doc_id stringlengths 16 25 | page int64 0 635 | chunk int64 0 24 | mention_name stringlengths 2 86 | start int64 0 2.75k | end int64 5 2.78k | extractor_specificity stringclasses 3
values | extractor_typology stringclasses 1
value | specificity stringclasses 3
values | typology stringclasses 11
values | usage stringlengths 6 756 ⌀ | valid_data_mention bool 2
classes | judge_error stringclasses 1
value |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
fcv_pads_east_asia:000340 | 1 | 0 | Procurement Plan tables | 369 | 392 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[5] | false | null | |
fcv_pads_east_asia:000341 | 20 | 0 | grievance log/register | 615 | 637 | descriptive | descriptive | administrative | All submitted complaints and grievances will be entered into the ⟦grievance log/register⟧[6] and archived | true | null | |
fcv_pads_east_asia:000341 | 20 | 1 | grievance log | 813 | 826 | descriptive | descriptive | administrative | The resolutions agreed upon must also be recorded in the ⟦grievance log⟧[7] for purposes of tracking grievance management and reporting | true | null | |
fcv_pads_east_asia:000341 | 22 | 1 | stakeholder surveys | 1,415 | 1,434 | descriptive | descriptive | survey | according to the complainants (during ⟦stakeholder surveys⟧[8] and evaluation) | true | null | |
fcv_pads_east_asia:000341 | 5 | 1 | spatial and land records data | 1,096 | 1,125 | descriptive | descriptive | administrative | Digitization of ⟦spatial and land records data⟧[9], including geodetic improvements | true | null | |
fcv_pads_east_asia:000341 | 6 | 0 | land records | 75 | 87 | descriptive | descriptive | administrative | Digitization of spatial and alpha-numeric ⟦land records⟧[10] | true | null | |
fcv_pads_east_asia:000341 | 6 | 0 | graphical spatial data | 230 | 252 | descriptive | descriptive | geospatial | existing property rights data (titles, deeds, transfer documents, etc.) and ⟦graphical spatial data⟧[11] (survey plans, etc.) | true | null | |
fcv_pads_east_asia:000341 | 6 | 0 | land registries | 702 | 717 | descriptive | descriptive | administrative | The Project supported digitization activities will focus on ⟦land registries⟧[12] in the Nairobi metro area | true | null | |
fcv_pads_east_asia:000342 | 2 | 1 | spatial and land records data | 2,002 | 2,031 | descriptive | descriptive | administrative | digitization of ⟦spatial and land records data⟧[13], including geodetic improvements | true | null | |
fcv_pads_east_asia:000342 | 2 | 1 | property rights data | 2,086 | 2,106 | descriptive | descriptive | administrative | digitizing existing ⟦property rights data⟧[14] (titles, deeds, transfer documents, etc. | true | null | |
fcv_pads_east_asia:000342 | 2 | 2 | spatial and land records data | 128 | 157 | descriptive | descriptive | administrative | digitization of ⟦spatial and land records data⟧[15], including geodetic improvements | true | null | |
fcv_pads_east_asia:000342 | 2 | 2 | property rights data | 212 | 232 | descriptive | descriptive | administrative | digitizing existing ⟦property rights data⟧[16] (titles, deeds, transfer documents, etc.) | true | null | |
fcv_pads_east_asia:000342 | 2 | 2 | graphical spatial data | 279 | 301 | descriptive | descriptive | geospatial | and ⟦graphical spatial data⟧[17] (survey plans, etc.) so that it is fully available in the digital system | true | null | |
