- Due to space constraints a new air handling unit to provide the required air changes per hour was not an option. After finalzing the laod calculations Essential Engineering determined the required space pressurization and sensible load offset could be accomplished by utilizing the make-up air from an existing make-up air handling unit. The required air changes per hour was achieved by utilizing fan powered HEPA units (FFU). The design also included a new humidificaiton system dedicated to the project.
145
  </p>
146
  </div>
147
  <div>
 
141
  <div>
142
  <h4 class="font-bold mb-2">Space Constaints</h4>
143
  <p class="text-gray-600">
144
+ Due to space constraints a new air handling unit to provide the required air changes per hour was not an option. After finalzing the load calculations Essential Engineering determined an existing make-up air unit had sufficient capacity to provide the required airflow to effecetively pressurize the cleanroom and offset both the sensible and exhasut loads. The required air changes per hour was achieved by utilizing fan powered HEPA units (FFU). The design also included a new humidificaiton system dedicated to the project.