File size: 36,771 Bytes
af1bee9 | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 | # Oracle Fusion Supply Chain Planning (SCP) coverage map for patch regression testing
| | |
|---|---|
| Owner | Fusion Analyst |
| Written | 9 Oct 2026, IST |
| Inputs | `BRIEF.md`, `architecture.pdf` (pdftotext), the P2P / O2C / R2R / A2R / Expenses / PPM / SCM / HCM / P2M coverage maps (format, scale, boundaries), public Oracle docs (links and titles checked 9 Oct 2026) |
| Pack order | Accepted order: A2R → Expenses → Project-to-Profit → Supply Chain Execution → HCM → Plan-to-Produce → **Supply Chain Planning** → Procurement Contracts/Sourcing depth → CX → Grants → Product Lifecycle Management |
| Scope | Planning data collections, Demand Management, Supply Planning / Planning Central, Order Promising engine, Backlog Management, Replenishment Planning, Sales and Operations Planning, Production Scheduling, Supply Chain and Demand Collaboration (folded in under the sub-product rule), planning setup, roles and integrations. **O2C, P2P, P2M, SCM and PPM rows are referenced, not duplicated** |
| Client questions | `analysis/open-client-questions.md` §SCP |
| Next reader | Fusion Test Designer |
| Pod access | **None.** No Oracle Fusion pod, credentials, or client data were used. |
> ## ⚠ Verification status: read this first
> **Nothing in this document has been checked against a live Oracle Fusion pod.** Every row, score, role, setup and patch-impact statement is **UNVERIFIED** until the Scout and pod probers run read-only against a real **test** pod. Target release, cohort, licensed planning products and UI generation are **unknown**.
>
> **What each tag means:**
>
> | Tag | Meaning |
> |---|---|
> | `UNVERIFIED · DOC-LINK` | The Oracle doc URL loaded on 9 Oct 2026 and its page title matched the book named. The statement itself was not checked on a pod. |
> | `UNVERIFIED · DOC-TOPIC` (†) | A topic with this name appears in the table of contents of the cited Oracle book (26D, or 26C where Oracle's 26D book list links to 26C). Behaviour was not checked on a pod. |
> | `UNVERIFIED · ANALYST` | Comes from general Oracle Fusion planning knowledge. Not checked against doc text or a pod. |
> | `UNVERIFIED · ASSUMED` | A placeholder value such as a usage score or "if used". It **must** be replaced with Scout/pod-prober data. |
> | `POD-REQUIRED` | Only a pod (or the client) can answer this. It is left blank on purpose rather than guessed. |
> | `event-driven` | A rare, calendar- or event-bound process. It runs in the patch cycle before each event, whatever its tier. |
> | `tolerant-suite` | An AI-dependent row or scenario. It runs in the separate tolerant suite, is reported separately and is **not counted toward go/no-go**. |
>
> No fact in this file comes from a pod: no plans, plan options, forecasting profiles, sourcing rules, ATP rules, data access sets, collection schedules, volumes or patch level.
### Decisions in force (Chief of Staff, 9 Oct 2026)
* **Shared scale:** P1 ≥ 75, P2 40–74, P3 20–39, P4 < 20. Priority = Impact × Change × Usage; Usage is always ASSUMED.
* **Standing rule: amount triage.** Any failure involving client amounts is triaged on the **local model with real amounts**, in every module. In SCP that covers planned quantities and values, forecast quantities and revenue measures, safety stock and allocation quantities. Not raised as a question.
* **Standing rule: boundaries.** The **source module owns everything up to the hand-off; the receiving module owns import onward; R2R owns GL.** Only pattern-breaking boundaries are flagged ⚑. Recorded exception elsewhere: COGS stays in O2C `ACC-02` (9 Oct 2026); none applies to SCP.
* **Standing rule: sub-products.** Fold into SCP (share the collect → plan → release flows): Demand Management, Supply Planning / Planning Central, Order Promising setup, Backlog Management, Replenishment Planning, S&OP, Production Scheduling (assigned to SCP by the P2M map), Supply Chain Collaboration and Demand Collaboration. No new separate pack.
* **`tolerant-suite` rule:** `DMD-04` (Planning Advisor) is wholly AI-dependent. `DMD-01` is **mixed**: statistical/ML forecast **values** are asserted in the tolerant suite (tolerance band against a baseline); the deterministic parts (plan run completes, forecast exists at every expected level, publish works) count toward go/no-go. **DECIDED (Chief of Staff, 9 Oct 2026): DMD-01 stays a mixed row**, following the precedent of O2C `CSH-02` and R2R `CM-03` (also R2R `CM-07`). Statistical/ML forecasting is not treated as wholly AI-dependent.