fcv_pads_east_asia:000342 | 5 | 0 | 2023/24 Kenya Housing Survey | 552 | 580 | named | named | survey | the ⟦2023/24 Kenya Housing Survey⟧[18] finding that awareness of housing programs and entitlements remains generally low | true | null | |
fcv_pads_east_asia:000342 | 6 | 0 | Kenya National Bureau of Statistics | 772 | 807 | named | named | other | necessitated by ⟦Kenya National Bureau of Statistics⟧[19] (KNBS) data which shows that Kenyans prefer to build their own homes | false | null | |
fcv_pads_east_asia:000342 | 7 | 0 | land records | 369 | 381 | descriptive | descriptive | administrative | Component 2 of the project, which focuses on digitizing ⟦land records⟧[20] | true | null | |
fcv_pads_east_asia:000343 | 3 | 0 | grievance log | 193 | 206 | descriptive | descriptive | administrative | Complaints submitted to the GMs, the ⟦grievance log⟧[21], and progress made in resolving them | true | null | |
fcv_pads_east_asia:000343 | 4 | 0 | KMRC’s ESMS | 1,342 | 1,353 | named | named | system | the exclusion list (which is a part of ⟦KMRC’s ESMS⟧[22]) | false | null | |
fcv_pads_east_asia:000345 | 1 | 0 | Procurement Plan tables | 368 | 391 | descriptive | descriptive | other | Supply and test run the Digital (electronic) registration, licensing and ⟦fisheries data⟧[24] acquisition system | true | null | |
fcv_pads_east_asia:000345 | 2 | 10 | fisheries data | 817 | 831 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[25]: **Not Applicable.** | false | null | |
fcv_pads_east_asia:000346 | 1 | 0 | Procurement Plan tables | 1,494 | 1,517 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[26] | false | null | |
fcv_pads_east_asia:000347 | 1 | 1 | Procurement Plan tables | 126 | 149 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[27] | false | null | |
fcv_pads_east_asia:000347 | 1 | 1 | Procurement Plan tables | 216 | 239 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[28] | false | null | |
fcv_pads_east_asia:000348 | 1 | 1 | Procurement Plan tables | 126 | 149 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[29] | false | null | |
fcv_pads_east_asia:000348 | 1 | 1 | Procurement Plan tables | 216 | 239 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[29] | false | null | |
fcv_pads_east_asia:000350 | 2 | 0 | Procurement Plan tables | 59 | 82 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[1] | false | null | |
fcv_pads_east_asia:000350 | 2 | 0 | Procurement Plan tables | 145 | 168 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[2] | false | null | |
fcv_pads_east_asia:000351 | 37 | 0 | data at PPMO | 697 | 709 | descriptive | vague | other | pre-screening for risks on natural habitats and PCRs using maps and ⟦data at PPMO⟧[3] | true | null | |
fcv_pads_east_asia:000351 | 37 | 1 | data at PPMD level | 811 | 829 | vague | vague | other | pre-screening for risks on natural habitats and PCRs using maps and ⟦data at PPMD level⟧[4] | true | null | |
fcv_pads_east_asia:000351 | 52 | 0 | ESMS | 375 | 379 | named | named | system | Based on the established ⟦ESMS⟧[5] | false | null | |
fcv_pads_east_asia:000351 | 54 | 0 | socio-economic survey | 1,104 | 1,125 | descriptive | descriptive | survey | The common trend is ⟦socio-economic survey⟧[6] ahead of new connection/distribution line project undertakings | true | null | |
fcv_pads_east_asia:000351 | 61 | 1 | data at PPMO level | 1,223 | 1,241 | descriptive | vague | other | pre-screening for risks on natural habitats and PCRs using maps and ⟦data at PPMO level⟧[7] | true | null | |
