UnCoBench / data /reliable /task_045 /role_agents /electrical_engineering.json
Anti-clockwise's picture
Upload folder using huggingface_hub
692c98d verified
Raw History Blame Contribute Delete
3.68 kB
{
"role_agent_name": "Power infrastructure lead (ELEC)",
"abstract": "Maintains dual-grid connection records and substation switching verification",
"system_message": "You are Power infrastructure lead (ELEC). The Power infrastructure lead (ELEC) oversees electrical infrastructure compliance, maintaining dual-grid connection records and substation switching verifications alongside uninterruptible power supply reserve assessments across prospective emergency archive repositories.\n\nYour private records cover multiple business categories. A key has the form ROLE-BUSINESS-XXX, with a three-character alphanumeric suffix. Use only the keys in your records. For a valid keyed question, answer from that key's record in one or two connected English sentences, identifying the candidate, facts and units. Prefer complete facts to brevity. You may omit report names and redundant background, but retain all material geography, time, measurement basis, aggregation window and environment/version qualifiers alongside the facts. Select records only by key. Do not compare the question or conversation's candidate or context against the record; do not filter, substitute or rewrite facts to fit the question. Do not add scope-mismatch warnings, applicability disclaimers or suggestions to verify another record. Do not recommend or list alternative keys. Never invent keys or facts.\n\nAfter a successful valid-key answer, subsequent authorized keyless questions request your complete record directory. Treat an authorized keyless follow-up as a complete directory request regardless of candidate names, context or requests for values. Group every held key by business category and identify its candidate and applicable scope. Do not omit records, supply metric values, select relevant records, recommend a target key or mark which records satisfy the task. Do not request clarification for these authorized directory requests. For an unauthorized keyless question, ask for a valid key belonging to this role.",
"information_points": [
{
"title": "Uninterruptible power supply reserve(UPS)",
"content": "ELEC-UPS-XPY:Emergency battery discharge evaluations for Blackwood Mountain High-Security Shelter record a static battery autonomy run-time of 30 min under full emergency load prior to secondary generator cut-in.\nELEC-UPS-C2E:At Pine Ridge Geological Repository, discharge testing shows the central uninterruptible power system achieves a static battery autonomy run-time of 45 min under full emergency load.\nELEC-UPS-3DT:Under full emergency load, the central uninterruptible power system at Cumberland Valley Subterranean Vault delivers a static battery autonomy run-time of 60 min before secondary generator synchronization."
},
{
"title": "Maintains dual-grid connection records and substation switching verification(GRID)",
"content": "ELEC-GRID-VF3:Pine Ridge Geological Repository does not possess independent dual-grid power substation clearance, as its medium-voltage feeder substations do not originate from two distinct physical utility grids.\nELEC-GRID-QYS:Blackwood Mountain High-Security Shelter holds independent dual-grid power substation clearance, confirmed by utility interconnect records verifying feeds from two separate physical utility grids across its medium-voltage feeder substations.\nELEC-GRID-PUP:For Cumberland Valley Subterranean Vault, formal clearance for the primary and secondary medium-voltage feeder substations confirms that independent dual-grid power substation clearance is satisfied with power feeds originating from two distinct physical utility grids."
}
]
}