| 1 |
+
AC – Actual Consumption
|
| 2 |
+
|
| 3 |
+
Meaning: Measured electricity consumption/load on the grid.
|
| 4 |
+
|
| 5 |
+
Data: Quarter-hourly values of total grid load, residual load, and other consumption-related metrics.
|
| 6 |
+
|
| 7 |
+
AG – Actual Generation
|
| 8 |
+
|
| 9 |
+
Meaning: Measured (real-time) electricity generation by source.
|
| 10 |
+
|
| 11 |
+
Data: Quarter-hourly values for biomass, hydropower, wind (onshore/offshore), photovoltaics, nuclear, coal, gas, etc.
|
| 12 |
+
|
| 13 |
+
AFRR – Automatic Frequency Restoration Reserve
|
| 14 |
+
|
| 15 |
+
Meaning: Balancing reserve activated automatically to stabilize system frequency.
|
| 16 |
+
|
| 17 |
+
Data: Quarter-hourly volumes activated (+/−), procurement prices, and volumes procured.
|
| 18 |
+
|
| 19 |
+
BE – Balancing Energy
|
| 20 |
+
|
| 21 |
+
Meaning: Energy used by TSOs to balance the power system in real-time.
|
| 22 |
+
|
| 23 |
+
Data: May include volumes (MWh) and costs (€/MWh) of balancing energy activated from various sources.
|
| 24 |
+
|
| 25 |
+
CBPF – Cross-Border Physical Flows
|
| 26 |
+
|
| 27 |
+
Meaning: Actual physical electricity flows across national borders.
|
| 28 |
+
|
| 29 |
+
Data: Quarter-hourly measurements of imports/exports (in MWh) with neighboring countries.
|
| 30 |
+
|
| 31 |
+
EBS – Exported Balancing Services
|
| 32 |
+
|
| 33 |
+
Meaning: Balancing services provided by one country’s TSO to another country’s TSO.
|
| 34 |
+
|
| 35 |
+
Data: Quarter-hourly or aggregated volumes (MWh) of balancing energy exported, and possibly associated costs.
|
| 36 |
+
|
| 37 |
+
FC – Forecasted Consumption
|
| 38 |
+
|
| 39 |
+
Meaning: Projected or estimated electricity consumption/load.
|
| 40 |
+
|
| 41 |
+
Data: Often day-ahead or short-term quarter-hourly forecasts of total grid load, residual load, etc.
|
| 42 |
+
|
| 43 |
+
FGDA – Forecasted Generation Day-Ahead
|
| 44 |
+
|
| 45 |
+
Meaning: Predicted generation by source for the next day (day-ahead).
|
| 46 |
+
|
| 47 |
+
Data: Hourly or quarter-hourly forecasted generation volumes for wind, solar, etc.
|
| 48 |
+
|
| 49 |
+
FCR – Frequency Containment Reserve
|
| 50 |
+
|
| 51 |
+
Meaning: Reserve capacity that automatically responds to frequency deviations (primary control).
|
| 52 |
+
|
| 53 |
+
Data: Procurement prices (€/MW), volumes procured, and activation data at quarter-hourly resolution.
|
| 54 |
+
|
| 55 |
+
GFI – Generation Forecast Intraday
|
| 56 |
+
|
| 57 |
+
Meaning: Intraday (within the same day) updates to the generation forecast.
|
| 58 |
+
|
| 59 |
+
Data: Quarter-hourly predicted generation volumes by technology, updated more frequently than day-ahead forecasts.
|
| 60 |
+
|
| 61 |
+
IBS – Imported Balancing Services
|
| 62 |
+
|
| 63 |
+
Meaning: Balancing services a TSO imports from neighboring countries’ TSOs.
|
| 64 |
+
|
| 65 |
+
Data: Quarter-hourly volumes (MWh) of balancing services imported and related costs.
|
| 66 |
+
|
| 67 |
+
MFRR – Manual Frequency Restoration Reserve
|
| 68 |
+
|
| 69 |
+
Meaning: Manually activated reserve used by TSOs to restore frequency and manage imbalances.
|
| 70 |
+
|
| 71 |
+
Data: Quarter-hourly volumes of capacity procured, volumes activated, and procurement prices.
|
| 72 |
+
|
| 73 |
+
SCE – Scheduled Commercial Exchanges
|
| 74 |
+
|
| 75 |
+
Meaning: Planned or scheduled cross-border electricity trades (as opposed to actual physical flows).
|
| 76 |
+
|
| 77 |
+
Data: Quarter-hourly net exports/imports (MWh) based on market schedules.
|
| 78 |
+
|
| 79 |
+
Prices (Originally “Day-ahead Prices”)
|
| 80 |
+
|
| 81 |
+
Meaning: Market-clearing electricity prices, typically from the day-ahead market.
|
| 82 |
+
|
| 83 |
+
Data: Hourly prices (€/MWh) for Germany/Luxembourg and neighboring bidding zones.
|
| 84 |
+
|
| 85 |
+
TSOs (Originally “Costs_of_TSOs_without_costs_of_DSOs”)
|
| 86 |
+
|
| 87 |
+
Meaning: Various costs and expenditures related to Transmission System Operators (TSOs).
|
| 88 |
+
|
| 89 |
+
Data: Monthly or quarterly cost data for network security, countertrading, balancing services, etc.
|
| 90 |
+
|
| 91 |
+
Gen_Capacity (Originally “Installed Generation Capacity”)
|
| 92 |
+
|
| 93 |
+
Meaning: Total installed power generation capacity by technology.
|
| 94 |
+
|
| 95 |
+
Data: Typically annual (sometimes monthly) capacity values (MW) for biomass, wind, solar, nuclear, coal, gas, and other generation sources.
|