* **`event-driven` rule:** `DMD-05` (annual planning calendar / time hierarchy extension and forecasting-profile retune).
* **Budgetary control:** owned by P2P `REQ-05` everywhere. Released planned purchase orders hand off to P2P requisitions before any funds check; no SCP row tests funds checks.
* **Excel add-in rule:** planning-table Excel export/edit and spreadsheet simulation-set edits are tested through the underlying CSV/REST services. The manual Windows check is a recorded gap.
* **Dedicated test structures (UNVERIFIED):** a dedicated synthetic planning organization set, plan and collection scope, so plan runs and releases never touch client planning data.
### Pack boundaries
**Standing-rule boundaries (no decision needed):**
| Boundary | Split under the standing rule | Rows |
|---|---|---|
| **All source modules → SCP: collections** | **Source packs own** their transactions (orders, on-hand, POs, work orders, resources). **SCP owns** collection onward | COL-01, COL-02 |
| **SCP → P2P: planned buy orders** | **SCP owns** planned orders and release. **P2P owns** requisition import onward (`P2P:REQ-*`) | SUP-02, SUP-03 |
| **SCP → P2M: planned make orders / production schedule** | **SCP owns** release. **P2M owns** work order creation onward (`P2M:WO-01`) | SUP-02, PSC-01 |
| **SCP → SCM: planned transfers** | **SCP owns** release. **SCM owns** transfer order creation onward (`SCM:TRF-01`) | SUP-02 |
| **SCP ↔ O2C: order promising and backlog** | **SCP owns** the promising engine setup and data refresh (`GOP-01`) and backlog plan runs. **O2C owns** scheduling the order line (`O2C:SCH-01/02`) and the fulfillment line updates onward | GOP-01, BKL-01 |
| **SCP → suppliers / customers: collaboration** | **SCP owns** publishing order forecasts; external partners stubbed | CLB-01, CLB-02 |
| **SCP → PPM: project-specific planning** | **SCP owns** the plan; project supply flows through P2P/P2M/SCM as above | SUP-07 |
**Boundaries that break the pattern:** none found in SCP.
**Referenced, not duplicated:** `O2C:SCH-01`, `SCH-02`, `ORC-02/03`; `P2P:REQ-01`, `REQ-05`; `P2M:WO-01`, `MSU-01`, `MSU-02`, `MNT-02`; `SCM:INV-04`, `TRF-01`, `REP-01` (min-max is SCM, not SCP); `PPM:CST-09`.
---
## 1. Scope and how this map is used
* **Covered:** see the header. Supply Planning is assumed; Planning Central is an alternative product with the same flows (rows apply to whichever is licensed).
* **Out of scope:** order-line scheduling and fulfillment (O2C), requisition onward (P2P), work orders (P2M), transfer orders and min-max (SCM), EPM planning (not Fusion SCM).
* **Test pods only, never production. No real client data. No secrets.** Plans, forecasts and history must be **synthetic**.
* **Stable IDs** such as `SUP-02`. Prefix as `SCP:` in a shared repository (SUP, SEC and INT IDs repeat across packs; `SCP:SUP-*` is not `P2P:SUP-*`).
## 2. Patch cadence
Same as P2P map §2: quarterly cohorts, test pod updated on the 1st Friday and production on the 3rd (about a 2-week window), optional monthly maintenance packs, opt-in expiry (public Oracle blogs, **UNVERIFIED · ANALYST**; MOS KB160632 / KB157616 **not opened**). Latest public doc release on 9 Oct 2026: **26D** (`DOC-LINK`). Note: Oracle's 26D SCM book list links *Using Supply Planning*, *Using Planning Central*, *Using Supply Chain Planning Common Features* and *Using Production Scheduling* to their **26C** paths. The pod's release, cohort and target patch are **POD-REQUIRED**.
*SCP note (UNVERIFIED · ANALYST):* planning regressions rarely show as UI errors. They show as plan runs that fail or run longer, collections that silently miss entities, planned order quantities or dates that shift, and releases that don't create downstream documents. Plan runs are long batch jobs, so the P1 suite needs a **small dedicated synthetic plan scope** to finish inside the patch window.
