AmirAziz1221 commited on
Commit
7c5295d
Β·
verified Β·
1 Parent(s): f2be7bc

Upload 3 files

Browse files
knowledge/asphalt_catalog.json ADDED
@@ -0,0 +1,29 @@
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1
+ {
2
+ "01LONGITUDINAL CRACKS": {"name":"Longitudinal Cracks","count":217,"severity":"Medium","priority":"P2","deadline":"1–3 months","risk":"Water ingress and progressive structural degradation","recommendation":"Seal cracks with modified bituminous mastic; mill and replace wearing course if crack opening is large."},
3
+ "02TRANSVERSE CRACKS": {"name":"Transverse Cracks","count":189,"severity":"Medium","priority":"P2","deadline":"1–3 months","risk":"Water infiltration, frost damage and vibration risk","recommendation":"Seal with SBS-modified mastic; investigate base and use anti-crack geogrid if recurring."},
4
+ "03ALLIGATOR CRACKING": {"name":"Alligator / Crocodile Skin Cracking","count":326,"severity":"High","priority":"P1/P2","deadline":"Immediate or short term","risk":"Structural fatigue, pothole formation and possible pavement collapse","recommendation":"Complete milling of affected layers and structural reconstruction."},
5
+ "04REFLECTION CRACKS": {"name":"Reflection Cracks","count":112,"severity":"Medium-High","priority":"P2","deadline":"1–3 months","risk":"Water ingress, internal erosion and pothole formation","recommendation":"Seal with elastomeric mastic; use anti-crack geogrid or SAMI membrane during resurfacing."},
6
+ "05POTHOLES": {"name":"Potholes","count":186,"severity":"High","priority":"P1","deadline":"24–48 hours","risk":"Direct accident risk and vehicle damage","recommendation":"Immediate hot/cold asphalt patching; cut, clean, prime, fill and compact."},
7
+ "06RUTTING": {"name":"Permanent Deformation / Rutting","count":263,"severity":"Medium-High","priority":"P1/P2","deadline":"Short term","risk":"Aquaplaning, motorcycle instability and lower-layer degradation","recommendation":"Mill affected area and replace with high-stability asphalt mix."},
8
+ "07UNDULATIONS AND CORRUGATION": {"name":"Undulations and Corrugation","count":87,"severity":"Medium","priority":"P2/P3","deadline":"1–3 months","risk":"Driving discomfort, braking instability and vehicle control risk","recommendation":"Mill wearing course and replace with deformation-resistant asphalt mixture."},
9
+ "08DEPRESSIONS AND SETTLEMENTS": {"name":"Depressions and Settlements","count":136,"severity":"High","priority":"P1","deadline":"Immediate","risk":"Water accumulation, aquaplaning and possible sudden collapse","recommendation":"Investigate cause with GPR/load tests; repair source and reconstruct pavement."},
10
+ "09SWELLING": {"name":"Swelling / Bulges","count":239,"severity":"Medium-High","priority":"P1/P2","deadline":"Short term or immediate if high","risk":"Vehicle instability and cyclist/pedestrian fall risk","recommendation":"Identify cause such as roots, frost, leakage or expansive soil; remove cause, mill and level."},
11
+ "10SURFACE RAVELING": {"name":"Surface Raveling","count":193,"severity":"Medium","priority":"P2/P3","deadline":"1–3 months","risk":"Loose aggregate, reduced traction and water penetration","recommendation":"Apply slurry seal, microsurfacing, or mill and resurface if advanced."},
12
+ "11PEELING AND LAYER DETACHMENT": {"name":"Peeling and Layer Detachment","count":190,"severity":"High","priority":"P1","deadline":"Immediate","risk":"Loose material and rapid exposure of lower layer","recommendation":"Remove loose material, mill affected area, apply tack coat and resurface."},
13
