
All assigned for follow-up
+
+
+
+ Loading view
+ Project activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Several projects are close to activation, but progress depends on small administrative corrections. Clearing incomplete files and confirming ownership will reduce delay, improve audit readiness, and allow the office to release approved work without further escalation.
+
+
+
+
+
+
+
+
Office Notes
+
Current attention is focused on review completion, documentation quality, and timely coordination between academic units and the central research office. Team leads are using this view to resolve blockers, confirm ownership, and keep each project aligned with internal policy.
+
Approval backlog is concentrated in new submissions with incomplete ethics attachments.
Two high-value projects are waiting on revised budget justification before release.
Records cleanup reduced duplicate sponsor entries across several departments.
Escalations are being routed to unit coordinators for direct follow-up.
+
Units involved11
Cases reassigned5
Records updated23
+
+
+
+
Recent Office Activity
+
Latest updates across approvals, records, and funding control.
+
+
+
+
+
+
+
+
Budget release on holdMissing approval note from finance control
High
Ethics file incompleteParticipant consent language requires revision
Medium
Sponsor record mismatchDepartment entry differs from central register
Low
+
Confirm unit reviewer for pending submissions7 projects without final reviewer assignment
Open
Release approved funding batch2 projects cleared after documentation check
Ready
Close duplicate sponsor recordsFollow-up required across 3 departments
In progress
+
Policy team returned one exception case for clarificationNeeds updated risk statement
Finance control cleared restricted spending lineRelease can proceed after office sign-off
Graduate coordinator added missing investigator credentialsSubmission now eligible for formal review
Unit office confirmed lead contact changeRecords updated for future notices
+
+
+
Portfolio Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Initial screening92%
Most submissions validated
Formal review68%
Backlog concentrated in exception cases
Funding release74%
Delayed by final approval checks
+
Recent Milestones
Portfolio intake closed
New submissions moved to initial screening
Compliance review updated
Exception cases reassigned to policy team
Funding release prepared
Awaiting final sign-off from finance control
Units involved11
Cases reassigned5
Records updated23
+
+
+
Internal use only. Funding, review, and compliance actions must be recorded before project status is changed.
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
Receiving activePutaway constrainedDispatch on hold
Monitor inbound receipts, putaway flow, and outbound release from one operating view.
+
+
+
+ Loading view
+ Facility activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main risk is not total volume but timing. Inbound receipts, reserve storage, and outbound release are all connected, so a short delay at dock assignment or packing review quickly affects the rest of the floor. Clearing blocked pallets and reallocating lift coverage should return the site to a steadier operating rhythm.
+
+
+
+
+
+
+
+
+
+
Floor Activity
+
Updated as teams complete receiving, storage, and release steps.
+
+
+
+
+
+
+
+
Dock queue above working limit6 loads waiting longer than target
High
Bulk zone capacity nearing thresholdReserve slots at 93% use
+ Live DispatchPriority LoadsDriver CoverageGate Readiness
+
+
+
+
+
+
+
Active monitoring
+
Coordinate active routes, rebalance drivers, and clear open exceptions from one operating view.
+
Dispatch is managing a tight operating window with several outbound runs stacked behind the same gate sequence. The team has already reallocated available units to protect higher-priority moves and reduce idle time at the yard.
+
+
+
Maya BennettFleet Dispatch Lead
+
+
+
+
Units in motion
148
12 reassigned during the current shift
Open route holds
9
Most tied to late gate release
Coverage gap
4
Backfill requested for long-haul lanes
On-time departure
93%
Holding steady after yard balancing
+
+
+
+
+ Loading view
+ Route coordination
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Most unresolved issues now sit between driver readiness and release timing. Supervisors are using this panel to confirm who can be reassigned, which routes need escalation, and where a short delay will create a downstream coverage gap.
+
Three priority loads were moved to alternate tractors to avoid missed departure targets.
Driver check-in compliance improved after direct follow-up from the shift desk.
Yard staging remains constrained near outbound lanes with refrigerated equipment.
+
Standby drivers6
Held departures9
Ready tractors22
+
+
+
+
+
Recent Activity
+
Latest dispatch actions and route decisions
+
+
+
+
+
+
+
+
Gate release delay affecting priority runLane B12 Waiting 18 min
High
Driver rest window blocks reassignmentLong-haul pool 2 units impacted
Medium
Trailer pairing mismatch in yard queueOutbound side Manual check required
Medium
+
Confirm backup operator for north corridor runDispatch desk request
In progress
Approve swap for delayed refrigerated unitRequires lead signoff
Pending
Close completed hold after gate clearanceRoute ready for release
Ready
+
Yard team confirmed two lanes cleared for outbound stagingPosted by yard control
Driver support updated availability for standby poolCoverage adjusted
Priority load reassignment accepted by route supervisorNo further approval needed
Fuel stop exception removed from active reviewDispatch note closed
+
+
+
Lead Note
+
The team is working through a compressed release window where small delays at the yard can quickly reduce route coverage. This view helps dispatch leads decide where to reassign equipment, push approvals, and keep priority movements on schedule.
+
Dispatch healthStable with exceptions
Driver readinessNear full coverage
Yard congestionElevated at outbound side
+
Priority lanes are protected, but remaining open holds need confirmation from yard and driver teams before release.
+
+ Open note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
Operating Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Route release completion78%
Based on active outbound plan
Driver assignment coverage91%
Remaining gap on long-haul lanes
Exception clearance64%
Open holds trending down
+
+
+
Use route reassignment only after confirming gate availability and driver hours.
Execution in focusControl review activeApproval queue open
Track release pacing, exception handling, and approval readiness across active cost centers.
+
+
+
+ Loading view
+ Execution overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
Release performance is broadly on plan, but the remaining blocked amount sits in cases that need manual confirmation. Resolving those records quickly will reduce queue pressure and allow controllers to close the cycle without extending approval coverage.
+
+
+
+
+
+
+
+
+
+
Recent Actions
+
Latest updates from controllers and approvers
+
+
+
+
+
+
+
+
High-value release held for documentation$220K requires source support
Manual adjustment exceeds local thresholdController comment attached
Medium
+
Clear blocked release requests12 records awaiting evidence
In progress
Confirm revised control notes4 items edited by reviewers
Pending
Close approved carryover actions7 ready for posting
Ready
+
Policy exception comment added to release caseBy regional controller
Approval path updated for restricted fundingRouting changed automatically
Supporting file accepted after validationBlocked amount reduced
Commitment request returned for correctionAccount line mismatch found
+
+
Execution Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Release completion92%
Against approved plan
Approval completion81%
All levels combined
Exception clearance64%
Policy and document checks
+
+
+
Controller Notes
+
Most exceptions are tied to account mapping and supporting documentation rather than overspend risk. Teams are being asked to resolve these items before release authority is expanded.
+
Release pacing remains healthy across core operating lines.
Exception volume is concentrated in a small set of manual adjustments.
Senior approval capacity is the main constraint on final clearance.
Control notes have been attached to all blocked items above threshold.
+
Open cases43
Needs review11
Cleared today19
+
Exception Signals
Control postureStable
Approval loadElevated
Release riskManaged
Initial allocation confirmed
Control baseline recorded
Mid-cycle release adjusted
Carryover request applied
Exception review escalated
Policy evidence requested
Final approval window opened
Queue routing updated
+
+
+
Only approved adjustments can move to release. Blocked items remain visible until evidence and sign-off are complete.
+
+
+
+
diff --git a/web_insert/Apache ECharts/box/chart_0006_box.html b/web_insert/Apache ECharts/box/chart_0006_box.html
new file mode 100644
index 0000000000000000000000000000000000000000..57a97484f9fd678a3cbc98f06476a4f68a835789
--- /dev/null
+++ b/web_insert/Apache ECharts/box/chart_0006_box.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T28 Municipal Service Bulletin
+
+
+
+
+
+
+
+
Internal circulationT28
+
Municipal Service Bulletin
+
Streetlight outage follow-up
+
Open bulletinCross-departmentAction required
+
+
+
Bulletin Summary
Operational notice and response summary for active public service issues requiring coordinated review.
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
+
+
+ Loading view
+ Service handling overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
Several matters remain open not because field action has stopped, but because the written record is incomplete or inconsistent across offices. Staff should treat documentation quality, ownership clarity, and response accuracy as equal to operational completion before moving any item to closed status.
+
+
+
+
+
+
+
+
Review Support
+
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
Confirm that each accepted notice has one accountable handling unit.
Reconcile field completion remarks with the official reply draft.
Flag cases where repeat contact suggests ineffective local closure.
Hold final release for items lacking signed verification.
+
Escalated3
Awaiting reply5
Returned for revision4
+
+
+
+
Recent Activity
+
Latest handling updates across the bulletin
+
+
+
+
+
+
+
+
Repeated contact on one closed itemClosure note conflicts with latest resident submission
High
Verification file missing from district replyEvidence not attached to the handling record
Medium
Approval wording exceeds service standardReply language requires simplification before release
Low
+
Confirm ownership for unresolved site restoration itemAwaiting district office acknowledgment
Open
Complete evidence check for resolved service interruption caseField note submitted without signed confirmation
In review
Approve final reply language for public releaseDraft prepared by coordination desk
Pending approval
+
District office updated handling noteOwnership confirmed and local follow-up arranged
Service unit returned revised reply draftLanguage adjusted to match verified field action
Supervisory office requested clarificationAsked whether the item meets closure conditions
Coordination desk logged resident repeat contactMatter retained in active bulletin
+
+
+
Review Insight
+
Teams are asked to confirm ownership, update response wording, and close record gaps before the next routing step. Any item with unresolved accountability or incomplete evidence should remain in controlled review rather than be marked complete.
+
Case verification76%
Most evidence checks completed
Reply drafting68%
Several items still under wording review
Final clearance41%
Held until all high-priority issues are confirmed
+
Coordination Signals
Priority routeJoint review
Public impactModerate
Release stateHeld for clearance
Local office reported restoration, but resident contact records indicate the issue may persist at the reported location.
+
+
Use this bulletin as the working record for approvals, response checks, and inter-office follow-up until all listed matters are either cleared or formally transferred.
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
Post-run assessment for the last completed checkout messaging experiment, including impact, rollout decision, and follow-up actions.
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
+
+
+ Loading view
+ Experiment results
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Analyst Note
+
The result is not only statistically reliable but also operationally clean. Teams reviewing payment quality, support demand, and buyer behavior did not identify a counter-signal large enough to block release, which makes this a suitable candidate for default rollout with normal monitoring.
+
+
+
+
+
+
+
+
Review Notes
+
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
Primary goal was improved checkout completion.
Guardrails covered payment success, cancellation intent, and support contact rate.
Result supports rollout with standard monitoring.
Follow-up work should focus on first-time buyer reassurance.
+
Control share50%
Variant share50%
Guardrails passed3/3
+
+
+
+
Recent Activity
+
Latest review updates and decision steps
+
+
+
+
+
+
+
+
Release approval pendingRequires product and operations sign-off
Medium
Follow-up test not yet scopedFirst-time buyer segment showed the strongest response
Low
Monitoring handoff requiredPost-release checks must be assigned before launch
Medium
+
Confirm rollout ownerRelease coordination for default experience
Open
Document final decisionAdd rationale to the experiment record
In progress
Prepare follow-up briefDraft next test for delivery reassurance
Not started
+
Data review completed by analyticsNo variance issues found in conversion events
Support lead confirmed stable contact volumeNo increase tied to variant exposure
Product owner attached final recommendationPromote Variant B with standard guardrails
Release coordinator requested approval windowDecision needed before deployment planning
+
+
+
Key Insight
+
The operational recommendation is to promote Variant B to the default experience, keep the current guardrails in place, and open a follow-up test on supporting text near delivery expectations.
+
Review completion92%
Only final approval remains
Release readiness84%
Monitoring and ownership still being confirmed
Follow-up planning36%
Next hypothesis not fully defined
+
Quality Signals
Audience balanceWithin tolerance
Tracking integrityVerified
Release readinessApproved pending sign-off
Control used the existing confirmation message. Variant B used shorter supporting language focused on confidence before purchase.
+
+
Rollout should begin with standard monitoring and a hold point if payment reliability moves outside normal range.
Monitor enrollment flow, review teaching requests, and keep campus services within response targets.
+
+
+
+ Loading view
+ Enrollment workload
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main pressure point is not overall volume but the number of cases waiting on a second team to confirm eligibility, roster placement, or account release. Clearing those handoffs will reduce repeat contacts and keep approvals moving in the right order.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Recent updates across admissions, scheduling, and support
+
+
+
+
+
+
+
+
Identity check queue exceeded review target14 learner files are outside normal handling time
Access provisioning paused for one intake groupRoster confirmation is still pending from registry
Medium
+
Approve seat exception requestsOwned by academic operations
In progress
Confirm account release listWaiting on final learner verification
Blocked
Close duplicate support casesMerge requests from advising and registry
Ready
+
Registry completed a priority batch reviewOpen count reduced after document validation
Scheduling submitted a conflict noteOne instructor assigned to overlapping sessions
Support added an access exceptionLearner record needs manual activation
Advising returned a hold for correctionProgram selection does not match approved path
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Enrollment validation74%
Most records reviewed; exceptions remain
Teaching assignment approval61%
Conflict cases still under review
Account activation release83%
Waiting on final roster handoff
+
+
+
Support Notes
+
Most exceptions are tied to incomplete learner records and overlapping instructor availability. Team leads are using the queue to clear blocked cases before they affect course readiness and support response times.
+
Admissions is prioritizing records with missing identity checks.
Scheduling is reviewing instructor conflicts before room release.
Support is holding account activation until final roster approval.
Policy notices were updated to reflect new escalation ownership.
+
Escalations7
Owners online12
Blocked cases19
+
Operational Signals
Validation backlogModerate
Seat release paceStable
Access turnaroundAt risk
Intake review opened
Registry triage assigned the latest submission batch
Faculty request escalated
Teaching load conflict moved to academic operations
Roster lock cleared
Student services approved the final exception set
+
+
+
Use this view to coordinate approvals, confirm handoffs, and clear blockers before escalation windows are breached.
+
+
+
+
diff --git a/web_insert/Apache ECharts/box/chart_0010_box.html b/web_insert/Apache ECharts/box/chart_0010_box.html
new file mode 100644
index 0000000000000000000000000000000000000000..3626f08ab3a7cb15d724208b90bf68865965c154
--- /dev/null
+++ b/web_insert/Apache ECharts/box/chart_0010_box.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T19 Fulfillment Control Center
+
+
+
+
+
+
Monitor outbound flow, clear held orders, and keep dock activity aligned with carrier cutoff commitments.
Outbound volume is moving at a healthy pace, but a growing cluster of held orders is starting to compress the final release window. Most exceptions are concentrated in a small number of picking zones, which means the team can recover service if reviews are completed before the next carrier handoff cycle.
Maya ChenFulfillment Operations Lead
+
Orders ready to release
1,284
Stable after the last verification pass
Orders on hold
73
Most require address or stock confirmation
Dock lanes active
18 / 22
Two lanes reserved for late priority loads
On-time dispatch
96.4%
Holding above internal service target
+
+
+
+ Loading view
+ Outbound release status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most outbound risk is not coming from overall volume; it is coming from a manageable set of held orders that can delay the final handoff sequence if left unresolved. Clearing those exceptions now protects both dock capacity and on-time dispatch.
+
+
+
+
+
+
+
+
Operational Notes
+
Dock activity remains balanced across active lanes, and release discipline is preventing unnecessary trailer dwell. The current focus is to resolve shipment holds in the queue, confirm a small set of short picks, and protect the late priority wave from congestion near final staging.
+
Address validation holds account for the largest share of delayed releases
Priority orders should be cleared before standard replenishment checks resume
Lane reassignment is available if staging volume exceeds the current threshold
Carrier handoff timing remains achievable with active exception review
+
Rush orders146
Review desks open5
Average hold age42m
+
+
+
+
Recent Actions
+
Latest fulfillment events and reviews
+
+
+
+
+
+
+
+
Held orders above control threshold73 orders pending review across three zones
High
Lane 12 staging nearing limitOverflow risk if the next release is not staggered
Medium
Carrier cutoff buffer tighteningPriority loads need final confirmation soon
Medium
+
Clear address validation holdsAssigned to order review desk
In progress
Confirm short pick substitutionsAwaiting floor lead approval
Pending
Protect late priority lane capacityReserve space before final handoff
Scheduled
+
Verification team cleared 22 held ordersQueue pressure eased in the last review cycle
Dock supervisor opened two backup positionsStaging congestion reduced near outbound lanes
Carrier desk confirmed on-time intakeNo change to active handoff sequence
Packing lead flagged repeat scan failuresIssue isolated to one station for follow-up
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Order release completion78%
Released against current outbound plan
Exception resolution63%
Held orders cleared or reassigned
Dock preparation87%
Lanes staffed and staged for handoff
+
Release Activity
Wave release completed
Primary outbound batch moved to final staging
Exception queue escalated
Held orders above review target triggered supervisor attention
Dock lanes rebalanced
Two lanes opened for priority handoff protection
Final verification in progress
Pack confirmation and label checks underway
Rush orders146
Review desks open5
Average hold age42m
+
+
+
Use this view to clear blockers early, protect release timing, and keep dock flow aligned with service commitments.
Track specimen intake, instrument readiness, review holds, and release validated results from one controlled queue.
+
+
+
+ Loading view
+ Specimen flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Current delays are not caused by intake volume but by a narrow cluster of held results that need repeat confirmation and signed reviewer rationale. Once those cases are closed, the release queue should return to normal pace.
+
+
+
+
+
+
+
+
+
+
Validation Activity
+
Latest laboratory actions and review updates
+
+
+
+
+
+
+
+
Quality hold threshold reachedChemistry lane 7 held results
High
Instrument maintenance window dueHematology bench service reminder
Complete supervisory sign-off for held chemistry cases24 items in review queue
In progress
Verify rerun documentation before release5 specimens require note completion
Pending
Confirm analyzer readiness after resetPost-interruption checks still open
Waiting confirmation
+
Accession team cleared label exceptionMatched specimen and order records
Reviewer added comment to held electrolyte panelAwaiting repeat outcome
Bench lead reassigned overflow workCapacity balanced across active stations
Final result packet released to care teamAudit trail completed
+
+
Throughput Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Accessioning completion92%
Most inbound samples logged and routed
Validation review68%
Routine cases moving faster than held work
Quality documentation81%
Remaining notes tied to reruns and holds
+
+
+
Escalation Notes
+
Supervisors are balancing turnaround targets with quality controls, making sure reruns, delta checks, and documentation updates are completed before any final authorization.
+
Priority samples are routed directly to staffed benches.
Held results require either repeat testing or reviewer comment.
Release activity is limited to validated work with complete audit notes.
+
Released today143
Open holds7
Assigned reviewers9
+
Bench Signals
Pending accession checks12
Benches at capacity2
Reruns in progress5
Intake batch reconciled
Analyzer lane reset
Senior review started
Release queue narrowed
+
+
+
All releases must include reviewer confirmation and complete traceability.
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
+ Active shiftRelease pendingLab verifiedEscalation open
+
+
+
+
+
+
+
+
Review in progress
Monitor active inspections, isolate nonconforming lots, and keep release decisions aligned across line, lab, and dispatch teams.
This overview is used by inspection leads to track open quality cases from first check through release decision. It brings together line findings, lab confirmation, hold status, and reviewer actions so each lot can move forward with a clear record.
Erin ColeQuality Assurance Lead
+
Lots under review
18
4 require supervisor sign-off
Pass rate
96.8%
Stable against control threshold
Items on hold
7
Awaiting disposition or retest
Average closure time
2.6h
Down after revised sampling steps
+
+
+
+ Loading view
+ Inspection activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A narrow group of nonconforming lots is driving most of the queue. The team has already isolated affected stock and limited release access, so the immediate focus is on finishing lab confirmation, recording final disposition, and clearing unaffected material without breaking traceability.
+
+
+
+
+
+
+
+
Coordination Notes
+
The current workload is concentrated on final assembly output where a small group of lots failed appearance and torque checks. Most cases are moving normally, but a limited set remains blocked while the team confirms whether rework is acceptable or a full containment action is needed.
+
Two lots were moved from routine review to controlled hold after repeat defects were confirmed at receiving check.
Lab confirmation has cleared one previously blocked lot for release with added inspection notes.
Dispatch has been asked not to allocate stock from any case marked pending disposition.
+
Open holds7
Retests due3
Approved releases11
+
+
+
+
Recent Actions
+
Latest updates across inspection, hold, and release handling.
+
+
+
+
+
+
+
+
Repeat defect pattern detectedThree related cases linked to the same source batch
High
Approval waiting on lab noteRelease decision cannot close until confirmation is attached
Medium
Containment nearing limitReserved hold area is close to capacity
Medium
+
Review pending disposition cases7 cases require lead decision
In progress
Confirm retest sampling planApplies to two blocked lots
Queued
Close cleared release recordsDocumentation ready for final update
Ready
+
Line inspector added a deviation noteAttached to lot under controlled hold
Lab result accepted by reviewerCase moved back to release check
Containment list updatedStock location confirmed for isolated units
Dispatch restriction acknowledgedOutbound allocation blocked for pending lots
+
+
+
Inspection Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion82%
Most scheduled checks are recorded
Disposition closure61%
Open exceptions still under review
Release documentation74%
Awaiting final sign-off on held lots
+
Case Progress
Inbound sample logged
Initial inspection record created
Deviation confirmed
Case routed to quality lead
Containment applied
Affected stock isolated from release
Disposition pending
Awaiting final approval
Open holds7
Retests due3
Approved releases11
+
+
+
Only approved dispositions can clear held material for release.
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
+
+
+
+
diff --git a/web_insert/Apache ECharts/heatmap/chart_0002_heatmap.html b/web_insert/Apache ECharts/heatmap/chart_0002_heatmap.html
new file mode 100644
index 0000000000000000000000000000000000000000..c934d13c7d8d49db0cb2ad6c3bf034a8d9548d6b
--- /dev/null
+++ b/web_insert/Apache ECharts/heatmap/chart_0002_heatmap.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
Operational summary for site load, steam demand, and utility variance across active production lines.
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
+
+
+ Loading view
+ Consumption overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operating Note
+
The current review is centered on whether the elevated water draw should be recorded as expected support usage or escalated as a controllable loss. Early checks support the first view, but the decision will remain open until sanitation records and supervisor confirmation are complete.
+
+
+
+
+
+
+
+
Supervisor Support
+
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
Base electrical load improved after non-process fans were isolated during idle periods.
Compressed air demand stayed even, with no signs of sustained leakage during the late run.
Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
Water variance should be rechecked once final sanitation logs are posted.
+
Open exceptions2
Lines reviewed6/6
Actions due3
+
+
+
+
Completion Progress
+
Status of review and follow-up
+
+
+
+
+
+
+
+
Water use above expected bandPackaging area support services
Medium
Line idle shutdown not confirmedTwo areas missing end-run verification
Low
Final sanitation log still pendingRequired to close variance review
Medium
+
Confirm restart-related water drawOperations supervisor to validate against log entries
In progress
Verify non-process equipment shutdownUtilities team to spot-check idle periods
Queued
Complete site approvalRequired before report closeout
Pending
+
Meter reconciliation completed for main supplyLogged by utilities desk
Maintenance confirmed no active steam issueInspection note added
Cost allocation refreshed for final reviewFinance rule set applied
+
+
+
Assessment
+
No immediate escalation is required, but the site energy lead has asked line supervisors to confirm idle-time shutdown discipline before the next reporting cycle is closed.
+
Meter validation100%
All core readings matched
Variance review68%
Awaiting supporting logs
Management sign-off35%
Ready for supervisor action
+
Key Signals
Load balanceSteady
Utility riskModerate
Approval statePending sign-off
Water intake exceeded the normal operating band during cleaning and restart activity. Review remains open until line notes and final meter confirmation are attached.
+
+
Use this report to confirm variances, assign follow-up, and complete site-level review before closeout.
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
Post-route summary for the latest dispatch cycle, focusing on late handoff recovery, depot coordination, and proof-of-delivery completion.
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
+
+
+ Loading view
+ Route performance view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
This review is being used to decide whether dispatch should adopt a standard delay-recovery playbook for mixed-stop runs. The current response relied on experienced staff making quick route adjustments, which worked in this case but may not scale without clearer depot release rules and a required outreach log for affected stops.
+
+
+
+
+
+
+
+
Support Notes
+
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
Departure drift started at the depot gate after loading lane congestion.
Manual reprioritization reduced missed arrival commitments on dense urban segments.
Proof-of-delivery capture improved after drivers were reminded to close stops before returning.
Two exception cases remain open pending package condition review.
+
Resequenced routes7
Support calls placed23
Returns held2
+
+
+
+
Recent Activity
+
Updates recorded during issue containment and closure review.
+
+
+
+
+
+
+
+
Proof mismatch on return scan2 consignments need depot confirmation
Medium
Loading lane congestion repeatedObserved across early dispatch wave
High
Customer contact note missing1 delayed stop closed without outreach log
Low
+
Validate open claims with depot supervisorAttach condition notes and return scans
In progress
Document route resequencing rulePrepare for dispatch handbook update
Pending
Close driver note reviewConfirm repeated gate delay comments
Ready
+
Driver team acknowledged revised stop orderField update logged by support desk
Depot supervisor added lane usage noteRoot cause linked to overlap during loading release
Customer service cleared outreach backlogAll affected recipients received status calls
The review focus is on whether the corrective actions used by the team should become standard practice for future mixed-stop routes with tight loading turnover.
+
Exception closure78%
Most delivery issues resolved in the same cycle
Driver note review64%
Comments grouped by route segment
Depot corrective action41%
Lane balancing plan awaiting sign-off
+
Field Signals
Route adherenceStable after intervention
Depot readinessNeeds lane balancing
Customer contact coverageAbove target
Opened after repeated departure slippage affected downstream stop timing and closure quality.
+
+
Internal review record for route performance follow-up and process adjustment.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.
Coordinate active equipment work, parts readiness, and technician handoff for the current plant queue.
+
+
+
+ Loading view
+ Asset service status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
The main risk is not the volume of open work but the overlap between recurring faults, shared spare parts, and incomplete close-out records. The coordinator is prioritizing jobs that restore stable operation fastest while making sure each completed repair can pass inspection without rework.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest maintenance coordination updates
+
+
+
+
+
+
+
+
Repeat fault on feeder motor requires supervisor reviewLinked to two prior corrective orders
Close-out blocked by missing isolation recordInspection will not release final status
High
+
Approve repair scope for Press Line 2 feederCost review attached by area lead
Pending approval
Confirm staged parts for conveyor coupling replacementMechanical crew waiting at access point
In progress
Return corrected close-out notes to inspectionPhoto evidence and isolation steps required
Needs update
+
Mechanical crew reported safe access at feeder bayField note added 14 min ago
Parts desk reserved seal kit for linked ordersReservation confirmed against active queue
Area lead raised priority on conveyor drive caseOperational impact now classified as elevated
Inspection returned one closure package for revisionMissing verification note in final step
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Priority repairs completed62%
8 of 13 cleared
Parts staging readiness73%
Most critical kits available
Close-out compliance81%
Several packages awaiting final note
+
+
+
Coordination Notes
+
The current focus is keeping high-use assets in service while clearing overdue follow-up work from earlier interventions. Notes, queue status, and technician updates are aligned here so handoff decisions can be made without opening separate records.
+
Three priority jobs share the same hydraulic seal kit and must be sequenced carefully.
Inspection has requested photo confirmation before closing two repeat-failure orders.
One conveyor drive can remain in service under reduced load until replacement stock is issued.
Electrical support is available for lockout review on escalated jobs.
+
On-site crews4
Locked out assets3
Rush requests2
+
Support Readiness
Critical assets online9/10
Awaiting approval4 orders
Parts shortfall2 items
Failure review completed for press feeder
Supervisor approved immediate repair path
Seal kit released from parts crib
Reserved against two linked work orders
Field update posted by mechanical crew
Access cleared and unit isolated
Close-out package returned for correction
Inspection note required before final release
+
+
+
All updates shown here are operational records and must match the approved work order before closure.
+ Live TradingStore NetworkPriority Follow-upRevenue Focus
+
+
+
+
+
+
+
Active Oversight
+
Monitor store execution, revenue pacing, stock pressure, and pending actions across the active trading cycle.
+
Trading performance is holding above plan, but momentum is uneven across the network. Flagship locations are carrying the result while several mid-tier stores are slipping on conversion after early demand spikes cleared core inventory.
+
+
+
Maya ChenSales Operations Lead
+
+
+
+
Net Sales
$4.8M
Running ahead of internal target with stronger in-store conversion.
Orders Closed
18,240
Order completion remains stable despite heavier queue volume.
Low Stock SKUs
126
Concentrated in top-selling lines requiring rapid replenishment.
Pending Exceptions
37
Most cases are tied to price overrides and fulfillment holds.
+
+
+
+
+ Loading view
+ Sales command view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Operations leads are using this board to coordinate price checks, stock transfers, and field follow-up. The immediate goal is to protect sell-through on priority lines without creating avoidable margin leakage or unresolved service cases.
+
Price override approvals increased after local markdown requests were reopened.
Transfer requests are highest in stores with strong accessory attachment rates.
Frontline teams need confirmed replenishment windows before issuing customer callbacks.
Regional managers have been asked to clear overdue store notes before next review.
+
Stores Flagged21
Cases Reassigned14
Open Callbacks89
+
+
+
+
+
Execution Activity
+
Store actions and approval movement
+
+
+
+
+
+
+
+
Override approvals approaching threshold12 stores exceeded normal approval volume
High
Core item coverage at riskTop stores reporting low back-room availability
Medium
Store callback backlog buildingCustomer follow-up notes remain open past target
Medium
+
Approve urgent pricing exceptionsSenior review required for margin-sensitive requests
In progress
Confirm transfer receipt with destination storesFollow up on high-demand replenishment moves
Pending
Close unresolved field notesSeveral stores have not updated execution status
Blocked
+
North region cleared three high-value exceptionsApproval cycle shortened after reassignment
Accessory attachment improved in premium storesStore coaching appears to be holding
Transfer requests stabilized after stock releaseMost urgent moves have been acknowledged
Customer callback queue remains unevenService follow-through needs local management review
+
+
+
Lead Note
+
This board supports the daily operating rhythm for sales control, exception handling, and store coordination across the retail network.
+
Conversion PressureElevated
Stock Transfer LoadHigh
Approval ResponseWithin SLA
+
Investigate sales pacing, confirm stock position, and clear open approvals before escalation.
+
+ View note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
Focus Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval clearance78%
Cleared against open exception volume
Transfer completion64%
Confirmed store-to-store movements
Field note closure52%
Resolved execution updates from stores
+
+
+
Use approved actions only. Store-facing updates must match pricing, stock, and service policy before release.
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
Post-run assessment for the last completed checkout messaging experiment, including impact, rollout decision, and follow-up actions.
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
+
+
+ Loading view
+ Experiment results
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Analyst Note
+
The result is not only statistically reliable but also operationally clean. Teams reviewing payment quality, support demand, and buyer behavior did not identify a counter-signal large enough to block release, which makes this a suitable candidate for default rollout with normal monitoring.
+
+
+
+
+
+
+
+
Review Notes
+
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
Primary goal was improved checkout completion.
Guardrails covered payment success, cancellation intent, and support contact rate.
Result supports rollout with standard monitoring.
Follow-up work should focus on first-time buyer reassurance.
+
Control share50%
Variant share50%
Guardrails passed3/3
+
+
+
+
Recent Activity
+
Latest review updates and decision steps
+
+
+
+
+
+
+
+
Release approval pendingRequires product and operations sign-off
Medium
Follow-up test not yet scopedFirst-time buyer segment showed the strongest response
Low
Monitoring handoff requiredPost-release checks must be assigned before launch
Medium
+
Confirm rollout ownerRelease coordination for default experience
Open
Document final decisionAdd rationale to the experiment record
In progress
Prepare follow-up briefDraft next test for delivery reassurance
Not started
+
Data review completed by analyticsNo variance issues found in conversion events
Support lead confirmed stable contact volumeNo increase tied to variant exposure
Product owner attached final recommendationPromote Variant B with standard guardrails
Release coordinator requested approval windowDecision needed before deployment planning
+
+
+
Key Insight
+
The operational recommendation is to promote Variant B to the default experience, keep the current guardrails in place, and open a follow-up test on supporting text near delivery expectations.
+
Review completion92%
Only final approval remains
Release readiness84%
Monitoring and ownership still being confirmed
Follow-up planning36%
Next hypothesis not fully defined
+
Quality Signals
Audience balanceWithin tolerance
Tracking integrityVerified
Release readinessApproved pending sign-off
Control used the existing confirmation message. Variant B used shorter supporting language focused on confidence before purchase.
+
+
Rollout should begin with standard monitoring and a hold point if payment reliability moves outside normal range.
+
+
+
+
diff --git a/web_insert/Apache ECharts/line/chart_0003_line.html b/web_insert/Apache ECharts/line/chart_0003_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..88ed2533803028d9bcbeff3eebb62e3e98ba17f8
--- /dev/null
+++ b/web_insert/Apache ECharts/line/chart_0003_line.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T19 Fulfillment Control Center
+
+
+
+
+
+
Monitor outbound flow, clear held orders, and keep dock activity aligned with carrier cutoff commitments.
Outbound volume is moving at a healthy pace, but a growing cluster of held orders is starting to compress the final release window. Most exceptions are concentrated in a small number of picking zones, which means the team can recover service if reviews are completed before the next carrier handoff cycle.
Maya ChenFulfillment Operations Lead
+
Orders ready to release
1,284
Stable after the last verification pass
Orders on hold
73
Most require address or stock confirmation
Dock lanes active
18 / 22
Two lanes reserved for late priority loads
On-time dispatch
96.4%
Holding above internal service target
+
+
+
+ Loading view
+ Outbound release status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most outbound risk is not coming from overall volume; it is coming from a manageable set of held orders that can delay the final handoff sequence if left unresolved. Clearing those exceptions now protects both dock capacity and on-time dispatch.
+
+
+
+
+
+
+
+
Operational Notes
+
Dock activity remains balanced across active lanes, and release discipline is preventing unnecessary trailer dwell. The current focus is to resolve shipment holds in the queue, confirm a small set of short picks, and protect the late priority wave from congestion near final staging.
+
Address validation holds account for the largest share of delayed releases
Priority orders should be cleared before standard replenishment checks resume
Lane reassignment is available if staging volume exceeds the current threshold
Carrier handoff timing remains achievable with active exception review
+
Rush orders146
Review desks open5
Average hold age42m
+
+
+
+
Recent Actions
+
Latest fulfillment events and reviews
+
+
+
+
+
+
+
+
Held orders above control threshold73 orders pending review across three zones
High
Lane 12 staging nearing limitOverflow risk if the next release is not staggered
Medium
Carrier cutoff buffer tighteningPriority loads need final confirmation soon
Medium
+
Clear address validation holdsAssigned to order review desk
In progress
Confirm short pick substitutionsAwaiting floor lead approval
Pending
Protect late priority lane capacityReserve space before final handoff
Scheduled
+
Verification team cleared 22 held ordersQueue pressure eased in the last review cycle
Dock supervisor opened two backup positionsStaging congestion reduced near outbound lanes
Carrier desk confirmed on-time intakeNo change to active handoff sequence
Packing lead flagged repeat scan failuresIssue isolated to one station for follow-up
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Order release completion78%
Released against current outbound plan
Exception resolution63%
Held orders cleared or reassigned
Dock preparation87%
Lanes staffed and staged for handoff
+
Release Activity
Wave release completed
Primary outbound batch moved to final staging
Exception queue escalated
Held orders above review target triggered supervisor attention
Dock lanes rebalanced
Two lanes opened for priority handoff protection
Final verification in progress
Pack confirmation and label checks underway
Rush orders146
Review desks open5
Average hold age42m
+
+
+
Use this view to clear blockers early, protect release timing, and keep dock flow aligned with service commitments.
+ Live DispatchPriority LoadsDriver CoverageGate Readiness
+
+
+
+
+
+
+
Active monitoring
+
Coordinate active routes, rebalance drivers, and clear open exceptions from one operating view.
+
Dispatch is managing a tight operating window with several outbound runs stacked behind the same gate sequence. The team has already reallocated available units to protect higher-priority moves and reduce idle time at the yard.
+
+
+
Maya BennettFleet Dispatch Lead
+
+
+
+
Units in motion
148
12 reassigned during the current shift
Open route holds
9
Most tied to late gate release
Coverage gap
4
Backfill requested for long-haul lanes
On-time departure
93%
Holding steady after yard balancing
+
+
+
+
+ Loading view
+ Route coordination
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Most unresolved issues now sit between driver readiness and release timing. Supervisors are using this panel to confirm who can be reassigned, which routes need escalation, and where a short delay will create a downstream coverage gap.
+
Three priority loads were moved to alternate tractors to avoid missed departure targets.
Driver check-in compliance improved after direct follow-up from the shift desk.
Yard staging remains constrained near outbound lanes with refrigerated equipment.
+
Standby drivers6
Held departures9
Ready tractors22
+
+
+
+
+
Recent Activity
+
Latest dispatch actions and route decisions
+
+
+
+
+
+
+
+
Gate release delay affecting priority runLane B12 Waiting 18 min
High
Driver rest window blocks reassignmentLong-haul pool 2 units impacted
Medium
Trailer pairing mismatch in yard queueOutbound side Manual check required
Medium
+
Confirm backup operator for north corridor runDispatch desk request
In progress
Approve swap for delayed refrigerated unitRequires lead signoff
Pending
Close completed hold after gate clearanceRoute ready for release
Ready
+
Yard team confirmed two lanes cleared for outbound stagingPosted by yard control
Driver support updated availability for standby poolCoverage adjusted
Priority load reassignment accepted by route supervisorNo further approval needed
Fuel stop exception removed from active reviewDispatch note closed
+
+
+
Lead Note
+
The team is working through a compressed release window where small delays at the yard can quickly reduce route coverage. This view helps dispatch leads decide where to reassign equipment, push approvals, and keep priority movements on schedule.
+
Dispatch healthStable with exceptions
Driver readinessNear full coverage
Yard congestionElevated at outbound side
+
Priority lanes are protected, but remaining open holds need confirmation from yard and driver teams before release.
+
+ Open note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
Operating Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Route release completion78%
Based on active outbound plan
Driver assignment coverage91%
Remaining gap on long-haul lanes
Exception clearance64%
Open holds trending down
+
+
+
Use route reassignment only after confirming gate availability and driver hours.
+
+
+
+
diff --git a/web_insert/Apache ECharts/line/chart_0005_line.html b/web_insert/Apache ECharts/line/chart_0005_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..4fe8b1e7b41a337dd7ddad8ee35d21f5727d0ca6
--- /dev/null
+++ b/web_insert/Apache ECharts/line/chart_0005_line.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
+ Active portfolioReview in progressFunding controlsCompliance watch
+
+
+
+
+
+
+
+
Managed
Monitor active studies, pending approvals, funding usage, and cross-team follow-up from one operational view.
The office is managing a mixed portfolio of faculty-led studies, lab collaborations, and student research initiatives. Most work is progressing within approved scope, but a small set of submissions requires administrative response before funds or participant activity can proceed.
Dr. Elaine PorterDirector, Research Administration
+
Open Projects
48
6 awaiting formal approval
Active Funding
$12.4M
Within approved allocation range
Pending Reviews
17
4 require principal investigator response
Policy Exceptions
3
All assigned for follow-up
+
+
+
+ Loading view
+ Project activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Several projects are close to activation, but progress depends on small administrative corrections. Clearing incomplete files and confirming ownership will reduce delay, improve audit readiness, and allow the office to release approved work without further escalation.
+
+
+
+
+
+
+
+
Office Notes
+
Current attention is focused on review completion, documentation quality, and timely coordination between academic units and the central research office. Team leads are using this view to resolve blockers, confirm ownership, and keep each project aligned with internal policy.
+
Approval backlog is concentrated in new submissions with incomplete ethics attachments.
Two high-value projects are waiting on revised budget justification before release.
Records cleanup reduced duplicate sponsor entries across several departments.
Escalations are being routed to unit coordinators for direct follow-up.
+
Units involved11
Cases reassigned5
Records updated23
+
+
+
+
Recent Office Activity
+
Latest updates across approvals, records, and funding control.
+
+
+
+
+
+
+
+
Budget release on holdMissing approval note from finance control
High
Ethics file incompleteParticipant consent language requires revision
Medium
Sponsor record mismatchDepartment entry differs from central register
Low
+
Confirm unit reviewer for pending submissions7 projects without final reviewer assignment
Open
Release approved funding batch2 projects cleared after documentation check
Ready
Close duplicate sponsor recordsFollow-up required across 3 departments
In progress
+
Policy team returned one exception case for clarificationNeeds updated risk statement
Finance control cleared restricted spending lineRelease can proceed after office sign-off
Graduate coordinator added missing investigator credentialsSubmission now eligible for formal review
Unit office confirmed lead contact changeRecords updated for future notices
+
+
+
Portfolio Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Initial screening92%
Most submissions validated
Formal review68%
Backlog concentrated in exception cases
Funding release74%
Delayed by final approval checks
+
Recent Milestones
Portfolio intake closed
New submissions moved to initial screening
Compliance review updated
Exception cases reassigned to policy team
Funding release prepared
Awaiting final sign-off from finance control
Units involved11
Cases reassigned5
Records updated23
+
+
+
Internal use only. Funding, review, and compliance actions must be recorded before project status is changed.
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
Coordinate active equipment work, parts readiness, and technician handoff for the current plant queue.
+
+
+
+ Loading view
+ Asset service status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
The main risk is not the volume of open work but the overlap between recurring faults, shared spare parts, and incomplete close-out records. The coordinator is prioritizing jobs that restore stable operation fastest while making sure each completed repair can pass inspection without rework.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest maintenance coordination updates
+
+
+
+
+
+
+
+
Repeat fault on feeder motor requires supervisor reviewLinked to two prior corrective orders
Close-out blocked by missing isolation recordInspection will not release final status
High
+
Approve repair scope for Press Line 2 feederCost review attached by area lead
Pending approval
Confirm staged parts for conveyor coupling replacementMechanical crew waiting at access point
In progress
Return corrected close-out notes to inspectionPhoto evidence and isolation steps required
Needs update
+
Mechanical crew reported safe access at feeder bayField note added 14 min ago
Parts desk reserved seal kit for linked ordersReservation confirmed against active queue
Area lead raised priority on conveyor drive caseOperational impact now classified as elevated
Inspection returned one closure package for revisionMissing verification note in final step
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Priority repairs completed62%
8 of 13 cleared
Parts staging readiness73%
Most critical kits available
Close-out compliance81%
Several packages awaiting final note
+
+
+
Coordination Notes
+
The current focus is keeping high-use assets in service while clearing overdue follow-up work from earlier interventions. Notes, queue status, and technician updates are aligned here so handoff decisions can be made without opening separate records.
+
Three priority jobs share the same hydraulic seal kit and must be sequenced carefully.
Inspection has requested photo confirmation before closing two repeat-failure orders.
One conveyor drive can remain in service under reduced load until replacement stock is issued.
Electrical support is available for lockout review on escalated jobs.
+
On-site crews4
Locked out assets3
Rush requests2
+
Support Readiness
Critical assets online9/10
Awaiting approval4 orders
Parts shortfall2 items
Failure review completed for press feeder
Supervisor approved immediate repair path
Seal kit released from parts crib
Reserved against two linked work orders
Field update posted by mechanical crew
Access cleared and unit isolated
Close-out package returned for correction
Inspection note required before final release
+
+
+
All updates shown here are operational records and must match the approved work order before closure.
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
Execution in focusControl review activeApproval queue open
Track release pacing, exception handling, and approval readiness across active cost centers.
+
+
+
+ Loading view
+ Execution overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
Release performance is broadly on plan, but the remaining blocked amount sits in cases that need manual confirmation. Resolving those records quickly will reduce queue pressure and allow controllers to close the cycle without extending approval coverage.
+
+
+
+
+
+
+
+
+
+
Recent Actions
+
Latest updates from controllers and approvers
+
+
+
+
+
+
+
+
High-value release held for documentation$220K requires source support
Manual adjustment exceeds local thresholdController comment attached
Medium
+
Clear blocked release requests12 records awaiting evidence
In progress
Confirm revised control notes4 items edited by reviewers
Pending
Close approved carryover actions7 ready for posting
Ready
+
Policy exception comment added to release caseBy regional controller
Approval path updated for restricted fundingRouting changed automatically
Supporting file accepted after validationBlocked amount reduced
Commitment request returned for correctionAccount line mismatch found
+
+
Execution Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Release completion92%
Against approved plan
Approval completion81%
All levels combined
Exception clearance64%
Policy and document checks
+
+
+
Controller Notes
+
Most exceptions are tied to account mapping and supporting documentation rather than overspend risk. Teams are being asked to resolve these items before release authority is expanded.
+
Release pacing remains healthy across core operating lines.
Exception volume is concentrated in a small set of manual adjustments.
Senior approval capacity is the main constraint on final clearance.
Control notes have been attached to all blocked items above threshold.
+
Open cases43
Needs review11
Cleared today19
+
Exception Signals
Control postureStable
Approval loadElevated
Release riskManaged
Initial allocation confirmed
Control baseline recorded
Mid-cycle release adjusted
Carryover request applied
Exception review escalated
Policy evidence requested
Final approval window opened
Queue routing updated
+
+
+
Only approved adjustments can move to release. Blocked items remain visible until evidence and sign-off are complete.
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
Post-route summary for the latest dispatch cycle, focusing on late handoff recovery, depot coordination, and proof-of-delivery completion.
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
+
+
+ Loading view
+ Route performance view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
This review is being used to decide whether dispatch should adopt a standard delay-recovery playbook for mixed-stop runs. The current response relied on experienced staff making quick route adjustments, which worked in this case but may not scale without clearer depot release rules and a required outreach log for affected stops.
+
+
+
+
+
+
+
+
Support Notes
+
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
Departure drift started at the depot gate after loading lane congestion.
Manual reprioritization reduced missed arrival commitments on dense urban segments.
Proof-of-delivery capture improved after drivers were reminded to close stops before returning.
Two exception cases remain open pending package condition review.
+
Resequenced routes7
Support calls placed23
Returns held2
+
+
+
+
Recent Activity
+
Updates recorded during issue containment and closure review.
+
+
+
+
+
+
+
+
Proof mismatch on return scan2 consignments need depot confirmation
Medium
Loading lane congestion repeatedObserved across early dispatch wave
High
Customer contact note missing1 delayed stop closed without outreach log
Low
+
Validate open claims with depot supervisorAttach condition notes and return scans
In progress
Document route resequencing rulePrepare for dispatch handbook update
Pending
Close driver note reviewConfirm repeated gate delay comments
Ready
+
Driver team acknowledged revised stop orderField update logged by support desk
Depot supervisor added lane usage noteRoot cause linked to overlap during loading release
Customer service cleared outreach backlogAll affected recipients received status calls
The review focus is on whether the corrective actions used by the team should become standard practice for future mixed-stop routes with tight loading turnover.
+
Exception closure78%
Most delivery issues resolved in the same cycle
Driver note review64%
Comments grouped by route segment
Depot corrective action41%
Lane balancing plan awaiting sign-off
+
Field Signals
Route adherenceStable after intervention
Depot readinessNeeds lane balancing
Customer contact coverageAbove target
Opened after repeated departure slippage affected downstream stop timing and closure quality.
+
+
Internal review record for route performance follow-up and process adjustment.
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
Receiving activePutaway constrainedDispatch on hold
Monitor inbound receipts, putaway flow, and outbound release from one operating view.
+
+
+
+ Loading view
+ Facility activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main risk is not total volume but timing. Inbound receipts, reserve storage, and outbound release are all connected, so a short delay at dock assignment or packing review quickly affects the rest of the floor. Clearing blocked pallets and reallocating lift coverage should return the site to a steadier operating rhythm.
+
+
+
+
+
+
+
+
+
+
Floor Activity
+
Updated as teams complete receiving, storage, and release steps.
+
+
+
+
+
+
+
+
Dock queue above working limit6 loads waiting longer than target
High
Bulk zone capacity nearing thresholdReserve slots at 93% use
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
Monitor enrollment flow, review teaching requests, and keep campus services within response targets.
+
+
+
+ Loading view
+ Enrollment workload
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main pressure point is not overall volume but the number of cases waiting on a second team to confirm eligibility, roster placement, or account release. Clearing those handoffs will reduce repeat contacts and keep approvals moving in the right order.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Recent updates across admissions, scheduling, and support
+
+
+
+
+
+
+
+
Identity check queue exceeded review target14 learner files are outside normal handling time
Access provisioning paused for one intake groupRoster confirmation is still pending from registry
Medium
+
Approve seat exception requestsOwned by academic operations
In progress
Confirm account release listWaiting on final learner verification
Blocked
Close duplicate support casesMerge requests from advising and registry
Ready
+
Registry completed a priority batch reviewOpen count reduced after document validation
Scheduling submitted a conflict noteOne instructor assigned to overlapping sessions
Support added an access exceptionLearner record needs manual activation
Advising returned a hold for correctionProgram selection does not match approved path
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Enrollment validation74%
Most records reviewed; exceptions remain
Teaching assignment approval61%
Conflict cases still under review
Account activation release83%
Waiting on final roster handoff
+
+
+
Support Notes
+
Most exceptions are tied to incomplete learner records and overlapping instructor availability. Team leads are using the queue to clear blocked cases before they affect course readiness and support response times.
+
Admissions is prioritizing records with missing identity checks.
Scheduling is reviewing instructor conflicts before room release.
Support is holding account activation until final roster approval.
Policy notices were updated to reflect new escalation ownership.
+
Escalations7
Owners online12
Blocked cases19
+
Operational Signals
Validation backlogModerate
Seat release paceStable
Access turnaroundAt risk
Intake review opened
Registry triage assigned the latest submission batch
Faculty request escalated
Teaching load conflict moved to academic operations
Roster lock cleared
Student services approved the final exception set
+
+
+
Use this view to coordinate approvals, confirm handoffs, and clear blockers before escalation windows are breached.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.
+ Live ControlDispatch ReadyStorage BalancedField Review Open
+
+
+
+
+
+
+
+
Operational
Track site output, storage readiness, dispatch commitments, and field actions across the active hub.
The hub is operating within target limits, with solar and wind assets sharing load as expected and storage carrying the balancing role for short fluctuations. Dispatch obligations remain intact, and no station is currently outside its approved operating envelope.
Elena MorrisRegional Hub Supervisor
+
Net Output
428 MW
Holding above committed delivery band
Available Storage
81%
Reserve margin kept for evening handoff
Curtailment Risk
Low
No immediate restriction notices in scope
Open Field Actions
7
Two require supervisor review
+
+
+
+ Loading view
+ Hub performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Output remains dependable across the hub, but the team is keeping close watch on the inland station until restart behavior is fully verified. Supervisors should clear the pending reserve note and confirm the inspection window so field and control actions stay aligned.
+
+
+
+
+
+
+
+
Operations Notes
+
Operations staff are watching one inland station where inverter recovery is slower than normal after a brief protective trip. The condition is stable, but the team has kept a local inspection open until the restart pattern returns to baseline.
+
Primary dispatch commitment remains fully covered by live generation and stored reserve.
One site review is waiting on field confirmation before the maintenance note can be closed.
Remote control authority is active for all stations in the current hub scope.
No compliance holds are blocking routine switching or battery balancing actions.
+
Stations Online14
Open Reviews3
Active Crews2
+
+
+
+
Shift Activity
+
Recorded actions and follow-up items for the active operating window.
+
+
+
+
+
+
+
+
Inland station restart varianceRecovery sequence exceeded normal duration
Medium
Storage reserve floor nearing handoff targetBalancing plan may need minor adjustment
Low
Field confirmation pending on breaker inspectionClosure blocked until site response is logged
Medium
+
Approve reserve adjustment noteSubmitted by shift operator
Pending approval
Confirm inland site inspection windowCrew lead requested access hold
Waiting
Close completed switching logControl steps verified by second reviewer
Ready
+
Grid desk accepted updated export positionAcknowledgement logged by dispatch coordinator
Battery balancing sequence completed without exceptionAutomatic control remained within approved limits
Field crew checked access route to inland stationTravel and handoff conditions confirmed
Remote link health check passed across all active sitesNo communication degradation recorded
+
+
+
Readiness Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Dispatch coverage96%
Committed export supported
Storage readiness81%
Reserve held for balancing
Field action closure68%
Open reviews moving toward sign-off
+
Recent Activity
Hub entered balanced operating mode
Control room update
Storage reserve floor adjusted for dispatch window
Shift approval recorded
Inverter restart review opened at inland station
Field follow-up assigned
Export commitment reconfirmed with grid desk
Acknowledgement received
Stations Online14
Open Reviews3
Active Crews2
+
+
+
Use this view to confirm readiness before approving dispatch changes or closing field actions.
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
Review account health, retention risk, and pending interventions for active customer segments.
+
+
+
+ Loading view
+ Active user case flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current queue reflects a concentrated effort to retain users who showed intent but encountered friction during critical account steps. Teams are expected to document every outreach attempt, confirm ownership before escalation, and close only when the account is either stable or formally transferred for continued monitoring.
+
+
+
+
+
+
+
+
+
+
Case Activity
+
Recent decisions and follow-up movement
+
+
+
+
+
+
+
+
High-value account awaiting decisionNo final disposition recorded after manual review
High
Outreach backlog risingFollow-up queue has crossed internal response target
Medium
Exception note incompletePolicy-sensitive case missing approval rationale
Medium
+
Confirm owner coverage for priority cases7 cases without confirmed handoff
In progress
Complete callback verificationPending contact outcomes need final status
Queued
Close resolved onboarding reviewsCases meet closure conditions after successful recovery
Ready
+
Owner updated on priority reviewRouting changed after shift handoff
Manual decision recordedCase moved from hold to monitor
Risk flag clearedActivity recovered after intervention
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Queue clearance72%
Handled against current intake
Outreach completion64%
Priority contacts sent and logged
Approval coverage89%
Cases with complete decision trail
+
+
+
Operational Notes
+
Current activity is centered on a rise in support-linked retention risk. Several accounts were routed into manual review after repeated onboarding exits, failed self-service recovery, or policy-sensitive changes that require a documented decision.
+
High-priority cases are routed to named owners before outreach begins.
Accounts with repeat friction stay in review until next-step evidence is recorded.
Policy exceptions require a reason code and final approval note.
+
Active owners16
Cases on hold12
Recovered users31
+
Review Signals
Escalation rate11%
Policy exceptions9
Pending callbacks22
Risk rule triggered
Account entered review after repeated drop-off behavior
Operations review started
Owner assigned and contact path confirmed
User contacted
Follow-up sent with recovery guidance and next action
Decision logged
Case moved to monitor, close, or escalate
+
+
+
Access, contact history, and policy decisions are recorded for audit review.
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
Editorial interpretation, policy check, and release readiness for a high-traffic article package.
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
+
+
+ Loading view
+ Article review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
The item remains on hold because reviewers want the final article to state only what can be supported directly in the reporting record. Once the headline and two interpretive passages are revised, the last policy note can be closed and the release team can complete handoff without reopening the brief.
+
+
+
+
+
+
+
+
Editorial Support Notes
+
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
Tighten the headline so it reflects verified reporting only
Rework two interpretive lines in the middle section
Confirm attribution order in the closing paragraph
Keep the release hold in place until policy notes are cleared
+
Linked notes12
Required edits3
Approvals2/3
+
+
+
+
Recent Activity
+
Latest actions across review, policy, and release handling.
+
+
+
+
+
+
+
+
Policy sign-off still openRelease cannot proceed until the final comment is resolved
High
Headline wording exceeds source certaintyDesk requested a narrower phrasing pass
Medium
Closing attribution order changedLatest revision needs reviewer confirmation
Low
+
Apply marked language editsThree passages require direct revision
Prepare release handoffQueue placement is ready once approval lands
Queued
+
Desk review updated with narrowed wording requestAdded by editorial review
Policy note linked to middle section passageMapped to required edit
Release hold confirmed by operationsQueue position preserved
Final pass assigned to senior reviewerAwaiting consolidated response
+
+
+
Reading Insight
+
Operations has held the item in the final queue so the desk can complete one coordinated pass rather than resolve comments in isolation. this workflow is intended to keep editors, policy reviewers, and release staff on the same record while the article moves through its last approval step.
+
Editorial review88%
Most text decisions are settled
Policy clearance67%
One required note remains
Release handoff54%
Prepared but not cleared
+
Release Signals
Attribution strengthNeeds tightening
Headline alignmentUnder revision
Release readinessPending approval
Final release depends on one policy approval and completion of marked language edits.
+
+
Use the same review record when updating wording, approvals, and release handling to avoid duplicate decisions.
+
+
+
+
diff --git a/web_insert/Apache ECharts/pie/chart_0011_pie.html b/web_insert/Apache ECharts/pie/chart_0011_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..600d077c933892754580c41d9a534fc17c966504
--- /dev/null
+++ b/web_insert/Apache ECharts/pie/chart_0011_pie.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T28 Municipal Service Bulletin
+
+
+
+
+
+
+
+
Internal circulationT28
+
Municipal Service Bulletin
+
Streetlight outage follow-up
+
Open bulletinCross-departmentAction required
+
+
+
Bulletin Summary
Operational notice and response summary for active public service issues requiring coordinated review.
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
+
+
+ Loading view
+ Service handling overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
Several matters remain open not because field action has stopped, but because the written record is incomplete or inconsistent across offices. Staff should treat documentation quality, ownership clarity, and response accuracy as equal to operational completion before moving any item to closed status.
+
+
+
+
+
+
+
+
Review Support
+
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
Confirm that each accepted notice has one accountable handling unit.
Reconcile field completion remarks with the official reply draft.
Flag cases where repeat contact suggests ineffective local closure.
Hold final release for items lacking signed verification.
+
Escalated3
Awaiting reply5
Returned for revision4
+
+
+
+
Recent Activity
+
Latest handling updates across the bulletin
+
+
+
+
+
+
+
+
Repeated contact on one closed itemClosure note conflicts with latest resident submission
High
Verification file missing from district replyEvidence not attached to the handling record
Medium
Approval wording exceeds service standardReply language requires simplification before release
Low
+
Confirm ownership for unresolved site restoration itemAwaiting district office acknowledgment
Open
Complete evidence check for resolved service interruption caseField note submitted without signed confirmation
In review
Approve final reply language for public releaseDraft prepared by coordination desk
Pending approval
+
District office updated handling noteOwnership confirmed and local follow-up arranged
Service unit returned revised reply draftLanguage adjusted to match verified field action
Supervisory office requested clarificationAsked whether the item meets closure conditions
Coordination desk logged resident repeat contactMatter retained in active bulletin
+
+
+
Review Insight
+
Teams are asked to confirm ownership, update response wording, and close record gaps before the next routing step. Any item with unresolved accountability or incomplete evidence should remain in controlled review rather than be marked complete.
+
Case verification76%
Most evidence checks completed
Reply drafting68%
Several items still under wording review
Final clearance41%
Held until all high-priority issues are confirmed
+
Coordination Signals
Priority routeJoint review
Public impactModerate
Release stateHeld for clearance
Local office reported restoration, but resident contact records indicate the issue may persist at the reported location.
+
+
Use this bulletin as the working record for approvals, response checks, and inter-office follow-up until all listed matters are either cleared or formally transferred.
+
+
+
+
diff --git a/web_insert/Apache ECharts/pie/chart_0012_pie.html b/web_insert/Apache ECharts/pie/chart_0012_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..72eb6412568c4f14e9a58088aba62317a117472c
--- /dev/null
+++ b/web_insert/Apache ECharts/pie/chart_0012_pie.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T34 Water Operations Control
+
+
+
+
+
+
+
+
+
+
Live networkShift handoffPriority review
Monitor plant output, service pressure, and field response from one operating view.
+
+
+
+ Loading view
+ Network status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Control Note
+
The active case is no longer expanding, but the team is holding controls in place until all dependent checks are complete. Field, dispatch, and service desk updates should stay aligned so closures do not outpace verified operating conditions.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Operational updates and required follow-up
+
+
+
+
+
+
+
+
Restricted pressure in east zoneCustomer impact limited; monitoring remains active
High
Booster station follow-up duePost-adjustment verification pending from field lead
Medium
Closure approval waitingSupervisor sign-off required on 3 linked work orders
Medium
+
Confirm downstream pressure readingsAssigned to east response crew
In progress
Validate temporary routing planRequired before restriction release
Pending review
Close resolved customer casesService desk waiting on operations note
Ready
+
Dispatch logged stable readings from sector valve setRecent field update
Plant control confirmed output remains on targetOperations note
Service desk tagged 4 cases for combined closureQueue update
Depot issued replacement fittings to mobile crewSupply confirmation
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident containment82%
Awaiting final field confirmation
Work order completion64%
Linked repairs moving through review
Case closure readiness71%
Service notes partially complete
+
+
+
Supervisor Notes
+
The current focus is to keep supply steady across high-demand zones, clear outstanding field confirmations, and close service cases that no longer need escalation. Supervisors are reviewing exceptions before the next handoff.
+
East transmission line remains in controlled operation with no new loss reports.
Two booster stations are running under temporary observation after overnight adjustment.
Customer-facing updates are limited to affected service pockets only.
Repair stock for seals and isolation fittings is available at primary depot.
+
Crews deployed9
Sites under watch4
Pending approvals6
+
Operational Signals
Reservoir balanceNormal
Pump readinessHigh
Field backlogModerate
Pressure deviation flagged
Network monitoring raised an east line variance and opened incident review.
Field isolation confirmed
Local crew secured the affected segment and reported stable downstream flow.
Supervisor review in progress
Operations lead is validating closure conditions before releasing restrictions.
+
+
+
Use confirmed field updates before changing service classification or closing a case.
Review inbound pitches, assign editorial follow-up, and keep the publication queue moving with clear ownership.
+
+
+
+ Loading view
+ Selection queue
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
Several strong submissions are moving forward at the same time, but the desk is losing time when ownership is unclear after approval. Tightening assignment rules here will reduce back-and-forth, speed contributor replies, and help section editors focus on pieces they are ready to develop.
+
+
+
+
+
+
+
+
+
+
Desk Activity
+
Latest review and assignment actions
+
+
+
+
+
+
+
+
Two approved pitches still have no ownerCleared in review but not accepted by a section editor
High
Standards check requested on a sensitive angleHold response until review note is returned
Medium
Contributor waiting on revision guidanceInitial feedback sent without a named follow-up editor
Medium
+
Confirm final owner for the education feature pitchShared interest across two sections
In progress
Send decline notes for out-of-scope submissionsReady after lead review
Ready
Close duplicate entry group and keep strongest versionThree related submissions from separate contributors
Blocked
+
Lead editor requested a tighter angle before commissionAdded to the top priority pitch
Assignment returned after capacity check failedSection owner asked for reassignment
Contributor replied with revised framing noteReady for second pass
Duplicate tag removed after manual comparisonSubmission can continue through normal review
+
+
Operational Insight
+
The current operating goal is simple: reduce duplicate review, assign one accountable editor to each viable pitch, and keep contributors informed before follow-up goes cold.
+
First-pass review78%
Most inbound items have initial editorial tags
Ownership assignment61%
Several approved pitches still need a named editor
Contributor replies84%
Outcome messages are nearly caught up
+
+
+
Contributor Support
+
Most delays are no longer in intake. The main bottleneck is editorial ownership after a pitch passes first review, especially when more than one section wants to claim the same idea.
+
Flag near-duplicate submissions before they reach senior review.
Move approved ideas into one owner queue with a clear response deadline.
Keep contributor communication consistent when a pitch is held, revised, or declined.
Surface sensitive topics for legal or standards review before commissioning.
+
Held11
Revisions requested14
Declines sent32
+
Operational Signals
Duplicate riskModerate
Standards review3 items pending
Editor capacityTight
Intake sweep completed
New submissions were normalized, deduplicated, and tagged by desk.
Senior review pass
Borderline pitches were escalated for direction on fit and urgency.
Assignment round
Approved items were matched to editors with open capacity.
Contributor follow-up
Reply notes were prepared for hold, revise, and decline outcomes.
+
+
+
Use one final outcome per pitch so downstream assignment and contributor replies stay aligned.
+ Active flightPriority reviewShared budgetStore traffic
+
+
+
+
+
+
+
+
Needs review
Track active retail promotions, review pacing risks, and keep launch approvals moving across paid channels.
This overview brings campaign owners, channel leads, and reviewers into one operating view for retail promotion activity. The focus is on release readiness, pacing discipline, and fast resolution when a campaign drifts outside its approved plan.
Avery NolanMarketing Operations Lead
+
Active campaigns
18
3 awaiting final release
Planned spend
$426K
Within current budget guardrail
Projected return
4.8x
Lift driven by repeat buyer segments
Creative compliance
92%
Remaining items need legal copy review
+
+
+
+ Loading view
+ Campaign performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
Current risk is concentrated in a small number of high-visibility promotions that are close to release but still depend on approval cleanup. Clearing those items will allow the team to open budget safely without creating rework for channel operations or compliance.
+
+
+
+
+
+
+
+
Operational Notes
+
Most campaigns are moving as expected, but a small group requires attention before budget can be fully opened. The current work centers on copy approval, audience overlap checks, and confirming that regional exclusions are applied before wider rollout.
+
Priority campaigns are grouped for same-day review by channel operations.
Budget adjustments require owner confirmation and finance-safe pacing limits.
Audience rule changes remain blocked until compliance notes are cleared.
Store traffic campaigns receive higher escalation when release windows narrow.
+
Queued reviews9
Open exceptions4
Released today5
+
+
+
+
Team Activity
+
Recent decisions and release changes
+
+
+
+
+
+
+
+
Copy exception still open for priority placementOwner response pending
High
Audience overlap exceeds internal thresholdShared budget campaign group
Medium
Regional exclusion missing from one launch setStore traffic promotion
Medium
+
Approve revised launch copyAssigned to compliance reviewer
In progress
Confirm pacing cap for shared budget groupRequested by channel lead
Pending
Validate excluded regions before releaseRequired for final activation
Ready
+
Budget guardrail updated for priority promotionRecorded by finance operations
Audience rule revision submittedWaiting for approval
Channel owner added release noteEscalation removed after review
Compliance returned one asset for editsCopy needs location disclaimer
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval completion74%
Most high-spend items already reviewed
Budget allocation68%
Remaining spend held behind final checks
Release readiness81%
Operational setup nearly complete
+
Release Flow
Intake completed
Briefs and spend limits confirmed
Review in progress
Compliance and audience checks underway
Release window
Approved campaigns move to channel activation
Queued reviews9
Open exceptions4
Released today5
+
+
+
Use this view to resolve blockers before expanding spend or opening additional channel coverage.
