File size: 32,111 Bytes
f06250e
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500
1501
1502
1503
1504
1505
1506
1507
1508
1509
1510
1511
1512
1513
1514
1515
1516
1517
1518
1519
1520
1521
1522
1523
1524
1525
1526
1527
1528
1529
1530
1531
1532
1533
1534
1535
1536
1537
1538
1539
1540
1541
1542
1543
1544
1545
1546
1547
1548
1549
1550
1551
1552
1553
1554
1555
1556
1557
1558
1559
1560
1561
## Page 1

FORMWORK

A STUDY OF ITS VARIOUS TYPES, MATERIALS AND
CONSTRUCTION TECHNIQUES

|
}

---

## Page 2

INTRODUCTION TO FORMWORK

What is Formwork?

Formwork in construction is the use of support structures and
moulds to create structures out of concrete which is poured

into the moulds. Formwork can be made using moulds out of
steel, wood, aluminium and/or prefabricated forms.

Formwork is an ancillary construction, used as a mould for a
structure. Into this mould, fresh concrete is placed only to
hgfden subsequently.

The construction of formwork takes time and involves
expenditure up to 20 to 25% of the cost of the structure or
even more.

The operation of removing the formwork is known as stripping.
Stripped formwork can be reused. Reusable forms are known
as panel forms and non-usable are called stationary forms.

Formwork is designed according to The ACI document SP-4.

---

## Page 3

A good formwork should satisfy the following requirements:
Strong enough to withstand all types of dead and live loads

Rigidly constructed and efficiently propped and braced both horizontally and vertically, so as to
retain its shape

The joints in the formwork should be tight against leakage of cement grout

Construction of formwork should permit removal of various parts in desired sequences without
damage fo the concrete

Material of the formwork should be cheap, easily available and should be suitable for reuse

The formwork should be set accurately to the desired line and levels should have plane surface.
AS light as possible

Material of the formwork should not warp or get distorted when exposed to the elements
Should rest on firm base

The following points are to be kept in view to effect economy in the cost of formwork:

The plan of the building should imply minimum number of variations in the size of rooms, floor area
etc. so as to permit reuse of the formwork repeatedly.

Design should be perfect to use slender sections only in a most economical way.

Minimum sawing and cutting of wooden pieces should be made to enable reuse of the material a
number of times. The quantity of surface finish depends on the quality of the formwork.

---

## Page 4

CATEGORIES OF FORMWORK

Conventional: The formwork is built on site out of timber and plywood or moisture-resistant particleboard. It is
easy to produce but time-consuming for larger structures, and the plywood facing has a relatively short
lifespan. It is still used extensively where the labour costs are lower than the costs for procuring reusable
formwork. It is also the most flexible type of formwork, so even where other systems are in use, complicated
sections may use it.

Modern-Day Formworks: This formwork systems are mostly modular, which are designed for speed and
efficiency. They are designed to provide increased accuracy and minimize waste in construction and most
have enhanced health and safety features built-in. The main types of formwork systems in use now are:

of

Table form/flying form
System column formwork
Horizontal panel

Slip form

Tunnel form

Engineered/Pre-fabricated Formworks: This formwork is built out of prefabricated modules with a metal frame
(usually steel or aluminium) and covered on the application (concrete) side with material having the wanted
surface structure (steel, aluminium, timber, etc.). The two major advantages of formwork systems, compared to
traditional timber formwork, are speed of construction and lower life-cycle costs (barring major force, the
frame is almost indestructible, while the covering if made of wood; may have to be replaced after a few -ora
few dozen — uses, but if the covering is made with steel or aluminium the form can achieve up to two thousand
uses depending on care and the applications).

---

## Page 5

MATERIALS USED

Formwork are mainly of two types
Steel formwork
Wooden formwork

Steel formwork is made of
Steel sheets
Angle Iron
Tee Iron

Wooden formwork consists of
Props
Planks battens
Ledgers
Sheeting

Steel Formwork

---

## Page 6

Timber formwork:

Most common material used for
bracing the member, hence called
as the traditional formwork.

can easily be cut to size onsite.
Joist are replaced with engineered
wood beams and supports are
replaced with metal props. This
makes this method more systematic

and reusable.

Various sizes of members of timber

Sheeting for slabs,
beam, column side
and beam bottom

25mm to 40mm

thick

mm
75 x 100mm to
100 x 100 mm

---

## Page 7

Plywood

- This is by far the most common material
used for the facing panel. It is easily cut
to shape on site, and if handled and
stored carefully, it can be used many
times.