+ "12BINDER BLEEDING": {"name":"Binder Bleeding / Exudation","count":261,"severity":"Medium-High","priority":"P1/P3","deadline":"Short term","risk":"Loss of skid resistance and accident risk","recommendation":"Apply cover aggregate; micro-mill and replace surface layer in severe cases."},
14
+ "13AGGREGATE POLISHING": {"name":"Aggregate Polishing","count":86,"severity":"Medium-High","priority":"P1","deadline":"Less than 1 month","risk":"Loss of wet skid resistance and increased braking distance","recommendation":"Apply anti-skid surface treatment or overlay with high-polish-resistant aggregate."},
15
+ "14PAVEMENT SHOULDER LEVEL DIFFERENCE": {"name":"Pavement–Shoulder Level Difference","count":59,"severity":"High","priority":"P1","deadline":"Short term or immediate if severe","risk":"Rollover and re-entry collision risk","recommendation":"Level shoulder to roadway or construct transition ramp."},
16
+ "15CONSTRUCTION JOINT DETERIORATION": {"name":"Construction Joint Deterioration","count":190,"severity":"Medium","priority":"P2/P3","deadline":"1–3 months","risk":"Water infiltration and progressive deterioration along joint","recommendation":"Seal joint with elastomeric bituminous mastic; rebuild if severe."},
17
+ "16CRESCENT CRACKS": {"name":"Crescent / Slippage Cracks","count":12,"severity":"High","priority":"P1","deadline":"Immediate or short term","risk":"Layer sliding, material detachment and motorcycle danger","recommendation":"Mill affected area and replace using proper tack coat and compaction."},
18
+ "17CHANNELS AND DEEP GROOVES": {"name":"Channels and Deep Grooves","count":69,"severity":"Medium-High","priority":"P2","deadline":"1–3 months","risk":"Aquaplaning and motorcycle/cyclist fall risk","recommendation":"Mill and resurface with abrasion-resistant mix; correct drainage."},
19
+ "18LATERAL DISPLACEMENT": {"name":"Lateral Displacement / Shoving","count":137,"severity":"Medium-High","priority":"P2/P3","deadline":"1–3 months","risk":"Vehicle instability on curves and cyclist risk","recommendation":"Mill affected area and replace with high-stability polymer-modified mix."},
20
+ "20WATER SEEPAGE": {"name":"Water Seepage / Wet Areas","count":275,"severity":"High","priority":"P1/P2","deadline":"24–48 hours investigation","risk":"Internal erosion, bearing-capacity loss and pavement collapse","recommendation":"Investigate drainage/leakage source, drain retained water and reconstruct affected pavement."},
21
+ "21PERIMETER DETERIORATION OF MANHOLES": {"name":"Perimeter Deterioration of Manholes","count":154,"severity":"High","priority":"P1","deadline":"Short term or immediate","risk":"Cyclist/motorcyclist falls, impact damage and water ingress","recommendation":"Demolish perimeter, adjust frame level and replace pavement with compacted hot mix."},
22
+ "22EDGE DETERIORATION": {"name":"Road Edge Deterioration","count":175,"severity":"Medium-High","priority":"P1/P3","deadline":"Medium term or immediate if dangerous","risk":"Loss of vehicle control and progressive edge failure","recommendation":"Cut deteriorated edge, replace with compacted hot mix and restore shoulder continuity."},
23
+ "23PATCHES IN POOR CONDITION": {"name":"Patches in Poor Condition","count":294,"severity":"Medium-High","priority":"P1/P2","deadline":"Short term","risk":"Uneven surface, fall risk and unresolved underlying defect","recommendation":"Mill and repatch correctly using straight cut, priming, hot mix and layer compaction."},
24
+ "24MARKING DAMAGE": {"name":"Horizontal Marking Damage","count":300,"severity":"Medium","priority":"P1/P3","deadline":"Short to long term","risk":"Driver disorientation and pedestrian visibility loss","recommendation":"Clean surface and repaint/apply thermoplastic marking with glass microspheres."},
25