Track specimen intake, instrument readiness, review holds, and release validated results from one controlled queue.
+
+
+
+ Loading view
+ Specimen flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Current delays are not caused by intake volume but by a narrow cluster of held results that need repeat confirmation and signed reviewer rationale. Once those cases are closed, the release queue should return to normal pace.
+
+
+
+
+
+
+
+
+
+
Validation Activity
+
Latest laboratory actions and review updates
+
+
+
+
+
+
+
+
Quality hold threshold reachedChemistry lane 7 held results
High
Instrument maintenance window dueHematology bench service reminder
Complete supervisory sign-off for held chemistry cases24 items in review queue
In progress
Verify rerun documentation before release5 specimens require note completion
Pending
Confirm analyzer readiness after resetPost-interruption checks still open
Waiting confirmation
+
Accession team cleared label exceptionMatched specimen and order records
Reviewer added comment to held electrolyte panelAwaiting repeat outcome
Bench lead reassigned overflow workCapacity balanced across active stations
Final result packet released to care teamAudit trail completed
+
+
Throughput Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Accessioning completion92%
Most inbound samples logged and routed
Validation review68%
Routine cases moving faster than held work
Quality documentation81%
Remaining notes tied to reruns and holds
+
+
+
Escalation Notes
+
Supervisors are balancing turnaround targets with quality controls, making sure reruns, delta checks, and documentation updates are completed before any final authorization.
+
Priority samples are routed directly to staffed benches.
Held results require either repeat testing or reviewer comment.
Release activity is limited to validated work with complete audit notes.
+
Released today143
Open holds7
Assigned reviewers9
+
Bench Signals
Pending accession checks12
Benches at capacity2
Reruns in progress5
Intake batch reconciled
Analyzer lane reset
Senior review started
Release queue narrowed
+
+
+
All releases must include reviewer confirmation and complete traceability.
Operational summary for site load, steam demand, and utility variance across active production lines.
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
+
+
+ Loading view
+ Consumption overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operating Note
+
The current review is centered on whether the elevated water draw should be recorded as expected support usage or escalated as a controllable loss. Early checks support the first view, but the decision will remain open until sanitation records and supervisor confirmation are complete.
+
+
+
+
+
+
+
+
Supervisor Support
+
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
Base electrical load improved after non-process fans were isolated during idle periods.
Compressed air demand stayed even, with no signs of sustained leakage during the late run.
Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
Water variance should be rechecked once final sanitation logs are posted.
+
Open exceptions2
Lines reviewed6/6
Actions due3
+
+
+
+
Completion Progress
+
Status of review and follow-up
+
+
+
+
+
+
+
+
Water use above expected bandPackaging area support services
Medium
Line idle shutdown not confirmedTwo areas missing end-run verification
Low
Final sanitation log still pendingRequired to close variance review
Medium
+
Confirm restart-related water drawOperations supervisor to validate against log entries
In progress
Verify non-process equipment shutdownUtilities team to spot-check idle periods
Queued
Complete site approvalRequired before report closeout
Pending
+
Meter reconciliation completed for main supplyLogged by utilities desk
Maintenance confirmed no active steam issueInspection note added
Cost allocation refreshed for final reviewFinance rule set applied
+
+
+
Assessment
+
No immediate escalation is required, but the site energy lead has asked line supervisors to confirm idle-time shutdown discipline before the next reporting cycle is closed.
+
Meter validation100%
All core readings matched
Variance review68%
Awaiting supporting logs
Management sign-off35%
Ready for supervisor action
+
Key Signals
Load balanceSteady
Utility riskModerate
Approval statePending sign-off
Water intake exceeded the normal operating band during cleaning and restart activity. Review remains open until line notes and final meter confirmation are attached.
+
+
Use this report to confirm variances, assign follow-up, and complete site-level review before closeout.
+
+
+
+
diff --git a/web_insert/Apache ECharts/scatter/chart_0004_scatter.html b/web_insert/Apache ECharts/scatter/chart_0004_scatter.html
new file mode 100644
index 0000000000000000000000000000000000000000..8b502424284bcd9fd263b1998599e5219519dad8
--- /dev/null
+++ b/web_insert/Apache ECharts/scatter/chart_0004_scatter.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T14 Store Stock Control
+
+
+
+
+
+
+
+
+
+
Live stockReplenishment reviewHold resolution
Track replenishment risk, release held inventory, and keep shelf availability aligned across active locations.
+
+
+
+ Loading view
+ Location stock position
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main concern is not total network stock but timing. Several locations can return to normal selling levels once held units are cleared and transfer approvals are issued in the right order. Teams are using this view to keep store demand, receiving capacity, and release controls aligned.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Latest stock handling and release steps
+
+
+
+
+
+
+
+
Count mismatch blocking release12 item lines remain held after store recount
High
Priority location below cover targetReplenishment risk increased across 4 stores
Medium
Receiving backlog nearing thresholdInbound confirmation lag may delay availability updates
Medium
+
Approve transfer batch for thin-cover stores29 lines prepared by distribution planning
Ready
Confirm held quantities against recount notes74 units waiting on store validation
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Hold review completion68%
Most flagged lines have first-pass decisions
Transfer approval completion54%
Awaiting release order from control lead
Count reconciliation73%
Repeat variance stores still under review
+
+
+
Operational Notes
+
this workflow supports the daily decision flow: identify where cover is too thin, confirm whether held stock can be released, and route transfer lines to the locations with the highest service risk. Notes and queue items below reflect the current handoff between store control, distribution, and floor operations.
+
Prioritize releases for locations with same-day shelf risk.
Delay nonessential transfers until held quantities are verified.
Escalate repeated count mismatches to store control leads.
Keep transfer approvals aligned with receiving capacity.
+
Priority stores11
Open holds18
Ready transfers7
+
Network Signals
Service riskElevated
Receiving pressureModerate
Approval backlogContained
Cycle count exceptions reviewed
Store control completed first-pass review on flagged lines.
Transfer requests consolidated
Low-cover locations were grouped for a single approval pass.
Held stock release pending
Distribution is waiting for final quantity confirmation.
+
+
+
Use release actions only after count confirmation is recorded in the item note.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
+ Active shiftRelease pendingLab verifiedEscalation open
+
+
+
+
+
+
+
+
Review in progress
Monitor active inspections, isolate nonconforming lots, and keep release decisions aligned across line, lab, and dispatch teams.
This overview is used by inspection leads to track open quality cases from first check through release decision. It brings together line findings, lab confirmation, hold status, and reviewer actions so each lot can move forward with a clear record.
Erin ColeQuality Assurance Lead
+
Lots under review
18
4 require supervisor sign-off
Pass rate
96.8%
Stable against control threshold
Items on hold
7
Awaiting disposition or retest
Average closure time
2.6h
Down after revised sampling steps
+
+
+
+ Loading view
+ Inspection activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A narrow group of nonconforming lots is driving most of the queue. The team has already isolated affected stock and limited release access, so the immediate focus is on finishing lab confirmation, recording final disposition, and clearing unaffected material without breaking traceability.
+
+
+
+
+
+
+
+
Coordination Notes
+
The current workload is concentrated on final assembly output where a small group of lots failed appearance and torque checks. Most cases are moving normally, but a limited set remains blocked while the team confirms whether rework is acceptable or a full containment action is needed.
+
Two lots were moved from routine review to controlled hold after repeat defects were confirmed at receiving check.
Lab confirmation has cleared one previously blocked lot for release with added inspection notes.
Dispatch has been asked not to allocate stock from any case marked pending disposition.
+
Open holds7
Retests due3
Approved releases11
+
+
+
+
Recent Actions
+
Latest updates across inspection, hold, and release handling.
+
+
+
+
+
+
+
+
Repeat defect pattern detectedThree related cases linked to the same source batch
High
Approval waiting on lab noteRelease decision cannot close until confirmation is attached
Medium
Containment nearing limitReserved hold area is close to capacity
Medium
+
Review pending disposition cases7 cases require lead decision
In progress
Confirm retest sampling planApplies to two blocked lots
Queued
Close cleared release recordsDocumentation ready for final update
Ready
+
Line inspector added a deviation noteAttached to lot under controlled hold
Lab result accepted by reviewerCase moved back to release check
Containment list updatedStock location confirmed for isolated units
Dispatch restriction acknowledgedOutbound allocation blocked for pending lots
+
+
+
Inspection Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion82%
Most scheduled checks are recorded
Disposition closure61%
Open exceptions still under review
Release documentation74%
Awaiting final sign-off on held lots
+
Case Progress
Inbound sample logged
Initial inspection record created
Deviation confirmed
Case routed to quality lead
Containment applied
Affected stock isolated from release
Disposition pending
Awaiting final approval
Open holds7
Retests due3
Approved releases11
+
+
+
Only approved dispositions can clear held material for release.
Reporting cycle activeEvidence under reviewSite coverage completeApproval pending
+
+
+
Reporting Summary
Consolidated operational view for facility emissions, evidence readiness, and approval progress across the reporting cycle.
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
+
+
+ Loading view
+ Emissions view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Reporting Note
+
Most reporting work is complete, but the team is holding release until the last boundary clarification and control statement are fully documented. Once those items are closed, the submission can move through approval without further operational changes.
+
+
+
+
+
+
+
+
Reporting Support
+
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
All operated facilities submitted activity data within the active reporting window.
Boundary assumptions were updated after internal control review.
Evidence coverage is complete for direct fuel use and purchased electricity.
Final sign-off is blocked only by unresolved exception responses.
+
Facilities in scope14
Evidence files linked128
Approvers assigned5
+
+
+
+
Review Activity
+
Recent actions tied to the current reporting cycle
+
+
+
+
+
+
+
+
Boundary note requires confirmationShared support load treatment updated by operations
Medium
Exception owner response overdueOne facility comment has not been returned
High
Approval pack awaiting final attachmentControl statement must be added before routing
Low
+
Validate revised allocation methodCheck consistency against facility evidence
In progress
Close open exception itemsCollect responses from assigned owners
Blocked
Route package for sign-offRelease once control statement is attached
+ Live TradingStore NetworkPriority Follow-upRevenue Focus
+
+
+
+
+
+
+
Active Oversight
+
Monitor store execution, revenue pacing, stock pressure, and pending actions across the active trading cycle.
+
Trading performance is holding above plan, but momentum is uneven across the network. Flagship locations are carrying the result while several mid-tier stores are slipping on conversion after early demand spikes cleared core inventory.
+
+
+
Maya ChenSales Operations Lead
+
+
+
+
Net Sales
$4.8M
Running ahead of internal target with stronger in-store conversion.
Orders Closed
18,240
Order completion remains stable despite heavier queue volume.
Low Stock SKUs
126
Concentrated in top-selling lines requiring rapid replenishment.
Pending Exceptions
37
Most cases are tied to price overrides and fulfillment holds.
+
+
+
+
+ Loading view
+ Sales command view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Operations leads are using this board to coordinate price checks, stock transfers, and field follow-up. The immediate goal is to protect sell-through on priority lines without creating avoidable margin leakage or unresolved service cases.
+
Price override approvals increased after local markdown requests were reopened.
Transfer requests are highest in stores with strong accessory attachment rates.
Frontline teams need confirmed replenishment windows before issuing customer callbacks.
Regional managers have been asked to clear overdue store notes before next review.
+
Stores Flagged21
Cases Reassigned14
Open Callbacks89
+
+
+
+
+
Execution Activity
+
Store actions and approval movement
+
+
+
+
+
+
+
+
Override approvals approaching threshold12 stores exceeded normal approval volume
High
Core item coverage at riskTop stores reporting low back-room availability
Medium
Store callback backlog buildingCustomer follow-up notes remain open past target
Medium
+
Approve urgent pricing exceptionsSenior review required for margin-sensitive requests
In progress
Confirm transfer receipt with destination storesFollow up on high-demand replenishment moves
Pending
Close unresolved field notesSeveral stores have not updated execution status
Blocked
+
North region cleared three high-value exceptionsApproval cycle shortened after reassignment
Accessory attachment improved in premium storesStore coaching appears to be holding
Transfer requests stabilized after stock releaseMost urgent moves have been acknowledged
Customer callback queue remains unevenService follow-through needs local management review
+
+
+
Lead Note
+
This board supports the daily operating rhythm for sales control, exception handling, and store coordination across the retail network.
+
Conversion PressureElevated
Stock Transfer LoadHigh
Approval ResponseWithin SLA
+
Investigate sales pacing, confirm stock position, and clear open approvals before escalation.
+
+ View note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
Focus Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval clearance78%
Cleared against open exception volume
Transfer completion64%
Confirmed store-to-store movements
Field note closure52%
Resolved execution updates from stores
+
+
+
Use approved actions only. Store-facing updates must match pricing, stock, and service policy before release.
Coordinate intake, review, and resolution for active public service requests across district teams.
+
+
+
+ Loading view
+ Request handling
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Demand remains manageable overall, but manual verification is creating uneven wait times between offices. Supervisors are prioritizing clean approvals, redirecting exception work to trained reviewers, and keeping resident communication tied closely to documented case decisions.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest actions across intake, review, and approval teams.
+
+
+
+
+
+
+
+
Approval queue nearing response limit8 requests need supervisor action within the service window
High
Identity mismatch rate increasedManual checks are slowing intake clearance in two offices
Medium
Returned submissions require follow-upResidents have not responded on 14 incomplete requests
Low
+
Clear specialist review backlogReassign exception cases from general intake
In progress
Approve release batchDecision notes are complete and ready for sign-off
Ready
Validate returned documentsCheck corrected records before reopening requests
Queued
+
North district accepted three escalated casesOwnership transferred from central review
Resident notice batch released after approvalNotifications sent for completed decisions
Compliance note added to exception handling rulesReview teams must record reason codes on manual overrides
Intake team cleared duplicate submissionsMerged records reduced queue noise for active requests
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Intake review72%
Most new submissions screened and routed
Eligibility verification54%
Manual checks remain the slowest step
Decision release81%
Approved cases moving out on schedule
+
+
+
Supervisor Notes
+
A review backlog has formed around eligibility checks that require manual confirmation. Supervisors are balancing faster routing with compliance controls so straightforward requests can move forward while exceptions remain documented and ready for audit.
+
Priority requests are held for direct supervisor review when identity or address records do not match.
Field offices can return incomplete submissions to intake without closing the case.
Resident notifications are released only after decision notes and supporting checks are complete.
Escalated items remain visible until ownership is accepted by the receiving team.
+
Avg. handling time2.8h
Returned to intake27
Supervisor holds11
+
Queue Health
Service levelStable
Review capacityTight
Escalation loadModerate
Intake queue reviewed
Initial screening completed for newly received submissions
Eligibility exceptions routed
Cases with missing verification moved to specialist review
Supervisor approvals issued
Approved requests released for resident notice and fulfillment
+
+
+
Access, routing, and decision history are logged for compliance review.
Review inbound pitches, assign editorial follow-up, and keep the publication queue moving with clear ownership.
+
+
+
+ Loading view
+ Selection queue
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
Several strong submissions are moving forward at the same time, but the desk is losing time when ownership is unclear after approval. Tightening assignment rules here will reduce back-and-forth, speed contributor replies, and help section editors focus on pieces they are ready to develop.
+
+
+
+
+
+
+
+
+
+
Desk Activity
+
Latest review and assignment actions
+
+
+
+
+
+
+
+
Two approved pitches still have no ownerCleared in review but not accepted by a section editor
High
Standards check requested on a sensitive angleHold response until review note is returned
Medium
Contributor waiting on revision guidanceInitial feedback sent without a named follow-up editor
Medium
+
Confirm final owner for the education feature pitchShared interest across two sections
In progress
Send decline notes for out-of-scope submissionsReady after lead review
Ready
Close duplicate entry group and keep strongest versionThree related submissions from separate contributors
Blocked
+
Lead editor requested a tighter angle before commissionAdded to the top priority pitch
Assignment returned after capacity check failedSection owner asked for reassignment
Contributor replied with revised framing noteReady for second pass
Duplicate tag removed after manual comparisonSubmission can continue through normal review
+
+
Operational Insight
+
The current operating goal is simple: reduce duplicate review, assign one accountable editor to each viable pitch, and keep contributors informed before follow-up goes cold.
+
First-pass review78%
Most inbound items have initial editorial tags
Ownership assignment61%
Several approved pitches still need a named editor
Contributor replies84%
Outcome messages are nearly caught up
+
+
+
Contributor Support
+
Most delays are no longer in intake. The main bottleneck is editorial ownership after a pitch passes first review, especially when more than one section wants to claim the same idea.
+
Flag near-duplicate submissions before they reach senior review.
Move approved ideas into one owner queue with a clear response deadline.
Keep contributor communication consistent when a pitch is held, revised, or declined.
Surface sensitive topics for legal or standards review before commissioning.
+
Held11
Revisions requested14
Declines sent32
+
Operational Signals
Duplicate riskModerate
Standards review3 items pending
Editor capacityTight
Intake sweep completed
New submissions were normalized, deduplicated, and tagged by desk.
Senior review pass
Borderline pitches were escalated for direction on fit and urgency.
Assignment round
Approved items were matched to editors with open capacity.
Contributor follow-up
Reply notes were prepared for hold, revise, and decline outcomes.
+
+
+
Use one final outcome per pitch so downstream assignment and contributor replies stay aligned.
+ Live DispatchPriority LoadsDriver CoverageGate Readiness
+
+
+
+
+
+
+
Active monitoring
+
Coordinate active routes, rebalance drivers, and clear open exceptions from one operating view.
+
Dispatch is managing a tight operating window with several outbound runs stacked behind the same gate sequence. The team has already reallocated available units to protect higher-priority moves and reduce idle time at the yard.
+
+
+
Maya BennettFleet Dispatch Lead
+
+
+
+
Units in motion
148
12 reassigned during the current shift
Open route holds
9
Most tied to late gate release
Coverage gap
4
Backfill requested for long-haul lanes
On-time departure
93%
Holding steady after yard balancing
+
+
+
+
+ Loading view
+ Route coordination
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Most unresolved issues now sit between driver readiness and release timing. Supervisors are using this panel to confirm who can be reassigned, which routes need escalation, and where a short delay will create a downstream coverage gap.
+
Three priority loads were moved to alternate tractors to avoid missed departure targets.
Driver check-in compliance improved after direct follow-up from the shift desk.
Yard staging remains constrained near outbound lanes with refrigerated equipment.
+
Standby drivers6
Held departures9
Ready tractors22
+
+
+
+
+
Recent Activity
+
Latest dispatch actions and route decisions
+
+
+
+
+
+
+
+
Gate release delay affecting priority runLane B12 Waiting 18 min
High
Driver rest window blocks reassignmentLong-haul pool 2 units impacted
Medium
Trailer pairing mismatch in yard queueOutbound side Manual check required
Medium
+
Confirm backup operator for north corridor runDispatch desk request
In progress
Approve swap for delayed refrigerated unitRequires lead signoff
Pending
Close completed hold after gate clearanceRoute ready for release
Ready
+
Yard team confirmed two lanes cleared for outbound stagingPosted by yard control
Driver support updated availability for standby poolCoverage adjusted
Priority load reassignment accepted by route supervisorNo further approval needed
Fuel stop exception removed from active reviewDispatch note closed
+
+
+
Lead Note
+
The team is working through a compressed release window where small delays at the yard can quickly reduce route coverage. This view helps dispatch leads decide where to reassign equipment, push approvals, and keep priority movements on schedule.
+
Dispatch healthStable with exceptions
Driver readinessNear full coverage
Yard congestionElevated at outbound side
+
Priority lanes are protected, but remaining open holds need confirmation from yard and driver teams before release.
+
+ Open note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
Operating Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Route release completion78%
Based on active outbound plan
Driver assignment coverage91%
Remaining gap on long-haul lanes
Exception clearance64%
Open holds trending down
+
+
+
Use route reassignment only after confirming gate availability and driver hours.
+ Active flightPriority reviewShared budgetStore traffic
+
+
+
+
+
+
+
+
Needs review
Track active retail promotions, review pacing risks, and keep launch approvals moving across paid channels.
This overview brings campaign owners, channel leads, and reviewers into one operating view for retail promotion activity. The focus is on release readiness, pacing discipline, and fast resolution when a campaign drifts outside its approved plan.
Avery NolanMarketing Operations Lead
+
Active campaigns
18
3 awaiting final release
Planned spend
$426K
Within current budget guardrail
Projected return
4.8x
Lift driven by repeat buyer segments
Creative compliance
92%
Remaining items need legal copy review
+
+
+
+ Loading view
+ Campaign performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
Current risk is concentrated in a small number of high-visibility promotions that are close to release but still depend on approval cleanup. Clearing those items will allow the team to open budget safely without creating rework for channel operations or compliance.
+
+
+
+
+
+
+
+
Operational Notes
+
Most campaigns are moving as expected, but a small group requires attention before budget can be fully opened. The current work centers on copy approval, audience overlap checks, and confirming that regional exclusions are applied before wider rollout.
+
Priority campaigns are grouped for same-day review by channel operations.
Budget adjustments require owner confirmation and finance-safe pacing limits.
Audience rule changes remain blocked until compliance notes are cleared.
Store traffic campaigns receive higher escalation when release windows narrow.
+
Queued reviews9
Open exceptions4
Released today5
+
+
+
+
Team Activity
+
Recent decisions and release changes
+
+
+
+
+
+
+
+
Copy exception still open for priority placementOwner response pending
High
Audience overlap exceeds internal thresholdShared budget campaign group
Medium
Regional exclusion missing from one launch setStore traffic promotion
Medium
+
Approve revised launch copyAssigned to compliance reviewer
In progress
Confirm pacing cap for shared budget groupRequested by channel lead
Pending
Validate excluded regions before releaseRequired for final activation
Ready
+
Budget guardrail updated for priority promotionRecorded by finance operations
Audience rule revision submittedWaiting for approval
Channel owner added release noteEscalation removed after review
Compliance returned one asset for editsCopy needs location disclaimer
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval completion74%
Most high-spend items already reviewed
Budget allocation68%
Remaining spend held behind final checks
Release readiness81%
Operational setup nearly complete
+
Release Flow
Intake completed
Briefs and spend limits confirmed
Review in progress
Compliance and audience checks underway
Release window
Approved campaigns move to channel activation
Queued reviews9
Open exceptions4
Released today5
+
+
+
Use this view to resolve blockers before expanding spend or opening additional channel coverage.
Reporting cycle activeEvidence under reviewSite coverage completeApproval pending
+
+
+
Reporting Summary
Consolidated operational view for facility emissions, evidence readiness, and approval progress across the reporting cycle.
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
+
+
+ Loading view
+ Emissions view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Reporting Note
+
Most reporting work is complete, but the team is holding release until the last boundary clarification and control statement are fully documented. Once those items are closed, the submission can move through approval without further operational changes.
+
+
+
+
+
+
+
+
Reporting Support
+
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
All operated facilities submitted activity data within the active reporting window.
Boundary assumptions were updated after internal control review.
Evidence coverage is complete for direct fuel use and purchased electricity.
Final sign-off is blocked only by unresolved exception responses.
+
Facilities in scope14
Evidence files linked128
Approvers assigned5
+
+
+
+
Review Activity
+
Recent actions tied to the current reporting cycle
+
+
+
+
+
+
+
+
Boundary note requires confirmationShared support load treatment updated by operations
Medium
Exception owner response overdueOne facility comment has not been returned
High
Approval pack awaiting final attachmentControl statement must be added before routing
Low
+
Validate revised allocation methodCheck consistency against facility evidence
In progress
Close open exception itemsCollect responses from assigned owners
Blocked
Route package for sign-offRelease once control statement is attached
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
+
+
+
+
diff --git a/web_insert/Chart.js/bar/chart_0065_bar.html b/web_insert/Chart.js/bar/chart_0065_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..e4daf7eaec08bd2a1e5c88aaea4fad3fac1c601e
--- /dev/null
+++ b/web_insert/Chart.js/bar/chart_0065_bar.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T04 Daily Energy Use Report
+
+
+
+
+
+
Operational summary for site load, steam demand, and utility variance across active production lines.
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
+
+
+ Loading view
+ Consumption overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operating Note
+
The current review is centered on whether the elevated water draw should be recorded as expected support usage or escalated as a controllable loss. Early checks support the first view, but the decision will remain open until sanitation records and supervisor confirmation are complete.
+
+
+
+
+
+
+
+
Supervisor Support
+
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
Base electrical load improved after non-process fans were isolated during idle periods.
Compressed air demand stayed even, with no signs of sustained leakage during the late run.
Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
Water variance should be rechecked once final sanitation logs are posted.
+
Open exceptions2
Lines reviewed6/6
Actions due3
+
+
+
+
Completion Progress
+
Status of review and follow-up
+
+
+
+
+
+
+
+
Water use above expected bandPackaging area support services
Medium
Line idle shutdown not confirmedTwo areas missing end-run verification
Low
Final sanitation log still pendingRequired to close variance review
Medium
+
Confirm restart-related water drawOperations supervisor to validate against log entries
In progress
Verify non-process equipment shutdownUtilities team to spot-check idle periods
Queued
Complete site approvalRequired before report closeout
Pending
+
Meter reconciliation completed for main supplyLogged by utilities desk
Maintenance confirmed no active steam issueInspection note added
Cost allocation refreshed for final reviewFinance rule set applied
+
+
+
Assessment
+
No immediate escalation is required, but the site energy lead has asked line supervisors to confirm idle-time shutdown discipline before the next reporting cycle is closed.
+
Meter validation100%
All core readings matched
Variance review68%
Awaiting supporting logs
Management sign-off35%
Ready for supervisor action
+
Key Signals
Load balanceSteady
Utility riskModerate
Approval statePending sign-off
Water intake exceeded the normal operating band during cleaning and restart activity. Review remains open until line notes and final meter confirmation are attached.
+
+
Use this report to confirm variances, assign follow-up, and complete site-level review before closeout.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
+ Active portfolioReview in progressFunding controlsCompliance watch
+
+
+
+
+
+
+
+
Managed
Monitor active studies, pending approvals, funding usage, and cross-team follow-up from one operational view.
The office is managing a mixed portfolio of faculty-led studies, lab collaborations, and student research initiatives. Most work is progressing within approved scope, but a small set of submissions requires administrative response before funds or participant activity can proceed.
Dr. Elaine PorterDirector, Research Administration
+
Open Projects
48
6 awaiting formal approval
Active Funding
$12.4M
Within approved allocation range
Pending Reviews
17
4 require principal investigator response
Policy Exceptions
3
All assigned for follow-up
+
+
+
+ Loading view
+ Project activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Several projects are close to activation, but progress depends on small administrative corrections. Clearing incomplete files and confirming ownership will reduce delay, improve audit readiness, and allow the office to release approved work without further escalation.
+
+
+
+
+
+
+
+
Office Notes
+
Current attention is focused on review completion, documentation quality, and timely coordination between academic units and the central research office. Team leads are using this view to resolve blockers, confirm ownership, and keep each project aligned with internal policy.
+
Approval backlog is concentrated in new submissions with incomplete ethics attachments.
Two high-value projects are waiting on revised budget justification before release.
Records cleanup reduced duplicate sponsor entries across several departments.
Escalations are being routed to unit coordinators for direct follow-up.
+
Units involved11
Cases reassigned5
Records updated23
+
+
+
+
Recent Office Activity
+
Latest updates across approvals, records, and funding control.
+
+
+
+
+
+
+
+
Budget release on holdMissing approval note from finance control
High
Ethics file incompleteParticipant consent language requires revision
Medium
Sponsor record mismatchDepartment entry differs from central register
Low
+
Confirm unit reviewer for pending submissions7 projects without final reviewer assignment
Open
Release approved funding batch2 projects cleared after documentation check
Ready
Close duplicate sponsor recordsFollow-up required across 3 departments
In progress
+
Policy team returned one exception case for clarificationNeeds updated risk statement
Finance control cleared restricted spending lineRelease can proceed after office sign-off
Graduate coordinator added missing investigator credentialsSubmission now eligible for formal review
Unit office confirmed lead contact changeRecords updated for future notices
+
+
+
Portfolio Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Initial screening92%
Most submissions validated
Formal review68%
Backlog concentrated in exception cases
Funding release74%
Delayed by final approval checks
+
Recent Milestones
Portfolio intake closed
New submissions moved to initial screening
Compliance review updated
Exception cases reassigned to policy team
Funding release prepared
Awaiting final sign-off from finance control
Units involved11
Cases reassigned5
Records updated23
+
+
+
Internal use only. Funding, review, and compliance actions must be recorded before project status is changed.
+ Live TradingStore NetworkPriority Follow-upRevenue Focus
+
+
+
+
+
+
+
Active Oversight
+
Monitor store execution, revenue pacing, stock pressure, and pending actions across the active trading cycle.
+
Trading performance is holding above plan, but momentum is uneven across the network. Flagship locations are carrying the result while several mid-tier stores are slipping on conversion after early demand spikes cleared core inventory.
+
+
+
Maya ChenSales Operations Lead
+
+
+
+
Net Sales
$4.8M
Running ahead of internal target with stronger in-store conversion.
Orders Closed
18,240
Order completion remains stable despite heavier queue volume.
Low Stock SKUs
126
Concentrated in top-selling lines requiring rapid replenishment.
Pending Exceptions
37
Most cases are tied to price overrides and fulfillment holds.
+
+
+
+
+ Loading view
+ Sales command view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Operations leads are using this board to coordinate price checks, stock transfers, and field follow-up. The immediate goal is to protect sell-through on priority lines without creating avoidable margin leakage or unresolved service cases.
+
Price override approvals increased after local markdown requests were reopened.
Transfer requests are highest in stores with strong accessory attachment rates.
Frontline teams need confirmed replenishment windows before issuing customer callbacks.
Regional managers have been asked to clear overdue store notes before next review.
+
Stores Flagged21
Cases Reassigned14
Open Callbacks89
+
+
+
+
+
Execution Activity
+
Store actions and approval movement
+
+
+
+
+
+
+
+
Override approvals approaching threshold12 stores exceeded normal approval volume
High
Core item coverage at riskTop stores reporting low back-room availability
Medium
Store callback backlog buildingCustomer follow-up notes remain open past target
Medium
+
Approve urgent pricing exceptionsSenior review required for margin-sensitive requests
In progress
Confirm transfer receipt with destination storesFollow up on high-demand replenishment moves
Pending
Close unresolved field notesSeveral stores have not updated execution status
Blocked
+
North region cleared three high-value exceptionsApproval cycle shortened after reassignment
Accessory attachment improved in premium storesStore coaching appears to be holding
Transfer requests stabilized after stock releaseMost urgent moves have been acknowledged
Customer callback queue remains unevenService follow-through needs local management review
+
+
+
Lead Note
+
This board supports the daily operating rhythm for sales control, exception handling, and store coordination across the retail network.
+
Conversion PressureElevated
Stock Transfer LoadHigh
Approval ResponseWithin SLA
+
Investigate sales pacing, confirm stock position, and clear open approvals before escalation.
+
+ View note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
Focus Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval clearance78%
Cleared against open exception volume
Transfer completion64%
Confirmed store-to-store movements
Field note closure52%
Resolved execution updates from stores
+
+
+
Use approved actions only. Store-facing updates must match pricing, stock, and service policy before release.
Coordinate active equipment work, parts readiness, and technician handoff for the current plant queue.
+
+
+
+ Loading view
+ Asset service status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
The main risk is not the volume of open work but the overlap between recurring faults, shared spare parts, and incomplete close-out records. The coordinator is prioritizing jobs that restore stable operation fastest while making sure each completed repair can pass inspection without rework.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest maintenance coordination updates
+
+
+
+
+
+
+
+
Repeat fault on feeder motor requires supervisor reviewLinked to two prior corrective orders
Close-out blocked by missing isolation recordInspection will not release final status
High
+
Approve repair scope for Press Line 2 feederCost review attached by area lead
Pending approval
Confirm staged parts for conveyor coupling replacementMechanical crew waiting at access point
In progress
Return corrected close-out notes to inspectionPhoto evidence and isolation steps required
Needs update
+
Mechanical crew reported safe access at feeder bayField note added 14 min ago
Parts desk reserved seal kit for linked ordersReservation confirmed against active queue
Area lead raised priority on conveyor drive caseOperational impact now classified as elevated
Inspection returned one closure package for revisionMissing verification note in final step
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Priority repairs completed62%
8 of 13 cleared
Parts staging readiness73%
Most critical kits available
Close-out compliance81%
Several packages awaiting final note
+
+
+
Coordination Notes
+
The current focus is keeping high-use assets in service while clearing overdue follow-up work from earlier interventions. Notes, queue status, and technician updates are aligned here so handoff decisions can be made without opening separate records.
+
Three priority jobs share the same hydraulic seal kit and must be sequenced carefully.
Inspection has requested photo confirmation before closing two repeat-failure orders.
One conveyor drive can remain in service under reduced load until replacement stock is issued.
Electrical support is available for lockout review on escalated jobs.
+
On-site crews4
Locked out assets3
Rush requests2
+
Support Readiness
Critical assets online9/10
Awaiting approval4 orders
Parts shortfall2 items
Failure review completed for press feeder
Supervisor approved immediate repair path
Seal kit released from parts crib
Reserved against two linked work orders
Field update posted by mechanical crew
Access cleared and unit isolated
Close-out package returned for correction
Inspection note required before final release
+
+
+
All updates shown here are operational records and must match the approved work order before closure.
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.
Post-route summary for the latest dispatch cycle, focusing on late handoff recovery, depot coordination, and proof-of-delivery completion.
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
+
+
+ Loading view
+ Route performance view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
This review is being used to decide whether dispatch should adopt a standard delay-recovery playbook for mixed-stop runs. The current response relied on experienced staff making quick route adjustments, which worked in this case but may not scale without clearer depot release rules and a required outreach log for affected stops.
+
+
+
+
+
+
+
+
Support Notes
+
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
Departure drift started at the depot gate after loading lane congestion.
Manual reprioritization reduced missed arrival commitments on dense urban segments.
Proof-of-delivery capture improved after drivers were reminded to close stops before returning.
Two exception cases remain open pending package condition review.
+
Resequenced routes7
Support calls placed23
Returns held2
+
+
+
+
Recent Activity
+
Updates recorded during issue containment and closure review.
+
+
+
+
+
+
+
+
Proof mismatch on return scan2 consignments need depot confirmation
Medium
Loading lane congestion repeatedObserved across early dispatch wave
High
Customer contact note missing1 delayed stop closed without outreach log
Low
+
Validate open claims with depot supervisorAttach condition notes and return scans
In progress
Document route resequencing rulePrepare for dispatch handbook update
Pending
Close driver note reviewConfirm repeated gate delay comments
Ready
+
Driver team acknowledged revised stop orderField update logged by support desk
Depot supervisor added lane usage noteRoot cause linked to overlap during loading release
Customer service cleared outreach backlogAll affected recipients received status calls
The review focus is on whether the corrective actions used by the team should become standard practice for future mixed-stop routes with tight loading turnover.
+
Exception closure78%
Most delivery issues resolved in the same cycle
Driver note review64%
Comments grouped by route segment
Depot corrective action41%
Lane balancing plan awaiting sign-off
+
Field Signals
Route adherenceStable after intervention
Depot readinessNeeds lane balancing
Customer contact coverageAbove target
Opened after repeated departure slippage affected downstream stop timing and closure quality.
+
+
Internal review record for route performance follow-up and process adjustment.
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
+
+
+
+
diff --git a/web_insert/Chart.js/line/chart_0057_line.html b/web_insert/Chart.js/line/chart_0057_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..1ab4ea97b60feeb00f6baf84a3e3f08c8ecad6cc
--- /dev/null
+++ b/web_insert/Chart.js/line/chart_0057_line.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T23 Population Health Surveillance Console
+
+
+
+
+
+
+
+
+
T23
+
+
Public Health Operations
+
Population Health Surveillance Console
+
Cluster Review 18
+
+
+
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
Post-run assessment for the last completed checkout messaging experiment, including impact, rollout decision, and follow-up actions.
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
+
+
+ Loading view
+ Experiment results
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Analyst Note
+
The result is not only statistically reliable but also operationally clean. Teams reviewing payment quality, support demand, and buyer behavior did not identify a counter-signal large enough to block release, which makes this a suitable candidate for default rollout with normal monitoring.
+
+
+
+
+
+
+
+
Review Notes
+
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
Primary goal was improved checkout completion.
Guardrails covered payment success, cancellation intent, and support contact rate.
Result supports rollout with standard monitoring.
Follow-up work should focus on first-time buyer reassurance.
+
Control share50%
Variant share50%
Guardrails passed3/3
+
+
+
+
Recent Activity
+
Latest review updates and decision steps
+
+
+
+
+
+
+
+
Release approval pendingRequires product and operations sign-off
Medium
Follow-up test not yet scopedFirst-time buyer segment showed the strongest response
Low
Monitoring handoff requiredPost-release checks must be assigned before launch
Medium
+
Confirm rollout ownerRelease coordination for default experience
Open
Document final decisionAdd rationale to the experiment record
In progress
Prepare follow-up briefDraft next test for delivery reassurance
Not started
+
Data review completed by analyticsNo variance issues found in conversion events
Support lead confirmed stable contact volumeNo increase tied to variant exposure
Product owner attached final recommendationPromote Variant B with standard guardrails
Release coordinator requested approval windowDecision needed before deployment planning
+
+
+
Key Insight
+
The operational recommendation is to promote Variant B to the default experience, keep the current guardrails in place, and open a follow-up test on supporting text near delivery expectations.
+
Review completion92%
Only final approval remains
Release readiness84%
Monitoring and ownership still being confirmed
Follow-up planning36%
Next hypothesis not fully defined
+
Quality Signals
Audience balanceWithin tolerance
Tracking integrityVerified
Release readinessApproved pending sign-off
Control used the existing confirmation message. Variant B used shorter supporting language focused on confidence before purchase.
+
+
Rollout should begin with standard monitoring and a hold point if payment reliability moves outside normal range.
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
Review account health, retention risk, and pending interventions for active customer segments.
+
+
+
+ Loading view
+ Active user case flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current queue reflects a concentrated effort to retain users who showed intent but encountered friction during critical account steps. Teams are expected to document every outreach attempt, confirm ownership before escalation, and close only when the account is either stable or formally transferred for continued monitoring.
+
+
+
+
+
+
+
+
+
+
Case Activity
+
Recent decisions and follow-up movement
+
+
+
+
+
+
+
+
High-value account awaiting decisionNo final disposition recorded after manual review
High
Outreach backlog risingFollow-up queue has crossed internal response target
Medium
Exception note incompletePolicy-sensitive case missing approval rationale
Medium
+
Confirm owner coverage for priority cases7 cases without confirmed handoff
In progress
Complete callback verificationPending contact outcomes need final status
Queued
Close resolved onboarding reviewsCases meet closure conditions after successful recovery
Ready
+
Owner updated on priority reviewRouting changed after shift handoff
Manual decision recordedCase moved from hold to monitor
Risk flag clearedActivity recovered after intervention
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Queue clearance72%
Handled against current intake
Outreach completion64%
Priority contacts sent and logged
Approval coverage89%
Cases with complete decision trail
+
+
+
Operational Notes
+
Current activity is centered on a rise in support-linked retention risk. Several accounts were routed into manual review after repeated onboarding exits, failed self-service recovery, or policy-sensitive changes that require a documented decision.
+
High-priority cases are routed to named owners before outreach begins.
Accounts with repeat friction stay in review until next-step evidence is recorded.
Policy exceptions require a reason code and final approval note.
+
Active owners16
Cases on hold12
Recovered users31
+
Review Signals
Escalation rate11%
Policy exceptions9
Pending callbacks22
Risk rule triggered
Account entered review after repeated drop-off behavior
Operations review started
Owner assigned and contact path confirmed
User contacted
Follow-up sent with recovery guidance and next action
Decision logged
Case moved to monitor, close, or escalate
+
+
+
Access, contact history, and policy decisions are recorded for audit review.
Coordinate intake, review, and resolution for active public service requests across district teams.
+
+
+
+ Loading view
+ Request handling
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Demand remains manageable overall, but manual verification is creating uneven wait times between offices. Supervisors are prioritizing clean approvals, redirecting exception work to trained reviewers, and keeping resident communication tied closely to documented case decisions.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest actions across intake, review, and approval teams.
+
+
+
+
+
+
+
+
Approval queue nearing response limit8 requests need supervisor action within the service window
High
Identity mismatch rate increasedManual checks are slowing intake clearance in two offices
Medium
Returned submissions require follow-upResidents have not responded on 14 incomplete requests
Low
+
Clear specialist review backlogReassign exception cases from general intake
In progress
Approve release batchDecision notes are complete and ready for sign-off
Ready
Validate returned documentsCheck corrected records before reopening requests
Queued
+
North district accepted three escalated casesOwnership transferred from central review
Resident notice batch released after approvalNotifications sent for completed decisions
Compliance note added to exception handling rulesReview teams must record reason codes on manual overrides
Intake team cleared duplicate submissionsMerged records reduced queue noise for active requests
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Intake review72%
Most new submissions screened and routed
Eligibility verification54%
Manual checks remain the slowest step
Decision release81%
Approved cases moving out on schedule
+
+
+
Supervisor Notes
+
A review backlog has formed around eligibility checks that require manual confirmation. Supervisors are balancing faster routing with compliance controls so straightforward requests can move forward while exceptions remain documented and ready for audit.
+
Priority requests are held for direct supervisor review when identity or address records do not match.
Field offices can return incomplete submissions to intake without closing the case.
Resident notifications are released only after decision notes and supporting checks are complete.
Escalated items remain visible until ownership is accepted by the receiving team.
+
Avg. handling time2.8h
Returned to intake27
Supervisor holds11
+
Queue Health
Service levelStable
Review capacityTight
Escalation loadModerate
Intake queue reviewed
Initial screening completed for newly received submissions
Eligibility exceptions routed
Cases with missing verification moved to specialist review
Supervisor approvals issued
Approved requests released for resident notice and fulfillment
+
+
+
Access, routing, and decision history are logged for compliance review.
Execution in focusControl review activeApproval queue open
Track release pacing, exception handling, and approval readiness across active cost centers.
+
+
+
+ Loading view
+ Execution overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
Release performance is broadly on plan, but the remaining blocked amount sits in cases that need manual confirmation. Resolving those records quickly will reduce queue pressure and allow controllers to close the cycle without extending approval coverage.
+
+
+
+
+
+
+
+
+
+
Recent Actions
+
Latest updates from controllers and approvers
+
+
+
+
+
+
+
+
High-value release held for documentation$220K requires source support
Manual adjustment exceeds local thresholdController comment attached
Medium
+
Clear blocked release requests12 records awaiting evidence
In progress
Confirm revised control notes4 items edited by reviewers
Pending
Close approved carryover actions7 ready for posting
Ready
+
Policy exception comment added to release caseBy regional controller
Approval path updated for restricted fundingRouting changed automatically
Supporting file accepted after validationBlocked amount reduced
Commitment request returned for correctionAccount line mismatch found
+
+
Execution Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Release completion92%
Against approved plan
Approval completion81%
All levels combined
Exception clearance64%
Policy and document checks
+
+
+
Controller Notes
+
Most exceptions are tied to account mapping and supporting documentation rather than overspend risk. Teams are being asked to resolve these items before release authority is expanded.
+
Release pacing remains healthy across core operating lines.
Exception volume is concentrated in a small set of manual adjustments.
Senior approval capacity is the main constraint on final clearance.
Control notes have been attached to all blocked items above threshold.
+
Open cases43
Needs review11
Cleared today19
+
Exception Signals
Control postureStable
Approval loadElevated
Release riskManaged
Initial allocation confirmed
Control baseline recorded
Mid-cycle release adjusted
Carryover request applied
Exception review escalated
Policy evidence requested
Final approval window opened
Queue routing updated
+
+
+
Only approved adjustments can move to release. Blocked items remain visible until evidence and sign-off are complete.
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
+
+
+
+
diff --git a/web_insert/Chart.js/line/chart_0065_line.html b/web_insert/Chart.js/line/chart_0065_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..3ca3b885b1e4237783a99592687f6d3be18d3e2d
--- /dev/null
+++ b/web_insert/Chart.js/line/chart_0065_line.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T19 Fulfillment Control Center
+
+
+
+
+
+
Monitor outbound flow, clear held orders, and keep dock activity aligned with carrier cutoff commitments.
Outbound volume is moving at a healthy pace, but a growing cluster of held orders is starting to compress the final release window. Most exceptions are concentrated in a small number of picking zones, which means the team can recover service if reviews are completed before the next carrier handoff cycle.
Maya ChenFulfillment Operations Lead
+
Orders ready to release
1,284
Stable after the last verification pass
Orders on hold
73
Most require address or stock confirmation
Dock lanes active
18 / 22
Two lanes reserved for late priority loads
On-time dispatch
96.4%
Holding above internal service target
+
+
+
+ Loading view
+ Outbound release status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most outbound risk is not coming from overall volume; it is coming from a manageable set of held orders that can delay the final handoff sequence if left unresolved. Clearing those exceptions now protects both dock capacity and on-time dispatch.
+
+
+
+
+
+
+
+
Operational Notes
+
Dock activity remains balanced across active lanes, and release discipline is preventing unnecessary trailer dwell. The current focus is to resolve shipment holds in the queue, confirm a small set of short picks, and protect the late priority wave from congestion near final staging.
+
Address validation holds account for the largest share of delayed releases
Priority orders should be cleared before standard replenishment checks resume
Lane reassignment is available if staging volume exceeds the current threshold
Carrier handoff timing remains achievable with active exception review
+
Rush orders146
Review desks open5
Average hold age42m
+
+
+
+
Recent Actions
+
Latest fulfillment events and reviews
+
+
+
+
+
+
+
+
Held orders above control threshold73 orders pending review across three zones
High
Lane 12 staging nearing limitOverflow risk if the next release is not staggered
Medium
Carrier cutoff buffer tighteningPriority loads need final confirmation soon
Medium
+
Clear address validation holdsAssigned to order review desk
In progress
Confirm short pick substitutionsAwaiting floor lead approval
Pending
Protect late priority lane capacityReserve space before final handoff
Scheduled
+
Verification team cleared 22 held ordersQueue pressure eased in the last review cycle
Dock supervisor opened two backup positionsStaging congestion reduced near outbound lanes
Carrier desk confirmed on-time intakeNo change to active handoff sequence
Packing lead flagged repeat scan failuresIssue isolated to one station for follow-up
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Order release completion78%
Released against current outbound plan
Exception resolution63%
Held orders cleared or reassigned
Dock preparation87%
Lanes staffed and staged for handoff
+
Release Activity
Wave release completed
Primary outbound batch moved to final staging
Exception queue escalated
Held orders above review target triggered supervisor attention
Dock lanes rebalanced
Two lanes opened for priority handoff protection
Final verification in progress
Pack confirmation and label checks underway
Rush orders146
Review desks open5
Average hold age42m
+
+
+
Use this view to clear blockers early, protect release timing, and keep dock flow aligned with service commitments.
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
Editorial interpretation, policy check, and release readiness for a high-traffic article package.
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
+
+
+ Loading view
+ Article review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
The item remains on hold because reviewers want the final article to state only what can be supported directly in the reporting record. Once the headline and two interpretive passages are revised, the last policy note can be closed and the release team can complete handoff without reopening the brief.
+
+
+
+
+
+
+
+
Editorial Support Notes
+
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
Tighten the headline so it reflects verified reporting only
Rework two interpretive lines in the middle section
Confirm attribution order in the closing paragraph
Keep the release hold in place until policy notes are cleared
+
Linked notes12
Required edits3
Approvals2/3
+
+
+
+
Recent Activity
+
Latest actions across review, policy, and release handling.
+
+
+
+
+
+
+
+
Policy sign-off still openRelease cannot proceed until the final comment is resolved
High
Headline wording exceeds source certaintyDesk requested a narrower phrasing pass
Medium
Closing attribution order changedLatest revision needs reviewer confirmation
Low
+
Apply marked language editsThree passages require direct revision
Prepare release handoffQueue placement is ready once approval lands
Queued
+
Desk review updated with narrowed wording requestAdded by editorial review
Policy note linked to middle section passageMapped to required edit
Release hold confirmed by operationsQueue position preserved
Final pass assigned to senior reviewerAwaiting consolidated response
+
+
+
Reading Insight
+
Operations has held the item in the final queue so the desk can complete one coordinated pass rather than resolve comments in isolation. this workflow is intended to keep editors, policy reviewers, and release staff on the same record while the article moves through its last approval step.
+
Editorial review88%
Most text decisions are settled
Policy clearance67%
One required note remains
Release handoff54%
Prepared but not cleared
+
Release Signals
Attribution strengthNeeds tightening
Headline alignmentUnder revision
Release readinessPending approval
Final release depends on one policy approval and completion of marked language edits.
+
+
Use the same review record when updating wording, approvals, and release handling to avoid duplicate decisions.
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
Response window nearing breachCommunity complaint intake acknowledgement due
Medium
+
Approve follow-up inspection routeCovers four sites in the eastern sector
Pending approval
Confirm operator mitigation evidenceAttachments received for one active enforcement case
Needs validation
Close resolved noise complaint setField confirmation submitted by mobile unit
Ready to close
+
Field unit uploaded updated meter checksAttached to two active site records
Permit holder acknowledged corrective requestResponse logged by duty desk
Laboratory intake confirmed sample receiptChain of custody matched on submission
Community hotline added new odor complaintMapped to an existing investigation area
+
+
+
Key Findings
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion68%
Scheduled visits finished for current cycle
Case documentation54%
Required records attached and reviewed
Corrective action follow-through41%
Operator submissions verified by staff
+
Case Progress
Threshold breach escalated
Zone lead notified and case priority raised
Field visit assigned
Mobile unit scheduled for on-site verification
Operator response logged
Facility submitted mitigation statement
Closure review pending
Supervisor approval required before release
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
Use verified readings and approved field notes when advancing any case to closure.
+
+
+
+
diff --git a/web_insert/Chart.js/line/chart_0071_line.html b/web_insert/Chart.js/line/chart_0071_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..a4c35de664fe39b9566cc96726811db41e7f322c
--- /dev/null
+++ b/web_insert/Chart.js/line/chart_0071_line.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
+
+
+
+
diff --git a/web_insert/Chart.js/line/chart_0073_line.html b/web_insert/Chart.js/line/chart_0073_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..930e8c2438ef4e1115c56a10e634cff8021a933a
--- /dev/null
+++ b/web_insert/Chart.js/line/chart_0073_line.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T34 Water Operations Control
+
+
+
+
+
+
+
+
+
+
Live networkShift handoffPriority review
Monitor plant output, service pressure, and field response from one operating view.
+
+
+
+ Loading view
+ Network status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Control Note
+
The active case is no longer expanding, but the team is holding controls in place until all dependent checks are complete. Field, dispatch, and service desk updates should stay aligned so closures do not outpace verified operating conditions.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Operational updates and required follow-up
+
+
+
+
+
+
+
+
Restricted pressure in east zoneCustomer impact limited; monitoring remains active
High
Booster station follow-up duePost-adjustment verification pending from field lead
Medium
Closure approval waitingSupervisor sign-off required on 3 linked work orders
Medium
+
Confirm downstream pressure readingsAssigned to east response crew
In progress
Validate temporary routing planRequired before restriction release
Pending review
Close resolved customer casesService desk waiting on operations note
Ready
+
Dispatch logged stable readings from sector valve setRecent field update
Plant control confirmed output remains on targetOperations note
Service desk tagged 4 cases for combined closureQueue update
Depot issued replacement fittings to mobile crewSupply confirmation
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident containment82%
Awaiting final field confirmation
Work order completion64%
Linked repairs moving through review
Case closure readiness71%
Service notes partially complete
+
+
+
Supervisor Notes
+
The current focus is to keep supply steady across high-demand zones, clear outstanding field confirmations, and close service cases that no longer need escalation. Supervisors are reviewing exceptions before the next handoff.
+
East transmission line remains in controlled operation with no new loss reports.
Two booster stations are running under temporary observation after overnight adjustment.
Customer-facing updates are limited to affected service pockets only.
Repair stock for seals and isolation fittings is available at primary depot.
+
Crews deployed9
Sites under watch4
Pending approvals6
+
Operational Signals
Reservoir balanceNormal
Pump readinessHigh
Field backlogModerate
Pressure deviation flagged
Network monitoring raised an east line variance and opened incident review.
Field isolation confirmed
Local crew secured the affected segment and reported stable downstream flow.
Supervisor review in progress
Operations lead is validating closure conditions before releasing restrictions.
+
+
+
Use confirmed field updates before changing service classification or closing a case.
Monitor enrollment flow, review teaching requests, and keep campus services within response targets.
+
+
+
+ Loading view
+ Enrollment workload
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main pressure point is not overall volume but the number of cases waiting on a second team to confirm eligibility, roster placement, or account release. Clearing those handoffs will reduce repeat contacts and keep approvals moving in the right order.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Recent updates across admissions, scheduling, and support
+
+
+
+
+
+
+
+
Identity check queue exceeded review target14 learner files are outside normal handling time
Access provisioning paused for one intake groupRoster confirmation is still pending from registry
Medium
+
Approve seat exception requestsOwned by academic operations
In progress
Confirm account release listWaiting on final learner verification
Blocked
Close duplicate support casesMerge requests from advising and registry
Ready
+
Registry completed a priority batch reviewOpen count reduced after document validation
Scheduling submitted a conflict noteOne instructor assigned to overlapping sessions
Support added an access exceptionLearner record needs manual activation
Advising returned a hold for correctionProgram selection does not match approved path
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Enrollment validation74%
Most records reviewed; exceptions remain
Teaching assignment approval61%
Conflict cases still under review
Account activation release83%
Waiting on final roster handoff
+
+
+
Support Notes
+
Most exceptions are tied to incomplete learner records and overlapping instructor availability. Team leads are using the queue to clear blocked cases before they affect course readiness and support response times.
+
Admissions is prioritizing records with missing identity checks.
Scheduling is reviewing instructor conflicts before room release.
Support is holding account activation until final roster approval.
Policy notices were updated to reflect new escalation ownership.
+
Escalations7
Owners online12
Blocked cases19
+
Operational Signals
Validation backlogModerate
Seat release paceStable
Access turnaroundAt risk
Intake review opened
Registry triage assigned the latest submission batch
Faculty request escalated
Teaching load conflict moved to academic operations
Roster lock cleared
Student services approved the final exception set
+
+
+
Use this view to coordinate approvals, confirm handoffs, and clear blockers before escalation windows are breached.
Receiving activePutaway constrainedDispatch on hold
Monitor inbound receipts, putaway flow, and outbound release from one operating view.
+
+
+
+ Loading view
+ Facility activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main risk is not total volume but timing. Inbound receipts, reserve storage, and outbound release are all connected, so a short delay at dock assignment or packing review quickly affects the rest of the floor. Clearing blocked pallets and reallocating lift coverage should return the site to a steadier operating rhythm.
+
+
+
+
+
+
+
+
+
+
Floor Activity
+
Updated as teams complete receiving, storage, and release steps.
+
+
+
+
+
+
+
+
Dock queue above working limit6 loads waiting longer than target
High
Bulk zone capacity nearing thresholdReserve slots at 93% use
Confirm quarantine release for damaged palletsNeeded before allocation can resume
Waiting approval
Move lift support to west bulk aisleReduce putaway backlog and free dock space
In progress
Validate pick face mismatch listTwo locations causing short picks
Ready
+
Receiving clerk closed two load check-insLane pressure eased slightly
Packing lead flagged carton damage on priority releaseManual review still open
Replenishment team completed fast-move top-offPick continuity improved
Supervisor approved temporary overflow stagingBulk reserve can recover
+
+
Flow Insight
+
Supervisors are reallocating lift support to the bulk zone to free receiving lanes and restore normal replenishment timing.
+
Receiving completion62%
Backlog concentrated at assigned docks
Putaway completion48%
Lift support still below target
Outbound release completion79%
Held orders pending review
+
+
+
Coordinator Notes
+
Most outbound work remains on target, but several releases are paused until damaged-unit reviews and location mismatches are cleared.
+
Dock 4 and Dock 6 are reserved for late carrier arrivals.
Three pallets in quarantine require quality release before stock can be allocated.
Overflow staging is active near the west aisle to prevent receiving backlog.
Cycle count holds remain limited to two pick faces.
+
Open holds11
Active pickers24
Free docks2
+
Exception Signals
Dock availabilityTight
Pick path healthStable
Replenishment paceBehind
Inbound queue reviewed
Dock assignments adjusted for high-volume receipts
Putaway priority updated
Bulk and fast-move lanes moved to top of worklist
Dispatch hold escalated
Packing lead asked to clear damaged carton review
Capacity watch enabled
Reserve zone threshold raised for temporary overflow
+
+
+
Use this console to clear blocked work first, then restore normal flow across receiving and dispatch.
+
+
+
+
diff --git a/web_insert/Chart.js/line/chart_0076_line.html b/web_insert/Chart.js/line/chart_0076_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..733e42844f93adfb45ed955ceb71f71ddc473e41
--- /dev/null
+++ b/web_insert/Chart.js/line/chart_0076_line.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T14 Store Stock Control
+
+
+
+
+
+
+
+
+
+
Live stockReplenishment reviewHold resolution
Track replenishment risk, release held inventory, and keep shelf availability aligned across active locations.
+
+
+
+ Loading view
+ Location stock position
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main concern is not total network stock but timing. Several locations can return to normal selling levels once held units are cleared and transfer approvals are issued in the right order. Teams are using this view to keep store demand, receiving capacity, and release controls aligned.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Latest stock handling and release steps
+
+
+
+
+
+
+
+
Count mismatch blocking release12 item lines remain held after store recount
High
Priority location below cover targetReplenishment risk increased across 4 stores
Medium
Receiving backlog nearing thresholdInbound confirmation lag may delay availability updates
Medium
+
Approve transfer batch for thin-cover stores29 lines prepared by distribution planning
Ready
Confirm held quantities against recount notes74 units waiting on store validation
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Hold review completion68%
Most flagged lines have first-pass decisions
Transfer approval completion54%
Awaiting release order from control lead
Count reconciliation73%
Repeat variance stores still under review
+
+
+
Operational Notes
+
this workflow supports the daily decision flow: identify where cover is too thin, confirm whether held stock can be released, and route transfer lines to the locations with the highest service risk. Notes and queue items below reflect the current handoff between store control, distribution, and floor operations.
+
Prioritize releases for locations with same-day shelf risk.
Delay nonessential transfers until held quantities are verified.
Escalate repeated count mismatches to store control leads.
Keep transfer approvals aligned with receiving capacity.
+
Priority stores11
Open holds18
Ready transfers7
+
Network Signals
Service riskElevated
Receiving pressureModerate
Approval backlogContained
Cycle count exceptions reviewed
Store control completed first-pass review on flagged lines.
Transfer requests consolidated
Low-cover locations were grouped for a single approval pass.
Held stock release pending
Distribution is waiting for final quantity confirmation.
+
+
+
Use release actions only after count confirmation is recorded in the item note.
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
+
+
+
+
diff --git a/web_insert/Chart.js/line/chart_0079_line.html b/web_insert/Chart.js/line/chart_0079_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..717a8039a1c6a4db50cc5067f95caf922689802c
--- /dev/null
+++ b/web_insert/Chart.js/line/chart_0079_line.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T28 Municipal Service Bulletin
+
+
+
+
+
+
+
+
Internal circulationT28
+
Municipal Service Bulletin
+
Streetlight outage follow-up
+
Open bulletinCross-departmentAction required
+
+
+
Bulletin Summary
Operational notice and response summary for active public service issues requiring coordinated review.
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
+
+
+ Loading view
+ Service handling overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
Several matters remain open not because field action has stopped, but because the written record is incomplete or inconsistent across offices. Staff should treat documentation quality, ownership clarity, and response accuracy as equal to operational completion before moving any item to closed status.
+
+
+
+
+
+
+
+
Review Support
+
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
Confirm that each accepted notice has one accountable handling unit.
Reconcile field completion remarks with the official reply draft.
Flag cases where repeat contact suggests ineffective local closure.
Hold final release for items lacking signed verification.
+
Escalated3
Awaiting reply5
Returned for revision4
+
+
+
+
Recent Activity
+
Latest handling updates across the bulletin
+
+
+
+
+
+
+
+
Repeated contact on one closed itemClosure note conflicts with latest resident submission
High
Verification file missing from district replyEvidence not attached to the handling record
Medium
Approval wording exceeds service standardReply language requires simplification before release
Low
+
Confirm ownership for unresolved site restoration itemAwaiting district office acknowledgment
Open
Complete evidence check for resolved service interruption caseField note submitted without signed confirmation
In review
Approve final reply language for public releaseDraft prepared by coordination desk
Pending approval
+
District office updated handling noteOwnership confirmed and local follow-up arranged
Service unit returned revised reply draftLanguage adjusted to match verified field action
Supervisory office requested clarificationAsked whether the item meets closure conditions
Coordination desk logged resident repeat contactMatter retained in active bulletin
+
+
+
Review Insight
+
Teams are asked to confirm ownership, update response wording, and close record gaps before the next routing step. Any item with unresolved accountability or incomplete evidence should remain in controlled review rather than be marked complete.
+
Case verification76%
Most evidence checks completed
Reply drafting68%
Several items still under wording review
Final clearance41%
Held until all high-priority issues are confirmed
+
Coordination Signals
Priority routeJoint review
Public impactModerate
Release stateHeld for clearance
Local office reported restoration, but resident contact records indicate the issue may persist at the reported location.
+
+
Use this bulletin as the working record for approvals, response checks, and inter-office follow-up until all listed matters are either cleared or formally transferred.
Track specimen intake, instrument readiness, review holds, and release validated results from one controlled queue.
+
+
+
+ Loading view
+ Specimen flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Current delays are not caused by intake volume but by a narrow cluster of held results that need repeat confirmation and signed reviewer rationale. Once those cases are closed, the release queue should return to normal pace.
+
+
+
+
+
+
+
+
+
+
Validation Activity
+
Latest laboratory actions and review updates
+
+
+
+
+
+
+
+
Quality hold threshold reachedChemistry lane 7 held results
High
Instrument maintenance window dueHematology bench service reminder
Complete supervisory sign-off for held chemistry cases24 items in review queue
In progress
Verify rerun documentation before release5 specimens require note completion
Pending
Confirm analyzer readiness after resetPost-interruption checks still open
Waiting confirmation
+
Accession team cleared label exceptionMatched specimen and order records
Reviewer added comment to held electrolyte panelAwaiting repeat outcome
Bench lead reassigned overflow workCapacity balanced across active stations
Final result packet released to care teamAudit trail completed
+
+
Throughput Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Accessioning completion92%
Most inbound samples logged and routed
Validation review68%
Routine cases moving faster than held work
Quality documentation81%
Remaining notes tied to reruns and holds
+
+
+
Escalation Notes
+
Supervisors are balancing turnaround targets with quality controls, making sure reruns, delta checks, and documentation updates are completed before any final authorization.
+
Priority samples are routed directly to staffed benches.
Held results require either repeat testing or reviewer comment.
Release activity is limited to validated work with complete audit notes.
+
Released today143
Open holds7
Assigned reviewers9
+
Bench Signals
Pending accession checks12
Benches at capacity2
Reruns in progress5
Intake batch reconciled
Analyzer lane reset
Senior review started
Release queue narrowed
+
+
+
All releases must include reviewer confirmation and complete traceability.
+ Live ControlDispatch ReadyStorage BalancedField Review Open
+
+
+
+
+
+
+
+
Operational
Track site output, storage readiness, dispatch commitments, and field actions across the active hub.
The hub is operating within target limits, with solar and wind assets sharing load as expected and storage carrying the balancing role for short fluctuations. Dispatch obligations remain intact, and no station is currently outside its approved operating envelope.
Elena MorrisRegional Hub Supervisor
+
Net Output
428 MW
Holding above committed delivery band
Available Storage
81%
Reserve margin kept for evening handoff
Curtailment Risk
Low
No immediate restriction notices in scope
Open Field Actions
7
Two require supervisor review
+
+
+
+ Loading view
+ Hub performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Output remains dependable across the hub, but the team is keeping close watch on the inland station until restart behavior is fully verified. Supervisors should clear the pending reserve note and confirm the inspection window so field and control actions stay aligned.
+
+
+
+
+
+
+
+
Operations Notes
+
Operations staff are watching one inland station where inverter recovery is slower than normal after a brief protective trip. The condition is stable, but the team has kept a local inspection open until the restart pattern returns to baseline.
+
Primary dispatch commitment remains fully covered by live generation and stored reserve.
One site review is waiting on field confirmation before the maintenance note can be closed.
Remote control authority is active for all stations in the current hub scope.
No compliance holds are blocking routine switching or battery balancing actions.
+
Stations Online14
Open Reviews3
Active Crews2
+
+
+
+
Shift Activity
+
Recorded actions and follow-up items for the active operating window.
+
+
+
+
+
+
+
+
Inland station restart varianceRecovery sequence exceeded normal duration
Medium
Storage reserve floor nearing handoff targetBalancing plan may need minor adjustment
Low
Field confirmation pending on breaker inspectionClosure blocked until site response is logged
Medium
+
Approve reserve adjustment noteSubmitted by shift operator
Pending approval
Confirm inland site inspection windowCrew lead requested access hold
Waiting
Close completed switching logControl steps verified by second reviewer
Ready
+
Grid desk accepted updated export positionAcknowledgement logged by dispatch coordinator
Battery balancing sequence completed without exceptionAutomatic control remained within approved limits
Field crew checked access route to inland stationTravel and handoff conditions confirmed
Remote link health check passed across all active sitesNo communication degradation recorded
+
+
+
Readiness Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Dispatch coverage96%
Committed export supported
Storage readiness81%
Reserve held for balancing
Field action closure68%
Open reviews moving toward sign-off
+
Recent Activity
Hub entered balanced operating mode
Control room update
Storage reserve floor adjusted for dispatch window
Shift approval recorded
Inverter restart review opened at inland station
Field follow-up assigned
Export commitment reconfirmed with grid desk
Acknowledgement received
Stations Online14
Open Reviews3
Active Crews2
+
+
+
Use this view to confirm readiness before approving dispatch changes or closing field actions.