- Astandard plywood thickness on site is
18mm. This is usually sufficient for most
pours.

- However, if the formwork is curved, a
thinner plywood is used to facilitate
bending.

- Thicker plywood may be used when the
weight of concrete causes a standard
thickness plywood to bow out, distorting
the concrete face.

---

## Page 8

Steel formwork:

- Steel forms are stronger, durable
and have longer life than timber
formwork and their reuses are more
in number

- Steel forms can be installed and
dismantled with greater ease and
speed.

- The quality of exposed concrete
surface by using steel forms is good
and such surfaces need no further
treatment.

- Steel formwork does not absorb
moisture from concrete.

- Steel formwork does not shrink or
warp

---

## Page 9

Aluminium formwork

Often used in pre-fabricated
formwork, that is put together on site.

Aluminium is strong and light, and
consequently fewer supports and ties
are required.

The lighter sections will deflect more,
but this can be avoided by simply
following the manufacturers
recommendations.

---

## Page 10

Plastic formwork

Glass reinforced plastics (GRP) and
vacuum formed plastics are used
when complicated concrete shapes
are required (e.g. waffle floors).

Although vacuum formed plastics

will always need support, GRP can
be fabricated with integral bearers
making it self supporting.

Like steel, plastic formwork can be
re-used many times, as long as care
is taken not to scour the surface
whilst vibrating the concrete.

---

## Page 11

PROCESS OF FORMWORK
CONSTRUCTION

FORMWORK FOR VARIOUS STRUCTURAL MEMBERS

Construction of formwork:

This normally involves the following operations:
Propping and centering
Shuttering
Provision of camber

Cleaning and surface treatment

---

## Page 12

FORMWORK FOR WALL

It consists of
* Timber sheeting
* Vertical posts
* Horizontal members
* Rackers
* Stakes
* Wedges

After completing one side of formwork
reinforcement is provided at the place
then the second side formwork is provided.

. ZS

ZA “a SOAS 4, SSS SSP LF RD ESTA ONS

2

TIMBER SPACER
BOLT WITH NUT& HEAD

STRUTS AT EQ AL
SPACING
BOARDING

BRACINGS

a ONL

WOODEN BLOCKS
PACKING

---

## Page 13

Wall Formworks and its components

Floor soffit Timber joists to support the floor soffit

Metal prop (tubular frame)

---

## Page 14

It consists of the following
— Side & End Planks
— Yoke
— Nut & Bolts

Two end & two side planks are
joined by the yokes and bolts.

---

## Page 15

| Erection sequence for a column

Prior to positioning column formwork check that steel for the column
has been inspected and cleared for casting.

-Propping

- Position formwork for the column from predetermined grids. Prop

- Plumb formwork both ways and securely support using adjustable
steel props.

- The propping angle should be 45° to the floor.

- - Ensure the steel props are safely secured to the column formwork
and the
flooryand that adjustment for pushing and pulling is operational.

- Serout the positions of column clamps from a storey rod.

ansfer the column clamp positions from the storey rod onto colu

mn formwork.

Use nails to support the arms of column clamps while wedging.

Position and wedge the bottom, middle and top clamps sets.

Check the formwork at the top for square.

Position and wedge the remainder of the column clamps.

Using a plumb bob suspended from a gauge block plumb the

COLUMN CLAMPS IN POSITION

column. Column clamps are created to give extra
external support to the formwork from
When all the column formwork is securely propped a final check must avoiding circularing of the column

be made for plumb and column alignment before and immediately
after the concrete has been poured and vibrated.

---

## Page 16

MS. Bars

35 mm TH Boarding

$0 x 100 Batten

20 min D budt
Wedge

Vashout --
hole

Ww

Adjustable steel clamps

Bolts through timber yokes

ADJUSTABLE STEEL CLAMPS

Wxtteste top and bottom

sTOREY ROO

Nails to provide temporary support for
clamps ]

Arms ready to intertock around coturnn-
note positions of returned ends
TEMPORARY GUPPORT FOR COLUMN CLAMP

---

## Page 17

CIRCULAR AND OCTAGONAL COLUMNS

Circular column formwork / STWPENER IBS

Fabricated steel, usually two piece, and often with
a hinge.

