function-gemma / training_data_manual_curated.csv
talha970's picture
Training in progress, epoch 1
bac5fb1 verified
"mark this open we're pulling the old carpet in room 305",edit_task,"{""title"":""Replace carpet in office"",""location"":""room 305"",""status"":""open""}"
"ray is taking the electrical rough in in parking garage level 1 this is electrical work make it critical done by may 18 crew of 2 budget 20000 mark complete",edit_task,"{""title"":""Run electrical rough-in"",""location"":""parking garage level 1"",""category"":""electrical"",""assignee"":""Ray"",""status"":""complete"",""end_date"":""2026-05-18"",""priority"":""p1"",""manpower"":""2"",""cost"":""20000""}"
"put 2 workers on it",edit_task,"{""manpower"":""2""}"
"jake is leading the concrete pour on the roof deck start may 6 finish wednesday cost 8000 need 10 guys mark it closed",edit_task,"{""title"":""Pour concrete slab"",""location"":""roof deck"",""assignee"":""Jake"",""status"":""closed"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06"",""manpower"":""10"",""cost"":""8000""}"
"gotta get the low voltage cabling done by may 7 crew of 1 should be enough make it medium priority and assign tony",edit_task,"{""title"":""Install low voltage cabling"",""assignee"":""Tony"",""end_date"":""2026-05-07"",""priority"":""p2"",""manpower"":""1""}"
"replace the broken faucet on level 4 put zack on it make it urgent and get it done by end of month",edit_task,"{""title"":""Replace broken plumbing fixture"",""location"":""level 4"",""assignee"":""Zack"",""end_date"":""2026-05-29"",""priority"":""p1""}"
"carpet replacement in suite 4b on s1 starts next tuesday wraps up wednesday crew of 2 cost is 5000 make it flooring",edit_task,"{""title"":""Replace carpet in office"",""plan"":""S-1"",""location"":""suite 4B"",""category"":""flooring"",""start_date"":""2026-05-12"",""end_date"":""2026-05-13"",""manpower"":""2"",""cost"":""5000""}"
"running sprinkler heads in the boiler room on structural s2 mark it low priority due next friday",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""structural S2"",""location"":""boiler room"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"exhaust fan needs replacing in room 412 budget is about 6000 this is hvac work assign hector",edit_task,"{""title"":""Replace exhaust fan"",""location"":""room 412"",""category"":""HVAC"",""assignee"":""Hector"",""cost"":""6000""}"
"need to repair the roof membrane on s1 put luis on it medium priority by end of next week crew of 2 budget 10000 checklist locate the breach clean and dry the area apply primer cut patch membrane adhere patch",edit_task,"{""title"":""Repair roof membrane"",""plan"":""S-1"",""assignee"":""Luis"",""end_date"":""2026-05-15"",""priority"":""p2"",""manpower"":""2"",""cost"":""10000"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""cut patch membrane"",""adhere patch""]}"
"water leaking from the pipes under the sink in bay 4 budget is about 5000 assign dave",edit_task,"{""title"":""Fix water leak under sink"",""location"":""bay 4"",""assignee"":""Dave"",""cost"":""5000""}"
"we're scheduling the electrical panel fix for room 201 on s1 need team of 6 starting may 4 through may 9 ballpark cost 5000",edit_task,"{""title"":""Fix electrical panel issue"",""plan"":""S-1"",""location"":""room 201"",""start_date"":""2026-05-04"",""end_date"":""2026-05-09"",""manpower"":""6"",""cost"":""5000""}"
"we got a roof membrane leak assign it to pat two person job should cost around 3500 start wednesday end thursday checklist locate the breach clean and dry the area apply primer cut patch membrane final walkthrough with the gc",edit_task,"{""title"":""Repair roof membrane"",""assignee"":""Pat"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""2"",""cost"":""3500"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""cut patch membrane"",""final walkthrough with the GC""]}"
"luis is taking the attic insulation job on e1 budget around 2500 mark it closed",edit_task,"{""title"":""Insulate attic space"",""plan"":""E1"",""assignee"":""Luis"",""status"":""closed"",""cost"":""2500""}"
"concrete pour for the foundation in bay 12 on fp2 gc wants it done by end of month put jake on it with 6 workers budget around 6000 make it priority two category concrete",edit_task,"{""title"":""Pour concrete slab"",""plan"":""FP-2"",""location"":""bay 12"",""category"":""concrete"",""assignee"":""Jake"",""end_date"":""2026-05-29"",""priority"":""p2"",""manpower"":""6"",""cost"":""6000""}"
"the toilet is cracked in the mezzanine on a301 get it replaced by next friday put sal on it with a team of 10 budget around 15000 make it priority two category plumbing",edit_task,"{""title"":""Replace broken plumbing fixture"",""plan"":""A301"",""location"":""mezzanine"",""category"":""plumbing"",""assignee"":""Sal"",""end_date"":""2026-05-15"",""priority"":""p2"",""manpower"":""10"",""cost"":""15000""}"
"doing the electrical rough in in the mezzanine on p4 mark it pending inspection tony is handling it due friday checklist pull permits mark box locations per plan drill studs request rough in inspection",edit_task,"{""title"":""Run electrical rough-in"",""plan"":""P4"",""location"":""mezzanine"",""assignee"":""Tony"",""status"":""pending inspection"",""end_date"":""2026-05-08"",""items"":[""pull permits"",""mark box locations per plan"",""drill studs"",""request rough-in inspection""]}"
"pouring the slab in the loading dock on fp3 mark it pending inspection dave is handling it due may 5 checklist set forms place rebar order concrete strip forms after cure",edit_task,"{""title"":""Pour concrete slab"",""plan"":""FP-3"",""location"":""loading dock"",""assignee"":""Dave"",""status"":""pending inspection"",""end_date"":""2026-05-05"",""items"":[""set forms"",""place rebar"",""order concrete"",""strip forms after cure""]}"
"new pull station needs install in the loading dock budget is about 1500 this is fire alarm work assign maria",edit_task,"{""title"":""Install fire alarm pull station"",""location"":""loading dock"",""category"":""fire alarm"",""assignee"":""Maria"",""cost"":""1500""}"
"drywall damage on the ceiling in the courtyard budget is about 10000 assign hector",edit_task,"{""title"":""Patch drywall ceiling"",""location"":""courtyard"",""assignee"":""Hector"",""cost"":""10000""}"
"set cost to 5000 manpower to 10 and category to insulation",edit_task,"{""category"":""insulation"",""manpower"":""10"",""cost"":""5000""}"
"update the name to fix cracked concrete",edit_task,"{""title"":""Fix cracked concrete""}"
"tearing down the partition wall in unit 12 on the ground floor mark it on hold troy is handling it due wednesday checklist verify no electrical or plumbing in wall shut off circuits remove door patch floor",edit_task,"{""title"":""Demolish interior partition"",""plan"":""ground floor"",""location"":""unit 12"",""assignee"":""Troy"",""status"":""on hold"",""end_date"":""2026-05-06"",""items"":[""verify no electrical or plumbing in wall"",""shut off circuits"",""remove door"",""patch floor""]}"
"water getting through the roof membrane assign it to tony crew of 3 should cost around 2000 start next tuesday finish friday checklist locate the breach clean and dry the area apply primer cut patch membrane final walkthrough with the gc",edit_task,"{""title"":""Repair roof membrane"",""assignee"":""Tony"",""start_date"":""2026-05-12"",""end_date"":""2026-05-15"",""manpower"":""3"",""cost"":""2000"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""cut patch membrane"",""final walkthrough with the GC""]}"
"exterior caulking is failing in parking garage level 1 on s2 mark it pending inspection tony is handling it checklist remove old caulk clean and dry joint apply backer rod inspect full perimeter",edit_task,"{""title"":""Install exterior caulking"",""plan"":""S-2"",""location"":""parking garage level 1"",""assignee"":""Tony"",""status"":""pending inspection"",""items"":[""remove old caulk"",""clean and dry joint"",""apply backer rod"",""inspect full perimeter""]}"
"breaker keeps tripping in the east wing budget is about 6000 assign vic",edit_task,"{""title"":""Fix electrical panel issue"",""location"":""east wing"",""assignee"":""Vic"",""cost"":""6000""}"
"new wall needs to be framed assign that to juan low priority end of next week is fine",edit_task,"{""title"":""Frame new partition wall"",""assignee"":""Juan"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"we're scheduling the electrical panel fix for grid line b2 on mep1 need 1 worker starting may 4 through friday ballpark cost 10000",edit_task,"{""title"":""Fix electrical panel issue"",""plan"":""MEP-1"",""location"":""grid line B2"",""start_date"":""2026-05-04"",""end_date"":""2026-05-08"",""manpower"":""1"",""cost"":""10000""}"
"gotta get the drywall ceiling patched by friday team of 1 should be enough make it asap and assign danny",edit_task,"{""title"":""Patch drywall ceiling"",""assignee"":""Danny"",""end_date"":""2026-05-08"",""priority"":""p1"",""manpower"":""1""}"
"nadia is taking the broken glass panel in the penthouse level this is glazing work urgent done by end of month manpower team of 1 budget about 7000 mark closed",edit_task,"{""title"":""Replace broken window glazing"",""location"":""penthouse level"",""category"":""glazing"",""assignee"":""Nadia"",""status"":""closed"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""1"",""cost"":""7000""}"
"roughing in the electrical for the new space in level 3 on sheet 9 mark it needs review reza is handling it due friday checklist pull permits mark box locations per plan drill studs request rough in inspection",edit_task,"{""title"":""Run electrical rough-in"",""plan"":""Sheet 9"",""location"":""level 3"",""assignee"":""Reza"",""status"":""needs review"",""end_date"":""2026-05-08"",""items"":[""pull permits"",""mark box locations per plan"",""drill studs"",""request rough-in inspection""]}"
"gotta get carpet replacement done in suite 4b down in the south corridor by friday not super urgent",edit_task,"{""title"":""Replace carpet in office"",""location"":""suite 4B south corridor"",""end_date"":""2026-05-08"",""priority"":""p3""}"
"we're putting in a drop ceiling on fp2 bobby is on this bump it to p1 before the owner review",edit_task,"{""title"":""Install ceiling grid and tiles"",""plan"":""FP-2"",""assignee"":""Bobby"",""priority"":""p1""}"
"installing the suspended ceiling grid in the mechanical room put mike on this one needs to be wrapped up by next friday it's low priority checklist snap layout lines install wall angle hang main tees install cross tees cut perimeter tiles take a photo for the record",edit_task,"{""title"":""Install ceiling grid and tiles"",""location"":""mechanical room"",""assignee"":""Mike"",""end_date"":""2026-05-15"",""priority"":""p3"",""items"":[""snap layout lines"",""install wall angle"",""hang main tees"",""install cross tees"",""cut perimeter tiles"",""take a photo for the record""]}"
"nadia and a team of 1 are blowing insulation in the attic in the west wing category is insulation budget about 6000 need it by end of month checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth document everything",edit_task,"{""title"":""Insulate attic space"",""location"":""west wing"",""category"":""insulation"",""assignee"":""Nadia"",""manpower"":""1"",""cost"":""6000"",""end_date"":""2026-05-29"",""items"":[""check existing R-value"",""seal air leaks"",""install baffles at eaves"",""blow insulation to target depth"",""document everything""]}"
"this one is the attic insulation job on id101 mark it medium priority brenda handles it by next tuesday budget around 6000 location is level 2 category insulation",edit_task,"{""title"":""Insulate attic space"",""plan"":""ID-101"",""location"":""level 2"",""category"":""insulation"",""assignee"":""Brenda"",""end_date"":""2026-05-12"",""priority"":""p2"",""cost"":""6000""}"
"we're dealing with a leak under the sink on a101 carlos is on this make it low by next tuesday",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""A101"",""assignee"":""Carlos"",""end_date"":""2026-05-12"",""priority"":""p3""}"
"we're painting the exterior facade on sheet 4 in basement level 2 starting next tuesday wrapping the same day crew of 2 cost 3500 category painting dave is lead checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat roll second coat",edit_task,"{""title"":""Paint exterior facade"",""plan"":""Sheet 4"",""location"":""basement level 2"",""category"":""painting"",""assignee"":""Dave"",""start_date"":""2026-05-12"",""end_date"":""2026-05-12"",""manpower"":""2"",""cost"":""3500"",""items"":[""pressure wash surface"",""scrape loose paint"",""apply primer"",""caulk gaps and cracks"",""roll first coat"",""roll second coat""]}"
"install sprinkler heads on s2 put troy on it priority two by end of month 4 workers budget about 7000 checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""S-2"",""assignee"":""Troy"",""end_date"":""2026-05-29"",""priority"":""p2"",""manpower"":""4"",""cost"":""7000"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""pressure test""]}"
"change category to plumbing and mark it closed",edit_task,"{""category"":""plumbing"",""status"":""closed""}"
"put kim and a team of 3 on the new wall framing this is framing work starts may 3 done by thursday",edit_task,"{""title"":""Frame new partition wall"",""category"":""framing"",""assignee"":""Kim"",""start_date"":""2026-05-03"",""end_date"":""2026-05-07"",""manpower"":""3""}"
"it's in the cafeteria and status is verified",edit_task,"{""location"":""cafeteria"",""status"":""verified""}"
"we need to swap out the old hvac in the basement put steve on it needs to be wrapped up by next tuesday it's urgent checklist shut down power to unit remove old unit install new unit check refrigerant lines test thermostat take a photo for the record",edit_task,"{""title"":""Replace broken HVAC unit"",""location"":""basement"",""assignee"":""Steve"",""end_date"":""2026-05-12"",""priority"":""p1"",""items"":[""shut down power to unit"",""remove old unit"",""install new unit"",""check refrigerant lines"",""test thermostat"",""take a photo for the record""]}"
"materials came out to about 2000",edit_task,"{""cost"":""2000""}"
"we're scheduling a window glazing replacement in the basement on the roof level plan need a team of 8 through may 11 ballpark cost 2000",edit_task,"{""title"":""Replace broken window glazing"",""plan"":""roof level"",""location"":""basement"",""end_date"":""2026-05-11"",""manpower"":""8"",""cost"":""2000""}"
"zack is taking the concrete pour in room 201 this is concrete work low priority done by wednesday manpower crew of 5 budget 12000 mark in progress",edit_task,"{""title"":""Pour concrete slab"",""location"":""room 201"",""category"":""concrete"",""assignee"":""Zack"",""status"":""in progress"",""end_date"":""2026-05-06"",""priority"":""p3"",""manpower"":""5"",""cost"":""12000""}"
"vic is taking the data and av cabling in mechanical room level 3 this is low voltage work medium priority done by next friday manpower 2 guys budget 15000 mark on hold",edit_task,"{""title"":""Install low voltage cabling"",""location"":""mechanical room level 3"",""category"":""low voltage"",""assignee"":""Vic"",""status"":""on hold"",""end_date"":""2026-05-15"",""priority"":""p2"",""manpower"":""2"",""cost"":""15000""}"
"move this to s2 and set location to elevator shaft b",edit_task,"{""plan"":""S-2"",""location"":""elevator shaft B""}"
"maria and a team of 1 are on the concrete pour in stairwell c category is concrete budget 20000 need it by may 11 checklist set forms place rebar order concrete pour slab document everything",edit_task,"{""title"":""Pour concrete slab"",""location"":""stairwell C"",""category"":""concrete"",""assignee"":""Maria"",""end_date"":""2026-05-11"",""manpower"":""1"",""cost"":""20000"",""items"":[""set forms"",""place rebar"",""order concrete"",""pour slab"",""document everything""]}"
"change the category to glazing put it on sheet 9 and set status to verified",edit_task,"{""plan"":""Sheet 9"",""category"":""glazing"",""status"":""verified""}"
"put this in bobby's queue",edit_task,"{""assignee"":""Bobby""}"
"this goes on civil sheet 3",edit_task,"{""plan"":""civil sheet 3""}"