+ "25STEP BETWEEN LANES": {"name":"Step Between Lanes","count":30,"severity":"Medium-High","priority":"P1/P2","deadline":"Less than 1 month","risk":"Motorcycle instability and water retention","recommendation":"Mill transition zone and level the step using a smooth ramp."},
26
+ "26THERMAL FATIGUE CRACKING": {"name":"Thermal Fatigue Cracking","count":123,"severity":"Medium","priority":"P2","deadline":"1–3 months","risk":"Water infiltration, freeze-thaw damage and structural cracking","recommendation":"Seal cracks; use polymer-modified bitumen during resurfacing."},
27
+ "27CHEMICAL AGENTS": {"name":"Deterioration due to Hydrocarbons / Chemical Agents","count":87,"severity":"Medium-High","priority":"P1/P2","deadline":"Less than 1 month","risk":"Softened asphalt, contamination and slippery surface","recommendation":"Apply absorbents, mill contaminated area, manage waste and replace with resistant asphalt mix."},
28
+ "28OXIDATION AND AGING OF BINDER": {"name":"Oxidation and Aging of Binder","count":221,"severity":"Medium","priority":"P3","deadline":"3–6 months","risk":"Brittleness, cracking and surface disintegration","recommendation":"Apply rejuvenating treatment or slurry seal; plan resurfacing before structural cracking."}
29
+ }
knowledge/concrete_catalog.json ADDED
@@ -0,0 +1,24 @@
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1
+ {
2
+ "01FLEXURAL CRACKS": {"name":"Flexural Cracks","count":303,"severity":"High","priority":"P1","deadline":"Immediate / short term","risk":"Loss of load-bearing capacity and partial collapse","recommendation":"Epoxy crack injection, reinforcement inspection and CFRP strengthening if needed."},
3
+ "02REINFORCEMENT CORROSION": {"name":"Reinforcement Corrosion","count":247,"severity":"High","priority":"P1","deadline":"Immediate / short term","risk":"Steel section loss, falling fragments and collapse risk","recommendation":"Clean and passivate reinforcement; repair with structural mortar and apply protection."},
4
+ "03DETACHMENT AND SPALLING": {"name":"Detachment and Spalling","count":190,"severity":"High","priority":"P1","deadline":"Immediate","risk":"Falling concrete fragments and exposed reinforcement","recommendation":"Mark area, remove unstable concrete and repair with thixotropic structural mortar."},
5
+ "04CONCRETE CARBONATION": {"name":"Concrete Carbonation","count":192,"severity":"Medium","priority":"P2","deadline":"1–3 months","risk":"Initiates reinforcement corrosion and reduces service life","recommendation":"Test carbonation depth and apply anti-carbonation / waterproofing coating."},
6
+ "05EFFLORESCENCE AND LEACHING": {"name":"Efflorescence and Leaching","count":316,"severity":"Low-Medium","priority":"P3","deadline":"3–6 months","risk":"Water ingress, porosity increase and durability reduction","recommendation":"Clean surface, seal joints/cracks, repair waterproofing and improve drainage."},
7
+ "06ALKALI SILICA REACTION": {"name":"Alkali-Silica Reaction","count":122,"severity":"High","priority":"P2","deadline":"1–3 months","risk":"Expansion, deformation and long-term structural degradation","recommendation":"Control moisture, take cores, perform lab diagnosis and assess structural capacity."},
8
+ "07DEFECTIVE EXPANSION JOINTS": {"name":"Defective Expansion Joints","count":98,"severity":"Medium-High","priority":"P2","deadline":"1–3 months","risk":"Water/salt ingress and deterioration of supports and abutments","recommendation":"Replace seals, clean joint, repair metal profiles and improve drainage."},
9
+ "08EXCESSIVE DEFORMATIONS": {"name":"Excessive Deformations","count":75,"severity":"Medium","priority":"P2","deadline":"1–3 months","risk":"Loss of function, water accumulation and structural safety risk","recommendation":"Level deck, inspect supports, calculate residual capacity and monitor topographically."},
