5a81b95 | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 | ================================================================================
WIDGETBOARD ENTERPRISE PLATFORM - PHASE 2 OUTLINE
================================================================================
Preliminary Phase 2 Specification (Subject to Phase 1 completion approval)
Created: 2025-11-16 18:23 UTC
Release Manager: Claude Code Agent (Autonomous)
Authority: System Director (Claus)
STATUS: β³ DRAFT (PENDING Phase 1 completion gate approval)
TARGET START: January 1, 2026
TARGET COMPLETION: February 28, 2026
GATE REQUIRED: Phase 1 quality gate (architecture + security) must be β
APPROVED
================================================================================
PHASE 2 MISSION
================================================================================
"Upgrade WidgetBoard from foundation to enterprise platform with intelligent
widget ecosystem and security intelligence capabilities. Deliver both consumer
and enterprise-focused widgets."
================================================================================
PHASE 2 STRUCTURE
================================================================================
Phase 2 has TWO parallel tracks:
TRACK 2.A: Core Widget Enterprise Upgrade
ββ Calendar Widget (professional mode)
ββ Notes Widget (enterprise features)
ββ Status Widget (real-time monitoring)
ββ Procurement Widget (workflow automation)
TRACK 2.B: Security Intelligence Widgets (NEW - from Cyberstreams V2)
ββ Feed Ingestion Widget (threat intelligence)
ββ Search Interface Widget (query capability)
ββ Activity Stream Widget (real-time monitoring)
PARALLEL EXECUTION:
- Track 2.A and 2.B can run concurrently
- Estimated 8 weeks for both tracks
- Both must complete by Feb 28, 2026
================================================================================
TRACK 2.A: CORE WIDGET ENTERPRISE UPGRADE
================================================================================
PURPOSE: Enhance existing widgets with professional/enterprise features
CURRENT WIDGETS (From Phase 1.A/B/C):
β
Calendar Widget (basic)
β
Notes Widget (basic)
β
Status Widget (basic)
β
Security Widget (basic)
β
Procurement Widget (basic)
PHASE 2 UPGRADES FOR EACH:
2.A.1: Calendar Widget Professional Mode
Features:
- Recurring events with recurrence rules
- Meeting room/resource booking
- Timezone support (multi-timezone meetings)
- Integration with other calendars (personal/team/external)
- Invite system (attendees, RSVPs)
- Conflict detection
- Search and filtering
Effort: 5-7 days
Owner: Chief Architect + Frontend team
2.A.2: Notes Widget Enterprise Features
Features:
- Collaborative editing (real-time, multi-user)
- Rich text formatting (bold, italic, lists, etc.)
- File attachments and embedding
- Version history and restore
- Tags and categorization
- Search with full-text indexing
- Sharing (public link, team, private)
- Markdown support
Effort: 7-10 days
Owner: Chief Architect + Frontend team
2.A.3: Status Widget Real-Time Monitoring
Features:
- Service status dashboard (multiple services)
- Status page integration (StatusPage, Atlassian)
- Custom status indicators
- Historical status tracking
- Incident timeline
- Notification rules
Effort: 5-7 days
Owner: Chief Architect + Backend team
2.A.4: Procurement Widget Workflow Automation
Features:
- Purchase request workflow (create, approve, order)
- Vendor management
- Budget tracking
- Approval chains
- Document attachment and signing
- Integration with accounting systems
- Status tracking and notifications
Effort: 8-10 days
Owner: Chief Architect + Backend team
2.A.5: Security Widget Enhancement
Features:
- Security alert aggregation
- Compliance checklist tracking
- Vulnerability scanning integration
- Certificate expiry monitoring
- Access control management
- Security audit logging
Effort: 7-10 days
Owner: Chief Architect + Security team
TOTAL EFFORT (TRACK 2.A): 32-44 days (6-8 weeks with overlap)
================================================================================
TRACK 2.B: SECURITY INTELLIGENCE WIDGETS (NEW - CYBERSTREAMS V2)
================================================================================
PURPOSE: Add security monitoring capabilities via Cyberstreams V2 modules
SOURCE: Cyberstreams V2 (https://github.com/Clauskraft/cyberstreams-v2)
TECH STACK: Fastify (API), OpenSearch (indexing), MinIO (storage)
COMPLIANCE: Audit-ready, GDPR-compliant
2.B.1: Feed Ingestion Widget (Threat Intelligence)
Purpose: Monitor RSS feeds for security threats and intelligence
Source Module: Cyberstreams "Feed Ingestion Engine"
Features:
- Multiple RSS feed sources
