Phase 6.5 Day 1: Real Qdrant cosine scores (A1) + verification timestamp (A2) 3f58d41 siddhm11 commited on May 3
fix(onboarding): correct hybrid_search call + add CLAUDE.md Rule 3.10 d33f7fa siddhm11 commited on May 3
Phase 6.1+6.2+6.3: Wire all 37 features into caller + health endpoint 5856b85 siddhm11 commited on May 2
Phase 6: LightGBM reranker integration (37-feature schema, 141-tree model) 63b37fd siddhm11 commited on May 2
docs: Update tracker - Phase 3.5 fully complete, all integration done 10fbe3b siddhm11 commited on Apr 20
Phase 3.5: Wire Turso DB for metadata (2.9x faster, includes citations) 12d7e78 siddhm11 commited on Apr 20
Fix SQLite permissions: writable dir + /tmp DB path for non-root user c450206 siddhm11 commited on Apr 19