## 3. End-to-end SCP flow (logical)
```
Source packs (O2C orders · SCM on-hand/transfers · P2P POs · P2M work orders/resources · PPM projects)
│
▼
Collections (COL-01 targeted / net change; COL-02 CSV loads) ─► planning data repository
│
├─► Demand plan (DMD-01 forecast run [values: tolerant] ─► DMD-02 adjust/approve/publish) ─┐
│ └─► Planning Advisor (DMD-04, tolerant) │
│ ▼
├─► Supply plan run (SUP-01) ─► pegging/exceptions/safety stock (SUP-04) ─► forecast consumption (SUP-05)
│ └─► planned orders (SUP-02) ─► release (manual SUP-02 / automatic SUP-03)
│ ├─► P2P requisitions ├─► P2M work orders └─► SCM transfer orders
├─► Production schedule (PSC-01) ─► P2M work orders
├─► Replenishment plan (RPL-01) · S&OP (SOP-01) · Backlog plan (BKL-01 ─► O2C fulfillment lines)
├─► Order promising refresh + rules (GOP-01..04) ─► O2C:SCH-01 schedules order lines
└─► Collaboration: order forecasts ─► suppliers ─► commits (CLB-01) · customers (CLB-02)
Cross-cutting: planners / network / measures / UI (SET) · data access sets (SEC) · REST / export / OTBI / ESS chain (INT)
```
*Diagram: UNVERIFIED · ANALYST. The flows actually enabled on the client pod are POD-REQUIRED.*
## 4. Scoring method (shared scale)
* **Impact, Change likelihood and Usage** are each 1–5, as in P2P map §4. **Risk** = Impact × Change. **Priority** = Risk × Usage. **Tiers:** P1 ≥ 75, P2 40–74, P3 20–39, P4 < 20.
* **All Usage scores are `UNVERIFIED · ASSUMED`** and reflect a "mid-size manufacturer/distributor: weekly collections and supply plan, monthly statistical demand plan, manual plus automatic release, order promising for sales orders; no backlog, replenishment, S&OP or production scheduling". All Impact and Change scores are **UNVERIFIED · ANALYST**.
* `event-driven` rows run before their event. `tolerant-suite` rows (and the tolerant scenarios of mixed rows) are excluded from go/no-go.
## 5. Risk × usage ranking (all rows UNVERIFIED)
*Sorted by Priority. Usage scores are placeholders.*
**Tier counts (provisional):** P1 = 6, P2 = 6, P3 = 9, P4 = 14, total 35 rows.
**Go/no-go counts:** 34 rows (P1 6, P2 6, P3 9, P4 13). Excluded: `DMD-04` (`tolerant-suite`, P4). `DMD-01` counts, but its forecast-value scenarios run in the tolerant suite.
**`event-driven`:** DMD-05 (P4).
| Rank | ID | Flow | Sub-process | Impact | Change likelihood | Risk (I×C) | Usage (ASSUMED) | Priority (Risk×Usage) | Tier | Tags |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | COL-01 | Data collections | Planning data collections from Fusion sources (targeted / net change; items, on-hand, orders, work definitions, resources) | 5 | 4 | 20 | 4 | **80** | P1 | |
| 2 | SUP-01 | Supply planning | Supply plan run (unconstrained / constrained) with plan options | 5 | 4 | 20 | 4 | **80** | P1 | |
| 3 | SUP-02 | Supply planning | Planned orders: review, firm, create and release manually (to P2P requisitions, P2M work orders, SCM transfer orders) | 5 | 4 | 20 | 4 | **80** | P1 | |
| 4 | GOP-01 | Order promising | Order promising engine: data refresh, ATP rules, promising profiles, sourcing rules and assignment sets (order-line scheduling is O2C SCH-01) | 5 | 4 | 20 | 4 | **80** | P1 | |
| 5 | SEC-01 | Roles & security (cross-cutting) | Planning job roles and data access sets | 5 | 4 | 20 | 4 | **80** | P1 | |
| 6 | INT-04 | Integrations / reports | Scheduled process chain: collections → plan run → release → order promising refresh | 5 | 3 | 15 | 5 | **75** | P1 | |
| 7 | DMD-01 | Demand planning | Demand plan run: statistical forecast generation via forecasting profiles (forecast values: tolerant-suite scenarios) | 5 | 4 | 20 | 3 | **60** | P2 | mixed: forecast values `tolerant-suite` |
| 8 | COL-02 | Data collections | Load planning data from CSV files / external sources | 4 | 4 | 16 | 3 | **48** | P2 | |
