@@ -50,6 +50,23 @@ FP= Flare Platform
|
|
| 50 |
• Dedicated HS for blowout disabling during rig operation.
|
| 51 |
• Partial stroking facilities for ESV valves for testing purposes.
|
| 52 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 53 |
|
| 54 |
________________________________
|
| 55 |
|
|
@@ -1655,4 +1672,22 @@ FP= Flare Platform
|
|
| 1655 |
|
| 1656 |
• ESD 0 push buttons hardwired to platform ESD systems.
|
| 1657 |
• Dedicated HS for blowout disabling during rig operation.
|
| 1658 |
-
• Partial stroking facilities for ESV valves for testing purposes.
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 50 |
• Dedicated HS for blowout disabling during rig operation.
|
| 51 |
• Partial stroking facilities for ESV valves for testing purposes.
|
| 52 |
|
| 53 |
+
Pipeline System:
|
| 54 |
+
• 36" pipeline transports gas (domestic and export) to delivery points at PLC and Thai border.
|
| 55 |
+
• Offshore pipeline length: 346 km to coast. (Yadana offshore to Pipeline Centre)
|
| 56 |
+
• Onshore pipeline length: 63 km. ( Pipeline centre to Metering Station)
|
| 57 |
+
|
| 58 |
+
• Custody transferred to PTT of Thailand at border.
|
| 59 |
+
• Gas further transported by 238 km long 42" pipeline from Metering station to Ratchaburi where main users are EGAT and TECO Power Plants.
|
| 60 |
+
|
| 61 |
+
Pressure Requirements:
|
| 62 |
+
• Required delivery pressure at EGAT power plant: 36.9 bar (550 psia).
|
| 63 |
+
• Contractual delivery pressure at Thai border: Maximum 64.5 bar (950 psia).
|
| 64 |
+
|
| 65 |
+
Gas Delivery:
|
| 66 |
+
MMSCFD = million standard cubic feet per day
|
| 67 |
+
• Normal domestic gas supply to MOGE at PLC: 50 MMSCFD since June 2010.
|
| 68 |
+
• Maximum export gas delivery to PTT: 720 MMSCFD with border back pressure around 53 barg (780 psig) by running PTT BVW7 compressors.
|
| 69 |
+
• Maximum delivery to PTT recorded around 750 MMSCFD in May 2011.
|
| 70 |
|
| 71 |
________________________________
|
| 72 |
|
|
|
|
| 1672 |
|
| 1673 |
• ESD 0 push buttons hardwired to platform ESD systems.
|
| 1674 |
• Dedicated HS for blowout disabling during rig operation.
|
| 1675 |
+
• Partial stroking facilities for ESV valves for testing purposes.
|
| 1676 |
+
|
| 1677 |
+
Pipeline System:
|
| 1678 |
+
• 36" pipeline transports gas (domestic and export) to delivery points at PLC and Thai border.
|
| 1679 |
+
• Offshore pipeline length: 346 km to coast. (Yadana offshore to Pipeline Centre)
|
| 1680 |
+
• Onshore pipeline length: 63 km. ( Pipeline centre to Metering Station)
|
| 1681 |
+
|
| 1682 |
+
• Custody transferred to PTT of Thailand at border.
|
| 1683 |
+
• Gas further transported by 238 km long 42" pipeline from Metering station to Ratchaburi where main users are EGAT and TECO Power Plants.
|
| 1684 |
+
|
| 1685 |
+
Pressure Requirements:
|
| 1686 |
+
• Required delivery pressure at EGAT power plant: 36.9 bar (550 psia).
|
| 1687 |
+
• Contractual delivery pressure at Thai border: Maximum 64.5 bar (950 psia).
|
| 1688 |
+
|
| 1689 |
+
Gas Delivery:
|
| 1690 |
+
MMSCFD = million standard cubic feet per day
|
| 1691 |
+
• Normal domestic gas supply to MOGE at PLC: 50 MMSCFD since June 2010.
|
| 1692 |
+
• Maximum export gas delivery to PTT: 720 MMSCFD with border back pressure around 53 barg (780 psig) by running PTT BVW7 compressors.
|
| 1693 |
+
• Maximum delivery to PTT recorded around 750 MMSCFD in May 2011.
|