- Real-time feed updates
- Feed normalization and tagging
- Threat level classification
- Feed filtering and search
- Duplicate detection
Technical Requirements:
- OpenSearch integration for indexing
- Background job for feed polling
- MinIO for feed archive storage
- Feed parser and normalizer
Effort: 8-10 days
Owner: Chief Architect + Backend team
Dependencies: Registry 2.0, OpenSearch setup
2.B.2: Search Interface Widget (Query Capability)
Purpose: Real-time search and filtering across security feeds/data
Source Module: Cyberstreams "Search Interface"
Features:
- Advanced query builder (multiple filters)
- Full-text search across feeds
- Saved search templates
- Result highlighting and export
- Search performance metrics
- Autocomplete and suggestions
Technical Requirements:
- OpenSearch query API integration
- UI for query building
- Result pagination and sorting
- Search history tracking
Effort: 7-9 days
Owner: Chief GUI Designer + Frontend team
Dependencies: Feed Ingestion Widget, OpenSearch
2.B.3: Activity Stream Widget (Real-Time Monitoring)
Purpose: Live stream of security events and activities
Source Module: Cyberstreams "Activity Stream Monitor"
Features:
- Server-Sent Events (SSE) for live updates
- Event filtering and categorization
- Real-time alerts and notifications
- Activity history view
- Event drill-down (click to see details)
- Custom alert rules
Technical Requirements:
- WebSocket or SSE implementation
- Event publishing system
- Real-time alert engine
- Event persistence
Effort: 8-10 days
Owner: Chief Architect + Backend team
Dependencies: Feed Ingestion Widget, Registry 2.0
TOTAL EFFORT (TRACK 2.B): 23-29 days (4-6 weeks)
MODULES NOT IN PHASE 2:
β Health Dashboard Widget (Phase 3+)
β Audit Logger Widget (Phase 4+)
================================================================================
PHASE 2 TIMELINE
================================================================================
January 2026:
Week 1 (Jan 1-5): Planning and architecture
- Chief Architect designs Track 2.A + 2.B architecture
- Backend team plans OpenSearch/MinIO setup
- Frontend team plans UI components
- Security review of Cyberstreams integration
Week 2-4 (Jan 6-31): Parallel implementation
Track 2.A (Core Widgets):
- 2.A.1: Calendar improvements (Jan 6-12)
- 2.A.2: Notes features (Jan 13-20)
- 2.A.3: Status widget (Jan 21-26)
Track 2.B (Security Widgets):
- 2.B.1: Feed Ingestion widget (Jan 6-15)
- Infrastructure setup (OpenSearch, MinIO) (Jan 6-10)
- 2.B.2: Search Interface widget (Jan 16-23)
February 2026:
Week 5-6 (Feb 1-14): Continue implementation + testing
Track 2.A:
- 2.A.4: Procurement widget (Feb 1-10)
- 2.A.5: Security widget (Feb 1-14)
- Testing and bug fixes (Feb 10-14)
Track 2.B:
- 2.B.3: Activity Stream widget (Feb 1-10)
- Integration testing (Feb 10-14)
- Security audit (Feb 10-20)
Week 7-8 (Feb 15-28): Final testing, optimization, gate
- Combined integration testing (Feb 15-21)
- Performance optimization (Feb 20-24)
- Security final audit (Feb 15-25)
- Quality gate review (Feb 25-28)
================================================================================
PHASE 2 DEPENDENCIES
================================================================================
MUST COMPLETE BEFORE PHASE 2 STARTS:
β
Phase 1.A: Widget Registry 2.0 (versioning, discovery, metrics)
β
Phase 1.B: Dashboard Shell (multi-monitor, collaboration, UX)
β
Phase 1.C: Component Design System (design tokens, accessibility)
β
Phase 1 Quality Gate: Architecture + Security approval
INFRASTRUCTURE REQUIRED:
- OpenSearch cluster (for security widget search)
- MinIO storage (for feed archives)
- Background job system (for feed polling)
- WebSocket/SSE infrastructure (for real-time updates)
================================================================================
PHASE 2 QUALITY GATES
================================================================================
MIDPOINT REVIEW (Feb 1):
- 50% of features implemented
- No blockers identified
- Build passing
- Tests at 80%+ coverage
FINAL GATE (Feb 28):
- 100% of features implemented
- 95%+ test coverage
- WCAG 2.1 AA compliance maintained
- Security audit passed
- Performance: <100ms UI response
- Zero critical bugs
- Architecture review approved
- Chief Architect sign-off required
================================================================================
PHASE 2 SUCCESS METRICS
================================================================================
TIMELINE:
β All features delivered by Feb 28, 2026
β Zero timeline slips >2 days
QUALITY:
β Zero critical bugs at gate
β 95%+ test coverage
β All tests passing
β WCAG 2.1 AA compliance