| 9 | DMD-02 | Demand planning | Demand plan editing, adjustments, approval, publish and archive | 4 | 4 | 16 | 3 | **48** | P2 | |
| 10 | SET-02 | Planning setup | Measures, dimensions, hierarchies, page layouts, tables / graphs / tiles (planning UI) | 3 | 4 | 12 | 4 | **48** | P2 | |
| 11 | INT-01 | Integrations / reports | REST: planned orders, supply orders, allocations, order forecasts | 4 | 4 | 16 | 3 | **48** | P2 | |
| 12 | SUP-03 | Supply planning | Automatic release of plan recommendations | 5 | 3 | 15 | 3 | **45** | P2 | |
| 13 | SUP-04 | Supply planning | Pegging, plan exceptions and messages; safety stock planning | 4 | 3 | 12 | 3 | **36** | P3 | |
| 14 | SUP-05 | Supply planning | Forecast consumption by sales orders | 4 | 3 | 12 | 3 | **36** | P3 | |
| 15 | SET-01 | Planning setup | Planners, plan types and options, supply network model, approved supplier list for planning | 4 | 3 | 12 | 3 | **36** | P3 | |
| 16 | INT-02 | Integrations / reports | Export planning data (CSV / Excel export, tested via services) | 3 | 3 | 9 | 3 | **27** | P3 | |
| 17 | GOP-02 | Order promising | Supply allocation rules and adjustments (REST / FBDI) | 4 | 3 | 12 | 2 | **24** | P3 | |
| 18 | GOP-04 | Order promising | Order Promising work area: check availability, alternative fulfillment scenarios | 3 | 4 | 12 | 2 | **24** | P3 | |
| 19 | BKL-01 | Backlog management | Backlog planning run: reprioritize / reschedule sales orders and release updates to O2C (if used) | 4 | 3 | 12 | 2 | **24** | P3 | |
| 20 | CLB-01 | Collaboration | Supply chain collaboration: publish order forecasts to suppliers, supplier commits | 4 | 3 | 12 | 2 | **24** | P3 | |
| 21 | INT-03 | Integrations / reports | OTBI / planning analytics | 3 | 4 | 12 | 2 | **24** | P3 | |
| 22 | COL-03 | Data collections | Purge collected data and staging tables | 3 | 3 | 9 | 2 | **18** | P4 | |
| 23 | DMD-03 | Demand planning | Forecast accuracy measures and demand exceptions | 3 | 3 | 9 | 2 | **18** | P4 | |
| 24 | SUP-06 | Supply planning | Simulation sets, copy plan, what-if | 3 | 3 | 9 | 2 | **18** | P4 | |
| 25 | SET-03 | Planning setup | Planning exception configuration and thresholds | 3 | 3 | 9 | 2 | **18** | P4 | |
| 26 | INT-05 | Integrations / reports | Publish supply order details / order forecasts to external systems | 3 | 3 | 9 | 2 | **18** | P4 | |
| 27 | DMD-05 | Demand planning | Annual planning calendar / time hierarchy extension and forecasting-profile retune | 4 | 3 | 12 | 1 | **12** | P4 | `event-driven` |
| 28 | SUP-08 | Supply planning | CTO / ATO and drop-ship planning (if used) | 4 | 3 | 12 | 1 | **12** | P4 | |
| 29 | RPL-01 | Replenishment planning | Replenishment plans: policies, replenishment orders, automatic release (if used) | 4 | 3 | 12 | 1 | **12** | P4 | |
| 30 | PSC-01 | Production scheduling | Production schedule: generate, review, release to work orders (if used) | 4 | 3 | 12 | 1 | **12** | P4 | |
| 31 | DMD-04 | Demand planning | Planning Advisor: hyperparameter tuning and data insights (if enabled) | 2 | 5 | 10 | 1 | **10** | P4 | `tolerant-suite` |
| 32 | SUP-07 | Supply planning | Project-specific supply planning (if used) | 3 | 3 | 9 | 1 | **9** | P4 | |
| 33 | GOP-03 | Order promising | Bills of resources and configured-item promising | 3 | 3 | 9 | 1 | **9** | P4 | |
| 34 | SOP-01 | Sales and operations planning | S&OP plan: run, compare, approve (if used) | 3 | 3 | 9 | 1 | **9** | P4 | |
| 35 | CLB-02 | Collaboration | Demand collaboration with customers (if used) | 3 | 3 | 9 | 1 | **9** | P4 | |
---
## 6. Coverage map by flow
Column guide: **Scenarios** are tagged H (happy path), N (negative), A (approval), M (quantity/date/amount assertion), Ho (hold / error), C (cancel / reverse) or R (role); **Patch-sensitive points**; **Data** (synthetic); **POD-REQUIRED** (client questions with IDs in `open-client-questions.md` §SCP).
