03e7fda | 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 | id,activity_id,project_id,description,category,severity,status,assigned_to,date_raised,delay_impact_days
iss_00001,act_001_01,proj_001,Key equipment broke down mid-task on Site Survey & Mobilization.,equipment_breakdown,medium,resolved,Contractor B,2022-01-12,0
iss_00002,act_001_01,proj_001,Key equipment broke down mid-task on Site Survey & Mobilization.,equipment_breakdown,medium,resolved,QA Inspector,2022-01-11,0
iss_00003,act_001_02,proj_001,Insufficient crew available; Demolition & Strip-Out understaffed.,labor_shortage,critical,resolved,Contractor B,2022-01-21,0
iss_00004,act_001_02,proj_001,Safety non-compliance flagged during Demolition & Strip-Out.,safety,medium,resolved,Project Engineer,2022-01-19,0
iss_00005,act_001_02,proj_001,Safety non-compliance flagged during Demolition & Strip-Out.,safety,medium,resolved,Site Manager,2022-01-25,0
iss_00006,act_001_03,proj_001,Undocumented additional work added to Structural Repairs & Reinforcement.,scope_creep,low,resolved,QA Inspector,2022-02-08,0
iss_00007,act_001_03,proj_001,Adverse weather halted outdoor work on Structural Repairs & Reinforcement.,weather,high,open,Contractor A,2022-02-09,2
iss_00008,act_001_03,proj_001,Client-requested scope change impacts Structural Repairs & Reinforcement.,design_change,medium,resolved,Procurement Lead,2022-02-04,0
iss_00009,act_001_03,proj_001,Adverse weather halted outdoor work on Structural Repairs & Reinforcement.,weather,low,resolved,Contractor B,2022-02-08,0
iss_00010,act_001_04,proj_001,Insufficient crew available; Waterproofing & Damp Proofing understaffed.,labor_shortage,low,open,Contractor B,2022-02-26,1
iss_00011,act_001_04,proj_001,Delivery of Waterproofing & Damp Proofing delayed by supplier.,material_delay,medium,open,QA Inspector,2022-02-26,0
iss_00012,act_001_04,proj_001,Municipal inspection failed; rework needed on Waterproofing & Damp Proofing.,inspection_fail,high,resolved,Project Engineer,2022-02-25,0
iss_00013,act_001_04,proj_001,Key equipment broke down mid-task on Waterproofing & Damp Proofing.,equipment_breakdown,medium,resolved,Site Manager,2022-02-24,0
iss_00014,act_001_05,proj_001,Insufficient crew available; Plumbing Rough-in understaffed.,labor_shortage,low,resolved,Safety Officer,2022-03-03,0
iss_00015,act_001_05,proj_001,Key equipment broke down mid-task on Plumbing Rough-in.,equipment_breakdown,low,resolved,Contractor B,2022-02-20,0
iss_00016,act_001_05,proj_001,Delivery of Plumbing Rough-in delayed by supplier.,material_delay,low,resolved,Project Engineer,2022-02-24,0
iss_00017,act_001_05,proj_001,Undocumented additional work added to Plumbing Rough-in.,scope_creep,low,resolved,QA Inspector,2022-02-22,0
iss_00018,act_001_06,proj_001,Municipal inspection failed; rework needed on Electrical Wiring & Conduits.,inspection_fail,critical,resolved,Client PM,2022-02-21,0
iss_00019,act_001_06,proj_001,Insufficient crew available; Electrical Wiring & Conduits understaffed.,labor_shortage,medium,resolved,Contractor B,2022-02-25,0
iss_00020,act_001_06,proj_001,Safety non-compliance flagged during Electrical Wiring & Conduits.,safety,high,resolved,Safety Officer,2022-02-23,0
iss_00021,act_001_06,proj_001,Municipal inspection failed; rework needed on Electrical Wiring & Conduits.,inspection_fail,low,resolved,Contractor A,2022-02-22,0
iss_00022,act_001_07,proj_001,Insufficient crew available; HVAC & Ventilation Installation understaffed.,labor_shortage,low,resolved,Project Engineer,2022-02-23,0
iss_00023,act_001_07,proj_001,Undocumented additional work added to HVAC & Ventilation Installation.,scope_creep,critical,open,Safety Officer,2022-02-24,4
iss_00024,act_001_07,proj_001,Undocumented additional work added to HVAC & Ventilation Installation.,scope_creep,critical,open,Contractor B,2022-02-20,5
iss_00025,act_001_07,proj_001,Adverse weather halted outdoor work on HVAC & Ventilation Installation.,weather,low,resolved,Client PM,2022-02-28,0
iss_00026,act_001_08,proj_001,Safety non-compliance flagged during Floor Leveling & Screed.,safety,high,resolved,Contractor A,2022-03-14,0
iss_00027,act_001_08,proj_001,Insufficient crew available; Floor Leveling & Screed understaffed.,labor_shortage,medium,resolved,Site Manager,2022-03-10,0
iss_00028,act_001_08,proj_001,Municipal inspection failed; rework needed on Floor Leveling & Screed.,inspection_fail,medium,open,Site Manager,2022-03-11,0
iss_00029,act_001_09,proj_001,Key equipment broke down mid-task on Tiling β Floors & Wet Areas.,equipment_breakdown,medium,resolved,Contractor A,2022-03-25,0
iss_00030,act_001_09,proj_001,Undocumented additional work added to Tiling β Floors & Wet Areas.,scope_creep,high,resolved,QA Inspector,2022-04-01,0
iss_00031,act_001_09,proj_001,Municipal inspection failed; rework needed on Tiling β Floors & Wet Areas.,inspection_fail,low,open,Project Engineer,2022-03-20,4
iss_00032,act_001_10,proj_001,Undocumented additional work added to Wall Plastering & Screeding.,scope_creep,medium,resolved,Client PM,2022-03-13,0
iss_00033,act_001_10,proj_001,Client-requested scope change impacts Wall Plastering & Screeding.,design_change,low,resolved,Contractor A,2022-03-11,0
iss_00034,act_001_10,proj_001,Client-requested scope change impacts Wall Plastering & Screeding.,design_change,low,open,Contractor B,2022-03-13,0
iss_00035,act_001_11,proj_001,Adverse weather halted outdoor work on False Ceiling & Insulation.,weather,low,resolved,Project Engineer,2022-03-29,0
iss_00036,act_001_11,proj_001,Insufficient crew available; False Ceiling & Insulation understaffed.,labor_shortage,low,resolved,Safety Officer,2022-03-31,0
iss_00037,act_001_11,proj_001,Insufficient crew available; False Ceiling & Insulation understaffed.,labor_shortage,critical,resolved,Client PM,2022-03-28,0
iss_00038,act_001_12,proj_001,Key equipment broke down mid-task on Painting β Primer & Finish Coats.,equipment_breakdown,high,resolved,Site Manager,2022-04-18,0
iss_00039,act_001_12,proj_001,Delivery of Painting β Primer & Finish Coats delayed by supplier.,material_delay,high,open,Contractor B,2022-04-12,2
iss_00040,act_001_12,proj_001,Delivery of Painting β Primer & Finish Coats delayed by supplier.,material_delay,medium,resolved,Contractor A,2022-04-19,0
iss_00041,act_001_13,proj_001,"Key equipment broke down mid-task on Carpentry, Joinery & Built-ins.",equipment_breakdown,critical,resolved,Project Engineer,2022-05-12,0
iss_00042,act_001_13,proj_001,"Client-requested scope change impacts Carpentry, Joinery & Built-ins.",design_change,medium,open,QA Inspector,2022-05-02,5
iss_00043,act_001_13,proj_001,"Undocumented additional work added to Carpentry, Joinery & Built-ins.",scope_creep,low,resolved,Safety Officer,2022-05-02,0
iss_00044,act_001_14,proj_001,"Undocumented additional work added to Fixtures, Fittings & Sanitaryware.",scope_creep,low,open,Contractor B,2022-05-21,1
iss_00045,act_001_14,proj_001,"Undocumented additional work added to Fixtures, Fittings & Sanitaryware.",scope_creep,critical,open,Site Manager,2022-05-22,2
iss_00046,act_001_14,proj_001,"Adverse weather halted outdoor work on Fixtures, Fittings & Sanitaryware.",weather,high,resolved,Project Engineer,2022-05-19,0
iss_00047,act_001_15,proj_001,"Adverse weather halted outdoor work on Final Inspection, Snag & Handover.",weather,low,open,QA Inspector,2022-05-29,5
iss_00048,act_001_15,proj_001,"Adverse weather halted outdoor work on Final Inspection, Snag & Handover.",weather,high,resolved,Contractor A,2022-06-01,0
