File size: 247,850 Bytes
050b5b1
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
275
276
277
278
279
280
281
282
283
284
285
286
287
288
289
290
291
292
293
294
295
296
297
298
299
300
301
302
303
304
305
306
307
308
309
310
311
312
313
314
315
316
317
318
319
320
321
322
323
324
325
326
327
328
329
330
331
332
333
334
335
336
337
338
339
340
341
342
343
344
345
346
347
348
349
350
351
352
353
354
355
356
357
358
359
360
361
362
363
364
365
366
367
368
369
370
371
372
373
374
375
376
377
378
379
380
381
382
383
384
385
386
387
388
389
390
391
392
393
394
395
396
397
398
399
400
401
402
403
404
405
406
407
408
409
410
411
412
413
414
415
416
417
418
419
420
421
422
423
424
425
426
427
428
429
430
431
432
433
434
435
436
437
438
439
440
441
442
443
444
445
446
447
448
449
450
451
452
453
454
455
456
457
458
459
460
461
462
463
464
465
466
467
468
469
470
471
472
473
474
475
476
477
478
479
480
481
482
483
484
485
486
487
488
489
490
491
492
493
494
495
496
497
498
499
500
501
502
503
504
505
506
507
508
509
510
511
512
513
514
515
516
517
518
519
520
521
522
523
524
525
526
527
528
529
530
531
532
533
534
535
536
537
538
539
540
541
542
543
544
545
546
547
548
549
550
551
552
553
554
555
556
557
558
559
560
561
562
563
564
565
566
567
568
569
570
571
572
573
574
575
576
577
578
579
580
581
582
583
584
585
586
587
588
589
590
591
592
593
594
595
596
597
598
599
600
601
602
603
604
605
606
607
608
609
610
611
612
613
614
615
616
617
618
619
620
621
622
623
624
625
626
627
628
629
630
631
632
633
634
635
636
637
638
639
640
641
642
643
644
645
646
647
648
649
650
651
652
653
654
655
656
657
658
659
660
661
662
663
664
665
666
667
668
669
670
671
672
673
674
675
676
677
678
679
680
681
682
683
684
685
686
687
688
689
690
691
692
693
694
695
696
697
698
699
700
701
702
703
704
705
706
707
708
709
710
711
712
713
714
715
716
717
718
719
720
721
722
723
724
725
726
727
728
729
730
731
732
733
734
735
736
737
738
739
740
741
742
743
744
745
746
747
748
749
750
751
752
753
754
755
756
757
758
759
760
761
762
763
764
765
766
767
768
769
770
771
772
773
774
775
776
777
778
779
780
781
782
783
784
785
786
787
788
789
790
791
792
793
794
795
796
797
798
799
800
801
802
803
804
805
806
807
808
809
810
811
812
813
814
815
816
817
818
819
820
821
822
823
824
825
826
827
828
829
830
831
832
833
834
835
836
837
838
839
840
841
842
843
844
845
846
847
848
849
850
851
852
853
854
855
856
857
858
859
860
861
862
863
864
865
866
867
868
869
870
871
872
873
874
875
876
877
878
879
880
881
882
883
884
885
886
887
888
889
890
891
892
893
894
895
896
897
898
899
900
901
902
903
904
905
906
907
908
909
910
911
912
913
914
915
916
917
918
919
920
921
922
923
924
925
926
927
928
929
930
931
932
933
934
935
936
937
938
939
940
941
942
943
944
945
946
947
948
949
950
951
952
953
954
955
956
957
958
959
960
961
962
963
964
965
966
967
968
969
970
971
972
973
974
975
976
977
978
979
980
981
982
983
984
985
986
987
988
989
990
991
992
993
994
995
996
997
998
999
1000
1001
1002
1003
1004
1005
1006
1007
1008
1009
1010
1011
1012
1013
1014
1015
1016
1017
1018
1019
1020
1021
1022
1023
1024
1025
1026
1027
1028
1029
1030
1031
1032
1033
1034
1035
1036
1037
1038
1039
1040
1041
1042
1043
1044
1045
1046
1047
1048
1049
1050
1051
1052
1053
1054
1055
1056
1057
1058
1059
1060
1061
1062
1063
1064
1065
1066
1067
1068
1069
1070
1071
1072
1073
1074
1075
1076
1077
1078
1079
1080
1081
1082
1083
1084
1085
1086
1087
1088
1089
1090
1091
1092
1093
1094
1095
1096
1097
1098
1099
1100
1101
1102
1103
1104
1105
1106
1107
1108
1109
1110
1111
1112
1113
1114
1115
1116
1117
1118
1119
1120
1121
1122
1123
1124
1125
1126
1127
1128
1129
1130
1131
1132
1133
1134
1135
1136
1137
1138
1139
1140
1141
1142
1143
1144
1145
1146
1147
1148
1149
1150
1151
1152
1153
1154
1155
1156
1157
1158
1159
1160
1161
1162
1163
1164
1165
1166
1167
1168
1169
1170
1171
1172
1173
1174
1175
1176
1177
1178
1179
1180
1181
1182
1183
1184
1185
1186
1187
1188
1189
1190
1191
1192
1193
1194
1195
1196
1197
1198
1199
1200
1201
1202
1203
1204
1205
1206
1207
1208
1209
1210
1211
1212
1213
1214
1215
1216
1217
1218
1219
1220
1221
1222
1223
1224
1225
1226
1227
1228
1229
1230
1231
1232
1233
1234
1235
1236
1237
1238
1239
1240
1241
1242
1243
1244
1245
1246
1247
1248
1249
1250
1251
1252
1253
1254
1255
1256
1257
1258
1259
1260
1261
1262
1263
1264
1265
1266
1267
1268
1269
1270
1271
1272
1273
1274
1275
1276
1277
1278
1279
1280
1281
1282
1283
1284
1285
1286
1287
1288
1289
1290
1291
1292
1293
1294
1295
1296
1297
1298
1299
1300
1301
1302
1303
1304
1305
1306
1307
1308
1309
1310
1311
1312
1313
1314
1315
1316
1317
1318
1319
1320
1321
1322
1323
1324
1325
1326
1327
1328
1329
1330
1331
1332
1333
1334
1335
1336
1337
1338
1339
1340
1341
1342
1343
1344
1345
1346
1347
1348
1349
1350
1351
1352
1353
1354
1355
1356
1357
1358
1359
1360
1361
1362
1363
1364
1365
1366
1367
1368
1369
1370
1371
1372
1373
1374
1375
1376
1377
1378
1379
1380
1381
1382
1383
1384
1385
1386
1387
1388
1389
1390
1391
1392
1393
1394
1395
1396
1397
1398
1399
1400
1401
1402
1403
1404
1405
1406
1407
1408
1409
1410
1411
1412
1413
1414
1415
1416
1417
1418
1419
1420
1421
1422
1423
1424
1425
1426
1427
1428
1429
1430
1431
1432
1433
1434
1435
1436
1437
1438
1439
1440
1441
1442
1443
1444
1445
1446
1447
1448
1449
1450
1451
1452
1453
1454
1455
1456
1457
1458
1459
1460
1461
1462
1463
1464
1465
1466
1467
1468
1469
1470
1471
1472
1473
1474
1475
1476
1477
1478
1479
1480
1481
1482
1483
1484
1485
1486
1487
1488
1489
1490
1491
1492
1493
1494
1495
1496
1497
1498
1499
1500
1501
1502
1503
1504
1505
1506
1507
1508
1509
1510
1511
1512
1513
1514
1515
1516
1517
1518
1519
1520
1521
1522
1523
1524
1525
1526
1527
1528
1529
1530
1531
1532
1533
1534
1535
1536
1537
1538
1539
1540
1541
1542
1543
1544
1545
1546
1547
1548
1549
1550
1551
1552
1553
1554
1555
1556
1557
1558
1559
1560
1561
1562
1563
1564
1565
1566
1567
1568
1569
1570
1571
1572
1573
1574
1575
1576
1577
1578
1579
1580
1581
1582
1583
1584
1585
1586
1587
1588
1589
1590
1591
1592
1593
1594
1595
1596
1597
1598
1599
1600
1601
1602
1603
1604
1605
1606
1607
1608
1609
1610
1611
1612
1613
1614
1615
1616
1617
1618
1619
1620
1621
1622
1623
1624
1625
1626
1627
1628
1629
1630
1631
1632
1633
1634
1635
1636
1637
1638
1639
1640
1641
1642
1643
1644
1645
1646
1647
1648
1649
1650
1651
1652
1653
1654
1655
1656
1657
1658
1659
1660
1661
1662
1663
1664
1665
1666
1667
1668
1669
1670
1671
1672
1673
1674
1675
1676
1677
1678
1679
1680
1681
1682
1683
1684
1685
1686
1687
1688
1689
1690
1691
1692
1693
1694
1695
1696
1697
1698
1699
1700
1701
1702
1703
1704
1705
1706
1707
1708
1709
1710
1711
1712
1713
1714
1715
1716
1717
1718
1719
1720
1721
1722
1723
1724
1725
1726
1727
1728
1729
1730
1731
1732
1733
1734
1735
1736
1737
1738
1739
1740
1741
1742
1743
1744
1745
1746
1747
1748
1749
1750
1751
1752
1753
1754
1755
1756
1757
1758
1759
1760
1761
1762
1763
1764
1765
1766
1767
1768
1769
1770
1771
1772
1773
1774
1775
1776
1777
1778
1779
1780
1781
1782
1783
1784
1785
1786
1787
1788
1789
1790
1791
1792
1793
1794
1795
1796
1797
1798
1799
1800
1801
1802
1803
1804
1805
1806
1807
1808
1809
1810
1811
1812
1813
1814
1815
1816
1817
1818
1819
1820
1821
1822
1823
1824
1825
1826
1827
1828
1829
1830
1831
1832
1833
1834
1835
1836
1837
1838
1839
1840
1841
1842
1843
1844
1845
1846
1847
1848
1849
1850
1851
1852
1853
1854
1855
1856
1857
1858
1859
1860
1861
1862
1863
1864
1865
1866
1867
1868
1869
1870
1871
1872
1873
1874
1875
1876
1877
1878
1879
1880
1881
1882
1883
1884
1885
1886
1887
1888
1889
1890
1891
1892
1893
1894
1895
1896
1897
1898
1899
1900
1901
1902
1903
1904
1905
1906
1907
1908
1909
1910
1911
1912
1913
1914
1915
1916
1917
1918
1919
1920
1921
1922
1923
1924
1925
1926
1927
1928
1929
1930
1931
1932
1933
1934
1935
1936
1937
1938
1939
1940
1941
1942
1943
1944
1945
1946
1947
1948
1949
1950
1951
1952
1953
1954
1955
1956
1957
1958
1959
1960
1961
1962
1963
1964
1965
1966
1967
1968
1969
1970
1971
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
2028
2029
2030
2031
2032
2033
2034
2035
2036
2037
2038
2039
2040
2041
2042
2043
2044
2045
2046
2047
2048
2049
2050
2051
2052
2053
2054
2055
2056
2057
2058
2059
2060
2061
2062
2063
2064
2065
2066
2067
2068
2069
2070
2071
2072
2073
2074
2075
2076
2077
2078
2079
2080
2081
2082
2083
2084
2085
2086
2087
2088
2089
2090
2091
2092
2093
2094
2095
2096
2097
2098
2099
2100
2101
2102
2103
2104
2105
2106
2107
2108
2109
2110
2111
2112
2113
2114
2115
2116
2117
2118
2119
2120
2121
2122
2123
2124
2125
2126
2127
2128
2129
2130
2131
2132
2133
2134
2135
2136
2137
2138
2139
2140
2141
2142
2143
2144
2145
2146
2147
2148
2149
2150
2151
2152
2153
2154
2155
2156
2157
2158
2159
2160
2161
2162
2163
2164
2165
2166
2167
2168
2169
2170
2171
2172
2173
2174
2175
2176
2177
2178
2179
2180
2181
2182
2183
2184
2185
2186
2187
2188
2189
2190
2191
2192
2193
2194
2195
2196
2197
2198
2199
2200
2201
2202
2203
2204
2205
2206
2207
2208
2209
2210
2211
2212
2213
2214
2215
2216
2217
2218
2219
2220
2221
2222
2223
2224
2225
2226
2227
2228
2229
2230
2231
2232
2233
2234
2235
2236
2237
2238
2239
2240
2241
2242
2243
2244
2245
2246
2247
2248
2249
2250
2251
2252
2253
2254
2255
2256
2257
2258
2259
2260
2261
2262
2263
2264
2265
2266
2267
2268
2269
2270
2271
2272
2273
2274
2275
2276
2277
2278
2279
2280
2281
2282
2283
2284
2285
2286
2287
2288
2289
2290
2291
2292
2293
2294
2295
2296
2297
2298
2299
2300
2301
2302
2303
2304
2305
2306
2307
2308
2309
2310
2311
2312
2313
2314
2315
2316
2317
2318
2319
2320
2321
2322
2323
2324
2325
2326
2327
2328
2329
2330
2331
2332
2333
2334
2335
2336
2337
2338
2339
2340
2341
2342
2343
2344
2345
2346
2347
2348
2349
2350
2351
2352
2353
2354
2355
2356
2357
2358
2359
2360
2361
2362
2363
2364
2365
2366
2367
2368
2369
2370
2371
2372
2373
2374
2375
2376
2377
2378
2379
2380
2381
2382
2383
2384
2385
2386
2387
2388
2389
2390
2391
2392
2393
2394
2395
2396
2397
2398
2399
2400
2401
2402
2403
2404
2405
2406
2407
2408
2409
2410
2411
2412
2413
2414
2415
2416
2417
2418
2419
2420
2421
2422
2423
2424
2425
2426
2427
2428
2429
2430
2431
2432
2433
2434
2435
2436
2437
2438
2439
2440
2441
2442
2443
2444
2445
2446
2447
2448
2449
2450
2451
2452
2453
2454
2455
2456
2457
2458
2459
2460
2461
2462
2463
2464
2465
2466
2467
2468
2469
2470
2471
2472
2473
2474
2475
2476
2477
2478
2479
2480
2481
2482
2483
2484
2485
2486
2487
2488
2489
2490
2491
2492
2493
2494
2495
2496
2497
2498
2499
2500
2501
2502
2503
2504
2505
2506
2507
2508
2509
2510
2511
2512
2513
2514
2515
2516
2517
2518
2519
2520
2521
2522
2523
2524
2525
2526
2527
2528
2529
2530
2531
2532
2533
2534
2535
2536
2537
2538
2539
2540
2541
2542
2543
2544
2545
2546
2547
2548
2549
2550
2551
2552
2553
2554
2555
2556
2557
2558
2559
2560
2561
2562
2563
2564
2565
2566
2567
2568
2569
2570
2571
2572
2573
2574
2575
2576
2577
2578
2579
2580
2581
2582
2583
2584
2585
2586
2587
2588
2589
2590
2591
2592
2593
2594
2595
2596
2597
2598
2599
2600
2601
2602
2603
2604
2605
2606
2607
2608
2609
2610
2611
2612
2613
2614
2615
2616
2617
2618
2619
2620
2621
2622
2623
2624
2625
2626
2627
2628
2629
2630
2631
2632
2633
2634
2635
2636
2637
2638
2639
2640
2641
2642
2643
2644
2645
2646
2647
2648
2649
2650
2651
2652
2653
2654
2655
2656
2657
2658
2659
2660
2661
2662
2663
2664
2665
2666
2667
2668
2669
2670
2671
2672
2673
2674
2675
2676
2677
2678
2679
2680
2681
2682
2683
2684
2685
2686
2687
2688
2689
2690
2691
2692
2693
2694
2695
2696
2697
2698
2699
2700
2701
2702
2703
2704
2705
2706
2707
2708
2709
2710
2711
2712
2713
2714
2715
2716
2717
2718
2719
2720
2721
2722
2723
2724
2725
2726
2727
2728
2729
2730
2731
2732
2733
2734
2735
2736
2737
2738
2739
2740
2741
2742
2743
2744
2745
2746
2747
2748
2749
2750
2751
2752
2753
2754
2755
2756
2757
2758
2759
2760
2761
2762
2763
2764
2765
2766
2767
2768
2769
2770
2771
2772
2773
2774
2775
2776
2777
2778
2779
2780
2781
2782
2783
2784
2785
2786
2787
2788
2789
2790
2791
2792
2793
2794
2795
2796
2797
2798
2799
2800
2801
2802
2803
2804
2805
2806
2807
2808
2809
2810
2811
2812
2813
2814
2815
2816
2817
2818
2819
2820
2821
2822
2823
2824
2825
2826
2827
2828
2829
2830
2831
2832
2833
2834
2835
2836
2837
2838
2839
2840
2841
2842
2843
2844
2845
2846
2847
2848
2849
2850
2851
2852
2853
2854
2855
2856
2857
2858
2859
2860
2861
2862
2863
2864
2865
2866
2867
2868
2869
2870
2871
2872
2873
2874
2875
2876
2877
2878
2879
2880
2881
2882
2883
2884
2885
2886
2887
2888
2889
2890
2891
2892
2893
2894
2895
2896
2897
2898
2899
2900
2901
2902
2903
2904
2905
2906
2907
2908
2909
2910
2911
2912
2913
2914
2915
2916
2917
2918
2919
2920
2921
2922
2923
2924
2925
2926
2927
2928
2929
2930
2931
2932
2933
2934
2935
2936
2937
2938
2939
2940
2941
2942
2943
2944
2945
2946
2947
2948
2949
2950
2951
2952
2953
2954
2955
2956
2957
2958
2959
2960
2961
2962
2963
2964
2965
2966
2967
2968
2969
2970
2971
2972
2973
2974
2975
2976
2977
2978
2979
2980
2981
2982
2983
2984
2985
2986
2987
2988
2989
2990
2991
2992
2993
2994
2995
2996
2997
2998
2999
3000
3001
3002
3003
3004
3005
3006
3007
3008
3009
3010
3011
3012
3013
3014
3015
3016
3017
3018
3019
3020
3021
3022
3023
3024
3025
3026
3027
3028
3029
3030
3031
3032
3033
3034
3035
3036
3037
3038
3039
3040
3041
3042
3043
3044
3045
3046
3047
3048
3049
3050
3051
3052
3053
3054
3055
3056
3057
3058
3059
3060
3061
3062
3063
3064
3065
3066
3067
3068
3069
3070
3071
3072
3073
3074
3075
3076
3077
3078
3079
3080
3081
3082
3083
3084
3085
3086
3087
3088
3089
3090
3091
3092
3093
3094
3095
3096
3097
3098
3099
3100
3101
3102
3103
3104
3105
3106
3107
3108
3109
3110
3111
3112
3113
3114
3115
3116
3117
3118
3119
3120
3121
3122
3123
3124
3125
3126
3127
3128
3129
3130
3131
3132
3133
3134
3135
3136
3137
3138
3139
3140
3141
3142
3143
3144
3145
3146
3147
3148
3149
3150
3151
3152
3153
3154
3155
3156
3157
3158
3159
3160
3161
3162
3163
3164
3165
3166
3167
3168
3169
3170
3171
3172
3173
3174
3175
3176
3177
3178
3179
3180
3181
3182
3183
3184
3185
3186
3187
3188
3189
3190
3191
3192
3193



 

Project Concert

BPD009 – Project Systems & Time Sheets
Business Process Document
1.00 Baselined

[Publish Date]
BPD PS& TM
Purpose:	The objective of this document is to summarise the validated Concert Programme business processes for Project Systems and Time Sheets including:
•	Business scope and requirements
•	Site specific variations
•	Detailed business activity 
•	High level roles and skills
•	Integration points
 
Scope:	In scope are the key activities of Project Systems and Time Sheets including Project Creation, Project Templates, Budgeting, Project Execution, Cost Allocation, Time Sheet Management and Project Closing. The scope of the Project Systems and Time Sheeting workstream covers:
•	The Consolidation of activities from Agresso to SAP – this includes all activities of the JM Davy business plus moving the time sheeting for the RD&E business area to SAP
•	Implementation of Project Systems for the management of R&D activities in line with the move of RD&E business time sheeting moving from Agresso to SAP
•	Implementation of Project Systems for the management of Formox Plant Designs and move of this business to the use of time sheeting in SAP
•	Other parts of CT will continue to use Internal Orders/their current processes for managing project type activities such as CAPEX projects.


Summary:	

All Project Systems and Time Sheeting processes in the defined business areas (JM Davy, RD&E, Formox Plant Designs) will be done on the Concert SAP system by the roles involved e.g., project manager, customer services etc., with interaction with the other roles e.g., finance, estimating etc. and the Master Data Team. Some processes will continue to take place out of the system using tools currently in place such as KeyedIn, Primavera, Excel.

Document Information
Document Name	Project Systems & Time Sheets Business Process Document
Last Saved	06/06/2022 16:07:00

Printed	NAMonday, 06 June 2022

Author(s)	Marco A. Desentis, Carl Scarlett
Business Owner	Carl Scarlett


 
Contents
1.	Document Control	8
1.1.	Authors	8
1.2.	Change History	8
1.3.	Approvers	8
1.4.	Reviewers	9
1.5.	Distribution Information	10
1.6.	External References	10
1.7.	Related Business Process Documents	11
1.8.	Glossary	11
2.	Introduction, Purpose and Scope	13
2.1.	Document Purpose	13
2.2.	Document Scope	13
2.3.	Document Architecture	13
3.	Business Context	14
3.1.	Concert Programme Vision	14
3.2.	Design Principles	15
4.	Design Scope	17
4.1.	Business Process Framework	17
4.2.	Organisation Process Hierarchy	18
4.3.	Concert Deployment Context / Scope	18
4.4.	Process Area Scope	18
4.4.1.	Process Areas - In Scope	18
4.4.2.	Scope Items – In Scope	20
4.4.3.	Process Areas - Out of Scope	20
4.5.	Site Related Scope	20
5.	Detailed Design	24
5.1.	Level 3 & 4 Business Processes	24
5.2.	Level 3 Business Area – 08.01.01 Maintain Project Definition & Structures	25
5.2.1.	Process: 08.01.01.01 Develop Project Policy and Procedure	25
5.2.2.	Process: 08.01.01.02 Create and Maintain Projects	27
5.2.2.1.	Level 4 Process Flow and Steps	29
5.2.2.2.	To-be Changes	32
5.2.2.3.	Site Specific Changes	33
5.2.3.	Process: 08.01.01.03 Project Template and Master Data Maintenance	33
5.2.3.1.	Project Templates	34
5.2.3.2.	Project Template for Licensing	34
5.2.3.3.	Project template for Licensing Proposals	38
5.2.3.4.	Project template for Formox Plant Designs	38
5.2.3.5.	Project template for R&D KeyedIn Projects	39
5.2.3.6.	Project Structures for “day-to-day" activities	40
5.2.3.7.	Level 4 Process Flow and Steps	42
5.2.3.8.	To-be Changes	44
5.2.3.9.	Site Specific Changes	44
5.3.	Level 3 Business Area – 08.01.02 Perform Project Budgeting & Planning	44
5.3.1.	Process: 08.01.02.01 Perform Budget for Project Spend	53
5.3.1.1.	Level 4 Process Flow and Steps	54
5.3.1.2.	To-be Changes	56
5.3.1.3.	Site Specific Changes	56
5.3.2.	Process: 08.01.02.02 Perform Project Forecasting	56
5.3.2.1.	Level 4 Process Flow and Steps	58
5.3.2.2.	To-be Changes	60
5.3.2.3.	Site Specific Changes	60
5.3.3.	Process: 08.01.02.03 Perform Project Amendment (over/under)	60
5.3.3.1.	Level 4 Process Flow and Steps	62
5.3.3.2.	To-be Changes	63
5.3.3.3.	Site Specific Changes	63
5.4.	Level 3 Business Area – 08.01.03 Capture Project Costs & Timesheets	64
5.4.1.	Process: 08.01.03.01 Capture Project Related Costs	65
5.4.1.1.	Level 4 Process Flow and Steps	70
5.4.1.2.	To-be Changes	71
5.4.1.3.	Site Specific Changes	72
5.4.2.	Process: 08.01.03.02 Maintaining HR Mini Master	72
5.4.2.1.	Level 4 Process Flow and Steps	74
5.4.2.2.	To-be Changes	76
5.4.2.3.	Site Specific Changes	76
5.4.3.	Process: 08.01.03.03 Enter & Approve Time	76
5.4.3.1.	Level 4 Process Flow and Steps	82
5.4.3.2.	To-be Changes	85
5.4.3.3.	Site Specific Changes	85
5.4.4.	Process: 08.01.03.04 Time Administration	85
5.4.4.1.	Level 4 Process Flow and Steps	86
5.4.4.2.	To-be Changes	88
5.4.4.3.	Site Specific Changes	88
5.4.5.	Process: 08.01.03.05 Reporting for Time Sheets	89
5.4.5.1.	Level 4 Process Flow and Steps	93
5.4.5.2.	To-be Changes	94
5.4.5.3.	Site Specific Changes	95
5.5.	Level 3 Business Area - 08.01.04 Capture Project Revenue (Billing)	95
5.5.1.	Process: 08.01.04.01 Maintain Policy & Procedure for Revenue Recognition	95
5.5.1.1.	Level 4 Process Flow and Steps	97
5.5.1.2.	To-be Changes	98
5.5.1.3.	Site Specific Changes	98
5.5.2.	Process: 08.01.04.02 Billing for Revenue Projects	98
5.5.2.1.	Level 4 Process Flow and Steps	101
5.5.2.2.	To-be Changes	102
5.5.2.3.	Site Specific Changes	102
5.5.3.	Process: 08.01.04.05 Account Revenue Recognition	103
5.5.3.1.	Level 4 Process Flow and Steps	106
5.5.3.2.	To-be Changes	106
5.5.3.3.	Site Specific Changes	106
5.6.	Level 3 Business Area – 08.01.05 Project Monitoring	107
5.6.1.	Process: 08.01.05.01 Perform Project Reporting	107
5.6.1.1.	Level 4 Process Flow and Steps	110
5.6.1.2.	To-be Changes	111
5.6.1.3.	Site Specific Changes	111
5.6.2.	Process: 08.01.05.02 Perform Integrations with Project Management Tools	112
5.6.2.1.	Level 4 Process Flow and Steps	116
5.6.2.2.	To-be Changes	118
5.6.2.3.	Site Specific Changes	118
5.7.	Level 3 Business Area – 08.01.06 Project Month & Year End Close	119
5.7.1.	Process: 08.01.06.01 Results Analysis	119
5.7.1.1.	Level 4 Process Flow and Steps	120
5.7.1.2.	To-be Changes	122
5.7.1.3.	Site Specific Changes	122
5.7.2.	Process: 08.01.06.02 Perform Project Settlement	122
5.7.2.1.	Level 4 Process Flow and Steps	124
5.7.2.2.	To-be Changes	125
5.7.2.3.	Site Specific Changes	126
5.7.3.	Process: 08.01.06.03 Project Closure	126
5.7.3.1.	Level 4 Process Flow and Steps	127
5.7.3.2.	To-be Changes	129
5.7.3.3.	Site Specific Changes	129
5.7.4.	Process: 08.01.06.04 Project Year End Close	129
5.7.4.1.	Level 4 Process Flow and Steps	129
5.7.4.2.	To-be Changes	130
5.7.4.3.	Site Specific Changes	130
5.8.	Level 3 Business Area – 08.01.07 Project Reporting	131
5.8.1.	Process: 08.01.07.01 Project Commitments	132
5.8.1.1.	Level 4 Process Flow and Steps	133
5.8.1.2.	To-be Changes	133
5.8.1.3.	Site Specific Changes	134
5.8.2.	Process: 08.01.07.02 Project Revenues	134
5.8.2.1.	Level 4 Process Flow and Steps	134
5.8.2.2.	To-be Changes	135
5.8.2.3.	Site Specific Changes	135
5.8.3.	Process: 08.01.07.03 Project Costs	135
5.8.3.1.	Level 4 Process Flow and Steps	136
5.8.3.2.	To-be Changes	136
5.8.3.3.	Site Specific Changes	137
5.8.4.	Process: 08.01.07.04 Project Cash Flow	137
5.8.4.1.	Level 4 Process Flow and Steps	137
5.8.4.2.	To-be Changes	138
5.8.4.3.	Site Specific Changes	138
5.9.	Headline ‘To- Be’ design changes	138
5.10.	Key Design Decisions	138
5.11.	Policies and Compliance	139
5.12.	Key Value Drivers	139
5.13.	Risk and Controls (to be completed by R&C Lead)	140
5.14.	Roles and Skills	140
5.14.1.	Business Role Change Summaries	142
5.14.1.1.	Business Role Finance	143
5.14.1.2.	Business Role Project Accountant	144
5.14.1.3.	Business Role Project Controller	145
5.14.1.4.	Business Role Project Admin	146
5.14.1.5.	Business Role Project Finance Admin	147
5.14.1.6.	Business Role Project Financial Controller	149
5.14.1.7.	Business Role Project Manager	150
5.14.1.8.	Business Roles Project Engineer/Lead Engineer/Planning Engineer	151
5.15.	Business, Functional and Non-functional Requirements and solution Design	153
5.15.1.	Business and Functional Requirements	153
5.15.2.	Non-functional Requirements	153
5.15.3.	Design Gaps	153
5.16.	Data Impact	154
6.	Risks, Issues, Actions and Dependencies	154
6.1.1.	Design Risks and Issues (outstanding)	154
6.1.2.	Design Related Actions	155
6.1.3.	Process Area Dependencies	155
7.	Appendix	156
7.1.	Segmentation	156