"we're knocking out the old partition on a4 juan is on this make it critical by may 6",edit_task,"{""title"":""Demolish interior partition"",""plan"":""A-4"",""assignee"":""Juan"",""end_date"":""2026-05-06"",""priority"":""p1""}"
"need drywall damage on the ceiling in exterior facade east put eddie on it should be done by wednesday cost around 7000",edit_task,"{""title"":""Patch drywall ceiling"",""location"":""exterior facade east"",""assignee"":""Eddie"",""end_date"":""2026-05-06"",""cost"":""7000""}"
"kick off may 6",edit_task,"{""start_date"":""2026-05-06""}"
"running low voltage cable in the break room floor 2 on sheet 9 put hector on it with a team of 10 budget 2500 make it urgent category low voltage",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""Sheet 9"",""location"":""break room floor 2"",""category"":""low voltage"",""assignee"":""Hector"",""priority"":""p1"",""manpower"":""10"",""cost"":""2500""}"
"install sprinkler heads on structural s2 put felix on it urgent by end of month 3 workers budget about 7000 checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""structural S2"",""assignee"":""Felix"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""3"",""cost"":""7000"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""pressure test""]}"
"omar is taking the busted window pane replacement over on p2 budget about 20000 mark it open",edit_task,"{""title"":""Replace broken window glazing"",""plan"":""P-2"",""assignee"":""Omar"",""status"":""open"",""cost"":""20000""}"
"something's wrong with the electrical panel in the penthouse level put carlos on it needs to be wrapped up by may 11 priority two checklist identify tripped breaker check load on circuit inspect wiring connections replace breaker if faulty test under load take a photo for the record",edit_task,"{""title"":""Fix electrical panel issue"",""location"":""penthouse level"",""assignee"":""Carlos"",""end_date"":""2026-05-11"",""priority"":""p2"",""items"":[""identify tripped breaker"",""check load on circuit"",""inspect wiring connections"",""replace breaker if faulty"",""test under load"",""take a photo for the record""]}"
"painting the exterior facade on sheet 4 starts tomorrow wraps up by thursday team of 6 cost is 5000 category painting",edit_task,"{""title"":""Paint exterior facade"",""plan"":""Sheet 4"",""category"":""painting"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""6"",""cost"":""5000""}"
"running rough in wiring in level 3 on the mezzanine plan make it medium priority due by may 7",edit_task,"{""title"":""Run electrical rough-in"",""plan"":""mezzanine"",""location"":""level 3"",""end_date"":""2026-05-07"",""priority"":""p2""}"
"we're roughing in the electrical for the new space on a101 lena is on this make it low priority by may 17",edit_task,"{""title"":""Run electrical rough-in"",""plan"":""A101"",""assignee"":""Lena"",""end_date"":""2026-05-17"",""priority"":""p3""}"
"assign carlos priority p3 cost 1200 and due by thursday",edit_task,"{""assignee"":""Carlos"",""end_date"":""2026-05-07"",""priority"":""p3"",""cost"":""1200""}"
"exterior caulking is failing in the west wing put bobby on it needs to be wrapped up by may 6 it's urgent checklist remove old caulk clean and dry joint apply backer rod apply caulk bead tool joint smooth take a photo for the record",edit_task,"{""title"":""Install exterior caulking"",""location"":""west wing"",""assignee"":""Bobby"",""end_date"":""2026-05-06"",""priority"":""p1"",""items"":[""remove old caulk"",""clean and dry joint"",""apply backer rod"",""apply caulk bead"",""tool joint smooth"",""take a photo for the record""]}"
"bobby and his team of 2 are roughing in the electrical for the new space in level 2 category is electrical budget 7000 need it by next tuesday checklist pull permits mark box locations per plan drill studs pull wire document everything",edit_task,"{""title"":""Run electrical rough-in"",""location"":""level 2"",""category"":""electrical"",""assignee"":""Bobby"",""end_date"":""2026-05-12"",""manpower"":""2"",""cost"":""7000"",""items"":[""pull permits"",""mark box locations per plan"",""drill studs"",""pull wire"",""document everything""]}"
"concrete slab has cracks in stairwell a put carlos on this needs to be wrapped up by may 15 normal priority checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure take a photo for the record",edit_task,"{""title"":""Repair cracked concrete"",""location"":""stairwell A"",""assignee"":""Carlos"",""end_date"":""2026-05-15"",""priority"":""p2"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""fill with epoxy inject"",""grind flush after cure"",""take a photo for the record""]}"
"bump it to medium and push the deadline to may 9",edit_task,"{""end_date"":""2026-05-09"",""priority"":""p2""}"
"need the electrical rough in for the new space assign it to nadia crew of 3 should cost around 2500 start may 4 end thursday checklist pull permits mark box locations per plan drill studs pull wire final walkthrough with the gc",edit_task,"{""title"":""Run electrical rough-in"",""assignee"":""Nadia"",""start_date"":""2026-05-04"",""end_date"":""2026-05-07"",""manpower"":""3"",""cost"":""2500"",""items"":[""pull permits"",""mark box locations per plan"",""drill studs"",""pull wire"",""final walkthrough with the GC""]}"
"sarah and 2 workers are on tearing down the partition wall in room 201 category is demo budget around 4000 need it by may 16 checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall document everything",edit_task,"{""title"":""Demolish interior partition"",""location"":""room 201"",""category"":""demo"",""assignee"":""Sarah"",""end_date"":""2026-05-16"",""manpower"":""2"",""cost"":""4000"",""items"":[""verify no electrical or plumbing in wall"",""shut off circuits"",""remove door"",""strip drywall"",""document everything""]}"
"sarah is taking the electrical rough in over at mep1 budget 4000 mark it complete",edit_task,"{""title"":""Run electrical rough-in"",""plan"":""MEP-1"",""assignee"":""Sarah"",""status"":""complete"",""cost"":""4000""}"
"install sprinkler heads on a301 put bobby on it p1 by end of next week team of 6 budget about 1500 checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""A301"",""assignee"":""Bobby"",""end_date"":""2026-05-16"",""priority"":""p1"",""manpower"":""6"",""cost"":""1500"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""pressure test""]}"
"waterproofing membrane on the deck in parking garage level 1 on a202 gc wants it done by may 9 put vic on it with a team of 2 budget 6000 make it medium priority category waterproofing",edit_task,"{""title"":""Apply waterproofing membrane"",""plan"":""A202"",""location"":""parking garage level 1"",""category"":""waterproofing"",""assignee"":""Vic"",""end_date"":""2026-05-09"",""priority"":""p2"",""manpower"":""2"",""cost"":""6000""}"
"resource it with team of 4",edit_task,"{""manpower"":""4""}"
"replacing the broken glass panel in stairwell b on a4 mark it complete brenda is handling it checklist measure opening order replacement glass remove broken pane seal exterior",edit_task,"{""title"":""Replace broken window glazing"",""plan"":""A-4"",""location"":""stairwell B"",""assignee"":""Brenda"",""status"":""complete"",""items"":[""measure opening"",""order replacement glass"",""remove broken pane"",""seal exterior""]}"
"replacing the broken glass panel on id101 starts wednesday morning wraps up next friday crew of 6 cost is 800 category glazing",edit_task,"{""title"":""Replace broken window glazing"",""plan"":""ID-101"",""category"":""glazing"",""start_date"":""2026-05-06"",""end_date"":""2026-05-15"",""manpower"":""6"",""cost"":""800""}"
"we're applying waterproofing membrane on exterior facade east put dave on it medium priority checklist clean substrate apply primer coat let cure apply first membrane coat let cure take a photo for the record",edit_task,"{""title"":""Apply waterproofing membrane"",""location"":""exterior facade east"",""assignee"":""Dave"",""priority"":""p2"",""items"":[""clean substrate"",""apply primer coat"",""let cure"",""apply first membrane coat"",""let cure"",""take a photo for the record""]}"
"breaker keeps tripping in unit 12 put reza on it needs to be wrapped up by next friday make it p2 checklist identify tripped breaker check load on circuit inspect wiring connections replace breaker if faulty test under load take a photo for the record",edit_task,"{""title"":""Fix electrical panel issue"",""location"":""unit 12"",""assignee"":""Reza"",""end_date"":""2026-05-15"",""priority"":""p2"",""items"":[""identify tripped breaker"",""check load on circuit"",""inspect wiring connections"",""replace breaker if faulty"",""test under load"",""take a photo for the record""]}"
"we're scheduling the recessed lighting install for break room floor 2 on e2 need 1 guy starting next tuesday through next friday ballpark cost 20000",edit_task,"{""title"":""Install recessed lighting"",""plan"":""E-2"",""location"":""break room floor 2"",""start_date"":""2026-05-12"",""end_date"":""2026-05-15"",""manpower"":""1"",""cost"":""20000""}"
"tag inspection",edit_task,"{""tags"":[""inspection""]}"
"installing data and av cabling on p2 starts may 4 wraps up by next tuesday team of 9 cost is 3000 category low voltage",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""P-2"",""category"":""low voltage"",""start_date"":""2026-05-04"",""end_date"":""2026-05-12"",""manpower"":""9"",""cost"":""3000""}"
"assign sal priority p2 cost around 2000 and due by friday",edit_task,"{""assignee"":""Sal"",""end_date"":""2026-05-08"",""priority"":""p2"",""cost"":""2000""}"
"painting the exterior facade on the ground floor on e1 gc wants it done by may 8 put sal on it with a team of 8 budget 10000 make it low priority category painting",edit_task,"{""title"":""Paint exterior facade"",""plan"":""E1"",""location"":""ground floor"",""category"":""painting"",""assignee"":""Sal"",""end_date"":""2026-05-08"",""priority"":""p3"",""manpower"":""8"",""cost"":""10000""}"
"window glazing is cracked assign that to nadia low priority end of next week is fine",edit_task,"{""title"":""Replace broken window glazing"",""assignee"":""Nadia"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"carlos and 1 worker are on patching the ceiling drywall in parking garage level 1 category drywall budget about 7000 need it by thursday checklist cut out damaged section install backing hang new drywall tape and mud document everything",edit_task,"{""title"":""Patch drywall ceiling"",""location"":""parking garage level 1"",""category"":""drywall"",""assignee"":""Carlos"",""end_date"":""2026-05-07"",""manpower"":""1"",""cost"":""7000"",""items"":[""cut out damaged section"",""install backing"",""hang new drywall"",""tape and mud"",""document everything""]}"
"new pull station needs install on s2 mark it low priority steve handles it by may 5 budget around 6000 location is west wing category fire alarm",edit_task,"{""title"":""Install fire alarm pull station"",""plan"":""S-2"",""location"":""west wing"",""category"":""fire alarm"",""assignee"":""Steve"",""end_date"":""2026-05-05"",""priority"":""p3"",""cost"":""6000""}"
"we're scheduling the exterior caulking install for room 412 on a4 need team of 1 starting this monday through wednesday ballpark cost 4000",edit_task,"{""title"":""Install exterior caulking"",""plan"":""A-4"",""location"":""room 412"",""start_date"":""2026-05-04"",""end_date"":""2026-05-06"",""manpower"":""1"",""cost"":""4000""}"
"lena is taking the tile floor install on roof level budget 7000 mark it in progress",edit_task,"{""title"":""Install tile flooring"",""plan"":""roof level"",""assignee"":""Lena"",""status"":""in progress"",""cost"":""7000""}"
"fire alarm pull station is broken in stairwell a put zack on it medium priority checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox wire new device take a photo for the record",edit_task,"{""title"":""Install fire alarm pull station"",""location"":""stairwell A"",""assignee"":""Zack"",""priority"":""p2"",""items"":[""shut off fire alarm circuit"",""remove old device"",""run new conduit if needed"",""mount backbox"",""wire new device"",""take a photo for the record""]}"
"ray and his 10 guys are on new sprinkler heads in room 412 category sprinkler budget 7000 checklist confirm pipe layout with plan drill ceiling openings install drops attach heads document everything",edit_task,"{""title"":""Install sprinkler heads"",""location"":""room 412"",""category"":""sprinkler"",""assignee"":""Ray"",""manpower"":""10"",""cost"":""7000"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""document everything""]}"
"replace the broken hvac unit on e1 put brenda on it make it p1 by end of month team of 1 budget about 8000 checklist shut down power to unit remove old unit install new unit check refrigerant lines test thermostat",edit_task,"{""title"":""Replace broken HVAC unit"",""plan"":""E1"",""assignee"":""Brenda"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""1"",""cost"":""8000"",""items"":[""shut down power to unit"",""remove old unit"",""install new unit"",""check refrigerant lines"",""test thermostat""]}"
"waterproofing the shower pan in the west wing put zack on it needs to be wrapped up by next friday priority two checklist clean substrate apply primer coat let cure apply first membrane coat let cure take a photo for the record",edit_task,"{""title"":""Apply waterproofing membrane"",""location"":""west wing"",""assignee"":""Zack"",""end_date"":""2026-05-15"",""priority"":""p2"",""items"":[""clean substrate"",""apply primer coat"",""let cure"",""apply first membrane coat"",""let cure"",""take a photo for the record""]}"
"we're replacing the hvac unit on a4 in room 201 starting this monday wrapping may 5 8 guys on it cost 15000 category hvac vic is lead checklist shut down power to unit remove old unit install new unit check refrigerant lines test thermostat verify airflow",edit_task,"{""title"":""Replace broken HVAC unit"",""plan"":""A-4"",""location"":""room 201"",""category"":""HVAC"",""assignee"":""Vic"",""start_date"":""2026-05-04"",""end_date"":""2026-05-05"",""manpower"":""8"",""cost"":""15000"",""items"":[""shut down power to unit"",""remove old unit"",""install new unit"",""check refrigerant lines"",""test thermostat"",""verify airflow""]}"
"need the broken faucet replaced assign it to lena crew of 3 should cost around 800 start may 6 end friday checklist shut off water remove old fixture clean mounting surface install new fixture final walkthrough with the gc",edit_task,"{""title"":""Replace broken plumbing fixture"",""assignee"":""Lena"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""3"",""cost"":""800"",""items"":[""shut off water"",""remove old fixture"",""clean mounting surface"",""install new fixture"",""final walkthrough with the GC""]}"
"juan is taking the attic insulation job in level 3 this is insulation work low priority manpower team of 8 budget 3000 mark verified",edit_task,"{""title"":""Insulate attic space"",""location"":""level 3"",""category"":""insulation"",""assignee"":""Juan"",""status"":""verified"",""priority"":""p3"",""manpower"":""8"",""cost"":""3000""}"
"ray and his 4 guys are on the waterproofing membrane on the deck in the east wing category waterproofing budget around 800 need it by thursday checklist clean substrate apply primer coat let cure apply first membrane coat document everything",edit_task,"{""title"":""Apply waterproofing membrane"",""location"":""east wing"",""category"":""waterproofing"",""assignee"":""Ray"",""end_date"":""2026-05-07"",""manpower"":""4"",""cost"":""800"",""items"":[""clean substrate"",""apply primer coat"",""let cure"",""apply first membrane coat"",""document everything""]}"
"omar is taking a duct leak in the plenum over at civil sheet 3 budget around 8000 mark it open",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""civil sheet 3"",""assignee"":""Omar"",""status"":""open"",""cost"":""8000""}"
"replace the exhaust fan on a101 put felix on it medium priority by end of next week team of 1 budget about 4000 checklist shut off circuit at panel remove old fan install new housing wire new fan test operation",edit_task,"{""title"":""Replace exhaust fan"",""plan"":""A101"",""assignee"":""Felix"",""end_date"":""2026-05-15"",""priority"":""p2"",""manpower"":""1"",""cost"":""4000"",""items"":[""shut off circuit at panel"",""remove old fan"",""install new housing"",""wire new fan"",""test operation""]}"