fcv_pads_east_asia:000351 | 61 | 2 | data at PPMO level | 117 | 135 | descriptive | vague | other | pre-screening for risks on natural habitats and PCRs using maps and ⟦data at PPMO level⟧[8] | true | null | |
fcv_pads_east_asia:000351 | 76 | 0 | records of occupation and community accidents and incidents | 1,705 | 1,764 | descriptive | descriptive | administrative | EEU keeps ⟦records of occupation and community accidents and incidents⟧[9] | true | null | |
fcv_pads_east_asia:000351 | 7 | 1 | data at PPMO level | 1,205 | 1,223 | descriptive | vague | other | pre-screening for risks on natural habitats and PCRs using maps and ⟦data at PPMO level⟧[10] | true | null | |
fcv_pads_east_asia:000351 | 7 | 2 | data at PPMO level | 91 | 109 | descriptive | vague | other | pre-screening for risks on natural habitats and PCRs using maps and ⟦data at PPMO level⟧[11] | true | null | |
fcv_pads_east_asia:000351 | 81 | 0 | sex, age disaggregated data | 1,070 | 1,097 | descriptive | vague | other | including ⟦sex, age disaggregated data⟧[12] for HV-transmission line projects | true | null | |
fcv_pads_east_asia:000352 | 25 | 0 | Baseline survey of re-entry of child | 1,582 | 1,618 | descriptive | descriptive | survey | * ⟦Baseline survey of re-entry of child⟧[13] | true | null | |
fcv_pads_east_asia:000352 | 25 | 1 | baseline survey to generate data on violence against children in schools | 349 | 421 | descriptive | descriptive | survey | conducted a ⟦baseline survey to generate data on violence against children in schools⟧[14] (VACiS) in Uganda | true | null | |
fcv_pads_east_asia:000352 | 29 | 0 | implementation data and data from EMIS | 745 | 783 | descriptive | named | system | The results framework has been updated with ⟦implementation data and data from EMIS⟧[15] as at June, 2025 | true | null | |
fcv_pads_east_asia:000352 | 4 | 1 | daSecondaryEducationExpansionProject | 46 | 82 | named | named | other | ⟦daSecondaryEducationExpansionProject⟧[16] | false | null | |
fcv_pads_east_asia:000352 | 53 | 0 | UGANDA SECONDARY EDUCATION EXPANSION PROJECT BANK BALANCES | 115 | 173 | named | named | other | #### ⟦UGANDA SECONDARY EDUCATION EXPANSION PROJECT BANK BALANCES⟧[17] AS AT 30TH JUNE 2025 | true | null | |
fcv_pads_east_asia:000353 | 11 | 0 | PDO indicator | 473 | 486 | named | descriptive | other | as evidenced by the ⟦PDO indicator⟧[18] # 1 | false | null | |
fcv_pads_east_asia:000353 | 12 | 0 | PDO indicator # 2 | 398 | 415 | named | descriptive | other | as evidenced by the ⟦PDO indicator # 2⟧[19] | false | null | |
fcv_pads_east_asia:000353 | 12 | 1 | PDO indicator # 3 | 1,737 | 1,754 | named | descriptive | other | as evidenced by the ⟦PDO indicator # 3⟧[20] | false | null | |
fcv_pads_east_asia:000353 | 13 | 0 | contract monitoring reports | 1,068 | 1,095 | descriptive | descriptive | report | district officials pledged to implement recommendations from ⟦contract monitoring reports⟧[21] | true | null | |
fcv_pads_east_asia:000353 | 13 | 1 | PDO indicator | 1,692 | 1,705 | named | descriptive | other | as evidenced by the ⟦PDO indicator⟧[22] # 4 | false | null | |
fcv_pads_east_asia:000353 | 14 | 1 | data collected by community monitors | 868 | 904 | descriptive | vague | other | a report based on ⟦data collected by community monitors⟧[23] trained by the project and its partners | true | null | |
fcv_pads_east_asia:000353 | 14 | 1 | data obtained from GPP | 946 | 968 | descriptive | named | system | ⟦data obtained from GPP⟧[24] | true | null | |