+ Active shiftRelease pendingLab verifiedEscalation open
+
+
+
+
+
+
+
+
Review in progress
Monitor active inspections, isolate nonconforming lots, and keep release decisions aligned across line, lab, and dispatch teams.
This overview is used by inspection leads to track open quality cases from first check through release decision. It brings together line findings, lab confirmation, hold status, and reviewer actions so each lot can move forward with a clear record.
Erin ColeQuality Assurance Lead
+
Lots under review
18
4 require supervisor sign-off
Pass rate
96.8%
Stable against control threshold
Items on hold
7
Awaiting disposition or retest
Average closure time
2.6h
Down after revised sampling steps
+
+
+
+ Loading view
+ Inspection activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A narrow group of nonconforming lots is driving most of the queue. The team has already isolated affected stock and limited release access, so the immediate focus is on finishing lab confirmation, recording final disposition, and clearing unaffected material without breaking traceability.
+
+
+
+
+
+
+
+
Coordination Notes
+
The current workload is concentrated on final assembly output where a small group of lots failed appearance and torque checks. Most cases are moving normally, but a limited set remains blocked while the team confirms whether rework is acceptable or a full containment action is needed.
+
Two lots were moved from routine review to controlled hold after repeat defects were confirmed at receiving check.
Lab confirmation has cleared one previously blocked lot for release with added inspection notes.
Dispatch has been asked not to allocate stock from any case marked pending disposition.
+
Open holds7
Retests due3
Approved releases11
+
+
+
+
Recent Actions
+
Latest updates across inspection, hold, and release handling.
+
+
+
+
+
+
+
+
Repeat defect pattern detectedThree related cases linked to the same source batch
High
Approval waiting on lab noteRelease decision cannot close until confirmation is attached
Medium
Containment nearing limitReserved hold area is close to capacity
Medium
+
Review pending disposition cases7 cases require lead decision
In progress
Confirm retest sampling planApplies to two blocked lots
Queued
Close cleared release recordsDocumentation ready for final update
Ready
+
Line inspector added a deviation noteAttached to lot under controlled hold
Lab result accepted by reviewerCase moved back to release check
Containment list updatedStock location confirmed for isolated units
Dispatch restriction acknowledgedOutbound allocation blocked for pending lots
+
+
+
Inspection Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion82%
Most scheduled checks are recorded
Disposition closure61%
Open exceptions still under review
Release documentation74%
Awaiting final sign-off on held lots
+
Case Progress
Inbound sample logged
Initial inspection record created
Deviation confirmed
Case routed to quality lead
Containment applied
Affected stock isolated from release
Disposition pending
Awaiting final approval
Open holds7
Retests due3
Approved releases11
+
+
+
Only approved dispositions can clear held material for release.
+ Live ControlDispatch ReadyStorage BalancedField Review Open
+
+
+
+
+
+
+
+
Operational
Track site output, storage readiness, dispatch commitments, and field actions across the active hub.
The hub is operating within target limits, with solar and wind assets sharing load as expected and storage carrying the balancing role for short fluctuations. Dispatch obligations remain intact, and no station is currently outside its approved operating envelope.
Elena MorrisRegional Hub Supervisor
+
Net Output
428 MW
Holding above committed delivery band
Available Storage
81%
Reserve margin kept for evening handoff
Curtailment Risk
Low
No immediate restriction notices in scope
Open Field Actions
7
Two require supervisor review
+
+
+
+ Loading view
+ Hub performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Output remains dependable across the hub, but the team is keeping close watch on the inland station until restart behavior is fully verified. Supervisors should clear the pending reserve note and confirm the inspection window so field and control actions stay aligned.
+
+
+
+
+
+
+
+
Operations Notes
+
Operations staff are watching one inland station where inverter recovery is slower than normal after a brief protective trip. The condition is stable, but the team has kept a local inspection open until the restart pattern returns to baseline.
+
Primary dispatch commitment remains fully covered by live generation and stored reserve.
One site review is waiting on field confirmation before the maintenance note can be closed.
Remote control authority is active for all stations in the current hub scope.
No compliance holds are blocking routine switching or battery balancing actions.
+
Stations Online14
Open Reviews3
Active Crews2
+
+
+
+
Shift Activity
+
Recorded actions and follow-up items for the active operating window.
+
+
+
+
+
+
+
+
Inland station restart varianceRecovery sequence exceeded normal duration
Medium
Storage reserve floor nearing handoff targetBalancing plan may need minor adjustment
Low
Field confirmation pending on breaker inspectionClosure blocked until site response is logged
Medium
+
Approve reserve adjustment noteSubmitted by shift operator
Pending approval
Confirm inland site inspection windowCrew lead requested access hold
Waiting
Close completed switching logControl steps verified by second reviewer
Ready
+
Grid desk accepted updated export positionAcknowledgement logged by dispatch coordinator
Battery balancing sequence completed without exceptionAutomatic control remained within approved limits
Field crew checked access route to inland stationTravel and handoff conditions confirmed
Remote link health check passed across all active sitesNo communication degradation recorded
+
+
+
Readiness Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Dispatch coverage96%
Committed export supported
Storage readiness81%
Reserve held for balancing
Field action closure68%
Open reviews moving toward sign-off
+
Recent Activity
Hub entered balanced operating mode
Control room update
Storage reserve floor adjusted for dispatch window
Shift approval recorded
Inverter restart review opened at inland station
Field follow-up assigned
Export commitment reconfirmed with grid desk
Acknowledgement received
Stations Online14
Open Reviews3
Active Crews2
+
+
+
Use this view to confirm readiness before approving dispatch changes or closing field actions.
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
Execution in focusControl review activeApproval queue open
Track release pacing, exception handling, and approval readiness across active cost centers.
+
+
+
+ Loading view
+ Execution overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
Release performance is broadly on plan, but the remaining blocked amount sits in cases that need manual confirmation. Resolving those records quickly will reduce queue pressure and allow controllers to close the cycle without extending approval coverage.
+
+
+
+
+
+
+
+
+
+
Recent Actions
+
Latest updates from controllers and approvers
+
+
+
+
+
+
+
+
High-value release held for documentation$220K requires source support
Manual adjustment exceeds local thresholdController comment attached
Medium
+
Clear blocked release requests12 records awaiting evidence
In progress
Confirm revised control notes4 items edited by reviewers
Pending
Close approved carryover actions7 ready for posting
Ready
+
Policy exception comment added to release caseBy regional controller
Approval path updated for restricted fundingRouting changed automatically
Supporting file accepted after validationBlocked amount reduced
Commitment request returned for correctionAccount line mismatch found
+
+
Execution Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Release completion92%
Against approved plan
Approval completion81%
All levels combined
Exception clearance64%
Policy and document checks
+
+
+
Controller Notes
+
Most exceptions are tied to account mapping and supporting documentation rather than overspend risk. Teams are being asked to resolve these items before release authority is expanded.
+
Release pacing remains healthy across core operating lines.
Exception volume is concentrated in a small set of manual adjustments.
Senior approval capacity is the main constraint on final clearance.
Control notes have been attached to all blocked items above threshold.
+
Open cases43
Needs review11
Cleared today19
+
Exception Signals
Control postureStable
Approval loadElevated
Release riskManaged
Initial allocation confirmed
Control baseline recorded
Mid-cycle release adjusted
Carryover request applied
Exception review escalated
Policy evidence requested
Final approval window opened
Queue routing updated
+
+
+
Only approved adjustments can move to release. Blocked items remain visible until evidence and sign-off are complete.
+
+
+
+
diff --git a/web_insert/Chart.js/line/chart_0086_line.html b/web_insert/Chart.js/line/chart_0086_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..543556bf020f2a50295e6dafa142631741e321c4
--- /dev/null
+++ b/web_insert/Chart.js/line/chart_0086_line.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T19 Fulfillment Control Center
+
+
+
+
+
+
Monitor outbound flow, clear held orders, and keep dock activity aligned with carrier cutoff commitments.
Outbound volume is moving at a healthy pace, but a growing cluster of held orders is starting to compress the final release window. Most exceptions are concentrated in a small number of picking zones, which means the team can recover service if reviews are completed before the next carrier handoff cycle.
Maya ChenFulfillment Operations Lead
+
Orders ready to release
1,284
Stable after the last verification pass
Orders on hold
73
Most require address or stock confirmation
Dock lanes active
18 / 22
Two lanes reserved for late priority loads
On-time dispatch
96.4%
Holding above internal service target
+
+
+
+ Loading view
+ Outbound release status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most outbound risk is not coming from overall volume; it is coming from a manageable set of held orders that can delay the final handoff sequence if left unresolved. Clearing those exceptions now protects both dock capacity and on-time dispatch.
+
+
+
+
+
+
+
+
Operational Notes
+
Dock activity remains balanced across active lanes, and release discipline is preventing unnecessary trailer dwell. The current focus is to resolve shipment holds in the queue, confirm a small set of short picks, and protect the late priority wave from congestion near final staging.
+
Address validation holds account for the largest share of delayed releases
Priority orders should be cleared before standard replenishment checks resume
Lane reassignment is available if staging volume exceeds the current threshold
Carrier handoff timing remains achievable with active exception review
+
Rush orders146
Review desks open5
Average hold age42m
+
+
+
+
Recent Actions
+
Latest fulfillment events and reviews
+
+
+
+
+
+
+
+
Held orders above control threshold73 orders pending review across three zones
High
Lane 12 staging nearing limitOverflow risk if the next release is not staggered
Medium
Carrier cutoff buffer tighteningPriority loads need final confirmation soon
Medium
+
Clear address validation holdsAssigned to order review desk
In progress
Confirm short pick substitutionsAwaiting floor lead approval
Pending
Protect late priority lane capacityReserve space before final handoff
Scheduled
+
Verification team cleared 22 held ordersQueue pressure eased in the last review cycle
Dock supervisor opened two backup positionsStaging congestion reduced near outbound lanes
Carrier desk confirmed on-time intakeNo change to active handoff sequence
Packing lead flagged repeat scan failuresIssue isolated to one station for follow-up
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Order release completion78%
Released against current outbound plan
Exception resolution63%
Held orders cleared or reassigned
Dock preparation87%
Lanes staffed and staged for handoff
+
Release Activity
Wave release completed
Primary outbound batch moved to final staging
Exception queue escalated
Held orders above review target triggered supervisor attention
Dock lanes rebalanced
Two lanes opened for priority handoff protection
Final verification in progress
Pack confirmation and label checks underway
Rush orders146
Review desks open5
Average hold age42m
+
+
+
Use this view to clear blockers early, protect release timing, and keep dock flow aligned with service commitments.
Coordinate active equipment work, parts readiness, and technician handoff for the current plant queue.
+
+
+
+ Loading view
+ Asset service status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
The main risk is not the volume of open work but the overlap between recurring faults, shared spare parts, and incomplete close-out records. The coordinator is prioritizing jobs that restore stable operation fastest while making sure each completed repair can pass inspection without rework.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest maintenance coordination updates
+
+
+
+
+
+
+
+
Repeat fault on feeder motor requires supervisor reviewLinked to two prior corrective orders
Close-out blocked by missing isolation recordInspection will not release final status
High
+
Approve repair scope for Press Line 2 feederCost review attached by area lead
Pending approval
Confirm staged parts for conveyor coupling replacementMechanical crew waiting at access point
In progress
Return corrected close-out notes to inspectionPhoto evidence and isolation steps required
Needs update
+
Mechanical crew reported safe access at feeder bayField note added 14 min ago
Parts desk reserved seal kit for linked ordersReservation confirmed against active queue
Area lead raised priority on conveyor drive caseOperational impact now classified as elevated
Inspection returned one closure package for revisionMissing verification note in final step
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Priority repairs completed62%
8 of 13 cleared
Parts staging readiness73%
Most critical kits available
Close-out compliance81%
Several packages awaiting final note
+
+
+
Coordination Notes
+
The current focus is keeping high-use assets in service while clearing overdue follow-up work from earlier interventions. Notes, queue status, and technician updates are aligned here so handoff decisions can be made without opening separate records.
+
Three priority jobs share the same hydraulic seal kit and must be sequenced carefully.
Inspection has requested photo confirmation before closing two repeat-failure orders.
One conveyor drive can remain in service under reduced load until replacement stock is issued.
Electrical support is available for lockout review on escalated jobs.
+
On-site crews4
Locked out assets3
Rush requests2
+
Support Readiness
Critical assets online9/10
Awaiting approval4 orders
Parts shortfall2 items
Failure review completed for press feeder
Supervisor approved immediate repair path
Seal kit released from parts crib
Reserved against two linked work orders
Field update posted by mechanical crew
Access cleared and unit isolated
Close-out package returned for correction
Inspection note required before final release
+
+
+
All updates shown here are operational records and must match the approved work order before closure.
+
+
+
+
diff --git a/web_insert/Chart.js/line/chart_0088_line.html b/web_insert/Chart.js/line/chart_0088_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..c939d4bf5a73fc34e240740827ac94ca5de0c636
--- /dev/null
+++ b/web_insert/Chart.js/line/chart_0088_line.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T23 Population Health Surveillance Console
+
+
+
+
+
+
+
+
+
T23
+
+
Public Health Operations
+
Population Health Surveillance Console
+
Cluster Review 18
+
+
+
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
Reporting cycle activeEvidence under reviewSite coverage completeApproval pending
+
+
+
Reporting Summary
Consolidated operational view for facility emissions, evidence readiness, and approval progress across the reporting cycle.
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
+
+
+ Loading view
+ Emissions view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Reporting Note
+
Most reporting work is complete, but the team is holding release until the last boundary clarification and control statement are fully documented. Once those items are closed, the submission can move through approval without further operational changes.
+
+
+
+
+
+
+
+
Reporting Support
+
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
All operated facilities submitted activity data within the active reporting window.
Boundary assumptions were updated after internal control review.
Evidence coverage is complete for direct fuel use and purchased electricity.
Final sign-off is blocked only by unresolved exception responses.
+
Facilities in scope14
Evidence files linked128
Approvers assigned5
+
+
+
+
Review Activity
+
Recent actions tied to the current reporting cycle
+
+
+
+
+
+
+
+
Boundary note requires confirmationShared support load treatment updated by operations
Medium
Exception owner response overdueOne facility comment has not been returned
High
Approval pack awaiting final attachmentControl statement must be added before routing
Low
+
Validate revised allocation methodCheck consistency against facility evidence
In progress
Close open exception itemsCollect responses from assigned owners
Blocked
Route package for sign-offRelease once control statement is attached
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
Monitor enrollment flow, review teaching requests, and keep campus services within response targets.
+
+
+
+ Loading view
+ Enrollment workload
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main pressure point is not overall volume but the number of cases waiting on a second team to confirm eligibility, roster placement, or account release. Clearing those handoffs will reduce repeat contacts and keep approvals moving in the right order.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Recent updates across admissions, scheduling, and support
+
+
+
+
+
+
+
+
Identity check queue exceeded review target14 learner files are outside normal handling time
Access provisioning paused for one intake groupRoster confirmation is still pending from registry
Medium
+
Approve seat exception requestsOwned by academic operations
In progress
Confirm account release listWaiting on final learner verification
Blocked
Close duplicate support casesMerge requests from advising and registry
Ready
+
Registry completed a priority batch reviewOpen count reduced after document validation
Scheduling submitted a conflict noteOne instructor assigned to overlapping sessions
Support added an access exceptionLearner record needs manual activation
Advising returned a hold for correctionProgram selection does not match approved path
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Enrollment validation74%
Most records reviewed; exceptions remain
Teaching assignment approval61%
Conflict cases still under review
Account activation release83%
Waiting on final roster handoff
+
+
+
Support Notes
+
Most exceptions are tied to incomplete learner records and overlapping instructor availability. Team leads are using the queue to clear blocked cases before they affect course readiness and support response times.
+
Admissions is prioritizing records with missing identity checks.
Scheduling is reviewing instructor conflicts before room release.
Support is holding account activation until final roster approval.
Policy notices were updated to reflect new escalation ownership.
+
Escalations7
Owners online12
Blocked cases19
+
Operational Signals
Validation backlogModerate
Seat release paceStable
Access turnaroundAt risk
Intake review opened
Registry triage assigned the latest submission batch
Faculty request escalated
Teaching load conflict moved to academic operations
Roster lock cleared
Student services approved the final exception set
+
+
+
Use this view to coordinate approvals, confirm handoffs, and clear blockers before escalation windows are breached.
+ Active portfolioReview in progressFunding controlsCompliance watch
+
+
+
+
+
+
+
+
Managed
Monitor active studies, pending approvals, funding usage, and cross-team follow-up from one operational view.
The office is managing a mixed portfolio of faculty-led studies, lab collaborations, and student research initiatives. Most work is progressing within approved scope, but a small set of submissions requires administrative response before funds or participant activity can proceed.
Dr. Elaine PorterDirector, Research Administration
+
Open Projects
48
6 awaiting formal approval
Active Funding
$12.4M
Within approved allocation range
Pending Reviews
17
4 require principal investigator response
Policy Exceptions
3
All assigned for follow-up
+
+
+
+ Loading view
+ Project activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Several projects are close to activation, but progress depends on small administrative corrections. Clearing incomplete files and confirming ownership will reduce delay, improve audit readiness, and allow the office to release approved work without further escalation.
+
+
+
+
+
+
+
+
Office Notes
+
Current attention is focused on review completion, documentation quality, and timely coordination between academic units and the central research office. Team leads are using this view to resolve blockers, confirm ownership, and keep each project aligned with internal policy.
+
Approval backlog is concentrated in new submissions with incomplete ethics attachments.
Two high-value projects are waiting on revised budget justification before release.
Records cleanup reduced duplicate sponsor entries across several departments.
Escalations are being routed to unit coordinators for direct follow-up.
+
Units involved11
Cases reassigned5
Records updated23
+
+
+
+
Recent Office Activity
+
Latest updates across approvals, records, and funding control.
+
+
+
+
+
+
+
+
Budget release on holdMissing approval note from finance control
High
Ethics file incompleteParticipant consent language requires revision
Medium
Sponsor record mismatchDepartment entry differs from central register
Low
+
Confirm unit reviewer for pending submissions7 projects without final reviewer assignment
Open
Release approved funding batch2 projects cleared after documentation check
Ready
Close duplicate sponsor recordsFollow-up required across 3 departments
In progress
+
Policy team returned one exception case for clarificationNeeds updated risk statement
Finance control cleared restricted spending lineRelease can proceed after office sign-off
Graduate coordinator added missing investigator credentialsSubmission now eligible for formal review
Unit office confirmed lead contact changeRecords updated for future notices
+
+
+
Portfolio Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Initial screening92%
Most submissions validated
Formal review68%
Backlog concentrated in exception cases
Funding release74%
Delayed by final approval checks
+
Recent Milestones
Portfolio intake closed
New submissions moved to initial screening
Compliance review updated
Exception cases reassigned to policy team
Funding release prepared
Awaiting final sign-off from finance control
Units involved11
Cases reassigned5
Records updated23
+
+
+
Internal use only. Funding, review, and compliance actions must be recorded before project status is changed.
+
+
+
+
diff --git a/web_insert/Chart.js/line/chart_0094_line.html b/web_insert/Chart.js/line/chart_0094_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..35ff4a78698f954dc3841ec6d0d96301210bbf5f
--- /dev/null
+++ b/web_insert/Chart.js/line/chart_0094_line.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T04 Daily Energy Use Report
+
+
+
+
+
+
Operational summary for site load, steam demand, and utility variance across active production lines.
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
+
+
+ Loading view
+ Consumption overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operating Note
+
The current review is centered on whether the elevated water draw should be recorded as expected support usage or escalated as a controllable loss. Early checks support the first view, but the decision will remain open until sanitation records and supervisor confirmation are complete.
+
+
+
+
+
+
+
+
Supervisor Support
+
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
Base electrical load improved after non-process fans were isolated during idle periods.
Compressed air demand stayed even, with no signs of sustained leakage during the late run.
Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
Water variance should be rechecked once final sanitation logs are posted.
+
Open exceptions2
Lines reviewed6/6
Actions due3
+
+
+
+
Completion Progress
+
Status of review and follow-up
+
+
+
+
+
+
+
+
Water use above expected bandPackaging area support services
Medium
Line idle shutdown not confirmedTwo areas missing end-run verification
Low
Final sanitation log still pendingRequired to close variance review
Medium
+
Confirm restart-related water drawOperations supervisor to validate against log entries
In progress
Verify non-process equipment shutdownUtilities team to spot-check idle periods
Queued
Complete site approvalRequired before report closeout
Pending
+
Meter reconciliation completed for main supplyLogged by utilities desk
Maintenance confirmed no active steam issueInspection note added
Cost allocation refreshed for final reviewFinance rule set applied
+
+
+
Assessment
+
No immediate escalation is required, but the site energy lead has asked line supervisors to confirm idle-time shutdown discipline before the next reporting cycle is closed.
+
Meter validation100%
All core readings matched
Variance review68%
Awaiting supporting logs
Management sign-off35%
Ready for supervisor action
+
Key Signals
Load balanceSteady
Utility riskModerate
Approval statePending sign-off
Water intake exceeded the normal operating band during cleaning and restart activity. Review remains open until line notes and final meter confirmation are attached.
+
+
Use this report to confirm variances, assign follow-up, and complete site-level review before closeout.
+ Live TradingStore NetworkPriority Follow-upRevenue Focus
+
+
+
+
+
+
+
Active Oversight
+
Monitor store execution, revenue pacing, stock pressure, and pending actions across the active trading cycle.
+
Trading performance is holding above plan, but momentum is uneven across the network. Flagship locations are carrying the result while several mid-tier stores are slipping on conversion after early demand spikes cleared core inventory.
+
+
+
Maya ChenSales Operations Lead
+
+
+
+
Net Sales
$4.8M
Running ahead of internal target with stronger in-store conversion.
Orders Closed
18,240
Order completion remains stable despite heavier queue volume.
Low Stock SKUs
126
Concentrated in top-selling lines requiring rapid replenishment.
Pending Exceptions
37
Most cases are tied to price overrides and fulfillment holds.
+
+
+
+
+ Loading view
+ Sales command view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Operations leads are using this board to coordinate price checks, stock transfers, and field follow-up. The immediate goal is to protect sell-through on priority lines without creating avoidable margin leakage or unresolved service cases.
+
Price override approvals increased after local markdown requests were reopened.
Transfer requests are highest in stores with strong accessory attachment rates.
Frontline teams need confirmed replenishment windows before issuing customer callbacks.
Regional managers have been asked to clear overdue store notes before next review.
+
Stores Flagged21
Cases Reassigned14
Open Callbacks89
+
+
+
+
+
Execution Activity
+
Store actions and approval movement
+
+
+
+
+
+
+
+
Override approvals approaching threshold12 stores exceeded normal approval volume
High
Core item coverage at riskTop stores reporting low back-room availability
Medium
Store callback backlog buildingCustomer follow-up notes remain open past target
Medium
+
Approve urgent pricing exceptionsSenior review required for margin-sensitive requests
In progress
Confirm transfer receipt with destination storesFollow up on high-demand replenishment moves
Pending
Close unresolved field notesSeveral stores have not updated execution status
Blocked
+
North region cleared three high-value exceptionsApproval cycle shortened after reassignment
Accessory attachment improved in premium storesStore coaching appears to be holding
Transfer requests stabilized after stock releaseMost urgent moves have been acknowledged
Customer callback queue remains unevenService follow-through needs local management review
+
+
+
Lead Note
+
This board supports the daily operating rhythm for sales control, exception handling, and store coordination across the retail network.
+
Conversion PressureElevated
Stock Transfer LoadHigh
Approval ResponseWithin SLA
+
Investigate sales pacing, confirm stock position, and clear open approvals before escalation.
+
+ View note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
Focus Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval clearance78%
Cleared against open exception volume
Transfer completion64%
Confirmed store-to-store movements
Field note closure52%
Resolved execution updates from stores
+
+
+
Use approved actions only. Store-facing updates must match pricing, stock, and service policy before release.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
Receiving activePutaway constrainedDispatch on hold
Monitor inbound receipts, putaway flow, and outbound release from one operating view.
+
+
+
+ Loading view
+ Facility activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main risk is not total volume but timing. Inbound receipts, reserve storage, and outbound release are all connected, so a short delay at dock assignment or packing review quickly affects the rest of the floor. Clearing blocked pallets and reallocating lift coverage should return the site to a steadier operating rhythm.
+
+
+
+
+
+
+
+
+
+
Floor Activity
+
Updated as teams complete receiving, storage, and release steps.
+
+
+
+
+
+
+
+
Dock queue above working limit6 loads waiting longer than target
High
Bulk zone capacity nearing thresholdReserve slots at 93% use
Confirm quarantine release for damaged palletsNeeded before allocation can resume
Waiting approval
Move lift support to west bulk aisleReduce putaway backlog and free dock space
In progress
Validate pick face mismatch listTwo locations causing short picks
Ready
+
Receiving clerk closed two load check-insLane pressure eased slightly
Packing lead flagged carton damage on priority releaseManual review still open
Replenishment team completed fast-move top-offPick continuity improved
Supervisor approved temporary overflow stagingBulk reserve can recover
+
+
Flow Insight
+
Supervisors are reallocating lift support to the bulk zone to free receiving lanes and restore normal replenishment timing.
+
Receiving completion62%
Backlog concentrated at assigned docks
Putaway completion48%
Lift support still below target
Outbound release completion79%
Held orders pending review
+
+
+
Coordinator Notes
+
Most outbound work remains on target, but several releases are paused until damaged-unit reviews and location mismatches are cleared.
+
Dock 4 and Dock 6 are reserved for late carrier arrivals.
Three pallets in quarantine require quality release before stock can be allocated.
Overflow staging is active near the west aisle to prevent receiving backlog.
Cycle count holds remain limited to two pick faces.
+
Open holds11
Active pickers24
Free docks2
+
Exception Signals
Dock availabilityTight
Pick path healthStable
Replenishment paceBehind
Inbound queue reviewed
Dock assignments adjusted for high-volume receipts
Putaway priority updated
Bulk and fast-move lanes moved to top of worklist
Dispatch hold escalated
Packing lead asked to clear damaged carton review
Capacity watch enabled
Reserve zone threshold raised for temporary overflow
+
+
+
Use this console to clear blocked work first, then restore normal flow across receiving and dispatch.
+
+
+
+
diff --git a/web_insert/Chart.js/other/chart_0032_other.html b/web_insert/Chart.js/other/chart_0032_other.html
new file mode 100644
index 0000000000000000000000000000000000000000..648793f09033b00c91e79c58cff09f944b699513
--- /dev/null
+++ b/web_insert/Chart.js/other/chart_0032_other.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
+
+
+
+
diff --git a/web_insert/Chart.js/other/chart_0033_other.html b/web_insert/Chart.js/other/chart_0033_other.html
new file mode 100644
index 0000000000000000000000000000000000000000..824bb2e68f92a49ad5d84f0f126ad30c3be7347a
--- /dev/null
+++ b/web_insert/Chart.js/other/chart_0033_other.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T34 Water Operations Control
+
+
+
+
+
+
+
+
+
+
Live networkShift handoffPriority review
Monitor plant output, service pressure, and field response from one operating view.
+
+
+
+ Loading view
+ Network status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Control Note
+
The active case is no longer expanding, but the team is holding controls in place until all dependent checks are complete. Field, dispatch, and service desk updates should stay aligned so closures do not outpace verified operating conditions.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Operational updates and required follow-up
+
+
+
+
+
+
+
+
Restricted pressure in east zoneCustomer impact limited; monitoring remains active
High
Booster station follow-up duePost-adjustment verification pending from field lead
Medium
Closure approval waitingSupervisor sign-off required on 3 linked work orders
Medium
+
Confirm downstream pressure readingsAssigned to east response crew
In progress
Validate temporary routing planRequired before restriction release
Pending review
Close resolved customer casesService desk waiting on operations note
Ready
+
Dispatch logged stable readings from sector valve setRecent field update
Plant control confirmed output remains on targetOperations note
Service desk tagged 4 cases for combined closureQueue update
Depot issued replacement fittings to mobile crewSupply confirmation
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident containment82%
Awaiting final field confirmation
Work order completion64%
Linked repairs moving through review
Case closure readiness71%
Service notes partially complete
+
+
+
Supervisor Notes
+
The current focus is to keep supply steady across high-demand zones, clear outstanding field confirmations, and close service cases that no longer need escalation. Supervisors are reviewing exceptions before the next handoff.
+
East transmission line remains in controlled operation with no new loss reports.
Two booster stations are running under temporary observation after overnight adjustment.
Customer-facing updates are limited to affected service pockets only.
Repair stock for seals and isolation fittings is available at primary depot.
+
Crews deployed9
Sites under watch4
Pending approvals6
+
Operational Signals
Reservoir balanceNormal
Pump readinessHigh
Field backlogModerate
Pressure deviation flagged
Network monitoring raised an east line variance and opened incident review.
Field isolation confirmed
Local crew secured the affected segment and reported stable downstream flow.
Supervisor review in progress
Operations lead is validating closure conditions before releasing restrictions.
+
+
+
Use confirmed field updates before changing service classification or closing a case.
Track specimen intake, instrument readiness, review holds, and release validated results from one controlled queue.
+
+
+
+ Loading view
+ Specimen flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Current delays are not caused by intake volume but by a narrow cluster of held results that need repeat confirmation and signed reviewer rationale. Once those cases are closed, the release queue should return to normal pace.
+
+
+
+
+
+
+
+
+
+
Validation Activity
+
Latest laboratory actions and review updates
+
+
+
+
+
+
+
+
Quality hold threshold reachedChemistry lane 7 held results
High
Instrument maintenance window dueHematology bench service reminder
Complete supervisory sign-off for held chemistry cases24 items in review queue
In progress
Verify rerun documentation before release5 specimens require note completion
Pending
Confirm analyzer readiness after resetPost-interruption checks still open
Waiting confirmation
+
Accession team cleared label exceptionMatched specimen and order records
Reviewer added comment to held electrolyte panelAwaiting repeat outcome
Bench lead reassigned overflow workCapacity balanced across active stations
Final result packet released to care teamAudit trail completed
+
+
Throughput Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Accessioning completion92%
Most inbound samples logged and routed
Validation review68%
Routine cases moving faster than held work
Quality documentation81%
Remaining notes tied to reruns and holds
+
+
+
Escalation Notes
+
Supervisors are balancing turnaround targets with quality controls, making sure reruns, delta checks, and documentation updates are completed before any final authorization.
+
Priority samples are routed directly to staffed benches.
Held results require either repeat testing or reviewer comment.
Release activity is limited to validated work with complete audit notes.
+
Released today143
Open holds7
Assigned reviewers9
+
Bench Signals
Pending accession checks12
Benches at capacity2
Reruns in progress5
Intake batch reconciled
Analyzer lane reset
Senior review started
Release queue narrowed
+
+
+
All releases must include reviewer confirmation and complete traceability.
Post-run assessment for the last completed checkout messaging experiment, including impact, rollout decision, and follow-up actions.
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
+
+
+ Loading view
+ Experiment results
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Analyst Note
+
The result is not only statistically reliable but also operationally clean. Teams reviewing payment quality, support demand, and buyer behavior did not identify a counter-signal large enough to block release, which makes this a suitable candidate for default rollout with normal monitoring.
+
+
+
+
+
+
+
+
Review Notes
+
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
Primary goal was improved checkout completion.
Guardrails covered payment success, cancellation intent, and support contact rate.
Result supports rollout with standard monitoring.
Follow-up work should focus on first-time buyer reassurance.
+
Control share50%
Variant share50%
Guardrails passed3/3
+
+
+
+
Recent Activity
+
Latest review updates and decision steps
+
+
+
+
+
+
+
+
Release approval pendingRequires product and operations sign-off
Medium
Follow-up test not yet scopedFirst-time buyer segment showed the strongest response
Low
Monitoring handoff requiredPost-release checks must be assigned before launch
Medium
+
Confirm rollout ownerRelease coordination for default experience
Open
Document final decisionAdd rationale to the experiment record
In progress
Prepare follow-up briefDraft next test for delivery reassurance
Not started
+
Data review completed by analyticsNo variance issues found in conversion events
Support lead confirmed stable contact volumeNo increase tied to variant exposure
Product owner attached final recommendationPromote Variant B with standard guardrails
Release coordinator requested approval windowDecision needed before deployment planning
+
+
+
Key Insight
+
The operational recommendation is to promote Variant B to the default experience, keep the current guardrails in place, and open a follow-up test on supporting text near delivery expectations.
+
Review completion92%
Only final approval remains
Release readiness84%
Monitoring and ownership still being confirmed
Follow-up planning36%
Next hypothesis not fully defined
+
Quality Signals
Audience balanceWithin tolerance
Tracking integrityVerified
Release readinessApproved pending sign-off
Control used the existing confirmation message. Variant B used shorter supporting language focused on confidence before purchase.
+
+
Rollout should begin with standard monitoring and a hold point if payment reliability moves outside normal range.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
Review inbound pitches, assign editorial follow-up, and keep the publication queue moving with clear ownership.
+
+
+
+ Loading view
+ Selection queue
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
Several strong submissions are moving forward at the same time, but the desk is losing time when ownership is unclear after approval. Tightening assignment rules here will reduce back-and-forth, speed contributor replies, and help section editors focus on pieces they are ready to develop.
+
+
+
+
+
+
+
+
+
+
Desk Activity
+
Latest review and assignment actions
+
+
+
+
+
+
+
+
Two approved pitches still have no ownerCleared in review but not accepted by a section editor
High
Standards check requested on a sensitive angleHold response until review note is returned
Medium
Contributor waiting on revision guidanceInitial feedback sent without a named follow-up editor
Medium
+
Confirm final owner for the education feature pitchShared interest across two sections
In progress
Send decline notes for out-of-scope submissionsReady after lead review
Ready
Close duplicate entry group and keep strongest versionThree related submissions from separate contributors
Blocked
+
Lead editor requested a tighter angle before commissionAdded to the top priority pitch
Assignment returned after capacity check failedSection owner asked for reassignment
Contributor replied with revised framing noteReady for second pass
Duplicate tag removed after manual comparisonSubmission can continue through normal review
+
+
Operational Insight
+
The current operating goal is simple: reduce duplicate review, assign one accountable editor to each viable pitch, and keep contributors informed before follow-up goes cold.
+
First-pass review78%
Most inbound items have initial editorial tags
Ownership assignment61%
Several approved pitches still need a named editor
Contributor replies84%
Outcome messages are nearly caught up
+
+
+
Contributor Support
+
Most delays are no longer in intake. The main bottleneck is editorial ownership after a pitch passes first review, especially when more than one section wants to claim the same idea.
+
Flag near-duplicate submissions before they reach senior review.
Move approved ideas into one owner queue with a clear response deadline.
Keep contributor communication consistent when a pitch is held, revised, or declined.
Surface sensitive topics for legal or standards review before commissioning.
+
Held11
Revisions requested14
Declines sent32
+
Operational Signals
Duplicate riskModerate
Standards review3 items pending
Editor capacityTight
Intake sweep completed
New submissions were normalized, deduplicated, and tagged by desk.
Senior review pass
Borderline pitches were escalated for direction on fit and urgency.
Assignment round
Approved items were matched to editors with open capacity.
Contributor follow-up
Reply notes were prepared for hold, revise, and decline outcomes.
+
+
+
Use one final outcome per pitch so downstream assignment and contributor replies stay aligned.
+ Live DispatchPriority LoadsDriver CoverageGate Readiness
+
+
+
+
+
+
+
Active monitoring
+
Coordinate active routes, rebalance drivers, and clear open exceptions from one operating view.
+
Dispatch is managing a tight operating window with several outbound runs stacked behind the same gate sequence. The team has already reallocated available units to protect higher-priority moves and reduce idle time at the yard.
+
+
+
Maya BennettFleet Dispatch Lead
+
+
+
+
Units in motion
148
12 reassigned during the current shift
Open route holds
9
Most tied to late gate release
Coverage gap
4
Backfill requested for long-haul lanes
On-time departure
93%
Holding steady after yard balancing
+
+
+
+
+ Loading view
+ Route coordination
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Most unresolved issues now sit between driver readiness and release timing. Supervisors are using this panel to confirm who can be reassigned, which routes need escalation, and where a short delay will create a downstream coverage gap.
+
Three priority loads were moved to alternate tractors to avoid missed departure targets.
Driver check-in compliance improved after direct follow-up from the shift desk.
Yard staging remains constrained near outbound lanes with refrigerated equipment.
+
Standby drivers6
Held departures9
Ready tractors22
+
+
+
+
+
Recent Activity
+
Latest dispatch actions and route decisions
+
+
+
+
+
+
+
+
Gate release delay affecting priority runLane B12 Waiting 18 min
High
Driver rest window blocks reassignmentLong-haul pool 2 units impacted
Medium
Trailer pairing mismatch in yard queueOutbound side Manual check required
Medium
+
Confirm backup operator for north corridor runDispatch desk request
In progress
Approve swap for delayed refrigerated unitRequires lead signoff
Pending
Close completed hold after gate clearanceRoute ready for release
Ready
+
Yard team confirmed two lanes cleared for outbound stagingPosted by yard control
Driver support updated availability for standby poolCoverage adjusted
Priority load reassignment accepted by route supervisorNo further approval needed
Fuel stop exception removed from active reviewDispatch note closed
+
+
+
Lead Note
+
The team is working through a compressed release window where small delays at the yard can quickly reduce route coverage. This view helps dispatch leads decide where to reassign equipment, push approvals, and keep priority movements on schedule.
+
Dispatch healthStable with exceptions
Driver readinessNear full coverage
Yard congestionElevated at outbound side
+
Priority lanes are protected, but remaining open holds need confirmation from yard and driver teams before release.
+
+ Open note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
Operating Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Route release completion78%
Based on active outbound plan
Driver assignment coverage91%
Remaining gap on long-haul lanes
Exception clearance64%
Open holds trending down
+
+
+
Use route reassignment only after confirming gate availability and driver hours.
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
Validate remediation evidencePriority cases waiting for document match
Pending
Prepare sign-off packReady after final ownership confirmation
Blocked
+
Escalation comment added to override reviewPosted by control reviewer
Case ownership transferred to assurance leadRouting rule applied
Closure note revised for policy wordingApproval language standardized
Supporting file attached to priority caseAwaiting reviewer acceptance
+
+
+
Risk Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Exception review72%
Most standard cases assessed
Evidence validation58%
Backlog remains in escalated items
Final sign-off41%
Dependent on ownership confirmation
+
Recent Case Events
Override cluster flagged
Rule threshold crossed in payment approval flow
Reviewer reassignment completed
Ownership aligned to finance controls team
Evidence request issued
Supporting records requested from local approvers
Escalation queue updated
High-risk items moved for priority handling
Awaiting action23
Reassigned11
Closed today9
+
+
+
Use approved closure language and attach supporting evidence before final sign-off.
+
+
+
+
diff --git a/web_insert/Chart.js/scatter/chart_0051_scatter.html b/web_insert/Chart.js/scatter/chart_0051_scatter.html
new file mode 100644
index 0000000000000000000000000000000000000000..832143a1076d4d49e8c2d1c02e3c58b5d38e7297
--- /dev/null
+++ b/web_insert/Chart.js/scatter/chart_0051_scatter.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T14 Store Stock Control
+
+
+
+
+
+
+
+
+
+
Live stockReplenishment reviewHold resolution
Track replenishment risk, release held inventory, and keep shelf availability aligned across active locations.
+
+
+
+ Loading view
+ Location stock position
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main concern is not total network stock but timing. Several locations can return to normal selling levels once held units are cleared and transfer approvals are issued in the right order. Teams are using this view to keep store demand, receiving capacity, and release controls aligned.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Latest stock handling and release steps
+
+
+
+
+
+
+
+
Count mismatch blocking release12 item lines remain held after store recount
High
Priority location below cover targetReplenishment risk increased across 4 stores
Medium
Receiving backlog nearing thresholdInbound confirmation lag may delay availability updates
Medium
+
Approve transfer batch for thin-cover stores29 lines prepared by distribution planning
Ready
Confirm held quantities against recount notes74 units waiting on store validation
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Hold review completion68%
Most flagged lines have first-pass decisions
Transfer approval completion54%
Awaiting release order from control lead
Count reconciliation73%
Repeat variance stores still under review
+
+
+
Operational Notes
+
this workflow supports the daily decision flow: identify where cover is too thin, confirm whether held stock can be released, and route transfer lines to the locations with the highest service risk. Notes and queue items below reflect the current handoff between store control, distribution, and floor operations.
+
Prioritize releases for locations with same-day shelf risk.
Delay nonessential transfers until held quantities are verified.
Escalate repeated count mismatches to store control leads.
Keep transfer approvals aligned with receiving capacity.
+
Priority stores11
Open holds18
Ready transfers7
+
Network Signals
Service riskElevated
Receiving pressureModerate
Approval backlogContained
Cycle count exceptions reviewed
Store control completed first-pass review on flagged lines.
Transfer requests consolidated
Low-cover locations were grouped for a single approval pass.
Held stock release pending
Distribution is waiting for final quantity confirmation.
+
+
+
Use release actions only after count confirmation is recorded in the item note.
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
+ Active flightPriority reviewShared budgetStore traffic
+
+
+
+
+
+
+
+
Needs review
Track active retail promotions, review pacing risks, and keep launch approvals moving across paid channels.
This overview brings campaign owners, channel leads, and reviewers into one operating view for retail promotion activity. The focus is on release readiness, pacing discipline, and fast resolution when a campaign drifts outside its approved plan.
Avery NolanMarketing Operations Lead
+
Active campaigns
18
3 awaiting final release
Planned spend
$426K
Within current budget guardrail
Projected return
4.8x
Lift driven by repeat buyer segments
Creative compliance
92%
Remaining items need legal copy review
+
+
+
+ Loading view
+ Campaign performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
Current risk is concentrated in a small number of high-visibility promotions that are close to release but still depend on approval cleanup. Clearing those items will allow the team to open budget safely without creating rework for channel operations or compliance.
+
+
+
+
+
+
+
+
Operational Notes
+
Most campaigns are moving as expected, but a small group requires attention before budget can be fully opened. The current work centers on copy approval, audience overlap checks, and confirming that regional exclusions are applied before wider rollout.
+
Priority campaigns are grouped for same-day review by channel operations.
Budget adjustments require owner confirmation and finance-safe pacing limits.
Audience rule changes remain blocked until compliance notes are cleared.
Store traffic campaigns receive higher escalation when release windows narrow.
+
Queued reviews9
Open exceptions4
Released today5
+
+
+
+
Team Activity
+
Recent decisions and release changes
+
+
+
+
+
+
+
+
Copy exception still open for priority placementOwner response pending
High
Audience overlap exceeds internal thresholdShared budget campaign group
Medium
Regional exclusion missing from one launch setStore traffic promotion
Medium
+
Approve revised launch copyAssigned to compliance reviewer
In progress
Confirm pacing cap for shared budget groupRequested by channel lead
Pending
Validate excluded regions before releaseRequired for final activation
Ready
+
Budget guardrail updated for priority promotionRecorded by finance operations
Audience rule revision submittedWaiting for approval
Channel owner added release noteEscalation removed after review
Compliance returned one asset for editsCopy needs location disclaimer
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval completion74%
Most high-spend items already reviewed
Budget allocation68%
Remaining spend held behind final checks
Release readiness81%
Operational setup nearly complete
+
Release Flow
Intake completed
Briefs and spend limits confirmed
Review in progress
Compliance and audience checks underway
Release window
Approved campaigns move to channel activation
Queued reviews9
Open exceptions4
Released today5
+
+
+
Use this view to resolve blockers before expanding spend or opening additional channel coverage.
Editorial interpretation, policy check, and release readiness for a high-traffic article package.
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
+
+
+ Loading view
+ Article review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
The item remains on hold because reviewers want the final article to state only what can be supported directly in the reporting record. Once the headline and two interpretive passages are revised, the last policy note can be closed and the release team can complete handoff without reopening the brief.
+
+
+
+
+
+
+
+
Editorial Support Notes
+
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
Tighten the headline so it reflects verified reporting only
Rework two interpretive lines in the middle section
Confirm attribution order in the closing paragraph
Keep the release hold in place until policy notes are cleared
+
Linked notes12
Required edits3
Approvals2/3
+
+
+
+
Recent Activity
+
Latest actions across review, policy, and release handling.
+
+
+
+
+
+
+
+
Policy sign-off still openRelease cannot proceed until the final comment is resolved
High
Headline wording exceeds source certaintyDesk requested a narrower phrasing pass
Medium
Closing attribution order changedLatest revision needs reviewer confirmation
Low
+
Apply marked language editsThree passages require direct revision
Prepare release handoffQueue placement is ready once approval lands
Queued
+
Desk review updated with narrowed wording requestAdded by editorial review
Policy note linked to middle section passageMapped to required edit
Release hold confirmed by operationsQueue position preserved
Final pass assigned to senior reviewerAwaiting consolidated response
+
+
+
Reading Insight
+
Operations has held the item in the final queue so the desk can complete one coordinated pass rather than resolve comments in isolation. this workflow is intended to keep editors, policy reviewers, and release staff on the same record while the article moves through its last approval step.
+
Editorial review88%
Most text decisions are settled
Policy clearance67%
One required note remains
Release handoff54%
Prepared but not cleared
+
Release Signals
Attribution strengthNeeds tightening
Headline alignmentUnder revision
Release readinessPending approval
Final release depends on one policy approval and completion of marked language edits.
+
+
Use the same review record when updating wording, approvals, and release handling to avoid duplicate decisions.
Review account health, retention risk, and pending interventions for active customer segments.
+
+
+
+ Loading view
+ Active user case flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current queue reflects a concentrated effort to retain users who showed intent but encountered friction during critical account steps. Teams are expected to document every outreach attempt, confirm ownership before escalation, and close only when the account is either stable or formally transferred for continued monitoring.
+
+
+
+
+
+
+
+
+
+
Case Activity
+
Recent decisions and follow-up movement
+
+
+
+
+
+
+
+
High-value account awaiting decisionNo final disposition recorded after manual review
High
Outreach backlog risingFollow-up queue has crossed internal response target
Medium
Exception note incompletePolicy-sensitive case missing approval rationale
Medium
+
Confirm owner coverage for priority cases7 cases without confirmed handoff
In progress
Complete callback verificationPending contact outcomes need final status
Queued
Close resolved onboarding reviewsCases meet closure conditions after successful recovery
Ready
+
Owner updated on priority reviewRouting changed after shift handoff
Manual decision recordedCase moved from hold to monitor
Risk flag clearedActivity recovered after intervention
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Queue clearance72%
Handled against current intake
Outreach completion64%
Priority contacts sent and logged
Approval coverage89%
Cases with complete decision trail
+
+
+
Operational Notes
+
Current activity is centered on a rise in support-linked retention risk. Several accounts were routed into manual review after repeated onboarding exits, failed self-service recovery, or policy-sensitive changes that require a documented decision.
+
High-priority cases are routed to named owners before outreach begins.
Accounts with repeat friction stay in review until next-step evidence is recorded.
Policy exceptions require a reason code and final approval note.
+
Active owners16
Cases on hold12
Recovered users31
+
Review Signals
Escalation rate11%
Policy exceptions9
Pending callbacks22
Risk rule triggered
Account entered review after repeated drop-off behavior
Operations review started
Owner assigned and contact path confirmed
User contacted
Follow-up sent with recovery guidance and next action
Decision logged
Case moved to monitor, close, or escalate
+
+
+
Access, contact history, and policy decisions are recorded for audit review.
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
Post-route summary for the latest dispatch cycle, focusing on late handoff recovery, depot coordination, and proof-of-delivery completion.
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
+
+
+ Loading view
+ Route performance view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
This review is being used to decide whether dispatch should adopt a standard delay-recovery playbook for mixed-stop runs. The current response relied on experienced staff making quick route adjustments, which worked in this case but may not scale without clearer depot release rules and a required outreach log for affected stops.
+
+
+
+
+
+
+
+
Support Notes
+
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
Departure drift started at the depot gate after loading lane congestion.
Manual reprioritization reduced missed arrival commitments on dense urban segments.
Proof-of-delivery capture improved after drivers were reminded to close stops before returning.
Two exception cases remain open pending package condition review.
+
Resequenced routes7
Support calls placed23
Returns held2
+
+
+
+
Recent Activity
+
Updates recorded during issue containment and closure review.
+
+
+
+
+
+
+
+
Proof mismatch on return scan2 consignments need depot confirmation
Medium
Loading lane congestion repeatedObserved across early dispatch wave
High
Customer contact note missing1 delayed stop closed without outreach log
Low
+
Validate open claims with depot supervisorAttach condition notes and return scans
In progress
Document route resequencing rulePrepare for dispatch handbook update
Pending
Close driver note reviewConfirm repeated gate delay comments
Ready
+
Driver team acknowledged revised stop orderField update logged by support desk
Depot supervisor added lane usage noteRoot cause linked to overlap during loading release
Customer service cleared outreach backlogAll affected recipients received status calls
The review focus is on whether the corrective actions used by the team should become standard practice for future mixed-stop routes with tight loading turnover.
+
Exception closure78%
Most delivery issues resolved in the same cycle
Driver note review64%
Comments grouped by route segment
Depot corrective action41%
Lane balancing plan awaiting sign-off
+
Field Signals
Route adherenceStable after intervention
Depot readinessNeeds lane balancing
Customer contact coverageAbove target
Opened after repeated departure slippage affected downstream stop timing and closure quality.
+
+
Internal review record for route performance follow-up and process adjustment.
Coordinate intake, review, and resolution for active public service requests across district teams.
+
+
+
+ Loading view
+ Request handling
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Demand remains manageable overall, but manual verification is creating uneven wait times between offices. Supervisors are prioritizing clean approvals, redirecting exception work to trained reviewers, and keeping resident communication tied closely to documented case decisions.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest actions across intake, review, and approval teams.
+
+
+
+
+
+
+
+
Approval queue nearing response limit8 requests need supervisor action within the service window
High
Identity mismatch rate increasedManual checks are slowing intake clearance in two offices
Medium
Returned submissions require follow-upResidents have not responded on 14 incomplete requests
Low
+
Clear specialist review backlogReassign exception cases from general intake
In progress
Approve release batchDecision notes are complete and ready for sign-off
Ready
Validate returned documentsCheck corrected records before reopening requests
Queued
+
North district accepted three escalated casesOwnership transferred from central review
Resident notice batch released after approvalNotifications sent for completed decisions
Compliance note added to exception handling rulesReview teams must record reason codes on manual overrides
Intake team cleared duplicate submissionsMerged records reduced queue noise for active requests
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Intake review72%
Most new submissions screened and routed
Eligibility verification54%
Manual checks remain the slowest step
Decision release81%
Approved cases moving out on schedule
+
+
+
Supervisor Notes
+
A review backlog has formed around eligibility checks that require manual confirmation. Supervisors are balancing faster routing with compliance controls so straightforward requests can move forward while exceptions remain documented and ready for audit.
+
Priority requests are held for direct supervisor review when identity or address records do not match.
Field offices can return incomplete submissions to intake without closing the case.
Resident notifications are released only after decision notes and supporting checks are complete.
Escalated items remain visible until ownership is accepted by the receiving team.
+
Avg. handling time2.8h
Returned to intake27
Supervisor holds11
+
Queue Health
Service levelStable
Review capacityTight
Escalation loadModerate
Intake queue reviewed
Initial screening completed for newly received submissions
Eligibility exceptions routed
Cases with missing verification moved to specialist review
Supervisor approvals issued
Approved requests released for resident notice and fulfillment
+
+
+
Access, routing, and decision history are logged for compliance review.
+ Active shiftRelease pendingLab verifiedEscalation open
+
+
+
+
+
+
+
+
Review in progress
Monitor active inspections, isolate nonconforming lots, and keep release decisions aligned across line, lab, and dispatch teams.
This overview is used by inspection leads to track open quality cases from first check through release decision. It brings together line findings, lab confirmation, hold status, and reviewer actions so each lot can move forward with a clear record.
Erin ColeQuality Assurance Lead
+
Lots under review
18
4 require supervisor sign-off
Pass rate
96.8%
Stable against control threshold
Items on hold
7
Awaiting disposition or retest
Average closure time
2.6h
Down after revised sampling steps
+
+
+
+ Loading view
+ Inspection activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A narrow group of nonconforming lots is driving most of the queue. The team has already isolated affected stock and limited release access, so the immediate focus is on finishing lab confirmation, recording final disposition, and clearing unaffected material without breaking traceability.
+
+
+
+
+
+
+
+
Coordination Notes
+
The current workload is concentrated on final assembly output where a small group of lots failed appearance and torque checks. Most cases are moving normally, but a limited set remains blocked while the team confirms whether rework is acceptable or a full containment action is needed.
+
Two lots were moved from routine review to controlled hold after repeat defects were confirmed at receiving check.
Lab confirmation has cleared one previously blocked lot for release with added inspection notes.
Dispatch has been asked not to allocate stock from any case marked pending disposition.
+
Open holds7
Retests due3
Approved releases11
+
+
+
+
Recent Actions
+
Latest updates across inspection, hold, and release handling.
+
+
+
+
+
+
+
+
Repeat defect pattern detectedThree related cases linked to the same source batch
High
Approval waiting on lab noteRelease decision cannot close until confirmation is attached
Medium
Containment nearing limitReserved hold area is close to capacity
Medium
+
Review pending disposition cases7 cases require lead decision
In progress
Confirm retest sampling planApplies to two blocked lots
Queued
Close cleared release recordsDocumentation ready for final update
Ready
+
Line inspector added a deviation noteAttached to lot under controlled hold
Lab result accepted by reviewerCase moved back to release check
Containment list updatedStock location confirmed for isolated units
Dispatch restriction acknowledgedOutbound allocation blocked for pending lots
+
+
+
Inspection Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion82%
Most scheduled checks are recorded
Disposition closure61%
Open exceptions still under review
Release documentation74%
Awaiting final sign-off on held lots
+
Case Progress
Inbound sample logged
Initial inspection record created
Deviation confirmed
Case routed to quality lead
Containment applied
Affected stock isolated from release
Disposition pending
Awaiting final approval
Open holds7
Retests due3
Approved releases11
+
+
+
Only approved dispositions can clear held material for release.
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
+
+
+
+
diff --git a/web_insert/Highcharts/bar/chart_0035_bar.html b/web_insert/Highcharts/bar/chart_0035_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..4a343dd6be8724e7c2117cf8448e520cdfe75a3f
--- /dev/null
+++ b/web_insert/Highcharts/bar/chart_0035_bar.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T28 Municipal Service Bulletin
+
+
+
+
+
+
+
+
Internal circulationT28
+
Municipal Service Bulletin
+
Streetlight outage follow-up
+
Open bulletinCross-departmentAction required
+
+
+
Bulletin Summary
Operational notice and response summary for active public service issues requiring coordinated review.
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
+
+
+ Loading view
+ Service handling overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
Several matters remain open not because field action has stopped, but because the written record is incomplete or inconsistent across offices. Staff should treat documentation quality, ownership clarity, and response accuracy as equal to operational completion before moving any item to closed status.
+
+
+
+
+
+
+
+
Review Support
+
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
Confirm that each accepted notice has one accountable handling unit.
Reconcile field completion remarks with the official reply draft.
Flag cases where repeat contact suggests ineffective local closure.
Hold final release for items lacking signed verification.
+
Escalated3
Awaiting reply5
Returned for revision4
+
+
+
+
Recent Activity
+
Latest handling updates across the bulletin
+
+
+
+
+
+
+
+
Repeated contact on one closed itemClosure note conflicts with latest resident submission
High
Verification file missing from district replyEvidence not attached to the handling record
Medium
Approval wording exceeds service standardReply language requires simplification before release
Low
+
Confirm ownership for unresolved site restoration itemAwaiting district office acknowledgment
Open
Complete evidence check for resolved service interruption caseField note submitted without signed confirmation
In review
Approve final reply language for public releaseDraft prepared by coordination desk
Pending approval
+
District office updated handling noteOwnership confirmed and local follow-up arranged
Service unit returned revised reply draftLanguage adjusted to match verified field action
Supervisory office requested clarificationAsked whether the item meets closure conditions
Coordination desk logged resident repeat contactMatter retained in active bulletin
+
+
+
Review Insight
+
Teams are asked to confirm ownership, update response wording, and close record gaps before the next routing step. Any item with unresolved accountability or incomplete evidence should remain in controlled review rather than be marked complete.
+
Case verification76%
Most evidence checks completed
Reply drafting68%
Several items still under wording review
Final clearance41%
Held until all high-priority issues are confirmed
+
Coordination Signals
Priority routeJoint review
Public impactModerate
Release stateHeld for clearance
Local office reported restoration, but resident contact records indicate the issue may persist at the reported location.
+
+
Use this bulletin as the working record for approvals, response checks, and inter-office follow-up until all listed matters are either cleared or formally transferred.
+ Live DispatchPriority LoadsDriver CoverageGate Readiness
+
+
+
+
+
+
+
Active monitoring
+
Coordinate active routes, rebalance drivers, and clear open exceptions from one operating view.
+
Dispatch is managing a tight operating window with several outbound runs stacked behind the same gate sequence. The team has already reallocated available units to protect higher-priority moves and reduce idle time at the yard.
+
+
+
Maya BennettFleet Dispatch Lead
+
+
+
+
Units in motion
148
12 reassigned during the current shift
Open route holds
9
Most tied to late gate release
Coverage gap
4
Backfill requested for long-haul lanes
On-time departure
93%
Holding steady after yard balancing
+
+
+
+
+ Loading view
+ Route coordination
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Most unresolved issues now sit between driver readiness and release timing. Supervisors are using this panel to confirm who can be reassigned, which routes need escalation, and where a short delay will create a downstream coverage gap.
+
Three priority loads were moved to alternate tractors to avoid missed departure targets.
Driver check-in compliance improved after direct follow-up from the shift desk.
Yard staging remains constrained near outbound lanes with refrigerated equipment.
+
Standby drivers6
Held departures9
Ready tractors22
+
+
+
+
+
Recent Activity
+
Latest dispatch actions and route decisions
+
+
+
+
+
+
+
+
Gate release delay affecting priority runLane B12 Waiting 18 min
High
Driver rest window blocks reassignmentLong-haul pool 2 units impacted
Medium
Trailer pairing mismatch in yard queueOutbound side Manual check required
Medium
+
Confirm backup operator for north corridor runDispatch desk request
In progress
Approve swap for delayed refrigerated unitRequires lead signoff
Pending
Close completed hold after gate clearanceRoute ready for release
Ready
+
Yard team confirmed two lanes cleared for outbound stagingPosted by yard control
Driver support updated availability for standby poolCoverage adjusted
Priority load reassignment accepted by route supervisorNo further approval needed
Fuel stop exception removed from active reviewDispatch note closed
+
+
+
Lead Note
+
The team is working through a compressed release window where small delays at the yard can quickly reduce route coverage. This view helps dispatch leads decide where to reassign equipment, push approvals, and keep priority movements on schedule.
+
Dispatch healthStable with exceptions
Driver readinessNear full coverage
Yard congestionElevated at outbound side
+
Priority lanes are protected, but remaining open holds need confirmation from yard and driver teams before release.
+
+ Open note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
Operating Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Route release completion78%
Based on active outbound plan
Driver assignment coverage91%
Remaining gap on long-haul lanes
Exception clearance64%
Open holds trending down
+
+
+
Use route reassignment only after confirming gate availability and driver hours.
+
+
+
+
diff --git a/web_insert/Highcharts/bar/chart_0037_bar.html b/web_insert/Highcharts/bar/chart_0037_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..8e4763a9ddf0fdef74b0013de8b8ffa45af7d25d
--- /dev/null
+++ b/web_insert/Highcharts/bar/chart_0037_bar.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T23 Population Health Surveillance Console
+
+
+
+
+
+
+
+
+
T23
+
+
Public Health Operations
+
Population Health Surveillance Console
+
Cluster Review 18
+
+
+
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
+
+
+
+
diff --git a/web_insert/Highcharts/bar/chart_0038_bar.html b/web_insert/Highcharts/bar/chart_0038_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..d2581da4b72dfacebb0b16afc7c5a5fbe654c57a
--- /dev/null
+++ b/web_insert/Highcharts/bar/chart_0038_bar.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T14 Store Stock Control
+
+
+
+
+
+
+
+
+
+
Live stockReplenishment reviewHold resolution
Track replenishment risk, release held inventory, and keep shelf availability aligned across active locations.
+
+
+
+ Loading view
+ Location stock position
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main concern is not total network stock but timing. Several locations can return to normal selling levels once held units are cleared and transfer approvals are issued in the right order. Teams are using this view to keep store demand, receiving capacity, and release controls aligned.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Latest stock handling and release steps
+
+
+
+
+
+
+
+
Count mismatch blocking release12 item lines remain held after store recount
High
Priority location below cover targetReplenishment risk increased across 4 stores
Medium
Receiving backlog nearing thresholdInbound confirmation lag may delay availability updates
Medium
+
Approve transfer batch for thin-cover stores29 lines prepared by distribution planning
Ready
Confirm held quantities against recount notes74 units waiting on store validation
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Hold review completion68%
Most flagged lines have first-pass decisions
Transfer approval completion54%
Awaiting release order from control lead
Count reconciliation73%
Repeat variance stores still under review
+
+
+
Operational Notes
+
this workflow supports the daily decision flow: identify where cover is too thin, confirm whether held stock can be released, and route transfer lines to the locations with the highest service risk. Notes and queue items below reflect the current handoff between store control, distribution, and floor operations.
+
Prioritize releases for locations with same-day shelf risk.
Delay nonessential transfers until held quantities are verified.
Escalate repeated count mismatches to store control leads.
Keep transfer approvals aligned with receiving capacity.
+
Priority stores11
Open holds18
Ready transfers7
+
Network Signals
Service riskElevated
Receiving pressureModerate
Approval backlogContained
Cycle count exceptions reviewed
Store control completed first-pass review on flagged lines.
Transfer requests consolidated
Low-cover locations were grouped for a single approval pass.
Held stock release pending
Distribution is waiting for final quantity confirmation.
+
+
+
Use release actions only after count confirmation is recorded in the item note.
+
+
+
+
diff --git a/web_insert/Highcharts/bar/chart_0039_bar.html b/web_insert/Highcharts/bar/chart_0039_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..16c434311cfa5d502ab8dc1c34fb181d01dc8c08
--- /dev/null
+++ b/web_insert/Highcharts/bar/chart_0039_bar.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T19 Fulfillment Control Center
+
+
+
+
+
+
Monitor outbound flow, clear held orders, and keep dock activity aligned with carrier cutoff commitments.
Outbound volume is moving at a healthy pace, but a growing cluster of held orders is starting to compress the final release window. Most exceptions are concentrated in a small number of picking zones, which means the team can recover service if reviews are completed before the next carrier handoff cycle.
Maya ChenFulfillment Operations Lead
+
Orders ready to release
1,284
Stable after the last verification pass
Orders on hold
73
Most require address or stock confirmation
Dock lanes active
18 / 22
Two lanes reserved for late priority loads
On-time dispatch
96.4%
Holding above internal service target
+
+
+
+ Loading view
+ Outbound release status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most outbound risk is not coming from overall volume; it is coming from a manageable set of held orders that can delay the final handoff sequence if left unresolved. Clearing those exceptions now protects both dock capacity and on-time dispatch.
+
+
+
+
+
+
+
+
Operational Notes
+
Dock activity remains balanced across active lanes, and release discipline is preventing unnecessary trailer dwell. The current focus is to resolve shipment holds in the queue, confirm a small set of short picks, and protect the late priority wave from congestion near final staging.
+
Address validation holds account for the largest share of delayed releases
Priority orders should be cleared before standard replenishment checks resume
Lane reassignment is available if staging volume exceeds the current threshold
Carrier handoff timing remains achievable with active exception review
+
Rush orders146
Review desks open5
Average hold age42m
+
+
+
+
Recent Actions
+
Latest fulfillment events and reviews
+
+
+
+
+
+
+
+
Held orders above control threshold73 orders pending review across three zones
High
Lane 12 staging nearing limitOverflow risk if the next release is not staggered
Medium
Carrier cutoff buffer tighteningPriority loads need final confirmation soon
Medium
+
Clear address validation holdsAssigned to order review desk
In progress
Confirm short pick substitutionsAwaiting floor lead approval
Pending
Protect late priority lane capacityReserve space before final handoff
Scheduled
+
Verification team cleared 22 held ordersQueue pressure eased in the last review cycle
Dock supervisor opened two backup positionsStaging congestion reduced near outbound lanes
Carrier desk confirmed on-time intakeNo change to active handoff sequence
Packing lead flagged repeat scan failuresIssue isolated to one station for follow-up
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Order release completion78%
Released against current outbound plan
Exception resolution63%
Held orders cleared or reassigned
Dock preparation87%
Lanes staffed and staged for handoff
+
Release Activity
Wave release completed
Primary outbound batch moved to final staging
Exception queue escalated
Held orders above review target triggered supervisor attention
Dock lanes rebalanced
Two lanes opened for priority handoff protection
Final verification in progress
Pack confirmation and label checks underway
Rush orders146
Review desks open5
Average hold age42m
+
+
+
Use this view to clear blockers early, protect release timing, and keep dock flow aligned with service commitments.
Coordinate intake, review, and resolution for active public service requests across district teams.
+
+
+
+ Loading view
+ Request handling
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Demand remains manageable overall, but manual verification is creating uneven wait times between offices. Supervisors are prioritizing clean approvals, redirecting exception work to trained reviewers, and keeping resident communication tied closely to documented case decisions.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest actions across intake, review, and approval teams.