"tearing down the partition wall in level 4 on the ground floor mark it tracked bobby is handling it due by may 11 checklist verify no electrical or plumbing in wall shut off circuits remove door patch floor",edit_task,"{""title"":""Demolish interior partition"",""plan"":""ground floor"",""location"":""level 4"",""assignee"":""Bobby"",""status"":""tracked"",""end_date"":""2026-05-11"",""items"":[""verify no electrical or plumbing in wall"",""shut off circuits"",""remove door"",""patch floor""]}"
"move to p2 location basement level 2 and mark verified",edit_task,"{""plan"":""P-2"",""location"":""basement level 2"",""status"":""verified""}"
"we're replacing the hvac unit on a201 in suite 3b starting may 3 wrapping may 9 9 guys on it cost 3000 category hvac dave is lead checklist shut down power to unit remove old unit install new unit check refrigerant lines test thermostat verify airflow",edit_task,"{""title"":""Replace broken HVAC unit"",""plan"":""A201"",""location"":""suite 3B"",""category"":""HVAC"",""assignee"":""Dave"",""start_date"":""2026-05-03"",""end_date"":""2026-05-09"",""manpower"":""9"",""cost"":""3000"",""items"":[""shut down power to unit"",""remove old unit"",""install new unit"",""check refrigerant lines"",""test thermostat"",""verify airflow""]}"
"ceiling drywall needs patching in level 2 put kim on it make it p2 checklist cut out damaged section install backing hang new drywall tape and mud sand smooth take a photo for the record",edit_task,"{""title"":""Patch drywall ceiling"",""location"":""level 2"",""assignee"":""Kim"",""priority"":""p2"",""items"":[""cut out damaged section"",""install backing"",""hang new drywall"",""tape and mud"",""sand smooth"",""take a photo for the record""]}"
"broken exhaust fan in the bathroom in bay 7 put hector on it needs to be wrapped up by thursday low priority checklist shut off circuit at panel remove old fan install new housing wire new fan test operation take a photo for the record",edit_task,"{""title"":""Replace exhaust fan"",""location"":""bay 7"",""assignee"":""Hector"",""end_date"":""2026-05-07"",""priority"":""p3"",""items"":[""shut off circuit at panel"",""remove old fan"",""install new housing"",""wire new fan"",""test operation"",""take a photo for the record""]}"
"5 guys on this one",edit_task,"{""manpower"":""5""}"
"water leaking from the pipes under the sink at grid line b2 on the roof level plan gc wants it done by wednesday put luis on it with a team of 7 budget around 2500 make it p1 category plumbing",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""roof level"",""location"":""grid line B2"",""category"":""plumbing"",""assignee"":""Luis"",""end_date"":""2026-05-06"",""priority"":""p1"",""manpower"":""7"",""cost"":""2500""}"
"get going next tuesday",edit_task,"{""start_date"":""2026-05-12""}"
"materials came out to 15000",edit_task,"{""cost"":""15000""}"
"gotta get breaker keeps tripping in bay 7 by friday not super urgent",edit_task,"{""title"":""Fix electrical panel issue"",""location"":""bay 7"",""end_date"":""2026-05-08"",""priority"":""p3""}"
"need attic insulation in the pool deck put felix on it should be done by friday cost is probably around 4000",edit_task,"{""title"":""Insulate attic space"",""location"":""pool deck"",""assignee"":""Felix"",""end_date"":""2026-05-08"",""cost"":""4000""}"
"reza and his 3 guys are on running sprinkler heads in suite 3b category sprinkler budget 2000 need it by next tuesday checklist confirm pipe layout with plan drill ceiling openings install drops attach heads document everything",edit_task,"{""title"":""Install sprinkler heads"",""location"":""suite 3B"",""category"":""sprinkler"",""assignee"":""Reza"",""end_date"":""2026-05-12"",""manpower"":""3"",""cost"":""2000"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""document everything""]}"
"carpet replacement in suite 4b in the cafeteria put maria on it needs to be wrapped up by may 11 medium priority checklist move furniture remove old carpet pull tack strips prep subfloor install new tack strips take a photo for the record",edit_task,"{""title"":""Replace carpet in office"",""location"":""suite 4B cafeteria"",""assignee"":""Maria"",""end_date"":""2026-05-11"",""priority"":""p2"",""items"":[""move furniture"",""remove old carpet"",""pull tack strips"",""prep subfloor"",""install new tack strips"",""take a photo for the record""]}"
"replacing the broken faucet in stairwell a put pat on it needs to be wrapped up by end of month low priority checklist shut off water remove old fixture clean mounting surface install new fixture reconnect supply lines take a photo for the record",edit_task,"{""title"":""Replace broken plumbing fixture"",""location"":""stairwell A"",""assignee"":""Pat"",""end_date"":""2026-05-29"",""priority"":""p3"",""items"":[""shut off water"",""remove old fixture"",""clean mounting surface"",""install new fixture"",""reconnect supply lines"",""take a photo for the record""]}"
"something's wrong with the electrical panel in level 3 on the mezzanine plan mark it on hold bobby is handling it due by may 7 checklist identify tripped breaker check load on circuit inspect wiring connections document findings",edit_task,"{""title"":""Fix electrical panel issue"",""plan"":""mezzanine"",""location"":""level 3"",""assignee"":""Bobby"",""status"":""on hold"",""end_date"":""2026-05-07"",""items"":[""identify tripped breaker"",""check load on circuit"",""inspect wiring connections"",""document findings""]}"
"set cost to 2500 manpower to 3 workers and category to fire alarm",edit_task,"{""category"":""fire alarm"",""manpower"":""3"",""cost"":""2500""}"
"need a new partition wall framed assign it to bobby two person job should cost around 2000 start tomorrow finish end of month checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate final walkthrough with the gc",edit_task,"{""title"":""Frame new partition wall"",""assignee"":""Bobby"",""start_date"":""2026-05-06"",""end_date"":""2026-05-29"",""manpower"":""2"",""cost"":""2000"",""items"":[""snap chalk lines"",""lay bottom plate"",""stand studs 16 OC"",""install top plate"",""final walkthrough with the GC""]}"
"replace carpet in the office on fp3 put sarah on it normal priority by end of month team of 4 budget about 10000 checklist move furniture remove old carpet pull tack strips prep subfloor install new tack strips",edit_task,"{""title"":""Replace carpet in office"",""plan"":""FP-3"",""assignee"":""Sarah"",""end_date"":""2026-05-29"",""priority"":""p2"",""manpower"":""4"",""cost"":""10000"",""items"":[""move furniture"",""remove old carpet"",""pull tack strips"",""prep subfloor"",""install new tack strips""]}"
"breaker keeps tripping in the loading dock on m2 mark it verified gus is handling it due by may 9 checklist identify tripped breaker check load on circuit inspect wiring connections document findings",edit_task,"{""title"":""Fix electrical panel issue"",""plan"":""M2"",""location"":""loading dock"",""assignee"":""Gus"",""status"":""verified"",""end_date"":""2026-05-09"",""items"":[""identify tripped breaker"",""check load on circuit"",""inspect wiring connections"",""document findings""]}"
"fix the water leak under the sink on a3 put steve on it bump it to p1 by end of next week one guy budget about 1200 checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""A-3"",""assignee"":""Steve"",""end_date"":""2026-05-15"",""priority"":""p1"",""manpower"":""1"",""cost"":""1200"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""reinstall p-trap""]}"
"replace the exhaust fan assign it to brenda crew of 3 should cost around 2000 start wednesday end friday checklist shut off circuit at panel remove old fan install new housing wire new fan final walkthrough with the gc",edit_task,"{""title"":""Replace exhaust fan"",""assignee"":""Brenda"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""3"",""cost"":""2000"",""items"":[""shut off circuit at panel"",""remove old fan"",""install new housing"",""wire new fan"",""final walkthrough with the GC""]}"
"install recessed lighting on s1 put omar on it low priority by end of month 6 workers budget about 10000 checklist run romex to junction box mount the housing cans connect wiring install trim rings test all fixtures",edit_task,"{""title"":""Install recessed lighting"",""plan"":""S-1"",""assignee"":""Omar"",""end_date"":""2026-05-29"",""priority"":""p3"",""manpower"":""6"",""cost"":""10000"",""items"":[""run romex to junction box"",""mount the housing cans"",""connect wiring"",""install trim rings"",""test all fixtures""]}"
"start tomorrow finish friday manpower 4 cost 1500",edit_task,"{""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""4"",""cost"":""1500""}"
"breaker keeps tripping in the west wing on e2 make it low priority due by may 15",edit_task,"{""title"":""Fix electrical panel issue"",""plan"":""E-2"",""location"":""west wing"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"installing the fire suppression heads in grid line b2 put eddie on it medium priority checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test take a photo for the record",edit_task,"{""title"":""Install sprinkler heads"",""location"":""grid line B2"",""assignee"":""Eddie"",""priority"":""p2"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""pressure test"",""take a photo for the record""]}"
"knocking out the old partition in unit 7 on c1 make it priority two due by may 6",edit_task,"{""title"":""Demolish interior partition"",""plan"":""C-1"",""location"":""unit 7"",""end_date"":""2026-05-06"",""priority"":""p2""}"
"brenda is leading the broken faucet replacement on the roof deck start wednesday finish next friday cost about 1500 need 6 workers mark it complete",edit_task,"{""title"":""Replace broken plumbing fixture"",""location"":""roof deck"",""assignee"":""Brenda"",""status"":""complete"",""start_date"":""2026-05-06"",""end_date"":""2026-05-15"",""manpower"":""6"",""cost"":""1500""}"
"set priority low assign sarah mark it in progress and due by next tuesday",edit_task,"{""assignee"":""Sarah"",""status"":""in progress"",""end_date"":""2026-05-12"",""priority"":""p3""}"
"flag it as p1",edit_task,"{""priority"":""p1""}"
"leak under the sink in suite 101 put reza on this one low priority checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap take a photo for the record",edit_task,"{""title"":""Fix water leak under sink"",""location"":""suite 101"",""assignee"":""Reza"",""priority"":""p3"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""reinstall p-trap"",""take a photo for the record""]}"
"we're scheduling the low voltage cabling install for the server room on civil sheet 3 need 1 guy starting this monday through friday ballpark cost 2000",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""civil sheet 3"",""location"":""server room"",""start_date"":""2026-05-04"",""end_date"":""2026-05-08"",""manpower"":""1"",""cost"":""2000""}"
"it's in the courtyard and status is tracked",edit_task,"{""location"":""courtyard"",""status"":""tracked""}"
"need some recessed lighting in exterior facade east put jake on it should be done by may 7 cost about 2500",edit_task,"{""title"":""Install recessed lighting"",""location"":""exterior facade east"",""assignee"":""Jake"",""end_date"":""2026-05-07"",""cost"":""2500""}"
"assign nadia cost about 2000 and bump it to p1",edit_task,"{""assignee"":""Nadia"",""priority"":""p1"",""cost"":""2000""}"
"slow drip under the kitchen sink in the lobby on e4 mark it on hold mike is handling it checklist shut off water supply remove p trap inspect drain line take photo",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""E4"",""location"":""lobby"",""assignee"":""Mike"",""status"":""on hold"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""take photo""]}"
"set plan to sheet 7",edit_task,"{""plan"":""Sheet 7""}"
"framing out a new partition on the ground floor put danny on it bump it to p1 get it done by friday",edit_task,"{""title"":""Frame new partition wall"",""location"":""ground floor"",""assignee"":""Danny"",""end_date"":""2026-05-08"",""priority"":""p1""}"
"gotta get a partition wall put up by may 19 one worker should be enough make it medium priority and assign dave",edit_task,"{""title"":""Frame new partition wall"",""assignee"":""Dave"",""end_date"":""2026-05-19"",""priority"":""p2"",""manpower"":""1""}"
"we're repairing cracked concrete on p4 in parking garage level 1 starting this monday wrapping by thursday team of 9 cost 20000 category concrete omar is lead checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure apply surface sealer",edit_task,"{""title"":""Repair cracked concrete"",""plan"":""P4"",""location"":""parking garage level 1"",""category"":""concrete"",""assignee"":""Omar"",""start_date"":""2026-05-04"",""end_date"":""2026-05-07"",""manpower"":""9"",""cost"":""20000"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""fill with epoxy inject"",""grind flush after cure"",""apply surface sealer""]}"
"sal is taking recaulking the facade joints in unit 7 this is waterproofing work priority two manpower 2 guys budget 10000 mark pending inspection",edit_task,"{""title"":""Install exterior caulking"",""location"":""unit 7"",""category"":""waterproofing"",""assignee"":""Sal"",""status"":""pending inspection"",""priority"":""p2"",""manpower"":""2"",""cost"":""10000""}"
"reza is leading the ceiling drywall patch in bay 4 start next tuesday finish thursday cost 12000 need a team of 10 mark it in progress",edit_task,"{""title"":""Patch drywall ceiling"",""location"":""bay 4"",""assignee"":""Reza"",""status"":""in progress"",""start_date"":""2026-05-12"",""end_date"":""2026-05-14"",""manpower"":""10"",""cost"":""12000""}"
"move it to room 412",edit_task,"{""location"":""room 412""}"
"we're replacing the carpet in mechanical room level 3 on a4 starting wednesday wrapping friday team of 6 cost about 3500 category flooring felix is lead checklist move furniture remove old carpet pull tack strips prep subfloor install new tack strips lay pad",edit_task,"{""title"":""Replace carpet in office"",""plan"":""A-4"",""location"":""mechanical room level 3"",""category"":""flooring"",""assignee"":""Felix"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""6"",""cost"":""3500"",""items"":[""move furniture"",""remove old carpet"",""pull tack strips"",""prep subfloor"",""install new tack strips"",""lay pad""]}"
"waterproofing membrane on the deck in the data center floor on e4 mark it priority two due by next tuesday",edit_task,"{""title"":""Apply waterproofing membrane"",""plan"":""E4"",""location"":""data center floor"",""end_date"":""2026-05-12"",""priority"":""p2""}"
"need painting the exterior facade in elevator shaft b put tony on it should be done by thursday cost about 3500",edit_task,"{""title"":""Paint exterior facade"",""location"":""elevator shaft B"",""assignee"":""Tony"",""end_date"":""2026-05-07"",""cost"":""3500""}"
"running recessed lights in stairwell c on id101 gc wants it done by next tuesday put felix and a crew of 5 on it budget about 3000 bump it to p1 category electrical",edit_task,"{""title"":""Install recessed lighting"",""plan"":""ID-101"",""location"":""stairwell C"",""category"":""electrical"",""assignee"":""Felix"",""end_date"":""2026-05-12"",""priority"":""p1"",""manpower"":""5"",""cost"":""3000""}"
"bump it to priority two and push the deadline to wednesday",edit_task,"{""end_date"":""2026-05-06"",""priority"":""p2""}"
"blowing insulation in the attic in the data center floor put steve on it make it top priority get it done by thursday",edit_task,"{""title"":""Insulate attic space"",""location"":""data center floor"",""assignee"":""Steve"",""end_date"":""2026-05-07"",""priority"":""p1""}"
"set priority medium location level 2 cost about 1500",edit_task,"{""location"":""level 2"",""priority"":""p2"",""cost"":""1500""}"
"nadia is leading the broken exhaust fan in the bathroom in the server room start this monday finish before the inspection cost around 8000 need 6 guys mark it closed",edit_task,"{""title"":""Replace exhaust fan"",""location"":""server room"",""assignee"":""Nadia"",""status"":""closed"",""start_date"":""2026-05-04"",""manpower"":""6"",""cost"":""8000""}"
