under project overview change Essential Engineering designed this state of the art facility to: Essential Engineering partnered with Hodess Cleanroom Construction and Gamewell Mechanical to deliver a turn-key Design-Build
under challenges change Air handling units were shipped in splits to fit down narrow service corridors and coordinated with prefabricated pipe rack sections through a single opening at the end of the building to: Coordinated shipping splits for custom air handling units to fit down narrow service corridors. The AHU installation was closely coordinate with the prefabricated pipe rack installation. All utilities were installed successfully and without issue.
add to challenges and solutions: Shipping splits for each custom air handler had to be coordinated to fit down narrow service corridors in conjunction with the sections of prefabricated pipe racks
add the following under challenges and solutions : THe facility was built inside an existing two story shell building. All our mechanical systems had to be supported independently from the original building structure. Our design included custom pipe racks that were prefabricated off site and shipped in sections to the facility. Air handling units and pipe rack installation had to be strategically coordinated through a single opening at the end of the building.
change advanced particle monitoring system with real-time alerts for critical partners to two (2) new custom 25,ooo cfm make-up air handling units, thirteen (13) custom recirculation air handling units ranging from 8,000 cfm to 32,000 cfm, two (2) hazardous exhaust fans, two (2) ethanol exhaust fans, two exhaust fans dedicated to specific tools, and two (2) general exhaust fans
add the following key featrue two (2) new custom 25,ooo cfm make-up air handling units, thirteen (13) custom recirculation air handling units ranging from 8,000 cfm to 32,000 cfm, two (2) hazardous exhaust fans, two (2) ethanol exhaust fans, two exhaust fans dedicated to specific tools, and two (2) general exhaust fans