Fibre cement pipes which are left in place as perm
anent formwork.

Timber sheathing tied with standard column clamp
s. Corners need to have infill pieces. Alternatively,
etal strap can be used without the need for corn
er infills.

Fabricated steel with bolted joints

Vertical steel two piece form column

TIMBER FRAME

Vertical Timber sheathing column

---

## Page 18

COLUMN BRACING FORMWORK

*Column formwork bracing performs two functions:

¢lt must maintain the accuracy of the column form position and plumb so that it is
within tolerance.

¢Withstand results of forces acting on either the column formwork or the bracing.

The forces may be wind or impact. These impact forces can occur from the coll
ision of Concrete buckets or cranes hoisting materials

wn i COLUMN Fromm
ihe went
‘Va ‘ j

HINGE TO TOP OF PROF
eoureo TO COLUMN FORM

PROP CATENSION
WHEN IM TENSION

PROF TIGHTENLD AGAINST
_- COLUMN CLamr

Fact of

HINGE TO BOTTOM OF
FORMwoRK

PROF BOLTED TO Siab

WOOD MLOCK SHOT
Se 'O Sean

---

## Page 19

FORMWORK FOR BEAM

Beam soffit must be thickened timber or strengthened plywood.

Beam sides 18mm plywood or 25mm boards, with studs (cleats)
at 500 to 600mm centres.

Deep beams (over 600mm) should have walkers and fies.
Use angle fillets in the beam side to soffit joint where possible.

owance must be made for height adjustment of the props or

Erection sequence for constructing beam formwork includes
¢ Position of sole plates;

¢Marking out and setting heights for falseworks;

bearers and Spreaders;
«Construct and erect side walls and beam soffit.

¢ Position of sole plates

Assemble and position props, adjustable head jacks, falseworks ,

p> 25 x 50 ties at 600 c/c

15 mm thick plywood 75 x 25 cleats
sdes at 600 c/c
— alternative
fixing teat— fixing cleat
75 x 50 crosshead _ 21 mm thick plywood
or headtree - soffit
w.i. dogs to both sides
100 x 75 props at
folding wedges 1-200 c/e
for adjustment —

a: 225 x 75 sole plate

21 men track plywood softer

18 mam thack plywood beam wes.

---

## Page 20

FORMWORK FOR STAIRCASE

¢Points fo consider when designing stair form work :

Stair formwork must support the weight of concrete.
The weight of the throat of the stair and the steps will
have to be supported.

Because of the slope of the stair, some of the force is
transmitted sideways. All formwork must be well tied
togéther to prevent sideway movement.

onsider the finish of the stair treads and type of nosing.
Space may have fo be left for purpose made nosing.

———

Y
———— f ot bridytng

---

## Page 21

SUSPENDED SLABS

Suspended floor slabs can be constructed using cast in-
situ, precast units or a combination of both.

Whichever method is used, it is important to support the
roposed method ofconstruction using a combination o
f timber or steel bearers and adjustable shoring.

The spacing and type of support system required is
determined by the load imposed during the
construction process.

Manufacturers provide tables to assist in the selection
and spacing of adjustable shoring
systems.

Standard slab formwork

The erection sequence for constructing a
suspended floor slab includes:

¢ Determining the bearer spacing;

¢ Erecting bearers and joists;

¢ Fixing the sheeting;

¢ Preparation for concrete.

---

## Page 22

SOLE PLATE

one vertical support member to the foundation

The vertical support requires a base plate fitted to help
pooren. the load to the sole plate, which is usually a
eper.

If the sole plate is positioned on natural ground, it is
important the ground is graded and consolidated to a
level surface.

The objective is to achieve maximum bearing beneath
sole plate. Once sole plates are positioned and firmly be
dded they should be checked for level. Form Work for concrete Beams & Slabs

---

## Page 23

\

---

## Page 24

Curing is the process in which the concrete is
protected from loss of moisture and kept within
a reasonable temperature range. The result of
this process is increased strength and
decreased permeability. Curing is also a key
player in mitigating cracks in the concrete,
which severely impacts durability

The length of adequate curing fime_ is
dependent on the following factors:

Mixture proportions

Specified strength

Size and shape of concrete member
Ambient weather conditions

Future exposure conditions

Deshuttering is a process after curing

---

## Page 25

DESHUTTERING

DESHUTTERING in simple means, the process of removing the shuttering (Formwork for
Concrete).