"reza is taking the data and av cabling over on sheet 9 budget 2000 mark it in progress",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""Sheet 9"",""assignee"":""Reza"",""status"":""in progress"",""cost"":""2000""}"
"drawing a301 location room 305 category roofing and assign lena",edit_task,"{""plan"":""A301"",""location"":""room 305"",""category"":""roofing"",""assignee"":""Lena""}"
"we got cracks in the floor slab assign that to lena low priority end of next week is fine",edit_task,"{""title"":""Repair cracked concrete"",""assignee"":""Lena"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"installing the suspended ceiling grid in the mechanical room on a301 mark it in progress tony is handling it due by end of month checklist snap layout lines install wall angle hang main tees final inspection",edit_task,"{""title"":""Install ceiling grid and tiles"",""plan"":""A301"",""location"":""mechanical room"",""assignee"":""Tony"",""status"":""in progress"",""end_date"":""2026-05-29"",""items"":[""snap layout lines"",""install wall angle"",""hang main tees"",""final inspection""]}"
"danny is taking running sprinkler heads over at s1 budget around 1200 mark it closed",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""S-1"",""assignee"":""Danny"",""status"":""closed"",""cost"":""1200""}"
"fire alarm pull station is broken assign it to pat crew of 3 should cost around 5000 start wednesday checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox final walkthrough with the gc",edit_task,"{""title"":""Install fire alarm pull station"",""assignee"":""Pat"",""start_date"":""2026-05-06"",""manpower"":""3"",""cost"":""5000"",""items"":[""shut off fire alarm circuit"",""remove old device"",""run new conduit if needed"",""mount backbox"",""final walkthrough with the GC""]}"
"we're repairing cracked concrete on p3 in unit 7 starting this monday wrapping end of month 7 workers on it cost about 4000 category concrete troy is lead checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure apply surface sealer",edit_task,"{""title"":""Repair cracked concrete"",""plan"":""P-3"",""location"":""unit 7"",""category"":""concrete"",""assignee"":""Troy"",""start_date"":""2026-05-04"",""end_date"":""2026-05-29"",""manpower"":""7"",""cost"":""4000"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""fill with epoxy inject"",""grind flush after cure"",""apply surface sealer""]}"
"assign maria priority two cost 6000",edit_task,"{""assignee"":""Maria"",""priority"":""p2"",""cost"":""6000""}"
"we got a hole in the drywall on the ceiling assign that to danny low priority end of next week is fine",edit_task,"{""title"":""Patch drywall ceiling"",""assignee"":""Danny"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"we're scheduling the exterior caulking install for the east wing on s1 need crew of 6 starting this monday through may 9 ballpark cost 8000",edit_task,"{""title"":""Install exterior caulking"",""plan"":""S-1"",""location"":""east wing"",""start_date"":""2026-05-04"",""end_date"":""2026-05-09"",""manpower"":""6"",""cost"":""8000""}"
"nadia is leading the broken faucet replacement in stairwell b start next tuesday finish end of month cost is 6000 and we need a crew of 3 mark it complete",edit_task,"{""title"":""Replace broken plumbing fixture"",""location"":""stairwell B"",""assignee"":""Nadia"",""status"":""complete"",""start_date"":""2026-05-12"",""end_date"":""2026-05-29"",""manpower"":""3"",""cost"":""6000""}"
"need team of 5 for this",edit_task,"{""manpower"":""5""}"
"pouring the slab in the south corridor on s1 put mike on it with a team of 7 budget about 15000 make it low priority category concrete",edit_task,"{""title"":""Pour concrete slab"",""plan"":""S-1"",""location"":""south corridor"",""category"":""concrete"",""assignee"":""Mike"",""priority"":""p3"",""manpower"":""7"",""cost"":""15000""}"
"attach to sheet 4",edit_task,"{""plan"":""Sheet 4""}"
"new pull station needs install assign that to reza low priority end of next week is fine",edit_task,"{""title"":""Install fire alarm pull station"",""assignee"":""Reza"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"it's in room 412 and status is pending inspection",edit_task,"{""location"":""room 412"",""status"":""pending inspection""}"
"assign this to dave",edit_task,"{""assignee"":""Dave""}"
"need running rough in wiring in suite 101 put tony on it should be done by may 16 cost about 2000",edit_task,"{""title"":""Run electrical rough-in"",""location"":""suite 101"",""assignee"":""Tony"",""end_date"":""2026-05-16"",""cost"":""2000""}"
"patch the roof membrane in the penthouse level on fp2 due next friday put brenda and 3 guys on it budget 1500 make it medium category roofing",edit_task,"{""title"":""Repair roof membrane"",""plan"":""FP-2"",""location"":""penthouse level"",""category"":""roofing"",""assignee"":""Brenda"",""end_date"":""2026-05-15"",""priority"":""p2"",""manpower"":""3"",""cost"":""1500""}"
"bump it to p1",edit_task,"{""priority"":""p1""}"
"start tomorrow finish by thursday put troy on it",edit_task,"{""assignee"":""Troy"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07""}"
"ductwork is leaking on m3 mark it high priority zack handles it by next tuesday budget around 15000 location is east wing category hvac",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""M-3"",""location"":""east wing"",""category"":""HVAC"",""assignee"":""Zack"",""end_date"":""2026-05-12"",""priority"":""p1"",""cost"":""15000""}"
"painting the exterior facade in stairwell c put luis on it needs to be wrapped up by next tuesday low priority checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat take a photo for the record",edit_task,"{""title"":""Paint exterior facade"",""location"":""stairwell C"",""assignee"":""Luis"",""end_date"":""2026-05-12"",""priority"":""p3"",""items"":[""pressure wash surface"",""scrape loose paint"",""apply primer"",""caulk gaps and cracks"",""roll first coat"",""take a photo for the record""]}"
"fixing the cracks in the floor slab in bay 7 put danny on it needs to be wrapped up by thursday top priority checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure take a photo for the record",edit_task,"{""title"":""Repair cracked concrete"",""location"":""bay 7"",""assignee"":""Danny"",""end_date"":""2026-05-07"",""priority"":""p1"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""fill with epoxy inject"",""grind flush after cure"",""take a photo for the record""]}"
"drywall damage on the ceiling assign it to carlos two person job should cost around 7000 start next tuesday end by thursday checklist cut out damaged section install backing hang new drywall tape and mud final walkthrough with the gc",edit_task,"{""title"":""Patch drywall ceiling"",""assignee"":""Carlos"",""start_date"":""2026-05-12"",""end_date"":""2026-05-14"",""manpower"":""2"",""cost"":""7000"",""items"":[""cut out damaged section"",""install backing"",""hang new drywall"",""tape and mud"",""final walkthrough with the GC""]}"
"put it under tile",edit_task,"{""category"":""tile""}"
"apply waterproofing membrane on sheet 4 put mike on it bump it to p1 by end of month team of 3 budget about 4000 checklist clean substrate apply primer coat let cure apply first membrane coat let cure",edit_task,"{""title"":""Apply waterproofing membrane"",""plan"":""Sheet 4"",""assignee"":""Mike"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""3"",""cost"":""4000"",""items"":[""clean substrate"",""apply primer coat"",""let cure"",""apply first membrane coat"",""let cure""]}"
"new sprinkler heads need to go in assign it to carlos crew of 3 should cost around 5000 start may 5 end next tuesday checklist confirm pipe layout with plan drill ceiling openings install drops attach heads final walkthrough with the gc",edit_task,"{""title"":""Install sprinkler heads"",""assignee"":""Carlos"",""start_date"":""2026-05-05"",""end_date"":""2026-05-12"",""manpower"":""3"",""cost"":""5000"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""final walkthrough with the GC""]}"
"bump it to not a rush and push the deadline to thursday",edit_task,"{""end_date"":""2026-05-07"",""priority"":""p3""}"
"gotta get recessed lights run in the south corridor by end of month medium priority",edit_task,"{""title"":""Install recessed lighting"",""location"":""south corridor"",""end_date"":""2026-05-29"",""priority"":""p2""}"
"move to e2 and bump it to p1",edit_task,"{""plan"":""E-2"",""priority"":""p1""}"
"need tile floor going in the mezzanine put brenda on it should be done by wednesday cost about 15000",edit_task,"{""title"":""Install tile flooring"",""location"":""mezzanine"",""assignee"":""Brenda"",""end_date"":""2026-05-06"",""cost"":""15000""}"
"we got a leak under the sink assign it to omar crew of 3 should cost around 6000 start this monday end may 5 checklist shut off water supply remove p trap inspect drain line replace gaskets final walkthrough with the gc",edit_task,"{""title"":""Fix water leak under sink"",""assignee"":""Omar"",""start_date"":""2026-05-04"",""end_date"":""2026-05-05"",""manpower"":""3"",""cost"":""6000"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""final walkthrough with the GC""]}"
"exterior caulking is failing on id101 mark it low priority reza handles it by wednesday budget around 2500 location is boiler room category waterproofing",edit_task,"{""title"":""Install exterior caulking"",""plan"":""ID-101"",""location"":""boiler room"",""category"":""waterproofing"",""assignee"":""Reza"",""end_date"":""2026-05-06"",""priority"":""p3"",""cost"":""2500""}"
"troy is leading the attic insulation in unit 12 start wednesday morning finish may 8 cost is around 15000 and we need 1 guy mark it closed",edit_task,"{""title"":""Insulate attic space"",""location"":""unit 12"",""assignee"":""Troy"",""status"":""closed"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""1"",""cost"":""15000""}"
"paint exterior facade on e1 put jake on it critical by end of month 8 workers budget about 12000 checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat",edit_task,"{""title"":""Paint exterior facade"",""plan"":""E1"",""assignee"":""Jake"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""8"",""cost"":""12000"",""items"":[""pressure wash surface"",""scrape loose paint"",""apply primer"",""caulk gaps and cracks"",""roll first coat""]}"
"we'll have 10 workers on site",edit_task,"{""manpower"":""10""}"
"running recessed lights in mechanical room level 3 on the ground floor gc wants it done by may 17 put eddie and a crew of 9 on it budget is 5000 make it p1 category electrical",edit_task,"{""title"":""Install recessed lighting"",""plan"":""ground floor"",""location"":""mechanical room level 3"",""category"":""electrical"",""assignee"":""Eddie"",""end_date"":""2026-05-17"",""priority"":""p1"",""manpower"":""9"",""cost"":""5000""}"
"roof membrane has a leak in mechanical room level 3 on the ground floor mark it tracked danny is handling it due by wednesday checklist locate the breach clean and dry the area apply primer document repair",edit_task,"{""title"":""Repair roof membrane"",""plan"":""ground floor"",""location"":""mechanical room level 3"",""assignee"":""Danny"",""status"":""tracked"",""end_date"":""2026-05-06"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""document repair""]}"
"need cracks in the floor slab fixed in the courtyard put juan on it should be done by thursday cost about 3000",edit_task,"{""title"":""Repair cracked concrete"",""location"":""courtyard"",""assignee"":""Juan"",""end_date"":""2026-05-07"",""cost"":""3000""}"
"move it to server room",edit_task,"{""location"":""server room""}"
"we got exterior paint job assign that to felix low priority end of next week is fine",edit_task,"{""title"":""Paint exterior facade"",""assignee"":""Felix"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"gotta get the waterproofing membrane applied by may 21 crew of 10 should be enough make it high priority and assign brenda",edit_task,"{""title"":""Apply waterproofing membrane"",""assignee"":""Brenda"",""end_date"":""2026-05-21"",""priority"":""p1"",""manpower"":""10""}"
"make it medium priority",edit_task,"{""priority"":""p2""}"
"we're scheduling cracked concrete repair in the east lobby on p2 need 8 guys starting may 3 through next tuesday ballpark cost 3000",edit_task,"{""title"":""Repair cracked concrete"",""plan"":""P-2"",""location"":""east lobby"",""start_date"":""2026-05-03"",""end_date"":""2026-05-12"",""manpower"":""8"",""cost"":""3000""}"
"classify this as structural",edit_task,"{""category"":""structural""}"
"gotta get the slab poured by may 18 need 10 workers on it make it high priority and assign steve",edit_task,"{""title"":""Pour concrete slab"",""assignee"":""Steve"",""end_date"":""2026-05-18"",""priority"":""p1"",""manpower"":""10""}"
"mark this open something's wrong with the electrical panel in the west wing",edit_task,"{""title"":""Fix electrical panel issue"",""location"":""west wing"",""status"":""open""}"
"assign ray make it high priority and due by friday",edit_task,"{""assignee"":""Ray"",""end_date"":""2026-05-08"",""priority"":""p1""}"
"we're fixing an hvac ductwork leak on a3 in suite 3b starting may 2 and wrapping friday need 10 guys on it cost 2000 make it hvac and give it to carlos checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed test system airflow",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""A-3"",""location"":""suite 3B"",""category"":""HVAC"",""assignee"":""Carlos"",""start_date"":""2026-05-02"",""end_date"":""2026-05-08"",""manpower"":""10"",""cost"":""2000"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""wrap with foil tape"",""re-insulate if needed"",""test system airflow""]}"
"we're installing the suspended ceiling grid in the lobby on sheet 9 mark it verified omar is handling it due by may 10 checklist snap layout lines install wall angle hang main tees final inspection",edit_task,"{""title"":""Install suspended ceiling grid"",""plan"":""Sheet 9"",""location"":""lobby"",""assignee"":""Omar"",""status"":""verified"",""end_date"":""2026-05-10"",""items"":[""snap layout lines"",""install wall angle"",""hang main tees"",""final inspection""]}"
"we're pulling the old carpet in stairwell b put omar on it make it medium priority and have it done by next tuesday",edit_task,"{""title"":""Replace carpet in stairwell"",""location"":""stairwell B"",""assignee"":""Omar"",""end_date"":""2026-05-12"",""priority"":""p2""}"
"we've got an hvac duct leak in the plenum at grid line b2 put kim on it have it wrapped by friday make it medium priority checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed take a photo for the record",edit_task,"{""title"":""Fix HVAC ductwork leak"",""location"":""plenum at grid line B2"",""assignee"":""Kim"",""end_date"":""2026-05-08"",""priority"":""p2"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""wrap with foil tape"",""re-insulate if needed"",""take a photo for the record""]}"
"breaker keeps tripping on a301 start this monday crew of 7 cost around 1200 this is electrical work",edit_task,"{""title"":""Fix electrical panel issue"",""plan"":""A301"",""category"":""electrical"",""start_date"":""2026-05-04"",""manpower"":""7"",""cost"":""1200""}"
"fire suppression work in the cafeteria budget is about 20000 assign brenda",edit_task,"{""title"":""Fire suppression work in cafeteria"",""location"":""cafeteria"",""category"":""fire suppression"",""assignee"":""Brenda"",""cost"":""20000""}"
"work is in the east lobby",edit_task,"{""location"":""east lobby""}"
"patch the roof membrane at grid line c4 make it high priority",edit_task,"{""title"":""Repair roof membrane"",""location"":""grid line C4"",""priority"":""p1""}"
"there's a hole in the drywall ceiling in bay 4 on a101 mark it open kim is handling it due by next tuesday checklist cut out damaged section install backing hang new drywall take photo",edit_task,"{""title"":""Patch drywall ceiling"",""plan"":""A101"",""location"":""bay 4"",""assignee"":""Kim"",""status"":""open"",""end_date"":""2026-05-12"",""items"":[""cut out damaged section"",""install backing"",""hang new drywall"",""take photo""]}"
