filename,title,document_family,source_type,jurisdiction,effective_date,date_accessed,url,ingest,notes chapter-xi-title-16-of-nycrr-part-1100-general-procedures.pdf,16 NYCRR Part 1100 - General Procedures (Article VIII),SIT,regulation,NY-state,2026-03-09,2026-07-01,https://dps.ny.gov/chapter-xi-title-16-nycrr-part-1100-general-procedures,true,Current ORES general procedures; RAPID Act regs. chapter-xi-title-16-of-nycrr-part-1101-major-renewable-energy-facility-siting.pdf,16 NYCRR Part 1101 - Major Renewable Energy Facility Siting,SIT,regulation,NY-state,2026-03-09,2026-07-01,https://dps.ny.gov/chapter-xi-title-16-nycrr-part-1101-major-renewable-energy-facility-siting,true,Application exhibits + uniform standards; core of risk citations. chapter-xi-title-16-of-nycrr-part-1102-major-electric-transmission-facility-siting.pdf,16 NYCRR Part 1102 - Major Electric Transmission Facility Siting,SIT,regulation,NY-state,2026-03-09,2026-07-01,https://dps.ny.gov/chapter-xi-title-16-nycrr-part-1102-major-electric-transmission-facility-siting,false,"TRANSMISSION ONLY - not solar. Kept on disk, excluded from ingestion: language mirrors Part 1101 and would pollute retrieval." 24-e-0621-sirs-effective-february-9-2026.pdf,NYS Standardized Interconnection Requirements (SIR),INT,regulation,NY-state,2026-02-09,2026-07-01,https://dps.ny.gov/nys-standardized-interconnection-requirements,true,Case 24-E-0621. Governs <=5 MW distribution interconnection. NY-Sun Program Manual (effective April 2026).pdf,NY-Sun Program Manual,INC,program_manual,NY-state,2026-04-01,2026-07-01,https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Programs/NY-Sun/Contractor-Resources/program-manual.pdf,true,"Verified 2026-08-04: cover states 'April 2026 - Version 22'; no day printed, first-of-month convention." NYSAGM Guidelines for Solar Energy Projects (effective October 2019).pdf,NYSAGM Guidelines for Solar Energy Projects - Construction Mitigation for Agricultural Lands,AGR,incorporated_by_reference,NY-state,2019-10-18,2026-07-01,https://dps.ny.gov/nysagm-guidelines-solar-energy-project,true,Incorporated by reference into ORES regs. agm-construction-mitigation-for-projects-on-agricultural-lands-july-2025.pdf,NYSAGM Construction Mitigation for Projects on Agricultural Lands,AGR,incorporated_by_reference,NY-state,2025-07-01,2026-07-01,https://dps.ny.gov/nysagm-construction-mitigation-projects-agricultural-lands,true,Newer companion to the 2019 solar guidelines. Solar-Installations-in-Agricultural-Lands.pdf,NYSERDA - Solar Installations on Agricultural Lands,AGR,guidance,NY-state,2025-11-01,2026-07-01,https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Programs/NY-Sun/Solar-Installations-in-Agricultural-Lands.pdf,true,"Verified 2026-08-04: this is Section 4 of the NYSERDA Solar Guidebook, Nov 2025 edition (PDF created 2025-11-10) -- i.e. the Guidebook's ag chapter IS ingested standalone under AGR, which partially realizes the D-09 chapter-level re-inclusion plan. Contains the 30-acre MSG 1-4 mitigation-payment rule; secondary family INC." 2024.08.01-indigenous-nation-areas-of-interest.pdf,Indigenous Nation Areas of Interest,SIT,incorporated_by_reference,NY-state,2024-08-01,2026-07-01,https://dps.ny.gov/indigenous-nation-areas-interest,true,"Verified 2026-08-04: the map itself states 'August 2024', matching the filename prefix; the ORES page's 'January 2024' is stale." NYSERDA Solar Guidebook for Local Governments (effective November 2025).pdf,NYSERDA Solar Guidebook for Local Governments,LOC,guidance,NY-state,2025-11-01,2026-07-01,https://www.nyserda.ny.gov/All-Programs/NY-Sun/Resources/Solar-Guidebook-for-Local-Governments,true,"Large multi-chapter doc; consider tagging chapters (RPTL 487 chapter -> INC, ag chapter -> AGR)." 6 NYCRR Part 617.pdf,6 NYCRR Part 617 - State Environmental Quality Review (SEQR),ENV,regulation,NY-state,2019-01-01,2026-07-01,https://dec.ny.gov/regulatory/permits-licenses/seqr,true,"Verified 2026-08-04: cover page states revisions adopted 2018-06-27, effective 2019-01-01. Applies to the local (<25 MW) track. SUPERSEDED 2026-06-12: DEC amendments adopted 2026-04-24 (EJ siting, climate, ORES SEQR exclusion codified) took effect before the 2026-07-01 download, but the downloaded reproduction is the 2019 text. Kept in v1 index (re-ingestion would invalidate the final eval runs); disclosed in repo Limitations; first item of corpus maintenance." VDER-Summary.pdf,VDER / Value Stack Summary,INC,guidance,NY-state,2017-05-05,2026-07-01,https://www.nyserda.ny.gov/-/media/Project/Nyserda/Files/Programs/NY-Sun/VDER-Summary.pdf,true,Verified 2026-08-04: NYSERDA deck summarizing the PSC VDER Phase One order (issued 2017-03-09); PDF created 2017-05-05. OLDEST doc in the corpus by nine years -- state this in the repo's Limitations; consider replacing with a current VDER summary in future work. scraped/ores_faq.md,ORES Frequently Asked Questions,SIT,guidance,NY-state,2026-07-01,2026-07-01,https://dps.ny.gov/ores-frequently-asked-questions,true,"Scraped 2026-07-01. Plain-language process overview; chunk per Q&A ('## Q:' headers). Contains perishable facts (project counts). Effective date = access date, stated explicitly (guidance page, no versioned effective date)." scraped/psl_article8/,PSL Article 8 - Siting of Renewable Energy and Electric Transmission (secs. 140-148),SIT,statute,NY-state,2024-04-20,2026-07-01,https://www.nysenate.gov/legislation/laws/PBS/A8,true,"Scraped 2026-07-01. One .txt per section = one chunk per section. Enabling statute; regs carry the operational detail. Effective date = RAPID Act enactment (Part O, Ch. 58, Laws of 2024; FY25 budget signed 2024-04-20); per-section amendment dates available via the OpenLegislation API. Sections 141 and 143 excluded as transmission-only (in excluded/): s143 per D-08, s141 per Q-11 resolved 2026-08-04 -- its title is 'Applicability related to siting major electric transmission facilities', the transmission twin of s140."