+
+
+
+
+
+
+
+
Approval queue nearing response limit8 requests need supervisor action within the service window
High
Identity mismatch rate increasedManual checks are slowing intake clearance in two offices
Medium
Returned submissions require follow-upResidents have not responded on 14 incomplete requests
Low
+
Clear specialist review backlogReassign exception cases from general intake
In progress
Approve release batchDecision notes are complete and ready for sign-off
Ready
Validate returned documentsCheck corrected records before reopening requests
Queued
+
North district accepted three escalated casesOwnership transferred from central review
Resident notice batch released after approvalNotifications sent for completed decisions
Compliance note added to exception handling rulesReview teams must record reason codes on manual overrides
Intake team cleared duplicate submissionsMerged records reduced queue noise for active requests
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Intake review72%
Most new submissions screened and routed
Eligibility verification54%
Manual checks remain the slowest step
Decision release81%
Approved cases moving out on schedule
+
+
+
Supervisor Notes
+
A review backlog has formed around eligibility checks that require manual confirmation. Supervisors are balancing faster routing with compliance controls so straightforward requests can move forward while exceptions remain documented and ready for audit.
+
Priority requests are held for direct supervisor review when identity or address records do not match.
Field offices can return incomplete submissions to intake without closing the case.
Resident notifications are released only after decision notes and supporting checks are complete.
Escalated items remain visible until ownership is accepted by the receiving team.
+
Avg. handling time2.8h
Returned to intake27
Supervisor holds11
+
Queue Health
Service levelStable
Review capacityTight
Escalation loadModerate
Intake queue reviewed
Initial screening completed for newly received submissions
Eligibility exceptions routed
Cases with missing verification moved to specialist review
Supervisor approvals issued
Approved requests released for resident notice and fulfillment
+
+
+
Access, routing, and decision history are logged for compliance review.
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
+ Active portfolioReview in progressFunding controlsCompliance watch
+
+
+
+
+
+
+
+
Managed
Monitor active studies, pending approvals, funding usage, and cross-team follow-up from one operational view.
The office is managing a mixed portfolio of faculty-led studies, lab collaborations, and student research initiatives. Most work is progressing within approved scope, but a small set of submissions requires administrative response before funds or participant activity can proceed.
Dr. Elaine PorterDirector, Research Administration
+
Open Projects
48
6 awaiting formal approval
Active Funding
$12.4M
Within approved allocation range
Pending Reviews
17
4 require principal investigator response
Policy Exceptions
3
All assigned for follow-up
+
+
+
+ Loading view
+ Project activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Several projects are close to activation, but progress depends on small administrative corrections. Clearing incomplete files and confirming ownership will reduce delay, improve audit readiness, and allow the office to release approved work without further escalation.
+
+
+
+
+
+
+
+
Office Notes
+
Current attention is focused on review completion, documentation quality, and timely coordination between academic units and the central research office. Team leads are using this view to resolve blockers, confirm ownership, and keep each project aligned with internal policy.
+
Approval backlog is concentrated in new submissions with incomplete ethics attachments.
Two high-value projects are waiting on revised budget justification before release.
Records cleanup reduced duplicate sponsor entries across several departments.
Escalations are being routed to unit coordinators for direct follow-up.
+
Units involved11
Cases reassigned5
Records updated23
+
+
+
+
Recent Office Activity
+
Latest updates across approvals, records, and funding control.
+
+
+
+
+
+
+
+
Budget release on holdMissing approval note from finance control
High
Ethics file incompleteParticipant consent language requires revision
Medium
Sponsor record mismatchDepartment entry differs from central register
Low
+
Confirm unit reviewer for pending submissions7 projects without final reviewer assignment
Open
Release approved funding batch2 projects cleared after documentation check
Ready
Close duplicate sponsor recordsFollow-up required across 3 departments
In progress
+
Policy team returned one exception case for clarificationNeeds updated risk statement
Finance control cleared restricted spending lineRelease can proceed after office sign-off
Graduate coordinator added missing investigator credentialsSubmission now eligible for formal review
Unit office confirmed lead contact changeRecords updated for future notices
+
+
+
Portfolio Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Initial screening92%
Most submissions validated
Formal review68%
Backlog concentrated in exception cases
Funding release74%
Delayed by final approval checks
+
Recent Milestones
Portfolio intake closed
New submissions moved to initial screening
Compliance review updated
Exception cases reassigned to policy team
Funding release prepared
Awaiting final sign-off from finance control
Units involved11
Cases reassigned5
Records updated23
+
+
+
Internal use only. Funding, review, and compliance actions must be recorded before project status is changed.
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
Editorial interpretation, policy check, and release readiness for a high-traffic article package.
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
+
+
+ Loading view
+ Article review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
The item remains on hold because reviewers want the final article to state only what can be supported directly in the reporting record. Once the headline and two interpretive passages are revised, the last policy note can be closed and the release team can complete handoff without reopening the brief.
+
+
+
+
+
+
+
+
Editorial Support Notes
+
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
Tighten the headline so it reflects verified reporting only
Rework two interpretive lines in the middle section
Confirm attribution order in the closing paragraph
Keep the release hold in place until policy notes are cleared
+
Linked notes12
Required edits3
Approvals2/3
+
+
+
+
Recent Activity
+
Latest actions across review, policy, and release handling.
+
+
+
+
+
+
+
+
Policy sign-off still openRelease cannot proceed until the final comment is resolved
High
Headline wording exceeds source certaintyDesk requested a narrower phrasing pass
Medium
Closing attribution order changedLatest revision needs reviewer confirmation
Low
+
Apply marked language editsThree passages require direct revision
Prepare release handoffQueue placement is ready once approval lands
Queued
+
Desk review updated with narrowed wording requestAdded by editorial review
Policy note linked to middle section passageMapped to required edit
Release hold confirmed by operationsQueue position preserved
Final pass assigned to senior reviewerAwaiting consolidated response
+
+
+
Reading Insight
+
Operations has held the item in the final queue so the desk can complete one coordinated pass rather than resolve comments in isolation. this workflow is intended to keep editors, policy reviewers, and release staff on the same record while the article moves through its last approval step.
+
Editorial review88%
Most text decisions are settled
Policy clearance67%
One required note remains
Release handoff54%
Prepared but not cleared
+
Release Signals
Attribution strengthNeeds tightening
Headline alignmentUnder revision
Release readinessPending approval
Final release depends on one policy approval and completion of marked language edits.
+
+
Use the same review record when updating wording, approvals, and release handling to avoid duplicate decisions.
Reporting cycle activeEvidence under reviewSite coverage completeApproval pending
+
+
+
Reporting Summary
Consolidated operational view for facility emissions, evidence readiness, and approval progress across the reporting cycle.
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
+
+
+ Loading view
+ Emissions view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Reporting Note
+
Most reporting work is complete, but the team is holding release until the last boundary clarification and control statement are fully documented. Once those items are closed, the submission can move through approval without further operational changes.
+
+
+
+
+
+
+
+
Reporting Support
+
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
All operated facilities submitted activity data within the active reporting window.
Boundary assumptions were updated after internal control review.
Evidence coverage is complete for direct fuel use and purchased electricity.
Final sign-off is blocked only by unresolved exception responses.
+
Facilities in scope14
Evidence files linked128
Approvers assigned5
+
+
+
+
Review Activity
+
Recent actions tied to the current reporting cycle
+
+
+
+
+
+
+
+
Boundary note requires confirmationShared support load treatment updated by operations
Medium
Exception owner response overdueOne facility comment has not been returned
High
Approval pack awaiting final attachmentControl statement must be added before routing
Low
+
Validate revised allocation methodCheck consistency against facility evidence
In progress
Close open exception itemsCollect responses from assigned owners
Blocked
Route package for sign-offRelease once control statement is attached
Track specimen intake, instrument readiness, review holds, and release validated results from one controlled queue.
+
+
+
+ Loading view
+ Specimen flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Current delays are not caused by intake volume but by a narrow cluster of held results that need repeat confirmation and signed reviewer rationale. Once those cases are closed, the release queue should return to normal pace.
+
+
+
+
+
+
+
+
+
+
Validation Activity
+
Latest laboratory actions and review updates
+
+
+
+
+
+
+
+
Quality hold threshold reachedChemistry lane 7 held results
High
Instrument maintenance window dueHematology bench service reminder
Complete supervisory sign-off for held chemistry cases24 items in review queue
In progress
Verify rerun documentation before release5 specimens require note completion
Pending
Confirm analyzer readiness after resetPost-interruption checks still open
Waiting confirmation
+
Accession team cleared label exceptionMatched specimen and order records
Reviewer added comment to held electrolyte panelAwaiting repeat outcome
Bench lead reassigned overflow workCapacity balanced across active stations
Final result packet released to care teamAudit trail completed
+
+
Throughput Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Accessioning completion92%
Most inbound samples logged and routed
Validation review68%
Routine cases moving faster than held work
Quality documentation81%
Remaining notes tied to reruns and holds
+
+
+
Escalation Notes
+
Supervisors are balancing turnaround targets with quality controls, making sure reruns, delta checks, and documentation updates are completed before any final authorization.
+
Priority samples are routed directly to staffed benches.
Held results require either repeat testing or reviewer comment.
Release activity is limited to validated work with complete audit notes.
+
Released today143
Open holds7
Assigned reviewers9
+
Bench Signals
Pending accession checks12
Benches at capacity2
Reruns in progress5
Intake batch reconciled
Analyzer lane reset
Senior review started
Release queue narrowed
+
+
+
All releases must include reviewer confirmation and complete traceability.
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
Execution in focusControl review activeApproval queue open
Track release pacing, exception handling, and approval readiness across active cost centers.
+
+
+
+ Loading view
+ Execution overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
Release performance is broadly on plan, but the remaining blocked amount sits in cases that need manual confirmation. Resolving those records quickly will reduce queue pressure and allow controllers to close the cycle without extending approval coverage.
+
+
+
+
+
+
+
+
+
+
Recent Actions
+
Latest updates from controllers and approvers
+
+
+
+
+
+
+
+
High-value release held for documentation$220K requires source support
Manual adjustment exceeds local thresholdController comment attached
Medium
+
Clear blocked release requests12 records awaiting evidence
In progress
Confirm revised control notes4 items edited by reviewers
Pending
Close approved carryover actions7 ready for posting
Ready
+
Policy exception comment added to release caseBy regional controller
Approval path updated for restricted fundingRouting changed automatically
Supporting file accepted after validationBlocked amount reduced
Commitment request returned for correctionAccount line mismatch found
+
+
Execution Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Release completion92%
Against approved plan
Approval completion81%
All levels combined
Exception clearance64%
Policy and document checks
+
+
+
Controller Notes
+
Most exceptions are tied to account mapping and supporting documentation rather than overspend risk. Teams are being asked to resolve these items before release authority is expanded.
+
Release pacing remains healthy across core operating lines.
Exception volume is concentrated in a small set of manual adjustments.
Senior approval capacity is the main constraint on final clearance.
Control notes have been attached to all blocked items above threshold.
+
Open cases43
Needs review11
Cleared today19
+
Exception Signals
Control postureStable
Approval loadElevated
Release riskManaged
Initial allocation confirmed
Control baseline recorded
Mid-cycle release adjusted
Carryover request applied
Exception review escalated
Policy evidence requested
Final approval window opened
Queue routing updated
+
+
+
Only approved adjustments can move to release. Blocked items remain visible until evidence and sign-off are complete.
+ Live TradingStore NetworkPriority Follow-upRevenue Focus
+
+
+
+
+
+
+
Active Oversight
+
Monitor store execution, revenue pacing, stock pressure, and pending actions across the active trading cycle.
+
Trading performance is holding above plan, but momentum is uneven across the network. Flagship locations are carrying the result while several mid-tier stores are slipping on conversion after early demand spikes cleared core inventory.
+
+
+
Maya ChenSales Operations Lead
+
+
+
+
Net Sales
$4.8M
Running ahead of internal target with stronger in-store conversion.
Orders Closed
18,240
Order completion remains stable despite heavier queue volume.
Low Stock SKUs
126
Concentrated in top-selling lines requiring rapid replenishment.
Pending Exceptions
37
Most cases are tied to price overrides and fulfillment holds.
+
+
+
+
+ Loading view
+ Sales command view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Operations leads are using this board to coordinate price checks, stock transfers, and field follow-up. The immediate goal is to protect sell-through on priority lines without creating avoidable margin leakage or unresolved service cases.
+
Price override approvals increased after local markdown requests were reopened.
Transfer requests are highest in stores with strong accessory attachment rates.
Frontline teams need confirmed replenishment windows before issuing customer callbacks.
Regional managers have been asked to clear overdue store notes before next review.
+
Stores Flagged21
Cases Reassigned14
Open Callbacks89
+
+
+
+
+
Execution Activity
+
Store actions and approval movement
+
+
+
+
+
+
+
+
Override approvals approaching threshold12 stores exceeded normal approval volume
High
Core item coverage at riskTop stores reporting low back-room availability
Medium
Store callback backlog buildingCustomer follow-up notes remain open past target
Medium
+
Approve urgent pricing exceptionsSenior review required for margin-sensitive requests
In progress
Confirm transfer receipt with destination storesFollow up on high-demand replenishment moves
Pending
Close unresolved field notesSeveral stores have not updated execution status
Blocked
+
North region cleared three high-value exceptionsApproval cycle shortened after reassignment
Accessory attachment improved in premium storesStore coaching appears to be holding
Transfer requests stabilized after stock releaseMost urgent moves have been acknowledged
Customer callback queue remains unevenService follow-through needs local management review
+
+
+
Lead Note
+
This board supports the daily operating rhythm for sales control, exception handling, and store coordination across the retail network.
+
Conversion PressureElevated
Stock Transfer LoadHigh
Approval ResponseWithin SLA
+
Investigate sales pacing, confirm stock position, and clear open approvals before escalation.
+
+ View note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
Focus Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval clearance78%
Cleared against open exception volume
Transfer completion64%
Confirmed store-to-store movements
Field note closure52%
Resolved execution updates from stores
+
+
+
Use approved actions only. Store-facing updates must match pricing, stock, and service policy before release.
Coordinate active equipment work, parts readiness, and technician handoff for the current plant queue.
+
+
+
+ Loading view
+ Asset service status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
The main risk is not the volume of open work but the overlap between recurring faults, shared spare parts, and incomplete close-out records. The coordinator is prioritizing jobs that restore stable operation fastest while making sure each completed repair can pass inspection without rework.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest maintenance coordination updates
+
+
+
+
+
+
+
+
Repeat fault on feeder motor requires supervisor reviewLinked to two prior corrective orders
Close-out blocked by missing isolation recordInspection will not release final status
High
+
Approve repair scope for Press Line 2 feederCost review attached by area lead
Pending approval
Confirm staged parts for conveyor coupling replacementMechanical crew waiting at access point
In progress
Return corrected close-out notes to inspectionPhoto evidence and isolation steps required
Needs update
+
Mechanical crew reported safe access at feeder bayField note added 14 min ago
Parts desk reserved seal kit for linked ordersReservation confirmed against active queue
Area lead raised priority on conveyor drive caseOperational impact now classified as elevated
Inspection returned one closure package for revisionMissing verification note in final step
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Priority repairs completed62%
8 of 13 cleared
Parts staging readiness73%
Most critical kits available
Close-out compliance81%
Several packages awaiting final note
+
+
+
Coordination Notes
+
The current focus is keeping high-use assets in service while clearing overdue follow-up work from earlier interventions. Notes, queue status, and technician updates are aligned here so handoff decisions can be made without opening separate records.
+
Three priority jobs share the same hydraulic seal kit and must be sequenced carefully.
Inspection has requested photo confirmation before closing two repeat-failure orders.
One conveyor drive can remain in service under reduced load until replacement stock is issued.
Electrical support is available for lockout review on escalated jobs.
+
On-site crews4
Locked out assets3
Rush requests2
+
Support Readiness
Critical assets online9/10
Awaiting approval4 orders
Parts shortfall2 items
Failure review completed for press feeder
Supervisor approved immediate repair path
Seal kit released from parts crib
Reserved against two linked work orders
Field update posted by mechanical crew
Access cleared and unit isolated
Close-out package returned for correction
Inspection note required before final release
+
+
+
All updates shown here are operational records and must match the approved work order before closure.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.
+ Live ControlDispatch ReadyStorage BalancedField Review Open
+
+
+
+
+
+
+
+
Operational
Track site output, storage readiness, dispatch commitments, and field actions across the active hub.
The hub is operating within target limits, with solar and wind assets sharing load as expected and storage carrying the balancing role for short fluctuations. Dispatch obligations remain intact, and no station is currently outside its approved operating envelope.
Elena MorrisRegional Hub Supervisor
+
Net Output
428 MW
Holding above committed delivery band
Available Storage
81%
Reserve margin kept for evening handoff
Curtailment Risk
Low
No immediate restriction notices in scope
Open Field Actions
7
Two require supervisor review
+
+
+
+ Loading view
+ Hub performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Output remains dependable across the hub, but the team is keeping close watch on the inland station until restart behavior is fully verified. Supervisors should clear the pending reserve note and confirm the inspection window so field and control actions stay aligned.
+
+
+
+
+
+
+
+
Operations Notes
+
Operations staff are watching one inland station where inverter recovery is slower than normal after a brief protective trip. The condition is stable, but the team has kept a local inspection open until the restart pattern returns to baseline.
+
Primary dispatch commitment remains fully covered by live generation and stored reserve.
One site review is waiting on field confirmation before the maintenance note can be closed.
Remote control authority is active for all stations in the current hub scope.
No compliance holds are blocking routine switching or battery balancing actions.
+
Stations Online14
Open Reviews3
Active Crews2
+
+
+
+
Shift Activity
+
Recorded actions and follow-up items for the active operating window.
+
+
+
+
+
+
+
+
Inland station restart varianceRecovery sequence exceeded normal duration
Medium
Storage reserve floor nearing handoff targetBalancing plan may need minor adjustment
Low
Field confirmation pending on breaker inspectionClosure blocked until site response is logged
Medium
+
Approve reserve adjustment noteSubmitted by shift operator
Pending approval
Confirm inland site inspection windowCrew lead requested access hold
Waiting
Close completed switching logControl steps verified by second reviewer
Ready
+
Grid desk accepted updated export positionAcknowledgement logged by dispatch coordinator
Battery balancing sequence completed without exceptionAutomatic control remained within approved limits
Field crew checked access route to inland stationTravel and handoff conditions confirmed
Remote link health check passed across all active sitesNo communication degradation recorded
+
+
+
Readiness Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Dispatch coverage96%
Committed export supported
Storage readiness81%
Reserve held for balancing
Field action closure68%
Open reviews moving toward sign-off
+
Recent Activity
Hub entered balanced operating mode
Control room update
Storage reserve floor adjusted for dispatch window
Shift approval recorded
Inverter restart review opened at inland station
Field follow-up assigned
Export commitment reconfirmed with grid desk
Acknowledgement received
Stations Online14
Open Reviews3
Active Crews2
+
+
+
Use this view to confirm readiness before approving dispatch changes or closing field actions.
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
+ Active flightPriority reviewShared budgetStore traffic
+
+
+
+
+
+
+
+
Needs review
Track active retail promotions, review pacing risks, and keep launch approvals moving across paid channels.
This overview brings campaign owners, channel leads, and reviewers into one operating view for retail promotion activity. The focus is on release readiness, pacing discipline, and fast resolution when a campaign drifts outside its approved plan.
Avery NolanMarketing Operations Lead
+
Active campaigns
18
3 awaiting final release
Planned spend
$426K
Within current budget guardrail
Projected return
4.8x
Lift driven by repeat buyer segments
Creative compliance
92%
Remaining items need legal copy review
+
+
+
+ Loading view
+ Campaign performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
Current risk is concentrated in a small number of high-visibility promotions that are close to release but still depend on approval cleanup. Clearing those items will allow the team to open budget safely without creating rework for channel operations or compliance.
+
+
+
+
+
+
+
+
Operational Notes
+
Most campaigns are moving as expected, but a small group requires attention before budget can be fully opened. The current work centers on copy approval, audience overlap checks, and confirming that regional exclusions are applied before wider rollout.
+
Priority campaigns are grouped for same-day review by channel operations.
Budget adjustments require owner confirmation and finance-safe pacing limits.
Audience rule changes remain blocked until compliance notes are cleared.
Store traffic campaigns receive higher escalation when release windows narrow.
+
Queued reviews9
Open exceptions4
Released today5
+
+
+
+
Team Activity
+
Recent decisions and release changes
+
+
+
+
+
+
+
+
Copy exception still open for priority placementOwner response pending
High
Audience overlap exceeds internal thresholdShared budget campaign group
Medium
Regional exclusion missing from one launch setStore traffic promotion
Medium
+
Approve revised launch copyAssigned to compliance reviewer
In progress
Confirm pacing cap for shared budget groupRequested by channel lead
Pending
Validate excluded regions before releaseRequired for final activation
Ready
+
Budget guardrail updated for priority promotionRecorded by finance operations
Audience rule revision submittedWaiting for approval
Channel owner added release noteEscalation removed after review
Compliance returned one asset for editsCopy needs location disclaimer
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval completion74%
Most high-spend items already reviewed
Budget allocation68%
Remaining spend held behind final checks
Release readiness81%
Operational setup nearly complete
+
Release Flow
Intake completed
Briefs and spend limits confirmed
Review in progress
Compliance and audience checks underway
Release window
Approved campaigns move to channel activation
Queued reviews9
Open exceptions4
Released today5
+
+
+
Use this view to resolve blockers before expanding spend or opening additional channel coverage.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
+
+
+
+
diff --git a/web_insert/Highcharts/line/chart_0031_line.html b/web_insert/Highcharts/line/chart_0031_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..b1c60b9d7c6a57ecfe873a25aff7cb02d9b55b58
--- /dev/null
+++ b/web_insert/Highcharts/line/chart_0031_line.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T04 Daily Energy Use Report
+
+
+
+
+
+
Operational summary for site load, steam demand, and utility variance across active production lines.
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
+
+
+ Loading view
+ Consumption overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operating Note
+
The current review is centered on whether the elevated water draw should be recorded as expected support usage or escalated as a controllable loss. Early checks support the first view, but the decision will remain open until sanitation records and supervisor confirmation are complete.
+
+
+
+
+
+
+
+
Supervisor Support
+
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
Base electrical load improved after non-process fans were isolated during idle periods.
Compressed air demand stayed even, with no signs of sustained leakage during the late run.
Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
Water variance should be rechecked once final sanitation logs are posted.
+
Open exceptions2
Lines reviewed6/6
Actions due3
+
+
+
+
Completion Progress
+
Status of review and follow-up
+
+
+
+
+
+
+
+
Water use above expected bandPackaging area support services
Medium
Line idle shutdown not confirmedTwo areas missing end-run verification
Low
Final sanitation log still pendingRequired to close variance review
Medium
+
Confirm restart-related water drawOperations supervisor to validate against log entries
In progress
Verify non-process equipment shutdownUtilities team to spot-check idle periods
Queued
Complete site approvalRequired before report closeout
Pending
+
Meter reconciliation completed for main supplyLogged by utilities desk
Maintenance confirmed no active steam issueInspection note added
Cost allocation refreshed for final reviewFinance rule set applied
+
+
+
Assessment
+
No immediate escalation is required, but the site energy lead has asked line supervisors to confirm idle-time shutdown discipline before the next reporting cycle is closed.
+
Meter validation100%
All core readings matched
Variance review68%
Awaiting supporting logs
Management sign-off35%
Ready for supervisor action
+
Key Signals
Load balanceSteady
Utility riskModerate
Approval statePending sign-off
Water intake exceeded the normal operating band during cleaning and restart activity. Review remains open until line notes and final meter confirmation are attached.
+
+
Use this report to confirm variances, assign follow-up, and complete site-level review before closeout.
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
Receiving activePutaway constrainedDispatch on hold
Monitor inbound receipts, putaway flow, and outbound release from one operating view.
+
+
+
+ Loading view
+ Facility activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main risk is not total volume but timing. Inbound receipts, reserve storage, and outbound release are all connected, so a short delay at dock assignment or packing review quickly affects the rest of the floor. Clearing blocked pallets and reallocating lift coverage should return the site to a steadier operating rhythm.
+
+
+
+
+
+
+
+
+
+
Floor Activity
+
Updated as teams complete receiving, storage, and release steps.
+
+
+
+
+
+
+
+
Dock queue above working limit6 loads waiting longer than target
High
Bulk zone capacity nearing thresholdReserve slots at 93% use
Confirm quarantine release for damaged palletsNeeded before allocation can resume
Waiting approval
Move lift support to west bulk aisleReduce putaway backlog and free dock space
In progress
Validate pick face mismatch listTwo locations causing short picks
Ready
+
Receiving clerk closed two load check-insLane pressure eased slightly
Packing lead flagged carton damage on priority releaseManual review still open
Replenishment team completed fast-move top-offPick continuity improved
Supervisor approved temporary overflow stagingBulk reserve can recover
+
+
Flow Insight
+
Supervisors are reallocating lift support to the bulk zone to free receiving lanes and restore normal replenishment timing.
+
Receiving completion62%
Backlog concentrated at assigned docks
Putaway completion48%
Lift support still below target
Outbound release completion79%
Held orders pending review
+
+
+
Coordinator Notes
+
Most outbound work remains on target, but several releases are paused until damaged-unit reviews and location mismatches are cleared.
+
Dock 4 and Dock 6 are reserved for late carrier arrivals.
Three pallets in quarantine require quality release before stock can be allocated.
Overflow staging is active near the west aisle to prevent receiving backlog.
Cycle count holds remain limited to two pick faces.
+
Open holds11
Active pickers24
Free docks2
+
Exception Signals
Dock availabilityTight
Pick path healthStable
Replenishment paceBehind
Inbound queue reviewed
Dock assignments adjusted for high-volume receipts
Putaway priority updated
Bulk and fast-move lanes moved to top of worklist
Dispatch hold escalated
Packing lead asked to clear damaged carton review
Capacity watch enabled
Reserve zone threshold raised for temporary overflow
+
+
+
Use this console to clear blocked work first, then restore normal flow across receiving and dispatch.
+
+
+
+
diff --git a/web_insert/Highcharts/line/chart_0034_line.html b/web_insert/Highcharts/line/chart_0034_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..a62273bb27a5ea3db6a27ad8e89e4e887cae3cc3
--- /dev/null
+++ b/web_insert/Highcharts/line/chart_0034_line.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
Monitor enrollment flow, review teaching requests, and keep campus services within response targets.
+
+
+
+ Loading view
+ Enrollment workload
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main pressure point is not overall volume but the number of cases waiting on a second team to confirm eligibility, roster placement, or account release. Clearing those handoffs will reduce repeat contacts and keep approvals moving in the right order.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Recent updates across admissions, scheduling, and support
+
+
+
+
+
+
+
+
Identity check queue exceeded review target14 learner files are outside normal handling time
Access provisioning paused for one intake groupRoster confirmation is still pending from registry
Medium
+
Approve seat exception requestsOwned by academic operations
In progress
Confirm account release listWaiting on final learner verification
Blocked
Close duplicate support casesMerge requests from advising and registry
Ready
+
Registry completed a priority batch reviewOpen count reduced after document validation
Scheduling submitted a conflict noteOne instructor assigned to overlapping sessions
Support added an access exceptionLearner record needs manual activation
Advising returned a hold for correctionProgram selection does not match approved path
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Enrollment validation74%
Most records reviewed; exceptions remain
Teaching assignment approval61%
Conflict cases still under review
Account activation release83%
Waiting on final roster handoff
+
+
+
Support Notes
+
Most exceptions are tied to incomplete learner records and overlapping instructor availability. Team leads are using the queue to clear blocked cases before they affect course readiness and support response times.
+
Admissions is prioritizing records with missing identity checks.
Scheduling is reviewing instructor conflicts before room release.
Support is holding account activation until final roster approval.
Policy notices were updated to reflect new escalation ownership.
+
Escalations7
Owners online12
Blocked cases19
+
Operational Signals
Validation backlogModerate
Seat release paceStable
Access turnaroundAt risk
Intake review opened
Registry triage assigned the latest submission batch
Faculty request escalated
Teaching load conflict moved to academic operations
Roster lock cleared
Student services approved the final exception set
+
+
+
Use this view to coordinate approvals, confirm handoffs, and clear blockers before escalation windows are breached.
Post-route summary for the latest dispatch cycle, focusing on late handoff recovery, depot coordination, and proof-of-delivery completion.
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
+
+
+ Loading view
+ Route performance view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
This review is being used to decide whether dispatch should adopt a standard delay-recovery playbook for mixed-stop runs. The current response relied on experienced staff making quick route adjustments, which worked in this case but may not scale without clearer depot release rules and a required outreach log for affected stops.
+
+
+
+
+
+
+
+
Support Notes
+
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
Departure drift started at the depot gate after loading lane congestion.
Manual reprioritization reduced missed arrival commitments on dense urban segments.
Proof-of-delivery capture improved after drivers were reminded to close stops before returning.
Two exception cases remain open pending package condition review.
+
Resequenced routes7
Support calls placed23
Returns held2
+
+
+
+
Recent Activity
+
Updates recorded during issue containment and closure review.
+
+
+
+
+
+
+
+
Proof mismatch on return scan2 consignments need depot confirmation
Medium
Loading lane congestion repeatedObserved across early dispatch wave
High
Customer contact note missing1 delayed stop closed without outreach log
Low
+
Validate open claims with depot supervisorAttach condition notes and return scans
In progress
Document route resequencing rulePrepare for dispatch handbook update
Pending
Close driver note reviewConfirm repeated gate delay comments
Ready
+
Driver team acknowledged revised stop orderField update logged by support desk
Depot supervisor added lane usage noteRoot cause linked to overlap during loading release
Customer service cleared outreach backlogAll affected recipients received status calls
The review focus is on whether the corrective actions used by the team should become standard practice for future mixed-stop routes with tight loading turnover.
+
Exception closure78%
Most delivery issues resolved in the same cycle
Driver note review64%
Comments grouped by route segment
Depot corrective action41%
Lane balancing plan awaiting sign-off
+
Field Signals
Route adherenceStable after intervention
Depot readinessNeeds lane balancing
Customer contact coverageAbove target
Opened after repeated departure slippage affected downstream stop timing and closure quality.
+
+
Internal review record for route performance follow-up and process adjustment.
+
+
+
+
diff --git a/web_insert/Highcharts/line/chart_0038_line.html b/web_insert/Highcharts/line/chart_0038_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..a2c2f394ce43dc7812a8cd1c55f63ba65a166ec5
--- /dev/null
+++ b/web_insert/Highcharts/line/chart_0038_line.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T28 Municipal Service Bulletin
+
+
+
+
+
+
+
+
Internal circulationT28
+
Municipal Service Bulletin
+
Streetlight outage follow-up
+
Open bulletinCross-departmentAction required
+
+
+
Bulletin Summary
Operational notice and response summary for active public service issues requiring coordinated review.
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
+
+
+ Loading view
+ Service handling overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
Several matters remain open not because field action has stopped, but because the written record is incomplete or inconsistent across offices. Staff should treat documentation quality, ownership clarity, and response accuracy as equal to operational completion before moving any item to closed status.
+
+
+
+
+
+
+
+
Review Support
+
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
Confirm that each accepted notice has one accountable handling unit.
Reconcile field completion remarks with the official reply draft.
Flag cases where repeat contact suggests ineffective local closure.
Hold final release for items lacking signed verification.
+
Escalated3
Awaiting reply5
Returned for revision4
+
+
+
+
Recent Activity
+
Latest handling updates across the bulletin
+
+
+
+
+
+
+
+
Repeated contact on one closed itemClosure note conflicts with latest resident submission
High
Verification file missing from district replyEvidence not attached to the handling record
Medium
Approval wording exceeds service standardReply language requires simplification before release
Low
+
Confirm ownership for unresolved site restoration itemAwaiting district office acknowledgment
Open
Complete evidence check for resolved service interruption caseField note submitted without signed confirmation
In review
Approve final reply language for public releaseDraft prepared by coordination desk
Pending approval
+
District office updated handling noteOwnership confirmed and local follow-up arranged
Service unit returned revised reply draftLanguage adjusted to match verified field action
Supervisory office requested clarificationAsked whether the item meets closure conditions
Coordination desk logged resident repeat contactMatter retained in active bulletin
+
+
+
Review Insight
+
Teams are asked to confirm ownership, update response wording, and close record gaps before the next routing step. Any item with unresolved accountability or incomplete evidence should remain in controlled review rather than be marked complete.
+
Case verification76%
Most evidence checks completed
Reply drafting68%
Several items still under wording review
Final clearance41%
Held until all high-priority issues are confirmed
+
Coordination Signals
Priority routeJoint review
Public impactModerate
Release stateHeld for clearance
Local office reported restoration, but resident contact records indicate the issue may persist at the reported location.
+
+
Use this bulletin as the working record for approvals, response checks, and inter-office follow-up until all listed matters are either cleared or formally transferred.
+
+
+
+
diff --git a/web_insert/Highcharts/line/chart_0039_line.html b/web_insert/Highcharts/line/chart_0039_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..6ec75b157826332d65875765e61c6eb577398163
--- /dev/null
+++ b/web_insert/Highcharts/line/chart_0039_line.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T34 Water Operations Control
+
+
+
+
+
+
+
+
+
+
Live networkShift handoffPriority review
Monitor plant output, service pressure, and field response from one operating view.
+
+
+
+ Loading view
+ Network status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Control Note
+
The active case is no longer expanding, but the team is holding controls in place until all dependent checks are complete. Field, dispatch, and service desk updates should stay aligned so closures do not outpace verified operating conditions.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Operational updates and required follow-up
+
+
+
+
+
+
+
+
Restricted pressure in east zoneCustomer impact limited; monitoring remains active
High
Booster station follow-up duePost-adjustment verification pending from field lead
Medium
Closure approval waitingSupervisor sign-off required on 3 linked work orders
Medium
+
Confirm downstream pressure readingsAssigned to east response crew
In progress
Validate temporary routing planRequired before restriction release
Pending review
Close resolved customer casesService desk waiting on operations note
Ready
+
Dispatch logged stable readings from sector valve setRecent field update
Plant control confirmed output remains on targetOperations note
Service desk tagged 4 cases for combined closureQueue update
Depot issued replacement fittings to mobile crewSupply confirmation
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident containment82%
Awaiting final field confirmation
Work order completion64%
Linked repairs moving through review
Case closure readiness71%
Service notes partially complete
+
+
+
Supervisor Notes
+
The current focus is to keep supply steady across high-demand zones, clear outstanding field confirmations, and close service cases that no longer need escalation. Supervisors are reviewing exceptions before the next handoff.
+
East transmission line remains in controlled operation with no new loss reports.
Two booster stations are running under temporary observation after overnight adjustment.
Customer-facing updates are limited to affected service pockets only.
Repair stock for seals and isolation fittings is available at primary depot.
+
Crews deployed9
Sites under watch4
Pending approvals6
+
Operational Signals
Reservoir balanceNormal
Pump readinessHigh
Field backlogModerate
Pressure deviation flagged
Network monitoring raised an east line variance and opened incident review.
Field isolation confirmed
Local crew secured the affected segment and reported stable downstream flow.
Supervisor review in progress
Operations lead is validating closure conditions before releasing restrictions.
+
+
+
Use confirmed field updates before changing service classification or closing a case.
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
Review account health, retention risk, and pending interventions for active customer segments.
+
+
+
+ Loading view
+ Active user case flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current queue reflects a concentrated effort to retain users who showed intent but encountered friction during critical account steps. Teams are expected to document every outreach attempt, confirm ownership before escalation, and close only when the account is either stable or formally transferred for continued monitoring.
+
+
+
+
+
+
+
+
+
+
Case Activity
+
Recent decisions and follow-up movement
+
+
+
+
+
+
+
+
High-value account awaiting decisionNo final disposition recorded after manual review
High
Outreach backlog risingFollow-up queue has crossed internal response target
Medium
Exception note incompletePolicy-sensitive case missing approval rationale
Medium
+
Confirm owner coverage for priority cases7 cases without confirmed handoff
In progress
Complete callback verificationPending contact outcomes need final status
Queued
Close resolved onboarding reviewsCases meet closure conditions after successful recovery
Ready
+
Owner updated on priority reviewRouting changed after shift handoff
Manual decision recordedCase moved from hold to monitor
Risk flag clearedActivity recovered after intervention
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Queue clearance72%
Handled against current intake
Outreach completion64%
Priority contacts sent and logged
Approval coverage89%
Cases with complete decision trail
+
+
+
Operational Notes
+
Current activity is centered on a rise in support-linked retention risk. Several accounts were routed into manual review after repeated onboarding exits, failed self-service recovery, or policy-sensitive changes that require a documented decision.
+
High-priority cases are routed to named owners before outreach begins.
Accounts with repeat friction stay in review until next-step evidence is recorded.
Policy exceptions require a reason code and final approval note.
+
Active owners16
Cases on hold12
Recovered users31
+
Review Signals
Escalation rate11%
Policy exceptions9
Pending callbacks22
Risk rule triggered
Account entered review after repeated drop-off behavior
Operations review started
Owner assigned and contact path confirmed
User contacted
Follow-up sent with recovery guidance and next action
Decision logged
Case moved to monitor, close, or escalate
+
+
+
Access, contact history, and policy decisions are recorded for audit review.
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
Post-run assessment for the last completed checkout messaging experiment, including impact, rollout decision, and follow-up actions.
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
+
+
+ Loading view
+ Experiment results
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Analyst Note
+
The result is not only statistically reliable but also operationally clean. Teams reviewing payment quality, support demand, and buyer behavior did not identify a counter-signal large enough to block release, which makes this a suitable candidate for default rollout with normal monitoring.
+
+
+
+
+
+
+
+
Review Notes
+
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
Primary goal was improved checkout completion.
Guardrails covered payment success, cancellation intent, and support contact rate.
Result supports rollout with standard monitoring.
Follow-up work should focus on first-time buyer reassurance.
+
Control share50%
Variant share50%
Guardrails passed3/3
+
+
+
+
Recent Activity
+
Latest review updates and decision steps
+
+
+
+
+
+
+
+
Release approval pendingRequires product and operations sign-off
Medium
Follow-up test not yet scopedFirst-time buyer segment showed the strongest response
Low
Monitoring handoff requiredPost-release checks must be assigned before launch
Medium
+
Confirm rollout ownerRelease coordination for default experience
Open
Document final decisionAdd rationale to the experiment record
In progress
Prepare follow-up briefDraft next test for delivery reassurance
Not started
+
Data review completed by analyticsNo variance issues found in conversion events
Support lead confirmed stable contact volumeNo increase tied to variant exposure
Product owner attached final recommendationPromote Variant B with standard guardrails
Release coordinator requested approval windowDecision needed before deployment planning
+
+
+
Key Insight
+
The operational recommendation is to promote Variant B to the default experience, keep the current guardrails in place, and open a follow-up test on supporting text near delivery expectations.
+
Review completion92%
Only final approval remains
Release readiness84%
Monitoring and ownership still being confirmed
Follow-up planning36%
Next hypothesis not fully defined
+
Quality Signals
Audience balanceWithin tolerance
Tracking integrityVerified
Release readinessApproved pending sign-off
Control used the existing confirmation message. Variant B used shorter supporting language focused on confidence before purchase.
+
+
Rollout should begin with standard monitoring and a hold point if payment reliability moves outside normal range.
+ Active shiftRelease pendingLab verifiedEscalation open
+
+
+
+
+
+
+
+
Review in progress
Monitor active inspections, isolate nonconforming lots, and keep release decisions aligned across line, lab, and dispatch teams.
This overview is used by inspection leads to track open quality cases from first check through release decision. It brings together line findings, lab confirmation, hold status, and reviewer actions so each lot can move forward with a clear record.
Erin ColeQuality Assurance Lead
+
Lots under review
18
4 require supervisor sign-off
Pass rate
96.8%
Stable against control threshold
Items on hold
7
Awaiting disposition or retest
Average closure time
2.6h
Down after revised sampling steps
+
+
+
+ Loading view
+ Inspection activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A narrow group of nonconforming lots is driving most of the queue. The team has already isolated affected stock and limited release access, so the immediate focus is on finishing lab confirmation, recording final disposition, and clearing unaffected material without breaking traceability.
+
+
+
+
+
+
+
+
Coordination Notes
+
The current workload is concentrated on final assembly output where a small group of lots failed appearance and torque checks. Most cases are moving normally, but a limited set remains blocked while the team confirms whether rework is acceptable or a full containment action is needed.
+
Two lots were moved from routine review to controlled hold after repeat defects were confirmed at receiving check.
Lab confirmation has cleared one previously blocked lot for release with added inspection notes.
Dispatch has been asked not to allocate stock from any case marked pending disposition.
+
Open holds7
Retests due3
Approved releases11
+
+
+
+
Recent Actions
+
Latest updates across inspection, hold, and release handling.
+
+
+
+
+
+
+
+
Repeat defect pattern detectedThree related cases linked to the same source batch
High
Approval waiting on lab noteRelease decision cannot close until confirmation is attached
Medium
Containment nearing limitReserved hold area is close to capacity
Medium
+
Review pending disposition cases7 cases require lead decision
In progress
Confirm retest sampling planApplies to two blocked lots
Queued
Close cleared release recordsDocumentation ready for final update
Ready
+
Line inspector added a deviation noteAttached to lot under controlled hold
Lab result accepted by reviewerCase moved back to release check
Containment list updatedStock location confirmed for isolated units
Dispatch restriction acknowledgedOutbound allocation blocked for pending lots
+
+
+
Inspection Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion82%
Most scheduled checks are recorded
Disposition closure61%
Open exceptions still under review
Release documentation74%
Awaiting final sign-off on held lots
+
Case Progress
Inbound sample logged
Initial inspection record created
Deviation confirmed
Case routed to quality lead
Containment applied
Affected stock isolated from release
Disposition pending
Awaiting final approval
Open holds7
Retests due3
Approved releases11
+
+
+
Only approved dispositions can clear held material for release.
Review inbound pitches, assign editorial follow-up, and keep the publication queue moving with clear ownership.
+
+
+
+ Loading view
+ Selection queue
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
Several strong submissions are moving forward at the same time, but the desk is losing time when ownership is unclear after approval. Tightening assignment rules here will reduce back-and-forth, speed contributor replies, and help section editors focus on pieces they are ready to develop.
+
+
+
+
+
+
+
+
+
+
Desk Activity
+
Latest review and assignment actions
+
+
+
+
+
+
+
+
Two approved pitches still have no ownerCleared in review but not accepted by a section editor
High
Standards check requested on a sensitive angleHold response until review note is returned
Medium
Contributor waiting on revision guidanceInitial feedback sent without a named follow-up editor
Medium
+
Confirm final owner for the education feature pitchShared interest across two sections
In progress
Send decline notes for out-of-scope submissionsReady after lead review
Ready
Close duplicate entry group and keep strongest versionThree related submissions from separate contributors
Blocked
+
Lead editor requested a tighter angle before commissionAdded to the top priority pitch
Assignment returned after capacity check failedSection owner asked for reassignment
Contributor replied with revised framing noteReady for second pass
Duplicate tag removed after manual comparisonSubmission can continue through normal review
+
+
Operational Insight
+
The current operating goal is simple: reduce duplicate review, assign one accountable editor to each viable pitch, and keep contributors informed before follow-up goes cold.
+
First-pass review78%
Most inbound items have initial editorial tags
Ownership assignment61%
Several approved pitches still need a named editor
Contributor replies84%
Outcome messages are nearly caught up
+
+
+
Contributor Support
+
Most delays are no longer in intake. The main bottleneck is editorial ownership after a pitch passes first review, especially when more than one section wants to claim the same idea.
+
Flag near-duplicate submissions before they reach senior review.
Move approved ideas into one owner queue with a clear response deadline.
Keep contributor communication consistent when a pitch is held, revised, or declined.
Surface sensitive topics for legal or standards review before commissioning.
+
Held11
Revisions requested14
Declines sent32
+
Operational Signals
Duplicate riskModerate
Standards review3 items pending
Editor capacityTight
Intake sweep completed
New submissions were normalized, deduplicated, and tagged by desk.
Senior review pass
Borderline pitches were escalated for direction on fit and urgency.
Assignment round
Approved items were matched to editors with open capacity.
Contributor follow-up
Reply notes were prepared for hold, revise, and decline outcomes.
+
+
+
Use one final outcome per pitch so downstream assignment and contributor replies stay aligned.
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
+
+
+
+
diff --git a/web_insert/Highcharts/other/chart_0018_other.html b/web_insert/Highcharts/other/chart_0018_other.html
new file mode 100644
index 0000000000000000000000000000000000000000..812ac803be2fb1b1ec8a228f742ca7ff42982ed1
--- /dev/null
+++ b/web_insert/Highcharts/other/chart_0018_other.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T28 Municipal Service Bulletin
+
+
+
+
+
+
+
+
Internal circulationT28
+
Municipal Service Bulletin
+
Streetlight outage follow-up
+
Open bulletinCross-departmentAction required
+
+
+
Bulletin Summary
Operational notice and response summary for active public service issues requiring coordinated review.
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
+
+
+ Loading view
+ Service handling overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
Several matters remain open not because field action has stopped, but because the written record is incomplete or inconsistent across offices. Staff should treat documentation quality, ownership clarity, and response accuracy as equal to operational completion before moving any item to closed status.
+
+
+
+
+
+
+
+
Review Support
+
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
Confirm that each accepted notice has one accountable handling unit.
Reconcile field completion remarks with the official reply draft.
Flag cases where repeat contact suggests ineffective local closure.
Hold final release for items lacking signed verification.
+
Escalated3
Awaiting reply5
Returned for revision4
+
+
+
+
Recent Activity
+
Latest handling updates across the bulletin
+
+
+
+
+
+
+
+
Repeated contact on one closed itemClosure note conflicts with latest resident submission
High
Verification file missing from district replyEvidence not attached to the handling record
Medium
Approval wording exceeds service standardReply language requires simplification before release
Low
+
Confirm ownership for unresolved site restoration itemAwaiting district office acknowledgment
Open
Complete evidence check for resolved service interruption caseField note submitted without signed confirmation
In review
Approve final reply language for public releaseDraft prepared by coordination desk
Pending approval
+
District office updated handling noteOwnership confirmed and local follow-up arranged
Service unit returned revised reply draftLanguage adjusted to match verified field action
Supervisory office requested clarificationAsked whether the item meets closure conditions
Coordination desk logged resident repeat contactMatter retained in active bulletin
+
+
+
Review Insight
+
Teams are asked to confirm ownership, update response wording, and close record gaps before the next routing step. Any item with unresolved accountability or incomplete evidence should remain in controlled review rather than be marked complete.
+
Case verification76%
Most evidence checks completed
Reply drafting68%
Several items still under wording review
Final clearance41%
Held until all high-priority issues are confirmed
+
Coordination Signals
Priority routeJoint review
Public impactModerate
Release stateHeld for clearance
Local office reported restoration, but resident contact records indicate the issue may persist at the reported location.
+
+
Use this bulletin as the working record for approvals, response checks, and inter-office follow-up until all listed matters are either cleared or formally transferred.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
Execution in focusControl review activeApproval queue open
Track release pacing, exception handling, and approval readiness across active cost centers.
+
+
+
+ Loading view
+ Execution overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
Release performance is broadly on plan, but the remaining blocked amount sits in cases that need manual confirmation. Resolving those records quickly will reduce queue pressure and allow controllers to close the cycle without extending approval coverage.
+
+
+
+
+
+
+
+
+
+
Recent Actions
+
Latest updates from controllers and approvers
+
+
+
+
+
+
+
+
High-value release held for documentation$220K requires source support
Manual adjustment exceeds local thresholdController comment attached
Medium
+
Clear blocked release requests12 records awaiting evidence
In progress
Confirm revised control notes4 items edited by reviewers
Pending
Close approved carryover actions7 ready for posting
Ready
+
Policy exception comment added to release caseBy regional controller
Approval path updated for restricted fundingRouting changed automatically
Supporting file accepted after validationBlocked amount reduced
Commitment request returned for correctionAccount line mismatch found
+
+
Execution Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Release completion92%
Against approved plan
Approval completion81%
All levels combined
Exception clearance64%
Policy and document checks
+
+
+
Controller Notes
+
Most exceptions are tied to account mapping and supporting documentation rather than overspend risk. Teams are being asked to resolve these items before release authority is expanded.
+
Release pacing remains healthy across core operating lines.
Exception volume is concentrated in a small set of manual adjustments.
Senior approval capacity is the main constraint on final clearance.
Control notes have been attached to all blocked items above threshold.
+
Open cases43
Needs review11
Cleared today19
+
Exception Signals
Control postureStable
Approval loadElevated
Release riskManaged
Initial allocation confirmed
Control baseline recorded
Mid-cycle release adjusted
Carryover request applied
Exception review escalated
Policy evidence requested
Final approval window opened
Queue routing updated
+
+
+
Only approved adjustments can move to release. Blocked items remain visible until evidence and sign-off are complete.
Review inbound pitches, assign editorial follow-up, and keep the publication queue moving with clear ownership.
+
+
+
+ Loading view
+ Selection queue
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
Several strong submissions are moving forward at the same time, but the desk is losing time when ownership is unclear after approval. Tightening assignment rules here will reduce back-and-forth, speed contributor replies, and help section editors focus on pieces they are ready to develop.
+
+
+
+
+
+
+
+
+
+
Desk Activity
+
Latest review and assignment actions
+
+
+
+
+
+
+
+
Two approved pitches still have no ownerCleared in review but not accepted by a section editor
High
Standards check requested on a sensitive angleHold response until review note is returned
Medium
Contributor waiting on revision guidanceInitial feedback sent without a named follow-up editor
Medium
+
Confirm final owner for the education feature pitchShared interest across two sections
In progress
Send decline notes for out-of-scope submissionsReady after lead review
Ready
Close duplicate entry group and keep strongest versionThree related submissions from separate contributors
Blocked
+
Lead editor requested a tighter angle before commissionAdded to the top priority pitch
Assignment returned after capacity check failedSection owner asked for reassignment
Contributor replied with revised framing noteReady for second pass
Duplicate tag removed after manual comparisonSubmission can continue through normal review
+
+
Operational Insight
+
The current operating goal is simple: reduce duplicate review, assign one accountable editor to each viable pitch, and keep contributors informed before follow-up goes cold.
+
First-pass review78%
Most inbound items have initial editorial tags
Ownership assignment61%
Several approved pitches still need a named editor
Contributor replies84%
Outcome messages are nearly caught up
+
+
+
Contributor Support
+
Most delays are no longer in intake. The main bottleneck is editorial ownership after a pitch passes first review, especially when more than one section wants to claim the same idea.
+
Flag near-duplicate submissions before they reach senior review.
Move approved ideas into one owner queue with a clear response deadline.
Keep contributor communication consistent when a pitch is held, revised, or declined.
Surface sensitive topics for legal or standards review before commissioning.
+
Held11
Revisions requested14
Declines sent32
+
Operational Signals
Duplicate riskModerate
Standards review3 items pending
Editor capacityTight
Intake sweep completed
New submissions were normalized, deduplicated, and tagged by desk.
Senior review pass
Borderline pitches were escalated for direction on fit and urgency.
Assignment round
Approved items were matched to editors with open capacity.
Contributor follow-up
Reply notes were prepared for hold, revise, and decline outcomes.
+
+
+
Use one final outcome per pitch so downstream assignment and contributor replies stay aligned.
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
+
+
+
+
diff --git a/web_insert/Highcharts/pie/chart_0032_pie.html b/web_insert/Highcharts/pie/chart_0032_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..a89935a7a3d9ade63da03b83b626e224497df3cb
--- /dev/null
+++ b/web_insert/Highcharts/pie/chart_0032_pie.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T34 Water Operations Control
+
+
+
+
+
+
+
+
+
+
Live networkShift handoffPriority review
Monitor plant output, service pressure, and field response from one operating view.
+
+
+
+ Loading view
+ Network status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Control Note
+
The active case is no longer expanding, but the team is holding controls in place until all dependent checks are complete. Field, dispatch, and service desk updates should stay aligned so closures do not outpace verified operating conditions.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Operational updates and required follow-up
+
+
+
+
+
+
+
+
Restricted pressure in east zoneCustomer impact limited; monitoring remains active
High
Booster station follow-up duePost-adjustment verification pending from field lead
Medium
Closure approval waitingSupervisor sign-off required on 3 linked work orders
Medium
+
Confirm downstream pressure readingsAssigned to east response crew
In progress
Validate temporary routing planRequired before restriction release
Pending review
Close resolved customer casesService desk waiting on operations note
Ready
+
Dispatch logged stable readings from sector valve setRecent field update
Plant control confirmed output remains on targetOperations note
Service desk tagged 4 cases for combined closureQueue update
Depot issued replacement fittings to mobile crewSupply confirmation
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident containment82%
Awaiting final field confirmation
Work order completion64%
Linked repairs moving through review
Case closure readiness71%
Service notes partially complete
+
+
+
Supervisor Notes
+
The current focus is to keep supply steady across high-demand zones, clear outstanding field confirmations, and close service cases that no longer need escalation. Supervisors are reviewing exceptions before the next handoff.
+
East transmission line remains in controlled operation with no new loss reports.
Two booster stations are running under temporary observation after overnight adjustment.
Customer-facing updates are limited to affected service pockets only.
Repair stock for seals and isolation fittings is available at primary depot.
+
Crews deployed9
Sites under watch4
Pending approvals6
+
Operational Signals
Reservoir balanceNormal
Pump readinessHigh
Field backlogModerate
Pressure deviation flagged
Network monitoring raised an east line variance and opened incident review.
Field isolation confirmed
Local crew secured the affected segment and reported stable downstream flow.
Supervisor review in progress
Operations lead is validating closure conditions before releasing restrictions.
+
+
+
Use confirmed field updates before changing service classification or closing a case.
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
+ Active portfolioReview in progressFunding controlsCompliance watch
+
+
+
+
+
+
+
+
Managed
Monitor active studies, pending approvals, funding usage, and cross-team follow-up from one operational view.
The office is managing a mixed portfolio of faculty-led studies, lab collaborations, and student research initiatives. Most work is progressing within approved scope, but a small set of submissions requires administrative response before funds or participant activity can proceed.
Dr. Elaine PorterDirector, Research Administration
+
Open Projects
48
6 awaiting formal approval
Active Funding
$12.4M
Within approved allocation range
Pending Reviews
17
4 require principal investigator response
Policy Exceptions
3
All assigned for follow-up
+
+
+
+ Loading view
+ Project activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Several projects are close to activation, but progress depends on small administrative corrections. Clearing incomplete files and confirming ownership will reduce delay, improve audit readiness, and allow the office to release approved work without further escalation.
+
+
+
+
+
+
+
+
Office Notes
+
Current attention is focused on review completion, documentation quality, and timely coordination between academic units and the central research office. Team leads are using this view to resolve blockers, confirm ownership, and keep each project aligned with internal policy.
+
Approval backlog is concentrated in new submissions with incomplete ethics attachments.
Two high-value projects are waiting on revised budget justification before release.
Records cleanup reduced duplicate sponsor entries across several departments.
Escalations are being routed to unit coordinators for direct follow-up.
+
Units involved11
Cases reassigned5
Records updated23
+
+
+
+
Recent Office Activity
+
Latest updates across approvals, records, and funding control.
+
+
+
+
+
+
+
+
Budget release on holdMissing approval note from finance control
High
Ethics file incompleteParticipant consent language requires revision
Medium
Sponsor record mismatchDepartment entry differs from central register
Low
+
Confirm unit reviewer for pending submissions7 projects without final reviewer assignment
Open
Release approved funding batch2 projects cleared after documentation check
Ready
Close duplicate sponsor recordsFollow-up required across 3 departments
In progress
+
Policy team returned one exception case for clarificationNeeds updated risk statement
Finance control cleared restricted spending lineRelease can proceed after office sign-off
Graduate coordinator added missing investigator credentialsSubmission now eligible for formal review
Unit office confirmed lead contact changeRecords updated for future notices
+
+
+
Portfolio Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Initial screening92%
Most submissions validated
Formal review68%
Backlog concentrated in exception cases
Funding release74%
Delayed by final approval checks
+
Recent Milestones
Portfolio intake closed
New submissions moved to initial screening
Compliance review updated
Exception cases reassigned to policy team
Funding release prepared
Awaiting final sign-off from finance control
Units involved11
Cases reassigned5
Records updated23
+
+
+
Internal use only. Funding, review, and compliance actions must be recorded before project status is changed.
Coordinate active equipment work, parts readiness, and technician handoff for the current plant queue.
+
+
+
+ Loading view
+ Asset service status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
The main risk is not the volume of open work but the overlap between recurring faults, shared spare parts, and incomplete close-out records. The coordinator is prioritizing jobs that restore stable operation fastest while making sure each completed repair can pass inspection without rework.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest maintenance coordination updates
+
+
+
+
+
+
+
+
Repeat fault on feeder motor requires supervisor reviewLinked to two prior corrective orders
Close-out blocked by missing isolation recordInspection will not release final status
High
+
Approve repair scope for Press Line 2 feederCost review attached by area lead
Pending approval
Confirm staged parts for conveyor coupling replacementMechanical crew waiting at access point
In progress
Return corrected close-out notes to inspectionPhoto evidence and isolation steps required
Needs update
+
Mechanical crew reported safe access at feeder bayField note added 14 min ago
Parts desk reserved seal kit for linked ordersReservation confirmed against active queue
Area lead raised priority on conveyor drive caseOperational impact now classified as elevated
Inspection returned one closure package for revisionMissing verification note in final step
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Priority repairs completed62%
8 of 13 cleared
Parts staging readiness73%
Most critical kits available
Close-out compliance81%
Several packages awaiting final note
+
+
+
Coordination Notes
+
The current focus is keeping high-use assets in service while clearing overdue follow-up work from earlier interventions. Notes, queue status, and technician updates are aligned here so handoff decisions can be made without opening separate records.
+
Three priority jobs share the same hydraulic seal kit and must be sequenced carefully.
Inspection has requested photo confirmation before closing two repeat-failure orders.
One conveyor drive can remain in service under reduced load until replacement stock is issued.
Electrical support is available for lockout review on escalated jobs.
+
On-site crews4
Locked out assets3
Rush requests2
+
Support Readiness
Critical assets online9/10
Awaiting approval4 orders
Parts shortfall2 items
Failure review completed for press feeder
Supervisor approved immediate repair path
Seal kit released from parts crib
Reserved against two linked work orders
Field update posted by mechanical crew
Access cleared and unit isolated
Close-out package returned for correction
Inspection note required before final release
+
+
+
All updates shown here are operational records and must match the approved work order before closure.
+ Live ControlDispatch ReadyStorage BalancedField Review Open
+
+
+
+
+
+
+
+
Operational
Track site output, storage readiness, dispatch commitments, and field actions across the active hub.
The hub is operating within target limits, with solar and wind assets sharing load as expected and storage carrying the balancing role for short fluctuations. Dispatch obligations remain intact, and no station is currently outside its approved operating envelope.
Elena MorrisRegional Hub Supervisor
+
Net Output
428 MW
Holding above committed delivery band
Available Storage
81%
Reserve margin kept for evening handoff
Curtailment Risk
Low
No immediate restriction notices in scope
Open Field Actions
7
Two require supervisor review
+
+
+
+ Loading view
+ Hub performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Output remains dependable across the hub, but the team is keeping close watch on the inland station until restart behavior is fully verified. Supervisors should clear the pending reserve note and confirm the inspection window so field and control actions stay aligned.
+
+
+
+
+
+
+
+
Operations Notes
+
Operations staff are watching one inland station where inverter recovery is slower than normal after a brief protective trip. The condition is stable, but the team has kept a local inspection open until the restart pattern returns to baseline.
+
Primary dispatch commitment remains fully covered by live generation and stored reserve.
One site review is waiting on field confirmation before the maintenance note can be closed.
Remote control authority is active for all stations in the current hub scope.
No compliance holds are blocking routine switching or battery balancing actions.
+
Stations Online14
Open Reviews3
Active Crews2
+
+
+
+
Shift Activity
+
Recorded actions and follow-up items for the active operating window.
+
+
+
+
+
+
+
+
Inland station restart varianceRecovery sequence exceeded normal duration
Medium
Storage reserve floor nearing handoff targetBalancing plan may need minor adjustment
Low
Field confirmation pending on breaker inspectionClosure blocked until site response is logged
Medium
+
Approve reserve adjustment noteSubmitted by shift operator
Pending approval
Confirm inland site inspection windowCrew lead requested access hold
Waiting
Close completed switching logControl steps verified by second reviewer
Ready
+
Grid desk accepted updated export positionAcknowledgement logged by dispatch coordinator
Battery balancing sequence completed without exceptionAutomatic control remained within approved limits
Field crew checked access route to inland stationTravel and handoff conditions confirmed
Remote link health check passed across all active sitesNo communication degradation recorded
+
+
+
Readiness Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Dispatch coverage96%
Committed export supported
Storage readiness81%
Reserve held for balancing
Field action closure68%
Open reviews moving toward sign-off
+
Recent Activity
Hub entered balanced operating mode
Control room update
Storage reserve floor adjusted for dispatch window
Shift approval recorded
Inverter restart review opened at inland station
Field follow-up assigned
Export commitment reconfirmed with grid desk
Acknowledgement received
Stations Online14
Open Reviews3
Active Crews2
+
+
+
Use this view to confirm readiness before approving dispatch changes or closing field actions.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.
+ Active shiftRelease pendingLab verifiedEscalation open
+
+
+
+
+
+
+
+
Review in progress
Monitor active inspections, isolate nonconforming lots, and keep release decisions aligned across line, lab, and dispatch teams.
This overview is used by inspection leads to track open quality cases from first check through release decision. It brings together line findings, lab confirmation, hold status, and reviewer actions so each lot can move forward with a clear record.
Erin ColeQuality Assurance Lead
+
Lots under review
18
4 require supervisor sign-off
Pass rate
96.8%
Stable against control threshold
Items on hold
7
Awaiting disposition or retest
Average closure time
2.6h
Down after revised sampling steps
+
+
+
+ Loading view
+ Inspection activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A narrow group of nonconforming lots is driving most of the queue. The team has already isolated affected stock and limited release access, so the immediate focus is on finishing lab confirmation, recording final disposition, and clearing unaffected material without breaking traceability.
+
+
+
+
+
+
+
+
Coordination Notes
+
The current workload is concentrated on final assembly output where a small group of lots failed appearance and torque checks. Most cases are moving normally, but a limited set remains blocked while the team confirms whether rework is acceptable or a full containment action is needed.
+
Two lots were moved from routine review to controlled hold after repeat defects were confirmed at receiving check.
Lab confirmation has cleared one previously blocked lot for release with added inspection notes.
Dispatch has been asked not to allocate stock from any case marked pending disposition.
+
Open holds7
Retests due3
Approved releases11
+
+
+
+
Recent Actions
+
Latest updates across inspection, hold, and release handling.
+
+
+
+
+
+
+
+
Repeat defect pattern detectedThree related cases linked to the same source batch
High
Approval waiting on lab noteRelease decision cannot close until confirmation is attached
Medium
Containment nearing limitReserved hold area is close to capacity
Medium
+
Review pending disposition cases7 cases require lead decision
In progress
Confirm retest sampling planApplies to two blocked lots
Queued
Close cleared release recordsDocumentation ready for final update
Ready
+
Line inspector added a deviation noteAttached to lot under controlled hold
Lab result accepted by reviewerCase moved back to release check
Containment list updatedStock location confirmed for isolated units
Dispatch restriction acknowledgedOutbound allocation blocked for pending lots
+
+
+
Inspection Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion82%
Most scheduled checks are recorded
Disposition closure61%
Open exceptions still under review
Release documentation74%
Awaiting final sign-off on held lots
+
Case Progress
Inbound sample logged
Initial inspection record created
Deviation confirmed
Case routed to quality lead
Containment applied
Affected stock isolated from release
Disposition pending
Awaiting final approval
Open holds7
Retests due3
Approved releases11
+
+
+
Only approved dispositions can clear held material for release.
+
+
+
+
diff --git a/web_insert/Highcharts/scatter/chart_0030_scatter.html b/web_insert/Highcharts/scatter/chart_0030_scatter.html
new file mode 100644
index 0000000000000000000000000000000000000000..3043c91fbce45c2b5f208bd5fc026fdb1714b538
--- /dev/null
+++ b/web_insert/Highcharts/scatter/chart_0030_scatter.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T14 Store Stock Control
+
+
+
+
+
+
+
+
+
+
Live stockReplenishment reviewHold resolution
Track replenishment risk, release held inventory, and keep shelf availability aligned across active locations.
+
+
+
+ Loading view
+ Location stock position
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main concern is not total network stock but timing. Several locations can return to normal selling levels once held units are cleared and transfer approvals are issued in the right order. Teams are using this view to keep store demand, receiving capacity, and release controls aligned.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Latest stock handling and release steps
+
+
+
+
+
+
+
+
Count mismatch blocking release12 item lines remain held after store recount
High
Priority location below cover targetReplenishment risk increased across 4 stores
Medium
Receiving backlog nearing thresholdInbound confirmation lag may delay availability updates
Medium
+
Approve transfer batch for thin-cover stores29 lines prepared by distribution planning
Ready
Confirm held quantities against recount notes74 units waiting on store validation
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Hold review completion68%
Most flagged lines have first-pass decisions
Transfer approval completion54%
Awaiting release order from control lead
Count reconciliation73%
Repeat variance stores still under review
+
+
+
Operational Notes
+
this workflow supports the daily decision flow: identify where cover is too thin, confirm whether held stock can be released, and route transfer lines to the locations with the highest service risk. Notes and queue items below reflect the current handoff between store control, distribution, and floor operations.
+
Prioritize releases for locations with same-day shelf risk.
Delay nonessential transfers until held quantities are verified.
Escalate repeated count mismatches to store control leads.
Keep transfer approvals aligned with receiving capacity.
+
Priority stores11
Open holds18
Ready transfers7
+
Network Signals
Service riskElevated
Receiving pressureModerate
Approval backlogContained
Cycle count exceptions reviewed
Store control completed first-pass review on flagged lines.
Transfer requests consolidated
Low-cover locations were grouped for a single approval pass.
Held stock release pending
Distribution is waiting for final quantity confirmation.
+
+
+
Use release actions only after count confirmation is recorded in the item note.