"we need a new partition wall put up assign it to steve crew of 3 cost around 2500 start this monday and finish next friday checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate final walkthrough with the gc",edit_task,"{""title"":""Frame new partition wall"",""assignee"":""Steve"",""start_date"":""2026-05-04"",""end_date"":""2026-05-15"",""manpower"":""3"",""cost"":""2500"",""items"":[""snap chalk lines"",""lay bottom plate"",""stand studs 16 OC"",""install top plate"",""final walkthrough with the GC""]}"
"put juan and 6 guys on new carpet in the office start next tuesday",edit_task,"{""title"":""Replace carpet in office"",""assignee"":""Juan"",""start_date"":""2026-05-12"",""manpower"":""6""}"
"move this to p2 and set the location to bay 12",edit_task,"{""plan"":""P-2"",""location"":""bay 12""}"
"need that hole in the drywall ceiling fixed in the server room put tony on it and get it done by may 18 cost around 1200",edit_task,"{""title"":""Patch drywall ceiling"",""location"":""server room"",""assignee"":""Tony"",""end_date"":""2026-05-18"",""cost"":""1200""}"
"we need the exterior facade painted on m2 put kim on it make it medium priority have it done by end of month crew of 1 budget about 3500 checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat",edit_task,"{""title"":""Paint exterior facade"",""plan"":""M2"",""assignee"":""Kim"",""end_date"":""2026-05-29"",""priority"":""p2"",""manpower"":""1"",""cost"":""3500"",""items"":[""pressure wash surface"",""scrape loose paint"",""apply primer"",""caulk gaps and cracks"",""roll first coat""]}"
"we're scheduling partition wall framing in parking garage level 1 on a4 need a team of 3 starting may 4 through next tuesday ballpark cost 7000",edit_task,"{""title"":""Frame new partition wall"",""plan"":""A-4"",""location"":""parking garage level 1"",""start_date"":""2026-05-04"",""end_date"":""2026-05-12"",""manpower"":""3"",""cost"":""7000""}"
"replace the broken glass panel in elevator shaft b on sheet 4 make it medium priority and due by thursday",edit_task,"{""title"":""Replace broken glass panel"",""plan"":""Sheet 4"",""location"":""elevator shaft B"",""end_date"":""2026-05-07"",""priority"":""p2""}"
"we're scheduling plumbing fixture replacement in the boiler room on mep 1 need 8 guys start next tuesday and run through thursday ballpark cost 4000",edit_task,"{""title"":""Replace broken plumbing fixture"",""plan"":""MEP-1"",""location"":""boiler room"",""start_date"":""2026-05-12"",""end_date"":""2026-05-14"",""manpower"":""8"",""cost"":""4000""}"
"get this going wednesday morning",edit_task,"{""start_date"":""2026-05-06""}"
"make this high priority",edit_task,"{""priority"":""p1""}"
"patch the roof membrane at grid line b2 put dave on it this is urgent and it needs to be wrapped by may 6 checklist locate the breach clean and dry the area apply primer cut patch membrane adhere patch take a photo for the record",edit_task,"{""title"":""Repair roof membrane"",""location"":""grid line B2"",""assignee"":""Dave"",""end_date"":""2026-05-06"",""priority"":""p1"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""cut patch membrane"",""adhere patch"",""take a photo for the record""]}"
"this is attic insulation in the penthouse level on sheet 7 mark it needs review brenda is handling it due by end of day wednesday checklist check existing r value seal air leaks install baffles at eaves take documentation photos",edit_task,"{""title"":""Insulate attic space"",""plan"":""Sheet 7"",""location"":""penthouse level"",""assignee"":""Brenda"",""status"":""needs review"",""end_date"":""2026-05-06"",""items"":[""check existing R-value"",""seal air leaks"",""install baffles at eaves"",""take documentation photos""]}"
"need that partition wall torn down in the north corridor put luis on it should be done by end of month cost around 2000",edit_task,"{""title"":""Demolish interior partition"",""location"":""north corridor"",""assignee"":""Luis"",""end_date"":""2026-05-29"",""cost"":""2000""}"
"gotta get the new partition wall framed by end of month 3 workers should be enough make it medium priority and assign steve",edit_task,"{""title"":""Frame new partition wall"",""assignee"":""Steve"",""end_date"":""2026-05-29"",""priority"":""p2"",""manpower"":""3""}"
"install recessed cans in bay 7 on fp2 make it low priority and due by may 10",edit_task,"{""title"":""Install recessed lighting"",""plan"":""FP-2"",""location"":""bay 7"",""end_date"":""2026-05-10"",""priority"":""p3""}"
"swap out the exhaust fan on the pool deck put lena on it make it medium priority and have it done by may 7 checklist shut off circuit at panel remove old fan install new housing wire new fan test operation take a photo for the record",edit_task,"{""title"":""Replace exhaust fan"",""location"":""pool deck"",""assignee"":""Lena"",""end_date"":""2026-05-07"",""priority"":""p2"",""items"":[""shut off circuit at panel"",""remove old fan"",""install new housing"",""wire new fan"",""test operation"",""take a photo for the record""]}"
"we've got a duct leak in the plenum assign pat to it start tomorrow and wrap it by friday budget 1200 checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape final walkthrough with the gc",edit_task,"{""title"":""Fix HVAC ductwork leak"",""assignee"":""Pat"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""cost"":""1200"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""wrap with foil tape"",""final walkthrough with the GC""]}"
"running rough in wiring in the north corridor put sarah on it have it done by may 21 make it medium priority checklist pull permits mark box locations per plan drill studs pull wire stub out boxes take a photo for the record",edit_task,"{""title"":""Run electrical rough-in"",""location"":""north corridor"",""assignee"":""Sarah"",""end_date"":""2026-05-21"",""priority"":""p2"",""items"":[""pull permits"",""mark box locations per plan"",""drill studs"",""pull wire"",""stub out boxes"",""take a photo for the record""]}"
"sal is leading the new partition framing in the penthouse level start tomorrow finish wednesday cost 8000 need a crew of 5 mark it needs review",edit_task,"{""title"":""Frame new partition wall"",""location"":""penthouse level"",""assignee"":""Sal"",""status"":""needs review"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06"",""manpower"":""5"",""cost"":""8000""}"
"set the start date to tomorrow and the due date to next friday",edit_task,"{""start_date"":""2026-05-06"",""end_date"":""2026-05-15""}"
"we're laying new carpet in the office on mep1 luis is on it make it top priority",edit_task,"{""title"":""Replace carpet in office"",""plan"":""MEP-1"",""assignee"":""Luis"",""priority"":""p1""}"
"have luis take care of it",edit_task,"{""assignee"":""Luis""}"
"troy is replacing the broken glass panel in bay 7 this is glazing work make it high priority have it done by friday need a crew of 5 budget 15000 mark it in progress",edit_task,"{""title"":""Replace broken glass panel"",""location"":""bay 7"",""category"":""glazing"",""assignee"":""Troy"",""status"":""in progress"",""end_date"":""2026-05-08"",""priority"":""p1"",""manpower"":""5"",""cost"":""15000""}"
"jake is taking the broken window glazing over at fp3 budget 3000 mark it on hold",edit_task,"{""title"":""Replace broken window glazing"",""plan"":""FP-3"",""assignee"":""Jake"",""status"":""on hold"",""cost"":""3000""}"
"new sprinkler heads need to go in on a301 start next tuesday need 5 workers cost 7000",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""A301"",""start_date"":""2026-05-12"",""manpower"":""5"",""cost"":""7000""}"
"assign this to kim and make it medium priority",edit_task,"{""assignee"":""Kim"",""priority"":""p2""}"
"drawing is a4",edit_task,"{""plan"":""A-4""}"
"we're recaulking the facade joints on sheet 4 dave is on it make it urgent and due by next friday",edit_task,"{""title"":""Install exterior caulking"",""plan"":""Sheet 4"",""assignee"":""Dave"",""end_date"":""2026-05-15"",""priority"":""p1""}"
"tag steve as the assignee",edit_task,"{""assignee"":""Steve""}"
"there's a slow drip under the kitchen sink in the cafeteria put sarah on it this can wait checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap take a photo for the record",edit_task,"{""title"":""Fix water leak under sink"",""location"":""cafeteria"",""assignee"":""Sarah"",""priority"":""p3"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""reinstall p-trap"",""take a photo for the record""]}"
"assign mike make it low priority and due by may 21",edit_task,"{""assignee"":""Mike"",""end_date"":""2026-05-21"",""priority"":""p3""}"
"painting the exterior facade in bay 7 on p2 the gc wants it done by end of day wednesday put maria and a crew of 8 on it budget 1500 make it medium priority this is painting",edit_task,"{""title"":""Paint exterior facade"",""plan"":""P-2"",""location"":""bay 7"",""category"":""painting"",""assignee"":""Maria"",""end_date"":""2026-05-06"",""priority"":""p2"",""manpower"":""8"",""cost"":""1500""}"
"apply the waterproofing membrane on the lobby deck on a301 mark it open pat is handling it due by may 6 checklist clean substrate apply primer coat let cure document result",edit_task,"{""title"":""Apply waterproofing membrane"",""plan"":""A301"",""location"":""lobby deck"",""assignee"":""Pat"",""status"":""open"",""end_date"":""2026-05-06"",""items"":[""clean substrate"",""apply primer coat"",""let cure"",""document result""]}"
"new carpet is going into the office in the west wing on civil sheet 3 mark it in progress luis is handling it due by friday checklist move furniture remove old carpet pull tack strips reinstall furniture",edit_task,"{""title"":""Replace carpet in office"",""plan"":""civil sheet 3"",""location"":""west wing"",""assignee"":""Luis"",""status"":""in progress"",""end_date"":""2026-05-08"",""items"":[""move furniture"",""remove old carpet"",""pull tack strips"",""reinstall furniture""]}"
"make the category plumbing put it on structural s2 and set the status to tracked",edit_task,"{""plan"":""structural S2"",""category"":""plumbing"",""status"":""tracked""}"
"need a new partition framed in the east wing put gus on it should be done by next tuesday cost around 15000",edit_task,"{""title"":""Frame new partition wall"",""location"":""east wing"",""assignee"":""Gus"",""end_date"":""2026-05-12"",""cost"":""15000""}"
"there's drywall damage on the ceiling at grid line c4 on a3 the gc wants it done by thursday put kim and a crew of 6 on it budget around 7000 make it medium priority this is drywall",edit_task,"{""title"":""Patch drywall ceiling"",""plan"":""A-3"",""location"":""grid line C4"",""category"":""drywall"",""assignee"":""Kim"",""end_date"":""2026-05-07"",""priority"":""p2"",""manpower"":""6"",""cost"":""7000""}"
"patch the drywall ceiling on e1 put nadia on it make it high priority have it done by end of next week crew of 5 budget about 2500 checklist cut out damaged section install backing hang new drywall tape and mud sand smooth",edit_task,"{""title"":""Patch drywall ceiling"",""plan"":""E1"",""assignee"":""Nadia"",""end_date"":""2026-05-15"",""priority"":""p1"",""manpower"":""5"",""cost"":""2500"",""items"":[""cut out damaged section"",""install backing"",""hang new drywall"",""tape and mud"",""sand smooth""]}"
"we need the slab poured assign it to sarah start next tuesday budget 2500 checklist set forms place rebar order concrete pour slab final walkthrough with the gc",edit_task,"{""title"":""Pour concrete slab"",""assignee"":""Sarah"",""start_date"":""2026-05-12"",""manpower"":""2"",""cost"":""2500"",""items"":[""set forms"",""place rebar"",""order concrete"",""pour slab"",""final walkthrough with the GC""]}"
"put bobby and a crew of 6 on the floor tile installation start may 5 and finish by may 8",edit_task,"{""title"":""Install tile flooring"",""assignee"":""Bobby"",""start_date"":""2026-05-05"",""end_date"":""2026-05-08"",""manpower"":""6""}"
"assign maria make it medium priority and cost 6000",edit_task,"{""assignee"":""Maria"",""priority"":""p2"",""cost"":""6000""}"
"there's a hole in the drywall ceiling assign that to danny low priority end of next week is fine",edit_task,"{""title"":""Patch drywall ceiling"",""assignee"":""Danny"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"we're scheduling exterior caulking in the east wing on s1 need a crew of 6 starting this monday through may 9 ballpark cost 8000",edit_task,"{""title"":""Install exterior caulking"",""plan"":""S-1"",""location"":""east wing"",""start_date"":""2026-05-04"",""end_date"":""2026-05-09"",""manpower"":""6"",""cost"":""8000""}"
"nadia is replacing the broken faucet in stairwell b start next tuesday finish by end of month cost 6000 need a crew of 3 mark it complete",edit_task,"{""title"":""Replace broken plumbing fixture"",""location"":""stairwell B"",""assignee"":""Nadia"",""status"":""complete"",""start_date"":""2026-05-12"",""end_date"":""2026-05-29"",""manpower"":""3"",""cost"":""6000""}"
"need a team of 5 for this",edit_task,"{""manpower"":""5""}"
"we're pouring the slab in the south corridor on s1 put mike and a crew of 7 on it budget about 15000 make it low priority this is concrete work",edit_task,"{""title"":""Pour concrete slab"",""plan"":""S-1"",""location"":""south corridor"",""category"":""concrete"",""assignee"":""Mike"",""priority"":""p3"",""manpower"":""7"",""cost"":""15000""}"
"attach it to sheet 4",edit_task,"{""plan"":""Sheet 4""}"
"we've got a new pull station to install assign that to reza low priority end of next week is fine",edit_task,"{""title"":""Install fire alarm pull station"",""assignee"":""Reza"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"it's in room 412 and the status is pending inspection",edit_task,"{""location"":""room 412"",""status"":""pending inspection""}"
"assign this to dave",edit_task,"{""assignee"":""Dave""}"
"need rough in wiring run in suite 101 put tony on it should be done by may 16 cost around 2000",edit_task,"{""title"":""Run electrical rough-in"",""location"":""suite 101"",""assignee"":""Tony"",""end_date"":""2026-05-16"",""cost"":""2000""}"
"patch the roof membrane in the penthouse level on fp2 the gc wants it done by next friday put brenda and a crew of 3 on it budget 1500 make it medium priority this is roofing",edit_task,"{""title"":""Repair roof membrane"",""plan"":""FP-2"",""location"":""penthouse level"",""category"":""roofing"",""assignee"":""Brenda"",""end_date"":""2026-05-15"",""priority"":""p2"",""manpower"":""3"",""cost"":""1500""}"
"bump it to high priority",edit_task,"{""priority"":""p1""}"
"start tomorrow finish by thursday put troy on it",edit_task,"{""assignee"":""Troy"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07""}"
"this one is an hvac ductwork leak on m3 in the east wing zack handles it make it high priority have it done by next tuesday budget around 15000",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""M-3"",""location"":""east wing"",""category"":""HVAC"",""assignee"":""Zack"",""end_date"":""2026-05-12"",""priority"":""p1"",""cost"":""15000""}"
"paint the exterior facade in stairwell c put luis on it have it done by next tuesday this is low priority checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat take a photo for the record",edit_task,"{""title"":""Paint exterior facade"",""location"":""stairwell C"",""assignee"":""Luis"",""end_date"":""2026-05-12"",""priority"":""p3"",""items"":[""pressure wash surface"",""scrape loose paint"",""apply primer"",""caulk gaps and cracks"",""roll first coat"",""take a photo for the record""]}"
"fix the cracks in the floor slab in bay 7 put danny on it have it done by thursday make it top priority checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure take a photo for the record",edit_task,"{""title"":""Repair cracked concrete"",""location"":""bay 7"",""assignee"":""Danny"",""end_date"":""2026-05-07"",""priority"":""p1"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""fill with epoxy inject"",""grind flush after cure"",""take a photo for the record""]}"
"we need the drywall ceiling patched assign it to carlos crew of 2 cost around 7000 start next tuesday and finish thursday checklist cut out damaged section install backing hang new drywall tape and mud final walkthrough with the gc",edit_task,"{""title"":""Patch drywall ceiling"",""assignee"":""Carlos"",""start_date"":""2026-05-12"",""end_date"":""2026-05-14"",""manpower"":""2"",""cost"":""7000"",""items"":[""cut out damaged section"",""install backing"",""hang new drywall"",""tape and mud"",""final walkthrough with the GC""]}"