PERFORMANCE:
β <100ms UI response time
β Feed ingestion <500ms
β Search query <200ms
β Activity stream live (<100ms from event to UI)
SECURITY:
β Security audit passed
β Cyberstreams compliance preserved
β GDPR audit complete
β Zero high-severity vulnerabilities
TEAM:
β 95%+ on-time delivery
β Team confidence high
β Knowledge documentation complete
================================================================================
ESTIMATED EFFORT SUMMARY
================================================================================
Track 2.A (Core Widgets): 32-44 days
Track 2.B (Security Widgets): 23-29 days
Planning & Architecture: 5-7 days
Testing & Integration: 10-12 days
Buffer: 10-15 days (unforeseen issues)
TOTAL PHASE 2: 80-107 days (12-16 weeks calendar time)
COMPRESSED TO: ~8 weeks actual (Jan 1 - Feb 28, with parallel execution)
TEAM SIZE NEEDED:
- 1x Chief Architect (full-time)
- 1-2x Backend engineers (full-time)
- 2-3x Frontend engineers (full-time)
- 1x Chief GUI Designer (part-time, design spec)
- 1x Security engineer (part-time, security audit)
- 1x DevOps (part-time, infrastructure)
================================================================================
PHASE 2 ASSUMPTIONS
================================================================================
1. Phase 1 quality gate PASSES (all items approved)
2. Team availability at above staffing levels
3. No major blocking issues from Phase 1
4. Cyberstreams V2 modules extract cleanly
5. OpenSearch/MinIO infrastructure available
6. No significant scope additions
7. No major technology pivot required
================================================================================
PHASE 2 RISKS
================================================================================
RISK: OpenSearch integration complexity
PROBABILITY: Medium
IMPACT: High (could delay 2.B by 1 week)
MITIGATION: Early infrastructure setup, proof of concept in January
RISK: Cyberstreams module extraction takes longer than estimated
PROBABILITY: Medium
IMPACT: Medium (could delay 2.B by 3-5 days)
MITIGATION: Start extraction in December (before Phase 2 start)
RISK: Security audit delays (2.B focus)
PROBABILITY: Medium
IMPACT: High (could delay entire Phase 2 by 1 week)
MITIGATION: Begin security review early, coordinate with auditors
RISK: Team context switch from Phase 1 to Phase 2
PROBABILITY: Low
IMPACT: Low (1-2 days ramp-up)
MITIGATION: Documentation and knowledge transfer in final Phase 1 week
================================================================================
NEXT STEPS FOR PHASE 2 PLANNING
================================================================================
IMMEDIATE (After Phase 1 completion):
1. System Director approves Phase 2 spec
2. Project Manager allocates resources
3. Chief Architect creates detailed architecture
4. Chief GUI Designer designs Phase 2 widgets
DECEMBER 2025 (Preparation):
1. Extract Cyberstreams V2 modules (proof of concept)
2. Set up OpenSearch/MinIO infrastructure
3. Create detailed technical specs for each widget
4. Document Phase 2 architectural decisions
JANUARY 1, 2026 (Phase 2 Kickoff):
1. Team kickoff meeting
2. Architecture review and approval
3. Begin Sprint 1 implementation
4. Daily standup and tracking
================================================================================
GOVERNANCE FOR PHASE 2
================================================================================
RELEASE MANAGER: Continues same role as Phase 1
- Main branch integrity
- Scope discipline (Phase 2 spec only)
- PR flow control (max 3 concurrent)
- Daily PM status syncs
- Quality gate enforcement
PROJECT MANAGER: Allocates resources, coordinates teams
- Resource allocation across Track 2.A and 2.B
- Timeline management
- Risk escalation
- Status reporting
CHIEF ARCHITECT: Technical decisions, architecture approval
- Widget architecture design
- OpenSearch/infrastructure decisions
- Performance optimization
- Security architecture
CHIEF GUI DESIGNER: Design decisions, component specs
- Phase 2 widget designs
- Component refinements
- Accessibility verification
- Design system expansion
================================================================================
END OF PHASE 2 OUTLINE
================================================================================
Status: DRAFT (Pending Phase 1 completion)
Last Updated: 2025-11-16 18:23 UTC
Authority: System Director (Claus)
Next Review: Upon Phase 1 completion (Dec 31, 2025 quality gate)
IMPORTANT: This is preliminary. Final Phase 2 spec will be confirmed after
Phase 1 quality gate passes. Scope may be adjusted based on Phase 1 outcomes.
