The main exception came from water intake, which rose during extended cleaning and restart checks after a short interruption on one line. The increase was reviewed by operations and maintenance and is not being treated as a loss event at this stage.
- Base electrical load improved after non-process fans were isolated during idle periods.
- Compressed air demand stayed even, with no signs of sustained leakage during the late run.
- Boiler efficiency remained acceptable after burner tuning completed earlier in the cycle.
- Water variance should be rechecked once final sanitation logs are posted.