Order and method of removing formwork:

Shuttering forming vertical faces of walls, beams & column sides should be removed first.
Shuittering forming sofit to slab should be removed next.

huttering forming soffit to beams, girders or other

heavily loaded members should be removed in the end.

Factors considerd :

Concreting is done under normal circumstances
Cement used is Ordinary Portland Cement
Adequate curing is done

Ambient temperature is not fall below 15 degree

---

## Page 26

DESHUTTERING AGENTS

There are chances of concréte sticking to the formwork

Hence deshuttering agents are used to ease the process
Dosage / Coverage:

Dilution ratio: KEM MRA 2: water at 1:10. Coverage: 1600 sq. ft. depending
on conditions of formwork

KEM MRA 1 - 25 / 30 mia% / liter depending upon the porosity and usage
condition of the substrate

---

## Page 27

TRADITIONAL FORMWORK

Timber form work was used traditionally later it
got replaced with modem materials due to its
limitations and cost factors

Formwork is built on site with timber and ply or
oisture resistant particle board.

It is easier to produce but the time taken is
more

Extensively used where the labor cost s are low ,
Usually timber in the form of
plywood, planking,
batten and joist are used as
the basic material.

It is the most flexible type of formwork

Human workers need to enter
into every comer to perform
the formwork installation works

---

## Page 28

re

XPLORING NEW FORMWORK TECHNIQUES

---

## Page 29

| SLIPFORM TECHNOLOGY
INTRODUCTION:

*Method of vertically extruding a reinforced concrete
section and is suitable for construction of core wallsin
high-rise structures — lift shafts, stair shafts,towers.

‘The formwork rises continuously, at a rate of about 300
mm per hour, supporting itself on the core and not
relying on support or access from other parts of the
building or permanent works.

«Allows for the continuous pouring of concrete into walls
of a structure and only stops when the full required
height of the structure has been reached.

‘The height of the formwork is designed in such a way
that while the top of the formwork is being filled by
concrete the lowest layer of concrete poured earlier ' : ‘
has already gained an initial set. When the formwork is “ae : 4 on
moved upwards the concrete that is then exposed ; . , ;
remains firm. :

CHEUNG KONG
CENTRE

---

## Page 30

| PROCEDURE :

«Assembly can only start once the foundations are in place and
the wall starter is in correct alignment.

*Slipform shuttering is aligned with the help of yokes.

*Horizontal crossbeams connect these yokes.

[Top Deck]
«Hydraulic jacks are atiached to these crossbeams for

simultaneous upward movement. eG
(Panel)

(Top Deck)
*Height of the slipform ranges from 1.1 to 1.5 metres. -

*Yokes and crossbeams also used to support the working
platform

«Structure should be rigid and shape maintained at all times.

*Make sure there is no lag or else if prevents the structure from
free upward movement

* Itis also possible to reduce wall thicknesses

as the construction gains height and arrangements
have to be made in the slipform structure that will
enable such reduction at regular intervals.

---

## Page 31

Concrete Supplier
Top Deck
Lattice Truss
Yoke

Lift Jack

Working Deck

Concrete Form

Hanging Deck

ERECTION OF A TOWER USING SLIPFORM

---

## Page 32

HORIZONTAL FORMWORK :

*Slipform methods of construction
can also be adapted to horizontal
structures and are used for paving,
canals, and tunneling.

* The technique is more in use for
structures that have continuous walls
like silos , chimneys, and piers for
very tall bridges.

* It has also been successfully used for
construction of buildings, although
this requires the manner of leaving
inserts for openings like doors and
windows to be decided well in
advance, as well as also any
necessary inserts to support floor slabs
after the walls are constructed.

---

## Page 33

ADVANTAGES:

*A major cost of concrete structure construction is the
required formwork to retain the concrete fill it can be safely
de-shuttered and be able to support itself and other imposed
loads.

*The formwork needs to be continually removed to newer
locations and then re-erected.

*Continuous use of manpower and lifting equipment like
cranes.

«In the case of slipform building, the formwork is erected only
nce and remains intact until the entire structure is
completed.

*Great reduction in the cost of formwork as

well as time saving for re-erection.

*Cost effective

*Saving onto the labour cost otherwise

used for intermittent concreting operations.

‘The reduction in the movement of formwork
and workers also leads to far more safe working
conditions that also make if a major advantage.