10
+ "09BEARING DETERIORATION": {"name":"Bearing Deterioration","count":367,"severity":"High","priority":"P1","deadline":"Immediate / short term","risk":"Deck instability, uneven load transfer and collapse risk","recommendation":"Replace deteriorated bearings using hydraulic jack and verify support geometry."},
11
+ "10FOUNDATION SCOUR": {"name":"Foundation Scour","count":285,"severity":"High","priority":"P1","deadline":"Immediate / short term","risk":"Undermining of foundation and structural instability","recommendation":"Underwater inspection, scour protection and foundation stabilization."},
12
+ "11SULFATE ATTACK": {"name":"Sulfate Attack","count":194,"severity":"High","priority":"P2","deadline":"1–3 months","risk":"Concrete expansion, cracking and strength loss","recommendation":"Laboratory diagnosis, remove deteriorated concrete and repair with sulfate-resistant system."},
13
+ "12FREEZE THAW DAMAGE": {"name":"Freeze-Thaw Damage","count":149,"severity":"Medium-High","priority":"P2","deadline":"1–3 months","risk":"Scaling, cracking and progressive concrete deterioration","recommendation":"Seal surface, repair damaged concrete and improve waterproofing/drainage."},
14
+ "13FOUNDATION SETTLEMENT": {"name":"Foundation Settlement","count":200,"severity":"High","priority":"P1/P2","deadline":"Immediate / short term","risk":"Differential movement, cracking and instability","recommendation":"Geotechnical investigation, monitoring, underpinning or foundation repair."},
15
+ "14HONEYCOMBING AND GRAVEL NESTS": {"name":"Honeycombing and Gravel Nests","count":384,"severity":"Medium","priority":"P2","deadline":"1–3 months","risk":"Reduced durability and reinforcement exposure","recommendation":"Remove weak concrete and fill with compatible repair mortar."},
16
+ "15CORROSION": {"name":"Corrosion","count":188,"severity":"High","priority":"P1/P2","deadline":"Short term","risk":"Loss of section and structural deterioration","recommendation":"Clean corrosion, passivate steel and repair/protect affected concrete."},
17
+ "16DEFICIENCIES IN WATERPROOFING AND DRAINAGE": {"name":"Deficiencies in Waterproofing and Drainage","count":225,"severity":"Medium-High","priority":"P2","deadline":"1–3 months","risk":"Water ingress and acceleration of several pathologies","recommendation":"Replace membrane, clean drains and improve drainage details."},
18
+ "17SHEAR CRACKING": {"name":"Shear Cracking","count":19,"severity":"High","priority":"P1","deadline":"Immediate","risk":"Brittle structural failure risk","recommendation":"Restrict load, inspect urgently and strengthen with CFRP/steel or structural repair."},
19
+ "18BIOLOGICAL COLONIZATION": {"name":"Biological Colonization","count":120,"severity":"Low-Medium","priority":"P3","deadline":"3–6 months","risk":"Surface degradation and moisture retention","recommendation":"Clean, apply biocide and water-repellent treatment."},
20
+ "19IMPACT DAMAGE": {"name":"Impact Damage","count":74,"severity":"Medium-High","priority":"P1/P2","deadline":"Immediate / short term","risk":"Local loss of capacity and falling fragments","recommendation":"Mark damaged area, remove loose material and repair/strengthen affected zone."},
21
+ "20MAP CRACKING DUE TO PLASTIC SHRINKAGE": {"name":"Map Cracking due to Plastic Shrinkage","count":84,"severity":"Medium","priority":"P2/P3","deadline":"1–3 months","risk":"Water ingress and durability loss","recommendation":"Seal cracks, apply protective coating and monitor progression."},
22
