expE-SCRATCH — clean-lineage run (fresh LoRA/modulation/pemb, never touched slots)
Headline: NO mosaic phase — fresh modulation + the constructed field family (lift/patch/rehearsal)
+ warp channel converge to coherent corridors within 200 own steps. At 400 steps it already rivals the warm-started twins
at +500 — early evidence the warm-start advantage is small and the clean-lineage model may match for free. Monitor τ.45 sampling.