---

## Page 34

fa)

Sa Saat ah A A Gn a ae eae

PRECAUTIONS

* Concrete is continuously protected against loss of moisture and
rapid temperature changes for 7 days

* Unhardened concrete is protected from rain and flowing water
* Prevent plastic shrinkage
* Plastic cracks are filled by injection of epoxy resin.

Reinforcing bars

Fresh concrete may be lifted from
the hardened part

Steel bar hinders
fresh concrete flow &

and causes cracking

---

## Page 35

RELATION BETWEEN
CONCRETE SETTING TIME
AND SLIPFORM RATE:

elt is calculated by using the
following equation:

Vs =(h1- h1) / (ts— tt)

Where

Vs —slipform rate (mm / h)

HI = the distance from the top
of the slipform panel to the
average curing front (mm)

H2 = The distance from the top
of the slipform panel to
average freeboard (mm)

Ts = setting time (h)

Tt = Time from mixing concrete
to placing

a gas slip form

design

Yoke leg Top Deck

KICT Intergrated Configuration
Control System

| Bade
GPS
ki Wireless.
plumb |

---

## Page 36

TUNNEL FORMWORK SYSTEM

sTunnel formwork system allows the contractor to cast walls and slabs
in one operation ina daily cycle.

elt combines the speed, quality and accuracy of factory/off-site
production with the flexibility and economy of in-situ construction

* Recognized as a modern method of construction (MMC).

---

## Page 37

The result is a cellular reinforced structure, the surfaces of which are
sufficiently high quality to require only minimal finishing for direct
decoration, while the end walls and facades are easily completed with
thermally insulated units that can be clad as required.

The system creates an efficient load-bearing structure for use in a wide
variety of applications.

Itis particularly effective in projects suited to repetitive cellular
construction such as residential blocks, hotels, student accommodation,
bo rracks and prisons.

---

## Page 38

ADVANTAGES:

Cost

cost-effective, high quality construction,
generating significant savings in time
and costs over alternative methods
without compromising on design

Building

The repetitive nature of the system and the use of prefabricated forms
nd reinforcing mats/cages simplifies the whole construction process,
producing a smooth and fast operation

Quality

Quality is enhanced despite the speed of construction. The precise,
even steel face of the formwork creates a smooth, high quality finish
capable of receiving direct decoration with the minimum of
preparation (a skim coat may be required). This reduces the
requirement for following trades, thus providing additional cost savings
and speeding the entire process.

---

## Page 39

Design

The large bays constructed provide exceptional flexibility in the
design and layout of the building and allow a high degree of
freedom in the final appearance.

Safety

Integral working platforms and edge protection systems. The
repetitive, predictable nature of the tasks involved encourages
familiarity with operations. The minimal requirement for tools and
quipment further reduces the risk of accidents on site.

Sustainability

The in-situ casting of units on site and the local availability of ready-
mixed concrete supplies reduce transportation impacts.
Just-in-time deliveries and near zero wastage produce an overall
tidier site with associated cost savings and safety benefits.
Concrete’s thermal mass coupled with correct insulation and boiler
design minimises heating costs and can even reduce air-
conditioning requirements.

---

## Page 40

GENERAL FACTS :

Tunnel formwork come in half units and in the form of an inverted “L”
which are bolted together at the top to form each tunnel. The inbuilt
wheels and the jacks help the formwork move in and out of the
position and adjusted to the final height.

The factory-made steel formwork can be re-used up to 600 times
and it can suit a variety of module sizes. This makes the method of
construction very versatile and extremely economical.

Tunnel-form work allows a 24-hour construction cycle to be achieved
and thus the buildability of in-situ concrete is improved by choosing
this type of formwork.

---

## Page 41

The Casting Process of Tunnel Formwork:
1) Stage One: Prefabricated Wall reinforcement is placed by

crane along the entire wing prior to casting the kickers (used to
position wall formwork).

Wal remforcement,
4

2) Stage Two: Two and a half tunnel is craned into place, bolted
together and ties are added.

Wat remforcement,

---

## Page 42

3) Stage Three: The wall concrete is poured.

Wat remforcement

4) Stage Four: The slab reinforcements are fixed

Wal rem forcement.

4

---

## Page 43

5) Stage 5: The slab concrete is placed. The formwork system provides
for a pour to be wrapped in tarpaulins and for the use of butane

heaters to maintain a sufficiently high temperature for the concrete to
reach its striking strength overnight.

