================================================================================ WIDGETBOARD ENTERPRISE PLATFORM - PHASE 2 OUTLINE ================================================================================ Preliminary Phase 2 Specification (Subject to Phase 1 completion approval) Created: 2025-11-16 18:23 UTC Release Manager: Claude Code Agent (Autonomous) Authority: System Director (Claus) STATUS: ⏳ DRAFT (PENDING Phase 1 completion gate approval) TARGET START: January 1, 2026 TARGET COMPLETION: February 28, 2026 GATE REQUIRED: Phase 1 quality gate (architecture + security) must be ✅ APPROVED ================================================================================ PHASE 2 MISSION ================================================================================ "Upgrade WidgetBoard from foundation to enterprise platform with intelligent widget ecosystem and security intelligence capabilities. Deliver both consumer and enterprise-focused widgets." ================================================================================ PHASE 2 STRUCTURE ================================================================================ Phase 2 has TWO parallel tracks: TRACK 2.A: Core Widget Enterprise Upgrade ├─ Calendar Widget (professional mode) ├─ Notes Widget (enterprise features) ├─ Status Widget (real-time monitoring) └─ Procurement Widget (workflow automation) TRACK 2.B: Security Intelligence Widgets (NEW - from Cyberstreams V2) ├─ Feed Ingestion Widget (threat intelligence) ├─ Search Interface Widget (query capability) └─ Activity Stream Widget (real-time monitoring) PARALLEL EXECUTION: - Track 2.A and 2.B can run concurrently - Estimated 8 weeks for both tracks - Both must complete by Feb 28, 2026 ================================================================================ TRACK 2.A: CORE WIDGET ENTERPRISE UPGRADE ================================================================================ PURPOSE: Enhance existing widgets with professional/enterprise features CURRENT WIDGETS (From Phase 1.A/B/C): ✅ Calendar Widget (basic) ✅ Notes Widget (basic) ✅ Status Widget (basic) ✅ Security Widget (basic) ✅ Procurement Widget (basic) PHASE 2 UPGRADES FOR EACH: 2.A.1: Calendar Widget Professional Mode Features: - Recurring events with recurrence rules - Meeting room/resource booking - Timezone support (multi-timezone meetings) - Integration with other calendars (personal/team/external) - Invite system (attendees, RSVPs) - Conflict detection - Search and filtering Effort: 5-7 days Owner: Chief Architect + Frontend team 2.A.2: Notes Widget Enterprise Features Features: - Collaborative editing (real-time, multi-user) - Rich text formatting (bold, italic, lists, etc.) - File attachments and embedding - Version history and restore - Tags and categorization - Search with full-text indexing - Sharing (public link, team, private) - Markdown support Effort: 7-10 days Owner: Chief Architect + Frontend team 2.A.3: Status Widget Real-Time Monitoring Features: - Service status dashboard (multiple services) - Status page integration (StatusPage, Atlassian) - Custom status indicators - Historical status tracking - Incident timeline - Notification rules Effort: 5-7 days Owner: Chief Architect + Backend team 2.A.4: Procurement Widget Workflow Automation Features: - Purchase request workflow (create, approve, order) - Vendor management - Budget tracking - Approval chains - Document attachment and signing - Integration with accounting systems - Status tracking and notifications Effort: 8-10 days Owner: Chief Architect + Backend team 2.A.5: Security Widget Enhancement Features: - Security alert aggregation - Compliance checklist tracking - Vulnerability scanning integration - Certificate expiry monitoring - Access control management - Security audit logging Effort: 7-10 days Owner: Chief Architect + Security team TOTAL EFFORT (TRACK 2.A): 32-44 days (6-8 weeks with overlap) ================================================================================ TRACK 2.B: SECURITY INTELLIGENCE WIDGETS (NEW - CYBERSTREAMS V2) ================================================================================ PURPOSE: Add security monitoring capabilities via Cyberstreams V2 modules SOURCE: Cyberstreams V2 (https://github.com/Clauskraft/cyberstreams-v2) TECH STACK: Fastify (API), OpenSearch (indexing), MinIO (storage) COMPLIANCE: Audit-ready, GDPR-compliant 2.B.1: Feed Ingestion Widget (Threat Intelligence) Purpose: Monitor RSS feeds for security threats and intelligence Source Module: Cyberstreams "Feed Ingestion Engine" Features: - Multiple RSS feed sources - Real-time feed updates - Feed normalization and tagging - Threat level classification - Feed filtering and search - Duplicate detection Technical Requirements: - OpenSearch integration for indexing - Background job for feed polling - MinIO for feed archive storage - Feed parser and normalizer Effort: 8-10 days Owner: Chief Architect + Backend team Dependencies: Registry 2.0, OpenSearch setup 2.B.2: Search Interface Widget (Query Capability) Purpose: Real-time search and filtering across security feeds/data Source Module: Cyberstreams "Search Interface" Features: - Advanced query builder (multiple filters) - Full-text search across feeds - Saved search templates - Result highlighting and export - Search performance metrics - Autocomplete and suggestions Technical Requirements: - OpenSearch query API integration - UI for query building - Result pagination and sorting - Search history tracking Effort: 7-9 days Owner: Chief GUI Designer + Frontend team Dependencies: Feed Ingestion Widget, OpenSearch 2.B.3: Activity Stream Widget (Real-Time Monitoring) Purpose: Live stream of security events and activities Source Module: Cyberstreams "Activity Stream Monitor" Features: - Server-Sent Events (SSE) for live updates - Event filtering and categorization - Real-time alerts and notifications - Activity history view - Event drill-down (click to see details) - Custom alert rules Technical Requirements: - WebSocket or SSE implementation - Event publishing system - Real-time alert engine - Event persistence Effort: 8-10 days Owner: Chief Architect + Backend team Dependencies: Feed Ingestion Widget, Registry 2.0 TOTAL EFFORT (TRACK 2.B): 23-29 days (4-6 weeks) MODULES NOT IN PHASE 2: ❌ Health Dashboard Widget (Phase 3+) ❌ Audit Logger Widget (Phase 4+) ================================================================================ PHASE 2 TIMELINE ================================================================================ January 2026: Week 1 (Jan 1-5): Planning and architecture - Chief Architect designs Track 2.A + 2.B architecture - Backend team plans OpenSearch/MinIO setup - Frontend team plans UI components - Security review of Cyberstreams integration Week 2-4 (Jan 6-31): Parallel implementation Track 2.A (Core Widgets): - 2.A.1: Calendar improvements (Jan 6-12) - 2.A.2: Notes features (Jan 13-20) - 2.A.3: Status widget (Jan 21-26) Track 2.B (Security Widgets): - 2.B.1: Feed Ingestion widget (Jan 6-15) - Infrastructure setup (OpenSearch, MinIO) (Jan 6-10) - 2.B.2: Search Interface widget (Jan 16-23) February 2026: Week 5-6 (Feb 1-14): Continue implementation + testing Track 2.A: - 2.A.4: Procurement widget (Feb 1-10) - 2.A.5: Security widget (Feb 1-14) - Testing and bug fixes (Feb 10-14) Track 2.B: - 2.B.3: Activity Stream widget (Feb 1-10) - Integration testing (Feb 10-14) - Security audit (Feb 10-20) Week 7-8 (Feb 15-28): Final testing, optimization, gate - Combined integration testing (Feb 15-21) - Performance optimization (Feb 20-24) - Security final audit (Feb 15-25) - Quality gate review (Feb 25-28) ================================================================================ PHASE 2 DEPENDENCIES ================================================================================ MUST COMPLETE BEFORE PHASE 2 STARTS: ✅ Phase 1.A: Widget Registry 2.0 (versioning, discovery, metrics) ✅ Phase 1.B: Dashboard Shell (multi-monitor, collaboration, UX) ✅ Phase 1.C: Component Design System (design tokens, accessibility) ✅ Phase 1 Quality Gate: Architecture + Security approval INFRASTRUCTURE REQUIRED: - OpenSearch cluster (for security widget search) - MinIO storage (for feed archives) - Background job system (for feed polling) - WebSocket/SSE infrastructure (for real-time updates) ================================================================================ PHASE 2 QUALITY GATES ================================================================================ MIDPOINT REVIEW (Feb 1): - 50% of features implemented - No blockers identified - Build passing - Tests at 80%+ coverage FINAL GATE (Feb 28): - 100% of features implemented - 95%+ test coverage - WCAG 2.1 AA compliance maintained - Security audit passed - Performance: <100ms UI response - Zero critical bugs - Architecture review approved - Chief Architect sign-off required ================================================================================ PHASE 2 SUCCESS METRICS ================================================================================ TIMELINE: ✓ All features delivered by Feb 28, 2026 ✓ Zero timeline slips >2 days QUALITY: ✓ Zero critical bugs at gate ✓ 95%+ test coverage ✓ All tests passing ✓ WCAG 2.1 AA compliance PERFORMANCE: ✓ <100ms UI response time ✓ Feed ingestion <500ms ✓ Search query <200ms ✓ Activity stream live (<100ms from event to UI) SECURITY: ✓ Security audit passed ✓ Cyberstreams compliance preserved ✓ GDPR audit complete ✓ Zero high-severity vulnerabilities TEAM: ✓ 95%+ on-time delivery ✓ Team confidence high ✓ Knowledge documentation complete ================================================================================ ESTIMATED EFFORT SUMMARY ================================================================================ Track 2.A (Core Widgets): 32-44 days Track 2.B (Security Widgets): 23-29 days Planning & Architecture: 5-7 days Testing & Integration: 10-12 days Buffer: 10-15 days (unforeseen issues) TOTAL PHASE 2: 80-107 days (12-16 weeks calendar time) COMPRESSED TO: ~8 weeks actual (Jan 1 - Feb 28, with parallel execution) TEAM SIZE NEEDED: - 1x Chief Architect (full-time) - 1-2x Backend engineers (full-time) - 2-3x Frontend engineers (full-time) - 1x Chief GUI Designer (part-time, design spec) - 1x Security engineer (part-time, security audit) - 1x DevOps (part-time, infrastructure) ================================================================================ PHASE 2 ASSUMPTIONS ================================================================================ 1. Phase 1 quality gate PASSES (all items approved) 2. Team availability at above staffing levels 3. No major blocking issues from Phase 1 4. Cyberstreams V2 modules extract cleanly 5. OpenSearch/MinIO infrastructure available 6. No significant scope additions 7. No major technology pivot required ================================================================================ PHASE 2 RISKS ================================================================================ RISK: OpenSearch integration complexity PROBABILITY: Medium IMPACT: High (could delay 2.B by 1 week) MITIGATION: Early infrastructure setup, proof of concept in January RISK: Cyberstreams module extraction takes longer than estimated PROBABILITY: Medium IMPACT: Medium (could delay 2.B by 3-5 days) MITIGATION: Start extraction in December (before Phase 2 start) RISK: Security audit delays (2.B focus) PROBABILITY: Medium IMPACT: High (could delay entire Phase 2 by 1 week) MITIGATION: Begin security review early, coordinate with auditors RISK: Team context switch from Phase 1 to Phase 2 PROBABILITY: Low IMPACT: Low (1-2 days ramp-up) MITIGATION: Documentation and knowledge transfer in final Phase 1 week ================================================================================ NEXT STEPS FOR PHASE 2 PLANNING ================================================================================ IMMEDIATE (After Phase 1 completion): 1. System Director approves Phase 2 spec 2. Project Manager allocates resources 3. Chief Architect creates detailed architecture 4. Chief GUI Designer designs Phase 2 widgets DECEMBER 2025 (Preparation): 1. Extract Cyberstreams V2 modules (proof of concept) 2. Set up OpenSearch/MinIO infrastructure 3. Create detailed technical specs for each widget 4. Document Phase 2 architectural decisions JANUARY 1, 2026 (Phase 2 Kickoff): 1. Team kickoff meeting 2. Architecture review and approval 3. Begin Sprint 1 implementation 4. Daily standup and tracking ================================================================================ GOVERNANCE FOR PHASE 2 ================================================================================ RELEASE MANAGER: Continues same role as Phase 1 - Main branch integrity - Scope discipline (Phase 2 spec only) - PR flow control (max 3 concurrent) - Daily PM status syncs - Quality gate enforcement PROJECT MANAGER: Allocates resources, coordinates teams - Resource allocation across Track 2.A and 2.B - Timeline management - Risk escalation - Status reporting CHIEF ARCHITECT: Technical decisions, architecture approval - Widget architecture design - OpenSearch/infrastructure decisions - Performance optimization - Security architecture CHIEF GUI DESIGNER: Design decisions, component specs - Phase 2 widget designs - Component refinements - Accessibility verification - Design system expansion ================================================================================ END OF PHASE 2 OUTLINE ================================================================================ Status: DRAFT (Pending Phase 1 completion) Last Updated: 2025-11-16 18:23 UTC Authority: System Director (Claus) Next Review: Upon Phase 1 completion (Dec 31, 2025 quality gate) IMPORTANT: This is preliminary. Final Phase 2 spec will be confirmed after Phase 1 quality gate passes. Scope may be adjusted based on Phase 1 outcomes. ================================================================================ PHASE 2 BACKEND PLATFORM INFRASTRUCTURE (NEW TRACK 2.C) ================================================================================ Added: 2025-11-16 18:30 UTC (from existing branches held for Phase 2) TRACK 2.C: Backend Platform Services (PARALLEL with 2.A and 2.B) PURPOSE: Build platform infrastructure foundation for core widgets BRANCHES CONTAINING THIS WORK: - copilot/sub-pr-14 (PlatformProvider + contracts) - copilot/sub-pr-14-one-more-time (Platform services + logging) - copilot/sub-pr-14-yet-again (WidgetComponentProps types) IMPLEMENTATION COMPONENTS: 2.C.1: PlatformProvider & Context Files: src/platform/core/PlatformProvider.tsx, PlatformContext.ts Purpose: React Context wrapper providing platform services to widgets Effort: 3-5 days Owner: Backend Architect (NEW ROLE recommended) 2.C.2: Service Implementations Files: src/domain/*, src/platform/*/InMemory*Service.ts Services: - SecurityOverwatchService (security operations) - AuditLogService (event logging) - VectorStoreAdapter (vector DB) - ProcurementIntelligenceService (procurement logic) - NotesAggregatorService (notes backend) Effort: 10-12 days Owner: Backend Architect + Backend team 2.C.3: Type System & Integration Files: src/platform/widgets/types.ts, WidgetComponentProps Purpose: Strong typing between widgets and services Effort: 3-4 days Owner: Chief Architect 2.C.4: Logging & Monitoring Files: utils/logger.ts, service logging integration Purpose: Replace console.* with proper logging service Effort: 2-3 days Owner: Backend team TOTAL EFFORT (TRACK 2.C): 18-24 days (3-4 weeks parallel) PHASE 2 REVISED STRUCTURE: Track 2.A: Core Widget Enterprise Upgrade (32-44 days) Track 2.B: Security Intelligence Widgets (23-29 days) Track 2.C: Backend Platform Infrastructure (18-24 days) [NEW] Total: 73-97 days of work compressed to 8 weeks (parallel execution) PARALLEL EXECUTION STRATEGY: - Track 2.A: Frontend engineers (UI widget upgrades) - Track 2.B: Frontend + Backend (Security widgets UI + backend) - Track 2.C: Backend engineers (Platform infrastructure) All three tracks run simultaneously Jan 1 - Feb 28 DEPENDENCIES: Track 2.A → Track 2.C: Widgets need platform services Track 2.B → Track 2.C: Security widgets need audit/logging Track 2.C is foundational: Must complete or integrate with other tracks TIMELINE IMPACT: - If all 3 tracks work in parallel: 8 weeks remains realistic - If Track 2.C slips: Blocks widget implementation - Recommendation: Assign dedicated backend team to Track 2.C TEAM REQUIREMENT FOR PHASE 2 (UPDATED): Track 2.A: 2-3 Frontend engineers (React) Track 2.B: 1-2 Frontend + 1 Backend (security integration) Track 2.C: 1-2 Backend engineers (platform infrastructure) [NEW] Total: 4-6 engineers minimum Current: 1 Chief Architect + 1 Chief GUI Designer RECOMMENDATION: Hire 2-3 specialists (confirmed in Interview #2) ================================================================================