"put it under tile",edit_task,"{""category"":""tile""}"
"apply waterproofing membrane on sheet 4 put mike on it make it high priority by end of month team of 3 budget about 4000 checklist clean substrate apply primer coat let cure apply first membrane coat let cure",edit_task,"{""title"":""Apply waterproofing membrane"",""plan"":""Sheet 4"",""assignee"":""Mike"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""3"",""cost"":""4000"",""items"":[""clean substrate"",""apply primer coat"",""let cure"",""apply first membrane coat"",""let cure""]}"
"new sprinkler heads need to go in assign it to carlos crew of 3 cost around 5000 start may 5 and finish next tuesday checklist confirm pipe layout with plan drill ceiling openings install drops attach heads final walkthrough with the gc",edit_task,"{""title"":""Install sprinkler heads"",""assignee"":""Carlos"",""start_date"":""2026-05-05"",""end_date"":""2026-05-12"",""manpower"":""3"",""cost"":""5000"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""final walkthrough with the GC""]}"
"make it low priority and push the deadline to thursday",edit_task,"{""end_date"":""2026-05-07"",""priority"":""p3""}"
"gotta get recessed lights run in the south corridor by end of month make it medium priority",edit_task,"{""title"":""Install recessed lighting"",""location"":""south corridor"",""end_date"":""2026-05-29"",""priority"":""p2""}"
"move it to e2 and bump it to high priority",edit_task,"{""plan"":""E-2"",""priority"":""p1""}"
"need tile floor put down in the mezzanine put brenda on it should be done by end of day wednesday cost around 15000",edit_task,"{""title"":""Install tile flooring"",""location"":""mezzanine"",""assignee"":""Brenda"",""end_date"":""2026-05-06"",""cost"":""15000""}"
"we've got a leak under the sink assign it to omar crew of 3 cost around 6000 start this monday and finish may 5 checklist shut off water supply remove p trap inspect drain line replace gaskets final walkthrough with the gc",edit_task,"{""title"":""Fix water leak under sink"",""assignee"":""Omar"",""start_date"":""2026-05-04"",""end_date"":""2026-05-05"",""manpower"":""3"",""cost"":""6000"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""final walkthrough with the GC""]}"
"waterproofing work in the boiler room on id101 make it low priority reza handles it by end of day wednesday budget around 2500",edit_task,"{""title"":""Apply waterproofing membrane"",""plan"":""ID-101"",""location"":""boiler room"",""category"":""waterproofing"",""assignee"":""Reza"",""end_date"":""2026-05-06"",""priority"":""p3"",""cost"":""2500""}"
"troy is leading the attic insulation in unit 12 start wednesday morning finish may 8 cost around 15000 need 1 guy mark it closed",edit_task,"{""title"":""Insulate attic space"",""location"":""unit 12"",""assignee"":""Troy"",""status"":""closed"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""1"",""cost"":""15000""}"
"paint the exterior facade on e1 put jake on it make it high priority by end of month need 8 workers budget about 12000 checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat",edit_task,"{""title"":""Paint exterior facade"",""plan"":""E1"",""assignee"":""Jake"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""8"",""cost"":""12000"",""items"":[""pressure wash surface"",""scrape loose paint"",""apply primer"",""caulk gaps and cracks"",""roll first coat""]}"
"we'll have 10 workers on site",edit_task,"{""manpower"":""10""}"
"running recessed lights in mechanical room level 3 on the ground floor gc wants it done by may 17 put eddie and a crew of 9 on it budget is 5000 make it high priority this is electrical",edit_task,"{""title"":""Install recessed lighting"",""plan"":""ground floor"",""location"":""mechanical room level 3"",""category"":""electrical"",""assignee"":""Eddie"",""end_date"":""2026-05-17"",""priority"":""p1"",""manpower"":""9"",""cost"":""5000""}"
"roof membrane has a leak in mechanical room level 3 on the ground floor mark it tracked danny is handling it due by end of day wednesday checklist locate the breach clean and dry the area apply primer document repair",edit_task,"{""title"":""Repair roof membrane"",""plan"":""ground floor"",""location"":""mechanical room level 3"",""assignee"":""Danny"",""status"":""tracked"",""end_date"":""2026-05-06"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""document repair""]}"
"need the cracks in the floor slab fixed in the courtyard put juan on it should be done by thursday cost around 3000",edit_task,"{""title"":""Repair cracked concrete"",""location"":""courtyard"",""assignee"":""Juan"",""end_date"":""2026-05-07"",""cost"":""3000""}"
"move it to the server room",edit_task,"{""location"":""server room""}"
"we've got exterior paint work assign that to felix low priority end of next week is fine",edit_task,"{""title"":""Paint exterior facade"",""assignee"":""Felix"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"tear down the partition wall in the west wing put zack on it make it urgent checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall cut studs take a photo for the record",edit_task,"{""title"":""Demolish interior partition"",""location"":""west wing"",""assignee"":""Zack"",""priority"":""p1"",""items"":[""verify no electrical or plumbing in wall"",""shut off circuits"",""remove door"",""strip drywall"",""cut studs"",""take a photo for the record""]}"
"do the exterior paint on level 4 put sal on it have it wrapped by end of day wednesday make it high priority checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat take a photo for the record",edit_task,"{""title"":""Paint exterior facade"",""location"":""level 4"",""assignee"":""Sal"",""end_date"":""2026-05-06"",""priority"":""p1"",""items"":[""pressure wash surface"",""scrape loose paint"",""apply primer"",""caulk gaps and cracks"",""roll first coat"",""take a photo for the record""]}"
"start wednesday morning finish by next tuesday put hector on it",edit_task,"{""assignee"":""Hector"",""start_date"":""2026-05-06"",""end_date"":""2026-05-12""}"
"gotta get the interior wall demo done by next tuesday crew of 9 should be enough make it medium priority and assign lena",edit_task,"{""title"":""Demolish interior partition"",""assignee"":""Lena"",""end_date"":""2026-05-12"",""priority"":""p2"",""manpower"":""9""}"
"relabel this as pour concrete slab",edit_task,"{""title"":""Pour concrete slab""}"
"do the electrical rough in on the data center floor put danny on it make it urgent get it done by thursday",edit_task,"{""title"":""Run electrical rough-in"",""location"":""data center floor"",""assignee"":""Danny"",""end_date"":""2026-05-07"",""priority"":""p1""}"
"the ac unit is shot in suite 101 put dave on it should be done by may 20 cost around 3500",edit_task,"{""title"":""Replace broken HVAC unit"",""location"":""suite 101"",""assignee"":""Dave"",""end_date"":""2026-05-20"",""cost"":""3500""}"
"need a new partition framed in basement level 2 put zack on it should be done by may 9 cost around 3500",edit_task,"{""title"":""Frame new partition wall"",""location"":""basement level 2"",""assignee"":""Zack"",""end_date"":""2026-05-09"",""cost"":""3500""}"
"the concrete slab has cracks assign it to eddie crew of 2 cost around 3000 start tomorrow and finish thursday checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject final walkthrough with the gc",edit_task,"{""title"":""Repair cracked concrete"",""assignee"":""Eddie"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""2"",""cost"":""3000"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""fill with epoxy inject"",""final walkthrough with the GC""]}"
"the hvac unit needs replacing in the west wing on a201 make it medium priority due by end of month",edit_task,"{""title"":""Replace broken HVAC unit"",""plan"":""A201"",""location"":""west wing"",""end_date"":""2026-05-29"",""priority"":""p2""}"
"gotta get the busted fixture in the bathroom fixed team of 3 should be enough make it low priority and assign zack",edit_task,"{""title"":""Replace broken plumbing fixture"",""location"":""bathroom"",""assignee"":""Zack"",""priority"":""p3"",""manpower"":""3""}"
"we've got a duct leak in the plenum assign it to steve crew of 2 cost around 3500 start may 4 finish may 8 checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape final walkthrough with the gc",edit_task,"{""title"":""Fix HVAC ductwork leak"",""assignee"":""Steve"",""start_date"":""2026-05-04"",""end_date"":""2026-05-08"",""manpower"":""2"",""cost"":""3500"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""wrap with foil tape"",""final walkthrough with the GC""]}"
"we're pouring the concrete slab on s2 in the server room starting wednesday morning and wrapping thursday crew of 10 cost 800 this is concrete hector is leading it checklist set forms place rebar order concrete pour slab screed and float apply curing compound",edit_task,"{""title"":""Pour concrete slab"",""plan"":""S-2"",""location"":""server room"",""category"":""concrete"",""assignee"":""Hector"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""10"",""cost"":""800"",""items"":[""set forms"",""place rebar"",""order concrete"",""pour slab"",""screed and float"",""apply curing compound""]}"
"danny is taking the broken exhaust fan in the bathroom on s2 budget 10000 mark it tracked",edit_task,"{""title"":""Replace exhaust fan"",""plan"":""S-2"",""location"":""bathroom"",""assignee"":""Danny"",""status"":""tracked"",""cost"":""10000""}"
"we're repairing cracked concrete on a301 in the mechanical room starting wednesday morning and wrapping thursday 7 workers on it cost 6000 this is concrete zack is leading it checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure apply surface sealer",edit_task,"{""title"":""Repair cracked concrete"",""plan"":""A301"",""location"":""mechanical room"",""category"":""concrete"",""assignee"":""Zack"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""7"",""cost"":""6000"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""fill with epoxy inject"",""grind flush after cure"",""apply surface sealer""]}"
"the ceiling drywall needs patching on a3 carlos is on it make it top priority by thursday",edit_task,"{""title"":""Patch drywall ceiling"",""plan"":""A-3"",""assignee"":""Carlos"",""end_date"":""2026-05-07"",""priority"":""p1""}"
"change the category to concrete and mark it complete",edit_task,"{""category"":""concrete"",""status"":""complete""}"
"give it to omar",edit_task,"{""assignee"":""Omar""}"
"eddie and his 5 guys are on the exterior paint in the mezzanine category painting budget 7000 need it by end of day wednesday checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks document everything",edit_task,"{""title"":""Paint exterior facade"",""location"":""mezzanine"",""category"":""painting"",""assignee"":""Eddie"",""end_date"":""2026-05-06"",""manpower"":""5"",""cost"":""7000"",""items"":[""pressure wash surface"",""scrape loose paint"",""apply primer"",""caulk gaps and cracks"",""document everything""]}"
"mark this verified it's rough in wiring in unit 7",edit_task,"{""title"":""Run electrical rough-in"",""location"":""unit 7"",""status"":""verified""}"
"the fire alarm pull station is broken assign it to vic crew of 3 cost around 12000 start wednesday morning and finish end of day wednesday checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox final walkthrough with the gc",edit_task,"{""title"":""Install fire alarm pull station"",""assignee"":""Vic"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06"",""manpower"":""3"",""cost"":""12000"",""items"":[""shut off fire alarm circuit"",""remove old device"",""run new conduit if needed"",""mount backbox"",""final walkthrough with the GC""]}"
"fix the hvac ductwork leak on s1 put kim on it this can wait by end of month team of 9 budget about 5000 checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""S-1"",""assignee"":""Kim"",""end_date"":""2026-05-29"",""priority"":""p3"",""manpower"":""9"",""cost"":""5000"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""wrap with foil tape"",""re-insulate if needed""]}"
"we're fixing the hvac ductwork leak on id101 in the courtyard starting tomorrow and wrapping next friday team of 4 on it cost 4000 this is hvac ray is leading it checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed test system airflow",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""ID-101"",""location"":""courtyard"",""category"":""HVAC"",""assignee"":""Ray"",""start_date"":""2026-05-06"",""end_date"":""2026-05-15"",""manpower"":""4"",""cost"":""4000"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""wrap with foil tape"",""re-insulate if needed"",""test system airflow""]}"
"carpet replacement in suite 4b put brenda on it have it wrapped by next tuesday make it urgent checklist move furniture remove old carpet pull tack strips prep subfloor install new tack strips take a photo for the record",edit_task,"{""title"":""Replace carpet in office"",""location"":""suite 4B"",""assignee"":""Brenda"",""end_date"":""2026-05-12"",""priority"":""p1"",""items"":[""move furniture"",""remove old carpet"",""pull tack strips"",""prep subfloor"",""install new tack strips"",""take a photo for the record""]}"
"steve and his 8 workers are swapping out the old hvac on the roof deck this is hvac budget 3500 need it by next friday checklist shut down power to unit remove old unit install new unit check refrigerant lines document everything",edit_task,"{""title"":""Replace broken HVAC unit"",""location"":""roof deck"",""category"":""HVAC"",""assignee"":""Steve"",""end_date"":""2026-05-15"",""manpower"":""8"",""cost"":""3500"",""items"":[""shut down power to unit"",""remove old unit"",""install new unit"",""check refrigerant lines"",""document everything""]}"
"repair the roof membrane on fp3 put jake on it make it high priority by end of next week crew of 8 budget about 8000 checklist locate the breach clean and dry the area apply primer cut patch membrane adhere patch",edit_task,"{""title"":""Repair roof membrane"",""plan"":""FP-3"",""assignee"":""Jake"",""end_date"":""2026-05-15"",""priority"":""p1"",""manpower"":""8"",""cost"":""8000"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""cut patch membrane"",""adhere patch""]}"
"reza and his crew of 2 are replacing the fire alarm pull station in suite 3b category fire alarm budget 7000 need it by end of day wednesday checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox document everything",edit_task,"{""title"":""Install fire alarm pull station"",""location"":""suite 3B"",""category"":""fire alarm"",""assignee"":""Reza"",""end_date"":""2026-05-06"",""manpower"":""2"",""cost"":""7000"",""items"":[""shut off fire alarm circuit"",""remove old device"",""run new conduit if needed"",""mount backbox"",""document everything""]}"
"this is a broken exhaust fan in the bathroom in unit 12 on m3 mark it closed steve is handling it due by next friday checklist shut off circuit at panel remove old fan install new housing take finished photo",edit_task,"{""title"":""Replace exhaust fan"",""plan"":""M-3"",""location"":""unit 12"",""assignee"":""Steve"",""status"":""closed"",""end_date"":""2026-05-15"",""items"":[""shut off circuit at panel"",""remove old fan"",""install new housing"",""take finished photo""]}"
"put ray and a crew of 2 on the drywall ceiling damage start wednesday morning and finish end of day wednesday",edit_task,"{""title"":""Patch drywall ceiling"",""assignee"":""Ray"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06"",""manpower"":""2""}"
"mark this complete it's rough in wiring on the ground floor",edit_task,"{""title"":""Run electrical rough-in"",""location"":""ground floor"",""status"":""complete""}"
"repair the roof membrane on fp3 put jake on it make it medium priority by end of month 7 workers budget about 20000 checklist locate the breach clean and dry the area apply primer cut patch membrane adhere patch",edit_task,"{""title"":""Repair roof membrane"",""plan"":""FP-3"",""assignee"":""Jake"",""end_date"":""2026-05-29"",""priority"":""p2"",""manpower"":""7"",""cost"":""20000"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""cut patch membrane"",""adhere patch""]}"
"task title is fix hvac ductwork leak",edit_task,"{""title"":""Fix HVAC ductwork leak""}"