+ Live DispatchPriority LoadsDriver CoverageGate Readiness
+
+
+
+
+
+
+
Active monitoring
+
Coordinate active routes, rebalance drivers, and clear open exceptions from one operating view.
+
Dispatch is managing a tight operating window with several outbound runs stacked behind the same gate sequence. The team has already reallocated available units to protect higher-priority moves and reduce idle time at the yard.
+
+
+
Maya BennettFleet Dispatch Lead
+
+
+
+
Units in motion
148
12 reassigned during the current shift
Open route holds
9
Most tied to late gate release
Coverage gap
4
Backfill requested for long-haul lanes
On-time departure
93%
Holding steady after yard balancing
+
+
+
+
+ Loading view
+ Route coordination
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Most unresolved issues now sit between driver readiness and release timing. Supervisors are using this panel to confirm who can be reassigned, which routes need escalation, and where a short delay will create a downstream coverage gap.
+
Three priority loads were moved to alternate tractors to avoid missed departure targets.
Driver check-in compliance improved after direct follow-up from the shift desk.
Yard staging remains constrained near outbound lanes with refrigerated equipment.
+
Standby drivers6
Held departures9
Ready tractors22
+
+
+
+
+
Recent Activity
+
Latest dispatch actions and route decisions
+
+
+
+
+
+
+
+
Gate release delay affecting priority runLane B12 Waiting 18 min
High
Driver rest window blocks reassignmentLong-haul pool 2 units impacted
Medium
Trailer pairing mismatch in yard queueOutbound side Manual check required
Medium
+
Confirm backup operator for north corridor runDispatch desk request
In progress
Approve swap for delayed refrigerated unitRequires lead signoff
Pending
Close completed hold after gate clearanceRoute ready for release
Ready
+
Yard team confirmed two lanes cleared for outbound stagingPosted by yard control
Driver support updated availability for standby poolCoverage adjusted
Priority load reassignment accepted by route supervisorNo further approval needed
Fuel stop exception removed from active reviewDispatch note closed
+
+
+
Lead Note
+
The team is working through a compressed release window where small delays at the yard can quickly reduce route coverage. This view helps dispatch leads decide where to reassign equipment, push approvals, and keep priority movements on schedule.
+
Dispatch healthStable with exceptions
Driver readinessNear full coverage
Yard congestionElevated at outbound side
+
Priority lanes are protected, but remaining open holds need confirmation from yard and driver teams before release.
+
+ Open note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
Operating Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Route release completion78%
Based on active outbound plan
Driver assignment coverage91%
Remaining gap on long-haul lanes
Exception clearance64%
Open holds trending down
+
+
+
Use route reassignment only after confirming gate availability and driver hours.
Track specimen intake, instrument readiness, review holds, and release validated results from one controlled queue.
+
+
+
+ Loading view
+ Specimen flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Current delays are not caused by intake volume but by a narrow cluster of held results that need repeat confirmation and signed reviewer rationale. Once those cases are closed, the release queue should return to normal pace.
+
+
+
+
+
+
+
+
+
+
Validation Activity
+
Latest laboratory actions and review updates
+
+
+
+
+
+
+
+
Quality hold threshold reachedChemistry lane 7 held results
High
Instrument maintenance window dueHematology bench service reminder
Complete supervisory sign-off for held chemistry cases24 items in review queue
In progress
Verify rerun documentation before release5 specimens require note completion
Pending
Confirm analyzer readiness after resetPost-interruption checks still open
Waiting confirmation
+
Accession team cleared label exceptionMatched specimen and order records
Reviewer added comment to held electrolyte panelAwaiting repeat outcome
Bench lead reassigned overflow workCapacity balanced across active stations
Final result packet released to care teamAudit trail completed
+
+
Throughput Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Accessioning completion92%
Most inbound samples logged and routed
Validation review68%
Routine cases moving faster than held work
Quality documentation81%
Remaining notes tied to reruns and holds
+
+
+
Escalation Notes
+
Supervisors are balancing turnaround targets with quality controls, making sure reruns, delta checks, and documentation updates are completed before any final authorization.
+
Priority samples are routed directly to staffed benches.
Held results require either repeat testing or reviewer comment.
Release activity is limited to validated work with complete audit notes.
+
Released today143
Open holds7
Assigned reviewers9
+
Bench Signals
Pending accession checks12
Benches at capacity2
Reruns in progress5
Intake batch reconciled
Analyzer lane reset
Senior review started
Release queue narrowed
+
+
+
All releases must include reviewer confirmation and complete traceability.
Post-route summary for the latest dispatch cycle, focusing on late handoff recovery, depot coordination, and proof-of-delivery completion.
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
+
+
+ Loading view
+ Route performance view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
This review is being used to decide whether dispatch should adopt a standard delay-recovery playbook for mixed-stop runs. The current response relied on experienced staff making quick route adjustments, which worked in this case but may not scale without clearer depot release rules and a required outreach log for affected stops.
+
+
+
+
+
+
+
+
Support Notes
+
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
Departure drift started at the depot gate after loading lane congestion.
Manual reprioritization reduced missed arrival commitments on dense urban segments.
Proof-of-delivery capture improved after drivers were reminded to close stops before returning.
Two exception cases remain open pending package condition review.
+
Resequenced routes7
Support calls placed23
Returns held2
+
+
+
+
Recent Activity
+
Updates recorded during issue containment and closure review.
+
+
+
+
+
+
+
+
Proof mismatch on return scan2 consignments need depot confirmation
Medium
Loading lane congestion repeatedObserved across early dispatch wave
High
Customer contact note missing1 delayed stop closed without outreach log
Low
+
Validate open claims with depot supervisorAttach condition notes and return scans
In progress
Document route resequencing rulePrepare for dispatch handbook update
Pending
Close driver note reviewConfirm repeated gate delay comments
Ready
+
Driver team acknowledged revised stop orderField update logged by support desk
Depot supervisor added lane usage noteRoot cause linked to overlap during loading release
Customer service cleared outreach backlogAll affected recipients received status calls
The review focus is on whether the corrective actions used by the team should become standard practice for future mixed-stop routes with tight loading turnover.
+
Exception closure78%
Most delivery issues resolved in the same cycle
Driver note review64%
Comments grouped by route segment
Depot corrective action41%
Lane balancing plan awaiting sign-off
+
Field Signals
Route adherenceStable after intervention
Depot readinessNeeds lane balancing
Customer contact coverageAbove target
Opened after repeated departure slippage affected downstream stop timing and closure quality.
+
+
Internal review record for route performance follow-up and process adjustment.
+
+
+
+
diff --git a/web_insert/Highcharts/scatter/chart_0034_scatter.html b/web_insert/Highcharts/scatter/chart_0034_scatter.html
new file mode 100644
index 0000000000000000000000000000000000000000..fa4281e6eb8530d888ca7275d753744d3f359fc9
--- /dev/null
+++ b/web_insert/Highcharts/scatter/chart_0034_scatter.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
Post-run assessment for the last completed checkout messaging experiment, including impact, rollout decision, and follow-up actions.
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
+
+
+ Loading view
+ Experiment results
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Analyst Note
+
The result is not only statistically reliable but also operationally clean. Teams reviewing payment quality, support demand, and buyer behavior did not identify a counter-signal large enough to block release, which makes this a suitable candidate for default rollout with normal monitoring.
+
+
+
+
+
+
+
+
Review Notes
+
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
Primary goal was improved checkout completion.
Guardrails covered payment success, cancellation intent, and support contact rate.
Result supports rollout with standard monitoring.
Follow-up work should focus on first-time buyer reassurance.
+
Control share50%
Variant share50%
Guardrails passed3/3
+
+
+
+
Recent Activity
+
Latest review updates and decision steps
+
+
+
+
+
+
+
+
Release approval pendingRequires product and operations sign-off
Medium
Follow-up test not yet scopedFirst-time buyer segment showed the strongest response
Low
Monitoring handoff requiredPost-release checks must be assigned before launch
Medium
+
Confirm rollout ownerRelease coordination for default experience
Open
Document final decisionAdd rationale to the experiment record
In progress
Prepare follow-up briefDraft next test for delivery reassurance
Not started
+
Data review completed by analyticsNo variance issues found in conversion events
Support lead confirmed stable contact volumeNo increase tied to variant exposure
Product owner attached final recommendationPromote Variant B with standard guardrails
Release coordinator requested approval windowDecision needed before deployment planning
+
+
+
Key Insight
+
The operational recommendation is to promote Variant B to the default experience, keep the current guardrails in place, and open a follow-up test on supporting text near delivery expectations.
+
Review completion92%
Only final approval remains
Release readiness84%
Monitoring and ownership still being confirmed
Follow-up planning36%
Next hypothesis not fully defined
+
Quality Signals
Audience balanceWithin tolerance
Tracking integrityVerified
Release readinessApproved pending sign-off
Control used the existing confirmation message. Variant B used shorter supporting language focused on confidence before purchase.
+
+
Rollout should begin with standard monitoring and a hold point if payment reliability moves outside normal range.
Reporting cycle activeEvidence under reviewSite coverage completeApproval pending
+
+
+
Reporting Summary
Consolidated operational view for facility emissions, evidence readiness, and approval progress across the reporting cycle.
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
+
+
+ Loading view
+ Emissions view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Reporting Note
+
Most reporting work is complete, but the team is holding release until the last boundary clarification and control statement are fully documented. Once those items are closed, the submission can move through approval without further operational changes.
+
+
+
+
+
+
+
+
Reporting Support
+
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
All operated facilities submitted activity data within the active reporting window.
Boundary assumptions were updated after internal control review.
Evidence coverage is complete for direct fuel use and purchased electricity.
Final sign-off is blocked only by unresolved exception responses.
+
Facilities in scope14
Evidence files linked128
Approvers assigned5
+
+
+
+
Review Activity
+
Recent actions tied to the current reporting cycle
+
+
+
+
+
+
+
+
Boundary note requires confirmationShared support load treatment updated by operations
Medium
Exception owner response overdueOne facility comment has not been returned
High
Approval pack awaiting final attachmentControl statement must be added before routing
Low
+
Validate revised allocation methodCheck consistency against facility evidence
In progress
Close open exception itemsCollect responses from assigned owners
Blocked
Route package for sign-offRelease once control statement is attached
Coordinate intake, review, and resolution for active public service requests across district teams.
+
+
+
+ Loading view
+ Request handling
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Demand remains manageable overall, but manual verification is creating uneven wait times between offices. Supervisors are prioritizing clean approvals, redirecting exception work to trained reviewers, and keeping resident communication tied closely to documented case decisions.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest actions across intake, review, and approval teams.
+
+
+
+
+
+
+
+
Approval queue nearing response limit8 requests need supervisor action within the service window
High
Identity mismatch rate increasedManual checks are slowing intake clearance in two offices
Medium
Returned submissions require follow-upResidents have not responded on 14 incomplete requests
Low
+
Clear specialist review backlogReassign exception cases from general intake
In progress
Approve release batchDecision notes are complete and ready for sign-off
Ready
Validate returned documentsCheck corrected records before reopening requests
Queued
+
North district accepted three escalated casesOwnership transferred from central review
Resident notice batch released after approvalNotifications sent for completed decisions
Compliance note added to exception handling rulesReview teams must record reason codes on manual overrides
Intake team cleared duplicate submissionsMerged records reduced queue noise for active requests
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Intake review72%
Most new submissions screened and routed
Eligibility verification54%
Manual checks remain the slowest step
Decision release81%
Approved cases moving out on schedule
+
+
+
Supervisor Notes
+
A review backlog has formed around eligibility checks that require manual confirmation. Supervisors are balancing faster routing with compliance controls so straightforward requests can move forward while exceptions remain documented and ready for audit.
+
Priority requests are held for direct supervisor review when identity or address records do not match.
Field offices can return incomplete submissions to intake without closing the case.
Resident notifications are released only after decision notes and supporting checks are complete.
Escalated items remain visible until ownership is accepted by the receiving team.
+
Avg. handling time2.8h
Returned to intake27
Supervisor holds11
+
Queue Health
Service levelStable
Review capacityTight
Escalation loadModerate
Intake queue reviewed
Initial screening completed for newly received submissions
Eligibility exceptions routed
Cases with missing verification moved to specialist review
Supervisor approvals issued
Approved requests released for resident notice and fulfillment
+
+
+
Access, routing, and decision history are logged for compliance review.
Editorial interpretation, policy check, and release readiness for a high-traffic article package.
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
+
+
+ Loading view
+ Article review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
The item remains on hold because reviewers want the final article to state only what can be supported directly in the reporting record. Once the headline and two interpretive passages are revised, the last policy note can be closed and the release team can complete handoff without reopening the brief.
+
+
+
+
+
+
+
+
Editorial Support Notes
+
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
Tighten the headline so it reflects verified reporting only
Rework two interpretive lines in the middle section
Confirm attribution order in the closing paragraph
Keep the release hold in place until policy notes are cleared
+
Linked notes12
Required edits3
Approvals2/3
+
+
+
+
Recent Activity
+
Latest actions across review, policy, and release handling.
+
+
+
+
+
+
+
+
Policy sign-off still openRelease cannot proceed until the final comment is resolved
High
Headline wording exceeds source certaintyDesk requested a narrower phrasing pass
Medium
Closing attribution order changedLatest revision needs reviewer confirmation
Low
+
Apply marked language editsThree passages require direct revision
Prepare release handoffQueue placement is ready once approval lands
Queued
+
Desk review updated with narrowed wording requestAdded by editorial review
Policy note linked to middle section passageMapped to required edit
Release hold confirmed by operationsQueue position preserved
Final pass assigned to senior reviewerAwaiting consolidated response
+
+
+
Reading Insight
+
Operations has held the item in the final queue so the desk can complete one coordinated pass rather than resolve comments in isolation. this workflow is intended to keep editors, policy reviewers, and release staff on the same record while the article moves through its last approval step.
+
Editorial review88%
Most text decisions are settled
Policy clearance67%
One required note remains
Release handoff54%
Prepared but not cleared
+
Release Signals
Attribution strengthNeeds tightening
Headline alignmentUnder revision
Release readinessPending approval
Final release depends on one policy approval and completion of marked language edits.
+
+
Use the same review record when updating wording, approvals, and release handling to avoid duplicate decisions.
Monitor enrollment flow, review teaching requests, and keep campus services within response targets.
+
+
+
+ Loading view
+ Enrollment workload
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main pressure point is not overall volume but the number of cases waiting on a second team to confirm eligibility, roster placement, or account release. Clearing those handoffs will reduce repeat contacts and keep approvals moving in the right order.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Recent updates across admissions, scheduling, and support
+
+
+
+
+
+
+
+
Identity check queue exceeded review target14 learner files are outside normal handling time
Access provisioning paused for one intake groupRoster confirmation is still pending from registry
Medium
+
Approve seat exception requestsOwned by academic operations
In progress
Confirm account release listWaiting on final learner verification
Blocked
Close duplicate support casesMerge requests from advising and registry
Ready
+
Registry completed a priority batch reviewOpen count reduced after document validation
Scheduling submitted a conflict noteOne instructor assigned to overlapping sessions
Support added an access exceptionLearner record needs manual activation
Advising returned a hold for correctionProgram selection does not match approved path
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Enrollment validation74%
Most records reviewed; exceptions remain
Teaching assignment approval61%
Conflict cases still under review
Account activation release83%
Waiting on final roster handoff
+
+
+
Support Notes
+
Most exceptions are tied to incomplete learner records and overlapping instructor availability. Team leads are using the queue to clear blocked cases before they affect course readiness and support response times.
+
Admissions is prioritizing records with missing identity checks.
Scheduling is reviewing instructor conflicts before room release.
Support is holding account activation until final roster approval.
Policy notices were updated to reflect new escalation ownership.
+
Escalations7
Owners online12
Blocked cases19
+
Operational Signals
Validation backlogModerate
Seat release paceStable
Access turnaroundAt risk
Intake review opened
Registry triage assigned the latest submission batch
Faculty request escalated
Teaching load conflict moved to academic operations
Roster lock cleared
Student services approved the final exception set
+
+
+
Use this view to coordinate approvals, confirm handoffs, and clear blockers before escalation windows are breached.
+
+
+
+
diff --git a/web_insert/Plotly/bar/chart_0096_bar.html b/web_insert/Plotly/bar/chart_0096_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..d2210c00db56daca226ca2eb1fd05cd0bbe75da9
--- /dev/null
+++ b/web_insert/Plotly/bar/chart_0096_bar.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T23 Population Health Surveillance Console
+
+
+
+
+
+
+
+
+
T23
+
+
Public Health Operations
+
Population Health Surveillance Console
+
Cluster Review 18
+
+
+
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
+ Active flightPriority reviewShared budgetStore traffic
+
+
+
+
+
+
+
+
Needs review
Track active retail promotions, review pacing risks, and keep launch approvals moving across paid channels.
This overview brings campaign owners, channel leads, and reviewers into one operating view for retail promotion activity. The focus is on release readiness, pacing discipline, and fast resolution when a campaign drifts outside its approved plan.
Avery NolanMarketing Operations Lead
+
Active campaigns
18
3 awaiting final release
Planned spend
$426K
Within current budget guardrail
Projected return
4.8x
Lift driven by repeat buyer segments
Creative compliance
92%
Remaining items need legal copy review
+
+
+
+ Loading view
+ Campaign performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
Current risk is concentrated in a small number of high-visibility promotions that are close to release but still depend on approval cleanup. Clearing those items will allow the team to open budget safely without creating rework for channel operations or compliance.
+
+
+
+
+
+
+
+
Operational Notes
+
Most campaigns are moving as expected, but a small group requires attention before budget can be fully opened. The current work centers on copy approval, audience overlap checks, and confirming that regional exclusions are applied before wider rollout.
+
Priority campaigns are grouped for same-day review by channel operations.
Budget adjustments require owner confirmation and finance-safe pacing limits.
Audience rule changes remain blocked until compliance notes are cleared.
Store traffic campaigns receive higher escalation when release windows narrow.
+
Queued reviews9
Open exceptions4
Released today5
+
+
+
+
Team Activity
+
Recent decisions and release changes
+
+
+
+
+
+
+
+
Copy exception still open for priority placementOwner response pending
High
Audience overlap exceeds internal thresholdShared budget campaign group
Medium
Regional exclusion missing from one launch setStore traffic promotion
Medium
+
Approve revised launch copyAssigned to compliance reviewer
In progress
Confirm pacing cap for shared budget groupRequested by channel lead
Pending
Validate excluded regions before releaseRequired for final activation
Ready
+
Budget guardrail updated for priority promotionRecorded by finance operations
Audience rule revision submittedWaiting for approval
Channel owner added release noteEscalation removed after review
Compliance returned one asset for editsCopy needs location disclaimer
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval completion74%
Most high-spend items already reviewed
Budget allocation68%
Remaining spend held behind final checks
Release readiness81%
Operational setup nearly complete
+
Release Flow
Intake completed
Briefs and spend limits confirmed
Review in progress
Compliance and audience checks underway
Release window
Approved campaigns move to channel activation
Queued reviews9
Open exceptions4
Released today5
+
+
+
Use this view to resolve blockers before expanding spend or opening additional channel coverage.
Review account health, retention risk, and pending interventions for active customer segments.
+
+
+
+ Loading view
+ Active user case flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current queue reflects a concentrated effort to retain users who showed intent but encountered friction during critical account steps. Teams are expected to document every outreach attempt, confirm ownership before escalation, and close only when the account is either stable or formally transferred for continued monitoring.
+
+
+
+
+
+
+
+
+
+
Case Activity
+
Recent decisions and follow-up movement
+
+
+
+
+
+
+
+
High-value account awaiting decisionNo final disposition recorded after manual review
High
Outreach backlog risingFollow-up queue has crossed internal response target
Medium
Exception note incompletePolicy-sensitive case missing approval rationale
Medium
+
Confirm owner coverage for priority cases7 cases without confirmed handoff
In progress
Complete callback verificationPending contact outcomes need final status
Queued
Close resolved onboarding reviewsCases meet closure conditions after successful recovery
Ready
+
Owner updated on priority reviewRouting changed after shift handoff
Manual decision recordedCase moved from hold to monitor
Risk flag clearedActivity recovered after intervention
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Queue clearance72%
Handled against current intake
Outreach completion64%
Priority contacts sent and logged
Approval coverage89%
Cases with complete decision trail
+
+
+
Operational Notes
+
Current activity is centered on a rise in support-linked retention risk. Several accounts were routed into manual review after repeated onboarding exits, failed self-service recovery, or policy-sensitive changes that require a documented decision.
+
High-priority cases are routed to named owners before outreach begins.
Accounts with repeat friction stay in review until next-step evidence is recorded.
Policy exceptions require a reason code and final approval note.
+
Active owners16
Cases on hold12
Recovered users31
+
Review Signals
Escalation rate11%
Policy exceptions9
Pending callbacks22
Risk rule triggered
Account entered review after repeated drop-off behavior
Operations review started
Owner assigned and contact path confirmed
User contacted
Follow-up sent with recovery guidance and next action
Decision logged
Case moved to monitor, close, or escalate
+
+
+
Access, contact history, and policy decisions are recorded for audit review.
Receiving activePutaway constrainedDispatch on hold
Monitor inbound receipts, putaway flow, and outbound release from one operating view.
+
+
+
+ Loading view
+ Facility activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main risk is not total volume but timing. Inbound receipts, reserve storage, and outbound release are all connected, so a short delay at dock assignment or packing review quickly affects the rest of the floor. Clearing blocked pallets and reallocating lift coverage should return the site to a steadier operating rhythm.
+
+
+
+
+
+
+
+
+
+
Floor Activity
+
Updated as teams complete receiving, storage, and release steps.
+
+
+
+
+
+
+
+
Dock queue above working limit6 loads waiting longer than target
High
Bulk zone capacity nearing thresholdReserve slots at 93% use
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
+
+
+
+
diff --git a/web_insert/Plotly/bar/chart_0102_bar.html b/web_insert/Plotly/bar/chart_0102_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..18369e58243446ecadfdfaa864f4b595a23b5666
--- /dev/null
+++ b/web_insert/Plotly/bar/chart_0102_bar.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T04 Daily Energy Use Report
+
+
+
+
+
+
Operational summary for site load, steam demand, and utility variance across active production lines.
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
+
+
+ Loading view
+ Consumption overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operating Note
+
The current review is centered on whether the elevated water draw should be recorded as expected support usage or escalated as a controllable loss. Early checks support the first view, but the decision will remain open until sanitation records and supervisor confirmation are complete.
+
+
+
+
+
+
+
+
Supervisor Support
+
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
Base electrical load improved after non-process fans were isolated during idle periods.
Compressed air demand stayed even, with no signs of sustained leakage during the late run.
Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
Water variance should be rechecked once final sanitation logs are posted.
+
Open exceptions2
Lines reviewed6/6
Actions due3
+
+
+
+
Completion Progress
+
Status of review and follow-up
+
+
+
+
+
+
+
+
Water use above expected bandPackaging area support services
Medium
Line idle shutdown not confirmedTwo areas missing end-run verification
Low
Final sanitation log still pendingRequired to close variance review
Medium
+
Confirm restart-related water drawOperations supervisor to validate against log entries
In progress
Verify non-process equipment shutdownUtilities team to spot-check idle periods
Queued
Complete site approvalRequired before report closeout
Pending
+
Meter reconciliation completed for main supplyLogged by utilities desk
Maintenance confirmed no active steam issueInspection note added
Cost allocation refreshed for final reviewFinance rule set applied
+
+
+
Assessment
+
No immediate escalation is required, but the site energy lead has asked line supervisors to confirm idle-time shutdown discipline before the next reporting cycle is closed.
+
Meter validation100%
All core readings matched
Variance review68%
Awaiting supporting logs
Management sign-off35%
Ready for supervisor action
+
Key Signals
Load balanceSteady
Utility riskModerate
Approval statePending sign-off
Water intake exceeded the normal operating band during cleaning and restart activity. Review remains open until line notes and final meter confirmation are attached.
+
+
Use this report to confirm variances, assign follow-up, and complete site-level review before closeout.
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
+ Live TradingStore NetworkPriority Follow-upRevenue Focus
+
+
+
+
+
+
+
Active Oversight
+
Monitor store execution, revenue pacing, stock pressure, and pending actions across the active trading cycle.
+
Trading performance is holding above plan, but momentum is uneven across the network. Flagship locations are carrying the result while several mid-tier stores are slipping on conversion after early demand spikes cleared core inventory.
+
+
+
Maya ChenSales Operations Lead
+
+
+
+
Net Sales
$4.8M
Running ahead of internal target with stronger in-store conversion.
Orders Closed
18,240
Order completion remains stable despite heavier queue volume.
Low Stock SKUs
126
Concentrated in top-selling lines requiring rapid replenishment.
Pending Exceptions
37
Most cases are tied to price overrides and fulfillment holds.
+
+
+
+
+ Loading view
+ Sales command view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Operations leads are using this board to coordinate price checks, stock transfers, and field follow-up. The immediate goal is to protect sell-through on priority lines without creating avoidable margin leakage or unresolved service cases.
+
Price override approvals increased after local markdown requests were reopened.
Transfer requests are highest in stores with strong accessory attachment rates.
Frontline teams need confirmed replenishment windows before issuing customer callbacks.
Regional managers have been asked to clear overdue store notes before next review.
+
Stores Flagged21
Cases Reassigned14
Open Callbacks89
+
+
+
+
+
Execution Activity
+
Store actions and approval movement
+
+
+
+
+
+
+
+
Override approvals approaching threshold12 stores exceeded normal approval volume
High
Core item coverage at riskTop stores reporting low back-room availability
Medium
Store callback backlog buildingCustomer follow-up notes remain open past target
Medium
+
Approve urgent pricing exceptionsSenior review required for margin-sensitive requests
In progress
Confirm transfer receipt with destination storesFollow up on high-demand replenishment moves
Pending
Close unresolved field notesSeveral stores have not updated execution status
Blocked
+
North region cleared three high-value exceptionsApproval cycle shortened after reassignment
Accessory attachment improved in premium storesStore coaching appears to be holding
Transfer requests stabilized after stock releaseMost urgent moves have been acknowledged
Customer callback queue remains unevenService follow-through needs local management review
+
+
+
Lead Note
+
This board supports the daily operating rhythm for sales control, exception handling, and store coordination across the retail network.
+
Conversion PressureElevated
Stock Transfer LoadHigh
Approval ResponseWithin SLA
+
Investigate sales pacing, confirm stock position, and clear open approvals before escalation.
+
+ View note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
Focus Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval clearance78%
Cleared against open exception volume
Transfer completion64%
Confirmed store-to-store movements
Field note closure52%
Resolved execution updates from stores
+
+
+
Use approved actions only. Store-facing updates must match pricing, stock, and service policy before release.
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
+
+
+
+
diff --git a/web_insert/Plotly/bar/chart_0106_bar.html b/web_insert/Plotly/bar/chart_0106_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..2230683b3802d2b1d994bebcff0c5c8f8d3186a5
--- /dev/null
+++ b/web_insert/Plotly/bar/chart_0106_bar.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T19 Fulfillment Control Center
+
+
+
+
+
+
Monitor outbound flow, clear held orders, and keep dock activity aligned with carrier cutoff commitments.
Outbound volume is moving at a healthy pace, but a growing cluster of held orders is starting to compress the final release window. Most exceptions are concentrated in a small number of picking zones, which means the team can recover service if reviews are completed before the next carrier handoff cycle.
Maya ChenFulfillment Operations Lead
+
Orders ready to release
1,284
Stable after the last verification pass
Orders on hold
73
Most require address or stock confirmation
Dock lanes active
18 / 22
Two lanes reserved for late priority loads
On-time dispatch
96.4%
Holding above internal service target
+
+
+
+ Loading view
+ Outbound release status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most outbound risk is not coming from overall volume; it is coming from a manageable set of held orders that can delay the final handoff sequence if left unresolved. Clearing those exceptions now protects both dock capacity and on-time dispatch.
+
+
+
+
+
+
+
+
Operational Notes
+
Dock activity remains balanced across active lanes, and release discipline is preventing unnecessary trailer dwell. The current focus is to resolve shipment holds in the queue, confirm a small set of short picks, and protect the late priority wave from congestion near final staging.
+
Address validation holds account for the largest share of delayed releases
Priority orders should be cleared before standard replenishment checks resume
Lane reassignment is available if staging volume exceeds the current threshold
Carrier handoff timing remains achievable with active exception review
+
Rush orders146
Review desks open5
Average hold age42m
+
+
+
+
Recent Actions
+
Latest fulfillment events and reviews
+
+
+
+
+
+
+
+
Held orders above control threshold73 orders pending review across three zones
High
Lane 12 staging nearing limitOverflow risk if the next release is not staggered
Medium
Carrier cutoff buffer tighteningPriority loads need final confirmation soon
Medium
+
Clear address validation holdsAssigned to order review desk
In progress
Confirm short pick substitutionsAwaiting floor lead approval
Pending
Protect late priority lane capacityReserve space before final handoff
Scheduled
+
Verification team cleared 22 held ordersQueue pressure eased in the last review cycle
Dock supervisor opened two backup positionsStaging congestion reduced near outbound lanes
Carrier desk confirmed on-time intakeNo change to active handoff sequence
Packing lead flagged repeat scan failuresIssue isolated to one station for follow-up
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Order release completion78%
Released against current outbound plan
Exception resolution63%
Held orders cleared or reassigned
Dock preparation87%
Lanes staffed and staged for handoff
+
Release Activity
Wave release completed
Primary outbound batch moved to final staging
Exception queue escalated
Held orders above review target triggered supervisor attention
Dock lanes rebalanced
Two lanes opened for priority handoff protection
Final verification in progress
Pack confirmation and label checks underway
Rush orders146
Review desks open5
Average hold age42m
+
+
+
Use this view to clear blockers early, protect release timing, and keep dock flow aligned with service commitments.
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.
+ Active shiftRelease pendingLab verifiedEscalation open
+
+
+
+
+
+
+
+
Review in progress
Monitor active inspections, isolate nonconforming lots, and keep release decisions aligned across line, lab, and dispatch teams.
This overview is used by inspection leads to track open quality cases from first check through release decision. It brings together line findings, lab confirmation, hold status, and reviewer actions so each lot can move forward with a clear record.
Erin ColeQuality Assurance Lead
+
Lots under review
18
4 require supervisor sign-off
Pass rate
96.8%
Stable against control threshold
Items on hold
7
Awaiting disposition or retest
Average closure time
2.6h
Down after revised sampling steps
+
+
+
+ Loading view
+ Inspection activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A narrow group of nonconforming lots is driving most of the queue. The team has already isolated affected stock and limited release access, so the immediate focus is on finishing lab confirmation, recording final disposition, and clearing unaffected material without breaking traceability.
+
+
+
+
+
+
+
+
Coordination Notes
+
The current workload is concentrated on final assembly output where a small group of lots failed appearance and torque checks. Most cases are moving normally, but a limited set remains blocked while the team confirms whether rework is acceptable or a full containment action is needed.
+
Two lots were moved from routine review to controlled hold after repeat defects were confirmed at receiving check.
Lab confirmation has cleared one previously blocked lot for release with added inspection notes.
Dispatch has been asked not to allocate stock from any case marked pending disposition.
+
Open holds7
Retests due3
Approved releases11
+
+
+
+
Recent Actions
+
Latest updates across inspection, hold, and release handling.
+
+
+
+
+
+
+
+
Repeat defect pattern detectedThree related cases linked to the same source batch
High
Approval waiting on lab noteRelease decision cannot close until confirmation is attached
Medium
Containment nearing limitReserved hold area is close to capacity
Medium
+
Review pending disposition cases7 cases require lead decision
In progress
Confirm retest sampling planApplies to two blocked lots
Queued
Close cleared release recordsDocumentation ready for final update
Ready
+
Line inspector added a deviation noteAttached to lot under controlled hold
Lab result accepted by reviewerCase moved back to release check
Containment list updatedStock location confirmed for isolated units
Dispatch restriction acknowledgedOutbound allocation blocked for pending lots
+
+
+
Inspection Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion82%
Most scheduled checks are recorded
Disposition closure61%
Open exceptions still under review
Release documentation74%
Awaiting final sign-off on held lots
+
Case Progress
Inbound sample logged
Initial inspection record created
Deviation confirmed
Case routed to quality lead
Containment applied
Affected stock isolated from release
Disposition pending
Awaiting final approval
Open holds7
Retests due3
Approved releases11
+
+
+
Only approved dispositions can clear held material for release.
+ Live ControlDispatch ReadyStorage BalancedField Review Open
+
+
+
+
+
+
+
+
Operational
Track site output, storage readiness, dispatch commitments, and field actions across the active hub.
The hub is operating within target limits, with solar and wind assets sharing load as expected and storage carrying the balancing role for short fluctuations. Dispatch obligations remain intact, and no station is currently outside its approved operating envelope.
Elena MorrisRegional Hub Supervisor
+
Net Output
428 MW
Holding above committed delivery band
Available Storage
81%
Reserve margin kept for evening handoff
Curtailment Risk
Low
No immediate restriction notices in scope
Open Field Actions
7
Two require supervisor review
+
+
+
+ Loading view
+ Hub performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Output remains dependable across the hub, but the team is keeping close watch on the inland station until restart behavior is fully verified. Supervisors should clear the pending reserve note and confirm the inspection window so field and control actions stay aligned.
+
+
+
+
+
+
+
+
Operations Notes
+
Operations staff are watching one inland station where inverter recovery is slower than normal after a brief protective trip. The condition is stable, but the team has kept a local inspection open until the restart pattern returns to baseline.
+
Primary dispatch commitment remains fully covered by live generation and stored reserve.
One site review is waiting on field confirmation before the maintenance note can be closed.
Remote control authority is active for all stations in the current hub scope.
No compliance holds are blocking routine switching or battery balancing actions.
+
Stations Online14
Open Reviews3
Active Crews2
+
+
+
+
Shift Activity
+
Recorded actions and follow-up items for the active operating window.
+
+
+
+
+
+
+
+
Inland station restart varianceRecovery sequence exceeded normal duration
Medium
Storage reserve floor nearing handoff targetBalancing plan may need minor adjustment
Low
Field confirmation pending on breaker inspectionClosure blocked until site response is logged
Medium
+
Approve reserve adjustment noteSubmitted by shift operator
Pending approval
Confirm inland site inspection windowCrew lead requested access hold
Waiting
Close completed switching logControl steps verified by second reviewer
Ready
+
Grid desk accepted updated export positionAcknowledgement logged by dispatch coordinator
Battery balancing sequence completed without exceptionAutomatic control remained within approved limits
Field crew checked access route to inland stationTravel and handoff conditions confirmed
Remote link health check passed across all active sitesNo communication degradation recorded
+
+
+
Readiness Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Dispatch coverage96%
Committed export supported
Storage readiness81%
Reserve held for balancing
Field action closure68%
Open reviews moving toward sign-off
+
Recent Activity
Hub entered balanced operating mode
Control room update
Storage reserve floor adjusted for dispatch window
Shift approval recorded
Inverter restart review opened at inland station
Field follow-up assigned
Export commitment reconfirmed with grid desk
Acknowledgement received
Stations Online14
Open Reviews3
Active Crews2
+
+
+
Use this view to confirm readiness before approving dispatch changes or closing field actions.
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
Monitor outbound flow, clear held orders, and keep dock activity aligned with carrier cutoff commitments.
Outbound volume is moving at a healthy pace, but a growing cluster of held orders is starting to compress the final release window. Most exceptions are concentrated in a small number of picking zones, which means the team can recover service if reviews are completed before the next carrier handoff cycle.
Maya ChenFulfillment Operations Lead
+
Orders ready to release
1,284
Stable after the last verification pass
Orders on hold
73
Most require address or stock confirmation
Dock lanes active
18 / 22
Two lanes reserved for late priority loads
On-time dispatch
96.4%
Holding above internal service target
+
+
+
+ Loading view
+ Outbound release status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most outbound risk is not coming from overall volume; it is coming from a manageable set of held orders that can delay the final handoff sequence if left unresolved. Clearing those exceptions now protects both dock capacity and on-time dispatch.
+
+
+
+
+
+
+
+
Operational Notes
+
Dock activity remains balanced across active lanes, and release discipline is preventing unnecessary trailer dwell. The current focus is to resolve shipment holds in the queue, confirm a small set of short picks, and protect the late priority wave from congestion near final staging.
+
Address validation holds account for the largest share of delayed releases
Priority orders should be cleared before standard replenishment checks resume
Lane reassignment is available if staging volume exceeds the current threshold
Carrier handoff timing remains achievable with active exception review
+
Rush orders146
Review desks open5
Average hold age42m
+
+
+
+
Recent Actions
+
Latest fulfillment events and reviews
+
+
+
+
+
+
+
+
Held orders above control threshold73 orders pending review across three zones
High
Lane 12 staging nearing limitOverflow risk if the next release is not staggered
Medium
Carrier cutoff buffer tighteningPriority loads need final confirmation soon
Medium
+
Clear address validation holdsAssigned to order review desk
In progress
Confirm short pick substitutionsAwaiting floor lead approval
Pending
Protect late priority lane capacityReserve space before final handoff
Scheduled
+
Verification team cleared 22 held ordersQueue pressure eased in the last review cycle
Dock supervisor opened two backup positionsStaging congestion reduced near outbound lanes
Carrier desk confirmed on-time intakeNo change to active handoff sequence
Packing lead flagged repeat scan failuresIssue isolated to one station for follow-up
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Order release completion78%
Released against current outbound plan
Exception resolution63%
Held orders cleared or reassigned
Dock preparation87%
Lanes staffed and staged for handoff
+
Release Activity
Wave release completed
Primary outbound batch moved to final staging
Exception queue escalated
Held orders above review target triggered supervisor attention
Dock lanes rebalanced
Two lanes opened for priority handoff protection
Final verification in progress
Pack confirmation and label checks underway
Rush orders146
Review desks open5
Average hold age42m
+
+
+
Use this view to clear blockers early, protect release timing, and keep dock flow aligned with service commitments.
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
Coordinate intake, review, and resolution for active public service requests across district teams.
+
+
+
+ Loading view
+ Request handling
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Demand remains manageable overall, but manual verification is creating uneven wait times between offices. Supervisors are prioritizing clean approvals, redirecting exception work to trained reviewers, and keeping resident communication tied closely to documented case decisions.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest actions across intake, review, and approval teams.
+
+
+
+
+
+
+
+
Approval queue nearing response limit8 requests need supervisor action within the service window
High
Identity mismatch rate increasedManual checks are slowing intake clearance in two offices
Medium
Returned submissions require follow-upResidents have not responded on 14 incomplete requests
Low
+
Clear specialist review backlogReassign exception cases from general intake
In progress
Approve release batchDecision notes are complete and ready for sign-off
Ready
Validate returned documentsCheck corrected records before reopening requests
Queued
+
North district accepted three escalated casesOwnership transferred from central review
Resident notice batch released after approvalNotifications sent for completed decisions
Compliance note added to exception handling rulesReview teams must record reason codes on manual overrides
Intake team cleared duplicate submissionsMerged records reduced queue noise for active requests
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Intake review72%
Most new submissions screened and routed
Eligibility verification54%
Manual checks remain the slowest step
Decision release81%
Approved cases moving out on schedule
+
+
+
Supervisor Notes
+
A review backlog has formed around eligibility checks that require manual confirmation. Supervisors are balancing faster routing with compliance controls so straightforward requests can move forward while exceptions remain documented and ready for audit.
+
Priority requests are held for direct supervisor review when identity or address records do not match.
Field offices can return incomplete submissions to intake without closing the case.
Resident notifications are released only after decision notes and supporting checks are complete.
Escalated items remain visible until ownership is accepted by the receiving team.
+
Avg. handling time2.8h
Returned to intake27
Supervisor holds11
+
Queue Health
Service levelStable
Review capacityTight
Escalation loadModerate
Intake queue reviewed
Initial screening completed for newly received submissions
Eligibility exceptions routed
Cases with missing verification moved to specialist review
Supervisor approvals issued
Approved requests released for resident notice and fulfillment
+
+
+
Access, routing, and decision history are logged for compliance review.
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
Post-run assessment for the last completed checkout messaging experiment, including impact, rollout decision, and follow-up actions.
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
+
+
+ Loading view
+ Experiment results
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Analyst Note
+
The result is not only statistically reliable but also operationally clean. Teams reviewing payment quality, support demand, and buyer behavior did not identify a counter-signal large enough to block release, which makes this a suitable candidate for default rollout with normal monitoring.
+
+
+
+
+
+
+
+
Review Notes
+
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
Primary goal was improved checkout completion.
Guardrails covered payment success, cancellation intent, and support contact rate.
Result supports rollout with standard monitoring.
Follow-up work should focus on first-time buyer reassurance.
+
Control share50%
Variant share50%
Guardrails passed3/3
+
+
+
+
Recent Activity
+
Latest review updates and decision steps
+
+
+
+
+
+
+
+
Release approval pendingRequires product and operations sign-off
Medium
Follow-up test not yet scopedFirst-time buyer segment showed the strongest response
Low
Monitoring handoff requiredPost-release checks must be assigned before launch
Medium
+
Confirm rollout ownerRelease coordination for default experience
Open
Document final decisionAdd rationale to the experiment record
In progress
Prepare follow-up briefDraft next test for delivery reassurance
Not started
+
Data review completed by analyticsNo variance issues found in conversion events
Support lead confirmed stable contact volumeNo increase tied to variant exposure
Product owner attached final recommendationPromote Variant B with standard guardrails
Release coordinator requested approval windowDecision needed before deployment planning
+
+
+
Key Insight
+
The operational recommendation is to promote Variant B to the default experience, keep the current guardrails in place, and open a follow-up test on supporting text near delivery expectations.
+
Review completion92%
Only final approval remains
Release readiness84%
Monitoring and ownership still being confirmed
Follow-up planning36%
Next hypothesis not fully defined
+
Quality Signals
Audience balanceWithin tolerance
Tracking integrityVerified
Release readinessApproved pending sign-off
Control used the existing confirmation message. Variant B used shorter supporting language focused on confidence before purchase.
+
+
Rollout should begin with standard monitoring and a hold point if payment reliability moves outside normal range.
+ Live DispatchPriority LoadsDriver CoverageGate Readiness
+
+
+
+
+
+
+
Active monitoring
+
Coordinate active routes, rebalance drivers, and clear open exceptions from one operating view.
+
Dispatch is managing a tight operating window with several outbound runs stacked behind the same gate sequence. The team has already reallocated available units to protect higher-priority moves and reduce idle time at the yard.
+
+
+
Maya BennettFleet Dispatch Lead
+
+
+
+
Units in motion
148
12 reassigned during the current shift
Open route holds
9
Most tied to late gate release
Coverage gap
4
Backfill requested for long-haul lanes
On-time departure
93%
Holding steady after yard balancing
+
+
+
+
+ Loading view
+ Route coordination
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Most unresolved issues now sit between driver readiness and release timing. Supervisors are using this panel to confirm who can be reassigned, which routes need escalation, and where a short delay will create a downstream coverage gap.
+
Three priority loads were moved to alternate tractors to avoid missed departure targets.
Driver check-in compliance improved after direct follow-up from the shift desk.
Yard staging remains constrained near outbound lanes with refrigerated equipment.
+
Standby drivers6
Held departures9
Ready tractors22
+
+
+
+
+
Recent Activity
+
Latest dispatch actions and route decisions
+
+
+
+
+
+
+
+
Gate release delay affecting priority runLane B12 Waiting 18 min
High
Driver rest window blocks reassignmentLong-haul pool 2 units impacted
Medium
Trailer pairing mismatch in yard queueOutbound side Manual check required
Medium
+
Confirm backup operator for north corridor runDispatch desk request
In progress
Approve swap for delayed refrigerated unitRequires lead signoff
Pending
Close completed hold after gate clearanceRoute ready for release
Ready
+
Yard team confirmed two lanes cleared for outbound stagingPosted by yard control
Driver support updated availability for standby poolCoverage adjusted
Priority load reassignment accepted by route supervisorNo further approval needed
Fuel stop exception removed from active reviewDispatch note closed
+
+
+
Lead Note
+
The team is working through a compressed release window where small delays at the yard can quickly reduce route coverage. This view helps dispatch leads decide where to reassign equipment, push approvals, and keep priority movements on schedule.
+
Dispatch healthStable with exceptions
Driver readinessNear full coverage
Yard congestionElevated at outbound side
+
Priority lanes are protected, but remaining open holds need confirmation from yard and driver teams before release.
+
+ Open note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
Operating Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Route release completion78%
Based on active outbound plan
Driver assignment coverage91%
Remaining gap on long-haul lanes
Exception clearance64%
Open holds trending down
+
+
+
Use route reassignment only after confirming gate availability and driver hours.
Coordinate active equipment work, parts readiness, and technician handoff for the current plant queue.
+
+
+
+ Loading view
+ Asset service status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
The main risk is not the volume of open work but the overlap between recurring faults, shared spare parts, and incomplete close-out records. The coordinator is prioritizing jobs that restore stable operation fastest while making sure each completed repair can pass inspection without rework.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest maintenance coordination updates
+
+
+
+
+
+
+
+
Repeat fault on feeder motor requires supervisor reviewLinked to two prior corrective orders
Close-out blocked by missing isolation recordInspection will not release final status
High
+
Approve repair scope for Press Line 2 feederCost review attached by area lead
Pending approval
Confirm staged parts for conveyor coupling replacementMechanical crew waiting at access point
In progress
Return corrected close-out notes to inspectionPhoto evidence and isolation steps required
Needs update
+
Mechanical crew reported safe access at feeder bayField note added 14 min ago
Parts desk reserved seal kit for linked ordersReservation confirmed against active queue
Area lead raised priority on conveyor drive caseOperational impact now classified as elevated
Inspection returned one closure package for revisionMissing verification note in final step
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Priority repairs completed62%
8 of 13 cleared
Parts staging readiness73%
Most critical kits available
Close-out compliance81%
Several packages awaiting final note
+
+
+
Coordination Notes
+
The current focus is keeping high-use assets in service while clearing overdue follow-up work from earlier interventions. Notes, queue status, and technician updates are aligned here so handoff decisions can be made without opening separate records.
+
Three priority jobs share the same hydraulic seal kit and must be sequenced carefully.
Inspection has requested photo confirmation before closing two repeat-failure orders.
One conveyor drive can remain in service under reduced load until replacement stock is issued.
Electrical support is available for lockout review on escalated jobs.
+
On-site crews4
Locked out assets3
Rush requests2
+
Support Readiness
Critical assets online9/10
Awaiting approval4 orders
Parts shortfall2 items
Failure review completed for press feeder
Supervisor approved immediate repair path
Seal kit released from parts crib
Reserved against two linked work orders
Field update posted by mechanical crew
Access cleared and unit isolated
Close-out package returned for correction
Inspection note required before final release
+
+
+
All updates shown here are operational records and must match the approved work order before closure.
Receiving activePutaway constrainedDispatch on hold
Monitor inbound receipts, putaway flow, and outbound release from one operating view.
+
+
+
+ Loading view
+ Facility activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main risk is not total volume but timing. Inbound receipts, reserve storage, and outbound release are all connected, so a short delay at dock assignment or packing review quickly affects the rest of the floor. Clearing blocked pallets and reallocating lift coverage should return the site to a steadier operating rhythm.
+
+
+
+
+
+
+
+
+
+
Floor Activity
+
Updated as teams complete receiving, storage, and release steps.
+
+
+
+
+
+
+
+
Dock queue above working limit6 loads waiting longer than target
High
Bulk zone capacity nearing thresholdReserve slots at 93% use
Review inbound pitches, assign editorial follow-up, and keep the publication queue moving with clear ownership.
+
+
+
+ Loading view
+ Selection queue
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
Several strong submissions are moving forward at the same time, but the desk is losing time when ownership is unclear after approval. Tightening assignment rules here will reduce back-and-forth, speed contributor replies, and help section editors focus on pieces they are ready to develop.
+
+
+
+
+
+
+
+
+
+
Desk Activity
+
Latest review and assignment actions
+
+
+
+
+
+
+
+
Two approved pitches still have no ownerCleared in review but not accepted by a section editor
High
Standards check requested on a sensitive angleHold response until review note is returned
Medium
Contributor waiting on revision guidanceInitial feedback sent without a named follow-up editor
Medium
+
Confirm final owner for the education feature pitchShared interest across two sections
In progress
Send decline notes for out-of-scope submissionsReady after lead review
Ready
Close duplicate entry group and keep strongest versionThree related submissions from separate contributors
Blocked
+
Lead editor requested a tighter angle before commissionAdded to the top priority pitch
Assignment returned after capacity check failedSection owner asked for reassignment
Contributor replied with revised framing noteReady for second pass
Duplicate tag removed after manual comparisonSubmission can continue through normal review
+
+
Operational Insight
+
The current operating goal is simple: reduce duplicate review, assign one accountable editor to each viable pitch, and keep contributors informed before follow-up goes cold.
+
First-pass review78%
Most inbound items have initial editorial tags
Ownership assignment61%
Several approved pitches still need a named editor
Contributor replies84%
Outcome messages are nearly caught up
+
+
+
Contributor Support
+
Most delays are no longer in intake. The main bottleneck is editorial ownership after a pitch passes first review, especially when more than one section wants to claim the same idea.
+
Flag near-duplicate submissions before they reach senior review.
Move approved ideas into one owner queue with a clear response deadline.
Keep contributor communication consistent when a pitch is held, revised, or declined.
Surface sensitive topics for legal or standards review before commissioning.
+
Held11
Revisions requested14
Declines sent32
+
Operational Signals
Duplicate riskModerate
Standards review3 items pending
Editor capacityTight
Intake sweep completed
New submissions were normalized, deduplicated, and tagged by desk.
Senior review pass
Borderline pitches were escalated for direction on fit and urgency.
Assignment round
Approved items were matched to editors with open capacity.
Contributor follow-up
Reply notes were prepared for hold, revise, and decline outcomes.
+
+
+
Use one final outcome per pitch so downstream assignment and contributor replies stay aligned.
+ Active flightPriority reviewShared budgetStore traffic
+
+
+
+
+
+
+
+
Needs review
Track active retail promotions, review pacing risks, and keep launch approvals moving across paid channels.
This overview brings campaign owners, channel leads, and reviewers into one operating view for retail promotion activity. The focus is on release readiness, pacing discipline, and fast resolution when a campaign drifts outside its approved plan.
Avery NolanMarketing Operations Lead
+
Active campaigns
18
3 awaiting final release
Planned spend
$426K
Within current budget guardrail
Projected return
4.8x
Lift driven by repeat buyer segments
Creative compliance
92%
Remaining items need legal copy review
+
+
+
+ Loading view
+ Campaign performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
Current risk is concentrated in a small number of high-visibility promotions that are close to release but still depend on approval cleanup. Clearing those items will allow the team to open budget safely without creating rework for channel operations or compliance.
+
+
+
+
+
+
+
+
Operational Notes
+
Most campaigns are moving as expected, but a small group requires attention before budget can be fully opened. The current work centers on copy approval, audience overlap checks, and confirming that regional exclusions are applied before wider rollout.
+
Priority campaigns are grouped for same-day review by channel operations.
Budget adjustments require owner confirmation and finance-safe pacing limits.
Audience rule changes remain blocked until compliance notes are cleared.
Store traffic campaigns receive higher escalation when release windows narrow.
+
Queued reviews9
Open exceptions4
Released today5
+
+
+
+
Team Activity
+
Recent decisions and release changes
+
+
+
+
+
+
+
+
Copy exception still open for priority placementOwner response pending
High
Audience overlap exceeds internal thresholdShared budget campaign group
Medium
Regional exclusion missing from one launch setStore traffic promotion
Medium
+
Approve revised launch copyAssigned to compliance reviewer
In progress
Confirm pacing cap for shared budget groupRequested by channel lead
Pending
Validate excluded regions before releaseRequired for final activation
Ready
+
Budget guardrail updated for priority promotionRecorded by finance operations
Audience rule revision submittedWaiting for approval
Channel owner added release noteEscalation removed after review
Compliance returned one asset for editsCopy needs location disclaimer
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval completion74%
Most high-spend items already reviewed
Budget allocation68%
Remaining spend held behind final checks
Release readiness81%
Operational setup nearly complete
+
Release Flow
Intake completed
Briefs and spend limits confirmed
Review in progress
Compliance and audience checks underway
Release window
Approved campaigns move to channel activation
Queued reviews9
Open exceptions4
Released today5
+
+
+
Use this view to resolve blockers before expanding spend or opening additional channel coverage.
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
Operational summary for site load, steam demand, and utility variance across active production lines.
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
+
+
+ Loading view
+ Consumption overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operating Note
+
The current review is centered on whether the elevated water draw should be recorded as expected support usage or escalated as a controllable loss. Early checks support the first view, but the decision will remain open until sanitation records and supervisor confirmation are complete.
+
+
+
+
+
+
+
+
Supervisor Support
+
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
Base electrical load improved after non-process fans were isolated during idle periods.
Compressed air demand stayed even, with no signs of sustained leakage during the late run.
Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
Water variance should be rechecked once final sanitation logs are posted.
+
Open exceptions2
Lines reviewed6/6
Actions due3
+
+
+
+
Completion Progress
+
Status of review and follow-up
+
+
+
+
+
+
+
+
Water use above expected bandPackaging area support services
Medium
Line idle shutdown not confirmedTwo areas missing end-run verification
Low
Final sanitation log still pendingRequired to close variance review
Medium
+
Confirm restart-related water drawOperations supervisor to validate against log entries
In progress
Verify non-process equipment shutdownUtilities team to spot-check idle periods
Queued
Complete site approvalRequired before report closeout
Pending
+
Meter reconciliation completed for main supplyLogged by utilities desk
Maintenance confirmed no active steam issueInspection note added
Cost allocation refreshed for final reviewFinance rule set applied
+
+
+
Assessment
+
No immediate escalation is required, but the site energy lead has asked line supervisors to confirm idle-time shutdown discipline before the next reporting cycle is closed.
+
Meter validation100%
All core readings matched
Variance review68%
Awaiting supporting logs
Management sign-off35%
Ready for supervisor action
+
Key Signals
Load balanceSteady
Utility riskModerate
Approval statePending sign-off
Water intake exceeded the normal operating band during cleaning and restart activity. Review remains open until line notes and final meter confirmation are attached.
+
+
Use this report to confirm variances, assign follow-up, and complete site-level review before closeout.
Execution in focusControl review activeApproval queue open
Track release pacing, exception handling, and approval readiness across active cost centers.
+
+
+
+ Loading view
+ Execution overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
Release performance is broadly on plan, but the remaining blocked amount sits in cases that need manual confirmation. Resolving those records quickly will reduce queue pressure and allow controllers to close the cycle without extending approval coverage.
+
+
+
+
+
+
+
+
+
+
Recent Actions
+
Latest updates from controllers and approvers
+
+
+
+
+
+
+
+
High-value release held for documentation$220K requires source support
Manual adjustment exceeds local thresholdController comment attached
Medium
+
Clear blocked release requests12 records awaiting evidence
In progress
Confirm revised control notes4 items edited by reviewers
Pending
Close approved carryover actions7 ready for posting
Ready
+
Policy exception comment added to release caseBy regional controller
Approval path updated for restricted fundingRouting changed automatically
Supporting file accepted after validationBlocked amount reduced
Commitment request returned for correctionAccount line mismatch found
+
+
Execution Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Release completion92%
Against approved plan
Approval completion81%
All levels combined
Exception clearance64%
Policy and document checks
+
+
+
Controller Notes
+
Most exceptions are tied to account mapping and supporting documentation rather than overspend risk. Teams are being asked to resolve these items before release authority is expanded.
+
Release pacing remains healthy across core operating lines.
Exception volume is concentrated in a small set of manual adjustments.
Senior approval capacity is the main constraint on final clearance.
Control notes have been attached to all blocked items above threshold.
+
Open cases43
Needs review11
Cleared today19
+
Exception Signals
Control postureStable
Approval loadElevated
Release riskManaged
Initial allocation confirmed
Control baseline recorded
Mid-cycle release adjusted
Carryover request applied
Exception review escalated
Policy evidence requested
Final approval window opened
Queue routing updated
+
+
+
Only approved adjustments can move to release. Blocked items remain visible until evidence and sign-off are complete.
+
+
+
+
diff --git a/web_insert/Plotly/box/chart_0057_box.html b/web_insert/Plotly/box/chart_0057_box.html
new file mode 100644
index 0000000000000000000000000000000000000000..67f29f177c2511549c57f5e7ac2a23423a7aa5de
--- /dev/null
+++ b/web_insert/Plotly/box/chart_0057_box.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T14 Store Stock Control
+
+
+
+
+
+
+
+
+
+
Live stockReplenishment reviewHold resolution
Track replenishment risk, release held inventory, and keep shelf availability aligned across active locations.
+
+
+
+ Loading view
+ Location stock position
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main concern is not total network stock but timing. Several locations can return to normal selling levels once held units are cleared and transfer approvals are issued in the right order. Teams are using this view to keep store demand, receiving capacity, and release controls aligned.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Latest stock handling and release steps
+
+
+
+
+
+
+
+
Count mismatch blocking release12 item lines remain held after store recount
High
Priority location below cover targetReplenishment risk increased across 4 stores
Medium
Receiving backlog nearing thresholdInbound confirmation lag may delay availability updates
Medium
+
Approve transfer batch for thin-cover stores29 lines prepared by distribution planning
Ready
Confirm held quantities against recount notes74 units waiting on store validation
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Hold review completion68%
Most flagged lines have first-pass decisions
Transfer approval completion54%
Awaiting release order from control lead
Count reconciliation73%
Repeat variance stores still under review
+
+
+
Operational Notes
+
this workflow supports the daily decision flow: identify where cover is too thin, confirm whether held stock can be released, and route transfer lines to the locations with the highest service risk. Notes and queue items below reflect the current handoff between store control, distribution, and floor operations.
+
Prioritize releases for locations with same-day shelf risk.
Delay nonessential transfers until held quantities are verified.
Escalate repeated count mismatches to store control leads.
Keep transfer approvals aligned with receiving capacity.
+
Priority stores11
Open holds18
Ready transfers7
+
Network Signals
Service riskElevated
Receiving pressureModerate
Approval backlogContained
Cycle count exceptions reviewed
Store control completed first-pass review on flagged lines.
Transfer requests consolidated
Low-cover locations were grouped for a single approval pass.
Held stock release pending
Distribution is waiting for final quantity confirmation.
+
+
+
Use release actions only after count confirmation is recorded in the item note.
+
+
+
+
diff --git a/web_insert/Plotly/heatmap/chart_0040_heatmap.html b/web_insert/Plotly/heatmap/chart_0040_heatmap.html
new file mode 100644
index 0000000000000000000000000000000000000000..1cbd0f7eac4e756e1f980ed76f20b3eca63e6b33
--- /dev/null
+++ b/web_insert/Plotly/heatmap/chart_0040_heatmap.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T23 Population Health Surveillance Console
+
+
+
+
+
+
+
+
+
T23
+
+
Public Health Operations
+
Population Health Surveillance Console
+
Cluster Review 18
+
+
+
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
Monitor enrollment flow, review teaching requests, and keep campus services within response targets.
+
+
+
+ Loading view
+ Enrollment workload
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main pressure point is not overall volume but the number of cases waiting on a second team to confirm eligibility, roster placement, or account release. Clearing those handoffs will reduce repeat contacts and keep approvals moving in the right order.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Recent updates across admissions, scheduling, and support
+
+
+
+
+
+
+
+
Identity check queue exceeded review target14 learner files are outside normal handling time
Access provisioning paused for one intake groupRoster confirmation is still pending from registry
Medium
+
Approve seat exception requestsOwned by academic operations
In progress
Confirm account release listWaiting on final learner verification
Blocked
Close duplicate support casesMerge requests from advising and registry
Ready
+
Registry completed a priority batch reviewOpen count reduced after document validation
Scheduling submitted a conflict noteOne instructor assigned to overlapping sessions
Support added an access exceptionLearner record needs manual activation
Advising returned a hold for correctionProgram selection does not match approved path
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Enrollment validation74%
Most records reviewed; exceptions remain
Teaching assignment approval61%
Conflict cases still under review
Account activation release83%
Waiting on final roster handoff
+
+
+
Support Notes
+
Most exceptions are tied to incomplete learner records and overlapping instructor availability. Team leads are using the queue to clear blocked cases before they affect course readiness and support response times.
+
Admissions is prioritizing records with missing identity checks.
Scheduling is reviewing instructor conflicts before room release.
Support is holding account activation until final roster approval.
Policy notices were updated to reflect new escalation ownership.
+
Escalations7
Owners online12
Blocked cases19
+
Operational Signals
Validation backlogModerate
Seat release paceStable
Access turnaroundAt risk
Intake review opened
Registry triage assigned the latest submission batch
Faculty request escalated
Teaching load conflict moved to academic operations
Roster lock cleared
Student services approved the final exception set
+
+
+
Use this view to coordinate approvals, confirm handoffs, and clear blockers before escalation windows are breached.
Editorial interpretation, policy check, and release readiness for a high-traffic article package.
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
+
+
+ Loading view
+ Article review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
The item remains on hold because reviewers want the final article to state only what can be supported directly in the reporting record. Once the headline and two interpretive passages are revised, the last policy note can be closed and the release team can complete handoff without reopening the brief.
+
+
+
+
+
+
+
+
Editorial Support Notes
+
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
Tighten the headline so it reflects verified reporting only
Rework two interpretive lines in the middle section
Confirm attribution order in the closing paragraph
Keep the release hold in place until policy notes are cleared
+
Linked notes12
Required edits3
Approvals2/3
+
+
+
+
Recent Activity
+
Latest actions across review, policy, and release handling.
+
+
+
+
+
+
+
+
Policy sign-off still openRelease cannot proceed until the final comment is resolved
High
Headline wording exceeds source certaintyDesk requested a narrower phrasing pass
Medium
Closing attribution order changedLatest revision needs reviewer confirmation
Low
+
Apply marked language editsThree passages require direct revision
Prepare release handoffQueue placement is ready once approval lands
Queued
+
Desk review updated with narrowed wording requestAdded by editorial review
Policy note linked to middle section passageMapped to required edit
Release hold confirmed by operationsQueue position preserved
Final pass assigned to senior reviewerAwaiting consolidated response
+
+
+
Reading Insight
+
Operations has held the item in the final queue so the desk can complete one coordinated pass rather than resolve comments in isolation. this workflow is intended to keep editors, policy reviewers, and release staff on the same record while the article moves through its last approval step.
+
Editorial review88%
Most text decisions are settled
Policy clearance67%
One required note remains
Release handoff54%
Prepared but not cleared
+
Release Signals
Attribution strengthNeeds tightening
Headline alignmentUnder revision
Release readinessPending approval
Final release depends on one policy approval and completion of marked language edits.
+
+
Use the same review record when updating wording, approvals, and release handling to avoid duplicate decisions.
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
+
+
+
+
diff --git a/web_insert/Plotly/heatmap/chart_0046_heatmap.html b/web_insert/Plotly/heatmap/chart_0046_heatmap.html
new file mode 100644
index 0000000000000000000000000000000000000000..a20276928b6664a85e478f28cc76c7fc36c97834
--- /dev/null
+++ b/web_insert/Plotly/heatmap/chart_0046_heatmap.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T34 Water Operations Control
+
+
+
+
+
+
+
+
+
+
Live networkShift handoffPriority review
Monitor plant output, service pressure, and field response from one operating view.
+
+
+
+ Loading view
+ Network status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Control Note
+
The active case is no longer expanding, but the team is holding controls in place until all dependent checks are complete. Field, dispatch, and service desk updates should stay aligned so closures do not outpace verified operating conditions.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Operational updates and required follow-up
+
+
+
+
+
+
+
+
Restricted pressure in east zoneCustomer impact limited; monitoring remains active
High
Booster station follow-up duePost-adjustment verification pending from field lead
Medium
Closure approval waitingSupervisor sign-off required on 3 linked work orders
Medium
+
Confirm downstream pressure readingsAssigned to east response crew
In progress
Validate temporary routing planRequired before restriction release
Pending review
Close resolved customer casesService desk waiting on operations note
Ready
+
Dispatch logged stable readings from sector valve setRecent field update
Plant control confirmed output remains on targetOperations note
Service desk tagged 4 cases for combined closureQueue update
Depot issued replacement fittings to mobile crewSupply confirmation
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident containment82%
Awaiting final field confirmation
Work order completion64%
Linked repairs moving through review
Case closure readiness71%
Service notes partially complete
+
+
+
Supervisor Notes
+
The current focus is to keep supply steady across high-demand zones, clear outstanding field confirmations, and close service cases that no longer need escalation. Supervisors are reviewing exceptions before the next handoff.
+
East transmission line remains in controlled operation with no new loss reports.
Two booster stations are running under temporary observation after overnight adjustment.
Customer-facing updates are limited to affected service pockets only.
Repair stock for seals and isolation fittings is available at primary depot.
+
Crews deployed9
Sites under watch4
Pending approvals6
+
Operational Signals
Reservoir balanceNormal
Pump readinessHigh
Field backlogModerate
Pressure deviation flagged
Network monitoring raised an east line variance and opened incident review.
Field isolation confirmed
Local crew secured the affected segment and reported stable downstream flow.
Supervisor review in progress
Operations lead is validating closure conditions before releasing restrictions.
+
+
+
Use confirmed field updates before changing service classification or closing a case.
+ Live TradingStore NetworkPriority Follow-upRevenue Focus
+
+
+
+
+
+
+
Active Oversight
+
Monitor store execution, revenue pacing, stock pressure, and pending actions across the active trading cycle.
+
Trading performance is holding above plan, but momentum is uneven across the network. Flagship locations are carrying the result while several mid-tier stores are slipping on conversion after early demand spikes cleared core inventory.
+
+
+
Maya ChenSales Operations Lead
+
+
+
+
Net Sales
$4.8M
Running ahead of internal target with stronger in-store conversion.
Orders Closed
18,240
Order completion remains stable despite heavier queue volume.
Low Stock SKUs
126
Concentrated in top-selling lines requiring rapid replenishment.
Pending Exceptions
37
Most cases are tied to price overrides and fulfillment holds.