6) Stage 6: The tunnel-forms are removed next day.

Wal remforcement

---

## Page 44

7) Stage 7: The process is repeated for the next two bays.

, Wal remforcement_
‘

Tunnel form can produce strong and durable in-situ cellular
structures. This method of construction can achieve time
savings up to 25% with cost savings of 15%.

Since the concrete finish is very good, the requirement for post
construction trades such as plasterers and electricians are
greatly reduced.

---

## Page 45

Honzorta! Panel
Stab Stopens

Wal Stopend
Vertical Panel (inner)
Push Put Prop
Wheeled Prop
Wheeled Prop Support

COMPONENTS OF TUNNEL FORMWORK

---

## Page 46

COLUMN SYSTEM FORMWORK

The column formwork

systems now available are
normally modular in nature
and allow quick assembly

) and erection on-site while

minimizing labor and
crane time. They are
available in steel,
aluminium and even
cardboard (not reusable
but recycled) and have a
variety of internal face
surfaces depending on the
concrete finish

i required. Innovations have

led to adjustable, reusable
column forms which can
be clamped on-site to give
different column sizes.

---

## Page 47

Benefits

‘Increased speed and efficiency in construction
‘The requirement of skilled labor is reduced due to
the

simplicity of assembly and disassembly.

«Metal column forms can be assembled and erected
more easily than traditional formwork.

* Disposable forms come ready assembled to site. ijl
*High quality surface finishes are possible. |
‘The highly engineered nature of the metal formw
yste ‘to the formwi

16mm bolts or
threaded rods hardwood

rs |

=<

column shutters
timber yoke ply and say 375 x 36

say 100x 75

---

## Page 48

Safety

«Metal formwork systems can have
integral ready-to-use concreting
platforms with guard rails and access
equipment including ladders. This
reduces the need for independent
access.

*For systems with disposable formwork,
working platforms for concreting have
to be erected separately to allow safe
access to the top of the column forms.
*Formwork systems are available which
need to be worked only from one side.
This could be an important safety
consideration for columns situated at
building edges and corners.

*Metal systems typically provide robust
assemblies.

*Assembly process is simple allowing site
operatives to become familiar with
health and safety aspects.

*Normally these formwork systems
require minimal use of power tools.

---

## Page 49

Other considerations

Column forms are designed for specific maximum concrete
pressures. The concrete placement rates have to be adjusted
to keep the concrete pressure within the specified limits.

The assembled formwork has to be restrained at the base
propery to avoid displacement, and grout loss during

vertical beam

fasterner

SCAFFOLD FOR COLUMN

---

## Page 50

M
~~
O
=
=
oO
O
LL
a)
Lu
_—
<
O
ag
faa)
<
Lu
Ww
as

---

## Page 51

ADVANTAGES OF PRE- FABRICATED FORMWORK

* Very little on-site skilled labor needed.

* The ability to reuse forms either as a large section or as
individual units.

* All prefabricated systems are designed for light as well as
heavy construction.

* Contractors can bid almost any type of work; straight,
battered, curved or cut-up.

* Prefab forms may be set in any combination, horizontally and
vertically, fo any wall height.

* On high walls, one side of forms can be erected and ties
placed; then the close-out side can be erected during
placement, minimizing concrete drop and assuring effective
vibration.

---

## Page 52

QO2Z>OQ

Oe = <7 Om

In a prefab system the contractor can remove
and replace forms at any point. This simplifies
erection and stripping, which can be started at
any location.

To allow for a casting pocket, a panel is simply
removed and replaced maintenance of forms
can be a tiresome task, but well-maintained
forms mean more reuses.

A big advance in prefab forming has been the
development of gang forming, which is simply
defined as the grouping together and moving
of a number of forms as a single unit.

The success of gang forming is due fo the
development of easy-to-use hard w a re and
ties, made _ especially for this forming
technique.

Since pre forms are pre - engineered and
precision made, they offer the best materials
available and work equally well on all jobs,
resulting in lower cost per use. Although
prefabricated forms work well on any size job,
the small job is a good way fo introduce the
system to the workmen.

---

## Page 53

DRAWBACKS

* High cost factor

* Greater transportation cost, due to the large
pieces, where as the regular formwork can be
transported easily .

* Too many pieces involved in the pre fabricated
formwork

*, Pre fabricated formwork, leave poor finishes at the
joints of the forming members.

