# SmartCoffee Pro Installition: 1. Placement: Must be on a flat, stable surface at least 1.2 meters above the ground. 2. Ventilation: Leave adequate space around the machine for air circulation to prevent overheating. 3. Power Safety: Never use with an extension cord or external timer. 4. Initial Setup: Before first use, wash the carafe and brew basket in mild detergent and run one full "water-only" brew cycle.