questions/ifc-bench-v2.csv
CHANGED
|
@@ -2069,7 +2069,7 @@ Breakdown by bathroom:
|
|
| 2069 |
4. A masonry – concrete block core – approximately 193 mm
|
| 2070 |
5. A metal stud layer (approximately 41 mm thick).
|
| 2071 |
6. An inner layer of plasterboard (approximately 16 mm thick).",arc,duplex,1
|
| 2072 |
-
"What is the total length of water supply piping in the building?","The total length of water supply piping in the building is
|
| 2073 |
"Where are the main electrical panels located?","The main electrical panels are located in rooms A101 and B101.",mep,duplex,1
|
| 2074 |
"How many radiator are there in room A202?","There is no room A-202, but there is a room A202-M, which has one radiator.",mep,duplex,2
|
| 2075 |
"Could you provide a detailed list of all boilers in the building, including their specifications and exact locations?","The boilers are located in the following spaces:
|
|
|
|
| 2069 |
4. A masonry – concrete block core – approximately 193 mm
|
| 2070 |
5. A metal stud layer (approximately 41 mm thick).
|
| 2071 |
6. An inner layer of plasterboard (approximately 16 mm thick).",arc,duplex,1
|
| 2072 |
+
"What is the total length of water supply piping in the building?","The total length of water supply piping in the building is 71.88 m (145 pipe segments: 45.83 m cold water and 26.04 m hot water).",mep,duplex,2
|
| 2073 |
"Where are the main electrical panels located?","The main electrical panels are located in rooms A101 and B101.",mep,duplex,1
|
| 2074 |
"How many radiator are there in room A202?","There is no room A-202, but there is a room A202-M, which has one radiator.",mep,duplex,2
|
| 2075 |
"Could you provide a detailed list of all boilers in the building, including their specifications and exact locations?","The boilers are located in the following spaces:
|