+
+
+
+
+ Loading view
+ Sales command view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Operations leads are using this board to coordinate price checks, stock transfers, and field follow-up. The immediate goal is to protect sell-through on priority lines without creating avoidable margin leakage or unresolved service cases.
+
Price override approvals increased after local markdown requests were reopened.
Transfer requests are highest in stores with strong accessory attachment rates.
Frontline teams need confirmed replenishment windows before issuing customer callbacks.
Regional managers have been asked to clear overdue store notes before next review.
+
Stores Flagged21
Cases Reassigned14
Open Callbacks89
+
+
+
+
+
Execution Activity
+
Store actions and approval movement
+
+
+
+
+
+
+
+
Override approvals approaching threshold12 stores exceeded normal approval volume
High
Core item coverage at riskTop stores reporting low back-room availability
Medium
Store callback backlog buildingCustomer follow-up notes remain open past target
Medium
+
Approve urgent pricing exceptionsSenior review required for margin-sensitive requests
In progress
Confirm transfer receipt with destination storesFollow up on high-demand replenishment moves
Pending
Close unresolved field notesSeveral stores have not updated execution status
Blocked
+
North region cleared three high-value exceptionsApproval cycle shortened after reassignment
Accessory attachment improved in premium storesStore coaching appears to be holding
Transfer requests stabilized after stock releaseMost urgent moves have been acknowledged
Customer callback queue remains unevenService follow-through needs local management review
+
+
+
Lead Note
+
This board supports the daily operating rhythm for sales control, exception handling, and store coordination across the retail network.
+
Conversion PressureElevated
Stock Transfer LoadHigh
Approval ResponseWithin SLA
+
Investigate sales pacing, confirm stock position, and clear open approvals before escalation.
+
+ View note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
Focus Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval clearance78%
Cleared against open exception volume
Transfer completion64%
Confirmed store-to-store movements
Field note closure52%
Resolved execution updates from stores
+
+
+
Use approved actions only. Store-facing updates must match pricing, stock, and service policy before release.
+ Active portfolioReview in progressFunding controlsCompliance watch
+
+
+
+
+
+
+
+
Managed
Monitor active studies, pending approvals, funding usage, and cross-team follow-up from one operational view.
The office is managing a mixed portfolio of faculty-led studies, lab collaborations, and student research initiatives. Most work is progressing within approved scope, but a small set of submissions requires administrative response before funds or participant activity can proceed.
Dr. Elaine PorterDirector, Research Administration
+
Open Projects
48
6 awaiting formal approval
Active Funding
$12.4M
Within approved allocation range
Pending Reviews
17
4 require principal investigator response
Policy Exceptions
3
All assigned for follow-up
+
+
+
+ Loading view
+ Project activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Several projects are close to activation, but progress depends on small administrative corrections. Clearing incomplete files and confirming ownership will reduce delay, improve audit readiness, and allow the office to release approved work without further escalation.
+
+
+
+
+
+
+
+
Office Notes
+
Current attention is focused on review completion, documentation quality, and timely coordination between academic units and the central research office. Team leads are using this view to resolve blockers, confirm ownership, and keep each project aligned with internal policy.
+
Approval backlog is concentrated in new submissions with incomplete ethics attachments.
Two high-value projects are waiting on revised budget justification before release.
Records cleanup reduced duplicate sponsor entries across several departments.
Escalations are being routed to unit coordinators for direct follow-up.
+
Units involved11
Cases reassigned5
Records updated23
+
+
+
+
Recent Office Activity
+
Latest updates across approvals, records, and funding control.
+
+
+
+
+
+
+
+
Budget release on holdMissing approval note from finance control
High
Ethics file incompleteParticipant consent language requires revision
Medium
Sponsor record mismatchDepartment entry differs from central register
Low
+
Confirm unit reviewer for pending submissions7 projects without final reviewer assignment
Open
Release approved funding batch2 projects cleared after documentation check
Ready
Close duplicate sponsor recordsFollow-up required across 3 departments
In progress
+
Policy team returned one exception case for clarificationNeeds updated risk statement
Finance control cleared restricted spending lineRelease can proceed after office sign-off
Graduate coordinator added missing investigator credentialsSubmission now eligible for formal review
Unit office confirmed lead contact changeRecords updated for future notices
+
+
+
Portfolio Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Initial screening92%
Most submissions validated
Formal review68%
Backlog concentrated in exception cases
Funding release74%
Delayed by final approval checks
+
Recent Milestones
Portfolio intake closed
New submissions moved to initial screening
Compliance review updated
Exception cases reassigned to policy team
Funding release prepared
Awaiting final sign-off from finance control
Units involved11
Cases reassigned5
Records updated23
+
+
+
Internal use only. Funding, review, and compliance actions must be recorded before project status is changed.
Track specimen intake, instrument readiness, review holds, and release validated results from one controlled queue.
+
+
+
+ Loading view
+ Specimen flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Current delays are not caused by intake volume but by a narrow cluster of held results that need repeat confirmation and signed reviewer rationale. Once those cases are closed, the release queue should return to normal pace.
+
+
+
+
+
+
+
+
+
+
Validation Activity
+
Latest laboratory actions and review updates
+
+
+
+
+
+
+
+
Quality hold threshold reachedChemistry lane 7 held results
High
Instrument maintenance window dueHematology bench service reminder
Complete supervisory sign-off for held chemistry cases24 items in review queue
In progress
Verify rerun documentation before release5 specimens require note completion
Pending
Confirm analyzer readiness after resetPost-interruption checks still open
Waiting confirmation
+
Accession team cleared label exceptionMatched specimen and order records
Reviewer added comment to held electrolyte panelAwaiting repeat outcome
Bench lead reassigned overflow workCapacity balanced across active stations
Final result packet released to care teamAudit trail completed
+
+
Throughput Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Accessioning completion92%
Most inbound samples logged and routed
Validation review68%
Routine cases moving faster than held work
Quality documentation81%
Remaining notes tied to reruns and holds
+
+
+
Escalation Notes
+
Supervisors are balancing turnaround targets with quality controls, making sure reruns, delta checks, and documentation updates are completed before any final authorization.
+
Priority samples are routed directly to staffed benches.
Held results require either repeat testing or reviewer comment.
Release activity is limited to validated work with complete audit notes.
+
Released today143
Open holds7
Assigned reviewers9
+
Bench Signals
Pending accession checks12
Benches at capacity2
Reruns in progress5
Intake batch reconciled
Analyzer lane reset
Senior review started
Release queue narrowed
+
+
+
All releases must include reviewer confirmation and complete traceability.
Review account health, retention risk, and pending interventions for active customer segments.
+
+
+
+ Loading view
+ Active user case flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current queue reflects a concentrated effort to retain users who showed intent but encountered friction during critical account steps. Teams are expected to document every outreach attempt, confirm ownership before escalation, and close only when the account is either stable or formally transferred for continued monitoring.
+
+
+
+
+
+
+
+
+
+
Case Activity
+
Recent decisions and follow-up movement
+
+
+
+
+
+
+
+
High-value account awaiting decisionNo final disposition recorded after manual review
High
Outreach backlog risingFollow-up queue has crossed internal response target
Medium
Exception note incompletePolicy-sensitive case missing approval rationale
Medium
+
Confirm owner coverage for priority cases7 cases without confirmed handoff
In progress
Complete callback verificationPending contact outcomes need final status
Queued
Close resolved onboarding reviewsCases meet closure conditions after successful recovery
Ready
+
Owner updated on priority reviewRouting changed after shift handoff
Manual decision recordedCase moved from hold to monitor
Risk flag clearedActivity recovered after intervention
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Queue clearance72%
Handled against current intake
Outreach completion64%
Priority contacts sent and logged
Approval coverage89%
Cases with complete decision trail
+
+
+
Operational Notes
+
Current activity is centered on a rise in support-linked retention risk. Several accounts were routed into manual review after repeated onboarding exits, failed self-service recovery, or policy-sensitive changes that require a documented decision.
+
High-priority cases are routed to named owners before outreach begins.
Accounts with repeat friction stay in review until next-step evidence is recorded.
Policy exceptions require a reason code and final approval note.
+
Active owners16
Cases on hold12
Recovered users31
+
Review Signals
Escalation rate11%
Policy exceptions9
Pending callbacks22
Risk rule triggered
Account entered review after repeated drop-off behavior
Operations review started
Owner assigned and contact path confirmed
User contacted
Follow-up sent with recovery guidance and next action
Decision logged
Case moved to monitor, close, or escalate
+
+
+
Access, contact history, and policy decisions are recorded for audit review.
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
+
+
+
+
diff --git a/web_insert/Plotly/line/chart_0112_line.html b/web_insert/Plotly/line/chart_0112_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..b73b24b5f4e853bd1c4918c2082e9331680d829b
--- /dev/null
+++ b/web_insert/Plotly/line/chart_0112_line.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T28 Municipal Service Bulletin
+
+
+
+
+
+
+
+
Internal circulationT28
+
Municipal Service Bulletin
+
Streetlight outage follow-up
+
Open bulletinCross-departmentAction required
+
+
+
Bulletin Summary
Operational notice and response summary for active public service issues requiring coordinated review.
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
+
+
+ Loading view
+ Service handling overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
Several matters remain open not because field action has stopped, but because the written record is incomplete or inconsistent across offices. Staff should treat documentation quality, ownership clarity, and response accuracy as equal to operational completion before moving any item to closed status.
+
+
+
+
+
+
+
+
Review Support
+
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
Confirm that each accepted notice has one accountable handling unit.
Reconcile field completion remarks with the official reply draft.
Flag cases where repeat contact suggests ineffective local closure.
Hold final release for items lacking signed verification.
+
Escalated3
Awaiting reply5
Returned for revision4
+
+
+
+
Recent Activity
+
Latest handling updates across the bulletin
+
+
+
+
+
+
+
+
Repeated contact on one closed itemClosure note conflicts with latest resident submission
High
Verification file missing from district replyEvidence not attached to the handling record
Medium
Approval wording exceeds service standardReply language requires simplification before release
Low
+
Confirm ownership for unresolved site restoration itemAwaiting district office acknowledgment
Open
Complete evidence check for resolved service interruption caseField note submitted without signed confirmation
In review
Approve final reply language for public releaseDraft prepared by coordination desk
Pending approval
+
District office updated handling noteOwnership confirmed and local follow-up arranged
Service unit returned revised reply draftLanguage adjusted to match verified field action
Supervisory office requested clarificationAsked whether the item meets closure conditions
Coordination desk logged resident repeat contactMatter retained in active bulletin
+
+
+
Review Insight
+
Teams are asked to confirm ownership, update response wording, and close record gaps before the next routing step. Any item with unresolved accountability or incomplete evidence should remain in controlled review rather than be marked complete.
+
Case verification76%
Most evidence checks completed
Reply drafting68%
Several items still under wording review
Final clearance41%
Held until all high-priority issues are confirmed
+
Coordination Signals
Priority routeJoint review
Public impactModerate
Release stateHeld for clearance
Local office reported restoration, but resident contact records indicate the issue may persist at the reported location.
+
+
Use this bulletin as the working record for approvals, response checks, and inter-office follow-up until all listed matters are either cleared or formally transferred.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
Reporting cycle activeEvidence under reviewSite coverage completeApproval pending
+
+
+
Reporting Summary
Consolidated operational view for facility emissions, evidence readiness, and approval progress across the reporting cycle.
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
+
+
+ Loading view
+ Emissions view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Reporting Note
+
Most reporting work is complete, but the team is holding release until the last boundary clarification and control statement are fully documented. Once those items are closed, the submission can move through approval without further operational changes.
+
+
+
+
+
+
+
+
Reporting Support
+
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
All operated facilities submitted activity data within the active reporting window.
Boundary assumptions were updated after internal control review.
Evidence coverage is complete for direct fuel use and purchased electricity.
Final sign-off is blocked only by unresolved exception responses.
+
Facilities in scope14
Evidence files linked128
Approvers assigned5
+
+
+
+
Review Activity
+
Recent actions tied to the current reporting cycle
+
+
+
+
+
+
+
+
Boundary note requires confirmationShared support load treatment updated by operations
Medium
Exception owner response overdueOne facility comment has not been returned
High
Approval pack awaiting final attachmentControl statement must be added before routing
Low
+
Validate revised allocation methodCheck consistency against facility evidence
In progress
Close open exception itemsCollect responses from assigned owners
Blocked
Route package for sign-offRelease once control statement is attached
Post-route summary for the latest dispatch cycle, focusing on late handoff recovery, depot coordination, and proof-of-delivery completion.
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
+
+
+ Loading view
+ Route performance view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
This review is being used to decide whether dispatch should adopt a standard delay-recovery playbook for mixed-stop runs. The current response relied on experienced staff making quick route adjustments, which worked in this case but may not scale without clearer depot release rules and a required outreach log for affected stops.
+
+
+
+
+
+
+
+
Support Notes
+
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
Departure drift started at the depot gate after loading lane congestion.
Manual reprioritization reduced missed arrival commitments on dense urban segments.
Proof-of-delivery capture improved after drivers were reminded to close stops before returning.
Two exception cases remain open pending package condition review.
+
Resequenced routes7
Support calls placed23
Returns held2
+
+
+
+
Recent Activity
+
Updates recorded during issue containment and closure review.
+
+
+
+
+
+
+
+
Proof mismatch on return scan2 consignments need depot confirmation
Medium
Loading lane congestion repeatedObserved across early dispatch wave
High
Customer contact note missing1 delayed stop closed without outreach log
Low
+
Validate open claims with depot supervisorAttach condition notes and return scans
In progress
Document route resequencing rulePrepare for dispatch handbook update
Pending
Close driver note reviewConfirm repeated gate delay comments
Ready
+
Driver team acknowledged revised stop orderField update logged by support desk
Depot supervisor added lane usage noteRoot cause linked to overlap during loading release
Customer service cleared outreach backlogAll affected recipients received status calls
The review focus is on whether the corrective actions used by the team should become standard practice for future mixed-stop routes with tight loading turnover.
+
Exception closure78%
Most delivery issues resolved in the same cycle
Driver note review64%
Comments grouped by route segment
Depot corrective action41%
Lane balancing plan awaiting sign-off
+
Field Signals
Route adherenceStable after intervention
Depot readinessNeeds lane balancing
Customer contact coverageAbove target
Opened after repeated departure slippage affected downstream stop timing and closure quality.
+
+
Internal review record for route performance follow-up and process adjustment.
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
+
+
+
+
diff --git a/web_insert/Plotly/line/chart_0118_line.html b/web_insert/Plotly/line/chart_0118_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..19c8d9ada7e5ae6eec8b94adcb6babce29c8d9df
--- /dev/null
+++ b/web_insert/Plotly/line/chart_0118_line.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
Editorial interpretation, policy check, and release readiness for a high-traffic article package.
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
+
+
+ Loading view
+ Article review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
The item remains on hold because reviewers want the final article to state only what can be supported directly in the reporting record. Once the headline and two interpretive passages are revised, the last policy note can be closed and the release team can complete handoff without reopening the brief.
+
+
+
+
+
+
+
+
Editorial Support Notes
+
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
Tighten the headline so it reflects verified reporting only
Rework two interpretive lines in the middle section
Confirm attribution order in the closing paragraph
Keep the release hold in place until policy notes are cleared
+
Linked notes12
Required edits3
Approvals2/3
+
+
+
+
Recent Activity
+
Latest actions across review, policy, and release handling.
+
+
+
+
+
+
+
+
Policy sign-off still openRelease cannot proceed until the final comment is resolved
High
Headline wording exceeds source certaintyDesk requested a narrower phrasing pass
Medium
Closing attribution order changedLatest revision needs reviewer confirmation
Low
+
Apply marked language editsThree passages require direct revision
Prepare release handoffQueue placement is ready once approval lands
Queued
+
Desk review updated with narrowed wording requestAdded by editorial review
Policy note linked to middle section passageMapped to required edit
Release hold confirmed by operationsQueue position preserved
Final pass assigned to senior reviewerAwaiting consolidated response
+
+
+
Reading Insight
+
Operations has held the item in the final queue so the desk can complete one coordinated pass rather than resolve comments in isolation. this workflow is intended to keep editors, policy reviewers, and release staff on the same record while the article moves through its last approval step.
+
Editorial review88%
Most text decisions are settled
Policy clearance67%
One required note remains
Release handoff54%
Prepared but not cleared
+
Release Signals
Attribution strengthNeeds tightening
Headline alignmentUnder revision
Release readinessPending approval
Final release depends on one policy approval and completion of marked language edits.
+
+
Use the same review record when updating wording, approvals, and release handling to avoid duplicate decisions.
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
+ Live TradingStore NetworkPriority Follow-upRevenue Focus
+
+
+
+
+
+
+
Active Oversight
+
Monitor store execution, revenue pacing, stock pressure, and pending actions across the active trading cycle.
+
Trading performance is holding above plan, but momentum is uneven across the network. Flagship locations are carrying the result while several mid-tier stores are slipping on conversion after early demand spikes cleared core inventory.
+
+
+
Maya ChenSales Operations Lead
+
+
+
+
Net Sales
$4.8M
Running ahead of internal target with stronger in-store conversion.
Orders Closed
18,240
Order completion remains stable despite heavier queue volume.
Low Stock SKUs
126
Concentrated in top-selling lines requiring rapid replenishment.
Pending Exceptions
37
Most cases are tied to price overrides and fulfillment holds.
+
+
+
+
+ Loading view
+ Sales command view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Operations leads are using this board to coordinate price checks, stock transfers, and field follow-up. The immediate goal is to protect sell-through on priority lines without creating avoidable margin leakage or unresolved service cases.
+
Price override approvals increased after local markdown requests were reopened.
Transfer requests are highest in stores with strong accessory attachment rates.
Frontline teams need confirmed replenishment windows before issuing customer callbacks.
Regional managers have been asked to clear overdue store notes before next review.
+
Stores Flagged21
Cases Reassigned14
Open Callbacks89
+
+
+
+
+
Execution Activity
+
Store actions and approval movement
+
+
+
+
+
+
+
+
Override approvals approaching threshold12 stores exceeded normal approval volume
High
Core item coverage at riskTop stores reporting low back-room availability
Medium
Store callback backlog buildingCustomer follow-up notes remain open past target
Medium
+
Approve urgent pricing exceptionsSenior review required for margin-sensitive requests
In progress
Confirm transfer receipt with destination storesFollow up on high-demand replenishment moves
Pending
Close unresolved field notesSeveral stores have not updated execution status
Blocked
+
North region cleared three high-value exceptionsApproval cycle shortened after reassignment
Accessory attachment improved in premium storesStore coaching appears to be holding
Transfer requests stabilized after stock releaseMost urgent moves have been acknowledged
Customer callback queue remains unevenService follow-through needs local management review
+
+
+
Lead Note
+
This board supports the daily operating rhythm for sales control, exception handling, and store coordination across the retail network.
+
Conversion PressureElevated
Stock Transfer LoadHigh
Approval ResponseWithin SLA
+
Investigate sales pacing, confirm stock position, and clear open approvals before escalation.
+
+ View note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
Focus Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval clearance78%
Cleared against open exception volume
Transfer completion64%
Confirmed store-to-store movements
Field note closure52%
Resolved execution updates from stores
+
+
+
Use approved actions only. Store-facing updates must match pricing, stock, and service policy before release.
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
+ Active flightPriority reviewShared budgetStore traffic
+
+
+
+
+
+
+
+
Needs review
Track active retail promotions, review pacing risks, and keep launch approvals moving across paid channels.
This overview brings campaign owners, channel leads, and reviewers into one operating view for retail promotion activity. The focus is on release readiness, pacing discipline, and fast resolution when a campaign drifts outside its approved plan.
Avery NolanMarketing Operations Lead
+
Active campaigns
18
3 awaiting final release
Planned spend
$426K
Within current budget guardrail
Projected return
4.8x
Lift driven by repeat buyer segments
Creative compliance
92%
Remaining items need legal copy review
+
+
+
+ Loading view
+ Campaign performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
Current risk is concentrated in a small number of high-visibility promotions that are close to release but still depend on approval cleanup. Clearing those items will allow the team to open budget safely without creating rework for channel operations or compliance.
+
+
+
+
+
+
+
+
Operational Notes
+
Most campaigns are moving as expected, but a small group requires attention before budget can be fully opened. The current work centers on copy approval, audience overlap checks, and confirming that regional exclusions are applied before wider rollout.
+
Priority campaigns are grouped for same-day review by channel operations.
Budget adjustments require owner confirmation and finance-safe pacing limits.
Audience rule changes remain blocked until compliance notes are cleared.
Store traffic campaigns receive higher escalation when release windows narrow.
+
Queued reviews9
Open exceptions4
Released today5
+
+
+
+
Team Activity
+
Recent decisions and release changes
+
+
+
+
+
+
+
+
Copy exception still open for priority placementOwner response pending
High
Audience overlap exceeds internal thresholdShared budget campaign group
Medium
Regional exclusion missing from one launch setStore traffic promotion
Medium
+
Approve revised launch copyAssigned to compliance reviewer
In progress
Confirm pacing cap for shared budget groupRequested by channel lead
Pending
Validate excluded regions before releaseRequired for final activation
Ready
+
Budget guardrail updated for priority promotionRecorded by finance operations
Audience rule revision submittedWaiting for approval
Channel owner added release noteEscalation removed after review
Compliance returned one asset for editsCopy needs location disclaimer
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval completion74%
Most high-spend items already reviewed
Budget allocation68%
Remaining spend held behind final checks
Release readiness81%
Operational setup nearly complete
+
Release Flow
Intake completed
Briefs and spend limits confirmed
Review in progress
Compliance and audience checks underway
Release window
Approved campaigns move to channel activation
Queued reviews9
Open exceptions4
Released today5
+
+
+
Use this view to resolve blockers before expanding spend or opening additional channel coverage.
+ Live DispatchPriority LoadsDriver CoverageGate Readiness
+
+
+
+
+
+
+
Active monitoring
+
Coordinate active routes, rebalance drivers, and clear open exceptions from one operating view.
+
Dispatch is managing a tight operating window with several outbound runs stacked behind the same gate sequence. The team has already reallocated available units to protect higher-priority moves and reduce idle time at the yard.
+
+
+
Maya BennettFleet Dispatch Lead
+
+
+
+
Units in motion
148
12 reassigned during the current shift
Open route holds
9
Most tied to late gate release
Coverage gap
4
Backfill requested for long-haul lanes
On-time departure
93%
Holding steady after yard balancing
+
+
+
+
+ Loading view
+ Route coordination
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Most unresolved issues now sit between driver readiness and release timing. Supervisors are using this panel to confirm who can be reassigned, which routes need escalation, and where a short delay will create a downstream coverage gap.
+
Three priority loads were moved to alternate tractors to avoid missed departure targets.
Driver check-in compliance improved after direct follow-up from the shift desk.
Yard staging remains constrained near outbound lanes with refrigerated equipment.
+
Standby drivers6
Held departures9
Ready tractors22
+
+
+
+
+
Recent Activity
+
Latest dispatch actions and route decisions
+
+
+
+
+
+
+
+
Gate release delay affecting priority runLane B12 Waiting 18 min
High
Driver rest window blocks reassignmentLong-haul pool 2 units impacted
Medium
Trailer pairing mismatch in yard queueOutbound side Manual check required
Medium
+
Confirm backup operator for north corridor runDispatch desk request
In progress
Approve swap for delayed refrigerated unitRequires lead signoff
Pending
Close completed hold after gate clearanceRoute ready for release
Ready
+
Yard team confirmed two lanes cleared for outbound stagingPosted by yard control
Driver support updated availability for standby poolCoverage adjusted
Priority load reassignment accepted by route supervisorNo further approval needed
Fuel stop exception removed from active reviewDispatch note closed
+
+
+
Lead Note
+
The team is working through a compressed release window where small delays at the yard can quickly reduce route coverage. This view helps dispatch leads decide where to reassign equipment, push approvals, and keep priority movements on schedule.
+
Dispatch healthStable with exceptions
Driver readinessNear full coverage
Yard congestionElevated at outbound side
+
Priority lanes are protected, but remaining open holds need confirmation from yard and driver teams before release.
+
+ Open note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
Operating Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Route release completion78%
Based on active outbound plan
Driver assignment coverage91%
Remaining gap on long-haul lanes
Exception clearance64%
Open holds trending down
+
+
+
Use route reassignment only after confirming gate availability and driver hours.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
Post-route summary for the latest dispatch cycle, focusing on late handoff recovery, depot coordination, and proof-of-delivery completion.
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
+
+
+ Loading view
+ Route performance view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
This review is being used to decide whether dispatch should adopt a standard delay-recovery playbook for mixed-stop runs. The current response relied on experienced staff making quick route adjustments, which worked in this case but may not scale without clearer depot release rules and a required outreach log for affected stops.
+
+
+
+
+
+
+
+
Support Notes
+
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
Departure drift started at the depot gate after loading lane congestion.
Manual reprioritization reduced missed arrival commitments on dense urban segments.
Proof-of-delivery capture improved after drivers were reminded to close stops before returning.
Two exception cases remain open pending package condition review.
+
Resequenced routes7
Support calls placed23
Returns held2
+
+
+
+
Recent Activity
+
Updates recorded during issue containment and closure review.
+
+
+
+
+
+
+
+
Proof mismatch on return scan2 consignments need depot confirmation
Medium
Loading lane congestion repeatedObserved across early dispatch wave
High
Customer contact note missing1 delayed stop closed without outreach log
Low
+
Validate open claims with depot supervisorAttach condition notes and return scans
In progress
Document route resequencing rulePrepare for dispatch handbook update
Pending
Close driver note reviewConfirm repeated gate delay comments
Ready
+
Driver team acknowledged revised stop orderField update logged by support desk
Depot supervisor added lane usage noteRoot cause linked to overlap during loading release
Customer service cleared outreach backlogAll affected recipients received status calls
The review focus is on whether the corrective actions used by the team should become standard practice for future mixed-stop routes with tight loading turnover.
+
Exception closure78%
Most delivery issues resolved in the same cycle
Driver note review64%
Comments grouped by route segment
Depot corrective action41%
Lane balancing plan awaiting sign-off
+
Field Signals
Route adherenceStable after intervention
Depot readinessNeeds lane balancing
Customer contact coverageAbove target
Opened after repeated departure slippage affected downstream stop timing and closure quality.
+
+
Internal review record for route performance follow-up and process adjustment.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.
Receiving activePutaway constrainedDispatch on hold
Monitor inbound receipts, putaway flow, and outbound release from one operating view.
+
+
+
+ Loading view
+ Facility activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main risk is not total volume but timing. Inbound receipts, reserve storage, and outbound release are all connected, so a short delay at dock assignment or packing review quickly affects the rest of the floor. Clearing blocked pallets and reallocating lift coverage should return the site to a steadier operating rhythm.
+
+
+
+
+
+
+
+
+
+
Floor Activity
+
Updated as teams complete receiving, storage, and release steps.
+
+
+
+
+
+
+
+
Dock queue above working limit6 loads waiting longer than target
High
Bulk zone capacity nearing thresholdReserve slots at 93% use
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
+ Live ControlDispatch ReadyStorage BalancedField Review Open
+
+
+
+
+
+
+
+
Operational
Track site output, storage readiness, dispatch commitments, and field actions across the active hub.
The hub is operating within target limits, with solar and wind assets sharing load as expected and storage carrying the balancing role for short fluctuations. Dispatch obligations remain intact, and no station is currently outside its approved operating envelope.
Elena MorrisRegional Hub Supervisor
+
Net Output
428 MW
Holding above committed delivery band
Available Storage
81%
Reserve margin kept for evening handoff
Curtailment Risk
Low
No immediate restriction notices in scope
Open Field Actions
7
Two require supervisor review
+
+
+
+ Loading view
+ Hub performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Output remains dependable across the hub, but the team is keeping close watch on the inland station until restart behavior is fully verified. Supervisors should clear the pending reserve note and confirm the inspection window so field and control actions stay aligned.
+
+
+
+
+
+
+
+
Operations Notes
+
Operations staff are watching one inland station where inverter recovery is slower than normal after a brief protective trip. The condition is stable, but the team has kept a local inspection open until the restart pattern returns to baseline.
+
Primary dispatch commitment remains fully covered by live generation and stored reserve.
One site review is waiting on field confirmation before the maintenance note can be closed.
Remote control authority is active for all stations in the current hub scope.
No compliance holds are blocking routine switching or battery balancing actions.
+
Stations Online14
Open Reviews3
Active Crews2
+
+
+
+
Shift Activity
+
Recorded actions and follow-up items for the active operating window.
+
+
+
+
+
+
+
+
Inland station restart varianceRecovery sequence exceeded normal duration
Medium
Storage reserve floor nearing handoff targetBalancing plan may need minor adjustment
Low
Field confirmation pending on breaker inspectionClosure blocked until site response is logged
Medium
+
Approve reserve adjustment noteSubmitted by shift operator
Pending approval
Confirm inland site inspection windowCrew lead requested access hold
Waiting
Close completed switching logControl steps verified by second reviewer
Ready
+
Grid desk accepted updated export positionAcknowledgement logged by dispatch coordinator
Battery balancing sequence completed without exceptionAutomatic control remained within approved limits
Field crew checked access route to inland stationTravel and handoff conditions confirmed
Remote link health check passed across all active sitesNo communication degradation recorded
+
+
+
Readiness Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Dispatch coverage96%
Committed export supported
Storage readiness81%
Reserve held for balancing
Field action closure68%
Open reviews moving toward sign-off
+
Recent Activity
Hub entered balanced operating mode
Control room update
Storage reserve floor adjusted for dispatch window
Shift approval recorded
Inverter restart review opened at inland station
Field follow-up assigned
Export commitment reconfirmed with grid desk
Acknowledgement received
Stations Online14
Open Reviews3
Active Crews2
+
+
+
Use this view to confirm readiness before approving dispatch changes or closing field actions.
Execution in focusControl review activeApproval queue open
Track release pacing, exception handling, and approval readiness across active cost centers.
+
+
+
+ Loading view
+ Execution overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
Release performance is broadly on plan, but the remaining blocked amount sits in cases that need manual confirmation. Resolving those records quickly will reduce queue pressure and allow controllers to close the cycle without extending approval coverage.
+
+
+
+
+
+
+
+
+
+
Recent Actions
+
Latest updates from controllers and approvers
+
+
+
+
+
+
+
+
High-value release held for documentation$220K requires source support
Manual adjustment exceeds local thresholdController comment attached
Medium
+
Clear blocked release requests12 records awaiting evidence
In progress
Confirm revised control notes4 items edited by reviewers
Pending
Close approved carryover actions7 ready for posting
Ready
+
Policy exception comment added to release caseBy regional controller
Approval path updated for restricted fundingRouting changed automatically
Supporting file accepted after validationBlocked amount reduced
Commitment request returned for correctionAccount line mismatch found
+
+
Execution Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Release completion92%
Against approved plan
Approval completion81%
All levels combined
Exception clearance64%
Policy and document checks
+
+
+
Controller Notes
+
Most exceptions are tied to account mapping and supporting documentation rather than overspend risk. Teams are being asked to resolve these items before release authority is expanded.
+
Release pacing remains healthy across core operating lines.
Exception volume is concentrated in a small set of manual adjustments.
Senior approval capacity is the main constraint on final clearance.
Control notes have been attached to all blocked items above threshold.
+
Open cases43
Needs review11
Cleared today19
+
Exception Signals
Control postureStable
Approval loadElevated
Release riskManaged
Initial allocation confirmed
Control baseline recorded
Mid-cycle release adjusted
Carryover request applied
Exception review escalated
Policy evidence requested
Final approval window opened
Queue routing updated
+
+
+
Only approved adjustments can move to release. Blocked items remain visible until evidence and sign-off are complete.
+
+
+
+
diff --git a/web_insert/Plotly/other/chart_0060_other.html b/web_insert/Plotly/other/chart_0060_other.html
new file mode 100644
index 0000000000000000000000000000000000000000..9eb0b76398565aef30627110b3a36658906d6ced
--- /dev/null
+++ b/web_insert/Plotly/other/chart_0060_other.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T28 Municipal Service Bulletin
+
+
+
+
+
+
+
+
Internal circulationT28
+
Municipal Service Bulletin
+
Streetlight outage follow-up
+
Open bulletinCross-departmentAction required
+
+
+
Bulletin Summary
Operational notice and response summary for active public service issues requiring coordinated review.
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
+
+
+ Loading view
+ Service handling overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
Several matters remain open not because field action has stopped, but because the written record is incomplete or inconsistent across offices. Staff should treat documentation quality, ownership clarity, and response accuracy as equal to operational completion before moving any item to closed status.
+
+
+
+
+
+
+
+
Review Support
+
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
Confirm that each accepted notice has one accountable handling unit.
Reconcile field completion remarks with the official reply draft.
Flag cases where repeat contact suggests ineffective local closure.
Hold final release for items lacking signed verification.
+
Escalated3
Awaiting reply5
Returned for revision4
+
+
+
+
Recent Activity
+
Latest handling updates across the bulletin
+
+
+
+
+
+
+
+
Repeated contact on one closed itemClosure note conflicts with latest resident submission
High
Verification file missing from district replyEvidence not attached to the handling record
Medium
Approval wording exceeds service standardReply language requires simplification before release
Low
+
Confirm ownership for unresolved site restoration itemAwaiting district office acknowledgment
Open
Complete evidence check for resolved service interruption caseField note submitted without signed confirmation
In review
Approve final reply language for public releaseDraft prepared by coordination desk
Pending approval
+
District office updated handling noteOwnership confirmed and local follow-up arranged
Service unit returned revised reply draftLanguage adjusted to match verified field action
Supervisory office requested clarificationAsked whether the item meets closure conditions
Coordination desk logged resident repeat contactMatter retained in active bulletin
+
+
+
Review Insight
+
Teams are asked to confirm ownership, update response wording, and close record gaps before the next routing step. Any item with unresolved accountability or incomplete evidence should remain in controlled review rather than be marked complete.
+
Case verification76%
Most evidence checks completed
Reply drafting68%
Several items still under wording review
Final clearance41%
Held until all high-priority issues are confirmed
+
Coordination Signals
Priority routeJoint review
Public impactModerate
Release stateHeld for clearance
Local office reported restoration, but resident contact records indicate the issue may persist at the reported location.
+
+
Use this bulletin as the working record for approvals, response checks, and inter-office follow-up until all listed matters are either cleared or formally transferred.
+ Active portfolioReview in progressFunding controlsCompliance watch
+
+
+
+
+
+
+
+
Managed
Monitor active studies, pending approvals, funding usage, and cross-team follow-up from one operational view.
The office is managing a mixed portfolio of faculty-led studies, lab collaborations, and student research initiatives. Most work is progressing within approved scope, but a small set of submissions requires administrative response before funds or participant activity can proceed.
Dr. Elaine PorterDirector, Research Administration
+
Open Projects
48
6 awaiting formal approval
Active Funding
$12.4M
Within approved allocation range
Pending Reviews
17
4 require principal investigator response
Policy Exceptions
3
All assigned for follow-up
+
+
+
+ Loading view
+ Project activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Several projects are close to activation, but progress depends on small administrative corrections. Clearing incomplete files and confirming ownership will reduce delay, improve audit readiness, and allow the office to release approved work without further escalation.
+
+
+
+
+
+
+
+
Office Notes
+
Current attention is focused on review completion, documentation quality, and timely coordination between academic units and the central research office. Team leads are using this view to resolve blockers, confirm ownership, and keep each project aligned with internal policy.
+
Approval backlog is concentrated in new submissions with incomplete ethics attachments.
Two high-value projects are waiting on revised budget justification before release.
Records cleanup reduced duplicate sponsor entries across several departments.
Escalations are being routed to unit coordinators for direct follow-up.
+
Units involved11
Cases reassigned5
Records updated23
+
+
+
+
Recent Office Activity
+
Latest updates across approvals, records, and funding control.
+
+
+
+
+
+
+
+
Budget release on holdMissing approval note from finance control
High
Ethics file incompleteParticipant consent language requires revision
Medium
Sponsor record mismatchDepartment entry differs from central register
Low
+
Confirm unit reviewer for pending submissions7 projects without final reviewer assignment
Open
Release approved funding batch2 projects cleared after documentation check
Ready
Close duplicate sponsor recordsFollow-up required across 3 departments
In progress
+
Policy team returned one exception case for clarificationNeeds updated risk statement
Finance control cleared restricted spending lineRelease can proceed after office sign-off
Graduate coordinator added missing investigator credentialsSubmission now eligible for formal review
Unit office confirmed lead contact changeRecords updated for future notices
+
+
+
Portfolio Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Initial screening92%
Most submissions validated
Formal review68%
Backlog concentrated in exception cases
Funding release74%
Delayed by final approval checks
+
Recent Milestones
Portfolio intake closed
New submissions moved to initial screening
Compliance review updated
Exception cases reassigned to policy team
Funding release prepared
Awaiting final sign-off from finance control
Units involved11
Cases reassigned5
Records updated23
+
+
+
Internal use only. Funding, review, and compliance actions must be recorded before project status is changed.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
+
+
+
+
diff --git a/web_insert/Plotly/other/chart_0063_other.html b/web_insert/Plotly/other/chart_0063_other.html
new file mode 100644
index 0000000000000000000000000000000000000000..45e25e455e84035b48c67992cb0c64920cea1d87
--- /dev/null
+++ b/web_insert/Plotly/other/chart_0063_other.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
Reporting cycle activeEvidence under reviewSite coverage completeApproval pending
+
+
+
Reporting Summary
Consolidated operational view for facility emissions, evidence readiness, and approval progress across the reporting cycle.
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
+
+
+ Loading view
+ Emissions view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Reporting Note
+
Most reporting work is complete, but the team is holding release until the last boundary clarification and control statement are fully documented. Once those items are closed, the submission can move through approval without further operational changes.
+
+
+
+
+
+
+
+
Reporting Support
+
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
All operated facilities submitted activity data within the active reporting window.
Boundary assumptions were updated after internal control review.
Evidence coverage is complete for direct fuel use and purchased electricity.
Final sign-off is blocked only by unresolved exception responses.
+
Facilities in scope14
Evidence files linked128
Approvers assigned5
+
+
+
+
Review Activity
+
Recent actions tied to the current reporting cycle
+
+
+
+
+
+
+
+
Boundary note requires confirmationShared support load treatment updated by operations
Medium
Exception owner response overdueOne facility comment has not been returned
High
Approval pack awaiting final attachmentControl statement must be added before routing
Low
+
Validate revised allocation methodCheck consistency against facility evidence
In progress
Close open exception itemsCollect responses from assigned owners
Blocked
Route package for sign-offRelease once control statement is attached
Post-run assessment for the last completed checkout messaging experiment, including impact, rollout decision, and follow-up actions.
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
+
+
+ Loading view
+ Experiment results
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Analyst Note
+
The result is not only statistically reliable but also operationally clean. Teams reviewing payment quality, support demand, and buyer behavior did not identify a counter-signal large enough to block release, which makes this a suitable candidate for default rollout with normal monitoring.
+
+
+
+
+
+
+
+
Review Notes
+
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
Primary goal was improved checkout completion.
Guardrails covered payment success, cancellation intent, and support contact rate.
Result supports rollout with standard monitoring.
Follow-up work should focus on first-time buyer reassurance.
+
Control share50%
Variant share50%
Guardrails passed3/3
+
+
+
+
Recent Activity
+
Latest review updates and decision steps
+
+
+
+
+
+
+
+
Release approval pendingRequires product and operations sign-off
Medium
Follow-up test not yet scopedFirst-time buyer segment showed the strongest response
Low
Monitoring handoff requiredPost-release checks must be assigned before launch
Medium
+
Confirm rollout ownerRelease coordination for default experience
Open
Document final decisionAdd rationale to the experiment record
In progress
Prepare follow-up briefDraft next test for delivery reassurance
Not started
+
Data review completed by analyticsNo variance issues found in conversion events
Support lead confirmed stable contact volumeNo increase tied to variant exposure
Product owner attached final recommendationPromote Variant B with standard guardrails
Release coordinator requested approval windowDecision needed before deployment planning
+
+
+
Key Insight
+
The operational recommendation is to promote Variant B to the default experience, keep the current guardrails in place, and open a follow-up test on supporting text near delivery expectations.
+
Review completion92%
Only final approval remains
Release readiness84%
Monitoring and ownership still being confirmed
Follow-up planning36%
Next hypothesis not fully defined
+
Quality Signals
Audience balanceWithin tolerance
Tracking integrityVerified
Release readinessApproved pending sign-off
Control used the existing confirmation message. Variant B used shorter supporting language focused on confidence before purchase.
+
+
Rollout should begin with standard monitoring and a hold point if payment reliability moves outside normal range.
+ Active shiftRelease pendingLab verifiedEscalation open
+
+
+
+
+
+
+
+
Review in progress
Monitor active inspections, isolate nonconforming lots, and keep release decisions aligned across line, lab, and dispatch teams.
This overview is used by inspection leads to track open quality cases from first check through release decision. It brings together line findings, lab confirmation, hold status, and reviewer actions so each lot can move forward with a clear record.
Erin ColeQuality Assurance Lead
+
Lots under review
18
4 require supervisor sign-off
Pass rate
96.8%
Stable against control threshold
Items on hold
7
Awaiting disposition or retest
Average closure time
2.6h
Down after revised sampling steps
+
+
+
+ Loading view
+ Inspection activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A narrow group of nonconforming lots is driving most of the queue. The team has already isolated affected stock and limited release access, so the immediate focus is on finishing lab confirmation, recording final disposition, and clearing unaffected material without breaking traceability.
+
+
+
+
+
+
+
+
Coordination Notes
+
The current workload is concentrated on final assembly output where a small group of lots failed appearance and torque checks. Most cases are moving normally, but a limited set remains blocked while the team confirms whether rework is acceptable or a full containment action is needed.
+
Two lots were moved from routine review to controlled hold after repeat defects were confirmed at receiving check.
Lab confirmation has cleared one previously blocked lot for release with added inspection notes.
Dispatch has been asked not to allocate stock from any case marked pending disposition.
+
Open holds7
Retests due3
Approved releases11
+
+
+
+
Recent Actions
+
Latest updates across inspection, hold, and release handling.
+
+
+
+
+
+
+
+
Repeat defect pattern detectedThree related cases linked to the same source batch
High
Approval waiting on lab noteRelease decision cannot close until confirmation is attached
Medium
Containment nearing limitReserved hold area is close to capacity
Medium
+
Review pending disposition cases7 cases require lead decision
In progress
Confirm retest sampling planApplies to two blocked lots
Queued
Close cleared release recordsDocumentation ready for final update
Ready
+
Line inspector added a deviation noteAttached to lot under controlled hold
Lab result accepted by reviewerCase moved back to release check
Containment list updatedStock location confirmed for isolated units
Dispatch restriction acknowledgedOutbound allocation blocked for pending lots
+
+
+
Inspection Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion82%
Most scheduled checks are recorded
Disposition closure61%
Open exceptions still under review
Release documentation74%
Awaiting final sign-off on held lots
+
Case Progress
Inbound sample logged
Initial inspection record created
Deviation confirmed
Case routed to quality lead
Containment applied
Affected stock isolated from release
Disposition pending
Awaiting final approval
Open holds7
Retests due3
Approved releases11
+
+
+
Only approved dispositions can clear held material for release.
+
+
+
+
diff --git a/web_insert/Plotly/pie/chart_0077_pie.html b/web_insert/Plotly/pie/chart_0077_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..f151c979832c49198704d45660435b77da127789
--- /dev/null
+++ b/web_insert/Plotly/pie/chart_0077_pie.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T34 Water Operations Control
+
+
+
+
+
+
+
+
+
+
Live networkShift handoffPriority review
Monitor plant output, service pressure, and field response from one operating view.
+
+
+
+ Loading view
+ Network status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Control Note
+
The active case is no longer expanding, but the team is holding controls in place until all dependent checks are complete. Field, dispatch, and service desk updates should stay aligned so closures do not outpace verified operating conditions.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Operational updates and required follow-up
+
+
+
+
+
+
+
+
Restricted pressure in east zoneCustomer impact limited; monitoring remains active
High
Booster station follow-up duePost-adjustment verification pending from field lead
Medium
Closure approval waitingSupervisor sign-off required on 3 linked work orders
Medium
+
Confirm downstream pressure readingsAssigned to east response crew
In progress
Validate temporary routing planRequired before restriction release
Pending review
Close resolved customer casesService desk waiting on operations note
Ready
+
Dispatch logged stable readings from sector valve setRecent field update
Plant control confirmed output remains on targetOperations note
Service desk tagged 4 cases for combined closureQueue update
Depot issued replacement fittings to mobile crewSupply confirmation
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident containment82%
Awaiting final field confirmation
Work order completion64%
Linked repairs moving through review
Case closure readiness71%
Service notes partially complete
+
+
+
Supervisor Notes
+
The current focus is to keep supply steady across high-demand zones, clear outstanding field confirmations, and close service cases that no longer need escalation. Supervisors are reviewing exceptions before the next handoff.
+
East transmission line remains in controlled operation with no new loss reports.
Two booster stations are running under temporary observation after overnight adjustment.
Customer-facing updates are limited to affected service pockets only.
Repair stock for seals and isolation fittings is available at primary depot.
+
Crews deployed9
Sites under watch4
Pending approvals6
+
Operational Signals
Reservoir balanceNormal
Pump readinessHigh
Field backlogModerate
Pressure deviation flagged
Network monitoring raised an east line variance and opened incident review.
Field isolation confirmed
Local crew secured the affected segment and reported stable downstream flow.
Supervisor review in progress
Operations lead is validating closure conditions before releasing restrictions.
+
+
+
Use confirmed field updates before changing service classification or closing a case.
Review account health, retention risk, and pending interventions for active customer segments.
+
+
+
+ Loading view
+ Active user case flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current queue reflects a concentrated effort to retain users who showed intent but encountered friction during critical account steps. Teams are expected to document every outreach attempt, confirm ownership before escalation, and close only when the account is either stable or formally transferred for continued monitoring.
+
+
+
+
+
+
+
+
+
+
Case Activity
+
Recent decisions and follow-up movement
+
+
+
+
+
+
+
+
High-value account awaiting decisionNo final disposition recorded after manual review
High
Outreach backlog risingFollow-up queue has crossed internal response target
Medium
Exception note incompletePolicy-sensitive case missing approval rationale
Medium
+
Confirm owner coverage for priority cases7 cases without confirmed handoff
In progress
Complete callback verificationPending contact outcomes need final status
Queued
Close resolved onboarding reviewsCases meet closure conditions after successful recovery
Ready
+
Owner updated on priority reviewRouting changed after shift handoff
Manual decision recordedCase moved from hold to monitor
Risk flag clearedActivity recovered after intervention
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Queue clearance72%
Handled against current intake
Outreach completion64%
Priority contacts sent and logged
Approval coverage89%
Cases with complete decision trail
+
+
+
Operational Notes
+
Current activity is centered on a rise in support-linked retention risk. Several accounts were routed into manual review after repeated onboarding exits, failed self-service recovery, or policy-sensitive changes that require a documented decision.
+
High-priority cases are routed to named owners before outreach begins.
Accounts with repeat friction stay in review until next-step evidence is recorded.
Policy exceptions require a reason code and final approval note.
+
Active owners16
Cases on hold12
Recovered users31
+
Review Signals
Escalation rate11%
Policy exceptions9
Pending callbacks22
Risk rule triggered
Account entered review after repeated drop-off behavior
Operations review started
Owner assigned and contact path confirmed
User contacted
Follow-up sent with recovery guidance and next action
Decision logged
Case moved to monitor, close, or escalate
+
+
+
Access, contact history, and policy decisions are recorded for audit review.
+
+
+
+
diff --git a/web_insert/Plotly/pie/chart_0079_pie.html b/web_insert/Plotly/pie/chart_0079_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..4f2935bcc50b665a8838f7181598a723600f577f
--- /dev/null
+++ b/web_insert/Plotly/pie/chart_0079_pie.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T14 Store Stock Control
+
+
+
+
+
+
+
+
+
+
Live stockReplenishment reviewHold resolution
Track replenishment risk, release held inventory, and keep shelf availability aligned across active locations.
+
+
+
+ Loading view
+ Location stock position
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main concern is not total network stock but timing. Several locations can return to normal selling levels once held units are cleared and transfer approvals are issued in the right order. Teams are using this view to keep store demand, receiving capacity, and release controls aligned.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Latest stock handling and release steps
+
+
+
+
+
+
+
+
Count mismatch blocking release12 item lines remain held after store recount
High
Priority location below cover targetReplenishment risk increased across 4 stores
Medium
Receiving backlog nearing thresholdInbound confirmation lag may delay availability updates
Medium
+
Approve transfer batch for thin-cover stores29 lines prepared by distribution planning
Ready
Confirm held quantities against recount notes74 units waiting on store validation
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Hold review completion68%
Most flagged lines have first-pass decisions
Transfer approval completion54%
Awaiting release order from control lead
Count reconciliation73%
Repeat variance stores still under review
+
+
+
Operational Notes
+
this workflow supports the daily decision flow: identify where cover is too thin, confirm whether held stock can be released, and route transfer lines to the locations with the highest service risk. Notes and queue items below reflect the current handoff between store control, distribution, and floor operations.
+
Prioritize releases for locations with same-day shelf risk.
Delay nonessential transfers until held quantities are verified.
Escalate repeated count mismatches to store control leads.
Keep transfer approvals aligned with receiving capacity.
+
Priority stores11
Open holds18
Ready transfers7
+
Network Signals
Service riskElevated
Receiving pressureModerate
Approval backlogContained
Cycle count exceptions reviewed
Store control completed first-pass review on flagged lines.
Transfer requests consolidated
Low-cover locations were grouped for a single approval pass.
Held stock release pending
Distribution is waiting for final quantity confirmation.
+
+
+
Use release actions only after count confirmation is recorded in the item note.
Coordinate intake, review, and resolution for active public service requests across district teams.
+
+
+
+ Loading view
+ Request handling
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Demand remains manageable overall, but manual verification is creating uneven wait times between offices. Supervisors are prioritizing clean approvals, redirecting exception work to trained reviewers, and keeping resident communication tied closely to documented case decisions.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest actions across intake, review, and approval teams.
+
+
+
+
+
+
+
+
Approval queue nearing response limit8 requests need supervisor action within the service window
High
Identity mismatch rate increasedManual checks are slowing intake clearance in two offices
Medium
Returned submissions require follow-upResidents have not responded on 14 incomplete requests
Low
+
Clear specialist review backlogReassign exception cases from general intake
In progress
Approve release batchDecision notes are complete and ready for sign-off
Ready
Validate returned documentsCheck corrected records before reopening requests
Queued
+
North district accepted three escalated casesOwnership transferred from central review
Resident notice batch released after approvalNotifications sent for completed decisions
Compliance note added to exception handling rulesReview teams must record reason codes on manual overrides
Intake team cleared duplicate submissionsMerged records reduced queue noise for active requests
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Intake review72%
Most new submissions screened and routed
Eligibility verification54%
Manual checks remain the slowest step
Decision release81%
Approved cases moving out on schedule
+
+
+
Supervisor Notes
+
A review backlog has formed around eligibility checks that require manual confirmation. Supervisors are balancing faster routing with compliance controls so straightforward requests can move forward while exceptions remain documented and ready for audit.
+
Priority requests are held for direct supervisor review when identity or address records do not match.
Field offices can return incomplete submissions to intake without closing the case.
Resident notifications are released only after decision notes and supporting checks are complete.
Escalated items remain visible until ownership is accepted by the receiving team.
+
Avg. handling time2.8h
Returned to intake27
Supervisor holds11
+
Queue Health
Service levelStable
Review capacityTight
Escalation loadModerate
Intake queue reviewed
Initial screening completed for newly received submissions
Eligibility exceptions routed
Cases with missing verification moved to specialist review
Supervisor approvals issued
Approved requests released for resident notice and fulfillment
+
+
+
Access, routing, and decision history are logged for compliance review.
Track specimen intake, instrument readiness, review holds, and release validated results from one controlled queue.
+
+
+
+ Loading view
+ Specimen flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Current delays are not caused by intake volume but by a narrow cluster of held results that need repeat confirmation and signed reviewer rationale. Once those cases are closed, the release queue should return to normal pace.
+
+
+
+
+
+
+
+
+
+
Validation Activity
+
Latest laboratory actions and review updates
+
+
+
+
+
+
+
+
Quality hold threshold reachedChemistry lane 7 held results
High
Instrument maintenance window dueHematology bench service reminder
Complete supervisory sign-off for held chemistry cases24 items in review queue
In progress
Verify rerun documentation before release5 specimens require note completion
Pending
Confirm analyzer readiness after resetPost-interruption checks still open
Waiting confirmation
+
Accession team cleared label exceptionMatched specimen and order records
Reviewer added comment to held electrolyte panelAwaiting repeat outcome
Bench lead reassigned overflow workCapacity balanced across active stations
Final result packet released to care teamAudit trail completed
+
+
Throughput Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Accessioning completion92%
Most inbound samples logged and routed
Validation review68%
Routine cases moving faster than held work
Quality documentation81%
Remaining notes tied to reruns and holds
+
+
+
Escalation Notes
+
Supervisors are balancing turnaround targets with quality controls, making sure reruns, delta checks, and documentation updates are completed before any final authorization.
+
Priority samples are routed directly to staffed benches.
Held results require either repeat testing or reviewer comment.
Release activity is limited to validated work with complete audit notes.
+
Released today143
Open holds7
Assigned reviewers9
+
Bench Signals
Pending accession checks12
Benches at capacity2
Reruns in progress5
Intake batch reconciled
Analyzer lane reset
Senior review started
Release queue narrowed
+
+
+
All releases must include reviewer confirmation and complete traceability.
+
+
+
+
diff --git a/web_insert/Plotly/pie/chart_0082_pie.html b/web_insert/Plotly/pie/chart_0082_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..24b3506cc78af7b18192b203ed73a98748e14e12
--- /dev/null
+++ b/web_insert/Plotly/pie/chart_0082_pie.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T23 Population Health Surveillance Console
+
+
+
+
+
+
+
+
+
T23
+
+
Public Health Operations
+
Population Health Surveillance Console
+
Cluster Review 18
+
+
+
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
+
+
+
+
diff --git a/web_insert/Plotly/pie/chart_0083_pie.html b/web_insert/Plotly/pie/chart_0083_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..9cbca7d68f55003b8e332554389b4e182e25f73c
--- /dev/null
+++ b/web_insert/Plotly/pie/chart_0083_pie.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T19 Fulfillment Control Center
+
+
+
+
+
+
Monitor outbound flow, clear held orders, and keep dock activity aligned with carrier cutoff commitments.
Outbound volume is moving at a healthy pace, but a growing cluster of held orders is starting to compress the final release window. Most exceptions are concentrated in a small number of picking zones, which means the team can recover service if reviews are completed before the next carrier handoff cycle.
Maya ChenFulfillment Operations Lead
+
Orders ready to release
1,284
Stable after the last verification pass
Orders on hold
73
Most require address or stock confirmation
Dock lanes active
18 / 22
Two lanes reserved for late priority loads
On-time dispatch
96.4%
Holding above internal service target
+
+
+
+ Loading view
+ Outbound release status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most outbound risk is not coming from overall volume; it is coming from a manageable set of held orders that can delay the final handoff sequence if left unresolved. Clearing those exceptions now protects both dock capacity and on-time dispatch.
+
+
+
+
+
+
+
+
Operational Notes
+
Dock activity remains balanced across active lanes, and release discipline is preventing unnecessary trailer dwell. The current focus is to resolve shipment holds in the queue, confirm a small set of short picks, and protect the late priority wave from congestion near final staging.
+
Address validation holds account for the largest share of delayed releases
Priority orders should be cleared before standard replenishment checks resume
Lane reassignment is available if staging volume exceeds the current threshold
Carrier handoff timing remains achievable with active exception review
+
Rush orders146
Review desks open5
Average hold age42m
+
+
+
+
Recent Actions
+
Latest fulfillment events and reviews
+
+
+
+
+
+
+
+
Held orders above control threshold73 orders pending review across three zones
High
Lane 12 staging nearing limitOverflow risk if the next release is not staggered
Medium
Carrier cutoff buffer tighteningPriority loads need final confirmation soon
Medium
+
Clear address validation holdsAssigned to order review desk
In progress
Confirm short pick substitutionsAwaiting floor lead approval
Pending
Protect late priority lane capacityReserve space before final handoff
Scheduled
+
Verification team cleared 22 held ordersQueue pressure eased in the last review cycle
Dock supervisor opened two backup positionsStaging congestion reduced near outbound lanes
Carrier desk confirmed on-time intakeNo change to active handoff sequence
Packing lead flagged repeat scan failuresIssue isolated to one station for follow-up
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Order release completion78%
Released against current outbound plan
Exception resolution63%
Held orders cleared or reassigned
Dock preparation87%
Lanes staffed and staged for handoff
+
Release Activity
Wave release completed
Primary outbound batch moved to final staging
Exception queue escalated
Held orders above review target triggered supervisor attention
Dock lanes rebalanced
Two lanes opened for priority handoff protection
Final verification in progress
Pack confirmation and label checks underway
Rush orders146
Review desks open5
Average hold age42m
+
+
+
Use this view to clear blockers early, protect release timing, and keep dock flow aligned with service commitments.
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
Coordinate active equipment work, parts readiness, and technician handoff for the current plant queue.
+
+
+
+ Loading view
+ Asset service status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
The main risk is not the volume of open work but the overlap between recurring faults, shared spare parts, and incomplete close-out records. The coordinator is prioritizing jobs that restore stable operation fastest while making sure each completed repair can pass inspection without rework.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest maintenance coordination updates
+
+
+
+
+
+
+
+
Repeat fault on feeder motor requires supervisor reviewLinked to two prior corrective orders
Close-out blocked by missing isolation recordInspection will not release final status
High
+
Approve repair scope for Press Line 2 feederCost review attached by area lead
Pending approval
Confirm staged parts for conveyor coupling replacementMechanical crew waiting at access point
In progress
Return corrected close-out notes to inspectionPhoto evidence and isolation steps required
Needs update
+
Mechanical crew reported safe access at feeder bayField note added 14 min ago
Parts desk reserved seal kit for linked ordersReservation confirmed against active queue
Area lead raised priority on conveyor drive caseOperational impact now classified as elevated
Inspection returned one closure package for revisionMissing verification note in final step
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Priority repairs completed62%
8 of 13 cleared
Parts staging readiness73%
Most critical kits available
Close-out compliance81%
Several packages awaiting final note
+
+
+
Coordination Notes
+
The current focus is keeping high-use assets in service while clearing overdue follow-up work from earlier interventions. Notes, queue status, and technician updates are aligned here so handoff decisions can be made without opening separate records.
+
Three priority jobs share the same hydraulic seal kit and must be sequenced carefully.
Inspection has requested photo confirmation before closing two repeat-failure orders.
One conveyor drive can remain in service under reduced load until replacement stock is issued.
Electrical support is available for lockout review on escalated jobs.
+
On-site crews4
Locked out assets3
Rush requests2
+
Support Readiness
Critical assets online9/10
Awaiting approval4 orders
Parts shortfall2 items
Failure review completed for press feeder
Supervisor approved immediate repair path
Seal kit released from parts crib
Reserved against two linked work orders
Field update posted by mechanical crew
Access cleared and unit isolated
Close-out package returned for correction
Inspection note required before final release
+
+
+
All updates shown here are operational records and must match the approved work order before closure.
Review inbound pitches, assign editorial follow-up, and keep the publication queue moving with clear ownership.
+
+
+
+ Loading view
+ Selection queue
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
Several strong submissions are moving forward at the same time, but the desk is losing time when ownership is unclear after approval. Tightening assignment rules here will reduce back-and-forth, speed contributor replies, and help section editors focus on pieces they are ready to develop.
+
+
+
+
+
+
+
+
+
+
Desk Activity
+
Latest review and assignment actions
+
+
+
+
+
+
+
+
Two approved pitches still have no ownerCleared in review but not accepted by a section editor
High
Standards check requested on a sensitive angleHold response until review note is returned
Medium
Contributor waiting on revision guidanceInitial feedback sent without a named follow-up editor
Medium
+
Confirm final owner for the education feature pitchShared interest across two sections
In progress
Send decline notes for out-of-scope submissionsReady after lead review
Ready
Close duplicate entry group and keep strongest versionThree related submissions from separate contributors
Blocked
+
Lead editor requested a tighter angle before commissionAdded to the top priority pitch
Assignment returned after capacity check failedSection owner asked for reassignment
Contributor replied with revised framing noteReady for second pass
Duplicate tag removed after manual comparisonSubmission can continue through normal review
+
+
Operational Insight
+
The current operating goal is simple: reduce duplicate review, assign one accountable editor to each viable pitch, and keep contributors informed before follow-up goes cold.
+
First-pass review78%
Most inbound items have initial editorial tags
Ownership assignment61%
Several approved pitches still need a named editor
Contributor replies84%
Outcome messages are nearly caught up
+
+
+
Contributor Support
+
Most delays are no longer in intake. The main bottleneck is editorial ownership after a pitch passes first review, especially when more than one section wants to claim the same idea.
+
Flag near-duplicate submissions before they reach senior review.
Move approved ideas into one owner queue with a clear response deadline.
Keep contributor communication consistent when a pitch is held, revised, or declined.
Surface sensitive topics for legal or standards review before commissioning.
+
Held11
Revisions requested14
Declines sent32
+
Operational Signals
Duplicate riskModerate
Standards review3 items pending
Editor capacityTight
Intake sweep completed
New submissions were normalized, deduplicated, and tagged by desk.
Senior review pass
Borderline pitches were escalated for direction on fit and urgency.
Assignment round
Approved items were matched to editors with open capacity.
Contributor follow-up
Reply notes were prepared for hold, revise, and decline outcomes.
+
+
+
Use one final outcome per pitch so downstream assignment and contributor replies stay aligned.
+
+
+
+
diff --git a/web_insert/Plotly/scatter/chart_0068_scatter.html b/web_insert/Plotly/scatter/chart_0068_scatter.html
new file mode 100644
index 0000000000000000000000000000000000000000..9badafa661f5434689cbec680004274d0ad49df8
--- /dev/null
+++ b/web_insert/Plotly/scatter/chart_0068_scatter.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T04 Daily Energy Use Report
+
+
+
+
+
+
Operational summary for site load, steam demand, and utility variance across active production lines.
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
+
+
+ Loading view
+ Consumption overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operating Note
+
The current review is centered on whether the elevated water draw should be recorded as expected support usage or escalated as a controllable loss. Early checks support the first view, but the decision will remain open until sanitation records and supervisor confirmation are complete.
+
+
+
+
+
+
+
+
Supervisor Support
+
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
Base electrical load improved after non-process fans were isolated during idle periods.
Compressed air demand stayed even, with no signs of sustained leakage during the late run.
Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
Water variance should be rechecked once final sanitation logs are posted.
+
Open exceptions2
Lines reviewed6/6
Actions due3
+
+
+
+
Completion Progress
+
Status of review and follow-up
+
+
+
+
+
+
+
+
Water use above expected bandPackaging area support services
Medium
Line idle shutdown not confirmedTwo areas missing end-run verification
Low
Final sanitation log still pendingRequired to close variance review
Medium
+
Confirm restart-related water drawOperations supervisor to validate against log entries
In progress
Verify non-process equipment shutdownUtilities team to spot-check idle periods
Queued
Complete site approvalRequired before report closeout
Pending
+
Meter reconciliation completed for main supplyLogged by utilities desk
Maintenance confirmed no active steam issueInspection note added
Cost allocation refreshed for final reviewFinance rule set applied
+
+
+
Assessment
+
No immediate escalation is required, but the site energy lead has asked line supervisors to confirm idle-time shutdown discipline before the next reporting cycle is closed.
+
Meter validation100%
All core readings matched
Variance review68%
Awaiting supporting logs
Management sign-off35%
Ready for supervisor action
+
Key Signals
Load balanceSteady
Utility riskModerate
Approval statePending sign-off
Water intake exceeded the normal operating band during cleaning and restart activity. Review remains open until line notes and final meter confirmation are attached.
+
+
Use this report to confirm variances, assign follow-up, and complete site-level review before closeout.
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
Monitor enrollment flow, review teaching requests, and keep campus services within response targets.
+
+
+
+ Loading view
+ Enrollment workload
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main pressure point is not overall volume but the number of cases waiting on a second team to confirm eligibility, roster placement, or account release. Clearing those handoffs will reduce repeat contacts and keep approvals moving in the right order.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Recent updates across admissions, scheduling, and support
+
+
+
+
+
+
+
+
Identity check queue exceeded review target14 learner files are outside normal handling time
Access provisioning paused for one intake groupRoster confirmation is still pending from registry
Medium
+
Approve seat exception requestsOwned by academic operations
In progress
Confirm account release listWaiting on final learner verification
Blocked
Close duplicate support casesMerge requests from advising and registry
Ready
+
Registry completed a priority batch reviewOpen count reduced after document validation
Scheduling submitted a conflict noteOne instructor assigned to overlapping sessions
Support added an access exceptionLearner record needs manual activation
Advising returned a hold for correctionProgram selection does not match approved path
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Enrollment validation74%
Most records reviewed; exceptions remain
Teaching assignment approval61%
Conflict cases still under review
Account activation release83%
Waiting on final roster handoff
+
+
+
Support Notes
+
Most exceptions are tied to incomplete learner records and overlapping instructor availability. Team leads are using the queue to clear blocked cases before they affect course readiness and support response times.
+
Admissions is prioritizing records with missing identity checks.
Scheduling is reviewing instructor conflicts before room release.
Support is holding account activation until final roster approval.
Policy notices were updated to reflect new escalation ownership.
+
Escalations7
Owners online12
Blocked cases19
+
Operational Signals
Validation backlogModerate
Seat release paceStable
Access turnaroundAt risk
Intake review opened
Registry triage assigned the latest submission batch
Faculty request escalated
Teaching load conflict moved to academic operations
Roster lock cleared
Student services approved the final exception set
+
+
+
Use this view to coordinate approvals, confirm handoffs, and clear blockers before escalation windows are breached.