iss_00049,act_002_01,proj_002,Key equipment broke down mid-task on Site Survey & Mobilization.,equipment_breakdown,low,resolved,Site Manager,2022-03-02,0
iss_00050,act_002_01,proj_002,Client-requested scope change impacts Site Survey & Mobilization.,design_change,high,resolved,Site Manager,2022-03-07,0
iss_00051,act_002_02,proj_002,Delivery of Demolition & Strip-Out delayed by supplier.,material_delay,critical,open,Safety Officer,2022-03-21,5
iss_00052,act_002_02,proj_002,Insufficient crew available; Demolition & Strip-Out understaffed.,labor_shortage,low,resolved,Procurement Lead,2022-03-12,0
iss_00053,act_002_02,proj_002,Municipal inspection failed; rework needed on Demolition & Strip-Out.,inspection_fail,medium,open,Client PM,2022-03-20,0
iss_00054,act_002_03,proj_002,Insufficient crew available; Structural Repairs & Reinforcement understaffed.,labor_shortage,low,open,Client PM,2022-03-26,4
iss_00055,act_002_03,proj_002,Key equipment broke down mid-task on Structural Repairs & Reinforcement.,equipment_breakdown,low,resolved,Site Manager,2022-03-30,0
iss_00056,act_002_03,proj_002,Key equipment broke down mid-task on Structural Repairs & Reinforcement.,equipment_breakdown,medium,resolved,Client PM,2022-03-30,0
iss_00057,act_002_03,proj_002,Key equipment broke down mid-task on Structural Repairs & Reinforcement.,equipment_breakdown,medium,resolved,Contractor A,2022-04-07,0
iss_00058,act_002_04,proj_002,Adverse weather halted outdoor work on Waterproofing & Damp Proofing.,weather,critical,open,Safety Officer,2022-04-12,2
iss_00059,act_002_04,proj_002,Safety non-compliance flagged during Waterproofing & Damp Proofing.,safety,low,resolved,Contractor A,2022-04-11,0
iss_00060,act_002_04,proj_002,Adverse weather halted outdoor work on Waterproofing & Damp Proofing.,weather,low,resolved,Contractor B,2022-04-17,0
iss_00061,act_002_04,proj_002,Adverse weather halted outdoor work on Waterproofing & Damp Proofing.,weather,high,resolved,Client PM,2022-04-16,0
iss_00062,act_002_05,proj_002,Insufficient crew available; Plumbing Rough-in understaffed.,labor_shortage,low,resolved,Safety Officer,2022-04-15,0
iss_00063,act_002_05,proj_002,Insufficient crew available; Plumbing Rough-in understaffed.,labor_shortage,high,resolved,Contractor B,2022-04-23,0
iss_00064,act_002_05,proj_002,Adverse weather halted outdoor work on Plumbing Rough-in.,weather,medium,resolved,Procurement Lead,2022-04-24,0
iss_00065,act_002_05,proj_002,Insufficient crew available; Plumbing Rough-in understaffed.,labor_shortage,low,resolved,Client PM,2022-04-13,0
iss_00066,act_002_06,proj_002,Insufficient crew available; Electrical Wiring & Conduits understaffed.,labor_shortage,medium,open,Safety Officer,2022-04-17,3
iss_00067,act_002_06,proj_002,Undocumented additional work added to Electrical Wiring & Conduits.,scope_creep,medium,resolved,QA Inspector,2022-04-21,0
iss_00068,act_002_06,proj_002,Safety non-compliance flagged during Electrical Wiring & Conduits.,safety,low,resolved,Project Engineer,2022-04-18,0
iss_00069,act_002_06,proj_002,Key equipment broke down mid-task on Electrical Wiring & Conduits.,equipment_breakdown,medium,resolved,Procurement Lead,2022-04-20,0
iss_00070,act_002_07,proj_002,Client-requested scope change impacts HVAC & Ventilation Installation.,design_change,medium,resolved,QA Inspector,2022-04-19,0
iss_00071,act_002_07,proj_002,Client-requested scope change impacts HVAC & Ventilation Installation.,design_change,high,open,Project Engineer,2022-04-11,0
iss_00072,act_002_07,proj_002,Safety non-compliance flagged during HVAC & Ventilation Installation.,safety,medium,resolved,Contractor A,2022-04-11,0
iss_00073,act_002_07,proj_002,Safety non-compliance flagged during HVAC & Ventilation Installation.,safety,medium,resolved,Contractor B,2022-04-15,0
iss_00074,act_002_08,proj_002,Undocumented additional work added to Floor Leveling & Screed.,scope_creep,low,resolved,QA Inspector,2022-04-29,0
iss_00075,act_002_08,proj_002,Client-requested scope change impacts Floor Leveling & Screed.,design_change,high,open,Contractor A,2022-04-28,1
iss_00076,act_002_08,proj_002,Key equipment broke down mid-task on Floor Leveling & Screed.,equipment_breakdown,high,resolved,QA Inspector,2022-05-01,0
iss_00077,act_002_09,proj_002,Delivery of Tiling β Floors & Wet Areas delayed by supplier.,material_delay,high,resolved,Contractor A,2022-05-26,0
iss_00078,act_002_09,proj_002,Adverse weather halted outdoor work on Tiling β Floors & Wet Areas.,weather,low,resolved,Contractor A,2022-05-18,0
iss_00079,act_002_09,proj_002,Insufficient crew available; Tiling β Floors & Wet Areas understaffed.,labor_shortage,low,resolved,QA Inspector,2022-05-15,0
iss_00080,act_002_10,proj_002,Adverse weather halted outdoor work on Wall Plastering & Screeding.,weather,medium,open,Client PM,2022-05-07,4
iss_00081,act_002_10,proj_002,Key equipment broke down mid-task on Wall Plastering & Screeding.,equipment_breakdown,high,resolved,Site Manager,2022-05-04,0
iss_00082,act_002_10,proj_002,Insufficient crew available; Wall Plastering & Screeding understaffed.,labor_shortage,low,resolved,Site Manager,2022-05-09,0
iss_00083,act_002_11,proj_002,Adverse weather halted outdoor work on False Ceiling & Insulation.,weather,medium,open,Procurement Lead,2022-05-24,3
iss_00084,act_002_11,proj_002,Municipal inspection failed; rework needed on False Ceiling & Insulation.,inspection_fail,critical,resolved,Project Engineer,2022-05-22,0
iss_00085,act_002_11,proj_002,Adverse weather halted outdoor work on False Ceiling & Insulation.,weather,low,open,Contractor B,2022-05-19,3
iss_00086,act_002_12,proj_002,Key equipment broke down mid-task on Painting β Primer & Finish Coats.,equipment_breakdown,medium,open,Contractor A,2022-06-09,1
iss_00087,act_002_12,proj_002,Undocumented additional work added to Painting β Primer & Finish Coats.,scope_creep,medium,resolved,QA Inspector,2022-06-09,0
iss_00088,act_002_12,proj_002,Key equipment broke down mid-task on Painting β Primer & Finish Coats.,equipment_breakdown,low,resolved,QA Inspector,2022-05-30,0
iss_00089,act_002_13,proj_002,"Municipal inspection failed; rework needed on Carpentry, Joinery & Built-ins.",inspection_fail,low,open,Safety Officer,2022-06-11,4
iss_00090,act_002_13,proj_002,"Client-requested scope change impacts Carpentry, Joinery & Built-ins.",design_change,low,resolved,Contractor A,2022-06-17,0
iss_00091,act_002_13,proj_002,"Delivery of Carpentry, Joinery & Built-ins delayed by supplier.",material_delay,high,resolved,Project Engineer,2022-06-12,0
iss_00092,act_002_14,proj_002,"Client-requested scope change impacts Fixtures, Fittings & Sanitaryware.",design_change,low,resolved,Site Manager,2022-07-08,0
iss_00093,act_002_14,proj_002,"Undocumented additional work added to Fixtures, Fittings & Sanitaryware.",scope_creep,low,resolved,Client PM,2022-06-29,0
iss_00094,act_002_14,proj_002,"Safety non-compliance flagged during Fixtures, Fittings & Sanitaryware.",safety,high,resolved,Project Engineer,2022-07-04,0
iss_00095,act_002_15,proj_002,"Key equipment broke down mid-task on Final Inspection, Snag & Handover.",equipment_breakdown,high,resolved,Contractor A,2022-07-12,0
iss_00096,act_002_15,proj_002,"Key equipment broke down mid-task on Final Inspection, Snag & Handover.",equipment_breakdown,high,resolved,Contractor B,2022-07-10,0
iss_00097,act_003_01,proj_003,Key equipment broke down mid-task on Site Survey & Mobilization.,equipment_breakdown,medium,resolved,Site Manager,2022-06-18,0
iss_00098,act_003_01,proj_003,Adverse weather halted outdoor work on Site Survey & Mobilization.,weather,low,resolved,Contractor A,2022-06-21,0
