# Production readiness checklist ## Verified - Supabase Postgres stores review jobs and survives a Space restart. - Review findings and verdicts are recoverable after restart. - RAGAS inputs and terminal failures are persisted in job payloads. - Groq provider routing avoids an exhausted Gemini quota when Groq is configured. - RAGAS can produce real context precision, faithfulness, and MMR values. - RAGAS provider calls have bounded retries and timeouts. - GitHub posting receipts distinguish inline, fallback, finding, and verdict failures. - React production build and Vercel deployment succeed. - A reproducible diff-backed benchmark fixture exists for five public PRs. - Live validation on `calcom/cal.com#8087` detected all four unawaited `forEach(async ...)` defects and returned `request_changes` with four high findings (score 2/10). - The approve path was exercised on that live job and persisted a truthful `post_failed` receipt: 0 inline comments, 0 fallback comments, 4 finding failures, and 1 verdict failure. - API rate limiting is enabled at 10 requests/minute and was verified live behind the Hugging Face proxy with a safe concurrent test producing HTTP 429. - Review creation idempotency was verified live: repeated submissions with the same `Idempotency-Key` returned the same persisted job ID. - Deterministic correctness checks survive remote-provider failures, and model prompts now bound diff and changed-file context to free-provider limits. ## Required before production release - Generate predictions from the five diff-backed fixtures and record precision, recall, F1, severity, category, and false-positive results. - Run an approve decision against a safe test PR and verify the GitHub posting receipt and resulting comments. - Add per-user GitHub OAuth or GitHub App authentication and job ownership. - Enable required API authentication and rate limits after OAuth is wired into the frontend. - Add browser, API lifecycle, restart-recovery, and posting integration tests. - Verify a second repository and PR independently of the project repository. RAGAS scores must remain explicitly marked unavailable or failed when the provider cannot return. The system must never substitute invented metrics.