section,item,description,unit,qty,rate Substructure,A1,Excavation for foundation (machine dig),m3,350,340 Substructure,A2,Blinding concrete grade 20,m3,40,1600 Substructure,A3,Concrete grade 35 in foundations,m3,120,1750 Substructure,A4,Reinforcement bar supply and fix (T16),kg,15000,11.5 Substructure,A5,Formwork to foundation faces,m2,800,460 Superstructure,B1,Masonry wall in cement sand mortar,m2,650,660 Superstructure,B2,Reinforced concrete column grade 35,m3,85,1850 Superstructure,B3,Formwork to columns,m2,900,470 Superstructure,B4,Reinforcement bar supply and fix (T20),kg,22000,12 Superstructure,B5,Precast concrete slab panel,m2,1400,1450 Finishes,C1,Cement sand plastering to wall,m2,1300,175 Finishes,C2,Emulsion painting to wall,m2,2400,52 Finishes,C3,Ceramic wall tiling,m2,900,2850 Finishes,C4,Waterproofing membrane to roof,m2,700,265 Finishes,C5,Ceiling false ceiling with metal frame,m2,1100,380 External Works,D1,Demolition of existing structures,m3,90,480 External Works,D2,Excavation and disposal of spoil,m3,420,355 External Works,D3,uPVC drainage pipe 110mm,m,320,285 External Works,D4,Road base and asphalt surfacing,m2,1500,620 External Works,D5,Scaffolding to external walls,m2,1200,115 Services,E1,Electrical installation point,no.,180,950 Services,E2,Plumbing installation point,no.,120,1050 Services,E3,Fire alarm detection point,no.,95,1250 Services,E4,LV switchboard supply and install,no.,2,185000 Joinery,F1,Hollow core door with frame and ironmongery,no.,45,2750 Joinery,F2,Aluminium window with glazing,m2,220,3100 Joinery,F3,Scaffolding to external walls,m2,1200,118