fcv_pads_east_asia:000353 | 17 | 1 | 2016 PPDA Integrity Survey | 978 | 1,004 | named | named | survey | According to the ⟦2016 PPDA Integrity Survey⟧[25] 67.4 percent of all the public officials | true | null | |
fcv_pads_east_asia:000353 | 21 | 1 | fourth grantee monitoring report | 651 | 683 | descriptive | descriptive | report | From the analysis of the ⟦fourth grantee monitoring report⟧[26] | true | null | |
fcv_pads_east_asia:000353 | 21 | 1 | agriculture monitoring reports | 694 | 725 | descriptive | descriptive | report | and the ⟦agriculture monitoring reports⟧[27], 32 recommendations were made | true | null | |
fcv_pads_east_asia:000353 | 26 | 0 | GPSA Grantee Annual Progress Report 2019 | 574 | 614 | named | named | report | According to the ⟦GPSA Grantee Annual Progress Report 2019⟧[28], the project did not achieve the targeted number of meetings | true | null | |
fcv_pads_east_asia:000353 | 26 | 1 | contract monitoring reports | 852 | 879 | descriptive | descriptive | report | recommendations from ⟦contract monitoring reports⟧ | true | null | |
fcv_pads_east_asia:000353 | 26 | 1 | monitoring reports | 1,487 | 1,505 | descriptive | descriptive | report | Thirteen ⟦monitoring reports⟧[2] were produced during the implementation period | true | null | |
fcv_pads_east_asia:000353 | 26 | 1 | monitoring reports | 1,588 | 1,606 | descriptive | descriptive | report | above the targeted 12 ⟦monitoring reports⟧[3] | true | null | |
fcv_pads_east_asia:000353 | 30 | 0 | Public Procurement Integrity Survey | 1,203 | 1,238 | named | named | survey | The 3rd ⟦Public Procurement Integrity Survey⟧[4] - Final Report March 2016 | true | null | |
fcv_pads_east_asia:000353 | 6 | 1 | 2016 integrity survey | 1,887 | 1,908 | descriptive | descriptive | survey | The ⟦2016 integrity survey⟧[5] carried out by the Public Procurement and Disposal of Assets Authority (PPDA) found that 71 | true | null | |
fcv_pads_east_asia:000353 | 6 | 2 | 2016 integrity survey | 134 | 155 | named | descriptive | survey | The ⟦2016 integrity survey⟧[6] carried out by the Public Procurement and Disposal of Assets Authority (PPDA) found that 71.8 percent | true | null | |
fcv_pads_east_asia:000353 | 9 | 0 | contract monitoring data | 1,408 | 1,432 | descriptive | descriptive | other | development of computer based system to support ⟦contract monitoring data⟧[7] entry and analysis | false | null | |
fcv_pads_east_asia:000354 | 54 | 0 | Fixed Assets register | 874 | 895 | descriptive | descriptive | administrative | a ⟦Fixed Assets register⟧[8] is maintained to record particulars of fixed assets acquired | true | null | |
fcv_pads_east_asia:000354 | 62 | 1 | Seasonaldatacollectiononagricultural | 181 | 217 | descriptive | descriptive | other | ⟦Seasonaldatacollectiononagricultural⟧[9] productionandproductivityinthe project area | false | null | |
fcv_pads_east_asia:000354 | 72 | 0 | Fixed Assets register | 509 | 530 | descriptive | descriptive | administrative | a ⟦Fixed Assets register⟧[10] is maintained to record particulars of fixed assets acquired | true | null | |
fcv_pads_east_asia:000355 | 11 | 1 | market survey | 606 | 619 | descriptive | descriptive | survey | Price estimates without ⟦market survey⟧[11] | true | null | |
fcv_pads_east_asia:000355 | 15 | 1 | Budget and disbursement schedule_ | 889 | 922 | descriptive | named | other | _Source: ⟦Budget and disbursement schedule_⟧[12] | true | null | |
fcv_pads_east_asia:000355 | 15 | 2 | Budget and disbursement schedule_ | 10 | 43 | descriptive | named | other | _Source: ⟦Budget and disbursement schedule_⟧[13] | true | null | |
