# Project Execution Plan This plan treats BridgeLink ASL as one integrated project rather than a role handoff. ## Goal Complete a Hugging Face Space proof of concept backed by reproducible WLASL experiments: ```text WLASL-100 training -> MediaPipe landmark extraction -> temporal CNN baseline -> WLASL-25 demo checkpoint -> Qwen2.5-VL reranking comparison -> metrics, charts, Space demo, CVPR-style report ``` ## Required Work 1. Train the landmark CNN on WLASL-100. 2. Export the smaller WLASL-25 demo checkpoint for presentation use. 3. Build the WLASL-25 hybrid eval manifest with CNN top-5 candidates. 4. Run local Qwen2.5-VL reranking on the same clip set. 5. Generate `results/` artifacts with accuracy, precision, recall, F1, confusion matrix, and comparison rows. 6. Use Hugging Face Space as the live demo surface for the CNN app. 7. Write the CVPR-style report from the docs and generated results. ## Done Criteria - Space demo runs with webcam and uploaded clips. - Dataset visuals reflect the WLASL evaluation subset. - Experiments show CNN versus VLM metrics honestly. - Repo includes scripts to regenerate metrics and presentation assets. - Final report includes dataset, methodology, hyperparameters, experiment setup, metrics, graphs, and limitations.