================================================================================
PHASE 2 BACKEND PLATFORM INFRASTRUCTURE (NEW TRACK 2.C)
================================================================================
Added: 2025-11-16 18:30 UTC (from existing branches held for Phase 2)
TRACK 2.C: Backend Platform Services (PARALLEL with 2.A and 2.B)
PURPOSE: Build platform infrastructure foundation for core widgets
BRANCHES CONTAINING THIS WORK:
- copilot/sub-pr-14 (PlatformProvider + contracts)
- copilot/sub-pr-14-one-more-time (Platform services + logging)
- copilot/sub-pr-14-yet-again (WidgetComponentProps types)
IMPLEMENTATION COMPONENTS:
2.C.1: PlatformProvider & Context
Files: src/platform/core/PlatformProvider.tsx, PlatformContext.ts
Purpose: React Context wrapper providing platform services to widgets
Effort: 3-5 days
Owner: Backend Architect (NEW ROLE recommended)
2.C.2: Service Implementations
Files: src/domain/*, src/platform/*/InMemory*Service.ts
Services:
- SecurityOverwatchService (security operations)
- AuditLogService (event logging)
- VectorStoreAdapter (vector DB)
- ProcurementIntelligenceService (procurement logic)
- NotesAggregatorService (notes backend)
Effort: 10-12 days
Owner: Backend Architect + Backend team
2.C.3: Type System & Integration
Files: src/platform/widgets/types.ts, WidgetComponentProps
Purpose: Strong typing between widgets and services
Effort: 3-4 days
Owner: Chief Architect
2.C.4: Logging & Monitoring
Files: utils/logger.ts, service logging integration
Purpose: Replace console.* with proper logging service
Effort: 2-3 days
Owner: Backend team
TOTAL EFFORT (TRACK 2.C): 18-24 days (3-4 weeks parallel)
PHASE 2 REVISED STRUCTURE:
Track 2.A: Core Widget Enterprise Upgrade (32-44 days)
Track 2.B: Security Intelligence Widgets (23-29 days)
Track 2.C: Backend Platform Infrastructure (18-24 days) [NEW]
Total: 73-97 days of work compressed to 8 weeks (parallel execution)
PARALLEL EXECUTION STRATEGY:
- Track 2.A: Frontend engineers (UI widget upgrades)
- Track 2.B: Frontend + Backend (Security widgets UI + backend)
- Track 2.C: Backend engineers (Platform infrastructure)
All three tracks run simultaneously Jan 1 - Feb 28
DEPENDENCIES:
Track 2.A β Track 2.C: Widgets need platform services
Track 2.B β Track 2.C: Security widgets need audit/logging
Track 2.C is foundational: Must complete or integrate with other tracks
TIMELINE IMPACT:
- If all 3 tracks work in parallel: 8 weeks remains realistic
- If Track 2.C slips: Blocks widget implementation
- Recommendation: Assign dedicated backend team to Track 2.C
TEAM REQUIREMENT FOR PHASE 2 (UPDATED):
Track 2.A: 2-3 Frontend engineers (React)
Track 2.B: 1-2 Frontend + 1 Backend (security integration)
Track 2.C: 1-2 Backend engineers (platform infrastructure) [NEW]
Total: 4-6 engineers minimum
Current: 1 Chief Architect + 1 Chief GUI Designer
RECOMMENDATION: Hire 2-3 specialists (confirmed in Interview #2)
================================================================================
|