timtkddn's picture
Upload Govdocs1 HTML/WPML/DOC files (10 buckets, 1000 docs)
85a62ec verified
Raw
History Blame Contribute Delete
1.54 kB
<html>
<body>
<p>Facility/Building Number </p>
<p>Building 4501 Conversion Project / Building 4501</p>
<p>Category</p>
<p>2</p>
<p>Description of Building Operations</p>
<p>The mission of the Conversion Project is to extract uranium in the form of uranium hexafloride (UF6) absorbed on sodium floride (NaF) pellets and transform it into a chemically stable uranium oxide (U3O8) by replacing fluorine with oxygen. The process involved consists of uranium recovery and conversion. </p>
<p>However, the facility is currently only authorized to depressurize the NaF traps (which contain the UF6). No conversion is authorized.</p>
<p>Summary of Major Hazards</p>
<p>Radioactive materials (including fissionable material), radioactive surface contamination and radioactive waste. </p>
<p>Summary of Controls</p>
<p>Safety-significant structures, systems and components </p>
<p>Cell D, </p>
<p>Cell D differential pressure instrumentation, </p>
<p>Cell D desorb and cryostat heaters isolation circuit, </p>
<p>Cell D ventilation HEPA filter bank,</p>
<p>Process off-gas HEPA filter,</p>
<p>Fire watch established if a loaded NaF trap remains within Building 4501 during off-shift hours.</p>
<p>Administrative Control Program</p>
<p>Radiation Protection Program</p>
<p>Emergency Preparedness Program</p>
<p>Fire Protection Program</p>
<p>Quality Assurance Program</p>
<p>Configuration Management Program</p>
<p>Maintenance Program</p>
<p>Nuclear Criticality Safety Program</p>
<p>Materials Inventory Control</p>
<p>Procedures </p>
</body>
</html>