"we've got a leak under the sink assign it to brenda crew of 2 cost around 3500 start may 6 and finish may 19 checklist shut off water supply remove p trap inspect drain line replace gaskets final walkthrough with the gc",edit_task,"{""title"":""Fix water leak under sink"",""assignee"":""Brenda"",""start_date"":""2026-05-06"",""end_date"":""2026-05-19"",""manpower"":""2"",""cost"":""3500"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""final walkthrough with the GC""]}"
"we're fixing the leak under the sink on structural s2 in stairwell b starting next tuesday and wrapping may 14 crew of 3 cost around 6000 category plumbing mike is leading it checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap run water test",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""structural S2"",""location"":""stairwell B"",""category"":""plumbing"",""assignee"":""Mike"",""start_date"":""2026-05-12"",""end_date"":""2026-05-14"",""manpower"":""3"",""cost"":""6000"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""reinstall p-trap"",""run water test""]}"
"this is fixing the cracks in the floor slab in the courtyard on sheet 7 mark it pending inspection kim is handling it due by end of month checklist rout crack to proper width blow out dust apply bond breaker if needed document",edit_task,"{""title"":""Repair cracked concrete"",""plan"":""Sheet 7"",""location"":""courtyard"",""assignee"":""Kim"",""status"":""pending inspection"",""end_date"":""2026-05-29"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""document""]}"
"recaulk the facade joints on s1 mark it low priority maria handles it by thursday budget 6000 location basement level 2 category waterproofing",edit_task,"{""title"":""Install exterior caulking"",""plan"":""S-1"",""location"":""basement level 2"",""category"":""waterproofing"",""assignee"":""Maria"",""end_date"":""2026-05-07"",""priority"":""p3"",""cost"":""6000""}"
"laying tile in the bathroom on sheet 7 starts this monday wraps up by thursday 6 workers on the crew cost is 3500 category is tile",edit_task,"{""title"":""Install tile flooring"",""plan"":""Sheet 7"",""location"":""bathroom"",""category"":""tile"",""start_date"":""2026-05-04"",""end_date"":""2026-05-07"",""manpower"":""6"",""cost"":""3500""}"
"assign brenda set priority to high and due before the inspection",edit_task,"{""assignee"":""Brenda"",""priority"":""p1""}"
"put eddie and a crew of 4 on knocking out the old partition this is demolition work starts may 6 done by thursday",edit_task,"{""title"":""Demolish interior partition"",""category"":""demolition"",""assignee"":""Eddie"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""4""}"
"move this to m2 and set the location to bay 12",edit_task,"{""plan"":""M2"",""location"":""bay 12""}"
"fix the hvac ductwork leak on structural s2 put vic on it make it high priority by end of month team of 10 budget about 20000 checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""structural S2"",""assignee"":""Vic"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""10"",""cost"":""20000"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""wrap with foil tape"",""re-insulate if needed""]}"
"we're painting the exterior facade on s1 in bay 7 starting tomorrow and wrapping friday crew of 1 cost about 1200 category painting eddie is leading it checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat roll second coat",edit_task,"{""title"":""Paint exterior facade"",""plan"":""S-1"",""location"":""bay 7"",""category"":""painting"",""assignee"":""Eddie"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""1"",""cost"":""1200"",""items"":[""pressure wash surface"",""scrape loose paint"",""apply primer"",""caulk gaps and cracks"",""roll first coat"",""roll second coat""]}"
"move it to p3",edit_task,"{""plan"":""P-3""}"
"lena is taking crack repair in unit 23 this is concrete work make it medium priority done by may 16 need a crew of 9 budget about 5000 mark it tracked",edit_task,"{""title"":""Repair cracked concrete"",""location"":""unit 23"",""category"":""concrete"",""assignee"":""Lena"",""status"":""tracked"",""end_date"":""2026-05-16"",""priority"":""p2"",""manpower"":""9"",""cost"":""5000""}"
"replace the broken faucet on e4 start this monday wrap up by may 5 team of 6 cost about 1200",edit_task,"{""title"":""Replace broken plumbing fixture"",""plan"":""E4"",""start_date"":""2026-05-04"",""end_date"":""2026-05-05"",""manpower"":""6"",""cost"":""1200""}"
"we're demoing the partition on c1 in the main lobby starting tomorrow and wrapping next tuesday 9 workers on it cost about 4000 this is demolition juan is leading it checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall cut studs remove plates",edit_task,"{""title"":""Demolish interior partition"",""plan"":""C-1"",""location"":""main lobby"",""category"":""demolition"",""assignee"":""Juan"",""start_date"":""2026-05-06"",""end_date"":""2026-05-12"",""manpower"":""9"",""cost"":""4000"",""items"":[""verify no electrical or plumbing in wall"",""shut off circuits"",""remove door"",""strip drywall"",""cut studs"",""remove plates""]}"
"omar is taking the new partition wall on m3 budget 7000 mark it pending inspection",edit_task,"{""title"":""Frame new partition wall"",""plan"":""M-3"",""assignee"":""Omar"",""status"":""pending inspection"",""cost"":""7000""}"
"paint the exterior facade on sheet 4 by end of month need 8 workers cost 800",edit_task,"{""title"":""Paint exterior facade"",""plan"":""Sheet 4"",""end_date"":""2026-05-29"",""manpower"":""8"",""cost"":""800""}"
"set priority to low location roof deck cost around 2500",edit_task,"{""location"":""roof deck"",""priority"":""p3"",""cost"":""2500""}"
"install the suspended ceiling grid in the west wing on fp2 the gc wants it done by may 19 put pat and a team of 2 on it budget about 15000 make it top priority",edit_task,"{""title"":""Install suspended ceiling grid"",""plan"":""FP-2"",""location"":""west wing"",""assignee"":""Pat"",""end_date"":""2026-05-19"",""priority"":""p1"",""manpower"":""2"",""cost"":""15000""}"
"start tomorrow end next friday manpower 4 guys and cost around 10000",edit_task,"{""start_date"":""2026-05-06"",""end_date"":""2026-05-15"",""manpower"":""4"",""cost"":""10000""}"
"we're scheduling carpet replacement for basement level 2 on e1 need 4 guys starting may 4 ballpark cost 20000",edit_task,"{""title"":""Replace carpet in office"",""plan"":""E1"",""location"":""basement level 2"",""start_date"":""2026-05-04"",""manpower"":""4"",""cost"":""20000""}"
"put mike on it",edit_task,"{""assignee"":""Mike""}"
"patch the drywall ceiling on e1 put eddie on it make it high priority by end of month 7 workers budget about 2500 checklist cut out damaged section install backing hang new drywall tape and mud sand smooth",edit_task,"{""title"":""Patch drywall ceiling"",""plan"":""E1"",""assignee"":""Eddie"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""7"",""cost"":""2500"",""items"":[""cut out damaged section"",""install backing"",""hang new drywall"",""tape and mud"",""sand smooth""]}"
"we're repairing cracked concrete on m3 at the pool deck starting tomorrow and wrapping next friday 4 guys on it cost about 6000 this is concrete hector is leading it checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure apply surface sealer",edit_task,"{""title"":""Repair cracked concrete"",""plan"":""M-3"",""location"":""pool deck"",""category"":""concrete"",""assignee"":""Hector"",""start_date"":""2026-05-06"",""end_date"":""2026-05-15"",""manpower"":""4"",""cost"":""6000"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""fill with epoxy inject"",""grind flush after cure"",""apply surface sealer""]}"
"bump it to low priority",edit_task,"{""priority"":""p3""}"
"felix is leading the cracked window glazing in the west wing start wednesday morning finish may 16 cost 1500 need a team of 9 mark it tracked",edit_task,"{""title"":""Replace broken window glazing"",""location"":""west wing"",""assignee"":""Felix"",""status"":""tracked"",""start_date"":""2026-05-06"",""end_date"":""2026-05-16"",""manpower"":""9"",""cost"":""1500""}"
"install sprinkler heads on a101 put gus on it make it medium priority by end of month 4 workers budget about 15000 checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""A101"",""assignee"":""Gus"",""end_date"":""2026-05-29"",""priority"":""p2"",""manpower"":""4"",""cost"":""15000"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""pressure test""]}"
"status is complete",edit_task,"{""status"":""complete""}"
"drawing fp2 location level 5 category glazing assign hector",edit_task,"{""plan"":""FP-2"",""location"":""level 5"",""category"":""glazing"",""assignee"":""Hector""}"
"new wall needs to be framed in the mezzanine put steve on it by end of month make it low priority checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate frame door opening take a photo for the record",edit_task,"{""title"":""Frame new partition wall"",""location"":""mezzanine"",""assignee"":""Steve"",""end_date"":""2026-05-29"",""priority"":""p3"",""items"":[""snap chalk lines"",""lay bottom plate"",""stand studs 16 OC"",""install top plate"",""frame door opening"",""take a photo for the record""]}"
"assign hector low priority cost 15000 and due by thursday",edit_task,"{""assignee"":""Hector"",""end_date"":""2026-05-07"",""priority"":""p3"",""cost"":""15000""}"
"recaulk the facade joints in the east wing on structural s2 make it high priority due by next friday",edit_task,"{""title"":""Install exterior caulking"",""plan"":""structural S2"",""location"":""east wing"",""end_date"":""2026-05-15"",""priority"":""p1""}"
"mark this open it's a new partition wall in room 412",edit_task,"{""title"":""Frame new partition wall"",""location"":""room 412"",""status"":""open""}"
"mark this pending inspection it's patching the roof membrane in elevator shaft b",edit_task,"{""title"":""Repair roof membrane"",""location"":""elevator shaft B"",""status"":""pending inspection""}"
"we're installing the fire alarm pull station on a202 at the pool deck starting may 6 and wrapping friday crew of 8 cost around 800 category fire alarm nadia is leading it checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox wire new device test alarm activation",edit_task,"{""title"":""Install fire alarm pull station"",""plan"":""A202"",""location"":""pool deck"",""category"":""fire alarm"",""assignee"":""Nadia"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""8"",""cost"":""800"",""items"":[""shut off fire alarm circuit"",""remove old device"",""run new conduit if needed"",""mount backbox"",""wire new device"",""test alarm activation""]}"
"move to sheet 9 and bump it to high priority",edit_task,"{""plan"":""Sheet 9"",""priority"":""p1""}"
"site is north corridor",edit_task,"{""location"":""north corridor""}"
"assign to luis and set priority to medium",edit_task,"{""assignee"":""Luis"",""priority"":""p2""}"
"we need data and av cabling installed assign it to ray crew of 3 cost around 12000 start next tuesday and finish end of month checklist pull permits if required route cable path drill penetrations pull cable final walkthrough with the gc",edit_task,"{""title"":""Install low voltage cabling"",""assignee"":""Ray"",""start_date"":""2026-05-12"",""end_date"":""2026-05-29"",""manpower"":""3"",""cost"":""12000"",""items"":[""pull permits if required"",""route cable path"",""drill penetrations"",""pull cable"",""final walkthrough with the GC""]}"
"relabel this as fix electrical panel issue",edit_task,"{""title"":""Fix electrical panel issue""}"
"this is electrical rough in on level 5 on fp3 make it top priority due by end of month",edit_task,"{""title"":""Run electrical rough-in"",""plan"":""FP-3"",""location"":""level 5"",""end_date"":""2026-05-29"",""priority"":""p1""}"
"call it fix water leak under sink",edit_task,"{""title"":""fix water leak under sink""}"
"set cost to 3500",edit_task,"{""cost"":""3500""}"
"run low voltage cable in the break room on floor 2 put danny on it have it done by friday make it high priority checklist pull permits if required route cable path drill penetrations pull cable terminate at patch panel take a photo for the record",edit_task,"{""title"":""Install low voltage cabling"",""location"":""break room floor 2"",""assignee"":""Danny"",""end_date"":""2026-05-08"",""priority"":""p1"",""items"":[""pull permits if required"",""route cable path"",""drill penetrations"",""pull cable"",""terminate at patch panel"",""take a photo for the record""]}"
"this is installing data and av cabling on level 2 on the ground floor mark it closed kim is handling it due by next tuesday checklist pull permits if required route cable path drill penetrations sign off",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""ground floor"",""location"":""level 2"",""assignee"":""Kim"",""status"":""closed"",""end_date"":""2026-05-12"",""items"":[""pull permits if required"",""route cable path"",""drill penetrations"",""sign off""]}"
"set cost to about 12000 manpower to 6 and category to painting",edit_task,"{""category"":""painting"",""manpower"":""6"",""cost"":""12000""}"
"the toilet is cracked and needs replacing assign it to eddie crew of 2 cost around 3000 start this monday and finish end of month checklist shut off water remove old fixture clean mounting surface install new fixture final walkthrough with the gc",edit_task,"{""title"":""Replace broken plumbing fixture"",""assignee"":""Eddie"",""start_date"":""2026-05-04"",""end_date"":""2026-05-29"",""manpower"":""2"",""cost"":""3000"",""items"":[""shut off water"",""remove old fixture"",""clean mounting surface"",""install new fixture"",""final walkthrough with the GC""]}"
"assign to maria and set priority to p1",edit_task,"{""assignee"":""Maria"",""priority"":""p1""}"
"we're scheduling partition demo for the north corridor on a201 need a team of 9 starting wednesday morning through may 19 ballpark cost 15000",edit_task,"{""title"":""Demolish interior partition"",""plan"":""A201"",""location"":""north corridor"",""start_date"":""2026-05-06"",""end_date"":""2026-05-19"",""manpower"":""9"",""cost"":""15000""}"
"tony is taking the slab pour on plumbing p4 budget 1500 mark it closed",edit_task,"{""title"":""Pour concrete slab"",""plan"":""plumbing P4"",""assignee"":""Tony"",""status"":""closed"",""cost"":""1500""}"
"this one is a busted window pane on e4 in the boiler room make it urgent felix handles it by friday budget around 8000 category glazing",edit_task,"{""title"":""Replace broken window glazing"",""plan"":""E4"",""location"":""boiler room"",""category"":""glazing"",""assignee"":""Felix"",""end_date"":""2026-05-08"",""priority"":""p1"",""cost"":""8000""}"
"we've got exterior paint work assign that to vic low priority end of next week is fine",edit_task,"{""title"":""Paint exterior facade"",""assignee"":""Vic"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"move this to structural s2 and set the location to elevator shaft b",edit_task,"{""plan"":""structural S2"",""location"":""elevator shaft B""}"
"put juan and a crew of 5 on the low voltage cabling start next tuesday and have it done by may 17",edit_task,"{""title"":""Install low voltage cabling"",""assignee"":""Juan"",""start_date"":""2026-05-12"",""end_date"":""2026-05-17"",""manpower"":""5""}"
"we've got hvac ductwork coming apart on a4 pat is on this make it high priority by end of month",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""A-4"",""assignee"":""Pat"",""end_date"":""2026-05-29"",""priority"":""p1""}"
"there's a slow drip under the kitchen sink in the mechanical room on civil sheet 3 mark it open brenda is handling it due by thursday checklist shut off water supply remove p trap inspect drain line take photo",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""civil sheet 3"",""location"":""mechanical room"",""assignee"":""Brenda"",""status"":""open"",""end_date"":""2026-05-07"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""take photo""]}"
"the ceiling tile system is going in on c1 at bay 12 make it medium priority kim handles it budget around 5000",edit_task,"{""title"":""Install ceiling grid and tiles"",""plan"":""C-1"",""location"":""bay 12"",""assignee"":""Kim"",""priority"":""p2"",""cost"":""5000""}"
"set cost to 3000 and manpower to 1",edit_task,"{""manpower"":""1"",""cost"":""3000""}"
