Sync 462: 32 new resources; deep a11y/SEO/consistency pass; refreshed translations and social card
Browse files
meta/MAINTENANCE_CALENDAR.md
CHANGED
|
@@ -36,7 +36,7 @@ The upstream Awesome 30-day rule opens the submission window on 2026-07-10. Befo
|
|
| 36 |
|
| 37 |
- [ ] Run the full preflight in [AWESOME_SUBMISSION.md](AWESOME_SUBMISSION.md#required-preflight) and fix every actionable finding.
|
| 38 |
- [ ] Confirm `awesome-lint` passes locally and against the public GitHub URL.
|
| 39 |
-
- [ ] Confirm the README scope, contribution guide,
|
| 40 |
- [ ] Review at least four open PRs in `sindresorhus/awesome` with substantive comments.
|
| 41 |
- [ ] Draft the `Add Loop Engineering` PR title, entry (URL ending in `#readme`), and PR body.
|
| 42 |
- [ ] Confirm a tagged release and a green Quality run on `main`.
|
|
|
|
| 36 |
|
| 37 |
- [ ] Run the full preflight in [AWESOME_SUBMISSION.md](AWESOME_SUBMISSION.md#required-preflight) and fix every actionable finding.
|
| 38 |
- [ ] Confirm `awesome-lint` passes locally and against the public GitHub URL.
|
| 39 |
+
- [ ] Confirm the README scope, contribution guide, and license are present and current (note: CI and last-updated badges were deliberately removed per awesome-list guidelines; keep only the Awesome badge).
|
| 40 |
- [ ] Review at least four open PRs in `sindresorhus/awesome` with substantive comments.
|
| 41 |
- [ ] Draft the `Add Loop Engineering` PR title, entry (URL ending in `#readme`), and PR body.
|
| 42 |
- [ ] Confirm a tagged release and a green Quality run on `main`.
|