+
+
+
+
diff --git a/web_insert/Plotly/scatter/chart_0072_scatter.html b/web_insert/Plotly/scatter/chart_0072_scatter.html
new file mode 100644
index 0000000000000000000000000000000000000000..fad82e3733c5dc6419090858dc1107d29588bcad
--- /dev/null
+++ b/web_insert/Plotly/scatter/chart_0072_scatter.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T04 Daily Energy Use Report
+
+
+
+
+
+
Operational summary for site load, steam demand, and utility variance across active production lines.
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
+
+
+ Loading view
+ Consumption overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operating Note
+
The current review is centered on whether the elevated water draw should be recorded as expected support usage or escalated as a controllable loss. Early checks support the first view, but the decision will remain open until sanitation records and supervisor confirmation are complete.
+
+
+
+
+
+
+
+
Supervisor Support
+
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
Base electrical load improved after non-process fans were isolated during idle periods.
Compressed air demand stayed even, with no signs of sustained leakage during the late run.
Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
Water variance should be rechecked once final sanitation logs are posted.
+
Open exceptions2
Lines reviewed6/6
Actions due3
+
+
+
+
Completion Progress
+
Status of review and follow-up
+
+
+
+
+
+
+
+
Water use above expected bandPackaging area support services
Medium
Line idle shutdown not confirmedTwo areas missing end-run verification
Low
Final sanitation log still pendingRequired to close variance review
Medium
+
Confirm restart-related water drawOperations supervisor to validate against log entries
In progress
Verify non-process equipment shutdownUtilities team to spot-check idle periods
Queued
Complete site approvalRequired before report closeout
Pending
+
Meter reconciliation completed for main supplyLogged by utilities desk
Maintenance confirmed no active steam issueInspection note added
Cost allocation refreshed for final reviewFinance rule set applied
+
+
+
Assessment
+
No immediate escalation is required, but the site energy lead has asked line supervisors to confirm idle-time shutdown discipline before the next reporting cycle is closed.
+
Meter validation100%
All core readings matched
Variance review68%
Awaiting supporting logs
Management sign-off35%
Ready for supervisor action
+
Key Signals
Load balanceSteady
Utility riskModerate
Approval statePending sign-off
Water intake exceeded the normal operating band during cleaning and restart activity. Review remains open until line notes and final meter confirmation are attached.
+
+
Use this report to confirm variances, assign follow-up, and complete site-level review before closeout.
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
Coordinate active equipment work, parts readiness, and technician handoff for the current plant queue.
+
+
+
+ Loading view
+ Asset service status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
The main risk is not the volume of open work but the overlap between recurring faults, shared spare parts, and incomplete close-out records. The coordinator is prioritizing jobs that restore stable operation fastest while making sure each completed repair can pass inspection without rework.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest maintenance coordination updates
+
+
+
+
+
+
+
+
Repeat fault on feeder motor requires supervisor reviewLinked to two prior corrective orders
Close-out blocked by missing isolation recordInspection will not release final status
High
+
Approve repair scope for Press Line 2 feederCost review attached by area lead
Pending approval
Confirm staged parts for conveyor coupling replacementMechanical crew waiting at access point
In progress
Return corrected close-out notes to inspectionPhoto evidence and isolation steps required
Needs update
+
Mechanical crew reported safe access at feeder bayField note added 14 min ago
Parts desk reserved seal kit for linked ordersReservation confirmed against active queue
Area lead raised priority on conveyor drive caseOperational impact now classified as elevated
Inspection returned one closure package for revisionMissing verification note in final step
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Priority repairs completed62%
8 of 13 cleared
Parts staging readiness73%
Most critical kits available
Close-out compliance81%
Several packages awaiting final note
+
+
+
Coordination Notes
+
The current focus is keeping high-use assets in service while clearing overdue follow-up work from earlier interventions. Notes, queue status, and technician updates are aligned here so handoff decisions can be made without opening separate records.
+
Three priority jobs share the same hydraulic seal kit and must be sequenced carefully.
Inspection has requested photo confirmation before closing two repeat-failure orders.
One conveyor drive can remain in service under reduced load until replacement stock is issued.
Electrical support is available for lockout review on escalated jobs.
+
On-site crews4
Locked out assets3
Rush requests2
+
Support Readiness
Critical assets online9/10
Awaiting approval4 orders
Parts shortfall2 items
Failure review completed for press feeder
Supervisor approved immediate repair path
Seal kit released from parts crib
Reserved against two linked work orders
Field update posted by mechanical crew
Access cleared and unit isolated
Close-out package returned for correction
Inspection note required before final release
+
+
+
All updates shown here are operational records and must match the approved work order before closure.
+ Live DispatchPriority LoadsDriver CoverageGate Readiness
+
+
+
+
+
+
+
Active monitoring
+
Coordinate active routes, rebalance drivers, and clear open exceptions from one operating view.
+
Dispatch is managing a tight operating window with several outbound runs stacked behind the same gate sequence. The team has already reallocated available units to protect higher-priority moves and reduce idle time at the yard.
+
+
+
Maya BennettFleet Dispatch Lead
+
+
+
+
Units in motion
148
12 reassigned during the current shift
Open route holds
9
Most tied to late gate release
Coverage gap
4
Backfill requested for long-haul lanes
On-time departure
93%
Holding steady after yard balancing
+
+
+
+
+ Loading view
+ Route coordination
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Most unresolved issues now sit between driver readiness and release timing. Supervisors are using this panel to confirm who can be reassigned, which routes need escalation, and where a short delay will create a downstream coverage gap.
+
Three priority loads were moved to alternate tractors to avoid missed departure targets.
Driver check-in compliance improved after direct follow-up from the shift desk.
Yard staging remains constrained near outbound lanes with refrigerated equipment.
+
Standby drivers6
Held departures9
Ready tractors22
+
+
+
+
+
Recent Activity
+
Latest dispatch actions and route decisions
+
+
+
+
+
+
+
+
Gate release delay affecting priority runLane B12 Waiting 18 min
High
Driver rest window blocks reassignmentLong-haul pool 2 units impacted
Medium
Trailer pairing mismatch in yard queueOutbound side Manual check required
Medium
+
Confirm backup operator for north corridor runDispatch desk request
In progress
Approve swap for delayed refrigerated unitRequires lead signoff
Pending
Close completed hold after gate clearanceRoute ready for release
Ready
+
Yard team confirmed two lanes cleared for outbound stagingPosted by yard control
Driver support updated availability for standby poolCoverage adjusted
Priority load reassignment accepted by route supervisorNo further approval needed
Fuel stop exception removed from active reviewDispatch note closed
+
+
+
Lead Note
+
The team is working through a compressed release window where small delays at the yard can quickly reduce route coverage. This view helps dispatch leads decide where to reassign equipment, push approvals, and keep priority movements on schedule.
+
Dispatch healthStable with exceptions
Driver readinessNear full coverage
Yard congestionElevated at outbound side
+
Priority lanes are protected, but remaining open holds need confirmation from yard and driver teams before release.
+
+ Open note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
Operating Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Route release completion78%
Based on active outbound plan
Driver assignment coverage91%
Remaining gap on long-haul lanes
Exception clearance64%
Open holds trending down
+
+
+
Use route reassignment only after confirming gate availability and driver hours.
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
Execution in focusControl review activeApproval queue open
Track release pacing, exception handling, and approval readiness across active cost centers.
+
+
+
+ Loading view
+ Execution overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
Release performance is broadly on plan, but the remaining blocked amount sits in cases that need manual confirmation. Resolving those records quickly will reduce queue pressure and allow controllers to close the cycle without extending approval coverage.
+
+
+
+
+
+
+
+
+
+
Recent Actions
+
Latest updates from controllers and approvers
+
+
+
+
+
+
+
+
High-value release held for documentation$220K requires source support
Manual adjustment exceeds local thresholdController comment attached
Medium
+
Clear blocked release requests12 records awaiting evidence
In progress
Confirm revised control notes4 items edited by reviewers
Pending
Close approved carryover actions7 ready for posting
Ready
+
Policy exception comment added to release caseBy regional controller
Approval path updated for restricted fundingRouting changed automatically
Supporting file accepted after validationBlocked amount reduced
Commitment request returned for correctionAccount line mismatch found
+
+
Execution Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Release completion92%
Against approved plan
Approval completion81%
All levels combined
Exception clearance64%
Policy and document checks
+
+
+
Controller Notes
+
Most exceptions are tied to account mapping and supporting documentation rather than overspend risk. Teams are being asked to resolve these items before release authority is expanded.
+
Release pacing remains healthy across core operating lines.
Exception volume is concentrated in a small set of manual adjustments.
Senior approval capacity is the main constraint on final clearance.
Control notes have been attached to all blocked items above threshold.
+
Open cases43
Needs review11
Cleared today19
+
Exception Signals
Control postureStable
Approval loadElevated
Release riskManaged
Initial allocation confirmed
Control baseline recorded
Mid-cycle release adjusted
Carryover request applied
Exception review escalated
Policy evidence requested
Final approval window opened
Queue routing updated
+
+
+
Only approved adjustments can move to release. Blocked items remain visible until evidence and sign-off are complete.
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
Track specimen intake, instrument readiness, review holds, and release validated results from one controlled queue.
+
+
+
+ Loading view
+ Specimen flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Current delays are not caused by intake volume but by a narrow cluster of held results that need repeat confirmation and signed reviewer rationale. Once those cases are closed, the release queue should return to normal pace.
+
+
+
+
+
+
+
+
+
+
Validation Activity
+
Latest laboratory actions and review updates
+
+
+
+
+
+
+
+
Quality hold threshold reachedChemistry lane 7 held results
High
Instrument maintenance window dueHematology bench service reminder
Complete supervisory sign-off for held chemistry cases24 items in review queue
In progress
Verify rerun documentation before release5 specimens require note completion
Pending
Confirm analyzer readiness after resetPost-interruption checks still open
Waiting confirmation
+
Accession team cleared label exceptionMatched specimen and order records
Reviewer added comment to held electrolyte panelAwaiting repeat outcome
Bench lead reassigned overflow workCapacity balanced across active stations
Final result packet released to care teamAudit trail completed
+
+
Throughput Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Accessioning completion92%
Most inbound samples logged and routed
Validation review68%
Routine cases moving faster than held work
Quality documentation81%
Remaining notes tied to reruns and holds
+
+
+
Escalation Notes
+
Supervisors are balancing turnaround targets with quality controls, making sure reruns, delta checks, and documentation updates are completed before any final authorization.
+
Priority samples are routed directly to staffed benches.
Held results require either repeat testing or reviewer comment.
Release activity is limited to validated work with complete audit notes.
+
Released today143
Open holds7
Assigned reviewers9
+
Bench Signals
Pending accession checks12
Benches at capacity2
Reruns in progress5
Intake batch reconciled
Analyzer lane reset
Senior review started
Release queue narrowed
+
+
+
All releases must include reviewer confirmation and complete traceability.
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
Monitor enrollment flow, review teaching requests, and keep campus services within response targets.
+
+
+
+ Loading view
+ Enrollment workload
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main pressure point is not overall volume but the number of cases waiting on a second team to confirm eligibility, roster placement, or account release. Clearing those handoffs will reduce repeat contacts and keep approvals moving in the right order.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Recent updates across admissions, scheduling, and support
+
+
+
+
+
+
+
+
Identity check queue exceeded review target14 learner files are outside normal handling time
Access provisioning paused for one intake groupRoster confirmation is still pending from registry
Medium
+
Approve seat exception requestsOwned by academic operations
In progress
Confirm account release listWaiting on final learner verification
Blocked
Close duplicate support casesMerge requests from advising and registry
Ready
+
Registry completed a priority batch reviewOpen count reduced after document validation
Scheduling submitted a conflict noteOne instructor assigned to overlapping sessions
Support added an access exceptionLearner record needs manual activation
Advising returned a hold for correctionProgram selection does not match approved path
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Enrollment validation74%
Most records reviewed; exceptions remain
Teaching assignment approval61%
Conflict cases still under review
Account activation release83%
Waiting on final roster handoff
+
+
+
Support Notes
+
Most exceptions are tied to incomplete learner records and overlapping instructor availability. Team leads are using the queue to clear blocked cases before they affect course readiness and support response times.
+
Admissions is prioritizing records with missing identity checks.
Scheduling is reviewing instructor conflicts before room release.
Support is holding account activation until final roster approval.
Policy notices were updated to reflect new escalation ownership.
+
Escalations7
Owners online12
Blocked cases19
+
Operational Signals
Validation backlogModerate
Seat release paceStable
Access turnaroundAt risk
Intake review opened
Registry triage assigned the latest submission batch
Faculty request escalated
Teaching load conflict moved to academic operations
Roster lock cleared
Student services approved the final exception set
+
+
+
Use this view to coordinate approvals, confirm handoffs, and clear blockers before escalation windows are breached.
Review inbound pitches, assign editorial follow-up, and keep the publication queue moving with clear ownership.
+
+
+
+ Loading view
+ Selection queue
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
Several strong submissions are moving forward at the same time, but the desk is losing time when ownership is unclear after approval. Tightening assignment rules here will reduce back-and-forth, speed contributor replies, and help section editors focus on pieces they are ready to develop.
+
+
+
+
+
+
+
+
+
+
Desk Activity
+
Latest review and assignment actions
+
+
+
+
+
+
+
+
Two approved pitches still have no ownerCleared in review but not accepted by a section editor
High
Standards check requested on a sensitive angleHold response until review note is returned
Medium
Contributor waiting on revision guidanceInitial feedback sent without a named follow-up editor
Medium
+
Confirm final owner for the education feature pitchShared interest across two sections
In progress
Send decline notes for out-of-scope submissionsReady after lead review
Ready
Close duplicate entry group and keep strongest versionThree related submissions from separate contributors
Blocked
+
Lead editor requested a tighter angle before commissionAdded to the top priority pitch
Assignment returned after capacity check failedSection owner asked for reassignment
Contributor replied with revised framing noteReady for second pass
Duplicate tag removed after manual comparisonSubmission can continue through normal review
+
+
Operational Insight
+
The current operating goal is simple: reduce duplicate review, assign one accountable editor to each viable pitch, and keep contributors informed before follow-up goes cold.
+
First-pass review78%
Most inbound items have initial editorial tags
Ownership assignment61%
Several approved pitches still need a named editor
Contributor replies84%
Outcome messages are nearly caught up
+
+
+
Contributor Support
+
Most delays are no longer in intake. The main bottleneck is editorial ownership after a pitch passes first review, especially when more than one section wants to claim the same idea.
+
Flag near-duplicate submissions before they reach senior review.
Move approved ideas into one owner queue with a clear response deadline.
Keep contributor communication consistent when a pitch is held, revised, or declined.
Surface sensitive topics for legal or standards review before commissioning.
+
Held11
Revisions requested14
Declines sent32
+
Operational Signals
Duplicate riskModerate
Standards review3 items pending
Editor capacityTight
Intake sweep completed
New submissions were normalized, deduplicated, and tagged by desk.
Senior review pass
Borderline pitches were escalated for direction on fit and urgency.
Assignment round
Approved items were matched to editors with open capacity.
Contributor follow-up
Reply notes were prepared for hold, revise, and decline outcomes.
+
+
+
Use one final outcome per pitch so downstream assignment and contributor replies stay aligned.
+
+
+
+
diff --git a/web_insert/Plotly/scatter/chart_0083_scatter.html b/web_insert/Plotly/scatter/chart_0083_scatter.html
new file mode 100644
index 0000000000000000000000000000000000000000..fa3e45722c10ed33a6a18cfd7e11fabbbd36be7c
--- /dev/null
+++ b/web_insert/Plotly/scatter/chart_0083_scatter.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T19 Fulfillment Control Center
+
+
+
+
+
+
Monitor outbound flow, clear held orders, and keep dock activity aligned with carrier cutoff commitments.
Outbound volume is moving at a healthy pace, but a growing cluster of held orders is starting to compress the final release window. Most exceptions are concentrated in a small number of picking zones, which means the team can recover service if reviews are completed before the next carrier handoff cycle.
Maya ChenFulfillment Operations Lead
+
Orders ready to release
1,284
Stable after the last verification pass
Orders on hold
73
Most require address or stock confirmation
Dock lanes active
18 / 22
Two lanes reserved for late priority loads
On-time dispatch
96.4%
Holding above internal service target
+
+
+
+ Loading view
+ Outbound release status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most outbound risk is not coming from overall volume; it is coming from a manageable set of held orders that can delay the final handoff sequence if left unresolved. Clearing those exceptions now protects both dock capacity and on-time dispatch.
+
+
+
+
+
+
+
+
Operational Notes
+
Dock activity remains balanced across active lanes, and release discipline is preventing unnecessary trailer dwell. The current focus is to resolve shipment holds in the queue, confirm a small set of short picks, and protect the late priority wave from congestion near final staging.
+
Address validation holds account for the largest share of delayed releases
Priority orders should be cleared before standard replenishment checks resume
Lane reassignment is available if staging volume exceeds the current threshold
Carrier handoff timing remains achievable with active exception review
+
Rush orders146
Review desks open5
Average hold age42m
+
+
+
+
Recent Actions
+
Latest fulfillment events and reviews
+
+
+
+
+
+
+
+
Held orders above control threshold73 orders pending review across three zones
High
Lane 12 staging nearing limitOverflow risk if the next release is not staggered
Medium
Carrier cutoff buffer tighteningPriority loads need final confirmation soon
Medium
+
Clear address validation holdsAssigned to order review desk
In progress
Confirm short pick substitutionsAwaiting floor lead approval
Pending
Protect late priority lane capacityReserve space before final handoff
Scheduled
+
Verification team cleared 22 held ordersQueue pressure eased in the last review cycle
Dock supervisor opened two backup positionsStaging congestion reduced near outbound lanes
Carrier desk confirmed on-time intakeNo change to active handoff sequence
Packing lead flagged repeat scan failuresIssue isolated to one station for follow-up
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Order release completion78%
Released against current outbound plan
Exception resolution63%
Held orders cleared or reassigned
Dock preparation87%
Lanes staffed and staged for handoff
+
Release Activity
Wave release completed
Primary outbound batch moved to final staging
Exception queue escalated
Held orders above review target triggered supervisor attention
Dock lanes rebalanced
Two lanes opened for priority handoff protection
Final verification in progress
Pack confirmation and label checks underway
Rush orders146
Review desks open5
Average hold age42m
+
+
+
Use this view to clear blockers early, protect release timing, and keep dock flow aligned with service commitments.
Coordinate intake, review, and resolution for active public service requests across district teams.
+
+
+
+ Loading view
+ Request handling
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Demand remains manageable overall, but manual verification is creating uneven wait times between offices. Supervisors are prioritizing clean approvals, redirecting exception work to trained reviewers, and keeping resident communication tied closely to documented case decisions.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest actions across intake, review, and approval teams.
+
+
+
+
+
+
+
+
Approval queue nearing response limit8 requests need supervisor action within the service window
High
Identity mismatch rate increasedManual checks are slowing intake clearance in two offices
Medium
Returned submissions require follow-upResidents have not responded on 14 incomplete requests
Low
+
Clear specialist review backlogReassign exception cases from general intake
In progress
Approve release batchDecision notes are complete and ready for sign-off
Ready
Validate returned documentsCheck corrected records before reopening requests
Queued
+
North district accepted three escalated casesOwnership transferred from central review
Resident notice batch released after approvalNotifications sent for completed decisions
Compliance note added to exception handling rulesReview teams must record reason codes on manual overrides
Intake team cleared duplicate submissionsMerged records reduced queue noise for active requests
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Intake review72%
Most new submissions screened and routed
Eligibility verification54%
Manual checks remain the slowest step
Decision release81%
Approved cases moving out on schedule
+
+
+
Supervisor Notes
+
A review backlog has formed around eligibility checks that require manual confirmation. Supervisors are balancing faster routing with compliance controls so straightforward requests can move forward while exceptions remain documented and ready for audit.
+
Priority requests are held for direct supervisor review when identity or address records do not match.
Field offices can return incomplete submissions to intake without closing the case.
Resident notifications are released only after decision notes and supporting checks are complete.
Escalated items remain visible until ownership is accepted by the receiving team.
+
Avg. handling time2.8h
Returned to intake27
Supervisor holds11
+
Queue Health
Service levelStable
Review capacityTight
Escalation loadModerate
Intake queue reviewed
Initial screening completed for newly received submissions
Eligibility exceptions routed
Cases with missing verification moved to specialist review
Supervisor approvals issued
Approved requests released for resident notice and fulfillment
+
+
+
Access, routing, and decision history are logged for compliance review.
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
+
+
+
+
diff --git a/web_insert/Vchart/bar/chart_0017_bar.html b/web_insert/Vchart/bar/chart_0017_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..c151eb90881b882d696bc26004b5c05f25d534e2
--- /dev/null
+++ b/web_insert/Vchart/bar/chart_0017_bar.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T28 Municipal Service Bulletin
+
+
+
+
+
+
+
+
Internal circulationT28
+
Municipal Service Bulletin
+
Streetlight outage follow-up
+
Open bulletinCross-departmentAction required
+
+
+
Bulletin Summary
Operational notice and response summary for active public service issues requiring coordinated review.
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
+
+
+ Loading view
+ Service handling overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
Several matters remain open not because field action has stopped, but because the written record is incomplete or inconsistent across offices. Staff should treat documentation quality, ownership clarity, and response accuracy as equal to operational completion before moving any item to closed status.
+
+
+
+
+
+
+
+
Review Support
+
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
Confirm that each accepted notice has one accountable handling unit.
Reconcile field completion remarks with the official reply draft.
Flag cases where repeat contact suggests ineffective local closure.
Hold final release for items lacking signed verification.
+
Escalated3
Awaiting reply5
Returned for revision4
+
+
+
+
Recent Activity
+
Latest handling updates across the bulletin
+
+
+
+
+
+
+
+
Repeated contact on one closed itemClosure note conflicts with latest resident submission
High
Verification file missing from district replyEvidence not attached to the handling record
Medium
Approval wording exceeds service standardReply language requires simplification before release
Low
+
Confirm ownership for unresolved site restoration itemAwaiting district office acknowledgment
Open
Complete evidence check for resolved service interruption caseField note submitted without signed confirmation
In review
Approve final reply language for public releaseDraft prepared by coordination desk
Pending approval
+
District office updated handling noteOwnership confirmed and local follow-up arranged
Service unit returned revised reply draftLanguage adjusted to match verified field action
Supervisory office requested clarificationAsked whether the item meets closure conditions
Coordination desk logged resident repeat contactMatter retained in active bulletin
+
+
+
Review Insight
+
Teams are asked to confirm ownership, update response wording, and close record gaps before the next routing step. Any item with unresolved accountability or incomplete evidence should remain in controlled review rather than be marked complete.
+
Case verification76%
Most evidence checks completed
Reply drafting68%
Several items still under wording review
Final clearance41%
Held until all high-priority issues are confirmed
+
Coordination Signals
Priority routeJoint review
Public impactModerate
Release stateHeld for clearance
Local office reported restoration, but resident contact records indicate the issue may persist at the reported location.
+
+
Use this bulletin as the working record for approvals, response checks, and inter-office follow-up until all listed matters are either cleared or formally transferred.
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
+
+
+
+
diff --git a/web_insert/Vchart/bar/chart_0020_bar.html b/web_insert/Vchart/bar/chart_0020_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..86edb0f608cdadda6885d4a5e805f77767b31d64
--- /dev/null
+++ b/web_insert/Vchart/bar/chart_0020_bar.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T14 Store Stock Control
+
+
+
+
+
+
+
+
+
+
Live stockReplenishment reviewHold resolution
Track replenishment risk, release held inventory, and keep shelf availability aligned across active locations.
+
+
+
+ Loading view
+ Location stock position
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main concern is not total network stock but timing. Several locations can return to normal selling levels once held units are cleared and transfer approvals are issued in the right order. Teams are using this view to keep store demand, receiving capacity, and release controls aligned.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Latest stock handling and release steps
+
+
+
+
+
+
+
+
Count mismatch blocking release12 item lines remain held after store recount
High
Priority location below cover targetReplenishment risk increased across 4 stores
Medium
Receiving backlog nearing thresholdInbound confirmation lag may delay availability updates
Medium
+
Approve transfer batch for thin-cover stores29 lines prepared by distribution planning
Ready
Confirm held quantities against recount notes74 units waiting on store validation
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Hold review completion68%
Most flagged lines have first-pass decisions
Transfer approval completion54%
Awaiting release order from control lead
Count reconciliation73%
Repeat variance stores still under review
+
+
+
Operational Notes
+
this workflow supports the daily decision flow: identify where cover is too thin, confirm whether held stock can be released, and route transfer lines to the locations with the highest service risk. Notes and queue items below reflect the current handoff between store control, distribution, and floor operations.
+
Prioritize releases for locations with same-day shelf risk.
Delay nonessential transfers until held quantities are verified.
Escalate repeated count mismatches to store control leads.
Keep transfer approvals aligned with receiving capacity.
+
Priority stores11
Open holds18
Ready transfers7
+
Network Signals
Service riskElevated
Receiving pressureModerate
Approval backlogContained
Cycle count exceptions reviewed
Store control completed first-pass review on flagged lines.
Transfer requests consolidated
Low-cover locations were grouped for a single approval pass.
Held stock release pending
Distribution is waiting for final quantity confirmation.
+
+
+
Use release actions only after count confirmation is recorded in the item note.
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
Validate remediation evidencePriority cases waiting for document match
Pending
Prepare sign-off packReady after final ownership confirmation
Blocked
+
Escalation comment added to override reviewPosted by control reviewer
Case ownership transferred to assurance leadRouting rule applied
Closure note revised for policy wordingApproval language standardized
Supporting file attached to priority caseAwaiting reviewer acceptance
+
+
+
Risk Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Exception review72%
Most standard cases assessed
Evidence validation58%
Backlog remains in escalated items
Final sign-off41%
Dependent on ownership confirmation
+
Recent Case Events
Override cluster flagged
Rule threshold crossed in payment approval flow
Reviewer reassignment completed
Ownership aligned to finance controls team
Evidence request issued
Supporting records requested from local approvers
Escalation queue updated
High-risk items moved for priority handling
Awaiting action23
Reassigned11
Closed today9
+
+
+
Use approved closure language and attach supporting evidence before final sign-off.
+
+
+
+
diff --git a/web_insert/Vchart/bar/chart_0022_bar.html b/web_insert/Vchart/bar/chart_0022_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..e76d6bc7558e70dea12d575e22107c2101dde059
--- /dev/null
+++ b/web_insert/Vchart/bar/chart_0022_bar.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T23 Population Health Surveillance Console
+
+
+
+
+
+
+
+
+
T23
+
+
Public Health Operations
+
Population Health Surveillance Console
+
Cluster Review 18
+
+
+
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
+
+
+
+
diff --git a/web_insert/Vchart/bar/chart_0023_bar.html b/web_insert/Vchart/bar/chart_0023_bar.html
new file mode 100644
index 0000000000000000000000000000000000000000..03e456607f701378cf6eef9f6fc6edae91318254
--- /dev/null
+++ b/web_insert/Vchart/bar/chart_0023_bar.html
@@ -0,0 +1,125 @@
+
+
+
+
+
+ T01 Production Control Board
+
+
+
+
+
+
+
+
+
T01
+
+
Industrial Operations
+
Production Control Board
+
Hold Review 4-118
+
+
+
+ Line 4Active RunQuality HoldMaintenance WatchSupervisor Review
+
+
+
+
+
+
+
Needs oversight
+
Live operating status for Line 4, utility load, quality hold activity, and shift response actions across the assembly floor.
+
Line 4 remains in active production with stable throughput after an earlier interruption at the sealing station. Quality has released the last contained batch, but one hold remains open on a pallet group awaiting final disposition from the floor lead.
+
+
+
Dana MercerFloor Operations Supervisor
+
+
+
+
Units Completed
18,420
Tracking above planned output for the current run
Scrap Rate
1.8%
Within control band after recent line adjustment
Unplanned Stops
3
Two cleared by local team, one under review
Utility Load
82%
Stable with no curtailment in effect
+
+
+
+
+ Loading view
+ Line performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Maintenance is monitoring recurring vibration on the conveyor drive. The issue is not blocking output, though the team has limited ramp changes until the inspection is completed and signed off.
+
One hold lot is isolated and tagged for review
Conveyor drive inspection is in progress
No staffing gap reported for the current shift
Output recovery is holding after the restart
+
Open Holds1
Active Calls2
Signed Notes7
+
+
+
+
+
Shift Activity
+
Coordinated actions across production, quality, and maintenance
+
+
+
+
+
+
+
+
Vibration watch remains active at conveyor driveRaised by maintenance control after repeated variance
High
Contained pallet group awaiting dispositionQuality review pending final supervisor signoff
Medium
Restart settings locked for this runProcess engineering requested no manual ramp changes
Low
+
Confirm release path for held materialOwner: Quality lead
Post revised run note to floor teamOwner: Shift supervisor
Pending
+
Seal station recovered to normal cycle timeLogged by operations
Quality hold boundary confirmed on affected lotLogged by quality
Drive housing check started at restricted speedLogged by maintenance
Supervisor requested tighter response updatesLogged by floor lead
+
+
+
Supervisor Note
+
The floor is operating, but decisions on release, inspection, and speed changes still require close coordination between teams.
+
Run StateActive with restriction
Quality Status1 hold open
Maintenance StatusInspection underway
+
Contained material remains off flow until quality and operations complete joint release.
+
+ Why restricted
+
The line returned to output after a short stop, but a recurring mechanical signal and one open quality hold mean the team is holding standard speed changes until both items are formally cleared.
+
+
+
+
+
Operational Insight
+
Supervisors are using this board to keep production, quality, and maintenance aligned on the same operating picture so decisions on holds, rework, and response timing stay consistent.
+
Run Completion76%
Current production order
Inspection Coverage61%
Targeted line check
Disposition Workflow48%
Held material release path
+
+
+
Use this board to confirm decisions before releasing held material or changing line speed.
Review account health, retention risk, and pending interventions for active customer segments.
+
+
+
+ Loading view
+ Active user case flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current queue reflects a concentrated effort to retain users who showed intent but encountered friction during critical account steps. Teams are expected to document every outreach attempt, confirm ownership before escalation, and close only when the account is either stable or formally transferred for continued monitoring.
+
+
+
+
+
+
+
+
+
+
Case Activity
+
Recent decisions and follow-up movement
+
+
+
+
+
+
+
+
High-value account awaiting decisionNo final disposition recorded after manual review
High
Outreach backlog risingFollow-up queue has crossed internal response target
Medium
Exception note incompletePolicy-sensitive case missing approval rationale
Medium
+
Confirm owner coverage for priority cases7 cases without confirmed handoff
In progress
Complete callback verificationPending contact outcomes need final status
Queued
Close resolved onboarding reviewsCases meet closure conditions after successful recovery
Ready
+
Owner updated on priority reviewRouting changed after shift handoff
Manual decision recordedCase moved from hold to monitor
Risk flag clearedActivity recovered after intervention
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Queue clearance72%
Handled against current intake
Outreach completion64%
Priority contacts sent and logged
Approval coverage89%
Cases with complete decision trail
+
+
+
Operational Notes
+
Current activity is centered on a rise in support-linked retention risk. Several accounts were routed into manual review after repeated onboarding exits, failed self-service recovery, or policy-sensitive changes that require a documented decision.
+
High-priority cases are routed to named owners before outreach begins.
Accounts with repeat friction stay in review until next-step evidence is recorded.
Policy exceptions require a reason code and final approval note.
+
Active owners16
Cases on hold12
Recovered users31
+
Review Signals
Escalation rate11%
Policy exceptions9
Pending callbacks22
Risk rule triggered
Account entered review after repeated drop-off behavior
Operations review started
Owner assigned and contact path confirmed
User contacted
Follow-up sent with recovery guidance and next action
Decision logged
Case moved to monitor, close, or escalate
+
+
+
Access, contact history, and policy decisions are recorded for audit review.
Reporting cycle activeEvidence under reviewSite coverage completeApproval pending
+
+
+
Reporting Summary
Consolidated operational view for facility emissions, evidence readiness, and approval progress across the reporting cycle.
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
+
+
+ Loading view
+ Emissions view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Reporting Note
+
Most reporting work is complete, but the team is holding release until the last boundary clarification and control statement are fully documented. Once those items are closed, the submission can move through approval without further operational changes.
+
+
+
+
+
+
+
+
Reporting Support
+
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
All operated facilities submitted activity data within the active reporting window.
Boundary assumptions were updated after internal control review.
Evidence coverage is complete for direct fuel use and purchased electricity.
Final sign-off is blocked only by unresolved exception responses.
+
Facilities in scope14
Evidence files linked128
Approvers assigned5
+
+
+
+
Review Activity
+
Recent actions tied to the current reporting cycle
+
+
+
+
+
+
+
+
Boundary note requires confirmationShared support load treatment updated by operations
Medium
Exception owner response overdueOne facility comment has not been returned
High
Approval pack awaiting final attachmentControl statement must be added before routing
Low
+
Validate revised allocation methodCheck consistency against facility evidence
In progress
Close open exception itemsCollect responses from assigned owners
Blocked
Route package for sign-offRelease once control statement is attached
+ Active portfolioReview in progressFunding controlsCompliance watch
+
+
+
+
+
+
+
+
Managed
Monitor active studies, pending approvals, funding usage, and cross-team follow-up from one operational view.
The office is managing a mixed portfolio of faculty-led studies, lab collaborations, and student research initiatives. Most work is progressing within approved scope, but a small set of submissions requires administrative response before funds or participant activity can proceed.
Dr. Elaine PorterDirector, Research Administration
+
Open Projects
48
6 awaiting formal approval
Active Funding
$12.4M
Within approved allocation range
Pending Reviews
17
4 require principal investigator response
Policy Exceptions
3
All assigned for follow-up
+
+
+
+ Loading view
+ Project activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Several projects are close to activation, but progress depends on small administrative corrections. Clearing incomplete files and confirming ownership will reduce delay, improve audit readiness, and allow the office to release approved work without further escalation.
+
+
+
+
+
+
+
+
Office Notes
+
Current attention is focused on review completion, documentation quality, and timely coordination between academic units and the central research office. Team leads are using this view to resolve blockers, confirm ownership, and keep each project aligned with internal policy.
+
Approval backlog is concentrated in new submissions with incomplete ethics attachments.
Two high-value projects are waiting on revised budget justification before release.
Records cleanup reduced duplicate sponsor entries across several departments.
Escalations are being routed to unit coordinators for direct follow-up.
+
Units involved11
Cases reassigned5
Records updated23
+
+
+
+
Recent Office Activity
+
Latest updates across approvals, records, and funding control.
+
+
+
+
+
+
+
+
Budget release on holdMissing approval note from finance control
High
Ethics file incompleteParticipant consent language requires revision
Medium
Sponsor record mismatchDepartment entry differs from central register
Low
+
Confirm unit reviewer for pending submissions7 projects without final reviewer assignment
Open
Release approved funding batch2 projects cleared after documentation check
Ready
Close duplicate sponsor recordsFollow-up required across 3 departments
In progress
+
Policy team returned one exception case for clarificationNeeds updated risk statement
Finance control cleared restricted spending lineRelease can proceed after office sign-off
Graduate coordinator added missing investigator credentialsSubmission now eligible for formal review
Unit office confirmed lead contact changeRecords updated for future notices
+
+
+
Portfolio Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Initial screening92%
Most submissions validated
Formal review68%
Backlog concentrated in exception cases
Funding release74%
Delayed by final approval checks
+
Recent Milestones
Portfolio intake closed
New submissions moved to initial screening
Compliance review updated
Exception cases reassigned to policy team
Funding release prepared
Awaiting final sign-off from finance control
Units involved11
Cases reassigned5
Records updated23
+
+
+
Internal use only. Funding, review, and compliance actions must be recorded before project status is changed.
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
Receiving activePutaway constrainedDispatch on hold
Monitor inbound receipts, putaway flow, and outbound release from one operating view.
+
+
+
+ Loading view
+ Facility activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main risk is not total volume but timing. Inbound receipts, reserve storage, and outbound release are all connected, so a short delay at dock assignment or packing review quickly affects the rest of the floor. Clearing blocked pallets and reallocating lift coverage should return the site to a steadier operating rhythm.
+
+
+
+
+
+
+
+
+
+
Floor Activity
+
Updated as teams complete receiving, storage, and release steps.
+
+
+
+
+
+
+
+
Dock queue above working limit6 loads waiting longer than target
High
Bulk zone capacity nearing thresholdReserve slots at 93% use
+ Live ControlDispatch ReadyStorage BalancedField Review Open
+
+
+
+
+
+
+
+
Operational
Track site output, storage readiness, dispatch commitments, and field actions across the active hub.
The hub is operating within target limits, with solar and wind assets sharing load as expected and storage carrying the balancing role for short fluctuations. Dispatch obligations remain intact, and no station is currently outside its approved operating envelope.
Elena MorrisRegional Hub Supervisor
+
Net Output
428 MW
Holding above committed delivery band
Available Storage
81%
Reserve margin kept for evening handoff
Curtailment Risk
Low
No immediate restriction notices in scope
Open Field Actions
7
Two require supervisor review
+
+
+
+ Loading view
+ Hub performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Output remains dependable across the hub, but the team is keeping close watch on the inland station until restart behavior is fully verified. Supervisors should clear the pending reserve note and confirm the inspection window so field and control actions stay aligned.
+
+
+
+
+
+
+
+
Operations Notes
+
Operations staff are watching one inland station where inverter recovery is slower than normal after a brief protective trip. The condition is stable, but the team has kept a local inspection open until the restart pattern returns to baseline.
+
Primary dispatch commitment remains fully covered by live generation and stored reserve.
One site review is waiting on field confirmation before the maintenance note can be closed.
Remote control authority is active for all stations in the current hub scope.
No compliance holds are blocking routine switching or battery balancing actions.
+
Stations Online14
Open Reviews3
Active Crews2
+
+
+
+
Shift Activity
+
Recorded actions and follow-up items for the active operating window.
+
+
+
+
+
+
+
+
Inland station restart varianceRecovery sequence exceeded normal duration
Medium
Storage reserve floor nearing handoff targetBalancing plan may need minor adjustment
Low
Field confirmation pending on breaker inspectionClosure blocked until site response is logged
Medium
+
Approve reserve adjustment noteSubmitted by shift operator
Pending approval
Confirm inland site inspection windowCrew lead requested access hold
Waiting
Close completed switching logControl steps verified by second reviewer
Ready
+
Grid desk accepted updated export positionAcknowledgement logged by dispatch coordinator
Battery balancing sequence completed without exceptionAutomatic control remained within approved limits
Field crew checked access route to inland stationTravel and handoff conditions confirmed
Remote link health check passed across all active sitesNo communication degradation recorded
+
+
+
Readiness Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Dispatch coverage96%
Committed export supported
Storage readiness81%
Reserve held for balancing
Field action closure68%
Open reviews moving toward sign-off
+
Recent Activity
Hub entered balanced operating mode
Control room update
Storage reserve floor adjusted for dispatch window
Shift approval recorded
Inverter restart review opened at inland station
Field follow-up assigned
Export commitment reconfirmed with grid desk
Acknowledgement received
Stations Online14
Open Reviews3
Active Crews2
+
+
+
Use this view to confirm readiness before approving dispatch changes or closing field actions.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
Editorial interpretation, policy check, and release readiness for a high-traffic article package.
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
+
+
+ Loading view
+ Article review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
The item remains on hold because reviewers want the final article to state only what can be supported directly in the reporting record. Once the headline and two interpretive passages are revised, the last policy note can be closed and the release team can complete handoff without reopening the brief.
+
+
+
+
+
+
+
+
Editorial Support Notes
+
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
Tighten the headline so it reflects verified reporting only
Rework two interpretive lines in the middle section
Confirm attribution order in the closing paragraph
Keep the release hold in place until policy notes are cleared
+
Linked notes12
Required edits3
Approvals2/3
+
+
+
+
Recent Activity
+
Latest actions across review, policy, and release handling.
+
+
+
+
+
+
+
+
Policy sign-off still openRelease cannot proceed until the final comment is resolved
High
Headline wording exceeds source certaintyDesk requested a narrower phrasing pass
Medium
Closing attribution order changedLatest revision needs reviewer confirmation
Low
+
Apply marked language editsThree passages require direct revision
Prepare release handoffQueue placement is ready once approval lands
Queued
+
Desk review updated with narrowed wording requestAdded by editorial review
Policy note linked to middle section passageMapped to required edit
Release hold confirmed by operationsQueue position preserved
Final pass assigned to senior reviewerAwaiting consolidated response
+
+
+
Reading Insight
+
Operations has held the item in the final queue so the desk can complete one coordinated pass rather than resolve comments in isolation. this workflow is intended to keep editors, policy reviewers, and release staff on the same record while the article moves through its last approval step.
+
Editorial review88%
Most text decisions are settled
Policy clearance67%
One required note remains
Release handoff54%
Prepared but not cleared
+
Release Signals
Attribution strengthNeeds tightening
Headline alignmentUnder revision
Release readinessPending approval
Final release depends on one policy approval and completion of marked language edits.
+
+
Use the same review record when updating wording, approvals, and release handling to avoid duplicate decisions.
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
+ Active shiftRelease pendingLab verifiedEscalation open
+
+
+
+
+
+
+
+
Review in progress
Monitor active inspections, isolate nonconforming lots, and keep release decisions aligned across line, lab, and dispatch teams.
This overview is used by inspection leads to track open quality cases from first check through release decision. It brings together line findings, lab confirmation, hold status, and reviewer actions so each lot can move forward with a clear record.
Erin ColeQuality Assurance Lead
+
Lots under review
18
4 require supervisor sign-off
Pass rate
96.8%
Stable against control threshold
Items on hold
7
Awaiting disposition or retest
Average closure time
2.6h
Down after revised sampling steps
+
+
+
+ Loading view
+ Inspection activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A narrow group of nonconforming lots is driving most of the queue. The team has already isolated affected stock and limited release access, so the immediate focus is on finishing lab confirmation, recording final disposition, and clearing unaffected material without breaking traceability.
+
+
+
+
+
+
+
+
Coordination Notes
+
The current workload is concentrated on final assembly output where a small group of lots failed appearance and torque checks. Most cases are moving normally, but a limited set remains blocked while the team confirms whether rework is acceptable or a full containment action is needed.
+
Two lots were moved from routine review to controlled hold after repeat defects were confirmed at receiving check.
Lab confirmation has cleared one previously blocked lot for release with added inspection notes.
Dispatch has been asked not to allocate stock from any case marked pending disposition.
+
Open holds7
Retests due3
Approved releases11
+
+
+
+
Recent Actions
+
Latest updates across inspection, hold, and release handling.
+
+
+
+
+
+
+
+
Repeat defect pattern detectedThree related cases linked to the same source batch
High
Approval waiting on lab noteRelease decision cannot close until confirmation is attached
Medium
Containment nearing limitReserved hold area is close to capacity
Medium
+
Review pending disposition cases7 cases require lead decision
In progress
Confirm retest sampling planApplies to two blocked lots
Queued
Close cleared release recordsDocumentation ready for final update
Ready
+
Line inspector added a deviation noteAttached to lot under controlled hold
Lab result accepted by reviewerCase moved back to release check
Containment list updatedStock location confirmed for isolated units
Dispatch restriction acknowledgedOutbound allocation blocked for pending lots
+
+
+
Inspection Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion82%
Most scheduled checks are recorded
Disposition closure61%
Open exceptions still under review
Release documentation74%
Awaiting final sign-off on held lots
+
Case Progress
Inbound sample logged
Initial inspection record created
Deviation confirmed
Case routed to quality lead
Containment applied
Affected stock isolated from release
Disposition pending
Awaiting final approval
Open holds7
Retests due3
Approved releases11
+
+
+
Only approved dispositions can clear held material for release.
+ Live TradingStore NetworkPriority Follow-upRevenue Focus
+
+
+
+
+
+
+
Active Oversight
+
Monitor store execution, revenue pacing, stock pressure, and pending actions across the active trading cycle.
+
Trading performance is holding above plan, but momentum is uneven across the network. Flagship locations are carrying the result while several mid-tier stores are slipping on conversion after early demand spikes cleared core inventory.
+
+
+
Maya ChenSales Operations Lead
+
+
+
+
Net Sales
$4.8M
Running ahead of internal target with stronger in-store conversion.
Orders Closed
18,240
Order completion remains stable despite heavier queue volume.
Low Stock SKUs
126
Concentrated in top-selling lines requiring rapid replenishment.
Pending Exceptions
37
Most cases are tied to price overrides and fulfillment holds.
+
+
+
+
+ Loading view
+ Sales command view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Operations leads are using this board to coordinate price checks, stock transfers, and field follow-up. The immediate goal is to protect sell-through on priority lines without creating avoidable margin leakage or unresolved service cases.
+
Price override approvals increased after local markdown requests were reopened.
Transfer requests are highest in stores with strong accessory attachment rates.
Frontline teams need confirmed replenishment windows before issuing customer callbacks.
Regional managers have been asked to clear overdue store notes before next review.
+
Stores Flagged21
Cases Reassigned14
Open Callbacks89
+
+
+
+
+
Execution Activity
+
Store actions and approval movement
+
+
+
+
+
+
+
+
Override approvals approaching threshold12 stores exceeded normal approval volume
High
Core item coverage at riskTop stores reporting low back-room availability
Medium
Store callback backlog buildingCustomer follow-up notes remain open past target
Medium
+
Approve urgent pricing exceptionsSenior review required for margin-sensitive requests
In progress
Confirm transfer receipt with destination storesFollow up on high-demand replenishment moves
Pending
Close unresolved field notesSeveral stores have not updated execution status
Blocked
+
North region cleared three high-value exceptionsApproval cycle shortened after reassignment
Accessory attachment improved in premium storesStore coaching appears to be holding
Transfer requests stabilized after stock releaseMost urgent moves have been acknowledged
Customer callback queue remains unevenService follow-through needs local management review
+
+
+
Lead Note
+
This board supports the daily operating rhythm for sales control, exception handling, and store coordination across the retail network.
+
Conversion PressureElevated
Stock Transfer LoadHigh
Approval ResponseWithin SLA
+
Investigate sales pacing, confirm stock position, and clear open approvals before escalation.
+
+ View note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
Focus Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval clearance78%
Cleared against open exception volume
Transfer completion64%
Confirmed store-to-store movements
Field note closure52%
Resolved execution updates from stores
+
+
+
Use approved actions only. Store-facing updates must match pricing, stock, and service policy before release.
+ Active flightPriority reviewShared budgetStore traffic
+
+
+
+
+
+
+
+
Needs review
Track active retail promotions, review pacing risks, and keep launch approvals moving across paid channels.
This overview brings campaign owners, channel leads, and reviewers into one operating view for retail promotion activity. The focus is on release readiness, pacing discipline, and fast resolution when a campaign drifts outside its approved plan.
Avery NolanMarketing Operations Lead
+
Active campaigns
18
3 awaiting final release
Planned spend
$426K
Within current budget guardrail
Projected return
4.8x
Lift driven by repeat buyer segments
Creative compliance
92%
Remaining items need legal copy review
+
+
+
+ Loading view
+ Campaign performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
Current risk is concentrated in a small number of high-visibility promotions that are close to release but still depend on approval cleanup. Clearing those items will allow the team to open budget safely without creating rework for channel operations or compliance.
+
+
+
+
+
+
+
+
Operational Notes
+
Most campaigns are moving as expected, but a small group requires attention before budget can be fully opened. The current work centers on copy approval, audience overlap checks, and confirming that regional exclusions are applied before wider rollout.
+
Priority campaigns are grouped for same-day review by channel operations.
Budget adjustments require owner confirmation and finance-safe pacing limits.
Audience rule changes remain blocked until compliance notes are cleared.
Store traffic campaigns receive higher escalation when release windows narrow.
+
Queued reviews9
Open exceptions4
Released today5
+
+
+
+
Team Activity
+
Recent decisions and release changes
+
+
+
+
+
+
+
+
Copy exception still open for priority placementOwner response pending
High
Audience overlap exceeds internal thresholdShared budget campaign group
Medium
Regional exclusion missing from one launch setStore traffic promotion
Medium
+
Approve revised launch copyAssigned to compliance reviewer
In progress
Confirm pacing cap for shared budget groupRequested by channel lead
Pending
Validate excluded regions before releaseRequired for final activation
Ready
+
Budget guardrail updated for priority promotionRecorded by finance operations
Audience rule revision submittedWaiting for approval
Channel owner added release noteEscalation removed after review
Compliance returned one asset for editsCopy needs location disclaimer
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval completion74%
Most high-spend items already reviewed
Budget allocation68%
Remaining spend held behind final checks
Release readiness81%
Operational setup nearly complete
+
Release Flow
Intake completed
Briefs and spend limits confirmed
Review in progress
Compliance and audience checks underway
Release window
Approved campaigns move to channel activation
Queued reviews9
Open exceptions4
Released today5
+
+
+
Use this view to resolve blockers before expanding spend or opening additional channel coverage.
Post-route summary for the latest dispatch cycle, focusing on late handoff recovery, depot coordination, and proof-of-delivery completion.
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
+
+
+ Loading view
+ Route performance view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
This review is being used to decide whether dispatch should adopt a standard delay-recovery playbook for mixed-stop runs. The current response relied on experienced staff making quick route adjustments, which worked in this case but may not scale without clearer depot release rules and a required outreach log for affected stops.
+
+
+
+
+
+
+
+
Support Notes
+
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
Departure drift started at the depot gate after loading lane congestion.
Manual reprioritization reduced missed arrival commitments on dense urban segments.
Proof-of-delivery capture improved after drivers were reminded to close stops before returning.
Two exception cases remain open pending package condition review.
+
Resequenced routes7
Support calls placed23
Returns held2
+
+
+
+
Recent Activity
+
Updates recorded during issue containment and closure review.
+
+
+
+
+
+
+
+
Proof mismatch on return scan2 consignments need depot confirmation
Medium
Loading lane congestion repeatedObserved across early dispatch wave
High
Customer contact note missing1 delayed stop closed without outreach log
Low
+
Validate open claims with depot supervisorAttach condition notes and return scans
In progress
Document route resequencing rulePrepare for dispatch handbook update
Pending
Close driver note reviewConfirm repeated gate delay comments
Ready
+
Driver team acknowledged revised stop orderField update logged by support desk
Depot supervisor added lane usage noteRoot cause linked to overlap during loading release
Customer service cleared outreach backlogAll affected recipients received status calls
The review focus is on whether the corrective actions used by the team should become standard practice for future mixed-stop routes with tight loading turnover.
+
Exception closure78%
Most delivery issues resolved in the same cycle
Driver note review64%
Comments grouped by route segment
Depot corrective action41%
Lane balancing plan awaiting sign-off
+
Field Signals
Route adherenceStable after intervention
Depot readinessNeeds lane balancing
Customer contact coverageAbove target
Opened after repeated departure slippage affected downstream stop timing and closure quality.
+
+
Internal review record for route performance follow-up and process adjustment.
Post-run assessment for the last completed checkout messaging experiment, including impact, rollout decision, and follow-up actions.
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
+
+
+ Loading view
+ Experiment results
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Analyst Note
+
The result is not only statistically reliable but also operationally clean. Teams reviewing payment quality, support demand, and buyer behavior did not identify a counter-signal large enough to block release, which makes this a suitable candidate for default rollout with normal monitoring.
+
+
+
+
+
+
+
+
Review Notes
+
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
Primary goal was improved checkout completion.
Guardrails covered payment success, cancellation intent, and support contact rate.
Result supports rollout with standard monitoring.
Follow-up work should focus on first-time buyer reassurance.
+
Control share50%
Variant share50%
Guardrails passed3/3
+
+
+
+
Recent Activity
+
Latest review updates and decision steps
+
+
+
+
+
+
+
+
Release approval pendingRequires product and operations sign-off
Medium
Follow-up test not yet scopedFirst-time buyer segment showed the strongest response
Low
Monitoring handoff requiredPost-release checks must be assigned before launch
Medium
+
Confirm rollout ownerRelease coordination for default experience
Open
Document final decisionAdd rationale to the experiment record
In progress
Prepare follow-up briefDraft next test for delivery reassurance
Not started
+
Data review completed by analyticsNo variance issues found in conversion events
Support lead confirmed stable contact volumeNo increase tied to variant exposure
Product owner attached final recommendationPromote Variant B with standard guardrails
Release coordinator requested approval windowDecision needed before deployment planning
+
+
+
Key Insight
+
The operational recommendation is to promote Variant B to the default experience, keep the current guardrails in place, and open a follow-up test on supporting text near delivery expectations.
+
Review completion92%
Only final approval remains
Release readiness84%
Monitoring and ownership still being confirmed
Follow-up planning36%
Next hypothesis not fully defined
+
Quality Signals
Audience balanceWithin tolerance
Tracking integrityVerified
Release readinessApproved pending sign-off
Control used the existing confirmation message. Variant B used shorter supporting language focused on confidence before purchase.
+
+
Rollout should begin with standard monitoring and a hold point if payment reliability moves outside normal range.
+
+
+
+
diff --git a/web_insert/Vchart/line/chart_0020_line.html b/web_insert/Vchart/line/chart_0020_line.html
new file mode 100644
index 0000000000000000000000000000000000000000..16b800201b15b53be42b8a1c00f0dbe0a7124a35
--- /dev/null
+++ b/web_insert/Vchart/line/chart_0020_line.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T34 Water Operations Control
+
+
+
+
+
+
+
+
+
+
Live networkShift handoffPriority review
Monitor plant output, service pressure, and field response from one operating view.
+
+
+
+ Loading view
+ Network status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Control Note
+
The active case is no longer expanding, but the team is holding controls in place until all dependent checks are complete. Field, dispatch, and service desk updates should stay aligned so closures do not outpace verified operating conditions.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Operational updates and required follow-up
+
+
+
+
+
+
+
+
Restricted pressure in east zoneCustomer impact limited; monitoring remains active
High
Booster station follow-up duePost-adjustment verification pending from field lead
Medium
Closure approval waitingSupervisor sign-off required on 3 linked work orders
Medium
+
Confirm downstream pressure readingsAssigned to east response crew
In progress
Validate temporary routing planRequired before restriction release
Pending review
Close resolved customer casesService desk waiting on operations note
Ready
+
Dispatch logged stable readings from sector valve setRecent field update
Plant control confirmed output remains on targetOperations note
Service desk tagged 4 cases for combined closureQueue update
Depot issued replacement fittings to mobile crewSupply confirmation
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident containment82%
Awaiting final field confirmation
Work order completion64%
Linked repairs moving through review
Case closure readiness71%
Service notes partially complete
+
+
+
Supervisor Notes
+
The current focus is to keep supply steady across high-demand zones, clear outstanding field confirmations, and close service cases that no longer need escalation. Supervisors are reviewing exceptions before the next handoff.
+
East transmission line remains in controlled operation with no new loss reports.
Two booster stations are running under temporary observation after overnight adjustment.
Customer-facing updates are limited to affected service pockets only.
Repair stock for seals and isolation fittings is available at primary depot.
+
Crews deployed9
Sites under watch4
Pending approvals6
+
Operational Signals
Reservoir balanceNormal
Pump readinessHigh
Field backlogModerate
Pressure deviation flagged
Network monitoring raised an east line variance and opened incident review.
Field isolation confirmed
Local crew secured the affected segment and reported stable downstream flow.
Supervisor review in progress
Operations lead is validating closure conditions before releasing restrictions.
+
+
+
Use confirmed field updates before changing service classification or closing a case.
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.
Receiving activePutaway constrainedDispatch on hold
Monitor inbound receipts, putaway flow, and outbound release from one operating view.
+
+
+
+ Loading view
+ Facility activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main risk is not total volume but timing. Inbound receipts, reserve storage, and outbound release are all connected, so a short delay at dock assignment or packing review quickly affects the rest of the floor. Clearing blocked pallets and reallocating lift coverage should return the site to a steadier operating rhythm.
+
+
+
+
+
+
+
+
+
+
Floor Activity
+
Updated as teams complete receiving, storage, and release steps.
+
+
+
+
+
+
+
+
Dock queue above working limit6 loads waiting longer than target
High
Bulk zone capacity nearing thresholdReserve slots at 93% use
Execution in focusControl review activeApproval queue open
Track release pacing, exception handling, and approval readiness across active cost centers.
+
+
+
+ Loading view
+ Execution overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
Release performance is broadly on plan, but the remaining blocked amount sits in cases that need manual confirmation. Resolving those records quickly will reduce queue pressure and allow controllers to close the cycle without extending approval coverage.
+
+
+
+
+
+
+
+
+
+
Recent Actions
+
Latest updates from controllers and approvers
+
+
+
+
+
+
+
+
High-value release held for documentation$220K requires source support
Manual adjustment exceeds local thresholdController comment attached
Medium
+
Clear blocked release requests12 records awaiting evidence
In progress
Confirm revised control notes4 items edited by reviewers
Pending
Close approved carryover actions7 ready for posting
Ready
+
Policy exception comment added to release caseBy regional controller
Approval path updated for restricted fundingRouting changed automatically
Supporting file accepted after validationBlocked amount reduced
Commitment request returned for correctionAccount line mismatch found
+
+
Execution Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Release completion92%
Against approved plan
Approval completion81%
All levels combined
Exception clearance64%
Policy and document checks
+
+
+
Controller Notes
+
Most exceptions are tied to account mapping and supporting documentation rather than overspend risk. Teams are being asked to resolve these items before release authority is expanded.
+
Release pacing remains healthy across core operating lines.
Exception volume is concentrated in a small set of manual adjustments.
Senior approval capacity is the main constraint on final clearance.
Control notes have been attached to all blocked items above threshold.
+
Open cases43
Needs review11
Cleared today19
+
Exception Signals
Control postureStable
Approval loadElevated
Release riskManaged
Initial allocation confirmed
Control baseline recorded
Mid-cycle release adjusted
Carryover request applied
Exception review escalated
Policy evidence requested
Final approval window opened
Queue routing updated
+
+
+
Only approved adjustments can move to release. Blocked items remain visible until evidence and sign-off are complete.
+ Active shiftRelease pendingLab verifiedEscalation open
+
+
+
+
+
+
+
+
Review in progress
Monitor active inspections, isolate nonconforming lots, and keep release decisions aligned across line, lab, and dispatch teams.
This overview is used by inspection leads to track open quality cases from first check through release decision. It brings together line findings, lab confirmation, hold status, and reviewer actions so each lot can move forward with a clear record.
Erin ColeQuality Assurance Lead
+
Lots under review
18
4 require supervisor sign-off
Pass rate
96.8%
Stable against control threshold
Items on hold
7
Awaiting disposition or retest
Average closure time
2.6h
Down after revised sampling steps
+
+
+
+ Loading view
+ Inspection activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A narrow group of nonconforming lots is driving most of the queue. The team has already isolated affected stock and limited release access, so the immediate focus is on finishing lab confirmation, recording final disposition, and clearing unaffected material without breaking traceability.
+
+
+
+
+
+
+
+
Coordination Notes
+
The current workload is concentrated on final assembly output where a small group of lots failed appearance and torque checks. Most cases are moving normally, but a limited set remains blocked while the team confirms whether rework is acceptable or a full containment action is needed.
+
Two lots were moved from routine review to controlled hold after repeat defects were confirmed at receiving check.
Lab confirmation has cleared one previously blocked lot for release with added inspection notes.
Dispatch has been asked not to allocate stock from any case marked pending disposition.
+
Open holds7
Retests due3
Approved releases11
+
+
+
+
Recent Actions
+
Latest updates across inspection, hold, and release handling.
+
+
+
+
+
+
+
+
Repeat defect pattern detectedThree related cases linked to the same source batch
High
Approval waiting on lab noteRelease decision cannot close until confirmation is attached
Medium
Containment nearing limitReserved hold area is close to capacity
Medium
+
Review pending disposition cases7 cases require lead decision
In progress
Confirm retest sampling planApplies to two blocked lots
Queued
Close cleared release recordsDocumentation ready for final update
Ready
+
Line inspector added a deviation noteAttached to lot under controlled hold
Lab result accepted by reviewerCase moved back to release check
Containment list updatedStock location confirmed for isolated units
Dispatch restriction acknowledgedOutbound allocation blocked for pending lots
+
+
+
Inspection Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Inspection completion82%
Most scheduled checks are recorded
Disposition closure61%
Open exceptions still under review
Release documentation74%
Awaiting final sign-off on held lots
+
Case Progress
Inbound sample logged
Initial inspection record created
Deviation confirmed
Case routed to quality lead
Containment applied
Affected stock isolated from release
Disposition pending
Awaiting final approval
Open holds7
Retests due3
Approved releases11
+
+
+
Only approved dispositions can clear held material for release.
Track specimen intake, instrument readiness, review holds, and release validated results from one controlled queue.
+
+
+
+ Loading view
+ Specimen flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Current delays are not caused by intake volume but by a narrow cluster of held results that need repeat confirmation and signed reviewer rationale. Once those cases are closed, the release queue should return to normal pace.
+
+
+
+
+
+
+
+
+
+
Validation Activity
+
Latest laboratory actions and review updates
+
+
+
+
+
+
+
+
Quality hold threshold reachedChemistry lane 7 held results
High
Instrument maintenance window dueHematology bench service reminder
Complete supervisory sign-off for held chemistry cases24 items in review queue
In progress
Verify rerun documentation before release5 specimens require note completion
Pending
Confirm analyzer readiness after resetPost-interruption checks still open
Waiting confirmation
+
Accession team cleared label exceptionMatched specimen and order records
Reviewer added comment to held electrolyte panelAwaiting repeat outcome
Bench lead reassigned overflow workCapacity balanced across active stations
Final result packet released to care teamAudit trail completed
+
+
Throughput Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Accessioning completion92%
Most inbound samples logged and routed
Validation review68%
Routine cases moving faster than held work
Quality documentation81%
Remaining notes tied to reruns and holds
+
+
+
Escalation Notes
+
Supervisors are balancing turnaround targets with quality controls, making sure reruns, delta checks, and documentation updates are completed before any final authorization.
+
Priority samples are routed directly to staffed benches.
Held results require either repeat testing or reviewer comment.
Release activity is limited to validated work with complete audit notes.
+
Released today143
Open holds7
Assigned reviewers9
+
Bench Signals
Pending accession checks12
Benches at capacity2
Reruns in progress5
Intake batch reconciled
Analyzer lane reset
Senior review started
Release queue narrowed
+
+
+
All releases must include reviewer confirmation and complete traceability.
Operational summary for monitored clinical equipment across active care areas and support locations.
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
+
+
+ Loading view
+ Device status overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Most equipment remains suitable for use, but the small set of unresolved faults is affecting confidence on the floor. Clearing status mismatches and recording final bench outcomes will reduce repeat calls and help unit leaders plan with fewer manual check-ins.
+
+
+
+
+
+
+
+
Coordination Notes
+
Current activity is concentrated around a small set of high-use assets with repeated battery decline and communication dropouts. Most units remain stable, but two treatment areas have requested faster confirmation on replacement timing before the next care block begins.
+
Priority remains on bedside pumps, mobile monitors, and portable suction units with unresolved service notes.
Any device marked restricted should stay out of patient use until engineering sign-off is recorded.
Swaps should be confirmed with the receiving unit before transport closes the request.
+
Restricted4
Awaiting swap3
Ready for release6
+
+
+
+
Shift Activity
+
Recent operational movement across monitored equipment
+
+
+
+
+
+
+
+
Restricted pump still listed as availableUnit roster and service status do not match
High
Battery decline on mobile monitor setTrend requires swap planning for active units
Medium
Calibration hold nearing service limitApproval needed before return to floor use
Medium
+
Confirm replacement dispatch for urgent care areaAwaiting transport acknowledgment
In progress
Close duplicate fault ticket on suction unitTwo entries reference the same serial group
Pending
Record bench test outcome for returned monitorNeeded before asset can be released
Ready
+
Unit coordinator requested faster swap timingDemand pressure rising in active treatment rooms
Service desk confirmed pickup routeRestricted device will move after handoff
Engineering note added to battery reviewRecommendation supports staged replacement
Inventory team released two cleared devicesAssets available for reassignment
+
+
+
Service Insight
+
The review below is intended to help supervisors clear immediate decisions, assign follow-up work, and keep device availability aligned with floor demand.
+
Open service work cleared68%
Based on active queue for this review cycle
Restriction validation82%
Most flagged devices now matched to correct floor status
Return-to-stock checks54%
Bench review remains the main delay
+
Service Signals
Battery stabilityWatch
ConnectivityStable
Calibration readinessMixed
Repeated disconnect events were logged on multiple rounds. Keep affected units available for bench check before redeployment.
+
+
Use this brief to confirm restrictions, route service work, and close unit requests before equipment is returned to circulation.
+ Live reviewControl exceptionsPriority queueEscalation watch
+
+
+
+
+
+
+
+
Monitoring active
Track control exceptions, reviewer activity, and case movement across the finance assurance queue.
The finance assurance team is working through a concentrated set of control exceptions linked to payment approval, vendor setup, and posting review. Most items are progressing within service expectations, but a small group of cases has moved into active escalation because evidence is incomplete or ownership has changed during review.
Maya ChenFinance Assurance Lead
+
Open audit cases
128
14 added since last handoff
High-risk exceptions
19
6 awaiting reviewer sign-off
Controls cleared
87%
Above internal response target
Average closure time
2.6 days
Improved after routing update
+
+
+
+ Loading view
+ Exception activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Assurance Note
+
Several open items are not blocked by severity alone; they are delayed because the original approver trail is fragmented across multiple handoffs. Tightening reviewer ownership and requiring complete closure language should reduce repeat follow-up and improve final approval speed.
+
+
+
+
+
+
+
+
Reviewer Notes
+
This center gives reviewers, control owners, and approvers a single operating view for triage, follow-up, and closure. The immediate focus is to reduce aging high-risk items, confirm remediation evidence, and keep sign-off activity aligned with internal policy.
+
Prioritize exceptions tied to approval override activity
Confirm evidence on reassigned cases before closure
Route unresolved owner disputes to escalation review
Keep closure notes consistent for downstream assurance checks
+
Awaiting action23
Reassigned11
Closed today9
+
+
+
+
Reviewer Activity
+
Latest movement across active cases
+
+
+
+
+
+
+
+
High-risk case aging beyond targetOwner response pending on two linked exceptions
High
Evidence package returned incompleteMissing approval rationale in closure file
Medium
Control owner changed during reviewReconfirm accountability before approval
Coordinate intake, review, publication readiness, and partner follow-up for a high-priority media package.