All rows: **UNVERIFIED**. † = topic seen in the TOC of the cited book:
* *Using Supply Chain Planning Common Features* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/faspf/index.html, 26C path) · *Using Supply Planning* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/fausp/index.html, 26C path) · *Using Planning Central* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/faupc/index.html, 26C path)
* *Using Demand Management* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fasdm/index.html) · *Using Order Promising* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fascp/index.html) · *Using Backlog Management* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faubm/index.html) · *Using Replenishment Planning* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faurp/index.html)
* *Using Sales and Operations Planning* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fasop/index.html) · *Using Production Scheduling* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/fapsu/index.html, 26C path) · *Using Supply Chain Collaboration* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faucc/index.html) · *Using Demand Collaboration* (https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faudc/index.html)
### 6.1 Data collections (COL)
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| COL-01 | H: targeted and net-change collections (†"Data Collection Types for Supply Chain Planning", "Collect Data Using the Targeted Collection Type", "Collect Data Using the Net Change Collection Type") of items, on-hand, open orders, POs, work orders and resources (†"Collect Resources and the Resource Availability from Oracle Fusion Cloud Manufacturing"). M: collected counts per entity equal the synthetic source counts. Ho: collection error surfaced | **Collection programs change with source-module changes; silent misses** | Dedicated synthetic org set with known counts | Collection schedule and scope (SCP-Q02) |
| COL-02 | H: load planning data from CSV (†"Load Planning Data from Files", "Import Templates Used to Create CSV Files for Oracle Supply Chain Planning"). N: bad row rejected | **Template changes** | Synthetic CSV | External data sources (SCP-Q08) |
| COL-03 | H: purge collected data and staging tables (†"How You Purge Collected Data from the Data Repository for Supply Chain Planning", "How You Purge Staging Tables for Supply Chain Planning") within the synthetic scope only | | | |
### 6.2 Demand planning (DMD): *Using Demand Management*
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| DMD-01 (mixed) | **Go/no-go scenarios:** H: demand plan run with a forecasting profile (†"Create a Forecasting Profile", "Forecasting Methods for Demand Plans") completes; forecast exists at every expected level; disaggregation (†"How Statistical Forecasts Are Disaggregated by Default") sums to the aggregate. **`tolerant-suite` scenarios:** forecast values within a tolerance band of the pre-patch baseline on the same synthetic history | **Forecasting engine (statistical/ML) changes values without errors** | 2–3 years of synthetic history | Forecasting profiles, plan frequency (SCP-Q03) |
| DMD-02 | H: adjust forecast in a planning table; A: approve demand plan (†"Approve a Demand Plan"); publish/archive. M: adjusted values persist and flow to the supply plan | Planning table UI (†"How You Can Edit Measure Data") | DMD-01 output | Approval practice (SCP-Q03) |
| DMD-03 | H: forecast accuracy measures (†"How You Measure Forecast Accuracy"); predefined demand exceptions (†"Predefined Demand Planning Exceptions") | | | |
| DMD-04 `tolerant-suite` | H: Planning Advisor (†"Enable Planning Advisor for Data Insights", "Hyperparameter-Tuning Details in the Planning Advisor") returns insights/tuning results. **Probabilistic; not counted toward go/no-go** | AI model changes | Synthetic history | Enabled? (SCP-Q03) |
| DMD-05 `event-driven` | H: planning calendar / time hierarchy extended for the next year (†"How You Create and Use Hybrid Time Hierarchies", "Run the Create Hybrid Time Hierarchies Scheduled Process"); forecasting profile retuned (†"How You Optimize Parameters for Forecasting Methods"). **Runs in the cycle before the planning-year boundary** | | | Planning calendar maintenance (SCP-Q09) |
### 6.3 Supply planning (SUP): *Using Supply Planning* / *Using Planning Central*
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| SUP-01 | H: run the supply plan (†"Define Supply Plan Options", "Differences Between the Recalculate and Run Plan Actions") unconstrained and, if used, constrained (†"Configure Supplier and Capacity Constraints"). M: planned order quantities and dates for the synthetic scope equal the baseline. Ho: plan run failure surfaced in plan messages (†"Review Plan Messages") | **Planning engine; run time; quantities/dates shift silently** | Dedicated synthetic plan | Plan types and options (SCP-Q04) |