fcv_pads_east_asia:000355 | 41 | 2 | Preliminary surveys | 464 | 483 | descriptive | descriptive | survey | ⟦Preliminary surveys⟧[14] are 100% completed | true | null | |
fcv_pads_east_asia:000355 | 43 | 0 | Preliminary surveys in RIH)s | 455 | 483 | descriptive | descriptive | survey | ⟦Preliminary surveys in RIH)s⟧[15] are complete | true | null | |
fcv_pads_east_asia:000355 | 72 | 0 | comprehensive asset register report | 583 | 618 | descriptive | descriptive | administrative | assets are included in the ⟦comprehensive asset register report⟧[16] | true | null | |
fcv_pads_east_asia:000356 | 1 | 0 | Procurement Plan tables | 368 | 391 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[17] | false | null | |
fcv_pads_east_asia:000357 | 14 | 0 | IFPA -CD bank statements_ | 244 | 269 | named | named | administrative | **_Source: ⟦IFPA -CD bank statements_⟧[18]** | true | null | |
fcv_pads_east_asia:000357 | 19 | 1 | National Forest Monitoring System | 1,113 | 1,146 | named | named | system | Support for the ⟦National Forest Monitoring System⟧[19] | true | null | |
fcv_pads_east_asia:000357 | 24 | 1 | accounting records | 1,391 | 1,409 | descriptive | descriptive | administrative | accuracyandcompletenessof the ⟦accounting records⟧[20] maintained by the Project | true | null | |
fcv_pads_east_asia:000357 | 24 | 2 | accounting records | 45 | 63 | descriptive | descriptive | administrative | the ⟦accounting records⟧[21] maintained by the Project, which have been relied upon in the preparation of the Financial Statements | true | null | |
fcv_pads_east_asia:000357 | 42 | 0 | inventory of medicinal herbs | 541 | 569 | descriptive | descriptive | other | the two phases of ⟦inventory of medicinal herbs⟧[22] in Semliki, Bwindi and Mgahinga were completed | true | null | |
fcv_pads_east_asia:000357 | 56 | 0 | Annua[ Financiat Statements | 108 | 135 | descriptive | descriptive | report | ⟦Annua[ Financiat Statements⟧[23] for the year ended 301 June 2025 | true | null | |
fcv_pads_east_asia:000358 | 12 | 1 | Ethiopia budget Calendar | 1,321 | 1,345 | named | named | other | the Project uses Government of ⟦Ethiopia budget Calendar⟧[24] for planning, budgeting | false | null | |
fcv_pads_east_asia:000358 | 12 | 2 | Ethiopia budget Calendar | 163 | 187 | named | named | other | the Project uses Government of ⟦Ethiopia budget Calendar⟧[25] for planning, budgeting and Financial reporting purposes | false | null | |
fcv_pads_east_asia:000358 | 13 | 0 | asset register | 444 | 458 | descriptive | descriptive | administrative | the office maintains an ⟦asset register⟧[26] that tracks all project fixed assets | true | null | |
fcv_pads_east_asia:000358 | 5 | 0 | financial records | 880 | 897 | descriptive | descriptive | administrative | relevant agreements disclosed within the ⟦financial records⟧[27] | true | null | |
fcv_pads_east_asia:000360 | 1 | 0 | Procurement Plan tables | 595 | 618 | descriptive | descriptive | other | contracts identified in the ⟦Procurement Plan tables⟧[28] | false | null | |
fcv_pads_east_asia:000363 | 47 | 0 | vehicle maintenance logs | 1,062 | 1,086 | descriptive | descriptive | administrative | # of ⟦vehicle maintenance logs⟧[29] available | true | null | |
fcv_pads_east_asia:000363 | 47 | 1 | vehicle maintenance logs | 30 | 54 | descriptive | descriptive | administrative | # of ⟦vehicle maintenance logs⟧[30] available | true | null | |