Pre“fab formwork deflect during placement.

Tye first cause of deflection is the rate of placing,

ich is usually too fast.

If recommended placing rates are followed and

there is good supervision of placement and

vibrating, the problem of deflection can be

controlled.

With many prefab systems, panels can be re m

oved at different locations and used as casting

pockets.

This procedure avoids dropping the concrete a

great distance and helps to maintain a more

constant rate of placement.

---

## Page 54

POINTS OF
DIFFERENTIATION

MATERIAL USED

TIME
CONSUMPTION

Pas SPAN

USED IN

FLEXIBILITY

CONVENTIONAL
METHOD

TIMBER ( Plywood
Or moisture-resistant
Particleboard).

VERY TIME
CONSUMING.
(For large
structures.)

The plywood facing
has a relatively
SHORT LIFE SPAN.

The labour costs are
LOWER than the
costs for procuring
reusable formwork.

MOST FLEXIBLE

MODERN DAY
METHOD

STEEL AND
ALUMINIUM.

DESIGNED FOR
SPEED AND
EFFICIENCY.
(mostly modular)

LONGER LIFE SPAN

The labour costs are
HIGHER than the
costs for procuring
reusable formwork.

LESS FLEXIBLE.

PREFABRICATED METHOD

Frame of ALUMINIUM
covered with ALUMINIUM
OR TIMBER

Work happens
simultaneously with
construction hence saves
time

The frame is very durable
(If made of metal n
aluminium can be used for
2000 times)

The labour costs are HIGHER
than the costs for procuring
reusable formwork.

There is NO FLEXIBILITY after
making the formwork

---

## Page 55

Time of Removal of formwork

OPC Rapid Hardening
Structural Member (Ordinary Portland Cement) Cement

1 Beam sides, walls & Columns 2-3 Days

Slab (Complete Formwork removal) 10 Days
Beams (Removal of Sheeting, Props 8 Days 5 Days
remains intact)

Beams & Arches (Complete formwork 14 Days

removal) (up to 6 m span)

Beams & Arches (Complete formwork 21 Days 8-10 Days
removal) (more than 6 m span)

---

## Page 56

ETA

Sawa 7

TTT) me /A TO gh

wa

|
eS FOS 1 See eee

r

---

## Page 57

Formwork failures are the cause of many accidents
and failures that occur during concrete construction
which usually happen when fresh concrete is placed

Generally some unexpected event causes one
member fo fail, then others become overloaded or
misaligned and the entire formwork structure collapses

Improper stripping and shore removal
Inadequate bracing

Vibration

Unstable soil under mudsills, shoring not plumb
nadequate control of concrete placement
Lack of attention to formwork details

Inadequate cross bracing and horizontal bracing of
shores

Forms sometime collapse when their shores/ jack are
displaced by the vibration caused by:

passing traffic
movement of workers & equipment on the formwork

the effect of vibrating concrete to consolidate it

---

## Page 58

SAFETY PRECAUTION

Material used for the construction of formwork must fulfill the
specification.

Formwork is fixed firmly & properly

Construction area must be protected to prevent vandalism of
formwork.

Warning sign must be put up at the area where the formwork is fixed
to prevent entrance of people that may damage the formwork.

The formwork must be inspected before the concrete is poured.

---

## Page 59

STRIKING, MAINTENANCE, STORAGE OF FORMWORK

Striking :

As column and beam side formwork will be removed before beam and slab
soffit formwork, provision must be made for easy removal and in the correct
order. If beam and slab soffit formwork is to be removed before the concrete
has achieved working strength, permanent propping or shoring is required.
Take care to avoid damage to formwork which is fo be re used. Eight or more
uses may be obtained from timber formwork.

Maintenance Clean forms with stiff brush and clean cold water. Use scrapers
only as a last resort. Keep forms well oiled to prevent delamination of
plywood or rusting of steel and always oil the edges.

Storage of forms Any formwork with steel components should be stored in the
dry. Avoid direct sunlight on timber forms. Store clear of the ground without
twist or bend, and keep free of dirt.

---

## Page 60

THANK YOU

ZEUS PITHAWALLA (37) RITHIKA RAVISHANKAR(40)  EKTA SHAH(44)
GARIMA RAJPUT(38) SHIVALI SANAP(41] RAJESH SHELAKE(45)
MANASVI RANE (39) SUVOJIT SEN(43)