| SUP-02 | H: firm and manually release planned orders (†"Create and Release Manual Planned Orders", "How Plan Recommendations Are Released") → requisition (P2P), work order (P2M), transfer order (SCM) created. M: released quantity/date on the downstream document. Ho: release errors | **Release interfaces to three packs** | SUP-01 output | Release practice (SCP-Q05) |
| SUP-03 | H: automatic release within the release time fence (†"Automatic Release Options"). N: orders outside the fence not released | Release rules | SUP-01 output | Auto-release used? (SCP-Q05) |
| SUP-04 | H: pegging (†"How FIFO Pegging Is Used in Supply Chain Planning"); predefined supply exceptions (†"Predefined Supply Planning Exceptions"); safety stock (†"Example of Safety Stock Planning with Lead Time Constraints"). M: safety stock levels | Exception logic | | Safety stock method |
| SUP-05 | M: forecast consumed by synthetic sales orders (†"Forecast Consumption") | Consumption logic | O2C synthetic order | |
| SUP-06 | H: simulation set (†"Create a Simulation Set"), copy plan (†"Copy a Plan"), what-if run | | | Used? |
| SUP-07 | H: project-specific supply planning (†"Checklist to Set Up Project-Specific Supply Planning") | | PPM synthetic project | Used? (SCP-Q01) |
| SUP-08 | H: CTO data collected (†"Collect CTO Data") and planned; drop shipments in supply planning (†"Drop Shipments in Supply Planning") | | | Used? (SCP-Q01) |
### 6.4 Order promising (GOP): *Using Order Promising*
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| GOP-01 | H: collect data for promising (†"Collect Data for Global Order Promising") and refresh; ATP rules (†"Available-to-Promise Rules", "Assign Your ATP Rules"), promising profiles (†"Manage Promising Profiles"), sourcing rules and assignment sets (†"Create Sourcing Rules", "Create an Assignment Set"). M: promised date for a synthetic availability check (†"Get Promising Dates in Real Time") equals the expected date. **Order-line scheduling itself is `O2C:SCH-01`** | **Promising engine and refresh; wrong dates silently** | Synthetic supply and sourcing | ATP rules, sourcing (SCP-Q06) |
| GOP-02 | H: allocation rule (†"Allocation Rule"); allocate via REST/FBDI (†"Allocate Supply Through REST API", "Allocate Supply Through FBDI"); adjust (†"Adjust Your Allocation Quantities") | | | Allocation used? (SCP-Q06) |
| GOP-03 | H: bill of resources (†"Create a Bill of Resources"); configured-item promising (†"Promise Your Configured Items") | | | CTO promising used? |
| GOP-04 | H: check availability (†"Check Availability") and alternative fulfillment scenarios (†"Create Alternative Fulfillment Scenarios to Reduce Cost") in the Order Promising work area | Work area UI | | |
### 6.5 Backlog, replenishment, S&OP, production scheduling, collaboration (BKL / RPL / SOP / PSC / CLB)
| ID | Scenarios to cover | Patch-sensitive points | Data | POD-REQUIRED |
|---|---|---|---|---|
| BKL-01 | H: backlog planning run (†"Overview of Backlog Management Processes") reprioritizes synthetic orders per rules (†"Overview of Backlog Planning Rules"); release results (†"Release Planning Results") → O2C fulfillment lines updated (O2C owns onward) | Planning rules | Synthetic backlog | Used? (SCP-Q01) |
| RPL-01 | H: replenishment plan (†"Create a Replenishment Plan") generates orders; automatic release (†"Automatic Release Options", "Overview of Replenishment Order Release") | | | Used? (SCP-Q01) |
| SOP-01 | H: S&OP plan refresh and run (†"Overview of Sales and Operations Planning", "Run the Orchestrate Refresh Measures Processes Scheduled Process"); compare plans (†"Compare Sales and Operations Plans") | | | Used? (SCP-Q01) |
| PSC-01 | H: production schedule with scope and options (†"Overview of Schedule Options", "Schedule Scope"); adjust work orders (†"Analysis and Adjustment Using Work Orders") → P2M work orders updated | | Synthetic plant from P2M | Used? (SCP-Q01) |
| CLB-01 | H: publish order forecast to a stubbed supplier (†"How You Publish Order Forecasts"); supplier commit recorded (†"Commit Order Forecasts") | Collaboration messaging | Stubbed supplier | Supplier collaboration used? (SCP-Q07) |
| CLB-02 | H: demand collaboration forecast cycle with a stubbed customer (*Demand Collaboration* †"Forecast Cycle Processes") | | Stubbed customer | Used? (SCP-Q07) |
### 6.6 Planning setup, roles and integrations (SET / SEC / INT)
| ID | Scenarios to cover | Patch-sensitive points | Data | Doc | POD-REQUIRED |
|---|---|---|---|---|---|
