Phase 6.5 Day 1: Real Qdrant cosine scores (A1) + verification timestamp (A2) 3f58d41 siddhm11 commited on about 1 month ago
Phase 6.1+6.2+6.3: Wire all 37 features into caller + health endpoint 5856b85 siddhm11 commited on about 1 month ago
Phase 6: LightGBM reranker integration (37-feature schema, 141-tree model) 63b37fd siddhm11 commited on May 2
docs: Update tracker - Phase 3.5 fully complete, all integration done 10fbe3b siddhm11 commited on Apr 20