iss_00099,act_003_02,proj_003,Client-requested scope change impacts Demolition & Strip-Out.,design_change,high,resolved,Contractor B,2022-07-06,0
iss_00100,act_003_02,proj_003,Adverse weather halted outdoor work on Demolition & Strip-Out.,weather,critical,resolved,Safety Officer,2022-07-02,0
iss_00101,act_003_02,proj_003,Adverse weather halted outdoor work on Demolition & Strip-Out.,weather,medium,resolved,QA Inspector,2022-06-25,0
iss_00102,act_003_03,proj_003,Key equipment broke down mid-task on Structural Repairs & Reinforcement.,equipment_breakdown,low,resolved,Contractor A,2022-07-16,0
iss_00103,act_003_03,proj_003,Undocumented additional work added to Structural Repairs & Reinforcement.,scope_creep,low,open,Contractor A,2022-07-27,2
iss_00104,act_003_03,proj_003,Insufficient crew available; Structural Repairs & Reinforcement understaffed.,labor_shortage,medium,open,Contractor B,2022-07-14,2
iss_00105,act_003_03,proj_003,Municipal inspection failed; rework needed on Structural Repairs & Reinforcement.,inspection_fail,medium,resolved,Contractor A,2022-07-17,0
iss_00106,act_003_04,proj_003,Undocumented additional work added to Waterproofing & Damp Proofing.,scope_creep,low,resolved,Client PM,2022-08-12,0
iss_00107,act_003_04,proj_003,Adverse weather halted outdoor work on Waterproofing & Damp Proofing.,weather,critical,resolved,Procurement Lead,2022-08-05,0
iss_00108,act_003_04,proj_003,Safety non-compliance flagged during Waterproofing & Damp Proofing.,safety,high,resolved,Contractor B,2022-08-12,0
iss_00109,act_003_04,proj_003,Safety non-compliance flagged during Waterproofing & Damp Proofing.,safety,medium,resolved,Safety Officer,2022-08-10,0
iss_00110,act_003_05,proj_003,Insufficient crew available; Plumbing Rough-in understaffed.,labor_shortage,medium,resolved,Client PM,2022-08-15,0
iss_00111,act_003_05,proj_003,Delivery of Plumbing Rough-in delayed by supplier.,material_delay,medium,resolved,Project Engineer,2022-08-16,0
iss_00112,act_003_05,proj_003,Delivery of Plumbing Rough-in delayed by supplier.,material_delay,low,open,Contractor B,2022-08-14,3
iss_00113,act_003_05,proj_003,Key equipment broke down mid-task on Plumbing Rough-in.,equipment_breakdown,high,open,Contractor A,2022-08-10,3
iss_00114,act_003_06,proj_003,Undocumented additional work added to Electrical Wiring & Conduits.,scope_creep,medium,resolved,Procurement Lead,2022-08-06,0
iss_00115,act_003_06,proj_003,Insufficient crew available; Electrical Wiring & Conduits understaffed.,labor_shortage,low,open,QA Inspector,2022-08-08,3
iss_00116,act_003_06,proj_003,Key equipment broke down mid-task on Electrical Wiring & Conduits.,equipment_breakdown,medium,resolved,Procurement Lead,2022-08-08,0
iss_00117,act_003_06,proj_003,Undocumented additional work added to Electrical Wiring & Conduits.,scope_creep,low,resolved,Contractor B,2022-08-12,0
iss_00118,act_003_07,proj_003,Adverse weather halted outdoor work on HVAC & Ventilation Installation.,weather,medium,resolved,Site Manager,2022-08-15,0
iss_00119,act_003_07,proj_003,Key equipment broke down mid-task on HVAC & Ventilation Installation.,equipment_breakdown,low,resolved,QA Inspector,2022-08-13,0
iss_00120,act_003_07,proj_003,Client-requested scope change impacts HVAC & Ventilation Installation.,design_change,low,resolved,QA Inspector,2022-08-10,0
iss_00121,act_003_07,proj_003,Municipal inspection failed; rework needed on HVAC & Ventilation Installation.,inspection_fail,medium,open,Client PM,2022-08-12,0
iss_00122,act_003_08,proj_003,Insufficient crew available; Floor Leveling & Screed understaffed.,labor_shortage,low,resolved,QA Inspector,2022-08-30,0
iss_00123,act_003_08,proj_003,Client-requested scope change impacts Floor Leveling & Screed.,design_change,medium,resolved,Site Manager,2022-08-23,0
iss_00124,act_003_08,proj_003,Key equipment broke down mid-task on Floor Leveling & Screed.,equipment_breakdown,medium,resolved,Contractor B,2022-08-25,0
iss_00125,act_003_09,proj_003,Safety non-compliance flagged during Tiling β Floors & Wet Areas.,safety,critical,resolved,Contractor B,2022-09-16,0
iss_00126,act_003_09,proj_003,Safety non-compliance flagged during Tiling β Floors & Wet Areas.,safety,critical,resolved,Site Manager,2022-09-20,0
iss_00127,act_003_09,proj_003,Client-requested scope change impacts Tiling β Floors & Wet Areas.,design_change,low,resolved,Contractor B,2022-09-13,0
iss_00128,act_003_10,proj_003,Safety non-compliance flagged during Wall Plastering & Screeding.,safety,low,resolved,Contractor B,2022-08-29,0
iss_00129,act_003_10,proj_003,Safety non-compliance flagged during Wall Plastering & Screeding.,safety,low,resolved,QA Inspector,2022-08-26,0
iss_00130,act_003_10,proj_003,Delivery of Wall Plastering & Screeding delayed by supplier.,material_delay,critical,resolved,Contractor B,2022-09-01,0
iss_00131,act_003_11,proj_003,Undocumented additional work added to False Ceiling & Insulation.,scope_creep,medium,resolved,Site Manager,2022-09-10,0
iss_00132,act_003_11,proj_003,Client-requested scope change impacts False Ceiling & Insulation.,design_change,medium,resolved,Contractor B,2022-09-16,0
iss_00133,act_003_11,proj_003,Key equipment broke down mid-task on False Ceiling & Insulation.,equipment_breakdown,low,open,Site Manager,2022-09-12,1
iss_00134,act_003_12,proj_003,Safety non-compliance flagged during Painting β Primer & Finish Coats.,safety,low,resolved,Contractor A,2022-10-01,0
iss_00135,act_003_12,proj_003,Undocumented additional work added to Painting β Primer & Finish Coats.,scope_creep,medium,resolved,QA Inspector,2022-09-25,0
iss_00136,act_003_12,proj_003,Safety non-compliance flagged during Painting β Primer & Finish Coats.,safety,high,resolved,Safety Officer,2022-09-21,0
iss_00137,act_003_13,proj_003,"Adverse weather halted outdoor work on Carpentry, Joinery & Built-ins.",weather,medium,resolved,Contractor B,2022-10-19,0
iss_00138,act_003_13,proj_003,"Key equipment broke down mid-task on Carpentry, Joinery & Built-ins.",equipment_breakdown,low,resolved,QA Inspector,2022-10-15,0
iss_00139,act_003_13,proj_003,"Insufficient crew available; Carpentry, Joinery & Built-ins understaffed.",labor_shortage,critical,resolved,Contractor A,2022-10-08,0
iss_00140,act_003_14,proj_003,"Delivery of Fixtures, Fittings & Sanitaryware delayed by supplier.",material_delay,medium,resolved,Procurement Lead,2022-11-04,0
iss_00141,act_003_14,proj_003,"Insufficient crew available; Fixtures, Fittings & Sanitaryware understaffed.",labor_shortage,medium,resolved,Site Manager,2022-10-30,0
iss_00142,act_003_14,proj_003,"Key equipment broke down mid-task on Fixtures, Fittings & Sanitaryware.",equipment_breakdown,low,resolved,QA Inspector,2022-10-27,0
iss_00143,act_003_15,proj_003,"Client-requested scope change impacts Final Inspection, Snag & Handover.",design_change,high,resolved,Safety Officer,2022-11-09,0
iss_00144,act_003_15,proj_003,"Key equipment broke down mid-task on Final Inspection, Snag & Handover.",equipment_breakdown,critical,resolved,QA Inspector,2022-11-06,0
iss_00145,act_004_01,proj_004,Safety non-compliance flagged during Site Survey & Mobilization.,safety,high,resolved,Client PM,2022-09-08,0
iss_00146,act_004_01,proj_004,Municipal inspection failed; rework needed on Site Survey & Mobilization.,inspection_fail,medium,resolved,QA Inspector,2022-09-08,0
iss_00147,act_004_02,proj_004,Client-requested scope change impacts Demolition & Strip-Out.,design_change,low,resolved,Site Manager,2022-09-13,0
iss_00148,act_004_02,proj_004,Delivery of Demolition & Strip-Out delayed by supplier.,material_delay,low,resolved,Safety Officer,2022-09-18,0