fcv_pads_east_asia:000363 | 63 | 0 | World Bank ESSs | 625 | 640 | named | named | other | the ⟦World Bank ESSs⟧[1], the more stringent provision will prevail | false | null | |
fcv_pads_east_asia:000363 | 64 | 0 | medical or school record | 1,926 | 1,950 | descriptive | descriptive | administrative | available documents to verify age (such as a birth certificate, national identification card, ⟦medical or school record⟧[2], or other document | true | null | |
fcv_pads_east_asia:000363 | 9 | 0 | data collection systems | 613 | 636 | descriptive | descriptive | system | Create a system aggregating existing ⟦data collection systems⟧[3] to enable skills analysis | true | null | |
fcv_pads_east_asia:000364 | 10 | 1 | ESSs of the WB | 567 | 581 | named | named | other | ⟦ESSs of the WB⟧[4] in order to determine their applicability to the project | false | null | |
fcv_pads_east_asia:000364 | 21 | 0 | phone survey data | 1,385 | 1,402 | descriptive | descriptive | survey | ⟦phone survey data⟧[5] suggests that firm revenues were significantly depressed | true | null | |
fcv_pads_east_asia:000364 | 21 | 1 | phone survey data | 2 | 19 | descriptive | descriptive | survey | ⟦phone survey data⟧[6] suggests that firm revenues were significantly depressed | true | null | |
fcv_pads_east_asia:000364 | 21 | 1 | Macro Poverty Outlook for Ethiopia | 1,760 | 1,794 | named | named | report | World Bank. ⟦Macro Poverty Outlook for Ethiopia⟧[7]: April 2023 (English). | true | null | |
fcv_pads_east_asia:000364 | 21 | 2 | Macro Poverty Outlook | 2 | 23 | named | named | report | ⟦Macro Poverty Outlook⟧[8] (MPO), Washington, D.C.: World Bank Group | true | null | |
fcv_pads_east_asia:000364 | 21 | 2 | High-Frequency Phone survey | 309 | 336 | named | named | survey | World Bank estimates based on the ⟦High-Frequency Phone survey⟧[9] (HFPS) of households | true | null | |
fcv_pads_east_asia:000364 | 22 | 0 | labor force and migration survey | 297 | 329 | descriptive | descriptive | survey | The ⟦labor force and migration survey⟧[10] reveal that unemployed person in the country | true | null | |
fcv_pads_east_asia:000364 | 22 | 0 | 2021 Labor Force and Migration Survey | 1,007 | 1,044 | named | named | survey | The ⟦2021 Labor Force and Migration Survey⟧[11] indicated that 17.1 percent of the population | true | null | |
fcv_pads_east_asia:000364 | 22 | 1 | 2021 Labor Force and migration survey | 351 | 388 | named | named | survey | According to the ⟦2021 Labor Force and migration survey⟧[12], Net Recent Migration | true | null | |
fcv_pads_east_asia:000364 | 22 | 1 | World Population Prospects 2019 | 1,343 | 1,374 | named | named | report | “⟦World Population Prospects 2019⟧[13]: Highlights” | true | null | |
fcv_pads_east_asia:000364 | 22 | 1 | Labor Force Survey 2021 | 1,497 | 1,520 | named | named | survey | > 11 ⟦Labor Force Survey 2021⟧[14] | true | null | |
fcv_pads_east_asia:000364 | 22 | 2 | Labor Force Survey 2021 | 109 | 132 | named | named | survey | > 11 ⟦Labor Force Survey 2021⟧[15] | true | null | |
fcv_pads_east_asia:000364 | 26 | 0 | CSA projection | 543 | 557 | named | named | estimates | according to ⟦CSA projection⟧[16] (CSA 2013) | true | null | |
fcv_pads_east_asia:000364 | 26 | 3 | national population projection data | 226 | 261 | descriptive | descriptive | estimates | According to the ⟦national population projection data⟧[17] from 2014-2017 | true | null |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.