 
1.	Document Control
1.1.	Authors
Author	Role
Marco Desentis	Workstream Functional Lead
Carl Scarlett	Workstream Business Process Expert  
1.2.	Change History
This version replaces all previous versions. Please archive any previous versions:
Version	Date Created /
Changed	Author	Comments / Summary of Change
0.1	29/02/2022	Aninda Roy	Initial Template 
0.2 	28/03/2022	Carl Scarlet	Review of section 1
0.3	29/03/2022	Marco Desentis	Review
0.4	18/04/2022	Marco Desentis	Review section 5
0.5	12/05/2022	Carl Scarlett	Version for SME review
0.5	12/05/2022	Uche Nnene	Internal QA Review
0.96	13/05/2022	PMO	In Review
0.97	19/05/2022	Carl Scarlett	Review Updates
0.98	01/06/2022	Matt Allen	Sending for Approval
1.00	06/06/2022	Matt Allen	Marking record of approval and baselining
1.3.	Approvers
This document requires the following approvals:
Name	Signature	Role	Date of Approval	Version
Carl Scarlett		PS/TM Business Process Expert - JM	06/06/22	1.0
1.4.	Reviewers
This document requires the following reviewers:
 Name	Role	Date of Issue	Version
Marco Desentis	PS/TM Functional Lead - EY	13/05/2022	0.96
Carl Scarlett	PS/TM Business Process Expert - JM	13/05/2022	0.96
Ashley Anderson	Projects & Engineering Director	13/05/2022	0.96
Jason Flynn	Financial Accounting Manager	13/05/2022	0.96
Hooman Toosi	Planning Engineer	13/05/2022	0.96
Alyse Giardini	Senior Cost Engineer	13/05/2022	0.96
Dale Smart	Business Support Manager	13/05/2022	0.96
Enrica Ippoliti	Plant Upgrade Project Engineering Manager	13/05/2022	0.96
Jonas Lindborg	Projektchef	13/05/2022	0.96
Carina Hugosson	Financial Controller	13/05/2022	0.96
Gabriella Bicki	Business Controller	13/05/2022	0.96
Mike Bainbridge	R&D Director	13/05/2022	0.96
Jennifer Williams	CT Portfolio Manager	13/05/2022	0.96
Jo Huby	KeyedIn Systems Admin	13/05/2022	0.96
Mariette Rosqvist	Finance Controller	13/05/2022	0.96
Steve Weaver	Project Manager	13/05/2022	0.96
Afraaz Ayaz	Project Accountant	13/05/2022	0.96
Peter Louwrens	Licensing Finance Manager	13/05/2022	0.96
Ashton Berry	Sector NPI Manager	13/05/2022	0.96
Jerry Springs	R&D Director	13/05/2022	0.96
Ian Triccas	Functional and Solution Architect – JM	13/05/2022	0.96
Uche Nnene	Business & Functional Lead - EY	13/05/2022	0.96
1.5.	Distribution Information 
This document has been distributed to:

Name	Role 	Date of Issue	Version
Ian Triccas	JM Solution Architect	06/06/22	1.0
Albert Venter <Albert.Venter@Matthey.com>	JM Test Manager	06/06/22	1.0
Kanika Syal <Kanika.Syal@gds.ey.com>	EY Test Manager	06/06/22	1.0
Ashley Winsper <Ashley.Winsper@matthey.com>	JM Data Lead	06/06/22	1.0
Srinivasarao Battini <Srinivasarao.Battini@matthey.com>	EY Data Lead	06/06/22	1.0
Shaylin Moodley <Shaylin.Moodley@uk.ey.com>	Risks and Controls Lead	06/06/22	1.0
1.6.	External References
The following referenced documents have been compiled but do not form a part of this document:
Name	Link/ Location
Business Process Master List	Link

Master Requirements Traceability Matrix	Link

RAID Log Management (Master RAID Consolidated)	Link

RICEFW Inventory	Link

Change Impact Assessment	Link

Risk & Controls Matrix 	Link

Functional Design Documents	TBC
1.7.	Related Business Process Documents
The following Business Process Documents are impacted by this Process (End to End):
Business Process Doc ID/Name	Cross functional Business Process	Author	Relationship	Link/Location
BPD003 – RTR	Vendor Invoice Management,
Vendor Payment.	Ryan O’Neill		BPD003 -RTR Project Concert.V01.docx

BPD005 – LES	Inventory Management,
Stock Transfers	Iantha Kirkup		BPD005 LES - Project Concert.docx

BPD008 – PM	Refurbishment Process,
PR Against Planned Maintenance	David Palhota		BPD008_PM -Project Concert.docx

BPD002 – STC	Inbound Deliveries,
Outbound Deliveries,
Subcontracting Process.	Bob Campbell		BPD002 Sales to Cash V01.docx

BPD 004 PTM (PM / QM)	Production Planning
Production execution
Quality Management	David Palhota		TBC
1.8.	Glossary
Acronym/Term	Description
AP	Accounts Payable
AR	Accounts Receivable
ATP	Available to Promise
BPD	Business Process Documents
BPE	Business Process Expert
BPML	Business Process Master List
BU	Business Unit
CIA	Change Impact Assessment
CRA	Credit Rating Agency
CRM	Customer Relationship Management System
CS	Customer Service
CT	Catalyst Technologies
DoA	Delegation of Authority
E2E	End to End
ERP	Enterprise Resource Planning (SAP)
FDD	Functional Design Documents
LN	Lotus Notes
MDG	Master Data Governance
PO	Purchase Order
RFQ	Request for Quote
RICEFW 	Reports, Interface, Conversion, Enhancements, Forms, Workflow
RTM	Master Requirements Traceability Matrix
SME	Subject Matter Expert
SO	Sales Order
STC	Sales to Cash
PS	Project System
TM	Time management


 
2.	Introduction, Purpose and Scope
2.1.	Document Purpose
This Business Process Documentation has been developed by Project Concert specifically in relation to the delivery of this programme. This document provides a detailed description of the organisation's related business processes and sub processes. The key business drive for this document is to provide a structured schematic that can be used for development and future operational reference.
This document aims to outline the business processes, interfaces, controls, measures, systems, and roles for the business processes covering Project Systems and Time Sheeting. This document covers the scope indicated below. 
This document provides the details to support:
•	Guiding principles to design the future state of the CT business functions and more specifically Project Systems and Time Sheeting with the enablement of SAP technology 
•	Process flow diagrams with associated process narratives
•	Agreed specific Project Systems and Time Sheeting requirements in the context of what is to be designed for the business functions and configured in SAP 
•	Agreed site specific requirements in the context of what is to be designed for the business functions and configured in SAP 
2.2.	Document Scope
This document scope covers the L4 business processes for the Project Systems and Time Sheeting process area in the identified business areas.
2.3.	Document Architecture
A BPD section will exist for each of the process areas that are identified in section 4.5
The intention of each BPD section is to detail:
•	The process area scope
•	A summary of the key changes agreed through the workshops for each process area
•	The level 3 / 4 process inventory (otherwise abbreviated to L3 / L4)
•	The design decisions for each component impacting the operating model
 
3.	Business Context
The following sections outline the context for the programme.
3.1.	Concert Programme Vision
The goal of the Concert programme is to enable the delivery of the CONCERT business case, decommission legacy ERPs, Harmonise and Improve SAP processes for Catalyst Technologies (CT) Business Unit.
The Concert Project will deliver value design that supports:
o	A strategic standard technology platform supported by SAP ECC 6.0 EHP 7, fit for the future of our business
o	A consistent Enterprise and data design (i.e., chart of accounts design), underpinned by robust data controls and governance
o	Harmonized and Improved sales, procurement, finance, manufacturing, logistics, maintenance, R&D and Licensing processes and controls
o	Harmonized and Improved transparency of reporting within ECC
o	A single version of the truth for financial reporting, compliance, and control
o	Vastly improved insight into our business drivers, allowing us to make the right decisions earlier
o	Business driven change to enable the adoption of consistent and leading SAP practices
At the end of Concert programme, there will be a step change from how the CT business works today. 
 
3.2.	Design Principles
The Concert Programme will be based these 15 key Design Principles: 
Theme	No	Design Principal Description
Value Based Design and Build
	1	Concert scope is bounded by the Catalyst Technologies Business unit; it will prioritise scope that achieve the goals of “Harmonisation”, “Improvement” and “Consolidation” prioritised based on value (maximise benefit, maximise ROI and minimise implementation cost)
	2	Scope classified as achieving “Harmonisation” will adopt the best of what exists today within CT business
	3	Scope classified as achieving “Improvement” will either adapt from Group / JM Standards / Unify or from Industry reference models / SAP Standard Best Practice
	4	Scope classified as achieving “Consolidation” will adopt the target SAP design (incl. any integrated applications)
	5	Concert Scope should consider vendor roadmaps and end of life dates to avoid regret spend on obsolete technology.
Business Led Adoption	6	CT BPEs (Business Process Experts) and Subject Matter Experts (SMEs) will own and govern the Concert design
Leverage JM and Global Best Practice Approach 	7	Concert design will not compromise health & safety, regulatory compliance, controls, and service continuity
	8	Group / JM standards / Unify processes will be adapted for “Improvement” scope
	9	Concert design will align with the JM Target Architecture 
CT Process Design aligned to Global Framework	10	Concert will establish a new CT Business Process Master List (BPML) that defines the E2E processes and numbering taxonomy for the CT business
	11	CT BPML will cover the full E2E processes down-to Level 1 to Level 3. BPML Level 4 and below will only be defined for prioritised Concert scope items
	12	Levels 1 to 5 of the CT BPML will follow the globally agreed process architecture levels and design standards
	13	Concert design aligned to agreed target operating model and CT organisational changes needed to realise the Concert Business Case 
Fit to Standard Approach
	14	Processes designed for cross-site standardisation while minimising site-specific variants / localisations
	15	Concert design will minimise customisation to reduce the cost and complexity of the solution

Table 3 1: Represents the overarching Concert Design Principles
 
Figure 1 - Represents the overarching Concert Design Principles & Themes
 
4.	Design Scope
4.1.	Business Process Framework
During prepare and high-level design, a future state level 1 and 2 process framework was defined and produced to provide a schematic view of how CT Organisation wished to transform the business to best deliver on the vision. This model gives a complete view of all the processes needed to be able to function as a chemical manufacturing organisation. The scope of the Concert programme is articulated in the diagram below. Selected scope items are agreed and documented within the BPML Baseline document 
Other aspects of the process framework out of scope for Concert will be impacted through other initiatives.
 


 
4.2.	Organisation Process Hierarchy
During Detailed Design the Concert Programme aims to provide Level 4 detail for impacted processes in accordance with business process definitions:
 
Figure 2 - CT Process Hierarchy
4.3.	Concert Deployment Context / Scope
In order to provide greater detail, the L2 processes are linked to technical solutions across the seven Concert functional areas: RTR, PS/TS, STP, STC, LES, PM and PP/QM. Each area has differing technical solutions but will require business and system integration to function effectively. The deployment approach considers the linkage between Business Capability and Technical Capability and the separation required across the Releases that form the deployment approach for the technical and business deployment.
The deployment plan is being finalized and will be referenced later.
4.4.	Process Area Scope
This BPD refers to the harmonisation, improvement, and consolidation of the Project System & Timesheets process area across the following businesses:
•	Licensing
•	Formox Plant Designs
•	R&D
4.4.1.	Process Areas - In Scope
This BPD refers to the Project Systems and Time Sheeting process area. JM CT have determined that Project Systems and Time Sheeting will only be applied in the following business areas at this stage:
•	JM Davy – Consolidation from Agresso to SAP
•	RD&E
•	Formox Plant Designs
All other business areas will continue to use Internal Orders/existing processes to manage projects and time at this stage.
 
The Project Systems and Time Sheeting process covers the following areas.
•	Maintain Project Definition and Structures
•	Perform Project Budgeting & Planning
•	Capture Project Costs & Timesheets
•	Capture Project Revenue (Billing)
•	Project Monitoring
•	Project Month & Year End Close
•	Project Reporting
4.4.2.	Scope Items – In Scope
Scope Item Number	Scope Item name
3.9.3	Revenue Recognition – Davy & Formox
3.8.1	Perform booking of Time sheets - Licensing
3.8.2	Perform booking of Time sheets - Formox
3.8.4	Project Systems (Agresso).
3.8.5	Project Systems (Formox Plant Designs).
3.8.6	Project Cost Control Reports
4.4.3.	Process Areas - Out of Scope
The following process areas have been agreed as out of scope for Concert Design for Projects and Timesheets: 
•	CAPEX – the use of Project Systems and related Time Sheeting for CAPEX activities has been excluded from the scope of Concert at this stage.

•	Technical Services/Field Services – the use of Project Systems and related Time Sheeting for these areas has been excluded from the scope of Concert at this stage.

•	Other users of Internal Orders on the CT SAP system outside of RD&E and Formox Plant Designs are all excluded from the current Concert scope.
4.5.	Site Related Scope
The implementation of Project Systems and Time Sheeting into the JM CT SAP system will be new for all sites as neither of these elements exist in the current CT SAP system. The different businesses do have similar concepts and systems in place but will all be moving to the new Project Systems and Time Sheeting solution in CT SAP.
Project Systems and Time Sheeting are being implemented across the Licensing, R&D and Formox Plant Design businesses and these have a presence across several CT sites. The following sections outline the different businesses, sites and processes that will be required.
The process “Project System & Timesheets” is an end-to-end business operation that involves, the following functions that have been identified and defined for the standard and harmonized project life cycle process to be followed by JM CT.

Project Lifecycle Harmonized and Standardized in SAP for JM CT

 

The following table describes in high level the functional scope of the seven sub-processes mentioned on the diagram of above.

Process Areas
L3 Process Area	L3 Process Description	L3 Process Description
08.01.01	Maintain Project Definition and Structures	The functionality will cover all the activities related with the project creation in the system.
The user will have the ability to design the structure of a project according business needs.
08.01.02	Perform Project Budgeting & Planning	The functionality will cover all the activities related with planning costs activities for projects and budgeting.
Planning will be used to create cost estimates in projects and the budgeting will be used to allocate the final amount approved in a project to be spent.
08.01.03	Capture Project Costs	The functionality will cover everything related with the collection of costs from different processes like:
•	Purchase
•	Sales
•	Finances
•	Time Sheets
08.01.04	Capture Project Revenue (Billing)	The functionality will cover the integration between sales and projects, for the correct allocation of revenues in projects.
08.01.05	Project Monitoring	The functionality will cover the different activities related with the overseen of the evolution of project during their execution.
08.01.06	Project Month & Year End Close	The functionality will cover everything related with the different activities involved on Month & Year end.
08.01.07	Project Reporting	The functionality will cover everything related with the identification, extraction and reporting of information related with projects.

 
SAP Project System (PS) is a part of SAP’s Project and Portfolio Management solution. Project System helps manage projects throughout the entire project lifecycle, from the creation of a project to the preparation of detailed plans, project execution and completion, according to the harmonized process that has been established for the JM CT business.

Due to its tight integration with SAP’s Finance and Logistics modules, the SAP PS Module can be used especially for large and complex projects such as construction, production, service, investment projects in all industries. 

Licensing
Project Systems and Time Sheeting are being implemented for the Licensing business to enable the replacement of the existing Agresso ERP system. 
Licensing Sites
Licensing is primarily based in Paddington and Stockton. Paddington is the base for the organisation, including project management and engineering, whilst Stockton is the base for R&D within the Licensing business.
The following L3 processes will be required for the Licensing business:
Process Areas for Licensing
L3 Process Area	L3 Process Description
08.01.01	Maintain Project Definition and Structures
08.01.02	Perform Project Budgeting & Planning
08.01.03	Capture Project Costs & Timesheets
08.01.04	Capture Project Revenue (Billing)
08.01.05	Project Monitoring
08.01.06	Project Month & Year End Close
08.01.07	Project Reporting

R&D
Currently R&D uses Agresso (the Licensing ERP system) to capture time related to R&D activities and Internal Orders in SAP for managing costs. The implementation of Project Systems and Time Sheeting on the CT SAP system will enable R&D projects to be tracked and managed within the system, replacing the Agresso time sheeting capability and enhancing the collection of costs associated with R&D activities. These costs will be able to be shared with KeyedIn.
R&D Sites
R&D activities take place across several the CT sites, including:
•	Savannah
•	Stockton
•	Chilton
•	Perstorp
•	Paddington
The following L3 processes will be required for the R&D business:
Process Areas for R&D
L3 Process Area	L3 Process Description
08.01.01	Maintain Project Definition and Structures
08.01.02	Perform Project Budgeting & Planning
08.01.03	Capture Project Costs & Timesheets
08.01.05	Project Monitoring
08.01.06	Project Month & Year End Close
08.01.07	Project Reporting

Formox Plant Designs
Currently Formox Plant Designs use Internal Orders for managing projects and carry out time sheeting in SharePoint. The implementation of Project Systems and Time Sheeting will bring this part of the business into line with the Licensing business and the common time sheet solution.
Formox Plant Designs activities take place on the Perstorp site in Sweden.
The following L3 processes will be required for the Formox Plant Designs business:
Process Areas for Formox Plant Designs
L3 Process Area	L3 Process Description
08.01.01	Maintain Project Definition and Structures
08.01.02	Perform Project Budgeting & Planning
08.01.03	Capture Project Costs & Timesheets
08.01.04	Capture Project Revenue (Billing)
08.01.05	Project Monitoring
08.01.06	Project Month & Year End Close
08.01.07	Project Reporting

5.	Detailed Design
5.1.	Level 3 & 4 Business Processes
Level 4 processes have been designed to cover both business and system steps.  The level 3 process has been used as a “golden thread” throughout the design to bring together all the operating model elements.  Each process map will document the activities, controls, roles, decisions, and systems in use, using the symbology shown below:

 
Figure 3 - Process Map Symbology

5.2.	Level 3 Business Area – 08.01.01 Maintain Project Definition & Structures
 
5.2.1.	Process: 08.01.01.01 Develop Project Policy and Procedure
To implement Project Systems and Time Sheeting in SAP for JM CT, several key elements required by these systems need to be defined.
The project structure within SAP allows the business to allocate and process all the information related to the execution of a project lifecycle. It enables the business to represent the different parts, phases and activities required to deliver a project.
To simplify the set-up of projects, templates will be developed to enable quick and consistent set-up of projects within SAP. The structures used in these templates will include:
1.	Project definition
2.	WBS elements
3.	Networks and activities
4.	Milestones
Providing templates with these structures will help the business to standardise the approach to the creation, monitoring and execution of projects within CT. Templates will be made available for each area of the business as required.
The templates and project structures will contain the elements required to manage projects within CT. The following table shows which main structures will be used across the different businesses.
Business	Project Definition	WBS Elements	Networks/Activities	Milestones
Licensing	In scope	In scope	In scope	In scope
Formox	In scope	In scope	Out of scope	Out of scope
R&D	In scope	In scope	Out of scope	Out of scope

As well as templates and common structures, a project Coding Mask has been developed. This is based on the Unify approach but has been adapted for CT use.
The project code being used by CT is as follows:
 
Refer to the FDD for full details of the coding structure and masks.
The project number will follow the guidelines below for different project types. This is designed to align with existing numbering in the CT businesses where appropriate.
Licensing (JM Davy) projects will be numbered using a 4-digit number preceded by 00 (XX according to the mask defined). This aligns with the existing 4-digit numbering used in the Licensing business. 
Example: Existing project 2543 will be numbered as 002543. The 4-digit number will allow the large number of existing document templates used in Licensing to be retained with limited changes. Studies and Plant Upgrades will also use the same 4-digit numbers preceded by 00 but with a different project type detailed in the text Project Type field in the Root WBS element. 
LI - will be the project type code used in the coding structure for all Licensing projects (projects, studies, plant upgrades) - this aligns with the current approach of these all taking consecutive numbers.

Within the project header it is possible to add a text field Project Type - the proposal here is to consider including a different text description to allow differentiation between projects, studies, and plant upgrades

The Project Type text field options will include:
•	Licensed Technology Project
•	Plant Upgrade
•	Study
The Project Type code in the coding will remain LI.
Licensing Proposals will use a 5-digit number preceded by an L and the Project Type code PS. This allows other businesses to use the same Project Type code (PS) and incorporate a different leading letter in the future. At this stage only L will be used for Licensing proposals. There is the option of using the Project Type text field in the Root WBS element if required as per Licensing projects.
Formox Plant Design projects will be numbered using a 3-digit number preceded by 000. This aligns with the existing 3-digit numbering used in the Formox business. Example: Existing project 218 will be numbered as 000218. 
R&D projects that are in KeyedIn (NPI & PIM projects) will use a 6-digit number which will align with that used in KeyedIn. Where necessary leading zeros will be added to make project number 6 digits long. Example: Existing project PRJ1985 will be numbered as 001985. For R&D projects in KeyedIn the KeyedIn project number and the programme number will be captured in User Fields at WBS element level, e.g., 0521 (programme number) and PRJ1985 (project number) will be stored in the User Fields for this example project. Any reference to a workstream number will be stored in a User Field in the appropriate WBS element. 
Segments: All relevant projects will be tagged with a Segment code. This provides an indication of the market segment that the project is associated with. This combined, where appropriate, with the customer will enable projects to be reported based on market segment. The segments are detailed in Appendix 7.1
Note: There is no flow diagram for this L4 process because this section defines the approach and structures that will support the creation of new projects.
5.2.2.	Process: 08.01.01.02 Create and Maintain Projects
Create and Maintain Projects Overview
The Create and Maintain Projects process refers to the flow of events required to create and maintain projects and their associated structures within SAP by the different CT businesses.
Projects are being used in CT for the management of activities across the Licensing, R&D and Formox Plant Designs business areas. Projects are not being used for other areas such as CAPEX at this time but will be implemented in the future.
A project will be set up in SAP based on a request from the requestor. The requestor will need to provide sufficient information for the project to be created. This will include:
•	Project Name
•	Project Type
•	Responsible Person
Once a project has been approved, the request will be used to set up the project. Once the project has been set up the requestor will be notified that the project has been created and is now available for use in SAP.
If changes are required to a project, these can be requested or performed directly depending on the rights of the person concerned. Changes can be made to all elements of the project so enabling flexibility required for the different projects undertaken by CT businesses.
If a project is not available immediately then hours/costs can be booked to a proposal and then transferred to the appropriate WBS elements of the project once it is created. A similar process can be used to handle correction of costs if booked to the incorrect project. The off-system processes for these corrections would continue like today but with revisions where references are needed to WBS elements.
Key points:
There are likely to be additional fields required that will be reviewed during the realisation phase, like dates, technology, free field entry texts etc.
Technology may be covered by existing use of Segment/Industry Code for example. 
Dates are available in the WBS elements, and these may be appropriate to use for things such as Effective Date.
Networks:
 There are 3 main sections to be configured in the Network: 
•	Network 
•	Graphic 
•	Activities 
 
Network - Key configuration parameters (in scope): 
 
Field  	Description 	In scope 
Network type 	For Licensing a network type will be set up, and an also a new control key. 
The key configuration of this control key will be explained below. 	In scope 
 
Control Key 
One important requirement from the business is the closing of the activities without the need to perform a “notification” on each activity. It will be necessary to create the following new control keys to plan “internal activities” and “external activities”. 

Notes:  
•	Planning – The licensing business has decided to perform all the planning (time) outside of the system, so this is not considered in the customisation of this functionality in SAP. 
•	MPR integration – This is not part of the requirements, and this integration will not be customised, the PR and PO’s will be created manually by the user. 
•	Validations and Substitutions – So far, there are no validations or substitutions considered to be customised at network level; However, during the realisation this will be confirmed.  
•	User fields – User fields are not considered at network level to be available for the user; However, this will be reviewed during the realisation phase in case there is a need for the use of any of the standard fields. 

The configuration for Licensing will be more oriented to cost allocation, instead of planning boards and integration with MRP and production.  Anything related with planning and the integration with MRP is not considered in the scope of the customising of project system for CT. 
 
Graphic – (out of the scope) 
Graphics and planning boards are not considered in the scope for Licensing. Any planning related with time will be performed outside of SAP or in Primavera. 
 
Activities Key configuration parameters (in scope): 

The following parameters will be maintained in the Network Profile: 
•	Network type (parameter) 
•	Activity parameter 
 
In JM CT the Network Type will be used to hold the information for controlling and managing the networks. The configuration required for the Licensing business for networks is very simple, because it will not be necessary for them manage capacities, integration with production (routings) and the integration with MRP. The user will be able to plan activities and general costs only according to the business requirements. 
 
