test / biotech-cleanroom-facility.html

Commit History

make projects tab active
98ca434
verified

mtourville commited on

change "Structural Integration Challenge" font size to match "Challenges and Solutions" font size
ed7eed0
verified

mtourville commited on

Manual changes saved
a5d7fcc
verified

mtourville commited on

Manual changes saved
c4107d7
verified

mtourville commited on

Manual changes saved
7500aa1
verified

mtourville commited on

Manual changes saved
a78dc64
verified

mtourville commited on

Manual changes saved
ed5a17a
verified

mtourville commited on

Manual changes saved
c4bcf18
verified

mtourville commited on

change project name to Pharma Cleanroom
c8d4f57
verified

mtourville commited on

under project overview change Essential Engineering designed this state of the art facility to: Essential Engineering partnered with Hodess Cleanroom Construction and Gamewell Mechanical to deliver a turn-key Design-Build
f4ea69a
verified

mtourville commited on

under challenges change Air handling units were shipped in splits to fit down narrow service corridors and coordinated with prefabricated pipe rack sections through a single opening at the end of the building to: Coordinated shipping splits for custom air handling units to fit down narrow service corridors. The AHU installation was closely coordinate with the prefabricated pipe rack installation. All utilities were installed successfully and without issue.
19b84db
verified

mtourville commited on

add to challenges and solutions: Shipping splits for each custom air handler had to be coordinated to fit down narrow service corridors in conjunction with the sections of prefabricated pipe racks
64929e5
verified

mtourville commited on

add the following under challenges and solutions : THe facility was built inside an existing two story shell building. All our mechanical systems had to be supported independently from the original building structure. Our design included custom pipe racks that were prefabricated off site and shipped in sections to the facility. Air handling units and pipe rack installation had to be strategically coordinated through a single opening at the end of the building.
3e1211b
verified

mtourville commited on

under utilities change units to imperial units
2b9c147
verified

mtourville commited on

change process chilled water to chilled water under utilities
d492275
verified

mtourville commited on

remove air changes from technical specs
f5115f8
verified

mtourville commited on

delete WFI from utilities
df98dfc
verified

mtourville commited on

delete clean steam generator from utilities
e40f5b2
verified

mtourville commited on

delete last 4 key features
f866673
verified

mtourville commited on

change automatic building management system to Hazardous, Ethanol, general and dedicated tool exhaust systems with N+1 redundancy
d1c6d5a
verified

mtourville commited on

add key feature
3e5d124
verified

mtourville commited on

change regimes to control
58e533a
verified

mtourville commited on

change general exhaust fans to general exhaust system with N+1 redundancy
e6e6747
verified

mtourville commited on

change two tool specific exhasut fans to dedicted tool exhaut systems with N+1 redundancy
27daa60
verified

mtourville commited on

change two ethanol exhuast fans to Ethanol exhaust systetm with N+1 redundancy
769d931
verified

mtourville commited on

change two hazardous exhaust fans to hazardous exhaust system with N+1 redundancy
8150ebb
verified

mtourville commited on

change advanced particle monitoring system with real-time alerts for critical partners to two (2) new custom 25,ooo cfm make-up air handling units, thirteen (13) custom recirculation air handling units ranging from 8,000 cfm to 32,000 cfm, two (2) hazardous exhaust fans, two (2) ethanol exhaust fans, two exhaust fans dedicated to specific tools, and two (2) general exhaust fans
768a50b
verified

mtourville commited on

add another key feature
3a7e290
verified

mtourville commited on

remove "and commissioned" from project overview
0463627
verified

mtourville commited on

add the following key featrue two (2) new custom 25,ooo cfm make-up air handling units, thirteen (13) custom recirculation air handling units ranging from 8,000 cfm to 32,000 cfm, two (2) hazardous exhaust fans, two (2) ethanol exhaust fans, two exhaust fans dedicated to specific tools, and two (2) general exhaust fans
d6bf3b9
verified

mtourville commited on

delete clean steam generator and sistrivution system for sterlization processes
8eeadff
verified

mtourville commited on

Change Biotech Cleanroom Facility to Grade A & B Pharmaceutical Cleanroom Facility
dd81a14
verified

mtourville commited on

change Boston, MA to Sanford, NC
5c69b88
verified

mtourville commited on

change headquarters address to 1668 Crawford Dairy Raod Chapel Hill, NC 27516
14179fa
verified

mtourville commited on

change biotech cleanrooms under the project tab to Pharmaceutical Cleanrooms
b5dc5fc
verified

mtourville commited on

change microelectronic facilities to micro-electromechanical facilities
aa7974d
verified

mtourville commited on

create a page for each of the featured projects
60b8a2d
verified

mtourville commited on