Spaces:
Sleeping
Sleeping
File size: 3,414 Bytes
3345ea7 |
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 |
{
"project_name": "Generate a name of the project. In response provide only name and do not include any other information.",
"project_overview": "Generate an overview section that just improves the project overview from the client requirements. Keep the text up to 15 lines and Please write the text without using pronouns.",
"project_introduction": "Address the client formally and thank them for considering Sifars for the project. Briefly describe Sifars, mentioning its mission, values, and focus on delivering state-of-the-art AI or software solutions.",
"about_us": "Provide a short introduction to Sifars, focusing on our team's expertise, technologies, and the successful solutions we have developed. Mention how long Sifars has been in operation and our experience with similar projects.",
"background_of_the_project": "Describe the key challenge the client is facing in their industry (replace with the client's field, e.g., healthcare, finance). Present the problem and how Sifars will address it using advanced technologies (AI, software development, automation, etc.).",
"scope_of_work": "Detail the tasks that will be performed. Example structure: Data Collection and Preprocessing. Solution Development (e.g., AI model, software system). Integration and API development. Testing and validation. Deployment on scalable infrastructure.",
"technical_approach": "Explain the approach in detail. Include methodologies like content-based and collaborative filtering if relevant, or other techniques used by Sifars. Customize this to reflect the [ Techstack ] that's going to be used by Sifars.",
"deployment_and_integration": "Specify the deployment method, such as using cloud services like AWS, GCP, or any other infrastructure that Sifars uses or defined in the [ Techstack ]. Mention how Sifars ensures seamless integration with the client’s platform using APIs.",
"timeline": "Create a timeline with project milestones in the following table format, like: Week 1: Initial Setup and Data Collection. Week 2-3: Development of Core Components. Week 4: Final Deployment and Testing. Add estimated pricing in a flexible structure, allowing payments at each milestone.",
"team_structure": "Generate a detailed breakdown of a project team's structure, including roles and responsibilities. The team may consists of members like Project Manager, UI/UX Designer, Full Stack Developers, AI Developers, Quality Assurance Specialists, DevOps Engineers, etc. For each role, provide the number of members and describe their key responsibilities. Ensure that the responsibilities align with typical tasks for each role in a software development project. Use clear, professional language and ensure that the descriptions are concise yet comprehensive.",
"platform": "Generate text explaining each [ techstack ] the application will be built upon.",
"licensing_model": "Based on the [ Techstack ] and other potential tooling that will be involved to build the project, generate the Licensing Model section. ",
"risk_analysis": "List potential risks (e.g., data availability, bias in the system) and propose mitigations.",
"past_projects": "Provide case studies of similar projects Sifars has worked on, showcasing the impact and results achieved. Refer to the knowledge files to find 2 relevant projects that could be similar to the provided requirements."
}
|