 

5.2.2.1.	Level 4 Process Flow and Steps
  Figure 4 – 08.01.01.02 Create and Maintain Projects

08.01.01.02 Create and Maintain Projects
L4 Process Step	System / Manual 	Narrative	Step Owner	SAP T-code
Project creation request	Manual	Creation and issue of the request form, establishing the requirement to create a project.	Requestor/ Project Manager	N/A
Approve project creation	Manual	Before a new project is created it must be approved by the appropriate person.	Approver	N/A
Template selection	SAP	For the creation of a new project, the user can select the corresponding “project template” to create the new project.
For JM CT some project templates have been defined to provide a consistent structure for the new project to follow.	Project accountant/ Project controller	CJ20n
Copy existing operative project	SAP	For the creation of a new project, the user has the option to create a new project, using as a “template” an existing operative project.
The operative project is a project that is active or used to be active, that can be used to create a new one.	Project accountant/ Project controller	CJ20n
Define/Select Project number	SAP	The system will present the latest number available that can be used by the user to create the new project.
The project number will not be assigned automatically by the system, the user will confirm the number to be used.
The structure of the project code will be established based on the coding already defined in section 5.2.1 of this document.	Project accountant/ Project controller	CJ20n
Project Creation	SAP	The CT user will create the project on this transaction, using the project code selected.
For the creation the user will have the option to create a project using a template or an operative project as described above.	Project accountant/ Project controller	CJ20n
Notification project created	Manual	Once the user has completed the creation of the project, the requestor will be notified via email.
The requestor will receive the code of the new project. By default, the project will not be released.
When a project has been created the details of the project will be available for the creation of the sales order via the STC process: 02.04.01.04 Create Customer Order with Project and Intercompany Sales Orders via 02.04.01.07.	Project accountant/ Project controller	N/A
Project change request	Manual	Creation and issue of the request form, establishing the requirement to modify an existing project.
NOTE: Project Managers may have the ability to make changes to projects themselves and hence the process allows these changes to be made directly.	Project Manager	N/A
Approve project change	Manual	Before a change is made to a project it must be approved by the appropriate person.
This process is followed when the Project Manager is not able to make changes directly to projects.	Approver	N/A
Create/modify project	SAP	The user will have this transaction available to create or modify projects.
The modifications will be performed according to the request made by the user.	Project accountant/ Project controller
Project Manager	CJ20n
Create/modify WBS	SAP	The user will have this transaction available to create or modify WBS elements.
The modifications will be performed according to the request made by the user.	Project accountant/ Project controller
Project Manager	CJ20n
Create/modify network	SAP	The user will have this transaction available to create or modify Networks.
The modifications will be performed according to the request made by the user.	Project accountant/ Project controller
Project Manager	CJ20n
Create/modify/milestone	SAP	The user will have this transaction available to create or modify milestones
The modifications will be performed according to the request made by the user.	Project accountant/ Project controller
Project Manager	CJ20n
Notification project modified	Manual	Once the user has completed the modification of the project, the requestor will be notified via email.
When a project has been modified the details of the project will be available for the creation of the sales order via the STC process: 02.04.01.04 Create Customer Order with Project and Intercompany Sales Orders via 02.04.01.07.	Project accountant/ Project controller
Project Manager	N/A

The following table provides more information on some of the important fields required during the creation/modification of a project.
Header Fields	Description	Mandatory / Optional
Project Profile	The profiles contain default values and control parameters for processing objects and functions in the Project System.
The Project System includes the following profiles:
•	Standard network profile
•	Network profile
•	Project profile
•	Plan profile for cost planning in the WBS
•	Budget profile for budget management
•	Information system profiles
For JM CT 5 project profiles are defined
 	Mandatory
Project definition	The project definition contains dates and organisational information that are binding for the entire project.
The project definition defines the project mask to be used by the project to build their project code	Mandatory

Integration with other L4 processes

Process integration
WS	L4 Process Area	L4 Process Description	L4 Process integration
STC	02.04.01.04	Create customer order with project	As part of the new practices adopted by the different JM CT businesses for projects, it will be necessary create a project number before creating a sales order.
STC	02.04.01.07	Create Sales order for Interco Project	This process will allow a company to invoice services to another affiliate, for cases where the company is using resources from an affiliate.
PS&TM	08.01.02.01	Perform Budgeting for project spend	Once the project has been created, the next step for the user will be the upload of the plan and initial budget for the project, that will be perform in this process.
TBC	TBC	External systems	There will be an integration with KeyedIn, that will be manual.
The user responsible, will create a project in SAP once have received the request from KeyedIn.
RTR	01.06.02	Expense Management (Concur)	There will be an interface between SAP and Concur. This interface will transfer the WBS codes created within projects into Concur, to allow the users to allocate and projects to receive charges (costs) from travel expenses reports.

The design of this interface will be finalised during the realisation phase.

5.2.2.2.	To-be Changes
Project creation and maintenance is a new process in JM CT SAP. The users from the different CT departments will not be able to allocate time to projects, unless the project has been created first. Existing processes for the creation of projects in Agresso or in SAP as Internal Orders will need to be adapted or revised to use SAP PS.

CT Sites	Changes	Business justification
All Sites	Implementation of PS is new to all sites. Processes for creation and maintenance of projects using PS will be new on all sites where this is being used. Existing processes used to create projects in Agresso/SAP will need to be revised to follow the requirements of SAP Project Systems. This includes where Projects are replacing current use of Internal Orders.	Implementation of PS for JM CT
All Sites	Adoption of project templates for the creation of new projects is a new process. 
This will support a standard process across JM CT to manage and administrate projects in the same way.	Standardisation of the process to create projects and the use of templates across all JM CT
All business	The creation of a project is considered “master data”; however, it has already been agreed that every business will establish their own responsible person to create new projects in the system as per of business needs and requests.
Every business will have autonomy to create and administrate their own projects.	The main target is to provide autonomy to every business to create their own projects, without the intervention from the global master data team.
5.2.2.3.	Site Specific Changes
In addition, the following site-specific changes (Existing and New Consolidation sites) and business justification for variation in the process is specified:
CT Sites	Changes	Business Justification
Agresso sites	The creation and modification of projects in SAP PS will require new and adapted processes compared to those currently followed for the creation and modification of projects in Agresso	Move from Agresso to SAP PS
Perstorp	The creation and modification of projects in SAP PS will require a modified process compared to that used for these activities using Internal Orders currently in this part of the business	Consolidation to the use of SAP PS for projects from the use of Internal Orders
Other existing SAP sites	The creation and modification of projects in SAP PS will require a modified process compared to that used for these activities using Internal Orders currently in this part of the business. There will be more use of Projects as currently not all R&D projects are given SAP codes, but they will be required going forwards for time sheeting purposes.	Consolidation to the use of SAP PS for projects from the use of Internal Orders
5.2.3.	Process: 08.01.01.03 Project Template and Master Data Maintenance
Project Template and Master Data Maintenance Overview
The Project Template and Master Data Maintenance process refers to the flow of activities required to create new templates or make changes to existing templates.
Project Templates will be used to help the business standardise the structure of each project depending on the nature of the business and the project type.
A project template is a preconfigured project, that can be used to setup a new project which SAP PS calls an Operative Project.
A Template is a neutral structure that can be used to standardise WBS structures, Networks, Activities and Milestones. Templates are Master Data structures. Within CT, these will be managed by the CT business teams involved in project creation rather than the Master Data Team. There will be multiple templates to reflect different project scenarios. Project and Network Templates contain a Project or Network Profile, and templates can contain inherent business rules. Templates are not mandatory, but if you have common, complex structures, they help maintain consistency. 
Existing Operative Projects and their Networks can be used to create new projects but are prone to inheriting errors present in the structure of the source project. 
Milestone Templates (Standard Milestones) can be attached to Standard WBS’s and Standard Networks. Standard Templates do not carry Settlement Rules.
To summarise, a project can be created on three ways:
1.	From a Template - this is a standard project structure that is then copied to create the project. Because you are using a standard template there should be no errors transferred to the new project.
2.	From an existing project - this copies an existing project (Operative Project) to create a new project (it retains the structure but the budgets etc. are not copied) - there is a risk here that errors in the original project will be copied into the new project.
3.	From scratch - clearly this takes time and would not be appropriate in most cases.

For JM CT Project Templates will be developed for the following businesses, as explained below.
•	JM Davy – Consolidation from Agresso to SAP
•	RD&E – move of time sheets and projects from Agresso/SAP to a common approach using Project Systems and SAP Time Sheeting
•	Formox Plant Designs – move of these from use of Internal Orders to Project Systems and introduction of SAP Time Sheeting in place of existing SharePoint based solution
Integration with Concur
Depending on the roll out timing, Concur updates may have to be performed manually at the go-live of PS/TM. 
It is intended native integration will be implemented removing this need, but this may be in a later phase. 
Integration with Concur and impact on available codes will need to be confirmed during realisation.
Note:
There will be a WBS element where royalties are collected as part of the structure. The accrual of royalties will be performed manually.
5.2.3.1.	Project Templates
The following project templates are being developed to cover project needs for the JM CT business.
5.2.3.2.	Project Template for Licensing
The diagram below shows the template structure for Licensing projects. This structure will be used for all Licensing projects (Licensed Packages, Studies and Plant Upgrades). Other activities such as proposals and day-to-day activities will use the simpler structures described later.
 
Figure 5 - Licensing Project Structure

The intent of this structure is to enable the Licensing business to continue to manage projects in a similar way to currently in Agresso down to a similar level of detail. In addition, the structure in SAP will enable the planning of manhours within SAP and the production of Cost Reports from SAP.
The project template includes all the elements that make up a single project. For Licensed packages this can include License Fee, Engineering, Equipment Supply and Catalysts. There is also consideration of the need to manage contracts which are owned and managed by a different legal entity to the entity doing the work (e.g., JM Plc (GB30) contracts with JM Davy performing the work and receiving the revenue). It is likely there will be some contracts where changes will be required but the template should provide a good basis for most Licensed packages. The same template will be used for Studies and Plant Upgrades, where not all elements will be used but will be created as part of the template and can then be removed or ignored at a later stage.
WBS Level 2 (Core Activities)
This level includes WBS elements that relate to the different elements of a Licensed package, i.e., License Fee, Engineering, Equipment Supply and Catalysts. There is also a WBS element for JM Plc at this level to handle the cases where JM Plc manages the contracts (including invoicing and receipt of payment). This will enable these to be handled within the project and then the costs/revenue can be transferred to the correct WBS element. 

WBS Level 3 (Work Orders) 
This level replicates the work orders currently found in Licensing. The total list of work orders has been reduced from those currently in use to a key sub-set agreed with the business. The sections below outline the workorders, the relevant WBS elements provided in the template and the reasoning behind the design. 

License Fee 
No WBS levels are required below Level 2 for the License Fee as there are no costs associated with this activity. The Level 2 WBS element will be used to handling billing etc. for the License Fee contract. 

Engineering Work Orders 
The Engineering WBS Level 2 is designed to cover the engineering aspects of the project, excluding those costs, billing etc. related to the supply of equipment by JM to the customer which will be covered under the Equipment Supply WBS Level 2. The Level 3 WBS elements used here are: 

Description 	Agresso Work Order 	SAP WBS Element 
PDP 	10 	10 
Post PDP 	20 	20 
Training 	40 	40 
Meetings 	51 	51 
Site Services (Reimbursable) 	55 	55 
Home Office Support 	58 	58 

If Technical Procurement Support (for customer procurement of equipment) is required, then an additional WBS element in the 20 series can be created to capture these costs. 

Work Order 30 is not included here as equipment costs associated with the supply of equipment by JM to the customer are moved to the Equipment Supply WBS Level 2. 

Equipment Supply 
The Equipment Supply WBS Level 2 is designed to cover the engineering, procurement, billing etc. activities related to the supply of equipment by JM to the customer. This does not include Technical Procurement Support of customer procurement which would be under the Engineering WBS Level 2 – see above.

A minimum of one WBS element would be created at WBS Level 3 for equipment supply as shown in the diagram (e.g., E1). It may be appropriate for some contracts to create multiple WBS Level 3 elements to cover multiple major items of equipment supply. 

Catalysts 
The Catalysts WBS Level 2 is designed to cover the procurement, billing, supply etc. activities related to the supply of catalysts by JM to the customer as part of the project. Future charges of catalyst would be handled as normal sales. 

The use of level 3 WBS elements may be required if there is a need to separate for example JM supply vs. PFR catalysts within the project. A typical WBS Level 3 would be C1. 

Note:
Revenue for catalysts will be able to be reported separately to the other project revenues as this is being handled through a separate WBS element. There will also be a separate Sales Order for the catalyst.

WBS Level 4 
This level enables a roll-up of the various functions within the project to a discipline level. This is used in the reporting and management of manhours. The Level 4 WBS and Level 5 WBS elements will be repeated under each of the Level 3 WBS elements under Engineering (Level 2 WBS ENG) and Equipment Supply (Level 2 WBS EQP). 

The Level 4 WBS elements are: 

Description (Discipline) 	SAP WBS Level 4 
Engineering 	10 
Process 	20 
R&D 	30 
Projects 	40 
Others 	60 

Note:
SAP PS has a limitation on the number of characters in the project coding mask (limited to 24). So, the new coding has been established to fit in this structure. The new coding will need to be understood by the different businesses and different users will need training and time to get used to the new structure. 

Concert has deliberately chosen codes that broadly align with existing codes in use in the business to help with this transition.

WBS Level 5 
This level enables the split of activities by function and roll-up to the functional level. This aligns with the Cost Reporting and planning activities. Activities will be placed below the Level 5 WBS elements. The information from these Level 5 WBS elements and reporting will also be fed to the planner for updating the forecast manhours and this then provides input to the forecasting of costs and revenue. 

The table below shows the mapping of existing codes to the new SAP WBS Level 5 numbering and the roll-up to the Level 4 WBS elements. 

Description (Function) 	Agresso Code 	SAP WBS Level 5 	SAP WBS Level 4 
Engineering Management 	100 	10 	10 
Procurement 	103 	13 	
Vessels & Heat Exchangers inc. Metallurgy 	104 	14 	
Mechanical 	105 	15 	
Electrical / Instrument 	106 	16 	
Piping / Layout 	107 	17 	
Civil / Structural 	108 	18 	
Fired Equipment 	109 	19 	
Process Design 	201 	21 	20 
Systems Engineering 	202 	22 	
Process Detailed Engineering 	205 	25 	
QA 	206 	26 	
R&D 	300 	30 	30 
R&D Commissioning 	300 	31 	
Project Management 	400 	40 	40 
Project Engineering 	401 	41 	
Project Controls (inc. Planning) 	402 	42 	
Secretarial (London) 	601 	61 	60 
Document Control/Office Services 	604 	64 	
Accounts 	700 	70 	
Business Services 	900 	90 	
Unallocated 	999 	99 	
 
Additional WBS elements can be created as required during the creation and operation of the project.
5.2.3.3.	Project template for Licensing Proposals
The diagram below shows the template structure for Licensing Proposals. The intent here is a separate project is created for each proposal.
 
Figure 6 - Licensing Proposals Structure
The structure allows for the capture of manhours and costs on proposals. The intent is to use generic discipline activities below the Manhours WBS Level 2 element to enable an understanding of manhours by discipline if required.
5.2.3.4.	Project template for Formox Plant Designs
The diagram below shows the template structure for Formox Plant Design projects.
Note: Other Formox activities will continue to use Internal Orders, only Formox Plant Design projects are moving to using PS/TM.
 
Figure 7 - Formox Plant Designs Project Structure

The aim of this structure is to align with the current approach within Formox Plant Designs. Existing GLs will be used within the WBS Level 2 elements to capture costs.  It is anticipated that this approach will allow the Formox Plant Design business to continue to use their existing planning, forecasting and revenue recognition tools, although some modifications will be required based on the finally developed reports that are available from SAP.
5.2.3.5.	Project template for R&D KeyedIn Projects
The diagram below shows the template structure for R&D projects that are established in KeyedIn. These will typically be NPI or PIM projects and will be created in KeyedIn before being set up in SAP. Other R&D activities will be covered by standard project structures described later for day-to-day activities.
 
Figure 8 - R&D KeyedIn Projects Structure

In order that the data can be transferred from SAP to KeyedIn for actual manhours and costs, the project template includes User Fields which will be populated at set-up with the matching information from KeyedIn. This includes:
·	KeyedIn Programme Number
·	KeyedIn Project Number
·	KeyedIn Workstream Number
These fields are required to enable the import of the data from SAP into the correct entry in KeyedIn. A field will also be provided to allow a project that is eligible for Tax Credits to be marked as such.
At WBS Level 2, one workstream WBS element will be created by default. This aligns with the current CT use of workstreams in KeyedIn. However, using this structure would enable the use of multiple workstreams at future date which is already used in other parts of JM.
At WBS Level 3, two WBS elements are created, one for manhours and one for costs. At the present time CT does not capture costs on specific R&D KeyedIn projects, but again this structure provides this capability. Initially only time will be captured against specific projects using the appropriate WBS element when employees’ complete timesheets.
5.2.3.6.	Project Structures for “day-to-day" activities
As CT is implementing time sheeting for the whole of RD&E including Licensing, Formox Plant Design projects and R&D as well as the broader Licensing business, it is necessary to have projects set up to provide places for time to be booked for on-going activities such as customer support, manufacturing support, innovation, and overheads. These projects will be continuous and used simply to collect time/costs as part of time sheeting.
The structure of these projects will be straightforward as there will be no need to segregate by activity or discipline. In some instances, multiple activities may be included in one overarching project, for example:
Customer Support
A single project could be created for Customer Support. Within this project the WBS Level 2 would provide a split by business area, e.g., Refinery Hydrogen, Additives, SNG and GTL, Ammonia & Nitrogen etc. Below this the WBS Level 3 could include various Key Accounts, plus Non-Key Accounts to which hours would be booked. The diagram below shows how this might look.
 
Figure 9 - Typical Non-project Activity Structure
Further work is required to finalize these project structures and coding's with the business, the aim being to reduce the number of codes in use at present in Agresso and consolidate to common coding across CT where possible.
Notes:
1.	The templates in SAP are considered as “master data”, however, for the creation of a “project template” or an operative project, each business will have their own responsible person. This person will receive and validate any project/template creation request made by the business, and once confirmed will be responsible to create the project in the system.
It has been established that every CT business will have autonomy to administer, create and improve the structure of their project templates and operative projects.
The responsible person will be also administer, modify and make any changes requested by the business on their project templates.
During the realisation phase, each business will establish the people responsible for the administration of templates and creation of projects.
2.	There will be a need to decide if the costs need to be included in the % completion calculation for revenue recognition and this may require a modification to the Results Analysis key for the specific WBS element. This will be further reviewed during Realisation and Training.

3.	The previous diagrams are generic and are proposed structures. The actual or final structures will be finalised during Realisation phase of the project.

4.	The intent is that each project will also be assigned to a “Segment” using a “User Field” (this has been explained in the FDD) within the project header. This will enable Segment to be defined for each project and hence reporting by segment will be possible. This field will be a key field for reporting purposes.

5.	For procurement on projects, the purchasing process will need to refer to the appropriate WBS element within a project to ensure that the commitments and costs appear on the project in the correct place. Authorisation requirements for purchasing will follow the standard STP processes with no additional elements due to the use of projects.

5.2.3.7.	Level 4 Process Flow and Steps
 
Figure 10 – 08.01.01.03 Project Template and Master Data Maintenance

08.01.01.03 Project Template and Master Data Maintenance	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
Create/Modify Project Template	Manual	Requestor needs to create/modify a “Template” and submits a request for approval.
The project template is a predefined structure that contains all the required “structures” to create a project, to manage and control a specific project.
 	Requestor	N/A
Review Request	Manual	Approver reviews the Template request received from Requestor. If the template request is approved, it will be sent to Master Data team or else will be sent to Requestor with a reason for the rejection.
	Approver	N/A
Create/Modify Template	SAP	Master Data team creates/modifies a Template after an approval.	Project Accountant/
Business Controller	CJ91/CN02
Create/Modify Project Definition & WBS	SAP	Master Data team creates/modifies the Project Definition and WBS Templates by using the transaction codes.	Project Accountant/
Business Controller	CJ91/CJ92
Create/Modify Network & Activities	SAP	Master Data team creates/modifies the Network and Activity Templates by using the Transaction codes.	Project Accountant/
Business Controller	CN01/CN02
Notification	Manual	An email notification will be sent to confirm the template has been created/modified.	Project Accountant/
Business Controller	N/A
5.2.3.8.	To-be Changes
Project template and master data maintenance for PS is a new process in CT SAP.

CT Sites	Changes	Business justification
All Sites	Implementation of PS is new to all sites. Processes for maintenance of templates and associated master data will be new on all sites where this is being used.	Implementation of PS for JM CT

5.2.3.9.	Site Specific Changes
In addition, the following site-specific changes (Existing and New Consolidation sites) and business justification for variation in the process is specified:
CT Sites	Changes	Business justification
	None identified	

5.3.	Level 3 Business Area – 08.01.02 Perform Project Budgeting & Planning
 

For JM CT projects planning and budgeting will be available for each project.
•	Planning – through this functionality in SAP, the users from the different businesses of JM CT will be able to create multiple “versions” of cost estimates per project.
o	The planning allows the users from the different businesses to plan at: 
	Total or annual level
	Cost element level
	Activity level

•	Budgeting – through this functionality in SAP, the users from the different businesses will be able to limit the amount that can be spent on a project for a specific phase.
o	SAP provides an active “availably control” functionality, to allow the user to restrict the amounts that can be spend in a project.
o	The budgeting in SAP will operate only at WBS element level.

Note: 
These two functions will be available for every business; however, the business can decide to skip the use of planning or budgeting for a specific project.
The recommendation is always to use these two functions to maintain consistency with the process defined and to allow the user to track the history of the budget agreed.

Planning
For Planning purposes in JM CT, the following “cost planning methods” have been established and will be available to perform cost planning in a project for each business:
The following table outlines the methods available per business:
Business	Level	Planning method
Licensing	WBS element	•	Total (Overall Planning)
•	Annual
•	Cost element (Cost and Revenues)
	Activity level	•	Cost element
•	Activity (man hours)
Formox	WBS element	•	Total (Overall Planning)
•	Annual
•	Cost element (Cost and Revenues)
R&D	WBS element	•	Total (Overall Planning)
•	Annual
•	Cost element (Cost and Revenues)

Definitions:
Planning method	Description
Total (Overall Planning)	With this method, the system will allow the user to allocate an “overall planning amount” for the entire duration of the project.
This would be equal to assigning an “overall amount value” for the project, at the highest level of the hierarchy, e.g., WBS-1 in the diagram below.
 

Annual	With this method, the system will allow the user to allocate an “overall annual amount” for each year until the project ends.
This would be equal to assigning an “annual amount value” for the project at WBS element level.
 
Cost element level
(Cost and Revenues)	With this method, the system will allow the different businesses to plan costs at cost element level (GL account) and at WBS element level. It will be also possible plan at activity level, if required.
 
For cost planning, there will be created the following planning cost element groups, with the valid range of accounts that can be used by the user to plan costs:
Cost element group	Description	Business	Type
LICE-PLCOST	Licensing planning costs	Licensing	Plan costs
FORM-PLCOST	Formox planning costs	Formox	Plan costs
R&D-PLCOST	R&D planning costs	R&D	Plan costs
LICE-PLREV	Licensing planning costs	Licensing	Revenues
FORM-PLREV	Formox planning costs	Formox	Revenues
R&D-PLREV	R&D planning costs	R&D	Revenues

Currently, is not considered in the scope the planning in a monthly basis. This will be reviewed during the realisation phase.

Activity level	With this method, the system will allow the user to plan hours & costs at activity level.
This method will be used, particularly in the Licensing business, to perform the planning of hours on activities.
At the activity level, the user will have available the option to cost activities, assigning the number of units (hours) and the cost associated (activity types in CO).
 

The JM CT business has currently identified the following set of activities:
Activity type	Description	Cost element no.	Unit
1000     	 Normal Hours	TBC number (realisation phase)	Hours
1100	Overtime | Mon-Fri	TBC number (realisation phase)	Hours
1500     	Overtime | Sat-Sun	TBC number (realisation phase)	Hours
2000      	Overtime | Bank Holiday	TBC number (realisation phase)	Hours


Planning costs on activities:
CT will not be using salary-based costing of manhours in SAP. This is because salaries are not included in the SAP HR records - salaries are maintained in Workday and for GDPR reasons not transferred to SAP. 
Rates will be established for the conversion of hours to costs based on disciplines. This will result in a reduction in the accuracy of the cost conversion as a rate will not match the actual salary cost but this is acceptable to the Finance team.

 
The current solution is designed to establish as a default, every employee is assigned and needs to be assigned into a specific cost centre in the organization.
This cost centre will work as key pivot to determine their rate. As the diagram shows, the calculation of a rate will be based on the relation between employee (level), cost centre and work centre (discipline).
This is the logic of how the table with the rates will be built in the system and will have to be updated once a year (as a minimum).
Note:
PRB costs will be included in the “cost rate”, and these costs will be determined outside of the system and will be added into the hourly cost rate within the system.
Planning versions:
JM CT will have available the use of “Planning versions” to produce multiple “snapshots” of the cost situation in a project.
CO planning versions are used to plan costs and revenues in a project. Using CO planning versions, JM CT can define various cost plans for a project, for example, an "optimistic" and a "pessimistic" or even a “forecast” plan. The user will be able to copy values from one version to another and make manual adjustments in the new version to represent for example a “Forecast”.
For the different JM CT businesses, the following “plan versions” will be set up.
Plan versions for Forecast
Plan Version	Description
ASS	As-sold budget version
CCE	Budget approved
M1	Forecast adjustments Jan
M2	Forecast adjustments Feb
M3	Forecast adjustments Mar
M4	Forecast adjustments Apr
M5	Forecast adjustments May
M6	Forecast adjustments Jun
M7	Forecast adjustments Jul
M8	Forecast adjustments Aug
M9	Forecast adjustments Sep
M10	Forecast adjustments Oct
M11	Forecast adjustments Nov
M12	Forecast adjustments Dec

Plan versions for budget adjustments
Plan Version	Description
BCE	Budget approved
B1	Budget adjustments Jan
B2	Budget adjustments Feb
B3	Budget adjustments Mar
B4	Budget adjustments Apr
B5	Budget adjustments May
B6	Budget adjustments Jun
B7	Budget adjustments Jul
B8	Budget adjustments Aug
B9	Budget adjustments Sep
B10	Budget adjustments Oct
B11	Budget adjustments Nov
B12	Budget adjustments Dec

Through these versions, the user will be able to compare a “baseline” version (budget approved) vs previous versions or vs a forecast version to determine and document variances.
Plan versions will be provided to allow monthly versions. Not all versions need to be used and it is anticipated that the frequency of use will vary across a Licensing project. 
Formox projects tend to work on a quarterly review and so they will not use all the versions available either.
If in a month (e.g., Jan) there are no changes in the plan and this happen for Feb and March, then the user will continue using this version (Jan), as the official plan until the project requires changes in the plan.
Budgeting
For Budgeting purposes in JM CT, the following “Budgeting methods”, will be available to allocate the budget approved in a project.
The following table describes the methods available per business:
Business	Level	Budgeting method
Licensing	WBS element	•	Total 
•	Annual
Formox	WBS element	•	Total 
•	Annual
R&D	WBS element	•	Total 
•	Annual

Definitions:
Budgeting method	Description
Total (overall budget)	With this method, the system will allow the user to allocate an “overall budget amount” for the duration of the project.
This would be equal to assigning an “overall amount value” for the project, in the highest level of the hierarchy or at WBS element level, e.g., WBS-1 in the diagram below.
 

Annual	With this method, the system will allow the user to allocate an “overall annual amount” for each year until the project ends.
 
This amount is what the system will use to control the budget spent, through the use of availability control on a project.

Note:
It is anticipated that there will be a degree of automation available, the details will be developed during Realisation. As part of this, the user will have available some additional functionality, to allow the upload of the budget and planning automatically at a certain level.
This will be reviewed during the realisation phase.
Availability control in projects:
Availability control (AVAC) compares the current distributed budget (or released amount) with the assigned value (actuals), issuing a warning by email and error messages when budget exceeds that available within the “Tolerance Limits Settings”.
•	When a project is being executed, the available funds are used at various places within the Project including when Commitments are created, and actual costs are incurred.
•	Availability control monitors funds using budget allocation. By entering business transactions that create cost assignments, the system checks whether there is still sufficient budget available for the Project.
•	Assigned funds can be found in the budgeted WBS element and in the lower-level assignable WBS elements.
•	To ensure that the available funds are not exhausted at an early stage, the budget can be released in stages, with AVAC activated on the Released Budget Amount.
The tables below detail the tolerance limits within availability control which will be enabled for each business area:
Licensing
Tolerance Limit for Licensing	70%	90%	100%
Actions	Warning	Warning with an email to the person responsible	Warning with an email to the person responsible
Formox
Tolerance Limit for Formox	70%	90%	100%
Actions	Warning	Warning with an email to the person responsible	Warning with an email to the person responsible
R&D
Tolerance Limit for R&D	70%	90%	100%
Actions	Warning	Warning with an email to the person responsible	Warning with an email to the person responsible

Note:
The intent of Availability Control is to provide warnings only - there is no intent to restrict spend on projects in CT at the present time. The use of this feature is optional and exact limits can be adjusted. We will establish the correct settings for each business during the build.
The user will be able to switch on or off this functionality for a specific project or for multiple projects. 
Planning Process:
During the project planning and development process, each business is expected to continue using the different tools currently in place to establish costs/budgets. This will enable them to develop the costings/budget during the development and quotation phase using these familiar off system tools.
Once the final version (costing version) has been agreed and approved, the cost engineer will copy and update manually the planning version in SAP.