This package brings together editorial planning, legal review, publishing control, and partner handling for one coordinated media effort. Teams are working from a shared operating view so that intake decisions, ownership changes, and approval calls stay aligned.
Avery ColeDuty Editor, Special Coverage
+
Active pieces
18
Across writing, edit, and release stages
Cleared for release
11
Ready once final routing is confirmed
Pending rights checks
4
Awaiting source and usage confirmation
Partner responses due
6
External distribution follow-up still open
+
+
+
+ Loading view
+ Coverage status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
This package is being handled under tighter review controls because multiple teams depend on one release sequence. Clearing the remaining rights and approval items now will prevent duplicate edits, partner confusion, and late changes to the final routing.
+
+
+
+
+
+
+
+
Coordination Notes
+
Most materials are moving on schedule, but a small group of items still depends on source confirmation and final language clearance. Operations is holding release sequencing until those dependencies are resolved to avoid rework across desks.
+
Primary desk has locked the running order for the lead package.
Rights review remains the main constraint on same-shift release.
Partner distribution will begin in waves after final internal clearance.
Escalations should route through the duty editor before reassignment.
+
Open holds3
Approvers waiting2
Partner packets5
+
+
+
+
Recent Activity
+
Latest handling across desks
+
+
+
+
+
+
+
+
Rights confirmation overdue on lead asset set2 items waiting on source desk reply
High
Approval chain missing final sign-offManaging editor review still open
Medium
Partner brief needs updated release languageDistribution note drafted but not cleared
Medium
+
Confirm usage terms for selected mediaAssigned to rights desk
In progress
Finalize internal release orderWaiting on final approval path
+ Live operationsCross-agencyPriority watchDuty shift
+
+
+
+
+
+
+
Operational posture
+
Unified command view for active municipal services, field coordination, and incident handling across the urban network.
+
The command center is managing a concentrated mix of street service faults, traffic disruptions, and public environment reports. Most issues remain within standard handling time, but a smaller group now requires coordinated action between transport, utilities, and district response teams.
+
+
+
Elaine PorterCity Duty Supervisor
+
+
+
+
Open incidents
128
14 escalated for cross-agency handling
Response teams active
46
Coverage stable across all patrol zones
Service restoration rate
92%
Recovered within standard handling window
Pending approvals
19
Mostly route closures and equipment release
+
+
+
+
+ Loading view
+ City service activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm field coverage, prioritize unresolved interruptions, and clear operational approvals that affect lane access, crew movement, and restoration sequencing.
+
Priority incidents are clustered around high-traffic corridors and dense residential blocks.
Utility restoration is progressing, but access control approvals are delaying two field teams.
Public hotline volume has eased after earlier dispatch reinforcement.
District coordinators have requested closer review of repeat reports from the same service area.
+
Escalations14
Resolved today87
Shared cases22
+
+
+
+
+
Recent Activity
+
Verified updates from command, field teams, and district coordination
+
+
+
+
+
+
+
+
Repeated outage reports require joint reviewDistrict North 6 linked cases
High
Route access approval nearing response limitTransport control 3 pending
Medium
Field crew handoff missing closure confirmationUtilities desk 1 unresolved
Low
+
Approve restricted access request for repair convoyAwaiting supervisor sign-off
Confirm closure note for completed street restorationField report submitted
Needs check
+
Dispatch reassigned two mobile teams to central corridor coverageOperations desk
District office requested higher priority handling for repeat public reportsCoordination channel
Utility lead confirmed material arrival for delayed repair orderField logistics
Supervisor note added to shared response protocolCommand record
+
+
+
Supervisor Note
+
This view supports live oversight of city services that require dispatch action, approval control, and coordinated follow-through until closure is confirmed.
+
Dispatch readinessNormal
Inter-agency coordinationHeightened
Public service continuityStable
+
Monitoring continues while transport access, utility repair, and district response remain under shared control.
+
+ Open note
+
A small set of unresolved cases is driving most of the operational pressure. Teams are not blocked by staffing, but by approval timing and shared ownership across agencies. Clearing those decisions quickly will improve restoration pace and reduce repeat public reports.
+
+
+
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident triage84%
Most incoming reports classified
Field response deployment76%
Crews assigned across active zones
Closure verification61%
Awaiting final confirmations
+
+
+
Use confirmed field updates before issuing escalations or releasing restricted access approvals.
+
+
+
+
diff --git a/web_insert/Vchart/pie/chart_0015_pie.html b/web_insert/Vchart/pie/chart_0015_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..9ff77f4c575391e9b228f86dc22f1c862780de57
--- /dev/null
+++ b/web_insert/Vchart/pie/chart_0015_pie.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T14 Store Stock Control
+
+
+
+
+
+
+
+
+
+
Live stockReplenishment reviewHold resolution
Track replenishment risk, release held inventory, and keep shelf availability aligned across active locations.
+
+
+
+ Loading view
+ Location stock position
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
The main concern is not total network stock but timing. Several locations can return to normal selling levels once held units are cleared and transfer approvals are issued in the right order. Teams are using this view to keep store demand, receiving capacity, and release controls aligned.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Latest stock handling and release steps
+
+
+
+
+
+
+
+
Count mismatch blocking release12 item lines remain held after store recount
High
Priority location below cover targetReplenishment risk increased across 4 stores
Medium
Receiving backlog nearing thresholdInbound confirmation lag may delay availability updates
Medium
+
Approve transfer batch for thin-cover stores29 lines prepared by distribution planning
Ready
Confirm held quantities against recount notes74 units waiting on store validation
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Hold review completion68%
Most flagged lines have first-pass decisions
Transfer approval completion54%
Awaiting release order from control lead
Count reconciliation73%
Repeat variance stores still under review
+
+
+
Operational Notes
+
this workflow supports the daily decision flow: identify where cover is too thin, confirm whether held stock can be released, and route transfer lines to the locations with the highest service risk. Notes and queue items below reflect the current handoff between store control, distribution, and floor operations.
+
Prioritize releases for locations with same-day shelf risk.
Delay nonessential transfers until held quantities are verified.
Escalate repeated count mismatches to store control leads.
Keep transfer approvals aligned with receiving capacity.
+
Priority stores11
Open holds18
Ready transfers7
+
Network Signals
Service riskElevated
Receiving pressureModerate
Approval backlogContained
Cycle count exceptions reviewed
Store control completed first-pass review on flagged lines.
Transfer requests consolidated
Low-cover locations were grouped for a single approval pass.
Held stock release pending
Distribution is waiting for final quantity confirmation.
+
+
+
Use release actions only after count confirmation is recorded in the item note.
Operationally stable with service pressure in student support
+
Monitor enrollment flow, service response, and teaching support from one working view.
+
The operations team is managing a heavy intake period while keeping teaching spaces, student requests, and internal approvals moving without delay. Attention is centered on unresolved student cases, delayed policy exceptions, and a small group of rooms still waiting for final checks.
+
+
+
Maya ChenDirector of Campus Operations
+
+
+
+
Open student cases
128
Includes advising, housing, and document follow-up
Pending approvals
34
Requests waiting on dean or operations review
Service response within target
92%
Based on the current operating window
Classroom readiness
97%
Rooms cleared for scheduled teaching activity
+
+
+
+
+ Loading view
+ Campus activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
+
+
+
+
Support Notes
+
Most functions are stable, but a rising queue in student services is starting to affect response time for document verification and housing support. Faculty support remains within target, and facilities has cleared most issues reported by academic departments.
+
Document verification requests are the largest source of new case volume.
Exception approvals are clustering around late registration and fee review.
A limited number of classrooms still require equipment sign-off before release.
+
Escalations11
Returned cases7
Cleared today54
+
+
+
+
+
Team Activity
+
Recent actions across campus operations
+
+
+
+
+
+
+
+
Student services backlog above targetUnassigned requests increased in the last review cycle
High
Approval aging in exception queueSeveral cases are nearing internal service limit
Medium
Room release pending final checkA small number of spaces remain unavailable to departments
Approve urgent registration exceptionsDean review pending on priority items
Waiting review
Close remaining room readiness checksFacilities to confirm equipment status
Ready to close
+
Advising team requested added routing support for intake questionsSubmitted by service desk lead
Housing follow-up cases moved into priority handlingEscalated after delayed student response
Academic affairs returned a policy exception for correctionMissing attachment in case record
Facilities completed projector checks in core teaching roomsRelease notice posted to departments
+
+
+
Shift Note
+
This console supports the daily coordination between admissions, student services, academic affairs, and facilities so teams can keep requests moving and prevent teaching disruption.
+
Admissions handoffSteady
Student support queueElevated
Teaching space statusNear complete
+
Student submitted required documents, but final approval is still waiting on academic review.
+
+ View note
+
Queue growth is concentrated in student-facing requests that need fast validation before they can move to the next approval step. Operations leadership is shifting coverage toward case assignment and document review to restore service levels while keeping teaching support on schedule.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Case assignment81%
Most new requests have a named owner
Approval completion68%
Exception reviews still require leadership attention
Room readiness97%
Only a few spaces remain under review
+
+
+
Use this view to clear urgent cases first, then return to approvals approaching service limits.
Review account health, retention risk, and pending interventions for active customer segments.
+
+
+
+ Loading view
+ Active user case flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current queue reflects a concentrated effort to retain users who showed intent but encountered friction during critical account steps. Teams are expected to document every outreach attempt, confirm ownership before escalation, and close only when the account is either stable or formally transferred for continued monitoring.
+
+
+
+
+
+
+
+
+
+
Case Activity
+
Recent decisions and follow-up movement
+
+
+
+
+
+
+
+
High-value account awaiting decisionNo final disposition recorded after manual review
High
Outreach backlog risingFollow-up queue has crossed internal response target
Medium
Exception note incompletePolicy-sensitive case missing approval rationale
Medium
+
Confirm owner coverage for priority cases7 cases without confirmed handoff
In progress
Complete callback verificationPending contact outcomes need final status
Queued
Close resolved onboarding reviewsCases meet closure conditions after successful recovery
Ready
+
Owner updated on priority reviewRouting changed after shift handoff
Manual decision recordedCase moved from hold to monitor
Risk flag clearedActivity recovered after intervention
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Queue clearance72%
Handled against current intake
Outreach completion64%
Priority contacts sent and logged
Approval coverage89%
Cases with complete decision trail
+
+
+
Operational Notes
+
Current activity is centered on a rise in support-linked retention risk. Several accounts were routed into manual review after repeated onboarding exits, failed self-service recovery, or policy-sensitive changes that require a documented decision.
+
High-priority cases are routed to named owners before outreach begins.
Accounts with repeat friction stay in review until next-step evidence is recorded.
Policy exceptions require a reason code and final approval note.
+
Active owners16
Cases on hold12
Recovered users31
+
Review Signals
Escalation rate11%
Policy exceptions9
Pending callbacks22
Risk rule triggered
Account entered review after repeated drop-off behavior
Operations review started
Owner assigned and contact path confirmed
User contacted
Follow-up sent with recovery guidance and next action
Decision logged
Case moved to monitor, close, or escalate
+
+
+
Access, contact history, and policy decisions are recorded for audit review.
+ Live DispatchPriority LoadsDriver CoverageGate Readiness
+
+
+
+
+
+
+
Active monitoring
+
Coordinate active routes, rebalance drivers, and clear open exceptions from one operating view.
+
Dispatch is managing a tight operating window with several outbound runs stacked behind the same gate sequence. The team has already reallocated available units to protect higher-priority moves and reduce idle time at the yard.
+
+
+
Maya BennettFleet Dispatch Lead
+
+
+
+
Units in motion
148
12 reassigned during the current shift
Open route holds
9
Most tied to late gate release
Coverage gap
4
Backfill requested for long-haul lanes
On-time departure
93%
Holding steady after yard balancing
+
+
+
+
+ Loading view
+ Route coordination
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Most unresolved issues now sit between driver readiness and release timing. Supervisors are using this panel to confirm who can be reassigned, which routes need escalation, and where a short delay will create a downstream coverage gap.
+
Three priority loads were moved to alternate tractors to avoid missed departure targets.
Driver check-in compliance improved after direct follow-up from the shift desk.
Yard staging remains constrained near outbound lanes with refrigerated equipment.
+
Standby drivers6
Held departures9
Ready tractors22
+
+
+
+
+
Recent Activity
+
Latest dispatch actions and route decisions
+
+
+
+
+
+
+
+
Gate release delay affecting priority runLane B12 Waiting 18 min
High
Driver rest window blocks reassignmentLong-haul pool 2 units impacted
Medium
Trailer pairing mismatch in yard queueOutbound side Manual check required
Medium
+
Confirm backup operator for north corridor runDispatch desk request
In progress
Approve swap for delayed refrigerated unitRequires lead signoff
Pending
Close completed hold after gate clearanceRoute ready for release
Ready
+
Yard team confirmed two lanes cleared for outbound stagingPosted by yard control
Driver support updated availability for standby poolCoverage adjusted
Priority load reassignment accepted by route supervisorNo further approval needed
Fuel stop exception removed from active reviewDispatch note closed
+
+
+
Lead Note
+
The team is working through a compressed release window where small delays at the yard can quickly reduce route coverage. This view helps dispatch leads decide where to reassign equipment, push approvals, and keep priority movements on schedule.
+
Dispatch healthStable with exceptions
Driver readinessNear full coverage
Yard congestionElevated at outbound side
+
Priority lanes are protected, but remaining open holds need confirmation from yard and driver teams before release.
+
+ Open note
+
Coverage remains manageable because standby capacity is still available, but the margin is narrowing. If gate release does not improve soon, dispatch will need to defer a lower-priority route to protect the remaining committed runs.
+
+
+
+
+
Operating Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Route release completion78%
Based on active outbound plan
Driver assignment coverage91%
Remaining gap on long-haul lanes
Exception clearance64%
Open holds trending down
+
+
+
Use route reassignment only after confirming gate availability and driver hours.
Track margin, liquidity, and approval flow across the current reporting cycle.
+
Results for the current cycle show stable revenue quality, firmer collection timing, and a narrower spread between forecast and actual operating spend. Leadership attention is centered on a small group of exceptions that continue to delay final sign-off.
+
+
+
Elena BrooksHead of Finance Operations
+
+
+
+
Operating Margin
18.4%
Ahead of plan after expense controls held through close.
Net Revenue
$42.8M
Commercial volume recovered while discount pressure remained contained.
Free Cash Position
$9.6M
Collections improved, with two larger receipts clearing late in cycle.
Open Approvals
14
Most remaining items are tied to accrual review and vendor dispute resolution.
+
+
+
+
+ Loading view
+ Performance overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Controller Note
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
+
+
+
+
Operational Notes
+
The finance team has moved from broad variance review into targeted action. Commercial finance is validating rebate accruals, treasury is holding a watch on outgoing commitments, and controllership is clearing the final reconciliations required for release.
+
Revenue conversion improved without a corresponding rise in credit exposure.
Procurement savings are real, but a portion remains pending validation before final recognition.
Two unresolved adjustments are keeping the package in review status.
Approval throughput improved after regional owners cleared backlog items.
+
Entities cleared11/12
Items escalated3
Notes unresolved2
+
+
+
+
+
Action Log
+
Latest review actions and ownership changes
+
+
+
+
+
+
+
+
Accrual mismatch requires owner confirmationImpacts reported operating spend in one business unit.
High
Vendor credit note still openPayment release remains on hold until dispute terms are accepted.
Medium
Policy note not attached to final packDisclosure wording must be added before executive circulation.
Low
+
Validate rebate accrual varianceCommercial finance and controllership joint review.
In progress
Clear disputed vendor balanceTreasury needs final settlement instruction.
Waiting
Release final commentary packBlocked until remaining approvals are complete.
Queued
+
Entity submission accepted after correctionReviewer noted that supporting entries now tie out.
Cash forecast updated by treasuryShort-term outflow pressure reduced after revised payment timing.
Expense exception moved to owner reviewThreshold breach confirmed and routed for explanation.
Approval backlog reducedRegional finance leads cleared six pending items.
+
+
+
Controller Note
+
This view brings together operating performance, cash discipline, and final approval readiness so finance leaders can decide what still needs intervention before release.
+
Forecast AccuracyWithin tolerance
Liquidity WatchStable
Control Exceptions2 active
+
Final release depends on accrual confirmation, exception closure, and leadership approval.
+
+ Show rationale
+
Margin performance is holding above plan, but the release decision should remain controlled until the last accrual and policy items are resolved. Once those exceptions are cleared, the package can move from finance review to executive approval without further rework.
+
+
+
+
+
Management Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Close completion92%
Final exceptions remain under review.
Approval coverage78%
Executive and policy sign-off still pending.
Reconciliation clearance86%
Most balance checks are complete.
+
+
+
Use approved commentary language before releasing any final summary outside the finance group.
+ Live NetworkPriority WatchDispatch ReadyProtected Load
+
+
+
+
+
+
+
Heightened Monitoring
+
Live oversight for network load, dispatch coordination, and exception handling across the operating area.
+
Operations is tracking elevated demand along two transmission corridors while maintaining service continuity for protected load. Dispatch teams are holding transfer options in reserve and reviewing station-level constraints before authorizing additional switching steps.
+
+
+
Maya ChenGrid Operations Supervisor
+
+
+
+
Active Watchpoints
18
4 require dispatch confirmation
Network Load
87%
Within controlled range
Unplanned Interruptions
3
All under field response
Restoration Readiness
92%
Crew coverage aligned to plan
+
+
+
+
+ Loading view
+ Network load view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
+
+
+
+
Control Notes
+
Field response remains active on a small number of interruption cases. Most conditions are stable, but one feeder cluster continues to show repeat voltage deviation after prior balancing work, prompting closer review from the control desk.
+
Transfer capacity remains available if corridor loading rises further.
Station operators have acknowledged the latest control instructions.
Protected facilities remain on normal supply with no curtailment request.
Exception handling is focused on repeat deviation and delayed field closeout.
+
Open cases11
Crews assigned6
Pending approvals2
+
+
+
+
+
Recent Activity
+
Latest control actions and field updates
+
+
+
+
+
+
+
+
Voltage deviation repeated at feeder clusterObserved after balancing adjustment
High
Switching clearance awaiting station responseTwo instructions not yet confirmed
Medium
Load concentration rising on protected routeCapacity still available within limit
Medium
+
Confirm alternate routing authorityDispatch desk and station lead
In progress
Close field interruption caseCrew report pending final verification
Station North acknowledged switching orderRecorded by control desk
Field team reported isolation completeReturn path still under review
Dispatch hold placed on additional transferAwaiting stability confirmation
Protected facility check returned normalNo local service concern reported
+
+
+
Supervisor Note
+
The operating area is stable overall, but targeted intervention remains necessary where repeated deviation and incomplete confirmation could affect restoration timing.
+
Frequency ControlNominal
Reserve MarginAdequate
Switching Clearance2 Pending
+
Hold transfer authority until final station acknowledgement is recorded and feeder stability remains consistent.
+
+ Review note
+
A controlled response is preferred over rapid switching at this stage. The team has enough reserve support to maintain service while approvals, station acknowledgements, and field verification are completed in sequence.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Restoration workflow74%
Verification stage
Dispatch acknowledgements81%
Most stations confirmed
Exception review58%
Repeat issue under assessment
+
+
+
Use approved switching language and record every dispatch confirmation before closing an event.
+
+
+
+
diff --git a/web_insert/Vchart/pie/chart_0021_pie.html b/web_insert/Vchart/pie/chart_0021_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..935822c7d0d50b6cdbfcb0ed0fb1aee09f6bbfd0
--- /dev/null
+++ b/web_insert/Vchart/pie/chart_0021_pie.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T28 Municipal Service Bulletin
+
+
+
+
+
+
+
+
Internal circulationT28
+
Municipal Service Bulletin
+
Streetlight outage follow-up
+
Open bulletinCross-departmentAction required
+
+
+
Bulletin Summary
Operational notice and response summary for active public service issues requiring coordinated review.
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
+
+
+ Loading view
+ Service handling overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
Several matters remain open not because field action has stopped, but because the written record is incomplete or inconsistent across offices. Staff should treat documentation quality, ownership clarity, and response accuracy as equal to operational completion before moving any item to closed status.
+
+
+
+
+
+
+
+
Review Support
+
Most open items relate to recurring service interruption, delayed site restoration, and inconsistent field closure notes. The present review cycle focuses on whether local handling records match the commitments already issued to residents and whether any matter now requires city-level direction.
+
Confirm that each accepted notice has one accountable handling unit.
Reconcile field completion remarks with the official reply draft.
Flag cases where repeat contact suggests ineffective local closure.
Hold final release for items lacking signed verification.
+
Escalated3
Awaiting reply5
Returned for revision4
+
+
+
+
Recent Activity
+
Latest handling updates across the bulletin
+
+
+
+
+
+
+
+
Repeated contact on one closed itemClosure note conflicts with latest resident submission
High
Verification file missing from district replyEvidence not attached to the handling record
Medium
Approval wording exceeds service standardReply language requires simplification before release
Low
+
Confirm ownership for unresolved site restoration itemAwaiting district office acknowledgment
Open
Complete evidence check for resolved service interruption caseField note submitted without signed confirmation
In review
Approve final reply language for public releaseDraft prepared by coordination desk
Pending approval
+
District office updated handling noteOwnership confirmed and local follow-up arranged
Service unit returned revised reply draftLanguage adjusted to match verified field action
Supervisory office requested clarificationAsked whether the item meets closure conditions
Coordination desk logged resident repeat contactMatter retained in active bulletin
+
+
+
Review Insight
+
Teams are asked to confirm ownership, update response wording, and close record gaps before the next routing step. Any item with unresolved accountability or incomplete evidence should remain in controlled review rather than be marked complete.
+
Case verification76%
Most evidence checks completed
Reply drafting68%
Several items still under wording review
Final clearance41%
Held until all high-priority issues are confirmed
+
Coordination Signals
Priority routeJoint review
Public impactModerate
Release stateHeld for clearance
Local office reported restoration, but resident contact records indicate the issue may persist at the reported location.
+
+
Use this bulletin as the working record for approvals, response checks, and inter-office follow-up until all listed matters are either cleared or formally transferred.
+ Live censusBed readinessStaff coverageEscalations
+
+
+
+
+
+
+
Operationally constrained
+
Coordinate patient flow, staffing coverage, and unit readiness from one shared operating view.
+
Capacity pressure is centered on intake, step-down, and surgical recovery. Bed turnover is steady, but final discharge steps are creating avoidable delays across several units.
+
+
+
Elena MorrisHospital Operations Supervisor
+
+
+
+
Occupied beds
412
Near internal threshold
Pending discharges
37
Requires final transport and pharmacy clearance
Coverage gaps
6
Concentrated in acute care units
Transfer requests
18
Most awaiting destination confirmation
+
+
+
+
+ Loading view
+ Capacity overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Shift Note
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
+
+
+
+
Coordination Notes
+
Operations leads are prioritizing discharge completion, transfer routing, and charge nurse escalation so incoming placements can be accepted without manual workarounds.
+
Three discharge holds are waiting on final medication reconciliation.
Environmental services response time improved after queue consolidation.
Two transport delays are affecting planned internal moves.
Supervisor review is required before reopening one closed observation room.
+
Open escalations9
Ready rooms14
Awaiting transport11
+
+
+
+
+
Team Activity
+
Recent coordination across units
+
+
+
+
+
+
+
+
Recovery unit nearing full occupancyOnly limited staffed beds remain available
High
Discharge packet approvals pendingSeveral patients cannot exit without final sign-off
Medium
Observation room held offlineSupervisor clearance still open after maintenance check
Medium
+
Confirm step-down transfer destinations18 requests need destination validation
In progress
Close discharge blockers on acute care floorsPrioritize cases waiting on pharmacy and transport
Pending
Approve temporary staffing adjustmentFloat coverage proposed for two high-demand units
Awaiting approval
+
Bed services cleared a backlog of ready roomsRoom turnover pace is improving across central units
Charge nurse flagged delayed transport responseInternal moves may slip if dispatch volume rises again
Placement team confirmed two urgent acceptsHigh-priority transfer routing is now moving forward
Pharmacy lead requested focused discharge reviewFinal reconciliations remain the main release blocker
+
+
+
Shift Note
+
This view supports hospital supervisors managing placement pressure, discharge pacing, and shared resource decisions across active units.
+
Emergency intake holdModerate
Isolation room readiness4 available
Transport responseDelayed
+
Track discharge blockers, transfer acceptance, and room readiness until placement pressure returns to normal operating range.
+
+ Show context
+
Intake demand remains manageable only if discharge clearance, transport response, and room turnover continue to move in sequence. Delays in any one step are quickly reflected in transfer backlog and bed availability, so unit leads are expected to confirm ownership and resolve blockers without waiting for a second escalation.
+
+
+
+
+
Throughput Insight
+
Staffing remains workable with targeted reassignments, though two units are relying on temporary coverage until the next handoff is confirmed.
+
Discharge completion68%
Most planned releases are in final review
Room turnover74%
Support teams are clearing ready spaces steadily
Staff coverage alignment81%
Remaining gaps are under supervisor review
+
+
+
Use this board to align throughput decisions, confirm ownership, and close unit blockers before they affect patient placement.
+
+
+
+
diff --git a/web_insert/Vchart/pie/chart_0023_pie.html b/web_insert/Vchart/pie/chart_0023_pie.html
new file mode 100644
index 0000000000000000000000000000000000000000..828778d7c36bc619996ec80470d24424a83a113f
--- /dev/null
+++ b/web_insert/Vchart/pie/chart_0023_pie.html
@@ -0,0 +1,109 @@
+
+
+
+
+
+ T23 Population Health Surveillance Console
+
+
+
+
+
+
+
+
+
T23
+
+
Public Health Operations
+
Population Health Surveillance Console
+
Cluster Review 18
+
+
+
+ Active monitoringEscalation readyField review openAgency coordination
+
+
+
+
+
+
+
+
Heightened monitoring
Track incoming signals, coordinate field review, and maintain a clear response posture across monitored communities.
The monitoring desk is tracking a sustained rise in respiratory and gastrointestinal symptom reports across several reporting zones. Intake remains stable, but the mix of signals has shifted toward higher-acuity records that need faster triage and clearer ownership.
Dr. Alina MercerRegional Surveillance Lead
+
Open signals
48
9 require immediate review
Confirmed clusters
6
2 moved to active response
Facilities reporting
312
Coverage holding above baseline
Response actions due
14
5 pending supervisor sign-off
+
+
+
+ Loading view
+ Signal overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Several facilities are reporting similar symptom patterns within a narrow review window. The immediate priority is to confirm whether these records reflect one expanding incident or multiple unrelated events, then route approved actions to the appropriate regional teams without delaying local guidance.
+
+
+
+
+
+
+
+
Coordination Notes
+
Clinical outreach teams have already contacted priority facilities, and local review leads are validating whether related records should be grouped into broader incident threads. Current operations focus on confirming severity, reducing duplicate review, and keeping partner agencies aligned on next actions.
+
Prioritize facilities with repeated escalation in the last reporting cycle.
Hold unmatched records in review until duplicate checks are complete.
Route any signal with field impact to regional coordination before closure.
Document contact attempts and disposition notes for all high-priority cases.
+
Escalations today11
Records merged27
Sites contacted64
+
+
+
+
Response Activity
+
Live operational updates
+
+
+
+
+
+
+
+
Repeated severity flags from two intake sitesNeeds analyst confirmation before escalation package is finalized
High
Delayed callback from priority care networkContact window exceeded for one assigned outreach task
Medium
Duplicate records detected in linked submissionsMerge decision required to prevent split handling
Medium
+
Validate facility-level symptom spikeAssigned to intake review team
In progress
Approve regional advisory languageWaiting on supervisory sign-off
Pending
Close resolved duplicate submissionsCase review queue
Ready
+
Field team confirmed onsite staffing pressure at one reporting facilityLogged by regional coordination
Intake rule updated to separate low-confidence symptom matchesApplied to new submissions
Supervisor requested clearer closure criteria for linked recordsApplies to all active reviews
Partner agency requested a consolidated situation briefResponse drafting in progress
+
+
+
Assessment
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Facility outreach completion72%
Priority contacts verified
Case linkage review58%
Duplicate checks underway
Supervisor approvals41%
Decision backlog remains
+
Recent Escalation Path
Signal threshold exceeded
Automated intake flagged a multi-site increase in symptom submissions.
Rapid review initiated
Duty analyst opened a consolidated review path for linked facilities.
Field outreach assigned
Regional teams received follow-up tasks for verification and local guidance.
Supervisor decision pending
Escalation package is awaiting approval for broader coordination.
Escalations today11
Records merged27
Sites contacted64
+
+
+
Use verified facility contacts and record every disposition before handoff.
In ReviewVenue ReadyAttendance StableEscalations Open
+
+
+
Cycle Summary
Operational summary for active test administration, venue readiness, and exception handling across the current assessment cycle.
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
+
+
+ Loading view
+ Assessment Overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Coordinator Note
+
Most examination activity is proceeding as planned, but closure depends on disciplined record completion. The immediate priority is to clear unresolved exceptions, confirm reserve staffing where local teams requested support, and complete attendance matching so final decisions can be released without later amendment.
+
+
+
+
+
+
+
+
Support Notes
+
The remaining work is concentrated around exception clearance, late access decisions, and a small number of incident notes awaiting documentation review. Local coordinators have been asked to close record gaps before final reconciliation.
+
Front desk verification queues remained within target at the largest campuses.
Two venues requested additional reserve invigilators after late staffing changes.
Access support requests were resolved on site in most cases without timetable impact.
Record matching is the main dependency for closing outstanding exceptions.
+
Venues flagged3
Support cases22
Records pending11
+
+
+
+
Recent Activity
+
Live handling across venues and review teams
+
+
+
+
+
+
+
+
Supervisor shortfall at one venueReserve coverage requested by local coordinator
Medium
Identity record mismatch remains unresolvedCandidate access held for manual verification
High
Incident note submitted without witness detailRecord cannot be closed until supporting note is attached
Low
+
Approve outstanding exception bundle17 cases waiting for central decision
In progress
Confirm reserve invigilator placementTwo venues still using temporary cover
Pending
Close attendance reconciliationFinal count required from all campuses
Waiting on input
+
Main campus reported smooth candidate intakeQueue times remained within control range
Local coordinator submitted access support resolutionNo further intervention required
Central review accepted one discretionary entry decisionDocumentation now marked complete
Venue team flagged missing witness detail on incident noteFollow-up sent to room supervisor
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Venue readiness96%
Final checks completed at most sites
Exception clearance71%
Remaining cases need review or supporting notes
Attendance reconciliation84%
Several campuses still finalizing counts
+
Control Signals
Venue coverageStable
Support loadModerate
Approval backlogWatch
Candidate admitted under local discretion pending identity record confirmation and supervisor note.
+
+
Use this briefing to confirm operational standing before releasing final venue closure updates.
Track release health, adoption movement, and follow-up work across the active product line.
+
This console brings product operations, customer feedback, and release follow-up into one working view. Teams use it to confirm whether new capability is landing as expected and to decide where intervention is needed before broader exposure.
+
+
+
Maya ChenDirector, Product Operations
+
+
+
+
Active accounts
18.4K
Up after the latest rollout gate was cleared
Feature activation
62%
Strong uptake in managed accounts
Risk reviews open
14
Most tied to onboarding friction
Resolution pace
2.8d
Within the target operating window
+
+
+
+
+ Loading view
+ Adoption performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Working Note
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Adoption is moving in the right direction, but several segments still show slow first-use completion. The current focus is to separate configuration issues from true product friction so support, product, and success leads can close the right actions without reopening the same cases.
+
Activation improved after the guided setup copy was simplified.
Low-volume segments continue to need hands-on follow-up from account teams.
Escalations are concentrated in accounts with partial permission mapping.
Recent fixes reduced repeat contacts from newly provisioned teams.
+
Open cases26
Teams engaged7
Blocked accounts9
+
+
+
+
+
Recent Updates
+
Actions and decisions recorded by the teams managing rollout quality.
Drop in activation for self-serve cohortBelow expected conversion after enablement
Medium
Feedback backlog approaching service limitTriage queue has unresolved duplicates
Medium
+
Confirm root cause tags for onboarding issuesOwned by product operations
In progress
Prepare guidance note for account teamsNeeded before broader customer outreach
Ready
Review unresolved enterprise feedbackPriority set by success leadership
Waiting
+
Support lead added a consolidated issue summaryIncludes affected flows and account impact
Product manager approved copy update for setup promptsChange moves to release verification
Success team flagged two at-risk renewals tied to adoptionAccounts need direct follow-up
Operations closed duplicate feedback items after triageQueue volume reduced and ownership clarified
+
+
+
Working Note
+
Use this area to compare product uptake with operational load, then move directly into review and assignment.
+
Onboarding completionStable
Repeat contact rateImproving
Enterprise rollout readinessUnder review
+
Monitor early usage quality before expanding access to additional accounts.
+
+ Show context
+
The current release is performing well in mature accounts, but early setup quality remains uneven across newer segments. Teams are using this record to keep support demand manageable while product changes, internal guidance, and account outreach are coordinated in the same operating cycle.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Activation follow-up68%
Issue grouping and owner assignment underway
Guidance rollout84%
Most internal teams have acknowledged the update
Escalation cleanup47%
Duplicate and low-signal items still being removed
+
+
+
Use this view to confirm priority, assign owners, and record follow-up before advancing the next release step.
Editorial interpretation, policy check, and release readiness for a high-traffic article package.
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
+
+
+ Loading view
+ Article review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Editor Note
+
The item remains on hold because reviewers want the final article to state only what can be supported directly in the reporting record. Once the headline and two interpretive passages are revised, the last policy note can be closed and the release team can complete handoff without reopening the brief.
+
+
+
+
+
+
+
+
Editorial Support Notes
+
The lead section is clear and timely, yet the second section introduces interpretation that should either be attributed more directly or reduced to a narrower claim. Reviewers agree that the piece is close to publishable, though the tone still needs to align with internal standards for certainty, source balance, and headline restraint.
+
Tighten the headline so it reflects verified reporting only
Rework two interpretive lines in the middle section
Confirm attribution order in the closing paragraph
Keep the release hold in place until policy notes are cleared
+
Linked notes12
Required edits3
Approvals2/3
+
+
+
+
Recent Activity
+
Latest actions across review, policy, and release handling.
+
+
+
+
+
+
+
+
Policy sign-off still openRelease cannot proceed until the final comment is resolved
High
Headline wording exceeds source certaintyDesk requested a narrower phrasing pass
Medium
Closing attribution order changedLatest revision needs reviewer confirmation
Low
+
Apply marked language editsThree passages require direct revision
Prepare release handoffQueue placement is ready once approval lands
Queued
+
Desk review updated with narrowed wording requestAdded by editorial review
Policy note linked to middle section passageMapped to required edit
Release hold confirmed by operationsQueue position preserved
Final pass assigned to senior reviewerAwaiting consolidated response
+
+
+
Reading Insight
+
Operations has held the item in the final queue so the desk can complete one coordinated pass rather than resolve comments in isolation. this workflow is intended to keep editors, policy reviewers, and release staff on the same record while the article moves through its last approval step.
+
Editorial review88%
Most text decisions are settled
Policy clearance67%
One required note remains
Release handoff54%
Prepared but not cleared
+
Release Signals
Attribution strengthNeeds tightening
Headline alignmentUnder revision
Release readinessPending approval
Final release depends on one policy approval and completion of marked language edits.
+
+
Use the same review record when updating wording, approvals, and release handling to avoid duplicate decisions.
Reporting cycle activeEvidence under reviewSite coverage completeApproval pending
+
+
+
Reporting Summary
Consolidated operational view for facility emissions, evidence readiness, and approval progress across the reporting cycle.
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
+
+
+ Loading view
+ Emissions view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Reporting Note
+
Most reporting work is complete, but the team is holding release until the last boundary clarification and control statement are fully documented. Once those items are closed, the submission can move through approval without further operational changes.
+
+
+
+
+
+
+
+
Reporting Support
+
The largest review focus is on boundary treatment for shared support loads and updated fuel allocation rules at two sites. Operational teams have already provided revised notes, and the reporting lead is now checking that the narrative, supporting evidence, and final figures align before release.
+
All operated facilities submitted activity data within the active reporting window.
Boundary assumptions were updated after internal control review.
Evidence coverage is complete for direct fuel use and purchased electricity.
Final sign-off is blocked only by unresolved exception responses.
+
Facilities in scope14
Evidence files linked128
Approvers assigned5
+
+
+
+
Review Activity
+
Recent actions tied to the current reporting cycle
+
+
+
+
+
+
+
+
Boundary note requires confirmationShared support load treatment updated by operations
Medium
Exception owner response overdueOne facility comment has not been returned
High
Approval pack awaiting final attachmentControl statement must be added before routing
Low
+
Validate revised allocation methodCheck consistency against facility evidence
In progress
Close open exception itemsCollect responses from assigned owners
Blocked
Route package for sign-offRelease once control statement is attached
+ Air QualityWaterway WatchNoise ControlIncident ReviewField Response
+
+
+
+
+
+
+
+
Monitoring active
Live field conditions, site review status, and response coordination for regulated locations across the district.
The center is coordinating site signals, field notes, and inspection follow-up for a cluster of elevated readings near mixed industrial and residential boundaries. Operations staff are prioritizing sites with repeated threshold breaches and incomplete corrective action records.
Lin QiaoDuty Operations Supervisor
+
Active Sites
148
Reporting within expected intervals
Open Alerts
19
Require review or field action
Teams Deployed
7
Assigned across priority zones
Pending Closures
12
Awaiting supervisor sign-off
+
+
+
+ Loading view
+ Regional condition view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Current priorities are driven by repeated threshold exceptions, incomplete operator evidence, and response commitments that must be met before cases can move from active monitoring into supervised closure.
+
+
+
+
+
+
+
+
Coordination Notes
+
Supervisors are using this view to confirm which locations need immediate contact, which cases can move into verification, and where additional sampling is required before enforcement recommendations are prepared.
+
Three adjacent sites show recurring particulate exceedance during the latest reporting window.
Two discharge locations remain under temporary observation pending laboratory confirmation.
A noise complaint cluster has been linked to overnight equipment cycling at one permitted facility.
Field teams are instructed to attach calibration notes before closing any reading exception.
+
Escalated cases6
Awaiting lab result9
Supervisor holds4
+
+
+
+
Recent Activity
+
Latest updates from field teams, intake staff, and case reviewers.
+
+
+
+
+
+
+
+
Particulate readings above control limitNorth boundary cluster 3 linked sites
+ Live IntakePriority DeskVerification ActiveEscalation Watch
+
+
+
+
+
+
+
Monitoring
+
Track intake, verify risk, and route priority stories before they move to the editorial queue.
+
This console is used by editorial operations to keep incoming reports moving through triage, verification, and assignment without losing track of risk. The main queue combines desk intake with source checks so teams can see which items are safe to advance and which need intervention.
+
+
+
Elena WardEditorial Operations Lead
+
+
+
+
Open story leads
148
Includes items awaiting desk review
Verification holds
19
Requires source or rights confirmation
Escalated items
7
Moved to senior editorial review
Cleared for publish
62
Ready for final assignment
+
+
+
+
+ Loading view
+ Primary story flow
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Current activity shows steady intake with a small cluster of unresolved rights and attribution issues. The desk is prioritizing items that already have supporting material, while holding anything with unclear provenance until the verification team closes the case.
+
Priority routing is applied automatically when multiple desks flag the same developing item.
Items with unresolved attribution stay out of assignment until a reviewer clears the source note.
Senior editors are only pulled in when legal, standards, or rights questions remain open after first review.
+
Senior reviews5
Merged duplicates13
Held packages4
+
+
+
+
+
Recent Activity
+
Latest desk actions and routing updates
+
+
+
+
+
+
+
+
Attribution conflict on priority itemDetected during source cross-check
External rights response pendingAwaiting confirmation before release
Medium
+
Review senior escalation notes2 items require decision on hold duration
In progress
Clear duplicate lead setRegional queue requires consolidation
Queued
Confirm source contact trailVerification needs final callback record
Waiting
+
Priority desk reopened a held submissionAdditional sourcing received
Verification marked one rights case as clearedAssignment may proceed
Standards note added to a developing leadLanguage guidance attached
Assignment queue accepted a bundled updateMerged from three related leads
+
+
+
Lead Note
+
Use this view to balance intake pressure with verification discipline so high-interest stories move forward without creating downstream correction risk.
+
Source confidenceStable
Rights exposureElevated
Desk capacityWithin target
+
Hold assignment until source ownership and reuse terms are confirmed by verification.
+
+ Desk rationale
+
The current operating posture favors speed only when source history and usage rights are already established. Items that arrive with incomplete attribution, uncertain ownership, or conflicting desk notes should remain visible in triage until one reviewer is accountable for the next decision.
+
+
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Lead triage78%
Most incoming items reviewed
Verification clearance64%
Pending rights responses remain
Assignment handoff71%
Approved stories moving on schedule
+
+
+
All routing changes and approvals are recorded in the audit log for desk review.
+ Live ControlDispatch ReadyStorage BalancedField Review Open
+
+
+
+
+
+
+
+
Operational
Track site output, storage readiness, dispatch commitments, and field actions across the active hub.
The hub is operating within target limits, with solar and wind assets sharing load as expected and storage carrying the balancing role for short fluctuations. Dispatch obligations remain intact, and no station is currently outside its approved operating envelope.
Elena MorrisRegional Hub Supervisor
+
Net Output
428 MW
Holding above committed delivery band
Available Storage
81%
Reserve margin kept for evening handoff
Curtailment Risk
Low
No immediate restriction notices in scope
Open Field Actions
7
Two require supervisor review
+
+
+
+ Loading view
+ Hub performance
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Supervisor Note
+
Output remains dependable across the hub, but the team is keeping close watch on the inland station until restart behavior is fully verified. Supervisors should clear the pending reserve note and confirm the inspection window so field and control actions stay aligned.
+
+
+
+
+
+
+
+
Operations Notes
+
Operations staff are watching one inland station where inverter recovery is slower than normal after a brief protective trip. The condition is stable, but the team has kept a local inspection open until the restart pattern returns to baseline.
+
Primary dispatch commitment remains fully covered by live generation and stored reserve.
One site review is waiting on field confirmation before the maintenance note can be closed.
Remote control authority is active for all stations in the current hub scope.
No compliance holds are blocking routine switching or battery balancing actions.
+
Stations Online14
Open Reviews3
Active Crews2
+
+
+
+
Shift Activity
+
Recorded actions and follow-up items for the active operating window.
+
+
+
+
+
+
+
+
Inland station restart varianceRecovery sequence exceeded normal duration
Medium
Storage reserve floor nearing handoff targetBalancing plan may need minor adjustment
Low
Field confirmation pending on breaker inspectionClosure blocked until site response is logged
Medium
+
Approve reserve adjustment noteSubmitted by shift operator
Pending approval
Confirm inland site inspection windowCrew lead requested access hold
Waiting
Close completed switching logControl steps verified by second reviewer
Ready
+
Grid desk accepted updated export positionAcknowledgement logged by dispatch coordinator
Battery balancing sequence completed without exceptionAutomatic control remained within approved limits
Field crew checked access route to inland stationTravel and handoff conditions confirmed
Remote link health check passed across all active sitesNo communication degradation recorded
+
+
+
Readiness Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Dispatch coverage96%
Committed export supported
Storage readiness81%
Reserve held for balancing
Field action closure68%
Open reviews moving toward sign-off
+
Recent Activity
Hub entered balanced operating mode
Control room update
Storage reserve floor adjusted for dispatch window
Shift approval recorded
Inverter restart review opened at inland station
Field follow-up assigned
Export commitment reconfirmed with grid desk
Acknowledgement received
Stations Online14
Open Reviews3
Active Crews2
+
+
+
Use this view to confirm readiness before approving dispatch changes or closing field actions.
+
+
+
+
diff --git a/web_insert/Vchart/scatter/chart_0018_scatter.html b/web_insert/Vchart/scatter/chart_0018_scatter.html
new file mode 100644
index 0000000000000000000000000000000000000000..057f4c4088fb287722b38d00b1605542e90437d3
--- /dev/null
+++ b/web_insert/Vchart/scatter/chart_0018_scatter.html
@@ -0,0 +1,92 @@
+
+
+
+
+
+ T04 Daily Energy Use Report
+
+
+
+
+
+
Operational summary for site load, steam demand, and utility variance across active production lines.
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
+
+
+ Loading view
+ Consumption overview
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operating Note
+
The current review is centered on whether the elevated water draw should be recorded as expected support usage or escalated as a controllable loss. Early checks support the first view, but the decision will remain open until sanitation records and supervisor confirmation are complete.
+
+
+
+
+
+
+
+
Supervisor Support
+
The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
+
Base electrical load improved after non-process fans were isolated during idle periods.
Compressed air demand stayed even, with no signs of sustained leakage during the late run.
Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
Water variance should be rechecked once final sanitation logs are posted.
+
Open exceptions2
Lines reviewed6/6
Actions due3
+
+
+
+
Completion Progress
+
Status of review and follow-up
+
+
+
+
+
+
+
+
Water use above expected bandPackaging area support services
Medium
Line idle shutdown not confirmedTwo areas missing end-run verification
Low
Final sanitation log still pendingRequired to close variance review
Medium
+
Confirm restart-related water drawOperations supervisor to validate against log entries
In progress
Verify non-process equipment shutdownUtilities team to spot-check idle periods
Queued
Complete site approvalRequired before report closeout
Pending
+
Meter reconciliation completed for main supplyLogged by utilities desk
Maintenance confirmed no active steam issueInspection note added
Cost allocation refreshed for final reviewFinance rule set applied
+
+
+
Assessment
+
No immediate escalation is required, but the site energy lead has asked line supervisors to confirm idle-time shutdown discipline before the next reporting cycle is closed.
+
Meter validation100%
All core readings matched
Variance review68%
Awaiting supporting logs
Management sign-off35%
Ready for supervisor action
+
Key Signals
Load balanceSteady
Utility riskModerate
Approval statePending sign-off
Water intake exceeded the normal operating band during cleaning and restart activity. Review remains open until line notes and final meter confirmation are attached.
+
+
Use this report to confirm variances, assign follow-up, and complete site-level review before closeout.
Post-route summary for the latest dispatch cycle, focusing on late handoff recovery, depot coordination, and proof-of-delivery completion.
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
+
+
+ Loading view
+ Route performance view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Review Note
+
This review is being used to decide whether dispatch should adopt a standard delay-recovery playbook for mixed-stop runs. The current response relied on experienced staff making quick route adjustments, which worked in this case but may not scale without clearer depot release rules and a required outreach log for affected stops.
+
+
+
+
+
+
+
+
Support Notes
+
Dispatch leads used route resequencing and direct driver callouts to contain delay spread. Most affected consignments were delivered during the original run, while a smaller group required manual customer outreach and depot-side confirmation before closure.
+
Departure drift started at the depot gate after loading lane congestion.
Manual reprioritization reduced missed arrival commitments on dense urban segments.
Proof-of-delivery capture improved after drivers were reminded to close stops before returning.
Two exception cases remain open pending package condition review.
+
Resequenced routes7
Support calls placed23
Returns held2
+
+
+
+
Recent Activity
+
Updates recorded during issue containment and closure review.
+
+
+
+
+
+
+
+
Proof mismatch on return scan2 consignments need depot confirmation
Medium
Loading lane congestion repeatedObserved across early dispatch wave
High
Customer contact note missing1 delayed stop closed without outreach log
Low
+
Validate open claims with depot supervisorAttach condition notes and return scans
In progress
Document route resequencing rulePrepare for dispatch handbook update
Pending
Close driver note reviewConfirm repeated gate delay comments
Ready
+
Driver team acknowledged revised stop orderField update logged by support desk
Depot supervisor added lane usage noteRoot cause linked to overlap during loading release
Customer service cleared outreach backlogAll affected recipients received status calls
The review focus is on whether the corrective actions used by the team should become standard practice for future mixed-stop routes with tight loading turnover.
+
Exception closure78%
Most delivery issues resolved in the same cycle
Driver note review64%
Comments grouped by route segment
Depot corrective action41%
Lane balancing plan awaiting sign-off
+
Field Signals
Route adherenceStable after intervention
Depot readinessNeeds lane balancing
Customer contact coverageAbove target
Opened after repeated departure slippage affected downstream stop timing and closure quality.
+
+
Internal review record for route performance follow-up and process adjustment.
+
+
+
+
diff --git a/web_insert/Vchart/scatter/chart_0020_scatter.html b/web_insert/Vchart/scatter/chart_0020_scatter.html
new file mode 100644
index 0000000000000000000000000000000000000000..a6844eb2dbec5395ddafce480adb09ab82f935af
--- /dev/null
+++ b/web_insert/Vchart/scatter/chart_0020_scatter.html
@@ -0,0 +1,99 @@
+
+
+
+
+
+ T34 Water Operations Control
+
+
+
+
+
+
+
+
+
+
Live networkShift handoffPriority review
Monitor plant output, service pressure, and field response from one operating view.
+
+
+
+ Loading view
+ Network status
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Control Note
+
The active case is no longer expanding, but the team is holding controls in place until all dependent checks are complete. Field, dispatch, and service desk updates should stay aligned so closures do not outpace verified operating conditions.
+
+
+
+
+
+
+
+
+
+
Recent Activity
+
Operational updates and required follow-up
+
+
+
+
+
+
+
+
Restricted pressure in east zoneCustomer impact limited; monitoring remains active
High
Booster station follow-up duePost-adjustment verification pending from field lead
Medium
Closure approval waitingSupervisor sign-off required on 3 linked work orders
Medium
+
Confirm downstream pressure readingsAssigned to east response crew
In progress
Validate temporary routing planRequired before restriction release
Pending review
Close resolved customer casesService desk waiting on operations note
Ready
+
Dispatch logged stable readings from sector valve setRecent field update
Plant control confirmed output remains on targetOperations note
Service desk tagged 4 cases for combined closureQueue update
Depot issued replacement fittings to mobile crewSupply confirmation
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Incident containment82%
Awaiting final field confirmation
Work order completion64%
Linked repairs moving through review
Case closure readiness71%
Service notes partially complete
+
+
+
Supervisor Notes
+
The current focus is to keep supply steady across high-demand zones, clear outstanding field confirmations, and close service cases that no longer need escalation. Supervisors are reviewing exceptions before the next handoff.
+
East transmission line remains in controlled operation with no new loss reports.
Two booster stations are running under temporary observation after overnight adjustment.
Customer-facing updates are limited to affected service pockets only.
Repair stock for seals and isolation fittings is available at primary depot.
+
Crews deployed9
Sites under watch4
Pending approvals6
+
Operational Signals
Reservoir balanceNormal
Pump readinessHigh
Field backlogModerate
Pressure deviation flagged
Network monitoring raised an east line variance and opened incident review.
Field isolation confirmed
Local crew secured the affected segment and reported stable downstream flow.
Supervisor review in progress
Operations lead is validating closure conditions before releasing restrictions.
+
+
+
Use confirmed field updates before changing service classification or closing a case.
+ Live TradingStore NetworkPriority Follow-upRevenue Focus
+
+
+
+
+
+
+
Active Oversight
+
Monitor store execution, revenue pacing, stock pressure, and pending actions across the active trading cycle.
+
Trading performance is holding above plan, but momentum is uneven across the network. Flagship locations are carrying the result while several mid-tier stores are slipping on conversion after early demand spikes cleared core inventory.
+
+
+
Maya ChenSales Operations Lead
+
+
+
+
Net Sales
$4.8M
Running ahead of internal target with stronger in-store conversion.
Orders Closed
18,240
Order completion remains stable despite heavier queue volume.
Low Stock SKUs
126
Concentrated in top-selling lines requiring rapid replenishment.
Pending Exceptions
37
Most cases are tied to price overrides and fulfillment holds.
+
+
+
+
+ Loading view
+ Sales command view
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Lead Note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
+
+
+
+
Operational Notes
+
Operations leads are using this board to coordinate price checks, stock transfers, and field follow-up. The immediate goal is to protect sell-through on priority lines without creating avoidable margin leakage or unresolved service cases.
+
Price override approvals increased after local markdown requests were reopened.
Transfer requests are highest in stores with strong accessory attachment rates.
Frontline teams need confirmed replenishment windows before issuing customer callbacks.
Regional managers have been asked to clear overdue store notes before next review.
+
Stores Flagged21
Cases Reassigned14
Open Callbacks89
+
+
+
+
+
Execution Activity
+
Store actions and approval movement
+
+
+
+
+
+
+
+
Override approvals approaching threshold12 stores exceeded normal approval volume
High
Core item coverage at riskTop stores reporting low back-room availability
Medium
Store callback backlog buildingCustomer follow-up notes remain open past target
Medium
+
Approve urgent pricing exceptionsSenior review required for margin-sensitive requests
In progress
Confirm transfer receipt with destination storesFollow up on high-demand replenishment moves
Pending
Close unresolved field notesSeveral stores have not updated execution status
Blocked
+
North region cleared three high-value exceptionsApproval cycle shortened after reassignment
Accessory attachment improved in premium storesStore coaching appears to be holding
Transfer requests stabilized after stock releaseMost urgent moves have been acknowledged
Customer callback queue remains unevenService follow-through needs local management review
+
+
+
Lead Note
+
This board supports the daily operating rhythm for sales control, exception handling, and store coordination across the retail network.
+
Conversion PressureElevated
Stock Transfer LoadHigh
Approval ResponseWithin SLA
+
Investigate sales pacing, confirm stock position, and clear open approvals before escalation.
+
+ View note
+
Sales are healthy overall, but the result is relying too heavily on a small group of stores. The immediate operating priority is to keep best-selling lines available, reduce approval delays, and make sure local teams close customer commitments before service risk expands.
+
+
+
+
+
Focus Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Approval clearance78%
Cleared against open exception volume
Transfer completion64%
Confirmed store-to-store movements
Field note closure52%
Resolved execution updates from stores
+
+
+
Use approved actions only. Store-facing updates must match pricing, stock, and service policy before release.
Post-run assessment for the last completed checkout messaging experiment, including impact, rollout decision, and follow-up actions.
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
+
+
+ Loading view
+ Experiment results
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Analyst Note
+
The result is not only statistically reliable but also operationally clean. Teams reviewing payment quality, support demand, and buyer behavior did not identify a counter-signal large enough to block release, which makes this a suitable candidate for default rollout with normal monitoring.
+
+
+
+
+
+
+
+
Review Notes
+
Variant B produced a clear improvement in completed orders while keeping refund intent, payment failure, and support contact rates within the expected range. The effect was strongest among first-time buyers and remained directionally positive across the broader audience.
+
Primary goal was improved checkout completion.
Guardrails covered payment success, cancellation intent, and support contact rate.
Result supports rollout with standard monitoring.
Follow-up work should focus on first-time buyer reassurance.
+
Control share50%
Variant share50%
Guardrails passed3/3
+
+
+
+
Recent Activity
+
Latest review updates and decision steps
+
+
+
+
+
+
+
+
Release approval pendingRequires product and operations sign-off
Medium
Follow-up test not yet scopedFirst-time buyer segment showed the strongest response
Low
Monitoring handoff requiredPost-release checks must be assigned before launch
Medium
+
Confirm rollout ownerRelease coordination for default experience
Open
Document final decisionAdd rationale to the experiment record
In progress
Prepare follow-up briefDraft next test for delivery reassurance
Not started
+
Data review completed by analyticsNo variance issues found in conversion events
Support lead confirmed stable contact volumeNo increase tied to variant exposure
Product owner attached final recommendationPromote Variant B with standard guardrails
Release coordinator requested approval windowDecision needed before deployment planning
+
+
+
Key Insight
+
The operational recommendation is to promote Variant B to the default experience, keep the current guardrails in place, and open a follow-up test on supporting text near delivery expectations.
+
Review completion92%
Only final approval remains
Release readiness84%
Monitoring and ownership still being confirmed
Follow-up planning36%
Next hypothesis not fully defined
+
Quality Signals
Audience balanceWithin tolerance
Tracking integrityVerified
Release readinessApproved pending sign-off
Control used the existing confirmation message. Variant B used shorter supporting language focused on confidence before purchase.
+
+
Rollout should begin with standard monitoring and a hold point if payment reliability moves outside normal range.
Coordinate intake, review, and resolution for active public service requests across district teams.
+
+
+
+ Loading view
+ Request handling
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Case Note
+
Demand remains manageable overall, but manual verification is creating uneven wait times between offices. Supervisors are prioritizing clean approvals, redirecting exception work to trained reviewers, and keeping resident communication tied closely to documented case decisions.
+
+
+
+
+
+
+
+
+
+
Team Activity
+
Latest actions across intake, review, and approval teams.
+
+
+
+
+
+
+
+
Approval queue nearing response limit8 requests need supervisor action within the service window
High
Identity mismatch rate increasedManual checks are slowing intake clearance in two offices
Medium
Returned submissions require follow-upResidents have not responded on 14 incomplete requests
Low
+
Clear specialist review backlogReassign exception cases from general intake
In progress
Approve release batchDecision notes are complete and ready for sign-off
Ready
Validate returned documentsCheck corrected records before reopening requests
Queued
+
North district accepted three escalated casesOwnership transferred from central review
Resident notice batch released after approvalNotifications sent for completed decisions
Compliance note added to exception handling rulesReview teams must record reason codes on manual overrides
Intake team cleared duplicate submissionsMerged records reduced queue noise for active requests
+
+
Service Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Intake review72%
Most new submissions screened and routed
Eligibility verification54%
Manual checks remain the slowest step
Decision release81%
Approved cases moving out on schedule
+
+
+
Supervisor Notes
+
A review backlog has formed around eligibility checks that require manual confirmation. Supervisors are balancing faster routing with compliance controls so straightforward requests can move forward while exceptions remain documented and ready for audit.
+
Priority requests are held for direct supervisor review when identity or address records do not match.
Field offices can return incomplete submissions to intake without closing the case.
Resident notifications are released only after decision notes and supporting checks are complete.
Escalated items remain visible until ownership is accepted by the receiving team.
+
Avg. handling time2.8h
Returned to intake27
Supervisor holds11
+
Queue Health
Service levelStable
Review capacityTight
Escalation loadModerate
Intake queue reviewed
Initial screening completed for newly received submissions
Eligibility exceptions routed
Cases with missing verification moved to specialist review
Supervisor approvals issued
Approved requests released for resident notice and fulfillment
+
+
+
Access, routing, and decision history are logged for compliance review.
Executive readyDisclosure check in progressCapital narrative alignedInternal distribution
+
+
+
Briefing Overview
Prepared for internal review ahead of the next external distribution cycle, with ownership, message discipline, and approval status aligned across finance and investor relations.
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
+
+
+ Loading view
+ Briefing summary
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Owner Note
+
The latest round of edits did not change the underlying investment story. Remaining work is focused on wording control, approval traceability, and keeping every investor-facing response anchored to the same finance-approved position.
+
+
+
+
+
+
+
+
Support Notes
+
The current focus is not on rewriting the narrative, but on tightening message consistency across risk wording, liquidity references, and near-term execution priorities. Teams are using this workflow to close final comments, confirm owners, and prevent late-stage variation in prepared materials.
+
Core investment case remains centered on disciplined cash use and dependable operating execution.
Leadership commentary has been reduced to a smaller set of repeatable points for external consistency.
Response language for common investor questions has been aligned to finance-reviewed assumptions.
Outstanding edits are confined to wording precision rather than directional changes.
+
Open comments5
Approvers left2
Locked sections11
+
+
+
+
Latest Activity
+
Recent changes affecting release readiness
+
+
+
+
+
+
+
+
Disclosure wording requires legal clearanceAffects final release decision
High
One leadership note remains unresolvedComment attached to capital allocation language
Medium
Response pack needs alignment checkFollow-up wording should mirror approved brief
Low
+
Close legal edits on risk languageOwner: Finance policy lead
In progress
Confirm final executive remarksOwner: Investor relations
Pending
Lock response wording for follow-up callsOwner: Communications review
Ready
+
Finance accepted the latest positioning summaryLogged by briefing coordinator
Legal returned edits on forward-looking languageRequires one final pass
Leadership requested a shorter opening statementChange recorded in review log
Distribution list narrowed to approval groupAccess updated for controlled handling
+
+
+
Briefing Insight
+
Open items are limited to disclosure phrasing and one sensitivity note requested by leadership. Once those points are resolved, the package can move from internal circulation to controlled release without further structural changes.
+
Narrative approval80%
Most sections cleared
Disclosure review60%
Pending legal sign-off
Response alignment88%
Final consistency pass underway
+
Control Signals
Message consistencyStrong
Approval riskModerate
Distribution readinessNear complete
Internal briefing set for leadership and investor-facing teams before controlled distribution.
+
+
Use approved language only when sharing outside the core review group. All pending comments must be resolved within this record before release.
Reconcile recent browsing and purchase signals to explain why conversion softened and what the store team should adjust next.
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
+
+
+ Loading view
+ Behavior review
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Manager Note
+
The strongest working theory is that customers still wanted to buy, but too many paused at the final decision stage because shipping expectations and sign-in requirements were not clear enough. If the next round of outreach and copy revisions reduces repeat basket exits, the team can close this case without broader pricing or assortment changes.
+
+
+
+
+
+
+
+
Cross-Team Notes
+
Across the review window, customer intent remained healthy through product detail visits and repeat sessions. The clearest shift appeared after basket confirmation, where more shoppers paused, left, and later returned without completing payment. The service desk did not report unusual complaint volume, which suggests the issue is more likely tied to confidence and clarity than outright failure.
+
Shoppers continued to view multiple items before adding to basket, indicating intent did not collapse early.
Exit behavior clustered around final review and sign-in rather than product discovery.
Recovery outreach worked best for returning shoppers who had already opened the basket more than once.
Store operations requested clearer ownership before any pricing or policy adjustment is published.
Recovery queue is below targetUnworked follow-ups remain in service backlog
High
Sign-in complaints remain unconfirmedFrontline notes mention hesitation, not failure
Low
+
Confirm revised checkout copyOwned by digital operations
In review
Prioritize recovery outreach for repeat basketsAssigned to service lead
Queued
Validate policy wording against service scriptsShared with retail support
Pending approval
+
Service desk added five consistent customer notes about unclear delivery timingLogged by support operations
Merchandising confirmed no major assortment change during the review windowPosted by category coordinator
Storefront team marked account sign-in as a likely confidence issueSubmitted during triage
Recovery messages were reopened more often by returning shoppers than first-time visitorsShared by retention specialist
+
+
+
Key Insight
+
Operations has already narrowed the problem to a few decision points: shipping expectations, promotion wording, and account sign-in during payment. The team is using this workflow to compare observed behavior with active recovery work so that merchandising, service, and digital operations can agree on one corrective path.
+
Root cause review78%
Evidence aligned across operations and support
Corrective copy approval54%
Waiting on final policy wording
Recovery follow-up completion39%
Backlog still being worked
+
Operational Signals
Likely friction pointBasket review to payment
Primary affected segmentReturning shoppers
Operational confidenceModerate
Opened to explain lower completion among high-intent sessions and assign corrective work across retail operations.
+
+
Use this review to align next actions before policy, copy, or service changes are released to the live store.
+ Live intakeQuality watchConversion follow-upOps owned
+
+
+
+
+
+
+
+
In review
Track acquisition quality, conversion movement, and follow-up actions across the active growth pipeline.
This center is used by product, growth, and operations leads to watch whether new demand is converting cleanly through the onboarding path. The focus is not just volume; the team is checking for quality drift, stalled follow-up, and pockets where strong demand is arriving without the right handoff.
Nina PatelGrowth Operations Lead
+
Qualified entries
18,240
Up from prior review window
Activation rate
42.6%
Holding above internal target
Review backlog
126
Mostly routed to growth ops
Escalations open
9
Awaiting owner response
+
+
+
+ Loading view
+ Conversion activity
+
+
+
+
+
Loading live workspace view...
+
+
+
+
+
+
Operator Note
+
Growth is healthy, but the team is watching for hidden conversion loss caused by review delays and missed ownership. Fast cleanup now protects the pipeline before backlog pressure becomes a broader onboarding problem.
+
+
+
+
+
+
+
+
Support Notes
+
The current operating picture shows healthy intake with a small rise in manual review work. Activation remains steady, but several owner queues are carrying delayed responses. Teams are using this view to rebalance assignments, clear exceptions, and protect conversion quality before backlogs spread.
+
High-intent traffic is arriving faster than expected in two priority segments.
Manual review volume increased after stricter duplicate detection rules were applied.
Most open risks are tied to delayed owner follow-up rather than low demand quality.
Support notes indicate a small cluster of onboarding confusion at the verification step.
+
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
+
Recent Team Activity
+
Latest operational updates across intake, review, and follow-up.
+
+
+
+
+
+
+
+
Unclaimed high-intent records rising22 items without owner in priority intake
High
Verification step complaints increasingSupport flagged repeated confusion in setup flow
Medium
Duplicate review queue above bufferManual checks exceeded normal handling range
Medium
+
Clear stale owner assignmentsRecheck records untouched beyond response target
Open
Verify routing rules for priority segmentConfirm latest intake is reaching trained operators
Pending
Compile support friction summaryPrepare concise note for product handoff
In progress
+
Ops reassigned dormant records to active ownersQueue coverage improved after shift balancing
Support attached fresh setup complaintsLanguage around verification is being reviewed
Priority channel intake remained above baselineQuality checks show no major drop in intent
Manual review team requested temporary reliefException handling load rose after policy update
+
+
+
Operational Insight
+
Teams are working from the same operating thread so owners, approvals, and follow-up notes stay aligned through the current cycle.
+
Owner follow-up coverage71%
Below expected response target
Queue cleanup58%
Oldest pending records still in review
Verification issue triage83%
Most support notes already categorized
+
Recent Changes
Intake threshold crossed
Routing limits adjusted for priority channels
Duplicate rule tightened
Manual review queue expanded to absorb exceptions
Owner follow-up audit started
Unclaimed records reassigned to active operators
Verification friction flagged
Support and product reviewing step wording
Open queues5
Avg response lag2.8h
Owners active14
+
+
+
Use this center to confirm queue health before routing additional demand to shared owners.