Commit History

27 days ago

  1. Explain the Figure 1 dash and unresolved telemetry in the caption⁠

    Verified signature
    00e61d8
  2. Align Electronics submission figures and tables; preserve measurements⁠

    Verified signature
    d5f4a97

28 days ago

  1. Publish complete Electronics submission: A100, MI250X, paper and raw evidence⁠

    Verified signature
    4f246c1
  2. Publish complete Electronics submission: A100, MI250X, paper and raw evidence⁠

    Verified signature
    0100997
  3. Publish complete Electronics submission: A100, MI250X, paper and raw evidence⁠

    Verified signature
    1227045
  4. Add Electronics revision snapshot (curated evidence at reproduction tag electronics-revision-2026-10-r2) (part 2)

    Verified signature
    2f451af
  5. Add Electronics revision snapshot (curated evidence at reproduction tag electronics-revision-2026-10-r2)

    Verified signature
    2c4cefd
  6. Add raw MI250X cross-accelerator evidence (2026-10-22)

    Verified signature
    8a1e757
  7. Add raw MI250X cross-accelerator evidence (2026-10-22)

    Verified signature
    454b3eb

  1. Release audited measurement study and larger-model evidence

    Verified signature
    d8321f8
  2. Publish verified admission-20260915-7b534ef benchmark and paper

    Verified signature
    f1172f1
  3. Publish documented resource-transfer benchmark, revised paper, and MIT original-material license

    Verified signature
    5e443bc

  1. Release critically revised manuscript and fully audited batch-by-logging control

    Verified signature
    7bae491
  2. Record public benchmark availability and manuscript snapshot provenance

    Verified signature
    c9bd99f
  3. Publish frozen RLVRAMBench evidence for paper revision 2897476

    Verified signature
    68aa8e0
  4. initial commit

    Verified signature
    e3cbbb3