  

The above diagram shows how the plan version “X” with an initial cost estimate made at WBS element, has been copied into the version “Y” but with some amendments made in the plan costs on the WBS elements WBS-142 and WBS-143.
In this case, the user had the option to create a new plan version, using an existing plan as the basis and then make corrections on the new version, to create the new plan version or forecast version.
The different business will have at least one plan version per month for “budgeting” and “forecast”.
5.3.1.	Process: 08.01.02.01 Perform Budget for Project Spend
For the JM CT businesses, the process will start by the manual upload of the final approved budget into the appropriate plan version in SAP. Once this version has been uploaded into the system, the cost engineer can copy this to a working budget version, if required, (e.g., Cost Control Estimate in Licensing) and perform any additional adjustment to create the final version approved.
The approved cost structure (planning version approved) for executing a project is documented by distributing the budget to the WBS elements of the project. This typically occurs during the approval phase before the start of the project execution phase.
Project reporting in SAP PS allows for the evaluation of the budget values together with the planned vs actual costs.
The following budgeting functions from PS will be available for the different JM CT businesses: 
1.	Original Budget
2.	Budget Supplement
3.	Budget Transfer
4.	Budget Return
5.	Budget Release
Functionality	Description
Original Budget	In CT the Original Budget will be maintained during the initial stage of the project when there is a need to allocate funds and have control of expenditure throughout the project life cycle. Ideally, this will be one-time activity and any change to the original budget will be done through budget update functionality as detailed in the Functional Design Document.
Supplements	If the funds provided are not sufficient, the system enables the use of budget supplements to increment the budget approved in a project.
Transfers	In CT transfer budget functionality will be intended for transfers between WBS within the same project and available for transfer among WBS elements of different projects.
Returns	In CT this function will allow us to return unused budget on a WBS element to the top-level WBS element in the project thereby increasing the distributable amount in the project.
Budget Release	In CT we will leverage the standard SAP functionality of approving partial or total budget originally allocated to the project. Management in CT may try to optimise the use of funds and hence this additional step of budget release will be defined. This will also be done to ensure the original available budget is not exhausted at an early stage of the project and so we can release the budget in stages.

Through the cost & revenue planning option in SAP, the different businesses from JM CT will be able to produce multiple planning versions at cost element level for project costs and revenues.
The revenues will be assigned and copied into the project from the revenue plan (billing plan) on the sales order assigned to the project.
5.3.1.1.	Level 4 Process Flow and Steps 
  
08.01.02.01 Perform Budget for Project Spend	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
Finalise Estimate/ Budget inc. approvals	 Manual	The final estimate/budget for the project is approved by the business and ready to be uploaded and input into SAP.	Cost Engineer	 N/A
Import Estimate/ Budget into SAP as a plan 	 SAP	Manual upload of the finalised cost plan/budget version into SAP PS.
This will be a manual process, where the user will have to type manually in SAP the values planned in the cost estimators or excel.	Cost Engineer	 CJ40
Copy Plan version to budget plan version 	 SAP	Copy the plan version to the budget in a Project.
The user will use this transaction to copy values from one version into another. 	Cost Engineer	 CJ9d
Confirm project budget plan version correct in SAP	 SAP	Verifying the Project budget has been correctly input into SAP.
The user will perform a review to verify that the plan budget has been copied correctly.	Cost Engineer	 CJ30
Copy budget version to Budget for Availability Control 	 SAP	Once the budget version has been confirmed, it will be copied into the “budgeting functionality” to allow the system to activate the “availability control”.
The availability control gets activated on the copied budget version	Cost Engineer	 CJ30
Project Budget released 	 SAP	The budget gets released Partially/Fully as per the project requirement. Once the Project budget gets released, the notification will be sent to the Project Manager. 	Project Manager	CJ32
Release Project/ WBS Elements 	SAP	Once the Project budget is released the Project Manager can release the Project/WBS elements for Project execution.	Project Manager	CJ20n

Integration with other L4 processes

Process integration
WS	L4 Process Area	L4 Process Description	L4 Process integration
PS&TM	08.01.01.02	Create & Maintain Projects	This process has been described in section 5.2.2.
A budget cannot be estimated for a project unless the project has been created first.
RTR	03.09.04	Maintain activity types	This process describes the setup of the activity types for projects. 
Through activity types, the user will be able to plan and to allocate costs into a project, especially for timesheet costs.
PS&TM	08.01.02.02	Perform project forecasting	The user will be able to create a forecast version from the actual or current version.
PS&TM	08.01.02.03	Perform project amendment (Over/Under)	The user will have the option to modify an existing plan or budget version.
STC	02.04.01.05	Create/Modify customer order with project	The user will be able to request the modification of revenue plan in a sales order.
Every customer sales order will have to be created with reference to a project (WBS element), to guarantee that the dates established on the billing plan will be inherit correctly into the forecast of the project.
STP	01.04.01.01	Create Purchase Requisition	Purchase requisitions will be created with reference to the project structures.
For materials and services, these will be able to be ordered for a project following this process.
The procurement department will have to receive the request and the PR will have to be processed in the system, but without have been triggered automatically by the release of the activity.
TBC	TBC	Concur integration	Concur will be used to allow the users to allocate and projects to receive charges (costs) from travel expenses reports; PS will be able to also transfer the budget to Concur.
This interface will be defined during the realisation phase.

5.3.1.2.	To-be Changes
Project planning and budgeting is a new process in JM CT SAP. The users from the different CT businesses will be able to plan “budget” versions (plan versions) in SAP. The current planning process for the different JM CT businesses will be adapted and planned in SAP.

CT Sites	Changes	Business justification
All Sites	Adoption of project planning versions to update and control budget and planning versions.	Standardisation of the process for planning budgets in projects.
All Sites	Adoption of the availability control in projects for the administration of the budget online.	Implements controls around budgets in projects.

5.3.1.3.	Site Specific Changes
In addition, the following site-specific changes (Existing and New Consolidation sites) and business justification for variation in the process is specified:
CT Sites	Changes	Business justification
Agresso	Existing processes for budget management will need to be adapted to use plan versions in SAP. Entry of data into CT SAP will be new to people as much of this activity is currently undertaken in Excel.	Standardisation and implementation of reporting and tracking of costs/budgets and forecasts in SAP.
Perstorp	Existing processes for budget management will need to be adapted to use plan versions for Projects in SAP. Existing processes use plan versions but for Internal Orders	Standardisation and implementation of reporting and tracking of costs/budgets and forecasts in SAP.
Other existing SAP sites	Budgeting is currently not planned to be used for other project types (R&D etc.).	Standardisation and implementation of reporting and tracking of costs/budgets and forecasts in SAP.

5.3.2.	Process: 08.01.02.02 Perform Project Forecasting
Using the cost & revenue planning option in SAP, the different businesses within JM CT will be able to produce multiple planning versions at cost element level for project costs and revenues.
In other words, a planning version that reflects the current situation in a project, can be used as point of start to create a forecast.
  

As previously described, the user will be able to create a copy of the current plan and then perform adjustments in the new version to create their new forecast for the project.
In summary, the businesses will be able to plan and track costs and revenue on planned versions created as well as produce forecasts for projects. 
The information from SAP will flow into the wider financial forecasting processes outside of Project Systems.
Changes to the billing plan will impact the invoicing on a project but not the revenue recognised. Invoices raised to a client will not be considered by the revenue recognition process, established for the different CT businesses.
Project Manager will provide to the cost engineer (in Licensing) with any updates/changes to be made, in a similar fashion to the existing process, i.e., reviewing and marking up a cost report.
5.3.2.1.	Level 4 Process Flow and Steps  
   
08.01.02.02 Perform Project Forecast	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
Send revised forecast details	Manual	Changes required to the plan will be documented and sent to be updated on the system in the corresponding project.
The changes will be made in excel or other legacy tools and then will be updated into SAP.	Project Manager	N/A
Copy plan to next version	SAP	A new planning version will be created by making a copy from the current version into a new one.
There will be available for the user, one plan version per calendar month and one plan version for budgeting purposes.
Each business will decide how often these versions need to be updated.	Finance Controller/ Cost Engineer	CJ9B
Modify new plan version	SAP	The new version will be modified in accordance with the changes to the forecast requested by the project manager.	Finance Controller/ Cost Engineer	CJ40
Perform changes on cost (primary cost elements)	SAP	The changes will be performed at cost element level, according to the list of “valid costs” that can be planned in a project.	Finance Controller/ Cost Engineer	CJ40
Perform changes on revenue (primary cost elements)	SAP	The changes will be performed at cost element level, according to the list of “valid revenue elements” that can be planned in a project.	Finance Controller/ Cost Engineer	CJ40
Notify plan has been updated	Manual	Confirmation will be sent by email that the plan has been updated.	Finance Controller/ Cost Engineer	N/A
Updated plan received	Manual	Notification that the plan has been updated is received.	Project Manager	N/A
Send details of adjustments	Manual	The updated plan will be reviewed, and any additional changes required will be sent for updates to be made.	Project Manager	N/A
Issue updated forecast plan	Manual	Notification will be issued to confirm the forecast has been updated.	Finance Controller/ Cost Engineer	N/A

Integration with other L4 processes

Process integration
WS	L4 Process Area	L4 Process Description	L4 Process integration
PS&TM	08.01.03.01	Capture Project Related Costs	The different costs received from the different modules in SAP, will work as point of reference to the user for changes in the forecast.
PS&TM	08.01.04.02 	Billing for revenue project	Depending on changes performed in the billing plan (dates), the system will amend the revenues at project level and as consequence there will be changes in the forecast.
PSTM	08.01.03.03	Enter and approve time	For Timesheets there will be a Fiori interface to allow the users to login and input their timesheets from any browser. This graphic interface will interact in the background with the standard transaction in SAP CATs that will process the times into SAP.
STP	01.04.01.01 	Purchase requisition  	For materials and services, these will be able to be ordered for a project following this process. 
The procurement department will have to receive the request and the PR will have to be processed in the system, but without having been triggered automatically by the release of the activity.  
PS&TM	08.01.01.02	Create & maintain projects	This process allows the user and the different businesses to create a project.
PS&TM	08.01.05.01	Perform Project Reporting Budget/Actual/Commitment/Plan	Once the forecast has been updated, the user will have the option to execute several reports to present the information.
This process describes the different reports that will be available for the user.

5.3.2.2.	To-be Changes
Project planning of costs, revenues and the associated forecasting in SAP is a relatively new process in JM CT. Some parts of the organisation have used similar processes before with Internal Orders, but the new processes use these techniques more extensively and with Projects rather than Internal Orders. Through implementing these processes, the JM CT user will be able to generate different plan and budget versions per project and perform the associated forecasting of project revenue and costs.
CT Sites	Changes	Business justification
All Sites	There must be a sales order created and linked into a project, to allow the user to visualise the planned revenues in a project.	
Standardisation of the process for planning budgets in projects.

All Sites	The move to a more extensive use of plan versions in SAP will be a change for all sites. In addition, the use of these with projects will be new to all sites.	Standardisation of the process for planning budgets in projects.
All business	The creation of a project is considered as “master data”; however, it has already been agreed that every business will establish their own responsible person to create new projects in the system as per business needs and requests.
Every business will have autonomy to create and administrate their own projects.	The main target is to provide autonomy to every business to create their own projects, without the intervention from the global master data team.


5.3.2.3.	Site Specific Changes
In addition, the following site-specific changes (Existing and New Consolidation sites) and business justification for variation in the process is specified:
CT Sites	Changes	Business justification
Agresso	Existing processes for planning and forecasting will need to be changed to use plan versions in SAP. Entry of data into CT SAP will be new to people as much of this activity is currently undertaken in Excel with some interaction with Agresso.	Standardisation and implementation of reporting and tracking of costs/budgets and forecasts in SAP.
Perstorp	Existing processes for planning and forecasting will need to be adapted to use plan versions for Projects in SAP. Existing processes use plan versions but for Internal Orders	Standardisation and implementation of reporting and tracking of costs/budgets and forecasts in SAP.
Other existing SAP sites	Project Forecasting is currently not planned to be used for other project types (R&D etc.).	Standardisation and implementation of reporting and tracking of costs/budgets and forecasts in SAP.
5.3.3.	Process: 08.01.02.03 Perform Project Amendment (over/under)
During the execution of a project, it is possible that an additional budget will be required or that budget will be moved within a project. This process allows these changes to be made to the project budget within SAP and ensures that this is reflected in any reporting. Additional controls are in place to ensure that the budget cannot be increased without the appropriate approvals.
Additions to Budget
Any addition (increase) in a project budget will need to be approved before it can be reflected in the project. This is likely to arise from a change in project scope that has been agreed with the customer (change order) or other change that has been agreed to be taken on by the project and hence as this increases the budget approval of the change is needed.
The user will also have the following options to make changes in the budget from a project:
Supplements:
If the funds provided are not sufficient, the system enables the use of budget supplements, which can be used on projects in CT. 

There are two types of supplements for projects.
 
A)	In The Project  
A Supplement can be made in the project from the top-down, from the higher-level WBS element to the lower level. We can supplement only as much budget on a WBS element, as is contained in the higher level. 

B)	To The Project 
Making a supplement to a project means providing a selected WBS element with the additional external budget. This is independent of the remaining budget on the higher level. The system updates the supplemented budget on the WBS upwards. 

Devolutions:
In CT, devolutions are not considered, however the functionality will be available for the user.

Transfers:
In CT transfer budget functionality will be intended for transfers between WBS within the same project and applicable for transfer among WBS elements of different projects.  
Returns:
In CT this function will allow us to return unused budget on a WBS element to the top-level WBS element in the project thereby increasing the distributable amount in the project. This can be used when the activities against a WBS element have been over-budgeted. 
Budget Reallocation
During the execution of a project, particularly complex licensing projects, it is likely that the project manager may wish to move budget from one element to another within the project. As this does not lead to an increase in the overall project budget this change does not require approval.
5.3.3.1.	Level 4 Process Flow and Steps 
  
08.01.02.03 Perform Project Amendment (over/under)	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
Change to budget identified	 Manual	Project Manager identifies a need for the budget to be changed, raises a request for additional budget or budget transfer within the project	Project Manager	 N/A
Request budget transfer within Project	 Manual	Project Manager requests the transfer of budget within the project.	Project Manager	 N/A
Request for additional budget	 Manual	The Project Manager requests an additional budget. Following approval, the budget will be amended on the project. If it is not approved the Project Manager will be informed and no change made.	Project Manager	 N/A
Cost plan/Budget version to next version	 SAP	Copy the plan or budget version to the next version using T-code CJ9b	Cost Engineer/
Project Accountant	 CJ9b
Update budget plan/version	 SAP	Update the budget plan version by using T-code CJ40	Cost Engineer/
Project Accountant	 CJ40
Copy budget version for Availability control	 SAP	Copy the planned version for availability control using T-code CJ30	Cost Engineer/
Project Accountant	CJ30
Budget Release	SAP	Release the partial/overall budget for the Project execution using T-code CJ32	Cost Engineer/
Project Accountant	CJ32
Notification for completion of budget change	Manual	Notification sent to the Project Manager after completion of the budget change	Cost Engineer/
Project Accountant	N/A

Integration with other L4 processes

Process integration
WS	L4 Process Area	L4 Process Description	L4 Process integration
PS&TM	08.01.02.02	Perform Budgeting for project spend	Budgeting of projects is a pre-requisite for needing to make amendments to budgets

5.3.3.2.	To-be Changes
Project budget changes are used in existing CT processes, but the use of Project Systems will lead to changes in the current processes and systems being used.
CT Sites	Changes	Business justification
All sites	The existing processes for changes to project budgets will need to be adapted to use the new SAP PS structures and processes. Existing approval routes will be used to manage changes of budget prior to updates being made in SAP	Standardisation of the use of SAP PS for managing projects

5.3.3.3.	Site Specific Changes
In addition, the following site-specific changes (Existing and New Consolidation sites) and business justification for variation in the process is specified:
CT Sites	Changes	Business justification
Agresso	Existing processes for changes to project budgets will be adapted to use SAP. Changes in budget allocation within a project will continue to be made by the Project Manager without additional approval. Changes to the overall budget and the associated approvals process will continue off the system prior to entry into SAP	Standardisation of the use of SAP PS for managing projects
Perstorp	Existing processes for changes to project budgets will be adapted to use SAP Project Systems rather than the existing use of Internal Orders.	Standardisation of the use of SAP PS for managing projects
Other existing SAP sites	Budgets and hence amendments are currently not planned to be used for other project types (R&D etc.).	Standardisation of the use of SAP PS for managing projects

5.4.	Level 3 Business Area – 08.01.03 Capture Project Costs & Timesheets
 

SAP Project System is closely integrated with other SAP modules like Logistics, Material Management, Sales and Distribution, Plant Maintenance and Production Planning module. 

The integration between the SAP Project System with the rest of the application modules will allow JM CT to design, plan, and execute the projects as part of the new process defined for JM CT.  

The following diagram shows the points where SAP Project System will integrate with other modules:
 
  
 
The table below describes the different integrations already mapped between PS&TM and other workstreams (SAP modules) for the different JM CT businesses:

Modules  	Description 	Licensing	Formox	R&D
RTR
(Finance and Controlling) 	Actual costs and postings will come from RTR as:
•	Overheads
•	Journals
•	Payments
•	Goods/services receipts	In scope	In scope	In scope
STP
(Materials Management) 	Commitments will come from the creation of:
•	Purchase requisitions
•	Purchase orders	In scope	In scope	In scope
STC
(Sales and Distribution) 	Revenue will be assigned into projects in two ways:
•	Planned revenues
These will be inherited into the project from the billing plan established on the sales orders.
•	Actual revenues
These will come from invoices raised to the clients.	In scope	In scope	In scope
Workday
(Human Resources) 	To manage the processing of timesheets, it will be required to enable the setup a “master record” for employees. 
There will be an interface between Workday and SAP, to transfer basic information about employees to allow them to process their timesheets	In scope	In scope	In scope
TS
(Time sheeting)	Timesheets in SAP will be a new functionality, to allow employees in JM CT to process their weekly timesheets in the system.	In scope	In scope	In scope
5.4.1.	Process: 08.01.03.01 Capture Project Related Costs
Organizational structure
In Project Systems every project (via WBS elements) will become a cost collector that will be assigned to specific financial structures. 

  
In general, each time a project receives a posting from finance (cost allocation), the posting will be assigned to the following financial structures as a minimum in accordance with the requirements of the following businesses:
•	Licensing
•	Formox
•	R&D

The following table summarises the main organisational structures that will be required to be used by the different CT businesses.

Business	Company code	Cost elements	Controlling area	Profit Centre	Plant
Licensing	Required	Required	Required	Required	Required
Formox	Required	Required	Required	Required	Required
R&D	Required	Required	Required	Required	Required

 

The financial organisational structure establishes the company and P&L where all the charges received by the project will be assigned.

Main PS&TM integrations with STP, STC and RTR.
Integration with procurement (STP)
  
Purchase Requisition Process Overview: 
The purchase requisition process refers to the flow of events that are triggered when any department needs to make a purchase.  
 
A purchase requisition is an internal document in SAP. It is used to give notification to the purchasing department of requirements for materials or services. Purchase requisitions can be created with reference to MRP/Planned order or can be created manually. Once it is created it will be sent for approval based on the approval matrix. 
 
Any PR with reference to a project will have to be created manually by the user or requestor area. The current design does not include the automatic order of materials or services triggered by the releasing of activities in a project.

Purchase requisitions (PR) will be created across all sites in CT to procure direct, indirect, and service materials. Most of the direct purchase requisitions will be triggered by MRP or planned orders at most sites.  Use of scheduling agreements for raw materials should be deployed at the same time as MRP use. There should be a logged dependency on each project.  

Reference: L4 Process 01.04.01.01 Create Purchase Requisition.

Integration with Sales (STC)

This process is intended to be used wherever the JM CT business activity is managed using SAP projects that include elements of customer invoicing.  For example: 

•	Licensing
•	Formox Plant Designs

SAP supports several approaches to the integration of sales order processing with PS, ranging from the closely coupled approach to a looser, financially focussed integration.  An example of close integration would be the so called “Engineer-to-order” process. The resulting Quotation reflects the costs and schedule contained within the project.  Similarly, it is possible to generate a project from the Quotation itself, using standard project templates; this too results in very close integration between PS and Sales. 
 
The approach documented here reflects a looser, financial integration.  The sales order is created using standard sales order transactions, namely VA01.  The sales document line item is then account assigned to the project by entering the billing WBS element.  This ensures that both planned and actual revenue can be reported and reviewed using standard PS reports, and hence the profitability of the project determined. 
 
Upon completion of a milestone, the project manager or administrator will be releasing the line item and collecting the required documentation to support billing.  They will manually contact finance to remove the billing block when milestone documentation is completed.  Invoicing will not be completed automatically in system. 
 
Invoices generated against the account assigned sales order line-item post with reference to the billing WBS, which must be released to receive revenue prior to invoice generation. This is a new process for JM CT and is intended to provide much improved management of customer billing with respect to complex engineering project and related activities.  
Reference: L4 Process 02.04.01.05 create sales order with project

Integration with Finance (RTR)

The Finance team will be able to allocate costs to projects via: 

•	FI Journals being posted directly to a Project – e.g., FI Journals will be posted to the project via transaction FB50 referring to a WBS element. 
•	Financial Allocations, Interest etc. - Distribution or assessment cycle functionalities will be used to allocate cost from a cost center to projects or WBS elements 
•	Postings will also come from procurement and sales via the use of cost elements. 
•	Financial accounting: WBS elements and Networks codes will act as cost objects in Financial Accounting transactions.  

With the standard integration between FI and PS, every WBS element and network will become a cost collector that will be assigned to specific organizational structures. 

Tech provisions
•	Tech Provisions will be handled as a cost under License Fee, but not considered as part of the % complete calculation. The process for accrual of Tech Provisions will be finalized during realization. It may be possible to automate this process, and this will be reviewed during realization.
Overheads
•	Overheads will be handled separately using distribution cycles, the functionality will be confirmed and validated during the realization phase.

Time sheets & intercompany allocations (TM)
JM CT users will have the option to allocate time to projects that do not belong to the company code that they are assigned to. 

An engineer, whose office base is in Sweden (for example), working on a project that is managed by the UK, for timesheet processing purposes will ask the UK project manager for the WBS element or Network/activity number where time should be allocated. 

  

There will be an intercompany process defined and operated by finance, to allocate timesheets coming from different business units. 

In this case an employee that belongs to a business unit in Sweden, this employee will be able to allocate time into a project that belongs to a UK business unit. This will be possible because during the definition of the corporate structure, it has been defined that every profit centre can receive postings from different business units.

Representation:
 
In the previous diagram, the movement A) is reflecting the effect that the system will create, when an employee in Sweden is allocating their time into a project that belongs to the UK; The system automatically will generate the effect (postings) using the intercompany accounts defined B).

With these postings created a user in Sweden will be able to report all the time allocated into projects that belongs to a different business unit and at the end of the month, the business unit will be able to raise an invoice for the services provided to the affiliate.

The process requires:  

1.	The setup of the intercompany account postings between business units (currently in the scope of RTR). 
2.	The process to clear and review the amounts allocated on each business unit during month-end (part of the scope of reporting in PS&TM). 
3.	The process to invoice these amounts to the business unit that has requested the works in the project. 

Key point:
It is important to mention that at project can start to receive cost allocations (journals, timesheets etc.), only once the project has been released.
There can be cases where because of the dynamic of the business it will be necessary to release a project (or a WBS element only), without have already updated the CCE budget, planning and forecast.
In terms of the operation of the system, this will be a valid scenario, however, for revenue recognition purposes, the system will not be able to calculate it, unless the different forecast values (forecast revenue and forecast cost) have been updated correctly in the system.

5.4.1.1.	Level 4 Process Flow and Steps
 

08.01.03.01 Capture project related costs
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
Project released	 SAP	Once the project has been released the project will be able to start to receive charges and movements from different modules.
As described above a project can start to receive movements and postings from the following processes:
•	STP
•	STC
•	RTR	Project Manager	 CJ20N
Project execution review and corrections	 Manual	The review of the execution of the project will become a daily, weekly, and monthly process to be executed by the project manager to review the evolution of the costs in a project.	Project Manager	 CJ20N
Project reporting	 Manual	There will be several reports in SAP that will help and support the project managers in performing their reviews of the evolution of every project.	Project Manager	 CJ20N


Integration with other L4 processes

Process integration
WS	L4 Process Area	L4 Process Description	L4 Process integration
PS&TM	08.01.02.02	Perform project forecast	Level 4 process defined to allocate and create a forecast on a project.
PS&TM	08.01.03.03	Enter and approve timesheets	Level 4 process defined to create and post timesheets into a project.
STP	05.02.01.02 	IM Goods Receipt	Level 4 process is defined to generate the reception of goods and services into a project.
STP	01.04.01.01	Create Purchase Requisition	Level 4 process is defined to create a purchase requisition with reference to a project.
RTR	03.01.07.01	Process General Ledger Journals	Process defined to allocate multiple costs into a project by finances.
STC	02.06.02.01	Create Customer Invoice	Process defined to create client invoices for a project.
PS&TM	08.01.03.04	Time administration	Process defined to create and to amend timesheets on project.
STC	02.04.01.05	Create Customer Order with Project	Process defined to create sales order with reference to a project.
PS&TM	08.01.02.01	Perform Budgeting for project spend	Process defined to establish the initial budget for a project.
PS&TM	08.01.07.01	Project Commitments	Process defined to allow the user to execute multiple reports to review commitments in projects.
PS&TM	08.01.07.02	Project Revenues	Process defined to allow the user to execute multiple reports to review revenues allocated in projects.
The reports also include the revenue forecasts.
PS&TM	08.01.07.03	Project Costs	Process defined to allow the user to know all the costs allocated into a project.
The reports will also provide views to compare actuals vs cost forecasts.
PS&TM	08.01.07.04	Project Cash flow	Process defined to allow the user to review all the payments made on invoices (providers) with reference to a project.
PS&TM	TBC	Cost report (Licensing)	The Licensing business will have available a report to create and produce their current “cost report for projects”.


5.4.1.2.	To-be Changes
The introduction of Project Systems to CT SAP will bring new processes for the administration of projects.
CT Sites	Changes	Business justification
All sites	There will be several new processes that will be integrated with projects to manage the full life cycle of the project.
Project systems will have and will provide strong integration with the all the rest of workstreams as described above.	Standardization of the use of SAP PS for managing projects

5.4.1.3.	Site Specific Changes
In addition, the following site-specific changes (Existing and New Consolidation sites) and business justification for variation in the process is specified:
CT Sites	Changes	Business justification
Agresso	Existing processes for managing projects in Licensing use Agresso and off-system tools. There will be several changes to processes and systems required as a result of the implementation of SAP Project Systems. Additional training on the new processes will be required.	Standardization of the use of SAP PS for managing projects
Perstorp	The existing process for managing projects in Formox Plant Designs is based on the current use of Internal Orders. Some of these processes will need to be revised and adapted to use Project Systems.	Standardization of the use of SAP PS for managing projects
Other existing SAP sites	There will be less impact on R&D and other projects due to their simpler nature and lack of budgeting and planning, however there will still be a need to handle issues such as purchasing within Project Systems.	Standardization of the use of SAP PS for managing projects

5.4.2.	Process: 08.01.03.02 Maintaining HR Mini Master
HR Mini Masters will be used by JM CT to access employee profile information for Time Sheeting purposes. An interface with Workday will transfer the information required into SAP related to the master record and details of the employees (as shown in the diagram below).
 