| SET-01 | H: planners (†"How You Define Planners for Supply Chain Planning"), supply network model (†"How You Maintain Your Supply Network Model"), approved supplier list for planning (†"How You Define the Approved Supplier List for Supply Chain Planning"), plan options | | Synthetic planners and network | | Network model (SCP-Q04) |
| SET-02 | H: page layouts, tables, graphs, tiles and measures (†"Manage Page Layouts in Supply Chain Planning", "Create a Tile in Supply Chain Planning", "How You Manage Planning Measures") render and save | **Planning UI is highly configurable; layout and measure changes per release** | | | User-defined measures and layouts (SCP-Q10) |
| SET-03 | H: exception thresholds (†"Configure Exception Thresholds") and exception sets (†"Configure Exception Sets") | | | | |
| SEC-01 | R: planner sees only orgs/items in their data access set (†"Create a Data Access Set and Define Its Conditions"); can't release outside scope; view-only role cannot release | **Planning security model** | Personas: Supply Planner, Demand Planner, Order Promising Manager, Planning Administrator (**UNVERIFIED · ANALYST** names) | Security Reference for Supply Chain Planning: https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fasvc/index.html | Data access sets, custom roles (SCP-Q10, X-Q07) |
| INT-01 | H: REST planned orders, supply orders, allocations, order forecasts. Contract: response superset of the baseline | Resource versions | Integration user (vault) | REST API for SCM: https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/fasrp/index.html (26C path) | REST consumers (SCP-Q08) |
| INT-02 | H: export planning data to CSV (†"Export Planning Data to CSV Files"); Excel export (†"Export Data to Microsoft Excel") tested via services | Export formats | | | |
| INT-03 | H: OTBI / planning analytics (†"Overview of Planning Analytics") show the synthetic plan | Subject areas | | Analytics and Reports for SCM: https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fauca/index.html | Custom reports (X-Q08) |
| INT-04 | H: the chain collections → plan run → release → promising refresh completes in order and within the expected run time | **Long batch chain; run-time regressions; triage "timing"** | | Scheduled Processes for SCM: https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faspc/index.html | **Scheduled job list** (SCP-Q02) |
| INT-05 | H: publish supply order details (†"How You Publish Supply Order Details") and order forecasts to stubbed external systems | Interface changes | Stub | | External consumers (SCP-Q08) |
---
## 7. What a quarterly patch typically touches in SCP (patch impact areas)
Generic expectations (**UNVERIFIED · ANALYST**). The real delta comes from the SCM readiness pages (https://docs.oracle.com/en/cloud/saas/readiness/scm.html, checked) and MOS notes (not opened).
| # | Impact area | Why it breaks tests | Rows most exposed | Mitigation |
|---|---|---|---|---|
| 1 | **Planning engine (supply)** | Planned quantities/dates shift without errors | SUP-01, SUP-04, SUP-05 | Baseline comparison on a small synthetic plan |
| 2 | **Collections** | Entities silently missed after source changes | COL-01, COL-02 | Entity count assertions |
| 3 | **Release interfaces** | Downstream requisitions / work orders / transfers not created | SUP-02, SUP-03, PSC-01 | Assert the downstream document exists |
| 4 | **Promising engine and refresh** | Wrong promised dates | GOP-01, GOP-02 | Expected-date recipes |
| 5 | **Forecasting engine** | Forecast values change | DMD-01 | Tolerant band (tolerant suite) + deterministic structure checks |
| 6 | **Planning UI (tables, layouts, tiles)** | Layout and measure behaviour changes | SET-02, DMD-02 | Render/save per layout; role/label locators |
| 7 | **Batch run time** | Chain exceeds the window | INT-04 | Track run time per patch; triage "timing" |
| 8 | **Security / data access sets** | Planners see or release out of scope | SEC-01 | Per-persona negative tests |
| 9 | **AI features** | Probabilistic behaviour | DMD-04, DMD-01 (values) | Tolerant suite (not counted toward go/no-go) |
## 8. Oracle documentation index (checked 9 Oct 2026 by page title)
| Area | Book | URL | Status |
|---|---|---|---|
| Common features | Using Supply Chain Planning Common Features | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/faspf/index.html | checked (26C path; linked from Oracle's 26D list) |
| Supply planning | Using Supply Planning | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/fausp/index.html | checked (26C path) |
| Planning Central | Using Planning Central | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/faupc/index.html | checked (26C path) |