iss_00149,act_004_02,proj_004,Adverse weather halted outdoor work on Demolition & Strip-Out.,weather,critical,resolved,Project Engineer,2022-09-21,0
iss_00150,act_004_03,proj_004,Key equipment broke down mid-task on Structural Repairs & Reinforcement.,equipment_breakdown,low,resolved,Site Manager,2022-10-11,0
iss_00151,act_004_03,proj_004,Adverse weather halted outdoor work on Structural Repairs & Reinforcement.,weather,critical,resolved,Contractor B,2022-10-10,0
iss_00152,act_004_03,proj_004,Safety non-compliance flagged during Structural Repairs & Reinforcement.,safety,medium,resolved,Contractor A,2022-10-02,0
iss_00153,act_004_03,proj_004,Insufficient crew available; Structural Repairs & Reinforcement understaffed.,labor_shortage,medium,resolved,Client PM,2022-10-15,0
iss_00154,act_004_04,proj_004,Adverse weather halted outdoor work on Waterproofing & Damp Proofing.,weather,critical,open,Site Manager,2022-10-25,0
iss_00155,act_004_04,proj_004,Delivery of Waterproofing & Damp Proofing delayed by supplier.,material_delay,medium,resolved,Site Manager,2022-10-20,0
iss_00156,act_004_04,proj_004,Key equipment broke down mid-task on Waterproofing & Damp Proofing.,equipment_breakdown,low,resolved,Procurement Lead,2022-10-24,0
iss_00157,act_004_04,proj_004,Adverse weather halted outdoor work on Waterproofing & Damp Proofing.,weather,low,resolved,Client PM,2022-10-22,0
iss_00158,act_004_05,proj_004,Client-requested scope change impacts Plumbing Rough-in.,design_change,high,resolved,QA Inspector,2022-10-29,0
iss_00159,act_004_05,proj_004,Municipal inspection failed; rework needed on Plumbing Rough-in.,inspection_fail,medium,resolved,Contractor B,2022-10-27,0
iss_00160,act_004_05,proj_004,Delivery of Plumbing Rough-in delayed by supplier.,material_delay,medium,resolved,Contractor A,2022-10-18,0
iss_00161,act_004_05,proj_004,Undocumented additional work added to Plumbing Rough-in.,scope_creep,critical,open,Client PM,2022-10-21,1
iss_00162,act_004_06,proj_004,Adverse weather halted outdoor work on Electrical Wiring & Conduits.,weather,low,resolved,Safety Officer,2022-11-01,0
iss_00163,act_004_06,proj_004,Client-requested scope change impacts Electrical Wiring & Conduits.,design_change,medium,resolved,Site Manager,2022-10-25,0
iss_00164,act_004_06,proj_004,Insufficient crew available; Electrical Wiring & Conduits understaffed.,labor_shortage,medium,resolved,Project Engineer,2022-10-29,0
iss_00165,act_004_06,proj_004,Key equipment broke down mid-task on Electrical Wiring & Conduits.,equipment_breakdown,medium,resolved,Procurement Lead,2022-10-31,0
iss_00166,act_004_07,proj_004,Adverse weather halted outdoor work on HVAC & Ventilation Installation.,weather,low,open,Site Manager,2022-10-21,1
iss_00167,act_004_07,proj_004,Safety non-compliance flagged during HVAC & Ventilation Installation.,safety,critical,resolved,Site Manager,2022-10-22,0
iss_00168,act_004_07,proj_004,Municipal inspection failed; rework needed on HVAC & Ventilation Installation.,inspection_fail,critical,open,Site Manager,2022-10-28,0
iss_00169,act_004_07,proj_004,Adverse weather halted outdoor work on HVAC & Ventilation Installation.,weather,low,resolved,Project Engineer,2022-10-20,0
iss_00170,act_004_08,proj_004,Safety non-compliance flagged during Floor Leveling & Screed.,safety,low,open,Contractor B,2022-11-06,5
iss_00171,act_004_08,proj_004,Municipal inspection failed; rework needed on Floor Leveling & Screed.,inspection_fail,medium,resolved,Safety Officer,2022-11-10,0
iss_00172,act_004_08,proj_004,Municipal inspection failed; rework needed on Floor Leveling & Screed.,inspection_fail,medium,resolved,QA Inspector,2022-11-10,0
iss_00173,act_004_09,proj_004,Key equipment broke down mid-task on Tiling β Floors & Wet Areas.,equipment_breakdown,critical,resolved,Project Engineer,2022-11-22,0
iss_00174,act_004_09,proj_004,Key equipment broke down mid-task on Tiling β Floors & Wet Areas.,equipment_breakdown,low,resolved,Client PM,2022-11-19,0
iss_00175,act_004_09,proj_004,Client-requested scope change impacts Tiling β Floors & Wet Areas.,design_change,critical,resolved,Procurement Lead,2022-11-27,0
iss_00176,act_004_10,proj_004,Municipal inspection failed; rework needed on Wall Plastering & Screeding.,inspection_fail,high,resolved,QA Inspector,2022-11-09,0
iss_00177,act_004_10,proj_004,Client-requested scope change impacts Wall Plastering & Screeding.,design_change,medium,resolved,Contractor A,2022-11-10,0
iss_00178,act_004_10,proj_004,Adverse weather halted outdoor work on Wall Plastering & Screeding.,weather,high,resolved,Client PM,2022-11-12,0
iss_00179,act_004_11,proj_004,Key equipment broke down mid-task on False Ceiling & Insulation.,equipment_breakdown,low,resolved,Safety Officer,2022-11-27,0
iss_00180,act_004_11,proj_004,Delivery of False Ceiling & Insulation delayed by supplier.,material_delay,low,resolved,QA Inspector,2022-11-23,0
iss_00181,act_004_11,proj_004,Safety non-compliance flagged during False Ceiling & Insulation.,safety,low,open,Safety Officer,2022-11-23,2
iss_00182,act_004_12,proj_004,Safety non-compliance flagged during Painting β Primer & Finish Coats.,safety,low,resolved,Site Manager,2022-12-17,0
iss_00183,act_004_12,proj_004,Safety non-compliance flagged during Painting β Primer & Finish Coats.,safety,low,resolved,Safety Officer,2022-12-09,0
iss_00184,act_004_12,proj_004,Insufficient crew available; Painting β Primer & Finish Coats understaffed.,labor_shortage,medium,resolved,Project Engineer,2022-12-07,0
iss_00185,act_004_13,proj_004,"Municipal inspection failed; rework needed on Carpentry, Joinery & Built-ins.",inspection_fail,high,resolved,Contractor A,2023-01-05,0
iss_00186,act_004_13,proj_004,"Key equipment broke down mid-task on Carpentry, Joinery & Built-ins.",equipment_breakdown,medium,resolved,Project Engineer,2022-12-24,0
iss_00187,act_004_13,proj_004,"Undocumented additional work added to Carpentry, Joinery & Built-ins.",scope_creep,medium,resolved,QA Inspector,2022-12-26,0
iss_00188,act_004_14,proj_004,"Insufficient crew available; Fixtures, Fittings & Sanitaryware understaffed.",labor_shortage,medium,resolved,QA Inspector,2023-01-13,0
iss_00189,act_004_14,proj_004,"Delivery of Fixtures, Fittings & Sanitaryware delayed by supplier.",material_delay,low,resolved,Site Manager,2023-01-17,0
iss_00190,act_004_14,proj_004,"Municipal inspection failed; rework needed on Fixtures, Fittings & Sanitaryware.",inspection_fail,low,resolved,Site Manager,2023-01-18,0
iss_00191,act_004_15,proj_004,"Delivery of Final Inspection, Snag & Handover delayed by supplier.",material_delay,medium,open,Contractor A,2023-01-26,3
iss_00192,act_004_15,proj_004,"Municipal inspection failed; rework needed on Final Inspection, Snag & Handover.",inspection_fail,low,resolved,QA Inspector,2023-01-23,0
iss_00193,act_005_01,proj_005,Safety non-compliance flagged during Site Survey & Mobilization.,safety,medium,open,Procurement Lead,2023-01-08,2
iss_00194,act_005_01,proj_005,Insufficient crew available; Site Survey & Mobilization understaffed.,labor_shortage,high,resolved,Contractor A,2023-01-05,0
iss_00195,act_005_02,proj_005,Client-requested scope change impacts Demolition & Strip-Out.,design_change,low,open,Safety Officer,2023-01-24,0
iss_00196,act_005_02,proj_005,Key equipment broke down mid-task on Demolition & Strip-Out.,equipment_breakdown,low,open,Safety Officer,2023-01-21,5
iss_00197,act_005_02,proj_005,Delivery of Demolition & Strip-Out delayed by supplier.,material_delay,critical,resolved,Client PM,2023-01-13,0