•	Workday – Workday is the corporate system selected by JM, to manage all the personal information for all employees.
•	Middleware – the middleware (SAP PI/PO) will be used to administer the mapping and flow of the information between both systems.
•	SAP – SAP CATS is the system to be used by CT to allow the employees to process and generate timesheets.


The interface between Workday and SAP HR, will support the transfer of information for the following info types.

•	000 (Actions)
•	001 (Org-Data)
•	002 (Personal data)
•	007 (Planned working hours)
•	0105 (Communication)
•	315 (Timesheet Default)

Note: 
IT0007 record from HRMM will provide planned working hours, which will be used as target working hours in CATS Timesheet and will be defaulted for each employee in the Fiori Interface. Users can edit the time as per their actual working hours, and the system will provide a warning message when the hours booked are over or under the target working hours.
IT0007 will also provide details about public holidays, as per the work schedule rule, however public holidays/target hours will only be for display purposes.
Note:
IT0315 record from HRMM will be used to default controlling area and Activity Types for each employee depending on their discipline. These defaults will be available for each employee in their Fiori interface and can be edited if needed.
SAP HR Infotypes are the information units that are used in the SAP Human Resource Management System. SAP HR Infotypes keep the information in structured way that facilitate the use of this data in SAP.

Note: The detail of this integration remains to be confirmed with the Workday team.

The interface will transfer the necessary information into SAP to allow employees to process their timesheets on a weekly basis.

Employee Records: the creation of HR Mini Masters based on the data available in Workday is intended to be automated. The details of this interface are still to be finalised due to limited access to the Workday team at present.

Note: For more information, please refer to the FDD document section 02.05.02.01

5.4.2.1.	Level 4 Process Flow and Steps
 
Figure 11 – 08.01.03.02 Maintaining HR Mini Master

08.01.03.02 Maintaining HR Mini Master	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
 1.	 Non-SAP	Workday File Transfer
Workday is the corporate system used by JM, to manage personal and payroll information for all employees.
Data will be sent from Workday to SAP. This process will be automated, details of which will be confirmed during the build phase.
The file format to be used will be confirmed during the build phase.	 NA	 NA
 2.	 SAP	Middleware
Middleware (SAP PI/PO) will be used to manage the mapping and flow of information between the systems.
Once the HRMM configuration is completed, an employee’s mini master data can be replicated from Workday to SAP via this process.	 NA	 NA
3	SAP	File Preparation
The data file will be prepared by the middleware in a format suitable (expected to be XML) for SAP upload.	NA	NA
 4.	 SAP	Update of SAP Info types
SAP CATS is the system being used by CT to allow the employees to process and generate timesheets.
SAP will receive the data file (XML) from the middleware and update the following Info types:
IT0000, IT0001, IT0002, IT0007, IT0105 and IT0315	 NA	 PA20/PA30

The following data fields are the key fields identified between Workday and SAP HR required to enable implementation of HR Mini Masters for JM CT:
Field	Mandatory / Optional
Personnel number	Mandatory
End Date	Mandatory
Start Date	Mandatory
Action Type	Mandatory
Action Reason	Mandatory
Company Code	Mandatory
Personnel Area	Mandatory
Employee Group	Mandatory
Employee Subgroup	Mandatory
Personnel Subarea	Mandatory
Organizational Unit	Mandatory
Position	Mandatory
Job	Mandatory
Last Name	Mandatory
First Name	Mandatory
Middle Name	Mandatory
Personnel ID number	Mandatory
Work Schedule Rule	Mandatory
Employment Percentage	Mandatory
Daily Working Hours	Mandatory
Weekly working hours	Mandatory
Monthly working hours	Mandatory
Weekly workdays	Mandatory
End Effective Date	Mandatory
Start Effective Date	Mandatory
Communication Type	Mandatory
Communication ID/Number	Mandatory
Controlling Area	Not Mandatory
Activity type	Not Mandatory

This information will be transferred into SAP and will allow employees to process their timesheets.
For a JM CT employee this process of data transfer will be completely transparent, and they will not have to perform any additional action in SAP. 
5.4.2.2.	To-be Changes
The implementation and maintenance of HR Mini Masters are new processes in JM CT SAP. In order to enable CT users to allocate time to projects HR Mini Masters are required. Updating and maintaining the HR Mini Masters is critical to ensure that this information is kept up to date. This will be a new process for all the parts of CT that will be using time sheets.

CT Sites	Changes	Business Justification
All Sites	Implementation of HRMM is new to all sites. 	Implementation of HRMM for JM CT employees to enable time sheeting in SAP

5.4.2.3.	Site Specific Changes
The implementation of HR Mini Masters for time sheeting will be new to the CT SAP system and hence this process will be new for all parts of CT concerned. No specific site changes are anticipated related to this process.
CT Sites	Changes	Business Justification
	None identified	

5.4.3.	Process: 08.01.03.03 Enter & Approve Time
An SAP Fiori interface will be developed to enable JM CT employees to prepare and submit their timesheets on a weekly basis.
What is SAP Fiori?.
Fiori is a streamlined application, delivering a role-based user experience that can be personalised across all lines of business, tasks, and devices. It uses tiles to encapsulate standard tasks like viewing sales orders or approving timesheets. 
 
This provides a user-friendly web application for inputting time sheet data. The layout the interface will display, will be based on the entry profile defined for each business (Licensing, R&D and Formox).
The Fiori interface:
•	Will be used to enter as well as approve the timesheets.
•	Is web-based, accessed via a browser and a user-friendly GUI.
•	Makes filling and approving timesheets a simpler experience which can be done from anywhere on any device with appropriate authorisations.

Classic Fiori interface
 
Time Sheet Approval
Timesheet approval helps to track which employees' timesheets have been checked for accuracy before closing out the pay period
The process will enable line managers to review, approve and reject timesheets for all employees.
Line managers will approve timesheets, in line with the approach currently being used in JM CT.
Line managers will reject timesheets, in line with the approach currently being used in JM CT and the following timesheet rejection reasons will be available.

Code	Timesheet Rejection reasons
REJ1	Hours booked to incorrect number
REJ2	Incorrect number of hours booked
REJ3	Incorrect overtime booked
REJ4	Incorrect work centre used
REJ5	Other error in timesheet

For JM CT the following status codes have been defined, to identify the stage for each time sheet during the approval process.
Note: These Status codes can be viewed using SAP standard report CATS_DA. CATS_DA is not available on the standard Fiori interface and so requires SAP access.
Note: Timesheet filling, release, submission, and approval will be done via Fiori interface.

 
Note: For more details, please refer to FDD section 2.5.2.3.

Status	Short description	Description in the context of JM CT
10	In process	The record is being processed and is not yet ready for transfer to the target components (Controlling).
20	Release for approval	The record has been released and is ready for approval or rejection by the line manager.
30	Approved	The record has been approved and is ready for transfer to the target components (Controlling), to convert hours to cost.
40	Approval rejected	The record has been rejected by line manager. It cannot be transferred to the target components (Controlling).
50	Change after approval	An approved record has been changed. The original record is assigned this status until the new record has been approved.
60	Canceled	The record was cancelled after approval.


Process:
The creation of projects will be managed within the business and will follow a similar process today. For example, in Licensing it is expected to use an updated version of the CWA. 
Once approved, the project can be set up using the templates provided alongside the creation of a Sales Order and necessary customer record. 
Once this is done employees will be able to book time to the WBS elements that have been set up, even if budget has not been assigned, provided the WBS element has been opened to allow bookings. 
Allocation of Rates per activity (discipline):
The allocation of time into projects will be covered by the uses of SAP “activity types”. Project concert will establish “activity rates” based on an average rate per “discipline”.
Example: (Licensing)
 
In this case the average rate will be established at discipline level and will be determined by the “Work Centre” in SAP:
Description (Discipline)	SAP WBS Level 4
Engineering	10
Process	20
R&D	30
Projects	40
Others	60

“Work Centres” will be defined in SAP for the disciplines in the table above and work centre will be an attribute that will be input in the timesheet by the employee.
The following table details the activity types defined for the different CT businesses to allocate time into projects:
Activity type	Description
1000	Normal Hours
1100	Overtime | Mon-Fri
1500	Overtime | Sat-Sun
2000	Overtime | Bank Holiday

This list will be reviewed during the realisation phase, to confirm if’s necessary add new activity types required by the CT Businesses.
For timesheet purposes, an employee will input in the Fiori app the following data:
1.	Project or projects (WBS element) where he wants to allocate their time.
2.	Activity type that refers to the type of work performed (e.g., 1000 Normal hours).
3.	Work centre, that will determine the “Discipline”.
 
With this combination of values in the fields, the system will be able to calculate the rate for the activity and then establish the cost to be allocated into the project.
Example:
Cost centre	Work centre	Activity type	Unit/Measure	Unit	Rate per h.
C100	W100	1000	Hr	1	£ 45.00 
C200	W100	1000	Hr	1	£ 35.00 
C300	F100	1100	Hr	1	£ 55.00 
C400	F200	1100	Hr	1	£ 65.00

The previous table shows how the rates will be setup in the system, this table will have to be maintain at least once a year or depending on business requests.
The following example shows how the system will make the conversion of hours to cost:
An employee “John Doe” creates a timesheet with 40hrs for the discipline “W100 design engineering” and the activity type 1000 Normal hours.
Employee 	John Doe
Cost centre	C200
Activity Type	1000
Work centre	W100

Note: by default, every employee will be assigned into a cost centre, and this will come from Workday.
 
In this case, the system will perform the following logic:
John Doe is assigned to the Cost Centre C200 (because this is the area within the company where he belongs), so the system will make the following calculation:
40 Hrs. multiplied by the rate from the table where the Cost Centre is equal to C200, Activity Type 1000 and Work Centre (discipline) W100.
Cost centre	Work centre	Activity type	Unit/Measure	Unit	Rate per h.
C100	W100	1000	Hr	1	£ 45.00 
C200	W100	1000	Hr	1	£ 35.00 
C300	F100	1100	Hr	1	£ 55.00 
C400	F200	1100	Hr	1	£ 65.00

As a result, the system will allocate into the project the cost of £35 GBP X 40 hrs = £1,400.00.
The table with the rates per activity and work centre will have to be created per business (Licensing, Formox and R&D) and will be part of the initial setup of the system.

5.4.3.1.	Level 4 Process Flow and Steps
 
Figure 12 – 08.01.03.03 Enter and Approve Time

08.01.03.03 Enter & Approve Time
L4 Process Step	System / Manual 	Narrative	Step owner	SAP 
T-Code
Time entry via Fiori application	Non-SAP	Time Entry via Fiori App
Every JM CT Employee will be provided with SAP Fiori interface URL, with username and password to submit and access weekly timesheets.
During the realization phase of the project the final list of end users that will have access to this functionality will be confirmed.
Delegates can be assigned and allowed to fill in timesheets on behalf of another user.
The Fiori interface will also be used to approve or reject the timesheets.	User	NA/ URL
Time Entered in CATS released and sent for approval (CATA)	SAP	Time Entry in CATS
Every entry made by a CT employee in the Fiori interface will redirect to CATS Time sheeting in SAP(CATA) in the background. 
Note: Users/Approvers need not know about the SAP interface, as all the timesheet related processes are done via the Fiori interface
Hours will be submitted weekly, saved, released, and sent for approval.
Approvers will receive an email notification that a timesheet is ready for approval.
Approval will be done via the Fiori interface by the line managers	User	URL
Timesheet Approval/
Rejection	SAP	Approval/Rejection
Depending on the timesheet data, the approver can either approve or reject the timesheet. If the timesheet is approved, it will be sent to finance and internally the hours will be converted to costs.
If the timesheet is rejected, the employee/delegate will need to re-enter the timesheet and send it back for approval.	Approver	NA/URL
Timesheet Transfer to Controlling	SAP	Transfer to Finance
After the timesheet has been approved, the hours from the timesheet will be moved to Finance/Controlling via an automatic process and converted to cost by using activity rates maintained per activity.	Finance	CAT7/KP26

The following fields are required for the time sheet entry, Initial Entry screen

Key Fields	Description	Mandatory / Optional
Data-entry profile	The Data Entry profile is a profile that will be created for each business: R&D, Licensing and Formox. It will define for each business group the customised fields they want to see in their timesheet, also the default fields that need to be shown while filling timesheets. 
This enables the businesses to default on some general settings relating to displaying weekdays or workdays only, displaying target hours etc. It can also be used for time settings like the number of weeks to be displayed etc. 
This will be configured during the configuration phase. 	Mandatory 
Personal Number 	Employee number filling in the timesheet 	Mandatory  
Key Date 	The key date determines the period for which you should enter or display times	Mandatory  


The following fields are required in timesheet entry

Key Fields	Description	Mandatory / Optional
Cost Centre 	Cost center is a field within the organizational unit, that defines the location of cost incurrence.
Cost Centre can be defaulted while filling the timesheets from the HR Mini master.	Mandatory   
WBS Element  	A work-breakdown structure element is a way of breaking down a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections
The user will have to type manually the WBS (project) where he wants to allocate their time.
The user will have the option to assign time to multiple projects in the same timesheet.	Mandatory   
Activity Type	Activity types describe the activity produced by a cost center and are measured in units of time.
Activity types can be selected from the list of drop downs available and can also be defaulted from HR Mini master.	Mandatory   
Hours	Total number of weekly hours utilized by an employee.	Mandatory  
Work Centre	Allocated work center as per JM disciplines	Mandatory  

Integration with other L4 processes

Process integration
WS	L4 Process Area	L4 Process Description	L4 Process integration
RTR	03.09.04	Maintain Activity Types	As part of the new Project Systems approach, it will be necessary to setup activity types to manage costs on timesheets.
PS&TM	08.01.01.02	Create & Maintain Projects	This level 4 process describes the creation of project in the system.
To allow any user to create their timesheets, it will be necessary to create the project first.
PS&TM	08.01.02.01	Perform Budgeting for Project Spend	This process describes how the budget needs to be assigned into the project before it can start to receive any costs.
The user will not be able to complete any timesheet entry unless the project has been released or the budget has been assigned.
RTR	03.09.05 	Maintain Activity Rates	As part of the new Project Systems approach, it will be necessary to setup rates per activity type to be used to allocate costs into a project.
RTR	08.01.03.02 	HR Mini Master	This process describes the integration between workday and SAP.

To allow employees from the CT businesses to process their timesheets in SAP, HR-Mini master records must be created in SAP.

It will not be possible for an employee to create timesheets if their SAP HR master record has not been copied from Workday into SAP.

5.4.3.2.	To-be Changes
Entering and approving timesheets on SAP is a new process in JM CT. Fiori interfaces and workflows will be created as required. Timesheet completion is a process that is currently used by many of this group of employees, however the systems, interfaces and processes will change.
CT Sites	Changes	Business Justification
All Sites	Implementation of timesheets and the approval procedure on SAP is new to all sites. 	With the replacement of Agresso by SAP, time tracking must be retained as this and the conversion to cost is a key part of the business areas concerned. Implementing time sheeting within SAP meets this need.
All Sites	Enabling a Fiori interface to allow the JM CT employees to create and submit timesheets.	The JM CT business has requested, the enabling of a browser application to allow the different employees from the business to create and process timesheets in a user friendly and flexible way.
5.4.3.3.	Site Specific Changes
CT Sites	Changes	Business Justification
Agresso Users
(Paddington, Stockton, Chilton, Savannah, Perstorp)	Employees currently completing time sheets in Agresso will be moving to the SAP based time sheeting system. This will require them to be trained on the new system and the processes required to complete and approve timesheets
The group of employees involved will cover Licensing (JM Davy) as well as the wider RD&E teams across multiple sites.	Time sheeting is required by these businesses and the replacement of Agresso with SAP requires this change of approach.
Perstorp	The Formox Plant Design team already complete timesheets using an existing SharePoint based system. These employees will be moved to using the CT SAP based time sheeting system.	Consolidation of the RD&E businesses on to one common time sheeting system and integration with Project Systems in SAP.
5.4.4.	Process: 08.01.03.04 Time Administration
When errors are identified with the time recorded on timesheets, these errors need to be corrected. Modifying incorrect time can be done at different points in the processes. Changes are more easily made prior to approval. After approval changes must be made via the finance team to enable correction of any cost postings as well as the time records.
•	Users
Users can identify incorrect timesheet data after submission. They can send a request to the approver (Line Managers) for resubmission of the timesheet via email. This can only be done if the timesheet has not been approved by the line manager. Users can also modify the timesheet if the timesheet has been rejected by approver.
•	Approvers
Approvers can modify the timesheet for user before approval if they are assigned as time administrators or delegates. They can also reject a time sheet and send it back to the user for correction. If an approver identifies an error in the timesheet after approval, an email notification is sent to finance and finance makes the necessary changes to the time sheet record and any financial corrections required. 
•	Finance Team
Once the Finance Team receives an email notification of incorrect timesheet data postings, they can make the adjustment, reverse the postings, and send an email notification to confirm the change has been made.
The identification of errors in timesheet allocations will follow the existing processes within the businesses. Similarly, the existing timesheet amendment process would be followed, and correction information provided to Finance. 
Revisions will be required to the existing processes/forms to reflect the revised systems, coding and how the changes need to be applied.

5.4.4.1.	Level 4 Process Flow and Steps
 
Figure 13 – 08.01.03.04 Time Administration
Time Administrator
The Time Administrator role will be performed by employees in the individual business groups of R&D, Licensing, and Formox. Each business will have at least one time administrator each.
Roles of Time Administrator,
•	These employees have the task of correctly recording and managing the Time Sheet data of the employees assigned to them.
•	Time Administrator manages time sheet allocation for all personnel numbers assigned to the user in his or her capacity as a time data administrator.
•	Time Administrator can also perform as a delegate, they can fill the Time sheet on behalf of the users.
•	Time Administrator also has the authorisation to approve/reject the timesheet of all the personnel numbers assigned to them.
•	Time Administrators are assigned in IT0001 for each employee.

08.01.03.04 Time Administration	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
Error in timesheet identified by user after sending	 SAP/
 Non-SAP	Error Identification in Timesheet
An error is identified in a timesheet by user after submitting timesheet, a user can ask the approver to reject the time sheet allowing resubmission via the “Enter and approve time” process.
If the error is identified by the approver before approving, the approver can edit the timesheet directly (if assigned as delegate/or time administrator) or reject the timesheet and send it back to user for resubmission.
If an error is identified after approving the timesheet, notification must be sent to the Finance team to enable time sheet correction.	 User/
Approver	 NA
Notification sent to user/line manager/project manager via email	Manual	The requestor will send the notification that there is an error in a timesheet posting, but the timesheet has already been posted into Finances.
The notification will be sent by email.	User/Approver/Project Manager
/Finance	NA
User requests rejection of timesheets	Manual	Based on a previous identification of an error on the processing of a timesheet. 
The user can detect the correction and send the indication to the approver to reject the timesheet.	User/Approver/Project Manager
/Finance	NA
Approver rejects timesheets	Fiori	The approver (line manager) can reject the timesheet in the system and then send the indication to the end user to re-process their timesheet again.	User/Approver/Project Manager
/Finance	Fiori
Correction received by line manager	 Manual	Correction Assessment
If correction is not required, no action is needed.
If correction is required, an email notification is sent to the Finance team.	 Manager	 NA
Error Identification by Finance	 SAP	Finance
The finance team identifies errors and corrections to be made and then, makes the required timesheet corrections and reverse on postings made.	Finance	 KB15N
Email Notification	 Non-SAP	Notification
Notification of any corrections made by the Finance team are sent to line managers and users via email	Finance	 NA

The following fields are required to correct an incorrect entry, TCODE KB15N,
 
Key Fields  	Description  	Mandatory / Optional  
Sender Element	In KB15n, the sender cost element can be cost center, WBS element or internal order. If timesheet data is incorrectly posted to CO, it can be reversed by inputting the respective cost collector (Cost Centre/WBS/Network/Internal orders) in KB15n in the Sender field	Mandatory  
Receiver Element	The receiving cost collector is entered in the receiver field and executing the program transfers the amount/hours from sender cost collector to receiver cost collector	Mandatory  
Date 	Date on which postings are to be reversed	Mandatory  
Amount	The amount to be reversed from one cost collector to another	Mandatory  
Secondary-cost element	Cost element used for internal cost allocation	Mandatory

Integration with other L4 processes

Process integration
WS	L4 Process Area	L4 Process Description	L4 Process integration
PSTM	08.01.03.03	Enter and Approve Timesheets	This is the process where the user will be able to input their timesheets into the corresponding projects.
PSTM	08.01.07.03	Project costs	This is the process where users from the different CT businesses, will be able to review the cost assigned into projects.

5.4.4.2.	To-be Changes
Modifying time is a new process in JM CT. Currently “modify time” is done in Agresso but this will be replaced by SAP “modify time”.
CT Sites	Changes	Business Justification
All Sites	Implementation of modify time in SAP is new to all sites. Some sites already have a process for handling changes to timesheets and these processes will need to be revised to align with the new SAP timesheet system.	The modify time process flow needs to be set up for JM CT. The replacement of Agresso with SAP requires this change of process to enable time sheets to be corrected.
5.4.4.3.	Site Specific Changes
Modify time for time sheeting will be new to the CT SAP system and hence this process will be new for all parts of CT concerned.
CT Sites	Changes	Business Justification
Agresso Users
(Paddington, Stockton, Chilton, Savannah, Perstorp)	Employees currently completing time sheets in Agresso will be moving to an SAP based time sheeting system, and this will require them to be trained on the new system and processes required to modify time.
The group of employees involved will cover Licensing (JM Davy) as well as the wider RD&E teams across multiple sites.	Time sheeting is required by these businesses and the replacement of Agresso with SAP requires this change of approach.
Perstorp	The Formox Plant Design team already complete timesheets using an existing SharePoint based system. These employees will move to using the CT SAP based time sheeting system and associated process for making corrections.	Consolidation of the RD&E businesses on to one common time sheeting system and integration with Project Systems in SAP.

5.4.5.	Process: 08.01.03.05 Reporting for Time Sheets
For JM CT there will be several standard reports available to analyse and report on timesheets. However, two main reports will cover 95% of the data and reporting requirements.
•	CATS_DA Report
•	CJI3
Note: Above reports are not available in Fiori interface but can be accessed in SAP with the right authorisations.
CATS_DA Report
The CATS_DA report will be used by the business to review information related to timesheets. The system will save all the information related with timesheets.
CATS_DA SAP Standard report 
The Standard SAP reports for Time Sheets (CATS_DA) contains all the data that has been recorded using Timesheets. As soon as a user has entered and saved data in the time sheet, the system writes the record in the table.
The CATS_DA reporting output will help to track timesheet data before it is transferred to PS/Controlling. It can help to:
•	Retrieve information at employee level, e.g., employee number, working hours, approver details, to help track changes in timesheets and dates
•	Provide details of timesheet status as defined in 5.4.3
•	Track delegate information. In the CATS_DA Output, we can view the name and the personal number of who updated the timesheet data (this can be a user or a delegate in place of the user).
•	Show HR information retained in SAP.
•	Provide the reason for rejection of timesheet by approver.
•	Provide data from timesheets from before as well as after the current system date.
•	Can be used by managers to track employee timesheet status before the last submission date. Multiple employee numbers can be checked at once.
 

 

 

CJI3 (Display Actual Cost Line Items for Projects) report:
CJI3 is a standard SAP report used to display the actual cost incurred by the project. This report is used to review and analyse expenditure line items posted against projects.
The Project Line-Item Report can be run as required to check and analyse project costs within a defined time frame. 
In relation to timesheets, this allows the reporting of the costs that have been transferred to the projects based on the time booked on the time sheets. 
There will be several benefits from the use of this report, including:
•	It can be used to validate month end settlements to Cost Centres
•	CJI3 shows all actual lines item posted to WBS elements/Activities.
For example, Actual Cost incurred at WBS level can be retrieved.

The example below shows the total cost incurred by WBS 1710-2021-0007-02.01 can be reported based on specified dates.
 
•	Costs can be tracked by posting dates.
•	Costs incurred from previous years can be tracked using the posting date selection field, as shown below,
 
•	The report provides follow up documents from controlling and provides controlling level information as shown below,
 
 
5.4.5.1.	Level 4 Process Flow and Steps
 
Figure 14 – 08.01.03.05 Reporting for Time Sheets

08.01.03.05 Reporting for Timesheets	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
Report View 	 Non-SAP	User wishes to view approved cost or time reports
User can view or export desired report output in multiple formats (excel/text etc.) from SAP.	 	 NA
CJI3
SAP Standard Report	 SAP	CJI3
User wants to extract actual costs incurred by project during a certain time	 	 CJI3
CATS_DA
SAP Standard Report	 SAP	CATS_DA
User wants to view Timesheet level data before transferring to controlling	 	 CATS_DA

The following table shows key SAP Fields from the CATS_DA Report Output. This report can be customised as required during the build phase.
Each CT business can have a different number of fields and time of export for this report, In SAP, R&D, Licensing and Formax will have one variant each with the fields and details as required.
Key field 	Technical name
Personnel Number 	PERNR 
Date 	WORKDATE 
Sender Cost Centre 	SKOSTL 
Activity Type 	LSTAR 
Activity Number 	LSTNR 
Receiver WBS element 	RPROJ 
Network number 	RNPLNR 
Controlling Area 	KOKRS 
Company Code 	BUKRS 
User Who Created Data Record 	ERNAM 
Date of Last Change 	LAEDA 
Time of Last Change 	LAETM 
Date of Approval 	APDAT 
Processing status 	STATUS 
Reason for rejection 	REASON

The table below show key SAP Fields from the CJI3 Report Output. This report can be customised as required during the build phase.
Each CT business can have a different number of fields and time of export for this report, In SAP, R&D, Licensing and Formax will have one variant each with the field and details as required.
Key fields	Technical name
Document No 	BELNR 
Cost element 	KSTAR 
Value TranCurr 	WTGBTR 
Transaction Currency 	TWAER 
Posting Date 	BUDAT 
WBS Element 	POSID 
Fiscal Year 	GJAHR

The final report layouts for each report, will be defined and completed during the build phase.
5.4.5.2.	To-be Changes
Time sheet reporting is a new process in JM CT SAP. These reports are readily available as they are SAP Standard reports and will be replacing the current Agresso and SharePoint Timesheet reporting processes and formats.
CT Sites	Changes	Business Justification
All Sites	Implementation of time sheet reporting is new for JM CT, although JM currently uses Agresso, and SharePoint based time sheet reporting. This will be replaced with SAP.
Existing timesheet reporting will need to be replaced with the appropriate reports from SAP. The process for accessing these reports will be new for the users.	With the replacement of Agresso by SAP, SAP time reporting must provide all the reporting required by the business. 
Implementing time sheeting reporting within SAP meets this need.
5.4.5.3.	Site Specific Changes
Time sheet reporting will be new to the CT SAP system as this will be replacing the existing Agresso and SharePoint processes and hence this process will be new for all parts of CT concerned.
CT Sites	Changes	Business Justification
Agresso Users
(Paddington, Stockton, Chilton, Savannah, Perstorp)	Reporting will change from that provided in Agresso to that available from SAP.	Move from Agresso to SAP CATS time sheeting solution using Fiori interface and hence need to provide reporting from SAP.
Perstorp	Reporting will change from that provided in the current SharePoint solution to that available from SAP.	Move from SharePoint to SAP CATS time sheeting using Fiori Interface solution and hence need to provide reporting from SAP.

