clarify-rl / docs

Commit History

  1. Semantic run names: Probe/Drift/Anchor/Restrain/Champion + regen all plots⁠

    Anurag Agarwal
    84fbeda
  2. Reframe: drop Run 7 from hero, keep only where appropriate⁠

    Anurag Agarwal
    023e210
  3. Polish Blog.md: fix broken images + visual hierarchy⁠

    Anurag Agarwal
    fe94ae7
  4. Stronger opening: meeting scheduling with 3 fabricated fields⁠

    Anurag Agarwal
    5df7029
  5. Expand Blog.md to comprehensive deep-dive (5.9k words, all evidence)⁠

    Anurag Agarwal
    7fbfbc0
  6. Reframe: environment is the contribution, training is validation⁠

    Anurag Agarwal
    ea8263a
  7. Add full plot deck to Blog and README⁠

    Anurag Agarwal
    f436dde
  8. Submission polish: Run 7 headline across all surfaces⁠

    Anurag Agarwal
    8cf6fc1
  9. Blog: human hook opening, simple language⁠

    Anurag Agarwal
    ca10a3a
  10. Update blog + slides with Run 5-7 findings⁠

    Anurag Agarwal
    3a0836e
  11. Run 6 results + training fixes + all plots regenerated⁠

    Anurag Agarwal
    aae07d0
  12. plots: add training progression + diagnostics, drop W&B links

    Verified signature
    099bec8

  1. docs: sync docs/slides.md (slide deck + auto-validator gate update)

    Verified signature
    5e0e1b0
  2. docs: add detailed model cards for Run 1 / Run 2 / Run 4

    Verified signature
    f1678ab
  3. docs: sync docs/trace_demo_run1.md

    Verified signature
    406b310
  4. docs: sync docs/trace_demo.md

    Verified signature
    6dbd9a2
  5. docs: sync docs/STATUS.md

    Verified signature
    f35202f
  6. docs: sync docs/blog.md

    Verified signature
    82693a1
  7. Update STATUS.md + SESSION_LOG.md: Phase 4 complete

    Anurag Agarwal
    9b0e12c
  8. ClarifyRL: initial HF Space deploy

    Anurag Agarwal
    2414d31