iss_00198,act_005_03,proj_005,Insufficient crew available; Structural Repairs & Reinforcement understaffed.,labor_shortage,low,resolved,Client PM,2023-02-06,0
iss_00199,act_005_03,proj_005,Key equipment broke down mid-task on Structural Repairs & Reinforcement.,equipment_breakdown,low,open,Procurement Lead,2023-01-30,1
iss_00200,act_005_03,proj_005,Adverse weather halted outdoor work on Structural Repairs & Reinforcement.,weather,medium,open,QA Inspector,2023-02-10,4
iss_00201,act_005_03,proj_005,Insufficient crew available; Structural Repairs & Reinforcement understaffed.,labor_shortage,medium,open,Procurement Lead,2023-02-04,3
iss_00202,act_005_04,proj_005,Safety non-compliance flagged during Waterproofing & Damp Proofing.,safety,high,resolved,Contractor A,2023-02-22,0
iss_00203,act_005_04,proj_005,Municipal inspection failed; rework needed on Waterproofing & Damp Proofing.,inspection_fail,high,resolved,Project Engineer,2023-02-21,0
iss_00204,act_005_04,proj_005,Insufficient crew available; Waterproofing & Damp Proofing understaffed.,labor_shortage,low,resolved,Project Engineer,2023-02-18,0
iss_00205,act_005_04,proj_005,Client-requested scope change impacts Waterproofing & Damp Proofing.,design_change,medium,resolved,Procurement Lead,2023-02-19,0
iss_00206,act_005_05,proj_005,Safety non-compliance flagged during Plumbing Rough-in.,safety,low,resolved,Safety Officer,2023-02-28,0
iss_00207,act_005_05,proj_005,Municipal inspection failed; rework needed on Plumbing Rough-in.,inspection_fail,high,resolved,Contractor A,2023-02-18,0
iss_00208,act_005_05,proj_005,Client-requested scope change impacts Plumbing Rough-in.,design_change,critical,resolved,Procurement Lead,2023-03-01,0
iss_00209,act_005_05,proj_005,Client-requested scope change impacts Plumbing Rough-in.,design_change,high,open,QA Inspector,2023-02-18,2
iss_00210,act_005_06,proj_005,Municipal inspection failed; rework needed on Electrical Wiring & Conduits.,inspection_fail,critical,resolved,Contractor A,2023-02-18,0
iss_00211,act_005_06,proj_005,Undocumented additional work added to Electrical Wiring & Conduits.,scope_creep,high,resolved,Project Engineer,2023-02-16,0
iss_00212,act_005_06,proj_005,Undocumented additional work added to Electrical Wiring & Conduits.,scope_creep,low,open,Procurement Lead,2023-02-21,5
iss_00213,act_005_06,proj_005,Municipal inspection failed; rework needed on Electrical Wiring & Conduits.,inspection_fail,low,resolved,Safety Officer,2023-02-22,0
iss_00214,act_005_07,proj_005,Client-requested scope change impacts HVAC & Ventilation Installation.,design_change,low,resolved,Safety Officer,2023-02-16,0
iss_00215,act_005_07,proj_005,Undocumented additional work added to HVAC & Ventilation Installation.,scope_creep,low,open,QA Inspector,2023-02-22,5
iss_00216,act_005_07,proj_005,Client-requested scope change impacts HVAC & Ventilation Installation.,design_change,low,resolved,Client PM,2023-02-24,0
iss_00217,act_005_07,proj_005,Undocumented additional work added to HVAC & Ventilation Installation.,scope_creep,medium,open,Project Engineer,2023-02-17,0
iss_00218,act_005_08,proj_005,Client-requested scope change impacts Floor Leveling & Screed.,design_change,low,resolved,Client PM,2023-03-09,0
iss_00219,act_005_08,proj_005,Insufficient crew available; Floor Leveling & Screed understaffed.,labor_shortage,medium,resolved,QA Inspector,2023-03-12,0
iss_00220,act_005_08,proj_005,Key equipment broke down mid-task on Floor Leveling & Screed.,equipment_breakdown,low,resolved,Client PM,2023-03-13,0
iss_00221,act_005_09,proj_005,Client-requested scope change impacts Tiling β Floors & Wet Areas.,design_change,low,open,Client PM,2023-03-26,5
iss_00222,act_005_09,proj_005,Delivery of Tiling β Floors & Wet Areas delayed by supplier.,material_delay,low,resolved,Procurement Lead,2023-03-26,0
iss_00223,act_005_09,proj_005,Client-requested scope change impacts Tiling β Floors & Wet Areas.,design_change,low,resolved,Contractor B,2023-03-22,0
iss_00224,act_005_10,proj_005,Safety non-compliance flagged during Wall Plastering & Screeding.,safety,high,open,Procurement Lead,2023-03-11,0
iss_00225,act_005_10,proj_005,Safety non-compliance flagged during Wall Plastering & Screeding.,safety,low,resolved,Contractor A,2023-03-07,0
iss_00226,act_005_10,proj_005,Delivery of Wall Plastering & Screeding delayed by supplier.,material_delay,medium,resolved,Site Manager,2023-03-12,0
iss_00227,act_005_11,proj_005,Client-requested scope change impacts False Ceiling & Insulation.,design_change,medium,open,Client PM,2023-03-25,0
iss_00228,act_005_11,proj_005,Adverse weather halted outdoor work on False Ceiling & Insulation.,weather,high,resolved,Contractor A,2023-03-26,0
iss_00229,act_005_11,proj_005,Safety non-compliance flagged during False Ceiling & Insulation.,safety,medium,resolved,Client PM,2023-03-29,0
iss_00230,act_005_12,proj_005,Municipal inspection failed; rework needed on Painting β Primer & Finish Coats.,inspection_fail,medium,open,Client PM,2023-04-13,2
iss_00231,act_005_12,proj_005,Safety non-compliance flagged during Painting β Primer & Finish Coats.,safety,high,resolved,Procurement Lead,2023-04-03,0
iss_00232,act_005_12,proj_005,Municipal inspection failed; rework needed on Painting β Primer & Finish Coats.,inspection_fail,medium,resolved,Site Manager,2023-04-04,0
iss_00233,act_005_13,proj_005,"Key equipment broke down mid-task on Carpentry, Joinery & Built-ins.",equipment_breakdown,high,resolved,Contractor B,2023-04-28,0
iss_00234,act_005_13,proj_005,"Undocumented additional work added to Carpentry, Joinery & Built-ins.",scope_creep,low,resolved,QA Inspector,2023-04-28,0
iss_00235,act_005_13,proj_005,"Client-requested scope change impacts Carpentry, Joinery & Built-ins.",design_change,high,open,Contractor A,2023-04-25,3
iss_00236,act_005_14,proj_005,"Undocumented additional work added to Fixtures, Fittings & Sanitaryware.",scope_creep,critical,resolved,Contractor B,2023-05-08,0
iss_00237,act_005_14,proj_005,"Safety non-compliance flagged during Fixtures, Fittings & Sanitaryware.",safety,high,resolved,QA Inspector,2023-05-08,0
iss_00238,act_005_14,proj_005,"Municipal inspection failed; rework needed on Fixtures, Fittings & Sanitaryware.",inspection_fail,low,resolved,Safety Officer,2023-05-13,0
iss_00239,act_005_15,proj_005,"Insufficient crew available; Final Inspection, Snag & Handover understaffed.",labor_shortage,medium,resolved,Safety Officer,2023-05-19,0
iss_00240,act_005_15,proj_005,"Insufficient crew available; Final Inspection, Snag & Handover understaffed.",labor_shortage,critical,resolved,Contractor B,2023-05-20,0
iss_00241,act_006_01,proj_006,Adverse weather halted outdoor work on Site Survey & Mobilization.,weather,medium,resolved,Contractor B,2023-03-06,0
iss_00242,act_006_01,proj_006,Undocumented additional work added to Site Survey & Mobilization.,scope_creep,low,resolved,Site Manager,2023-03-07,0
iss_00243,act_006_02,proj_006,Delivery of Demolition & Strip-Out delayed by supplier.,material_delay,low,resolved,Contractor A,2023-03-14,0
iss_00244,act_006_02,proj_006,Undocumented additional work added to Demolition & Strip-Out.,scope_creep,medium,resolved,Site Manager,2023-03-14,0
iss_00245,act_006_02,proj_006,Municipal inspection failed; rework needed on Demolition & Strip-Out.,inspection_fail,low,resolved,Contractor B,2023-03-15,0
iss_00246,act_006_03,proj_006,Municipal inspection failed; rework needed on Structural Repairs & Reinforcement.,inspection_fail,low,resolved,QA Inspector,2023-03-29,0