| Demand | Using Demand Management | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fasdm/index.html | checked |
| Promising | Using Order Promising | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fascp/index.html | checked |
| Backlog | Using Backlog Management | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faubm/index.html | checked |
| Replenishment | Using Replenishment Planning | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faurp/index.html | checked |
| S&OP | Using Sales and Operations Planning | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fasop/index.html | checked |
| Production scheduling | Using Production Scheduling | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/fapsu/index.html | checked (26C path) |
| Supplier collaboration | Using Supply Chain Collaboration | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faucc/index.html | checked |
| Customer collaboration | Using Demand Collaboration | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faudc/index.html | checked |
| Setup | Implementing Supply Chain Planning | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faivc/index.html | checked |
| Roles | Security Reference for Supply Chain Planning | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fasvc/index.html | checked |
| Scheduled processes | Scheduled Processes for SCM | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/faspc/index.html | checked |
| REST | REST API for Oracle Fusion Cloud SCM | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26c/fasrp/index.html | checked (26C path) |
| Reports admin | Creating and Administering Analytics and Reports for SCM | https://docs.oracle.com/en/cloud/saas/supply-chain-and-manufacturing/26d/fauca/index.html | checked |
| Release readiness | Readiness: Supply Chain & Manufacturing | https://docs.oracle.com/en/cloud/saas/readiness/scm.html | checked |
| Update policy | MOS KB160632, KB157616 | My Oracle Support (login) | **not opened** |
## 9. Open questions and gaps
**Client-only questions** are in `analysis/open-client-questions.md` §SCP (SCP-Q01 onward). Internal decisions are reported to the Chief of Staff, not listed here. Amount triage, boundaries and sub-products are standing rules, not questions.
### 9.1 Gaps
* **Plan scope and run time:** P1 plan runs need a small dedicated synthetic scope; full client-scale plan runs are out of scope for patch regression.
* **Baselines:** supply plan and forecast comparisons need a pre-patch baseline captured on the test pod after each refresh.
* **Forecast values:** only tolerance-band checks are possible (tolerant suite); exact values are not stable across engine updates.
* **Excel / spreadsheet edits:** tested via CSV/REST. The manual Windows check is a recorded gap.
* **Collaboration partners and external systems:** stubbed only.
* **Mock app scope:** the mock is P2P-only. SCP P1 minimum: collections with count assertions, supply plan run, manual release creating a downstream requisition, promising date check, data access set visibility, batch chain timing.
* **Handoff:** no messaging channel from this analyst.
### 9.2 POD-REQUIRED checklist for the Scout and pod probers (read-only, test pod)
- [ ] Release, cohort, opt-ins; planning licensing (Supply Planning or Planning Central, Demand, Order Promising, Backlog, Replenishment, S&OP, Production Scheduling, Collaboration)
- [ ] Plans, plan types, options, collection scope and schedule
- [ ] Forecasting profiles and demand plan cycle
- [ ] Release rules and time fences
- [ ] ATP rules, sourcing rules, assignment sets, allocation
- [ ] Data access sets and custom roles; user-defined measures and layouts
- [ ] REST / CSV / publish integrations; scheduled job chain and typical run times
- [ ] Plan sizes and run frequency, to replace the ASSUMED usage scores
## 10. Handoff notes for the Fusion Test Designer
* P1 rows: COL-01, SUP-01, SUP-02, GOP-01, SEC-01 (80); INT-04 (75).
* Backbone chain: synthetic source data → collections (COL-01, count check) → demand plan (DMD-01 structure; values in tolerant suite) → approve/publish (DMD-02) → supply plan (SUP-01, baseline compare) → release (SUP-02) → `P2P:REQ-*` / `P2M:WO-01` / `SCM:TRF-01` exist → promising refresh (GOP-01) → `O2C:SCH-01` promised date.
* Put `map_ids:` (prefix `SCP:`), `verification: UNVERIFIED`, `schedule: event-driven` for DMD-05, `suite: tolerant` for DMD-04 and for the forecast-value scenarios of DMD-01 on every case. Link to, don't recreate, the referenced O2C/P2P/P2M/SCM/PPM rows.
* All history, forecasts and plans must be synthetic. No secrets in YAML.
*End of document. Status: DRAFT, UNVERIFIED. Pending Scout and pod-prober data and a target patch.*
|