5.5.	Level 3 Business Area - 08.01.04 Capture Project Revenue (Billing)
As part of the design established by the Project Concert, revenues will be assigned and allocated into a project by the creation of a sales order.

To process a billing document (invoice) for a client, the project will have a sales order that will be linked to the project, so every invoice raised to the client in the system will automatically assign the revenue to the project.

This process will be used wherever the JM CT business activity is managed through the use of SAP projects that include elements of customer invoicing.  
 
•	Licensing – Davy  
•	Formox
•	R&D 
 
The current BPD document contains a description of how PS and Sales will work together to enable customer billing where project work is on behalf of an external customer.

5.5.1.	Process: 08.01.04.01 Maintain Policy & Procedure for Revenue Recognition
Revenue recognition is an accounting principle used to determine when and how the revenue from a project needs to be recognised for accounting purposes. 
By using the SAP Result Analysis Functionality (RA), the different businesses will be able to calculate revenue recognition on projects, based on the guidelines established for each business. 
For the Licensing and Formox Plant Design businesses CT will adopt the cost-based percentage of completion method to recognise revenue in projects as well as point in time.
The following table defines the scope of businesses and methods that will implement this functionality to automatically calculate revenue recognition in projects:

Business	Revenue Recognition	Methods	Existing / New
Licensing	Required	Revenue Recognized = Plan revenue x POC
POC = actual costs incurred / Forecast total costs
PIT = Revenue Recognition equal to actual cost (at one specific point of time)	In scope
Formox	Required	Revenue Recognized = Plan revenue x POC
POC = actual costs incurred / Forecast total costs
PIT = Revenue Recognition equal to actual cost (at one specific point of time)	In scope
R&D	Not applicable	Not applicable	Out of scope

During the creation of the project the RA Keys will be determined as required for revenue recognition.
PIT – will apply mainly on projects where the cost will be equal to the revenue to be recognised in the corresponding period. E.g., for Licensing projects, Royalties projects, Breakeven projects, where the “payments” are made by the clients once a year or every six months, PIT will recognise all the cost incurred in a monthly basis as revenue recognised until the payment happen, and then the system will perform the corresponding adjustment.
Important – Every RA is related with only one calculation method; this means will have to be WBS elements to calculate revenue recognition based on POC and WBS elements for PIT. One WBS element cannot have more than one calculation method applied to it.
These are project parameters that will be predefined in the project templates, so it will not be necessary capture and assign these RA keys to the structure, every time that a project is created.
However, it will be one of the pre-checks that will have to be performed by the corresponding project controllers, to ensure that these keys are assigned correctly.
Without the correct assignment of the RA keys to the structure, the system will not be able to automatically create the corresponding calculations to establish the revenue recognition for the project.
The RA key will determine the method to be used by the system (see table above) to calculate revenue recognition.
During the realisation phase of the project additional RA keys will be created if required.
 
Currently, 3 result analysis keys have been identified as being required.
 
Result Analysis key 	Description 	Existing / New 
LI00001 	Result analysis key Licensing 	In scope 
FO0001 	Result analysis key Formox 	In scope 
RD0001 	Result analysis key R&D 	Out of scope 
 
Note:
During the realisation phase the correct reconciliation process will be determined. This process will help the business to provide additional reporting, to verify the results calculated with the revenue recognition process.

The process will provide a comprehensive model to the user, to review the main inputs taken by the revenue recognition process in SAP, and to verify if the results obtained are correct. The process will also provide a different mechanism to make corrections and adjustments in case this is necessary.

Breakeven projects are part of the scope of this design document, but they will be reviewed in more detail during the realisation phase, to identify the best method to manage and administer the calculation of revenue recognition.
5.5.1.1.	Level 4 Process Flow and Steps
Non applicable for this section.
5.5.1.2.	To-be Changes
Result Analysis is a new process in JM CT SAP. The process will provide a standard and automated process for every CT business to calculate revenue recognition in projects.
The process will be fully automated and integrated with finances, so once the results has been approved and validated, the user will have the option to transfer and post the effect into Finances.
CT Sites	Changes	Business Justification
All Sites	Every CT business will migrate their current calculation process to determine Revenue Recognition into SAP.
The new process will help to automate in SAP the calculations, instead of being performed outside of SAP manually.
There will be new processes and systems required.	Use of a standard tool to provide the different CT businesses a standard and automated method to calculate revenue recognition in projects.


5.5.1.3.	Site Specific Changes
Result Analysis is a new process in JM CT SAP and will harmonize the method to calculate RA across all the CT businesses. The process will provide a standard and automated process for every CT business to calculate revenue recognition in projects.
CT Sites	Changes	Business Justification
Licensing	RA will replace the current manual processes used in Licensing for revenue recognition. This will require people to understand the new processes and systems needed.	Move from existing manual process to an automated standard tool for revenue recognition.
Formox	RA will replace the current development used by Formox to calculate revenue recognition.
Formox is currently using a “tailor made” program (ZFXX_SVATOOL)  for revenue recognition.	Use of a standard tool to provide the different CT businesses, a standard and automated method to calculate revenue recognition in projects.
RA will be able to deliver the results, as required by Formox.

5.5.2.	Process: 08.01.04.02 Billing for Revenue Projects
For Revenue billing, SAP supports several approaches to the integration of sales order processing with PS, ranging from the closely coupled approach to a looser, financially focussed integration.  

For the different JM businesses, the process will require a sales order is created using standard sales order transactions (T-code: VA01) in the SD module (STC).  The sales document line item is then account assigned to the project by entering the billing WBS element, for example:  

 

This ensures that both planned and actual revenue can be reported and reviewed using standard PS reports, and hence the profitability of the project determined. 
 
Upon completion of a milestone, the project manager or administrator will release the line item and collect the required documentation to support billing.  They will manually contact finance to remove the billing block when milestone documentation is completed.  Invoicing will not be completed automatically in system.

 
 
Invoices will be generated against the account assigned sales order line-item post with reference to the billing WBS, which will be released to receive revenue prior to invoice generation. 

Note:
•	The completion of a milestone in a project implies the creation and sending (including documentation support) of the invoice to the client. This is the moment where the system will allocate the revenue to the project (revenue recognition does not take place at this stage).
•	The PM can change whenever required the due date in a milestone or in several milestones. Finance can have access to see these milestone dates in the system.
•	The revenue forecast will be taken by the project from the billing plan established in the Sales order. This revenue forecast will provide good level of visibility to the user, to know “when” the project is expected to release an invoice to the client (this means create the invoice and prepare it to be sent to the client).
•	If there are changes in the milestones of the projects, because of delays (for example) these changes will have to be reflected manually in the billing plan of the sales order.

During the period end, result analysis will be performed on those WBS elements which are assigned to sales orders, like license agreement, engineering agreement, catalyst agreement etc in the Licensing business. 

While doing result analysis on a WBS element the system will consider all sub level WBS elements and Network Activities to calculate the result analysis. Result analysis will consider data like actual cost of work done, forecast total cost (not budget), planned revenue and actual revenue (Milestone billing and down payments). 

Below there is a list of some business requirements that have been considered in the current design for the different JM CT businesses:

•	Support customer billing of activities managed through a project 
•	Support for milestone billing to project 
•	Support for billing of services such as training and engineer site visits  
•	Link planned revenue visibly to the project 
•	Link actual revenue visibly to the project 
•	Need time for non-Davy employees to be input for % completion calculations for revenue recognition 
•	Limit the number of transactions to manage billing associated with intercompany actions 
•	Handle revenue recognition across JM legal entities, especially where % complete is required. 
5.5.2.1.	Level 4 Process Flow and Steps
 
08.01.04.02 Billing for revenue project	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
Revenue milestone reached	Manual	The project manager will determine based on the progress achieved in their project, if a milestone has been reached as part of the milestones agreed in the contract.	Project Manager	NA
Confirmation milestone completed	SAP	If the milestone has been reached, the project manager will change the status of the milestone in SAP to “complete”.
This will provide a clear indication in the system that a milestone has been reached, and will allow any user to know the status	Project Manager	CJ20n
Prepare invoice support documentation	Manual	The project manager will put together all the supporting documentation of the milestone achieved.	Project Manager	NA
Notification project milestone reached	Email	The project manager will notify the billing clerk that a contract and project milestone has been reached, this will allow the billing clerk to start to process and issue the invoice.	Billing clerk	NA
Send invoice	Manual/
email	The invoice issued will be send to the project manager to add all the support documentation.	Project Manager	NA
Project manager to request intercompany invoice	Manual	The project manager will request to the billing clerk the creation of an invoice (sales order created first), but in this case the client will be an affiliate.
Example: When Plc is holding the contract with the end client, but Davy is delivering the work to the client.	Billing clerk	VA01
Delivery of the invoice to the client plus documentation	Manual	The project manager will prepare all support documentation for the work delivered to the client.
The project manager will put together all the documentation plus the invoice to be send to the client. 	Client	Na

Integration with other L4 processes

Process integration
WS	L4 Process Area	L4 Process Description	L4 Process integration
STC	02.04.01.05	Create customer order with project	Process defined to create sales order with reference to a project.
As has been explained before, during the creation of the sales order by this process, the sales order will be created and linked to a project (WBS element).
STC	02.06.02.01	Invoicing	This process describes the steps that will be followed by the account clerks to issue and process invoices with reference to a project.
PS&TM	08.01.07.02	Project revenues	Process defined to allow the user to execute multiple reports to review revenues allocate in projects.
The reports are also including the revenue forecasts.
PS&TM	08.01.06.01	Revenue recognition / Result analysis	This process describes the steps and effects calculated and posted into Finances, as a result of the automatic calculation of revenue recognition in projects.
This process must be part and will be one to the steps of the month end process of the business.

5.5.2.2.	To-be Changes
The issue of an invoice to a client in relation to a project is a new process for the different JM CT Businesses in SAP. The new process will establish the need to create or have a sales order created first to process and issue an invoice to a client.
CT Sites	Changes	Business Justification
 All	To issue an invoice to a client, the sales order and the invoice will have to be referenced to a project (WBS elements)	Guarantee that all the revenues related with clients, will be assigned to referenced to a project (WBS element).
5.5.2.3.	Site Specific Changes

CT Sites	Changes	Business Justification
Licensing	Moving from Agresso to SAP will require a change of processes and systems. People will need to be trained on the new systems and requirements of the processes.	Consolidation of the Licensing business from Agresso to SAP and introduction of standard processes for handling of invoices on projects.
Formox	Formox will move from using Internal Orders to using Projects in SAP and the associated changes to the invoicing process. People will need to be trained in the new processes.	Introduction of standard processes for handling of invoices and the use of projects in SAP.
Other SAP sites (R&D)	Where applicable sites will need to move to the use of the same processes for handling invoicing customers from projects. People will need to be trained in the new processes.	Introduction of standard processes for handling of invoices and the use of projects in SAP.

5.5.3.	Process: 08.01.04.05 Account Revenue Recognition
As described above, RA has a standard integration with Finances in SAP to allow the user to transfer automatically, the amounts calculated into the corresponding Balance Sheet and P&L accounts.
To allow that PS RA automatically calculate the proposal of revenue recognition to be posted into Finances, the system and the calculation method will take the following inputs as elements to perform the calculation.
 
To calculate and propose accounting adjustment entries as per matching principle, Result Analysis considers data like planned cost, planned revenue, actual cost, actual revenue, method to be used to match cost and revenue, and GL accounts to be posted. Result Analysis does not post any accounting entries.  

Revenue relating to the project will coming from SD (sales order billing) to the WBS elements.  

During period end, Result Analysis (Transaction KKA2) will be performed on the project to match cost and revenue. It is performed at WBS level and will consider all the sub level WBS elements and Network Activities.  

The user will have the option to execute this process in “test” as many times they required before transferring the final amounts to Finances.
This will help the user to review case by case (project) to perform any change or amendment in the information.
The calculated results obtained by RA will be saved but will not be posted into Finance, until the project settlement has been executed (08.01.06.02 Perform Project Settlement).
Once the user has confirmed the results, the settlement will create the postings established in the account determination of RA.
Example:
The first posting will reflect the revenues collected by the project.
 
The revenues will continue be posted into the current accounts, but now using the global chart of accounts defined by JM.
The final number of the GL accounts to be used, will be defined during the realisation phase.
The next posting presents the allocation of costs into project that will come from timesheets and purchases (goods or services with reference to a project).
Example:
 

Finally, depending on the method used, RA in SAP will generate the following posting at project level, to recognize the revenue calculated.
 
RA will calculate the effect and will generate a posting per project “Debiting the cumulative revenue account” and “Crediting Revenue”.
This effect will be posted the last day of the period and then, the system will create a reverse movement in the first day of the following period.
 
This is because, RA will calculate the revenue recognition for a project in a cumulative basis depending on the NEW progress achieved in the month.
The main target is that the different CT businesses must have a “netting effect” in their revenue accounts on their balance sheet, as the following diagram presents.
  
The number of the GL accounts will be defined during the realisation phase of the project.
Note:
•	Revenue recognition (via Results Analysis) will be set up to calculate revenue based on the relevant WBS elements and types of revenue recognition required by the different businesses.
•	Invoices will be not part of any of the calculation methods defined for JM CT.

5.5.3.1.	Level 4 Process Flow and Steps
Non applicable for this section
5.5.3.2.	To-be Changes

CT Sites	Changes	Business Justification
All	The postings (results) generated by RA, will be posted automatically into the corresponding Balance Sheet and P&L account.
The main change is that all the postings that currently are performed manually by the user, the system will calculate automatically and will automatically transfer the information to Finances.	Ensure that all the revenues related with clients, will be referenced to a project (WBS element).
Provide a standard platform to automate the calculation and postings of Revenue Recognition into the Financial reports of every business.

5.5.3.3.	Site Specific Changes
Revenue recognition automation within SAP will be new to some parts of the business and in others the process will change from a custom process to the standard SAP process.
CT Sites	Changes	Business Justification
Licensing	The Licensing business will be migrating from Agresso to SAP and moving from a manual revenue recognition process to an automated one. This will require the use of new systems and processes.	Consolidation of the Licensing business from Agresso to SAP and introduction of standard automated processes for revenue recognition.
Formox	The Formox business will be moving from a custom revenue recognition process to the SAP standard automated process. This will require the use of a new process.	Introduction of standard processes for automated revenue recognition in SAP.
Other SAP sites (R&D)	Where applicable sites will need to move to the use of the same processes for handling revenue recognition for projects. People will need to be trained in the new processes.	Introduction of standard processes for automated revenue recognition in SAP.


 
5.6.	Level 3 Business Area – 08.01.05 Project Monitoring
The project monitoring processes are how the different CT businesses will be able to review and monitor the project and integrate with other external systems.
For project monitoring purposes, the following integrations between SAP and legacy systems or applications currently used by CT have been identified.

Business 	Description	Type	Comments:
Licensing	Integration with Primavera	SAP standard Report (manual)	Outbound only
Licensing/ Formox	Integration with Tableau (Segmentation)	SAP standard Report (manual)	Outbound only
R&D	Integration with KeyedIn	SAP standard Report (manual)	Inbound and outbound

All business	Integration Workday/
HR-Mini-master	Interface (automatic)	Inbound only
Licensing	Finances forecast	SAP standard Report	Outbound only

Each of these integrations will be explained in more detail in the following sections.
5.6.1.	Process: 08.01.05.01 Perform Project Reporting
Regarding project reporting of costs, two main reports have been identified that are key for every business to present and deliver results.
These reports are:
Business 	Description	Type
Licensing	Project cost report	SAP standard (to-be  configured as a variant)
Formox	Integration with Tableau (Segmentation)	SAP standard Report (manual)

1. Licensing cost report
The “cost report” is a standard report used by the Licensing business to track the status of a project for a specific period. To fulfil this requirement, a new report will be developed using “report painter” in SAP.
Report painter is a standard reporting tool in SAP to create and combine multiple views, extracting and presenting the information from multiple tables. 
The following diagram shows the main components of this report and from where the information will be extracted from SAP.

The following image shows the layout of the report that is expected to be built.
 
The columns in the image above related as follows:
Column 	Description	Description
A	Original Budget	The original budget will come from a project version created at the start of the project. The original budget will be updated manually into the system by the cost engineer.
B	Approved changes	Changes approved will come from changes approved on the original budget. This will also be registered in a project version.
C	Current budget	This field will be a calculated field that will be the result of the sum of fields A and B.
D	Commitment	This column will present the “commitment”, that is the total of Purchase orders and purchase requisitions created per WBS and activity
This is a new column for this report and for the users of this report.
This is part of the improvements made by the standard integration and process in SAP as it allows the report to show committed spend as well as actual spend to date.
E	Spent to date	This field (column) will display the total actual cost to date.
F	Forecast to go	This field will display the estimated forecast established by the project manager. 
These values will be stored in a project version.
G	Total Forecast	This will be a calculated field that will equal the sum of D + E + F
H	Budget (over/under)	Calculated field
I	Changes in forecast	Calculated field
J	Remarks	The notes will be extracted from every WBS from the documentation section.
The details of this report will be reviewed during the realisation phase of the project.
Note:
The intent would be that the updates/changes to the cost reports are done by the Cost Engineer following a similar process to today but using plan versions in SAP. 
It will be possible to make comparisons between multiple versions to review the corresponding variances. For example, the user will be able to report e.g., a version for January vs a version from April from the same year or from a different year.

2. Formox Financial Forecast 
The “Financial forecast” for the Formox business is a standard report used to know the situation of a project for a specific period.
This report will be created and extracted from the systems using standard cost elements reports.
 
Currently, the report is created via the monthly download of the information into excel and then is formatted and organized in excel to fulfil the requirement.
•	This process will continue, however, the user will have to use some different reports in PS (cost elements reporting), to download and format the information in excel.
•	Some additional cost elements groups will be created for reporting purposes and the range of cost elements for each group will be determined during the build phase of the project.
The details of this report will be reviewed during the realisation phase of the project.
5.6.1.1.	Level 4 Process Flow and Steps
Licensing cost report
  
Licensing cost report	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
Requirement to extract the report	Manual	Reception of the requirement to generate this report for a specific project.	Cost Engineer	NA
Execute transaction
ZLCOSTREP	SAP	With the request already established, the user will have to open this transaction in SAP and then select the project number to execute the report.	Cost Engineer	ZLCOSTREP
Delivery and review of the data	Manual	In the same transaction (as above) the user will execute the download process into an excel or create a printout for the end user.
Note: the format will be defined during the realisation phase	Cost Engineer	N/A

Formox Financial Forecast
 
Formox Financial Forecast	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
Requirement to extract the report	Manual	Reception of the requirement to generate this report for a specific project.	Project administrator/
Project planner/ Project Manager	NA
Execute transaction
ZFFINFOR	SAP	With the request already established, the user will have to open this transaction in SAP and then select the project number to execute the report.	Project administrator/
Project planner/ Project Manager	ZFFINFOR
Delivery and review of the data	Manual	In the same transaction (as above) the user will execute the download process into an excel or create a printout for the end user.
Note: the format will be defined during the realisation phase	Project administrator/
Project planner/ Project Manager	N/A

5.6.1.2.	To-be Changes

CT Sites	Changes	Business Justification
NA	NA	NA

5.6.1.3.	Site Specific Changes

CT Sites	Changes	Business Justification
Licensing	The report will be extracted directly from SAP.
The report will provide a full consolidated view of the commitments, plans, budgets, actuals and forecast per project.
This report will be executed by the Licensing business.
The new report will incorporate the possibility for the user to review the value of the commitments in a project.	The business needs to be able to produce this report in a monthly, weekly, or daily basis.
This report provides a consolidated view of the status of a project.
Formox	The report will be extracted directly from SAP.
This report will be executed by the Formox business.
The new report will incorporate the possibility for the user to review the value of the commitments in a project.	This report provides a consolidated view of the status of a project.
The report will continue providing a view at project and at cost element level.

5.6.2.	Process: 08.01.05.02 Perform Integrations with Project Management Tools
1. Primavera
Primavera is a project management tool, currently used by the Licensing business to prepare reporting information regarding forecast and availability per project.
For the new design, Licensing will continue using Primavera to prepare the current reports requested by the business; However, there will be a manual interface where the user from Licensing will be able to download the information requested from SAP to an excel file.
There will be a predetermined “layout” in SAP defined in the following report, that the user will use to extract and present the information with the content required.

In the new process the Licensing business will extract the information from SAP PS instead of Agresso, as follows:
 

Through the use the transaction CJI3, the Concert project team in conjunction with the users, will predefine a data layout that will match with the data requirements from Primavera (this will be finalised during realisation).
Menu Path:
CJI3: Information Systems → Project System → Financials → Line Items → Actual Costs/Revenues
The report will generate the layout with the information required and the user will have the option to export the file into excel to then be uploaded into Primavera.
 
The initial structure (data fields) of the file that will be uploaded into Primavera, has already been defined in the FDD for PS.
The list of fields already determined will be reviewed and confirmed during the realisation phase of the project.
This interface will be a “manual interface”, so the end user will have the responsibility to generate this file in SAP, download the file into the net or their own PC and then upload into Primavera.
2. Integration with Tableau
The integration with Tableau will be similar to the integration with Primavera. The user will prepare the information in SAP and then the file extracted will be uploaded into Tableau using a manual interface.
The user will generate a report in CJI3 with the fields and data required, the file will be downloaded and then uploaded manually in Tableau.
Menu Path:
CJI3: Information Systems → Project System → Financials → Line Items → Actual Costs/Revenues

3. Integration with KeyedIn
For the integration between SAP and KeyedIn there has been identified two main interfaces that will be performed manually.
A.	Project creation
B.	Project actuals
 
A.	Project Creation
During project creation, every time a project is created in KeyedIn, a project will also have to be created in SAP via 08.01.01.02 Create & Maintain project structure.

a.	Project creation in SAP will be a manual process and the project structure of the project will follow the defined template.
b.	The user will populate manually in predefined User Fields, within the project and WBS elements, the key information from KeyedIn. This includes the programme number, project number and workstream number used by KeyedIn to setup the project. This is how the user will be able to identify the project in SAP and in KeyedIn.

B.	Project Actuals
SAP will transfer to KeyedIn the hours allocated into a project, plus their equivalent in cost.

a.	As part of the standard functionality, SAP is converting the hours allocated in projects by multiplying the units (hours) against the hourly rate established for the activity.
b.	The interface will also transfer into KeyedIn other actuals, like invoices, goods receipts of services & materials; The interface will transfer any cost allocated into the project, that has affected the balance.
c.	In the same way as for Primavera and Tableau, a layout will be defined in CJI3 that will provide the details required by KeyedIn.
 
4. Workday Integration
This integration has been already described in the sections: 
•	5.4.1 – 08.01.03.01 Capture Project Related Costs
•	5.4.2 – 08.01.03.02 Maintaining HR Mini Master
5. Licensing Financial Forecast
There are several reports and datasets required to be produced and fed into the Licensing Financial Forecasting process. It is anticipated that this information will be available in the standard SAP reports. The reports required and integration with the existing processes will be reviewed during the realisation phase.
For this business requirement most of the information required will extracted using transaction CJI3, the Concert project team in conjunction with the users will predefine several data layouts that will match with the data requirements of the Financial Forecast for Davy (this will be finalised during realisation).
Menu Path:
CJI3: Information Systems → Project System → Financials → Line Items → Actual Costs/Revenues
The report will generate the layout with the information required and the user will have the option to export the file into excel to then be uploaded into final Financial Forecast report in excel.
 
The list of fields will be reviewed and confirmed during the realisation phase of the project.
This interface will be a “manual interface”, so the end user will have the responsibility to generate this file in SAP and upload into forecast data base.

5.6.2.1.	Level 4 Process Flow and Steps
Integration with Primavera
 
Primavera	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
User requires the extraction of data from SAP	Manual	The user will start with the business need to update and modify the forecast in Primavera.	Project administrator/
Project planner	NA
Actual Line items	SAP	With the request already established, the user will have to open this transaction in SAP and then select the predetermined layout.
The Layout will produce the report with the structure required that will be verified by the user, before download the information.  	Project administrator/
Project planner	CJI3
Generate download actual line items	SAP	In the same transaction the user will execute the download process into an excel file or the format required.
Note: the format will be defined during the realisation phase	Project administrator/
Project planner	CJI3
Generate import into Primavera	Primavera	With the file with the information downloaded, the user will perform the necessary activities in Primavera to perform the upload.	Project administrator/
Project planner	NA

Integration with Tableau
 
Tableau	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
User requires the extraction of data from SAP	Manual	The user will start with the business need to update and modify the actuals in Tableau.	Project administrator/
Project planner	NA
Actual Line items	SAP	With the request already established, the user will have to open this transaction in SAP and then select the predetermined layout.
The Layout will produce the report with the structure required that will be verified by the user, before download the information.  	Project administrator/
Project planner	CJI3
Generate download actual line items	SAP	In the same transaction the user will execute the download process into an excel file or the format required.
Note: the format will be defined during the realisation phase	Project administrator/
Project planner	CJI3
Generate import into Tableau	Tableau	With the file with the information downloaded, the user will perform the necessary activities in Tableau to perform the upload.	Project administrator/
Project planner	NA

Integration with KeyedIn
 
KeyedIn	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
User requires the extraction of data from SAP	Manual	The user will start with the business need to update and modify the actuals in KeyedIn.	Project administrator/
Project planner	NA
Actual Line items	SAP	With the request already established, the user will have to open this transaction in SAP and then select the predetermined layout.
The Layout will produce a report with the structure required that will be verified by the user, before downloading the information.  
The report will consider any cost that has been posted into the project such as, timesheets, vendor invoices, internal costs (overheads), goods receipts of materials and services.	Project administrator/
Project planner	CJI3
Generate download actual line items	SAP	In the same transaction the user will execute the download process into an excel file or the format required.
Note: the format will be defined during the realisation phase	Project administrator/
Project planner	CJI3
Generate import into KeyedIn	KeyedIn	With the file with the information downloaded, the user will perform the necessary activities in KeyedIn to perform the upload.	Project administrator/
Project planner	NA

5.6.2.2.	To-be Changes

CT Sites	Changes	Business Justification
NA	NA	NA

5.6.2.3.	Site Specific Changes

CT Sites	Changes	Business Justification
Primavera	The process will continue working in the same way that currently is managed; However, the extraction of the information will be performed in SAP and transferred manually into Primavera	This interface is part of the scope of the project and is necessary to the Licensing business.
This interface will continue helping the business to prepare consolidated forecast in Primavera. 
Tableau	The process will continue working in the same way that currently is managed; However, the extraction of the information will be performed in SAP and transferred manually into Tableau.	This interface allows the continued collection of time data across the RD&E business (Licensing, Formox Plant Designs and R&D) as is currently performed using data from Agresso.
KeyedIn	The integration will continue existing between KeyedIn and SAP, however, the process will be a mix between automatic and manual.
SAP will provide at the end of the period to Keyedin with all the actuals (costs), that are coming from timesheets and other costs.	This interface allows projects to capture time and costs associated with R&D projects in KeyedIn and the transfer of this information back to KeyedIn for project management and reporting.