iss_00247,act_006_03,proj_006,Municipal inspection failed; rework needed on Structural Repairs & Reinforcement.,inspection_fail,low,resolved,Safety Officer,2023-04-03,0
iss_00248,act_006_03,proj_006,Key equipment broke down mid-task on Structural Repairs & Reinforcement.,equipment_breakdown,medium,resolved,Contractor A,2023-04-04,0
iss_00249,act_006_03,proj_006,Municipal inspection failed; rework needed on Structural Repairs & Reinforcement.,inspection_fail,medium,open,Safety Officer,2023-03-31,3
iss_00250,act_006_04,proj_006,Client-requested scope change impacts Waterproofing & Damp Proofing.,design_change,low,resolved,Project Engineer,2023-04-22,0
iss_00251,act_006_04,proj_006,Municipal inspection failed; rework needed on Waterproofing & Damp Proofing.,inspection_fail,low,resolved,Procurement Lead,2023-04-20,0
iss_00252,act_006_04,proj_006,Key equipment broke down mid-task on Waterproofing & Damp Proofing.,equipment_breakdown,high,resolved,Contractor A,2023-04-20,0
iss_00253,act_006_04,proj_006,Undocumented additional work added to Waterproofing & Damp Proofing.,scope_creep,medium,resolved,Safety Officer,2023-04-25,0
iss_00254,act_006_05,proj_006,Safety non-compliance flagged during Plumbing Rough-in.,safety,medium,resolved,QA Inspector,2023-04-24,0
iss_00255,act_006_05,proj_006,Delivery of Plumbing Rough-in delayed by supplier.,material_delay,critical,open,Contractor A,2023-04-29,3
iss_00256,act_006_05,proj_006,Adverse weather halted outdoor work on Plumbing Rough-in.,weather,medium,resolved,Project Engineer,2023-04-26,0
iss_00257,act_006_05,proj_006,Safety non-compliance flagged during Plumbing Rough-in.,safety,low,resolved,Client PM,2023-04-17,0
iss_00258,act_006_06,proj_006,Key equipment broke down mid-task on Electrical Wiring & Conduits.,equipment_breakdown,low,resolved,Procurement Lead,2023-04-29,0
iss_00259,act_006_06,proj_006,Undocumented additional work added to Electrical Wiring & Conduits.,scope_creep,high,open,Contractor A,2023-04-22,2
iss_00260,act_006_06,proj_006,Insufficient crew available; Electrical Wiring & Conduits understaffed.,labor_shortage,high,resolved,Safety Officer,2023-04-30,0
iss_00261,act_006_06,proj_006,Delivery of Electrical Wiring & Conduits delayed by supplier.,material_delay,low,resolved,Site Manager,2023-04-28,0
iss_00262,act_006_07,proj_006,Client-requested scope change impacts HVAC & Ventilation Installation.,design_change,medium,resolved,Procurement Lead,2023-04-20,0
iss_00263,act_006_07,proj_006,Client-requested scope change impacts HVAC & Ventilation Installation.,design_change,high,resolved,Contractor B,2023-04-22,0
iss_00264,act_006_07,proj_006,Municipal inspection failed; rework needed on HVAC & Ventilation Installation.,inspection_fail,high,resolved,Procurement Lead,2023-04-27,0
iss_00265,act_006_07,proj_006,Client-requested scope change impacts HVAC & Ventilation Installation.,design_change,low,open,Contractor A,2023-04-26,4
iss_00266,act_006_08,proj_006,Insufficient crew available; Floor Leveling & Screed understaffed.,labor_shortage,low,open,Procurement Lead,2023-05-11,0
iss_00267,act_006_08,proj_006,Delivery of Floor Leveling & Screed delayed by supplier.,material_delay,critical,resolved,Procurement Lead,2023-05-07,0
iss_00268,act_006_08,proj_006,Client-requested scope change impacts Floor Leveling & Screed.,design_change,high,resolved,Procurement Lead,2023-05-14,0
iss_00269,act_006_09,proj_006,Insufficient crew available; Tiling β Floors & Wet Areas understaffed.,labor_shortage,medium,resolved,Contractor B,2023-05-24,0
iss_00270,act_006_09,proj_006,Client-requested scope change impacts Tiling β Floors & Wet Areas.,design_change,low,resolved,Project Engineer,2023-06-04,0
iss_00271,act_006_09,proj_006,Undocumented additional work added to Tiling β Floors & Wet Areas.,scope_creep,low,resolved,Procurement Lead,2023-05-31,0
iss_00272,act_006_10,proj_006,Municipal inspection failed; rework needed on Wall Plastering & Screeding.,inspection_fail,medium,resolved,Contractor A,2023-05-14,0
iss_00273,act_006_10,proj_006,Key equipment broke down mid-task on Wall Plastering & Screeding.,equipment_breakdown,high,open,Procurement Lead,2023-05-08,2
iss_00274,act_006_10,proj_006,Key equipment broke down mid-task on Wall Plastering & Screeding.,equipment_breakdown,low,resolved,Procurement Lead,2023-05-07,0
iss_00275,act_006_11,proj_006,Safety non-compliance flagged during False Ceiling & Insulation.,safety,critical,resolved,Procurement Lead,2023-05-28,0
iss_00276,act_006_11,proj_006,Delivery of False Ceiling & Insulation delayed by supplier.,material_delay,critical,resolved,Project Engineer,2023-05-29,0
iss_00277,act_006_11,proj_006,Key equipment broke down mid-task on False Ceiling & Insulation.,equipment_breakdown,medium,open,Safety Officer,2023-06-02,1
iss_00278,act_006_12,proj_006,Safety non-compliance flagged during Painting β Primer & Finish Coats.,safety,medium,resolved,Contractor B,2023-06-11,0
iss_00279,act_006_12,proj_006,Municipal inspection failed; rework needed on Painting β Primer & Finish Coats.,inspection_fail,critical,open,Procurement Lead,2023-06-13,5
iss_00280,act_006_12,proj_006,Undocumented additional work added to Painting β Primer & Finish Coats.,scope_creep,medium,open,Client PM,2023-06-09,5
iss_00281,act_006_13,proj_006,"Safety non-compliance flagged during Carpentry, Joinery & Built-ins.",safety,medium,resolved,QA Inspector,2023-06-28,0
iss_00282,act_006_13,proj_006,"Delivery of Carpentry, Joinery & Built-ins delayed by supplier.",material_delay,low,resolved,Project Engineer,2023-06-29,0
iss_00283,act_006_13,proj_006,"Insufficient crew available; Carpentry, Joinery & Built-ins understaffed.",labor_shortage,medium,resolved,Safety Officer,2023-07-03,0
iss_00284,act_006_14,proj_006,"Client-requested scope change impacts Fixtures, Fittings & Sanitaryware.",design_change,low,resolved,QA Inspector,2023-07-20,0
iss_00285,act_006_14,proj_006,"Insufficient crew available; Fixtures, Fittings & Sanitaryware understaffed.",labor_shortage,low,resolved,Site Manager,2023-07-15,0
iss_00286,act_006_14,proj_006,"Undocumented additional work added to Fixtures, Fittings & Sanitaryware.",scope_creep,high,resolved,Site Manager,2023-07-16,0
iss_00287,act_006_15,proj_006,"Safety non-compliance flagged during Final Inspection, Snag & Handover.",safety,low,resolved,Contractor B,2023-08-01,0
iss_00288,act_006_15,proj_006,"Client-requested scope change impacts Final Inspection, Snag & Handover.",design_change,low,resolved,Client PM,2023-07-28,0
iss_00289,act_007_01,proj_007,Client-requested scope change impacts Site Survey & Mobilization.,design_change,high,resolved,Project Engineer,2023-06-01,0
iss_00290,act_007_01,proj_007,Delivery of Site Survey & Mobilization delayed by supplier.,material_delay,medium,resolved,Project Engineer,2023-06-01,0
iss_00291,act_007_02,proj_007,Adverse weather halted outdoor work on Demolition & Strip-Out.,weather,high,resolved,QA Inspector,2023-06-19,0
iss_00292,act_007_02,proj_007,Insufficient crew available; Demolition & Strip-Out understaffed.,labor_shortage,medium,resolved,Procurement Lead,2023-06-13,0
iss_00293,act_007_02,proj_007,Client-requested scope change impacts Demolition & Strip-Out.,design_change,medium,resolved,Safety Officer,2023-06-15,0
iss_00294,act_007_03,proj_007,Adverse weather halted outdoor work on Structural Repairs & Reinforcement.,weather,high,resolved,QA Inspector,2023-07-01,0
iss_00295,act_007_03,proj_007,Insufficient crew available; Structural Repairs & Reinforcement understaffed.,labor_shortage,low,resolved,Contractor A,2023-07-02,0