+ "21EXPANSION JOINTS": {"name":"Expansion Joints","count":51,"severity":"Medium-High","priority":"P2","deadline":"1–3 months","risk":"Water ingress and support deterioration","recommendation":"Clean joint, replace seal and repair adjacent concrete."},
23
+ "22DEFECTS IN PARAPETS AND RAILINGS": {"name":"Defects in Parapets and Railings","count":157,"severity":"Medium-High","priority":"P1","deadline":"Immediate / short term","risk":"User safety risk during vehicle impact or road departure","recommendation":"Repair or replace damaged modules and verify containment level."}
24
+ }
knowledge/facades_catalog.json ADDED
@@ -0,0 +1,24 @@
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1
+ {
2
+ "01 CRACKS FISSURES": {"name":"Cracks and Fissures in Cladding","count":790,"severity":"Medium-High","priority":"P2","deadline":"1–3 months","risk":"Water ingress and possible structural degradation","recommendation":"Seal surface cracks with elastic mortar; use resin injection or structural stitching for structural cracks."},
3
+ "02 DAMPNESS DUE TO FILTRATION": {"name":"Dampness due to Filtration","count":271,"severity":"High","priority":"P2","deadline":"1–3 months","risk":"Water ingress and deterioration of finishes","recommendation":"Locate entry point, repair waterproofing, seal joints and apply water-repellent treatment."},
4
+ "03 EFFLORESCENCE": {"name":"Efflorescence","count":260,"severity":"Low-Medium","priority":"P3","deadline":"3–6 months","risk":"Aesthetic and superficial degradation","recommendation":"Dry brush, neutralize salts, waterproof affected area and remove moisture source."},
5
+ "04 CLADDING DETACHMENT": {"name":"Cladding Detachment","count":162,"severity":"High","priority":"P1","deadline":"Immediate","risk":"Falling fragments onto people or vehicles","recommendation":"Cordoning off, percussion inspection, removal of loose pieces and mechanical re-anchoring."},
6
+ "05 REBAR CORROSION": {"name":"Rebar Corrosion","count":598,"severity":"High","priority":"P1","deadline":"Immediate","risk":"Structural collapse and falling fragments","recommendation":"Urgent structural assessment, passivation of reinforcement and UNE-EN 1504 repair mortar."},
7
+ "06 CAPILLARY DAMP": {"name":"Capillary Dampness","count":555,"severity":"Medium","priority":"P2","deadline":"1–3 months","risk":"Material degradation and health issues","recommendation":"Inject hydrophobic chemical barrier, replace affected coating with breathable mortar and improve drainage."},
8
+ "07 CARBONATION": {"name":"Carbonation","count":182,"severity":"Medium-High","priority":"P2","deadline":"1–3 months","risk":"Reinforcement corrosion and structural loss","recommendation":"Test carbonation depth, apply protective coating and repair advanced areas according to UNE-EN 1504."},
9
+ "08 OXIDATION OF METALLIC ELEMENTS": {"name":"Oxidation of Metallic Elements","count":550,"severity":"Medium","priority":"P1/P2","deadline":"1–3 months","risk":"Falling elements and facade staining","recommendation":"Brush or sandblast rust, apply anti-rust primer and replace elements with section loss."},
10
+ "09 BIOLOGICAL GROWTH": {"name":"Biological Colonization","count":708,"severity":"Low-Medium","priority":"P3","deadline":"3–6 months","risk":"Support degradation and aesthetic damage","recommendation":"Clean with water/steam, apply approved biocide and hydrophobic treatment."},
11
+ "10 JOINT SEALING FAILURE": {"name":"Joint Sealing Failure","count":119,"severity":"High","priority":"P2","deadline":"1–3 months","risk":"Water ingress and interior deterioration","recommendation":"Remove deteriorated sealant, clean substrate and apply new elastic sealant with primer/backer rod."},
12