5.7.	Level 3 Business Area – 08.01.06 Project Month & Year End Close
 
5.7.1.	Process: 08.01.06.01 Results Analysis
Results Analysis (RA) is a functionality in SAP Controlling to evaluate ongoing, unfinished activities, such as service orders, production orders or projects at month-end.
In the JM CT business, a project will be created with the required structure (following the template structures), but the forecast (cost and revenue) will have to be maintained in the corresponding planning versions (this has been explained in more detail in section 5.3 of this document)  
During period end, Result Analysis (Transaction KKA2 in SAP) will be performed on the project to match cost and revenue. It is performed at WBS level and considers all the sub level WBS elements and Network Activities. 
To calculate and propose accounting adjustment entries as per matching principle, Result Analysis considers various data like planned cost, planned revenue, actual cost, actual revenue, method to be used to match cost and revenue, and GL accounts to be posted. Result Analysis does not post any accounting entries.
Revenue recognition is an accounting principle used to determine when and how revenue is recognized for accounting purposes. By using the result analysis functionality in SAP, the different businesses will be able to calculate revenue recognition on projects, based on the guidelines established for each business. 
The table below describes the Result Analysis methods that will be provided in the system for the different JM CT businesses according to their business requirements.
Business	Revenue Recognition	Methods	Existing / New
Licensing	Required	Revenue Recognized = Plan revenue x POC
POC = actual costs incurred / Forecast total costs
PIT = Revenue Recognition equal to actual cost (at one specific point of time)	New
Formox	Required	Revenue Recognized = Plan revenue x POC
POC = actual costs incurred / Forecast total costs
PIT = Revenue Recognition equal to actual cost (at one specific point of time)	New
R&D	Optional	Revenue Recognized = Plan revenue x POC
POC = actual costs incurred / Forecast total costs
PIT = Revenue Recognition equal to actual cost (at one specific point of time)	New

5.7.1.1.	Level 4 Process Flow and Steps
 

08.01.06.01 Result Analysis
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
Project Creation	SAP	As it has been commented before, there must be a project created first and a sales order linked to this project.	Project Manager	Cj20n
Release project/WBS elements	SAP	The milestones will be released on this transaction, to allow the triggering of the invoicing process.
The release of the WBS will be more for informative purposes.	Project Manager	CJ20n
Milestone approval	SAP	The milestone will be approved by the project manager, and this will trigger the invoicing process.	Project Manager	CJ20n
Revenue recognition
Pre-review	Manual	The user will start to perform the prechecks to calculate revenue recognition.
The first point is to ensure that all the invoices has been issued.	Project administrator	NA
Verify settlement rule	SAP	For new projects that have not been settled before, it will be necessary confirm if the settlement rule has been assigned correctly.
For projects created from a “template”, the settlement rule will be already predetermined.	Project Administrator	CJ20n
Verify Result analysis key	SAP	For new projects that have not been settled before, it will be necessary confirm if the “Result analysis key” has been assigned correctly.
For projects created from a “template”, the result analysis key will be already predetermined.	Project Administrator	CJ20n
Change cut off period	SAP	The Project Financial Controller maintains the cut off period for settlement/Result Analysis.
The cut-off period determines the period in which RA will make the calculations.
The period must be aligned to the financial period.	Project Finance Administrator	KKAO
Result Analysis	SAP	The Project Financial Controller runs the Result Analysis individually or collectively using the T. codes KKA2/KKAJ respectively	Project Finance Administrator	KKA2/KKAJ
Review results/RA reports	SAP	The RA reports will need to be reviewed to confirm they are correct or if corrections will be needed.
The RA analysis process will calculate and prepare the postings, but this will not be released to Finances until the settlement is executed	Project Finance Administrator	N/A
Perform corrections	SAP	The corrections are to be performed for the settlement rule and Result Analysis key in CJ20N.
It will be necessary in some cases to make corrections on planned costs and planned revenues	Project Finance Administrator	CJ20N
Perform corrections to costs/Revenue	SAP	If the Result Analysis reports are not correct, the corrections are made at the planned costs and Revenues using T. codes CJ40 & CJ42, to run RA.	Project Finance Administrator	CJ40/CJ42

Integration with other processes

Process integration
WS	L4 Process Area	L4 Process Description	L4 Process integration
RTR	03.01.07.02	Perform Period close	Result analysis (RA) must be seen as another transaction as part of the financial month end process.
RA will perform the calculations on a project, to calculate the results of revenue to be recognized in a project.
PS&TM	08.01.06.02	Perform project settlement	Once RA has made the calculations related with the revenue recognition on projects the Settlement process will transfer all these values into postings that will be reflected in Finance.
PS&TM	08.01.02.01	Perform Budgeting for project spend  	Process defined to establish the initial budget for a project.  
STC	02.04.01.05	Create Customer Order with Project  	Process defined to create sales order with reference to a project. 
STC	02.06.02.01	Create customer invoice	Process defined to create client invoices for a project

5.7.1.2.	To-be Changes

CT Sites	Changes	Business Justification
All Sites	Through the functionality of RA analysis, the system will automate the calculation of POC and revenue recognition.
Currently, these calculations are made outside of SAP or via a custom process.	Simplification and automation of the revenue recognition process for the different JM CT businesses.

5.7.1.3.	Site Specific Changes

CT Sites	Changes	Business Justification
Agresso	Through the functionality of RA analysis, the system will automate the calculation of POC and revenue recognition.
Currently, these calculations are made outside of SAP using Excel. There will be a change in the process, actions required of the people involved and additional training required. It is possible that the results will be different to that seen before and this will need to be resolved.	Simplification and automation of the revenue recognition process for the different JM CT businesses onto a common approach.
Perstorp	Formox currently use a custom process for revenue recognition. Moving to the SAP standard approach will make things consistent across the business but will lead to changes for the people involved in the process. There will be changes in the steps, actions and possibly the output.	Simplification and automation of the revenue recognition process for the different JM CT business onto a common approach.
Other existing SAP sites	Non-revenue projects won’t have to perform revenue recognition so impact of this change will be minimal on these sites at this stage.	Simplification and automation of the revenue recognition process for the different JM CT business onto a common approach.
5.7.2.	Process: 08.01.06.02 Perform Project Settlement
Settlement in SAP is the process, where the costs and revenues allocated (P&L accounts) and collected in a project, will be transferred, or “settled” into different receivers.
During the execution of the project settlement, costs and revenues which are collected in projects must be settled to one or more receivers as part of the period end processing and year-end close.
In JM CT the settlement function is used to settle (transfer) values from P&L accounts to Cost Centres or Profit Centres. 
Configuration will be required in project systems for all JM CT projects, to allow the businesses to settle values to the different defined receivers.
This configuration will be saved in the “settlement profile” and it will be defined only for WBS elements and networks, that have the following “operative indicators” activated:
1.	Account assignment element 
2.	Billing element
This configuration will be predefined in each project template, so the project settlement field will have a predefined settlement profile assigned.
The following table describes the different senders and receivers that will be available for projects and businesses:

Business	Sender	Receivers
Licensing	•	WBS elements
•	Networks	•	Cost centres
•	Profit centres
•	GL accounts
Formox	•	WBS elements	•	Cost centres
•	Profit centres
•	GL accounts
R&D	•	WBS elements	•	Cost centres
•	Profit centres
•	GL accounts

5.7.2.1.	Level 4 Process Flow and Steps
  
Perform Project Settlement 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code

Verify settlement rule	SAP	For new projects that have not been settled before, it will be necessary confirm if the settlement rule has been assigned correctly.
For projects created from a “template”, settlement rule will be already predetermined.	Project Administrator	CJ20n
Execute settlement in test
(individual)	SAP	Execution of the settlement individually in test.
The settlement can be executed for one project only or for multiple projects.	Project financial controller	CJ88
Review settlement log (errors)	SAP	Reviewing and confirming there are no errors in the settlement log.
Because the settlement can be executed in test, this will allow the user to perform and review and potential error identified by the system, before performing the settlement in real.	Project financial controller	CJ88
Execute settlement in test
(massive)	SAP	Execution of the settlement massively in test.
The settlement can be executed for one project only or for multiple projects.	Project financial controller	CJ8G
Review settlement log (errors)	SAP	Reviewing and confirming there are no errors in the settlement log.
Because the settlement can be executed in test, this will allow the user to perform and review and potential error identified by the system, before performing the settlement in real.	Project financial controller	CJ8G
Perform corrections settlement rule	SAP	If there are errors in the settlement rule, this will have to be corrected in the project.	Project financial controller	CJ20n
Perform corrections cost/revenues	SAP	The errors can also be in the planning costs and planning revenues.
As part of the analysis performed in the log, the user will have the option to make corrections to these values.	Project financial controller	CJ40
Execute settlement – real (individual)	SAP	With all the corrections in the data made, the user can execute the settlement for a specific project.	Project financial controller	CJ88
Execute settlement – real (massive)	SAP	With all the corrections in the data made, the user can execute the settlement for multiple projects.	Project financial controller	CJ8G

Integration with other L4 processes

Process integration
WS	L4 Process Area	L4 Process Description	L4 Process integration
RTR	03.01.07.02	Perform Period close	The project settlement must be seen as another transaction as part of the financial month end process.
The project settlement is the process that will transfer the amounts calculated in RA into Finances.
PSTM	08.01.06.01	Result Analysis	Once RA have made the calculations related with the revenue recognition on projects the Settlement process will transfer all these values into postings that will be reflected in Finance.

5.7.2.2.	To-be Changes

CT Sites	Changes	Business Justification
All Sites	Through the settlement functionality in SAP, the user will have an automated process to perform the settlement on their projects automatically.	The results will be allocated to the correct receiver (Cost centre, Profit Centre) during the month end process.
This will guarantee that costs will not be left in the P&L.

5.7.2.3.	Site Specific Changes

CT Sites	Changes	Business Justification
Agresso	Settlement in SAP will be a different process to that undertaken in Agresso. The process, activities etc. will be different, additional training will be required.	Consolidation of CT business onto a common system using standard SAP functionality and Project Systems.
Perstorp	Settlement using Projects will be different to that currently done using Internal Orders. Additional training will be required.	Consolidation of CT business onto a common system using standard SAP functionality and Project Systems.
Other existing SAP sites	Settlement using Project will be different to that currently done using Internal Orders. Additional training will be required as this will be applicable to some non-revenue projects.	Consolidation of CT business onto a common system using standard SAP functionality and Project Systems.

5.7.3.	Process: 08.01.06.03 Project Closure
The project closure process in SAP PS, is the process where the business performs the final close on a project.
The project closure process has several stages and activities that will have to be performed and confirmed by the user, before passing to the stage to perform the final close of a project.
The following table describe the steps that every business will have to follow to perform the final close of a project.
No.	Activity	Description	Licensing	Formox	R&D
1	Perform final confirmation on each activity	Every activity in the project needs to be marked as completed	Required	Not Req.	Not Req.
2	Any stock in the project needs to be cleared	Clear any stock received by the project	Required	Required	Required
3	Perform any goods/receipt pending	Complete any "good/receipts" on goods already bought	Required	Required	Required
4	Perform and complete any invoice verification	Perform the invoice verification process on any invoice pending	Required	Required	Required
5	Transfer into finances any timesheet open or pending	Complete and transfer into Finances any timesheets pending	Required	Required	Required
6	Cancel any material reservation	Cancel any material reservation made by the project.	Required	Required	Not Req.
7	Confirm there are no items pending to be invoiced to the client.	Complete the billing on any invoice pending with the client.	Required	Required	Required
8	Move the status of the project to TECO	Move the status of the project from REL (Release) to TECO (Technical close)	Required	Required	Required
9	Confirm there are no payments pending	Confirm all the payments on invoices allocated in the project have been paid	Required	Required	Required
10	Confirm there are no overheads pending	Confirm the project has received any overheads pending	Required	Required	Required
11	Execute the revenue recognition process	Execute the Result Analysis process to calculate Revenue Recognition.	Required	Required	Required
12	Execute the project settlement	Execute the project settlement process, to achieve Zero value in the WBS.	Required	Required	Required
13	Cancel any PO missing or open	Cancel and delete any PO open	Required	Required	Required
14	Change the status of the project to CLSD	Move the status of the project from TECO (Technical close) to CLSD (Closed).	Required	Required	Required

5.7.3.1.	Level 4 Process Flow and Steps
  
08.01.06.03 Perform Project Closure
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code
Project closing request
	Manual
	Request to perform the final close in a project sent.
	Project Manager
	N/A

Change status to TECO
	SAP	Change of the status in the project from REL (Release) to TECO (Technical close).
	Project Administrator
	CJ20N

Confirm the status of the pending bills
	Manual
	Confirm there are no items from the billing plan pending to be invoiced to the client for the project.	Project Administrator
	N/A

Confirm the status of the pending PO's and PR's. bills
	Manual
	Confirm there are no items from PO’s pending to be received by the project.
	Project Administrator
	N/A

Posting of the Time sheets
	Manual
	Confirm there are no timesheets opened pending to be approved.
	Project Administrator
	N/A

Posting of costs and Over heads
	Manual
	Confirm all finances costs and overheads have been posted into the project.	Project Administrator
	N/A

Result Analysis/
Project Settlement
	Manual
	Confirm and complete the execution of result analysis.
	Project Administrator
	N/A

Project Closure
	SAP	Confirm the project has been finally closed, by changing the status from TECO to CLSD.	Project Administrator
	CJ20N

Notification
	Manual
	Project Administrator sends notification to Project Manager confirming closure of the project.
	Project Administrator
	N/A


Integration with other processes

Process integration
WS	L4 Process Area	L4 Process Description	L4 Process integration
STP	01.05.01.01	Goods Receive Direct/Indirect	Level 4 process defined to generate the reception of goods and services into a project.  
STC	02.06.02.01	Create customer invoice	Process defined to create client invoices for a project.  
RTR	03.01.07.01	Process General Ledger Journals	Process defined to allocate multiple costs into a project by finances.  
PSTM	08.01.03.03	Enter and Approve time	Level 4 process defined to create and post timesheets into a project.  
PSTM	08.01.06.01	Result Analysis	Once RA has made the calculations related with the revenue recognition on projects the Settlement process will transfer all these values into postings that will be reflected in Finances.
PSTM	08.01.06.02	Perform project settlement	The Settlement process will transfer all these values into postings that will be reflected in Finances.
The process will generate in finances the corresponding postings to reflect the revenue to be recognised in a project.

Note:
The business will be able to generate reports (including the cost report) from a project or multiple projects, during and even when the project has been officially closed.
5.7.3.2.	To-be Changes

CT Sites	Changes	Business Justification
All Sites	The introduction of Project Systems will introduce the new process for the closure of projects to all sites.	Implementation of Project Systems in JM CT SAP

5.7.3.3.	Site Specific Changes

CT Sites	Changes	Business Justification
Agresso	The process for the closure of projects will be different to that currently undertaken in Agresso. New processes will need to be followed, requiring additional training.	Consolidation to Project Systems in JM CT SAP.
Perstorp	The process for the closure of projects will be a change to existing processes where projects use Internal Orders. New processes will need to be followed, requiring additional training.	Consolidation to Project Systems in JM CT SAP.
Other existing SAP sites	The process for the closure of projects will be a change to existing processes where projects use Internal Orders. New processes will need to be followed, requiring additional training.	Consolidation to Project Systems in JM CT SAP.

5.7.4.	Process: 08.01.06.04 Project Year End Close
The year-end process in projects will be linked to the year-end process defined by the Finance team.
5.7.4.1.	Level 4 Process Flow and Steps
  

08.01.06.04 Perform Project Year End Close
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code

Budget carry forward
	SAP
	The budget gets carried forward to next period using T-code CJCO.
The system will transfer the remaining budget from the previous year into the following year.
	Project Administrator
	CJCO

Commitment carries forward
	SAP
	Carry forward the commitment using T-code CJCF, as the goods received will happen in the next period.
The system will transfer the remaining items of the commitment (PO’s) into the following year.
	Project Administrator
	CJCF


Integration with other processes

Process integration
WS	L4 Process Area	L4 Process Description	L4 Process integration
RTR	03.01.07.02	Perform Period close	The project settlement must be seen as another transaction as part of the financial month end process.
The project settlement will be the process that will transfer the amounts calculated in RA into Finances.
PS&TM	08.01.06.01	Result Analysis	Once RA have made the calculations related with the revenue recognition on projects the Settlement process will transfer all these values into postings that will be reflected in Finance.
PS&TM	08.01.06.02	Perform project settlement	The Settlement process will transfer all these values into postings that will be reflected in Finance.
The process will generate in Finance the corresponding postings to reflect the revenue to be recognized in a project.

5.7.4.2.	To-be Changes

CT Sites	Changes	Business Justification
All Sites	The introduction of Project Systems will introduce a new process for project year end to all sites.	Implementation of Project Systems in JM CT SAP

5.7.4.3.	Site Specific Changes

CT Sites	Changes	Business Justification
Agresso	The process for year-end close of projects will be new following the move from Agresso to SAP. New processes will need to be followed and additional training required.	Consolidation on Project Systems in JM CT SAP.
Perstorp	The process for year-end close of projects will be a change to existing processes where projects use Internal Orders. New processes will need to be followed, requiring additional training.	Consolidation on Project Systems in JM CT SAP.
Other existing SAP Sites	The process for year-end close of projects will be a change to existing processes where projects use Internal Orders. New processes will need to be followed, requiring additional training.	Consolidation on Project Systems in JM CT SAP.

5.8.	Level 3 Business Area – 08.01.07 Project Reporting
 
In the SAP system, a Project Information System is used to monitor and control the project master data. It will allow the JM CT users to analyse each project, parts of projects, or multiple projects.
The analysis will include creating different overview reports and advanced level reports with various degrees of detail. These reports meet the metrics required as part of project management data.
Key functions in PS reports
•	Using the PS Information system, JM CT can run standard reports in the system or can create their own reports to meet specific tasks in the Licensing, Formox and R&D businesses.
•	These reports can be displayed directly and are available in Project Information system or you can run them as background jobs.
•	Report analysis includes considering various fields and functions of a project.
Note:
Depending on the authorisation roles for each user in the system, the user will be able to use all these reports or only some. The final authorisation roles will be defined during the realisation phase.
All the reports in SAP can be downloaded into multiple standard formats (Excel, PDF, TXT etc).
All the SAP standard reports enable different views to visualize revenues, costs, budgets and cashflows. The enabling and use of these views will be reviewed during the training phase of the project.

Types of Reports
For JM CT, there will be available the following types of reports in the PS Information System.
•	Technical Reports
The PS Information System in SAP PS will allow the different users from the JM CT businesses to manage and control a project technically.
This allows the user to select all the objects or specific objects (fields) in the system, like: WBS elements, Networks, PS text, materials etc. to check their status and their use in the project hierarchy. 
Via the PS Information System, JM CT users can monitor the data related to current projects as well as data in archive to see historical data and lessons learnt.
•	Commercial Reports
JM CT users can view various commercial reports related to project progress in the SAP PS system.
•	The Cost Element Report is used to view cost and revenues summarised by cost element
•	To monitor full value flow in the project, you can use Cost/Revenue and Payment hierarchy reports. Payment hierarchy reports contain data related to drill down into a project.
•	To display actual, plan, commitment, and budget values you can use Line-Item Reports.
5.8.1.	Process: 08.01.07.01 Project Commitments
In SAP PS commitment management is part of the cost monitoring process. Commitment items are triggered by purchase requisitions and purchase orders for projects and will be reduced by various business transactions such as goods receipts. 
For commitment reporting there will two types of reports available for JM CT:
•	Hierarchy reports 
•	Line-item reports 
Each of these types of reports will analyse the commitments on projects at different levels of detail. 
•	Hierarchy reports run faster than cost element reports and will present the results, based on the structure defined on the project.
•	Line-item reports are more detailed than cost element reports and hierarchy reports. Line-item reports will enable the user to select individual POs and items from the PO.
The commitments on projects, will be integrated in two ways:
1.	Purchase Requisition: A purchase requisition process refers to the flow of events that are triggered when any department needs to make a purchase.   

Purchase requisitions (PR) will be created across all sites in CT to procure direct, indirect, services or goods with reference to a project. 
 
2.	Purchase Order Process: A purchase order process refers to the flow of events that are triggered when the purchaser creates a purchase order with/without reference to purchase requisition.  
  
The purchase order (PO) will be created by CT to procure direct materials, indirect materials and services from suppliers set up in the system for projects. Most of the direct POs will be created by converting approved PRs to purchase orders and these orders will take the project number from the PR. 
 
5.8.1.1.	Level 4 Process Flow and Steps
 
08.01.07.01 Project commitments
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code

Commitments per month	SAP	With the execution of this report, the business user will be able to know the "commitment" of a project split per month.	Project Manager/
Project Engineer
Project controller	S_ALR_87100187
Commitment line items	SAP	With the execution of this report, the business user will be able to know the "commitment" from a project per line-item.
The commitment will be presented at PO item level.	Project Manager/
Project Engineer
Project controller	CJI5
Commitment detail
	SAP	With the execution of this report, the business user will be able to know the "commitment" in a project in detail.
The system will present the commitment split by:
•	Purchase requisition open
•	Purchase orders open
•	Reservations	Project Manager/
Project Engineer
Project controller	S_ALR_87013537
5.8.1.2.	To-be Changes

CT Sites	Changes	Business Justification
All Sites	Commitment management will be a new function in projects, that will allow the different users from the JM CT business to know the total commitment and detailed commitment for projects in real time. This will be new to CT with the implementation of Project Systems, requiring new processes and training and understanding of the reporting options available.	Realtime integration with the STP process (Source to pay).
This standard integration between purchasing and projects, will provide project managers the ability to visualise the amounts already committed in a project.

5.8.1.3.	Site Specific Changes

CT Sites	Changes	Business Justification
All Sites	N/A	N/A

5.8.2.	Process: 08.01.07.02 Project Revenues
Several standard revenue reports will be available. The reports will provide different breakdowns to present the revenue allocated in a project, such as by WBS element, date month, cost element etc.
All these reports are standard and will be available for the users.
5.8.2.1.	Level 4 Process Flow and Steps

 

Project Revenues
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code

Actual Revenue as per structure view	 SAP	With the execution of this report, the business user will be able to know the "Revenue" on a project based around a project structure view.	Project Manager / Project Engineer/Project controller	S_ALR_87013563
Plan Revenue detail	 SAP	With the execution of this report, the business user will be able to know the "Revenue" on a project at a line-item level.	Project Manager / Project Engineer/Project controller	S_ALR_87013564


5.8.2.2.	To-be Changes

CT Sites	Changes	Business Justification
All Sites	Revenue management in SAP Projects is new to the business and will allow the different users from the JM CT business to know the total revenues in detail coming from sales orders in projects in real time. New processes will be applied in SAP and additional training will be required.	Realtime integration with the STC process (Sales to cash).
This standard integration between sales and projects will provide, to the project managers, the ability to visualise the revenue amounts forecasted and real.

5.8.2.3.	Site Specific Changes

CT Sites	Changes	Business Justification
All Sites	N/A	N/A

5.8.3.	Process: 08.01.07.03 Project Costs
Project Cost Management is the financial aspect of project management that involves allocating and tracking costs for projects.
Projects of all types receive costs from various sources:
•	Material costs resulting from consumption recorded for the project. These credit project inventory
•	Service costs resulting from service confirmations. These credit the cost centres which performed the services.
•	Other direct costs using supplier invoices, journal entry vouchers, or expense reports
•	Some project types may also receive overhead costs using overhead distribution or overhead absorption. These credit cost centres
•	Customer projects are JM CT projects that are managed for customers and are always linked to a sales order. This integrates customer projects into the normal order-to-cash scenario and offers standard functions such as reporting by function of expense, profit analysis, and automatic revenue recognition.
Reports relating to these costs are standard and will be available for users.
5.8.3.1.	Level 4 Process Flow and Steps
 
Project Costs
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code

Actual cost as per structure view	SAP	With the execution of this report, the business user will be able to know the "cost " from a project structural view.
This uses the project structure defined for the project.	Project Manager / Project Engineer
Project controller	S_ALR_8701351
Cost line items	SAP	With the execution of this report, the business user will be able to know the "cost" from a project line item view.
The report will provide in detail all the charges that have been allocated into the project. This will provide full visibility on the origin of the movement to the user.	Project Manager / Project Engineer
Project controller	CJI3
Planed cost detail	 SAP	With the execution of this report, the business user will be able to know the "Cost" of a project in detail.	Project Manager / Project Engineer
Project controller	S_ALR_8701352

5.8.3.2.	To-be Changes

CT Sites	Changes	Business Justification
All Sites	Cost management in SAP Projects is a new process that will allow the different users from JM CT to know in detail the costs allocated into a project. This will require new processes and reporting. Additional training will be required.	Realtime integration with the RTR process (Record to report).
This standard integration between Finance and projects, will provide project managers the ability to visualise the amounts already allocated into a project.

5.8.3.3.	Site Specific Changes

CT Sites	Changes	Business Justification
All Sites	N/A	N/A

5.8.4.	Process: 08.01.07.04 Project Cash Flow
Reports will be available that will provide a cash flow view of payments, already made by a project to a vendor or multiple vendors.
The reports will show the information related with the payment made, plus details like the payment method, payments terms, transfer reference, bank etc.
The cash flow forecast is a function that is also included in the scope of the project, this will be managed through the setup of additional cost elements. The user will be able to schedule an estimated cashflow per year and per month, the user also will have to the option to modify and reschedule payments on the project forecast.
All these reports are standard and will be available for users.
5.8.4.1.	Level 4 Process Flow and Steps
 

Project Cash Flow	 
L4 Process Step	System / Manual 	Narrative	Step owner	SAP T-Code

Actual Payments/
Payments Commitments	 SAP	The user will be able to review the schedule of all the payments to be made and already paid by project.	Project Manager / Project Engineer
Project controller	CJIA
Payments	 SAP	This report enables the user to view in detail all the payments that have been processed with project invoices.	Project Manager / Project Engineer
Project controller	S_ALR_87013591
5.8.4.2.	To-be Changes

CT Sites	Changes	Business Justification
All Sites	Cash flow in SAP Projects is a new process that will allow the different users from JM CT to know the total of payments already made over invoices received with reference to a project. Additional processes and reporting will be used, and training will be required.	Consolidation to Project Systems within CT SAP.

5.8.4.3.	Site Specific Changes

CT Sites	Changes	Business Justification
All Sites	N/A	N/A

5.9.	Headline ‘To- Be’ design changes 
The business has requested several changes to the way in which the Project Systems and Time Sheeting processes will be managed and executed in the future:
Change Theme	Change Statement
Remove Agresso	The consolidation of the businesses currently using Agresso on to the CT SAP system is a key change of the project.
Revenue Recognition	In moving from Agresso the implementation of revenue recognition on the system rather than the existing off system process.
Time Sheeting	With the removal of Agresso, a replacement solution for time sheeting is required.
Project Systems	Moving from Agresso requires the implementation of Project Systems within the CT SAP to enable these businesses to function.

These changes were identified in HLD and do not provide an exhaustive list but were to provide indicative direction for the detailed design.
To help deliver on these change themes, all aspects of the Operating Model wheel were considered through a series of workshops and the following changes have been identified.
5.10.	Key Design Decisions
The business has agreed to the following Key Outstanding Design Decisions as part of the new ways of working as it impacts the Project Systems and Time Sheeting processes to be managed and executed as part of the to-be design: 
No	BAG Ref	Theme	Decisions
	N/A	N/A	N/A

Reference link for cross functional key design decision 
5.11.	Policies and Compliance
The Project Systems and Time Sheeting workstream must comply with JM Policies set by Group.  They can be found on MyJM.  Many of the policies dealing with ERP systems are codified in the ICFR, including Segregation of Duties, Proper Approvals, and Access Rights.  Sites are also responsible for compliance with local Tax and Governmental Reporting requirements, which are typically supported by data from SAP.  
The following key policies have been identified as being impacted by the Concert design
No	New/Existing	Decisions
1	Existing	JM Accounting Policies to be adhered to
2	Existing	JM Internal Control Framework (ICFR) to be adhered to
3	Existing	JM Master Data polices to be followed

Concert is considering related Controls and Policies in developing the Detailed Design.  A complete list of Risk and Controls considered can be found in Risk and Control Matrix.
5.12.	Key Value Drivers
The design has highlighted for L3 processes the key value drivers resulting in the process harmonization and improvement (the why), to meet the business value statements and KPIs as highlighted in the High-level design.