iss_00296,act_007_03,proj_007,Undocumented additional work added to Structural Repairs & Reinforcement.,scope_creep,low,resolved,Safety Officer,2023-06-29,0
iss_00297,act_007_03,proj_007,Client-requested scope change impacts Structural Repairs & Reinforcement.,design_change,high,resolved,Client PM,2023-07-11,0
iss_00298,act_007_04,proj_007,Safety non-compliance flagged during Waterproofing & Damp Proofing.,safety,low,resolved,Client PM,2023-07-23,0
iss_00299,act_007_04,proj_007,Client-requested scope change impacts Waterproofing & Damp Proofing.,design_change,high,resolved,Client PM,2023-07-28,0
iss_00300,act_007_04,proj_007,Delivery of Waterproofing & Damp Proofing delayed by supplier.,material_delay,medium,resolved,Procurement Lead,2023-07-26,0
iss_00301,act_007_04,proj_007,Delivery of Waterproofing & Damp Proofing delayed by supplier.,material_delay,low,resolved,Project Engineer,2023-07-27,0
iss_00302,act_007_05,proj_007,Delivery of Plumbing Rough-in delayed by supplier.,material_delay,low,resolved,Safety Officer,2023-08-02,0
iss_00303,act_007_05,proj_007,Delivery of Plumbing Rough-in delayed by supplier.,material_delay,low,open,Site Manager,2023-07-26,4
iss_00304,act_007_05,proj_007,Insufficient crew available; Plumbing Rough-in understaffed.,labor_shortage,critical,resolved,Contractor A,2023-07-29,0
iss_00305,act_007_05,proj_007,Undocumented additional work added to Plumbing Rough-in.,scope_creep,critical,resolved,Site Manager,2023-07-22,0
iss_00306,act_007_06,proj_007,Delivery of Electrical Wiring & Conduits delayed by supplier.,material_delay,medium,open,QA Inspector,2023-07-29,2
iss_00307,act_007_06,proj_007,Municipal inspection failed; rework needed on Electrical Wiring & Conduits.,inspection_fail,high,resolved,Project Engineer,2023-07-22,0
iss_00308,act_007_06,proj_007,Delivery of Electrical Wiring & Conduits delayed by supplier.,material_delay,low,resolved,Project Engineer,2023-07-30,0
iss_00309,act_007_06,proj_007,Key equipment broke down mid-task on Electrical Wiring & Conduits.,equipment_breakdown,medium,resolved,Procurement Lead,2023-07-22,0
iss_00310,act_007_07,proj_007,Key equipment broke down mid-task on HVAC & Ventilation Installation.,equipment_breakdown,high,resolved,QA Inspector,2023-07-27,0
iss_00311,act_007_07,proj_007,Adverse weather halted outdoor work on HVAC & Ventilation Installation.,weather,low,open,Safety Officer,2023-07-26,4
iss_00312,act_007_07,proj_007,Client-requested scope change impacts HVAC & Ventilation Installation.,design_change,medium,resolved,Project Engineer,2023-07-24,0
iss_00313,act_007_07,proj_007,Insufficient crew available; HVAC & Ventilation Installation understaffed.,labor_shortage,medium,open,Site Manager,2023-07-21,5
iss_00314,act_007_08,proj_007,Client-requested scope change impacts Floor Leveling & Screed.,design_change,high,open,Procurement Lead,2023-08-09,1
iss_00315,act_007_08,proj_007,Municipal inspection failed; rework needed on Floor Leveling & Screed.,inspection_fail,low,resolved,Project Engineer,2023-08-11,0
iss_00316,act_007_08,proj_007,Adverse weather halted outdoor work on Floor Leveling & Screed.,weather,medium,resolved,Contractor A,2023-08-08,0
iss_00317,act_007_09,proj_007,Insufficient crew available; Tiling β Floors & Wet Areas understaffed.,labor_shortage,low,resolved,Procurement Lead,2023-08-31,0
iss_00318,act_007_09,proj_007,Client-requested scope change impacts Tiling β Floors & Wet Areas.,design_change,medium,resolved,Safety Officer,2023-09-06,0
iss_00319,act_007_09,proj_007,Municipal inspection failed; rework needed on Tiling β Floors & Wet Areas.,inspection_fail,high,open,Safety Officer,2023-09-06,2
iss_00320,act_007_10,proj_007,Insufficient crew available; Wall Plastering & Screeding understaffed.,labor_shortage,low,resolved,Procurement Lead,2023-08-16,0
iss_00321,act_007_10,proj_007,Insufficient crew available; Wall Plastering & Screeding understaffed.,labor_shortage,low,open,Project Engineer,2023-08-16,4
iss_00322,act_007_10,proj_007,Client-requested scope change impacts Wall Plastering & Screeding.,design_change,low,resolved,Contractor B,2023-08-12,0
iss_00323,act_007_11,proj_007,Client-requested scope change impacts False Ceiling & Insulation.,design_change,medium,resolved,Procurement Lead,2023-08-29,0
iss_00324,act_007_11,proj_007,Delivery of False Ceiling & Insulation delayed by supplier.,material_delay,medium,open,QA Inspector,2023-09-01,2
iss_00325,act_007_11,proj_007,Insufficient crew available; False Ceiling & Insulation understaffed.,labor_shortage,low,resolved,QA Inspector,2023-09-04,0
iss_00326,act_007_12,proj_007,Delivery of Painting β Primer & Finish Coats delayed by supplier.,material_delay,high,resolved,Site Manager,2023-09-14,0
iss_00327,act_007_12,proj_007,Client-requested scope change impacts Painting β Primer & Finish Coats.,design_change,medium,resolved,Site Manager,2023-09-21,0
iss_00328,act_007_12,proj_007,Municipal inspection failed; rework needed on Painting β Primer & Finish Coats.,inspection_fail,low,resolved,Site Manager,2023-09-20,0
iss_00329,act_007_13,proj_007,"Safety non-compliance flagged during Carpentry, Joinery & Built-ins.",safety,critical,resolved,Project Engineer,2023-10-01,0
iss_00330,act_007_13,proj_007,"Safety non-compliance flagged during Carpentry, Joinery & Built-ins.",safety,high,resolved,QA Inspector,2023-10-02,0
iss_00331,act_007_13,proj_007,"Insufficient crew available; Carpentry, Joinery & Built-ins understaffed.",labor_shortage,medium,resolved,Client PM,2023-10-15,0
iss_00332,act_007_14,proj_007,"Key equipment broke down mid-task on Fixtures, Fittings & Sanitaryware.",equipment_breakdown,medium,resolved,Client PM,2023-10-21,0
iss_00333,act_007_14,proj_007,"Key equipment broke down mid-task on Fixtures, Fittings & Sanitaryware.",equipment_breakdown,medium,resolved,Project Engineer,2023-10-21,0
iss_00334,act_007_14,proj_007,"Delivery of Fixtures, Fittings & Sanitaryware delayed by supplier.",material_delay,low,resolved,Client PM,2023-10-20,0
iss_00335,act_007_15,proj_007,"Client-requested scope change impacts Final Inspection, Snag & Handover.",design_change,high,resolved,QA Inspector,2023-11-02,0
iss_00336,act_007_15,proj_007,"Municipal inspection failed; rework needed on Final Inspection, Snag & Handover.",inspection_fail,medium,resolved,Site Manager,2023-11-02,0
iss_00337,act_008_01,proj_008,Municipal inspection failed; rework needed on Site Survey & Mobilization.,inspection_fail,medium,open,Contractor B,2024-01-21,2
iss_00338,act_008_01,proj_008,Undocumented additional work added to Site Survey & Mobilization.,scope_creep,low,open,Safety Officer,2024-01-21,0
iss_00339,act_008_02,proj_008,Client-requested scope change impacts Demolition & Strip-Out.,design_change,medium,resolved,Contractor A,2024-02-03,0
iss_00340,act_008_02,proj_008,Safety non-compliance flagged during Demolition & Strip-Out.,safety,critical,open,Client PM,2024-02-03,2
iss_00341,act_008_02,proj_008,Undocumented additional work added to Demolition & Strip-Out.,scope_creep,low,resolved,Contractor B,2024-02-08,0
iss_00342,act_008_03,proj_008,Delivery of Structural Repairs & Reinforcement delayed by supplier.,material_delay,low,resolved,Contractor B,2024-02-29,0
iss_00343,act_008_03,proj_008,Undocumented additional work added to Structural Repairs & Reinforcement.,scope_creep,medium,open,Project Engineer,2024-02-14,5
iss_00344,act_008_03,proj_008,Municipal inspection failed; rework needed on Structural Repairs & Reinforcement.,inspection_fail,critical,open,Site Manager,2024-02-20,2