+ "11 BULGING OF THE LINING": {"name":"Bulging of the Lining","count":251,"severity":"High","priority":"P1","deadline":"Immediate","risk":"Falling materials onto people","recommendation":"Cordoning off, remove areas at risk and replace cladding with compatible mortar."},
13
+ "12 DETERIORATION ELEMENTS OF CORONATION": {"name":"Deterioration of Coronation Elements","count":487,"severity":"High","priority":"P1","deadline":"Immediate","risk":"Falling fragments and water ingress","recommendation":"Inspect from scaffolding, consolidate/replace damaged parts and waterproof coping/drip edge."},
14
+ "13 DETERIORATION OF EXTERIOR WOODWORK": {"name":"Deterioration of Exterior Woodwork","count":138,"severity":"Medium","priority":"P2","deadline":"1–3 months","risk":"Water ingress and loss of functionality","recommendation":"Repair or replace damaged frames, seals and hardware; restore protective coating."},
15
+ "14 STAINS AND GENERAL SOILING": {"name":"Stains and General Soiling","count":313,"severity":"Low","priority":"P3","deadline":"3–6 months","risk":"Aesthetic degradation and urban image impact","recommendation":"Clean with pressure water, steam, gentle blasting or surface-specific cleaning products."},
16
+ "15 EROSION AND DISINTEGRATION OF MORTARS": {"name":"Erosion and Disintegration of Mortars","count":243,"severity":"Medium","priority":"P2","deadline":"1–3 months","risk":"Water ingress and support loss","recommendation":"Remove deteriorated mortar, consolidate substrate and repoint with compatible breathable mortar."},
17
+ "16 CORNICE DETACHMENT": {"name":"Cornice Detachment","count":247,"severity":"High","priority":"P1","deadline":"Immediate","risk":"Falling onto people and vehicles","recommendation":"Urgent cordoning off, scaffold inspection, dismantle at-risk parts and reinstall with stainless anchors."},
18
+ "17 BREAKAGE OR DETERIORATION OF DOWNPIPES AND GUTTERS": {"name":"Breakage or Deterioration of Downpipes and Gutters","count":106,"severity":"Medium-High","priority":"P2","deadline":"1–3 months","risk":"Water ingress and facade deterioration","recommendation":"Clean gutters, replace damaged sections, retighten clamps and check slopes/joints."},
19
+ "21 DIRT FROM RUNOFF": {"name":"Dirt from Runoff","count":84,"severity":"Low","priority":"P3","deadline":"3–6 months","risk":"Aesthetic degradation","recommendation":"Clean surface and correct runoff paths using drip edges or water-repellent treatment."},
20
+ "22 SURFACE CONDENSATION ON FACADE": {"name":"Surface Condensation on Facade","count":165,"severity":"Low-Medium","priority":"P3","deadline":"3–6 months","risk":"Moisture staining, mold and superficial degradation","recommendation":"Improve ventilation/thermal conditions and clean biological or moisture-related deposits."},
21
+ "23 DETACHMENT OF CLADDING NATURAL STONE": {"name":"Detachment of Natural Stone Cladding","count":212,"severity":"High","priority":"P1","deadline":"Immediate","risk":"Falling stone pieces and public safety risk","recommendation":"Cordoning off, inspect anchors, remove unstable slabs and reinstall with mechanical safety anchors."},
22
+ "24 PAINT DETERIORATION": {"name":"Paint Deterioration","count":351,"severity":"Low-Medium","priority":"P3","deadline":"3–6 months","risk":"Loss of protection and aesthetic degradation","recommendation":"Remove loose paint, prepare substrate and repaint with compatible exterior coating."},
23
+ "25 GLASS BREAKAGE": {"name":"Glass Breakage","count":249,"severity":"High","priority":"P1","deadline":"Immediate","risk":"Falling glass and injury risk","recommendation":"Cordoning off, remove broken glass and replace with compliant safety glazing."}
24
+ }