L3 Reference	Value Driver Description	KPI Reference	Name (KPI's)	Benefits
	CT will establish a common system for reporting of all RD&E initiatives and resources to provide better visibility and understanding of overall R&D costs using PS and Timesheets - enabling better decision making on use of R&D budget and resources	Operating Efficiencies	Total Cost of Finance Function	
	CT will move the Licensing business from Agresso to SAP with other parts of CT enabling improved efficiencies of financial management and associated cost savings	Cost Reduction	Total Cost of Finance Function	
	CT will establish a standard approach to the management of projects making use of Project Systems and Time Sheets across the business as appropriate. This will enable improved understanding of costs and resources and drive increased efficiency and visibility enabling better decision making and monitoring.	Operating Efficiencies	Total Cost of Finance Function	

 
5.13.	Risk and Controls (to be completed by R&C Lead)
Leveraging SAP Standard functionality can prove to be beneficial when controling and managing risk within workstreams. In the PS workstream the need to implement and thereafter operate a range of controls that are Automated, Semi-Automated or Manual hasn’t been identified. 
PS Control Type Summary 
Automated	Automated – Access	Automated – SOD	Manual	Semi-automated	Total
1	1	-	6	2	10
 
PS Control Risk Rating Summary 
Critical	High	Medium	Low	Total
2	7	-	1	10
 
PS Control Current State Summary 
Not Operating	Operating	Partially Operating	Total
1	8	1	10

Refer to the Risk and Control Matrix for detailed view of controls that will be applied -  Link.
5.14.	Roles and Skills
1.	Analysis is based on only composite roles excluding direct assignment of single roles.
2.	Global roles indicated below are our grouping of existing composite roles across company codes/purchasing organisation/plants for ease of reference.
3.	Please refer to the file PS Business Roles Analysis.xlsb for mapping the existing composite roles to the grouping, as referred in point 2.
Step owner	SAP T-Code
Project accountant/ Project controller	CJ20N
Project accountant/ Project controller	CJ20N
Project accountant/ Project controller	CJ20N
Project accountant/ Project controller	CJ20N
Project accountant/ Project controller	CJ20N
Project Manager	CJ20N
Project accountant/ Project controller	CJ20N
Project Manager	CJ20N
Project accountant/ Project controller	CJ20N
Project Manager	CJ20N
Project accountant/ Project controller	CJ20N
Project Manager	CJ20N
Master Data team	CJ91
Master Data team	CN02
Master Data team	CJ91
Master Data team	CJ92
Master Data team	CN01
Master Data team	CN02
Cost Engineer/ Project manager	CJ40
Cost Engineer/ Project manager	CJ9D
Cost Engineer/ Project manager	CJ30
Cost Engineer/ Project manager	CJ30
Project Manager	CJ32
Project Manager	CJ20N
Finance Controller/ Cost Engineer	CJ9B
Finance Controller/ Cost Engineer	CJ40
Finance Controller/ Cost Engineer	CJ40
Finance Controller/ Cost Engineer	CJ40
Cost Engineer/ Project Accountant	CJ9B
Cost Engineer/ Project Accountant	CJ40
Cost Engineer/ Project Accountant	CJ30
Cost Engineer/ Project Accountant	CJ32
Finance	CAT7
Finance	KP26
Finance	KB15N
Project Manager / Project Engineer/Lead Engineer/Planning Engineer	CJI3
Project Manager / Project Engineer/Lead Engineer/Planning Engineer	CATS_DA
Project Administrator	CJ20N
Project Administrator	CJ20N
Project Finance Administrator	KKAO
Project Finance Administrator	KKA2
Project Finance Administrator	KKAJ
Project Finance Administrator	CJ20N
Project Finance Administrator	CJ40
Project Finance Administrator	CJ42
Project Administrator	CJ20N
Project financial controller	CJ88
Project financial controller	CJ88
Project financial controller	CJ8G
Project financial controller	CJ8G
Project financial controller	CJ20N
Project financial controller	CJ40
Project financial controller	CJ88
Project financial controller	CJ8G
Project Administrator	CJ20N
Project Administrator	CJ20N
Project Administrator	CJCO
Project Administrator	CJCF
Project Manager / Project Engineer/Project controller	S_ALR_87100187
Project Manager / Project Engineer/Project controller	CJI5
Project Manager / Project Engineer/Project controller	S_ALR_87013537
Project Manager / Project Engineer/Project controller	S_ALR_87013563
Project Manager / Project Engineer/Project controller	S_ALR_87013564
Project Manager / Project Engineer/Project controller	S_ALR_8701351
Project Manager / Project Engineer/Project controller	CJI3
Project Manager / Project Engineer/Project controller	S_ALR_8701352
Project Manager / Project Engineer/Project controller	CJIA
Project Manager / Project Engineer/Project controller	S_ALR_87013591

5.14.1.	Business Role Change Summaries
Legends	Description
Business Role	EY’s grouping of different business 
EY Global Role	EY’s company code and/or site agnostic grouping of existing composite role(s)
Distinct User	Unique number of users that currently hold access to the composite role(s)
Comments	Brief description of the access the composite role provides
T-Codes (required by Business Role)	Tick mark means Composite role provides access
SoD	EY’s indicator of whether the existing composite role(s) contain segregation of duties concern
SA	EY’s indicator of whether the existing composite role(s) contains sensitive access from a financial reporting perspective 
 
5.14.1.1.	Business Role Finance
a.	As per BPD, individuals with business role ‘Finance’ require access to 3 specific T-codes:

i.	CAT7
ii.	KP26
iii.	KB15N

b.	Through analysis of the existing SAP composite roles, we noted that 5 such SAP composite roles were providing access to one of the mentioned T-codes.
c.	None of the roles grant access to two T-codes: CAT7 and KB15N.
See summary below:
Business Role	EY Global Roles	Comments	Distinct Users	Finance	SOD	SA
				KP26		
Finance	Y_FI_CCXX_FINANCE_OPERATIONS	This role is implemented for company codes DE35, IN10, SE33, US32, US38 and GB30. 	22			
Finance	Y_FI_CCXX_PRODUCT_COSTING	This role is implemented for company codes DE35, IN10, SE33, US32, US38 and GB30.	17			
Finance	Y_FI_CCXX_BUSINESS_ACCOUNTANT	This role is implemented for company code GB30 only.	9			
Finance	Y_FI_CCXX_FINANCE_OPS_PARK	This role is implemented for company code GB30 only.	2		 	
Finance	Y_FI_CCXX_FINANCE_OPS_POST	This role is implemented for company code GB30 only.	1		 	
 
Change(s) Required – 
1. Clone roles mentioned above for each site without such a role (including consolidation sites) - following the same naming convention, altering underlying company code specific authorisations accordingly.
2. Ensure that users across all sites with Finance responsibilities are assigned the relevant SAP role or roles from these based on their specific responsibilities and the company code(s) within which they operate.
3. As these are marked as Sensitive Access; ensure that no users outside of those with Finance responsibilities are assigned these SAP roles.
4. 1/5 composite roles are marked as SoD; ensure that access to conflicting T-Codes is either mitigated or access to conflicting T-code(s) are withdrawn from these SAP roles. 
5. Ensure that none of these SAP roles are intended for business roles that do not have Finance responsibilities.
6. Add 2/3 missing Finance T-Codes to existing composite role(s) - None of the 5 composite roles provide access to 2 T-Codes (CAT7 and KB15N).
 
5.14.1.2.	Business Role Project Accountant
As per BPD, individuals with business role ‘Project Accountant’ require access to 5 specific T-codes:
a.	CJ20N
b.	CJ9B
c.	CJ40
d.	CJ30
e.	CJ32
Through analysis of the existing SAP composite roles, we noted that 4 such SAP composite roles were providing access to one of the mentioned T-codes.
None of the roles grant access to four T-codes: CJ9B, CJ30 and CJ32 and CJ40.
See summary below:
Business Role	EY Global Roles	Comments	Distinct Users	Project Accountant	SOD	SA
				CJ20N		
Project accountant	Y:EC_GLOBL_OTC_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10			
Project accountant	Y:EC_GLOBL_PTM_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10			
Project accountant	Y:EC_GLOBL_PTP_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10			
Project accountant	Y:EC_GLOBL_RTR_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10			

Change(s) Required – 
1. Clone roles mentioned above for each site without such a role (including consolidation sites) - following the same naming convention, altering underlying company code specific authorisations accordingly.
2. Ensure that users across all sites with Project Accountant responsibilities are assigned the relevant SAP role or roles from these based on their specific responsibilities and the company code(s) within which they operate.
3. All composite roles are marked as SoD; ensure that access to conflicting T-Codes is either mitigated or access to conflicting T-code(s) are withdrawn from these SAP roles. 
4. Add 4/5 missing Project Accountant T-Codes to existing composite role(s) - None of the 4 composite roles provide access to 4 T-Codes required. 

5.14.1.3.	Business Role Project Controller
As per BPD, individuals with business role ‘Project Controller’ require access to 11 specific T-codes:
a.	CJ20N
b.	S_ALR_87100187
c.	CJI5
d.	S_ALR_87013537
e.	S_ALR_87013563
f.	S_ALR_87013564
g.	S_ALR_8701351
h.	S_ALR_8701352
i.	S_ALR_87013591
j.	CJI3
k.	CJIA
Through analysis of the existing SAP composite roles, we noted that 4 such SAP composite roles provided access to one or more of the mentioned T-codes.
None of the roles grant access to nine T-codes: CJI5, CJIA, and S_ALR_87100187, S_ALR_87013563, S_ALR_87013564, S_ALR_8701351, S_ALR_8701352, S_ALR_87013591and S_ALR_87013537.
See summary below:
Business Role	EY Global Roles	Comments	Distinct Users	Project Controller	SOD	SA
				CJ20N	CJI3		
Project controller	Y:EC_GLOBL_OTC_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10				
Project controller	Y:EC_GLOBL_PTM_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10				
Project controller	Y:EC_GLOBL_PTP_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10				
Project controller	Y:EC_GLOBL_RTR_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10				

Change(s) Required – 
1. Clone roles mentioned above for each site without such a role (including consolidation sites) - following the same naming convention, altering underlying company code specific authorisations accordingly.
2. Ensure that users across all sites with Project Controller responsibilities are assigned the relevant SAP role or roles from these based on their specific responsibilities and the company code(s) within which they operate.
3. All composite roles are marked as SoD; ensure that access to conflicting T-Codes is either mitigated or access to conflicting T-code(s) are withdrawn from these SAP roles. 
4. Add 9/11 missing Project Controller T-Codes to existing composite role(s) - None of the 4 composite roles provide access to 9 T-Codes required.

5.14.1.4.	Business Role Project Admin
As per BPD, individuals with business role ‘Project Admin’ require access to 3 specific T-codes:
a.	CJ20N
b.	CJCO
c.	CJCF
Through analysis of the existing SAP composite roles, we noted that 4 such SAP composite roles were providing access to one of the mentioned T-codes.
None of the roles grant access to 2 T-codes: CJCO and CJCF
See summary below:
Business Role	EY Global Roles	Comments	Distinct Users	Project Administrator	SOD	SA
				CJ20N		
Project Administrator	Y:EC_GLOBL_OTC_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10			
Project Administrator	Y:EC_GLOBL_PTM_SUPPORT_DISP	  1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10			
Project Administrator	Y:EC_GLOBL_PTP_SUPPORT_DISP	  1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10			
Project Administrator	Y:EC_GLOBL_RTR_SUPPORT_DISP	  1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10			
 
Change(s) Required – 
1. Clone roles mentioned above for each site without such a role (including consolidation sites) - following the same naming convention, altering underlying company code specific authorisations accordingly.
2. Ensure that users across all sites with Project Administrator responsibilities are assigned the relevant SAP role or roles from these based on their specific responsibilities and the company code(s) within which they operate.
3. All composite roles are marked as SoD; ensure that access to conflicting T-Codes is either mitigated or access to conflicting T-code(s) are withdrawn from these SAP roles. 
4. Add 2/3 missing Project Administrator T-Codes to existing composite role(s) - None of the 4 composite roles provide access to 2 T-Codes required.

5.14.1.5.	Business Role Project Finance Admin
As per BPD, individuals with business role ‘Project Finance Admin’ require access to 6 specific T-codes:
a.	KKAO
b.	KKA2
c.	KKAJ
d.	CJ20N
e.	CJ40
f.	CJ42
Through analysis of the existing SAP composite roles, we noted that 4 such SAP composite roles were providing access to one or more of the mentioned T-codes.
None of the roles grant access to four T-codes: KKA2, KKAJ, CJ40 and CJ42
See summary below:
Business Role	EY Global Roles	Comments	Distinct Users	Project Finance Administrator	SOD	SA
				CJ20N	KKAO		
Project Finance Administrator	Y:EC_GLOBL_OTC_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10		 		
Project Finance Administrator	Y:EC_GLOBL_PTM_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10		 		
Project Finance Administrator	Y:EC_GLOBL_PTP_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10		 		
Project Finance Administrator	Y:EC_GLOBL_RTR_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10		 		
Project Finance Administrator	Y_FI_CCXX_PRODUCT_COSTING	 This role is implemented for company codes DE35, IN10, SE33, US32, US38 and GB30.	17	 		 	
 
Change(s) Required – 
1. Clone roles mentioned above for each site without such a role (including consolidation sites) - following the same naming convention, altering underlying company code specific authorisations accordingly.
2. Ensure that users across all sites with Project Finance Administrator responsibilities are assigned the relevant SAP role or roles from these based on their specific responsibilities and the company code(s) within which they operate.
3. 4/5 composite roles are marked as SoD; ensure that access to conflicting T-Codes is either mitigated or access to conflicting T-code(s) are withdrawn from these SAP roles. 
4. Add 4/6 missing Project Finance Administrator T-Codes to existing composite role(s) - None of the 4 composite roles provide access to 4 T-Codes required.

5.14.1.6.	Business Role Project Financial Controller
As per BPD, individuals with business role ‘Project Financial Controller’ require access to 4 specific T-codes:
a.	CJ20N
b.	CJ8G
c.	CJ40
Through analysis of the existing SAP composite roles, we noted that 4 such SAP composite roles were providing access to one or more of the mentioned T-codes.
None of the roles grant access to 2 T-codes:  CJ8G and CJ40.
See summary below:
Business Role	EY Global Roles	Comments	Distinct Users	Project Financial Controller	SOD	SA
				CJ20N	CJ88		
Project financial controller	Y:EC_GLOBL_OTC_SUPPORT_DISP	 	10				
Project financial controller	Y:EC_GLOBL_PTM_SUPPORT_DISP	 	10				
Project financial controller	Y:EC_GLOBL_PTP_SUPPORT_DISP	 	10				
Project financial controller	Y:EC_GLOBL_RTR_SUPPORT_DISP	 	10				

Change(s) Required – 
1. Clone roles mentioned above for each site without such a role (including consolidation sites) - following the same naming convention, altering underlying company code specific authorisations accordingly.
2. Ensure that users across all sites with Project Financial Controller responsibilities are assigned the relevant SAP role or roles from these based on their specific responsibilities and the company code(s) within which they operate.
3. All composite roles are marked as SoD; ensure that access to conflicting T-Codes is either mitigated or access to conflicting T-code(s) are withdrawn from these SAP roles. 
4. Add 2/4 missing Project Financial Controller T-Codes to existing composite role(s) - None of the 4 composite roles provide access to 2 T-Codes required.

5.14.1.7.	Business Role Project Manager
As per BPD, individuals with business role ‘Project Manager’ require access to 16 specific T-codes:
a.	CJ20N
b.	S_ALR_87100187
c.	CJI5
d.	S_ALR_87013537
e.	S_ALR_87013563
f.	S_ALR_87013564
g.	S_ALR_8701351
h.	S_ALR_8701352
i.	S_ALR_87013591
j.	CJI3
k.	CJIA
l.	CATS_DA
m.	CJ30
n.	CJ32
o.	CJ9D
p.	CJ40
Through analysis of the existing SAP composite roles, we noted that 4 such SAP composite roles provided access to one or more of the mentioned T-codes.
None of the roles grant access to 14 T-codes: CJI5, CJIA, and S_ALR_87100187, S_ALR_87013563, S_ALR_87013564, S_ALR_8701351, S_ALR_8701352, S_ALR_87013591and S_ALR_87013537, CJ9D, CATS_DA, CJ30, CJ32 and CJ40. 
See summary below:
Business Role	EY Global Roles	Comments	Distinct Users	Project Manager	SOD	SA
				CJ20N	CJI3		
Project Manager	Y:EC_GLOBL_OTC_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10				
Project Manager	Y:EC_GLOBL_PTM_SUPPORT_DISP	  1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10				
Project Manager	Y:EC_GLOBL_PTP_SUPPORT_DISP	  1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10				
Project Manager	Y:EC_GLOBL_RTR_SUPPORT_DISP	  1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10				

Change(s) Required – 
1. Clone roles mentioned above for each site without such a role (including consolidation sites) - following the same naming convention, altering underlying company code specific authorisations accordingly.
2. Ensure that users across all sites with Project Manager responsibilities are assigned the relevant SAP role or roles from these based on their specific responsibilities and the company code(s) within which they operate.
3. All composite roles are marked as SoD; ensure that access to conflicting T-Codes is either mitigated or access to conflicting T-code(s) are withdrawn from these SAP roles. 
4. Add 14/16 missing Project Manager T-Codes to existing composite role(s) - None of the 4 composite roles provide access to 14 T-Codes required.

5.14.1.8.	Business Roles Project Engineer/Lead Engineer/Planning Engineer
As per BPD, individuals with business role ‘Project Engineer/Lead Engineer/Planning Engineer’ require access to 2 specific T-codes:
a.	CJI3
b.	CATS_DA
Through analysis of the existing SAP composite roles, we noted that 4 such SAP composite roles were providing access to one of the mentioned T-codes.
None of the roles grant access to 1 T-code: CATS_DA 
See summary below
Business Role	EY Global Roles	Comments	Distinct Users	Project/Lead/Planning Engineer	SOD	SA
				CJI3		
Project Engineer/Lead Engineer/Planning Engineer	Y:EC_GLOBL_OTC_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10			
Project Engineer/Lead Engineer/Planning Engineer	Y:EC_GLOBL_PTM_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10			
Project Engineer/Lead Engineer/Planning Engineer	Y:EC_GLOBL_PTP_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10			
Project Engineer/Lead Engineer/Planning Engineer	Y:EC_GLOBL_RTR_SUPPORT_DISP	 1. This role is currently implemented for all Company Codes
2. This is currently a display only role	10			

Change(s) Required – 
1. Clone roles mentioned above for each site without such a role (including consolidation sites) - following the same naming convention, altering underlying company code specific authorisations accordingly.
2. Ensure that users across all sites with Project/Lead/Planning Engineer responsibilities are assigned the relevant SAP role or roles from these based on their specific responsibilities and the company code(s) within which they operate.
3. All composite roles are marked as SoD; ensure that access to conflicting T-Codes is either mitigated or access to conflicting T-code(s) are withdrawn from these SAP roles. 
4. Add 1/2 missing Project/Lead/Planning Engineer T-Codes to existing composite role(s) - None of the 4 composite roles provide access to 1 T-Code required.

 

5.15.	Business, Functional and Non-functional Requirements and solution Design
5.15.1.	Business and Functional Requirements 
Refer to the Project Systems and Time Sheets Functional Design Document (FDD)
5.15.2.	Non-functional Requirements 
Specify any No-functional Requirements (NFRs) that are identified during the design activities.  These will be fed into the NFR section of the RTM after high level design.  NFRs include SLAs, user numbers, transaction volumes, archiving, system performance, Business continuity / disaster recovery requirements.

Ref	NFR Category	NFR Description	NFR Type (SLA / Volumes etc.)
1	None Identified	N/A	N/A

5.15.3.	Design Gaps
Specify requirement that is not met by SAP Standard and which a design decision is still to be determined through the JM Governance process
Ref	Requirement Description	GAP Resolution Options	Impact (L/M/H)	Resolution Date	Owner
1	Workday Integration	Interface development	H	tbc	Marco Desentis
2	Licensing Cost Reports	Enhancement to reporting	H	tbc	Marco Desentis
3	Segment User Field Validation	Enhancement to validation	M	tbc	Marco Desentis

	 
5.16.	Data Impact
Name of Data Object	Object Type (Standard/Custom) (New/Existing)	Name of the (Table)	Name of the (Field)	Data Requirement
(Mention "No Improvement" if object not in scope for any data improvements)	Sites Impacted/Affected	Remarks
PSTM_C001	Activity Rates for timesheets	COST	TBC	In scope	All	 
PSTM_C002	1001 – activity types	CSSL	TBC	In scope	All	
PSTM_C007	1029 – Project hours	CAUFV	TBC	In scope	All	
PSTM_C003	Project definition / WBS element	PROJ
PRPS	TBC	In scope	All	
PSTM_C004	1075 – WBS budget	RPSCO
BPJA	TBC	In scope	Licensing and Formox sites	
PSTM_C005	1077 – WBS plan	COEP/ COSP/ COSS	TBC	In scope	Licensing and Formox sites	
PSTM-C006	Network / activities	RPSCO / CAUFV	TBC	In scope	Licensing Sites	

6.	Risks, Issues, Actions and Dependencies
6.1.1.	Design Risks and Issues (outstanding)
Document any risks / Issues impacting on the business process design / solution and ability to deliver the scope within the agreed schedule timeline and budget and deliver on the benefits.

Ref No	Risk / Issue Description	Impact 	Status	Mitigation	Resolution Date
1	Workday integration	High	Open	JM IT is working on the assembly of the corresponding team, to support project Concert on the definition of the data and technical integration between Workday and SAP	TBC

6.1.2.	Design Related Actions 
Document any open actions assigned to the design group as part of the business process design / solution that is required to be completed and could impact the realisation phase. 

Ref	Action	Owner	Due Date	Status Closed / Open
1	Workday Integration
There still definitions to make for the integration between SAP (HR-Mini master) and Workday.
There still need to be reviewed:
•	Data model mapping between both systems
•	Technical integration
•	Technical connectivity to be used	Carl Scarlet / Marco Desentis	TBC	Open


6.1.3.	Process Area Dependencies 
Document any dependencies with other processes that will impact the end to end design of the above solution.
Ref ID	Dependency Area	Dependency Description	Agreed (Y/N)	Type
Predecessor / Post step	Integration Process Flow Ref
D001	RTR	Dunning procedure	TBC		
D002	RTR	Credit Management	TBC		
D004	RTR	Automated credit approval	TBC		
D004	LES	Stock Allocation for sales	TBC		
 
7.	Appendix
7.1.	Segmentation
The following table details the segmentation structure that will be used to tag projects within CT. This is to enable reporting of time and costs based on market segments. This list will be used to create a table from which the segment can be selected when a project is created. The table will use the column of names that are 20 characters long or less due to limitations with the User Fields in SAP.
URN	Category Group	Value Chain	Segment Group	Segment	Segment for User Field
(≤ 20 characters)
URN01	Base Business	Building Blocks	Formaldehyde	Formaldehyde - Wood & Chemicals	Formaldehyde - W&C
URN02	Base Business	Building Blocks	Methanol	Methanol - Fuel Additives & Chemicals	Methanol - F&C
URN03	Base Business	Building Blocks	Nitrogen	Amines	Amines
URN04	Base Business	Building Blocks	Nitrogen	Ammonia - Fertilizers & Chemicals	Ammonia - Fertil.
URN05	Base Business	Building Blocks	Nitrogen	Nitric Acid	Nitric Acid
URN06	Base Business	Building Blocks	PTA	PTA	PTA
URN07	Base Business	Fuels & Energy	FCC Additives	FCC Additives	Additives
URN08	Base Business	Fuels & Energy	FCC Additives (ZSM-5)	FCC Additives (ZSM-5)	Additives (ZSM-5)
URN09	Base Business	Fuels & Energy	Gas Purification	Natural Gas Processing	Nat. Gas Processing
URN10	Base Business	Fuels & Energy	GTL	GTL	GTL
URN11	Base Business	Fuels & Energy	Refinery Fuels	Refinery Fuels	Refinery Fuels
URN12	Base Business	Fuels & Energy	Refinery Hydrogen	Refinery Hydrogen	Refinery Hydrogen
URN13	Base Business	Fuels & Energy	Refinery Purification	Refinery Purification	Refinery Purif.
URN14	Base Business	Fuels & Energy	SNG	SNG from Coal	SNG from Coal
URN15	Base Business	Intermediates	Acetic Acid	Acetic Acid	Acetic Acid
URN16	Base Business	Intermediates	Agchem	Paraquat Alternatives	Paraquat Altern.
URN17	Base Business	Intermediates	Alcohols	Alcohols - Detergent Alcohols	Alcohols - DA
URN18	Base Business	Intermediates	Alcohols	Alcohols - Natural Detergent Alcohols	Alcohols - NDA
URN19	Base Business	Intermediates	Alcohols	Alcohols - Oxo-Alcohols	Alcohols - Oxo
URN20	Base Business	Intermediates	Alcohols	Alcohols - Polyols	Alcohols - Polyols
URN21	Base Business	Intermediates	Alcohols	Alcohols - Tech Polymer Diols	Alcohols - Tech Pol
URN22	Base Business	Intermediates	Edible Oils	Edible Oils	Edible Oils
URN23	Base Business	Intermediates	Fluorochemicals	Fluorochemicals	Fluorochemicals
URN24	Base Business	Intermediates	Hydrogen Peroxide	Hydrogen Peroxide	Hydrogen Peroxide
URN25	Base Business	Intermediates	Olefins	Olefins	Olefins
URN26	Base Business	Intermediates	Oleochemicals	Oleochemicals	Oleochemicals
URN27	Base Business	Intermediates	Solvents	Solvents	Solvents
URN28	Base Business	Intermediates	Sponge	Sponge	Sponge
URN29	Base Business	Intermediates	VCM	VCM via Ethylene (EDC)	VCM via Ethylene
URN30	Base Business	Other	Copper Zeolite	Copper Zeolite (77-1 and CuZe)	Copper Zeolite
URN31	Base Business	Other	Environmental Catalysts	Environmental Catalysts	Environ. Catalysts
URN32	Emerging	Building Blocks	CO2 Purification	CO2 Purification	CO2 Purification
URN33	Emerging	Building Blocks	MEG	MEG	MEG
URN34	Emerging	Building Blocks	SNG	SNG for CO2 Transport	SNG - CO2 Transport
URN35	Emerging	Fuels & Energy	Bio-pyrolysis	Bio-pyrolysis (Anellotech)	Bio-pyrolysis
URN36	Emerging	Fuels & Energy	Blue Hydrogen	Blue Hydrogen (LCH)	Blue Hydrogen (LCH)
URN37	Emerging	Fuels & Energy	Electrolyser Gas Purification	Electrolyser Gas Purification	Electr. Gas Purif.
URN38	Emerging	Fuels & Energy	Green Hydrogen	Green Hydrogen Purification for Automotive	Green H2 Purif.
URN39	Emerging	Fuels & Energy	Sustainable Fuels non Syngas routes	Biodiesel	Biodiesel
URN40	Emerging	Fuels & Energy	Sustainable Fuels non Syngas routes	Biorefining (Virent)	Biorefining
URN41	Emerging	Fuels & Energy	Sustainable Fuels Syngas routes	FT for SAF	FT for SAF
URN42	Emerging	Intermediates	Ethyl Acetate	Ethyl Acetate	Ethyl Acetate
URN43	Emerging	Intermediates	VCM	VCM via Acetylene	VCM via Acetylene
URN44	Emerging	Other	Low Carbon Solutions	Low Carbon Solutions	Low Carbon Solution
URN45	Emerging	Other	Plastics Recycling	Plastics Recycling - Catalytic Pyrolysis & Purification	Plastics Recycling 
URN46	Emerging	Other	Ventilation Air Methane Abatement	Ventilation Air Methane Abatement (COMET)	Methane Abatement