iss_00345,act_008_03,proj_008,Safety non-compliance flagged during Structural Repairs & Reinforcement.,safety,low,open,Contractor A,2024-02-20,0
iss_00346,act_008_04,proj_008,Client-requested scope change impacts Waterproofing & Damp Proofing.,design_change,medium,open,QA Inspector,2024-03-04,5
iss_00347,act_008_04,proj_008,Key equipment broke down mid-task on Waterproofing & Damp Proofing.,equipment_breakdown,high,open,Safety Officer,2024-03-08,2
iss_00348,act_008_04,proj_008,Key equipment broke down mid-task on Waterproofing & Damp Proofing.,equipment_breakdown,high,open,Site Manager,2024-03-05,2
iss_00349,act_008_04,proj_008,Safety non-compliance flagged during Waterproofing & Damp Proofing.,safety,low,resolved,Site Manager,2024-03-04,0
iss_00350,act_008_05,proj_008,Client-requested scope change impacts Plumbing Rough-in.,design_change,high,open,Safety Officer,2024-03-07,5
iss_00351,act_008_05,proj_008,Key equipment broke down mid-task on Plumbing Rough-in.,equipment_breakdown,high,open,Contractor B,2024-03-10,5
iss_00352,act_008_05,proj_008,Insufficient crew available; Plumbing Rough-in understaffed.,labor_shortage,critical,resolved,Project Engineer,2024-03-13,0
iss_00353,act_008_05,proj_008,Key equipment broke down mid-task on Plumbing Rough-in.,equipment_breakdown,medium,open,Site Manager,2024-03-13,4
iss_00354,act_008_06,proj_008,Undocumented additional work added to Electrical Wiring & Conduits.,scope_creep,medium,open,Client PM,2024-03-07,2
iss_00355,act_008_06,proj_008,Municipal inspection failed; rework needed on Electrical Wiring & Conduits.,inspection_fail,critical,open,Project Engineer,2024-03-11,2
iss_00356,act_008_06,proj_008,Safety non-compliance flagged during Electrical Wiring & Conduits.,safety,high,open,Procurement Lead,2024-03-15,1
iss_00357,act_008_06,proj_008,Key equipment broke down mid-task on Electrical Wiring & Conduits.,equipment_breakdown,medium,open,Contractor A,2024-03-09,4
iss_00358,act_008_07,proj_008,Undocumented additional work added to HVAC & Ventilation Installation.,scope_creep,medium,open,Project Engineer,2024-03-14,3
iss_00359,act_008_07,proj_008,Adverse weather halted outdoor work on HVAC & Ventilation Installation.,weather,critical,open,Contractor B,2024-03-14,3
iss_00360,act_008_07,proj_008,Municipal inspection failed; rework needed on HVAC & Ventilation Installation.,inspection_fail,high,open,Contractor A,2024-03-11,0
iss_00361,act_008_07,proj_008,Key equipment broke down mid-task on HVAC & Ventilation Installation.,equipment_breakdown,medium,open,Project Engineer,2024-03-07,3
iss_00362,act_008_08,proj_008,Undocumented additional work added to Floor Leveling & Screed.,scope_creep,low,open,Procurement Lead,2024-03-22,2
iss_00363,act_008_08,proj_008,Adverse weather halted outdoor work on Floor Leveling & Screed.,weather,high,resolved,Site Manager,2024-03-23,0
iss_00364,act_008_08,proj_008,Insufficient crew available; Floor Leveling & Screed understaffed.,labor_shortage,low,resolved,QA Inspector,2024-03-27,0
iss_00365,act_008_09,proj_008,Safety non-compliance flagged during Tiling β Floors & Wet Areas.,safety,low,resolved,Project Engineer,2024-04-10,0
iss_00366,act_008_09,proj_008,Insufficient crew available; Tiling β Floors & Wet Areas understaffed.,labor_shortage,medium,resolved,Safety Officer,2024-04-04,0
iss_00367,act_008_09,proj_008,Delivery of Tiling β Floors & Wet Areas delayed by supplier.,material_delay,low,resolved,Procurement Lead,2024-04-14,0
iss_00368,act_009_01,proj_009,Undocumented additional work added to Site Survey & Mobilization.,scope_creep,high,open,Contractor B,2024-03-06,3
iss_00369,act_009_01,proj_009,Adverse weather halted outdoor work on Site Survey & Mobilization.,weather,high,resolved,Contractor A,2024-03-02,0
iss_00370,act_009_02,proj_009,Delivery of Demolition & Strip-Out delayed by supplier.,material_delay,medium,open,Procurement Lead,2024-03-16,5
iss_00371,act_009_02,proj_009,Safety non-compliance flagged during Demolition & Strip-Out.,safety,medium,open,Client PM,2024-03-11,4
iss_00372,act_009_02,proj_009,Client-requested scope change impacts Demolition & Strip-Out.,design_change,low,open,QA Inspector,2024-03-14,4
iss_00373,act_009_03,proj_009,Safety non-compliance flagged during Structural Repairs & Reinforcement.,safety,medium,resolved,Contractor B,2024-03-24,0
iss_00374,act_009_03,proj_009,Client-requested scope change impacts Structural Repairs & Reinforcement.,design_change,medium,open,Safety Officer,2024-03-26,4
iss_00375,act_009_03,proj_009,Safety non-compliance flagged during Structural Repairs & Reinforcement.,safety,low,open,Procurement Lead,2024-04-06,2
iss_00376,act_009_03,proj_009,Client-requested scope change impacts Structural Repairs & Reinforcement.,design_change,high,open,Contractor A,2024-03-30,2
iss_00377,act_009_04,proj_009,Municipal inspection failed; rework needed on Waterproofing & Damp Proofing.,inspection_fail,low,open,Contractor B,2024-04-12,4
iss_00378,act_009_04,proj_009,Delivery of Waterproofing & Damp Proofing delayed by supplier.,material_delay,critical,open,Site Manager,2024-04-19,1
iss_00379,act_009_04,proj_009,Delivery of Waterproofing & Damp Proofing delayed by supplier.,material_delay,medium,open,QA Inspector,2024-04-19,4
iss_00380,act_009_04,proj_009,Adverse weather halted outdoor work on Waterproofing & Damp Proofing.,weather,high,open,Contractor A,2024-04-19,0
iss_00381,act_009_05,proj_009,Key equipment broke down mid-task on Plumbing Rough-in.,equipment_breakdown,medium,open,Client PM,2024-04-23,1
iss_00382,act_009_05,proj_009,Insufficient crew available; Plumbing Rough-in understaffed.,labor_shortage,critical,resolved,Project Engineer,2024-04-23,0
iss_00383,act_009_05,proj_009,Insufficient crew available; Plumbing Rough-in understaffed.,labor_shortage,medium,open,Procurement Lead,2024-04-22,2
iss_00384,act_009_05,proj_009,Insufficient crew available; Plumbing Rough-in understaffed.,labor_shortage,high,open,QA Inspector,2024-04-13,0
iss_00385,act_009_06,proj_009,Safety non-compliance flagged during Electrical Wiring & Conduits.,safety,low,resolved,Site Manager,2024-04-22,0
iss_00386,act_009_06,proj_009,Delivery of Electrical Wiring & Conduits delayed by supplier.,material_delay,low,resolved,Project Engineer,2024-04-22,0
iss_00387,act_009_06,proj_009,Client-requested scope change impacts Electrical Wiring & Conduits.,design_change,low,open,Procurement Lead,2024-04-16,1
iss_00388,act_009_06,proj_009,Adverse weather halted outdoor work on Electrical Wiring & Conduits.,weather,low,resolved,Project Engineer,2024-04-12,0
iss_00389,act_009_07,proj_009,Key equipment broke down mid-task on HVAC & Ventilation Installation.,equipment_breakdown,low,resolved,Project Engineer,2024-04-18,0
iss_00390,act_009_07,proj_009,Delivery of HVAC & Ventilation Installation delayed by supplier.,material_delay,medium,open,Project Engineer,2024-04-21,3
iss_00391,act_009_07,proj_009,Undocumented additional work added to HVAC & Ventilation Installation.,scope_creep,medium,resolved,Client PM,2024-04-19,0
iss_00392,act_009_07,proj_009,Municipal inspection failed; rework needed on HVAC & Ventilation Installation.,inspection_fail,medium,open,QA Inspector,2024-04-25,5
iss_00393,act_009_08,proj_009,Safety non-compliance flagged during Floor Leveling & Screed.,safety,medium,open,Contractor A,2024-05-03,1
iss_00394,act_009_08,proj_009,Key equipment broke down mid-task on Floor Leveling & Screed.,equipment_breakdown,critical,open,QA Inspector,2024-04-30,5
iss_00395,act_009_08,proj_009,Adverse weather halted outdoor work on Floor Leveling & Screed.,weather,medium,open,Safety Officer,2024-05-05,0
|