"fix the cracks in the floor slab in bay 4 put dave on it have it wrapped by may 11 make it low priority checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure take a photo for the record",edit_task,"{""title"":""Repair cracked concrete"",""location"":""bay 4"",""assignee"":""Dave"",""end_date"":""2026-05-11"",""priority"":""p3"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""fill with epoxy inject"",""grind flush after cure"",""take a photo for the record""]}"
"we've got fire suppression heads to install assign that to juan low priority end of next week is fine",edit_task,"{""title"":""Install sprinkler heads"",""assignee"":""Juan"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"start may 6 end may 7 manpower 3 workers and cost 3000",edit_task,"{""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""3"",""cost"":""3000""}"
"target completion end of month",edit_task,"{""end_date"":""2026-05-29""}"
"title should be replace carpet in office",edit_task,"{""title"":""Replace carpet in office""}"
"send a team of 5 over",edit_task,"{""manpower"":""5""}"
"vic and his crew of 1 are on the broken exhaust fan at the pool deck this is mechanical budget 3500 need it by next friday checklist shut off circuit at panel remove old fan install new housing wire new fan document everything",edit_task,"{""title"":""Replace exhaust fan"",""location"":""pool deck"",""category"":""mechanical"",""assignee"":""Vic"",""end_date"":""2026-05-15"",""manpower"":""1"",""cost"":""3500"",""items"":[""shut off circuit at panel"",""remove old fan"",""install new housing"",""wire new fan"",""document everything""]}"
"we're fixing the leak under the sink on mep1 in the main lobby starting this monday and wrapping may 5 team of 9 cost 4000 category plumbing vic is leading it checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap run water test",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""MEP-1"",""location"":""main lobby"",""category"":""plumbing"",""assignee"":""Vic"",""start_date"":""2026-05-04"",""end_date"":""2026-05-05"",""manpower"":""9"",""cost"":""4000"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""reinstall p-trap"",""run water test""]}"
"set cost to 15000",edit_task,"{""cost"":""15000""}"
"install tile flooring on a301 put sarah on it make it high priority by end of next week team of 9 budget about 6000 checklist demo old flooring level subfloor apply thinset mortar lay tile to pattern cut edge tiles",edit_task,"{""title"":""Install tile flooring"",""plan"":""A301"",""assignee"":""Sarah"",""end_date"":""2026-05-15"",""priority"":""p1"",""manpower"":""9"",""cost"":""6000"",""items"":[""demo old flooring"",""level subfloor"",""apply thinset mortar"",""lay tile to pattern"",""cut edge tiles""]}"
"we need the shower pan waterproofed assign it to jake crew of 3 cost around 2000 start this monday and finish friday checklist clean substrate apply primer coat let cure apply first membrane coat final walkthrough with the gc",edit_task,"{""title"":""Apply waterproofing membrane"",""assignee"":""Jake"",""start_date"":""2026-05-04"",""end_date"":""2026-05-08"",""manpower"":""3"",""cost"":""2000"",""items"":[""clean substrate"",""apply primer coat"",""let cure"",""apply first membrane coat"",""final walkthrough with the GC""]}"
"we need a new partition wall put up assign it to omar crew of 2 cost around 3500 start wednesday morning and finish thursday checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate final walkthrough with the gc",edit_task,"{""title"":""Frame new partition wall"",""assignee"":""Omar"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""2"",""cost"":""3500"",""items"":[""snap chalk lines"",""lay bottom plate"",""stand studs 16 OC"",""install top plate"",""final walkthrough with the GC""]}"
"assign nadia on it and get it done by may 7",edit_task,"{""assignee"":""Nadia"",""end_date"":""2026-05-07""}"
"slab pour scheduled at exterior facade east put steve on that make it high priority get it done by next tuesday",edit_task,"{""title"":""Pour concrete slab"",""location"":""exterior facade east"",""assignee"":""Steve"",""end_date"":""2026-05-12"",""priority"":""p1""}"
"put pat and a crew of 3 on painting the exterior facade this is painting work start may 3 and finish thursday",edit_task,"{""title"":""Paint exterior facade"",""category"":""painting"",""assignee"":""Pat"",""start_date"":""2026-05-03"",""end_date"":""2026-05-07"",""manpower"":""3""}"
"put it on the ground floor",edit_task,"{""plan"":""ground floor""}"
"this is a busted fixture in the bathroom in the lobby on e1 mark it open bobby is handling it due by end of month checklist shut off water remove old fixture clean mounting surface take photo",edit_task,"{""title"":""Replace broken plumbing fixture"",""plan"":""E1"",""location"":""lobby bathroom"",""assignee"":""Bobby"",""status"":""open"",""end_date"":""2026-05-29"",""items"":[""shut off water"",""remove old fixture"",""clean mounting surface"",""take photo""]}"
"the fire alarm pull station is broken in mechanical room level 3 put reza on it have it done by may 17 make it low priority checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox wire new device take a photo for the record",edit_task,"{""title"":""Install fire alarm pull station"",""location"":""mechanical room level 3"",""assignee"":""Reza"",""end_date"":""2026-05-17"",""priority"":""p3"",""items"":[""shut off fire alarm circuit"",""remove old device"",""run new conduit if needed"",""mount backbox"",""wire new device"",""take a photo for the record""]}"
"luis and his team of 5 are on the hvac ductwork leak in the server room category hvac budget 3500 need it by end of day wednesday checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape document everything",edit_task,"{""title"":""Fix HVAC ductwork leak"",""location"":""server room"",""category"":""HVAC"",""assignee"":""Luis"",""end_date"":""2026-05-06"",""manpower"":""5"",""cost"":""3500"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""wrap with foil tape"",""document everything""]}"
"gotta get new carpet into the office in the north corridor by end of month make it medium priority",edit_task,"{""title"":""Replace carpet in office"",""location"":""north corridor"",""end_date"":""2026-05-29"",""priority"":""p2""}"
"we're installing the fire alarm pull station on a4 at grid line b2 starting tomorrow and wrapping may 8 team of 5 cost about 1200 category fire alarm brenda is leading it checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox wire new device test alarm activation",edit_task,"{""title"":""Install fire alarm pull station"",""plan"":""A-4"",""location"":""grid line B2"",""category"":""fire alarm"",""assignee"":""Brenda"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""5"",""cost"":""1200"",""items"":[""shut off fire alarm circuit"",""remove old device"",""run new conduit if needed"",""mount backbox"",""wire new device"",""test alarm activation""]}"
"happening at stairwell b",edit_task,"{""location"":""stairwell B""}"
"change the title to patch drywall ceiling",edit_task,"{""title"":""patch drywall ceiling""}"
"gotta get the hvac unit replaced in elevator shaft b by friday make it medium priority",edit_task,"{""title"":""Replace broken HVAC unit"",""location"":""elevator shaft B"",""end_date"":""2026-05-08"",""priority"":""p2""}"
"we've got a new partition to frame in suite 3b put mike on it have it wrapped by next friday make it medium priority checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate frame door opening take a photo for the record",edit_task,"{""title"":""Frame new partition wall"",""location"":""suite 3B"",""assignee"":""Mike"",""end_date"":""2026-05-15"",""priority"":""p2"",""items"":[""snap chalk lines"",""lay bottom plate"",""stand studs 16 OC"",""install top plate"",""frame door opening"",""take a photo for the record""]}"
"trade is hvac",edit_task,"{""category"":""HVAC""}"
"eddie is leading the water leak under the sink in suite 3b start may 3 finish by thursday cost 4000 need 2 workers mark it open",edit_task,"{""title"":""Fix water leak under sink"",""location"":""suite 3B"",""assignee"":""Eddie"",""status"":""open"",""start_date"":""2026-05-03"",""end_date"":""2026-05-07"",""manpower"":""2"",""cost"":""4000""}"
"this is swapping out the exhaust fan in the west wing on e4 mark it open tony is handling it due by end of day wednesday checklist shut off circuit at panel remove old fan install new housing take finished photo",edit_task,"{""title"":""Replace exhaust fan"",""plan"":""E4"",""location"":""west wing"",""assignee"":""Tony"",""status"":""open"",""end_date"":""2026-05-06"",""items"":[""shut off circuit at panel"",""remove old fan"",""install new housing"",""take finished photo""]}"
"happening at bay 4",edit_task,"{""location"":""bay 4""}"
"due end of day wednesday",edit_task,"{""end_date"":""2026-05-06""}"
"gotta get the panel with the tripped breaker fixed at grid line c4 by end of day wednesday make it low priority",edit_task,"{""title"":""Fix electrical panel issue"",""location"":""grid line C4"",""end_date"":""2026-05-06"",""priority"":""p3""}"
"we're insulating the attic on a201 on the ground floor starting wednesday morning and wrapping before the gc walkthrough team of 6 cost 6000 category insulation maria is leading it checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take documentation photos",edit_task,"{""title"":""Insulate attic space"",""plan"":""A201"",""location"":""ground floor"",""category"":""insulation"",""assignee"":""Maria"",""start_date"":""2026-05-06"",""end_date"":""2026-05-09"",""manpower"":""6"",""cost"":""6000"",""items"":[""check existing R-value"",""seal air leaks"",""install baffles at eaves"",""blow insulation to target depth"",""verify depth with ruler"",""take documentation photos""]}"
"patch the roof membrane in stairwell b on fp3 mark it tracked gus is handling it due by next friday checklist locate the breach clean and dry the area apply primer document repair",edit_task,"{""title"":""Repair roof membrane"",""plan"":""FP-3"",""location"":""stairwell B"",""assignee"":""Gus"",""status"":""tracked"",""end_date"":""2026-05-15"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""document repair""]}"
"mark this on hold there's a slow drip under the kitchen sink in parking garage level 1",edit_task,"{""title"":""Fix water leak under sink"",""location"":""parking garage level 1"",""status"":""on hold""}"
"we're scheduling carpet replacement at grid line c4 on s2 need a team of 2 starting may 3 through may 8 ballpark cost 7000",edit_task,"{""title"":""Replace carpet in office"",""plan"":""S-2"",""location"":""grid line C4"",""start_date"":""2026-05-03"",""end_date"":""2026-05-08"",""manpower"":""2"",""cost"":""7000""}"
"troy is leading the new pull station install in elevator shaft b start tomorrow finish friday cost 5000 need a crew of 5 mark it tracked",edit_task,"{""title"":""Install fire alarm pull station"",""location"":""elevator shaft B"",""assignee"":""Troy"",""status"":""tracked"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""5"",""cost"":""5000""}"
"budget is 5000 and category is electrical",edit_task,"{""category"":""electrical"",""cost"":""5000""}"
"sarah is taking the ac unit replacement in unit 7 this is hvac work make it high priority done by may 6 need a crew of 3 budget 7000 mark tracked",edit_task,"{""title"":""Replace broken HVAC unit"",""location"":""unit 7"",""category"":""HVAC"",""assignee"":""Sarah"",""status"":""tracked"",""end_date"":""2026-05-06"",""priority"":""p1"",""manpower"":""3"",""cost"":""7000""}"
"this is tile flooring in grid line b2 on sheet 4 mark it in progress tony is handling it due by next tuesday checklist demo old flooring level subfloor apply thinset mortar final walkthrough",edit_task,"{""title"":""Install tile flooring"",""plan"":""Sheet 4"",""location"":""grid line B2"",""assignee"":""Tony"",""status"":""in progress"",""end_date"":""2026-05-12"",""items"":[""demo old flooring"",""level subfloor"",""apply thinset mortar"",""final walkthrough""]}"
"we're installing recessed lighting on s2 at exterior facade east starting this monday and wrapping next tuesday 8 workers on it cost 1500 category electrical mike is leading it checklist run romex to junction box mount the housing cans connect wiring install trim rings test all fixtures take finished photo",edit_task,"{""title"":""Install recessed lighting"",""plan"":""S-2"",""location"":""exterior facade east"",""category"":""electrical"",""assignee"":""Mike"",""start_date"":""2026-05-04"",""end_date"":""2026-05-12"",""manpower"":""8"",""cost"":""1500"",""items"":[""run romex to junction box"",""mount the housing cans"",""connect wiring"",""install trim rings"",""test all fixtures"",""take finished photo""]}"
"we've got a leak under the sink in the penthouse level on e1 the gc wants it done by next tuesday put steve and a team of 5 on it budget 3500 make it urgent this is plumbing",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""E1"",""location"":""penthouse level"",""category"":""plumbing"",""assignee"":""Steve"",""end_date"":""2026-05-12"",""priority"":""p1"",""manpower"":""5"",""cost"":""3500""}"
"we're scheduling cracked concrete repair in room 305 on c1 need a team of 4 starting may 3 through next tuesday ballpark cost 5000",edit_task,"{""title"":""Repair cracked concrete"",""plan"":""C-1"",""location"":""room 305"",""start_date"":""2026-05-03"",""end_date"":""2026-05-12"",""manpower"":""4"",""cost"":""5000""}"
"the fire alarm pull station is broken assign it to mike crew of 3 cost around 1200 start next tuesday checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox final walkthrough with the gc",edit_task,"{""title"":""Install fire alarm pull station"",""assignee"":""Mike"",""start_date"":""2026-05-12"",""manpower"":""3"",""cost"":""1200"",""items"":[""shut off fire alarm circuit"",""remove old device"",""run new conduit if needed"",""mount backbox"",""final walkthrough with the GC""]}"
"carlos is leading the facade joint caulking in bay 12 start next tuesday finish thursday cost around 15000 need 8 workers mark it verified",edit_task,"{""title"":""Install exterior caulking"",""location"":""bay 12"",""assignee"":""Carlos"",""status"":""verified"",""start_date"":""2026-05-12"",""end_date"":""2026-05-14"",""manpower"":""8"",""cost"":""15000""}"
"we're installing tile flooring on c1 on level 4 starting tomorrow and wrapping before the inspection team of 8 cost 2500 category tile felix is leading it checklist demo old flooring level subfloor apply thinset mortar lay tile to pattern cut edge tiles grout",edit_task,"{""title"":""Install tile flooring"",""plan"":""C-1"",""location"":""level 4"",""category"":""tile"",""assignee"":""Felix"",""start_date"":""2026-05-06"",""end_date"":""2026-05-11"",""manpower"":""8"",""cost"":""2500"",""items"":[""demo old flooring"",""level subfloor"",""apply thinset mortar"",""lay tile to pattern"",""cut edge tiles"",""grout""]}"
"vic and his team of 4 are on the electrical panel issue in stairwell a category electrical budget 800 need it by may 7 checklist identify tripped breaker check load on circuit inspect wiring connections replace breaker if faulty document everything",edit_task,"{""title"":""Fix electrical panel issue"",""location"":""stairwell A"",""category"":""electrical"",""assignee"":""Vic"",""end_date"":""2026-05-07"",""manpower"":""4"",""cost"":""800"",""items"":[""identify tripped breaker"",""check load on circuit"",""inspect wiring connections"",""replace breaker if faulty"",""document everything""]}"
"put it under fire suppression",edit_task,"{""category"":""fire suppression""}"
"we're scheduling carpet replacement for stairwell a on sheet 9 need 2 guys starting may 2 through next tuesday ballpark cost 15000",edit_task,"{""title"":""Replace carpet in office"",""plan"":""Sheet 9"",""location"":""stairwell A"",""start_date"":""2026-05-02"",""end_date"":""2026-05-12"",""manpower"":""2"",""cost"":""15000""}"
"brenda is leading the waterproofing membrane in stairwell b start next tuesday finish next tuesday cost 20000 need 5 workers mark it verified",edit_task,"{""title"":""Apply waterproofing membrane"",""location"":""stairwell B"",""assignee"":""Brenda"",""status"":""verified"",""start_date"":""2026-05-12"",""end_date"":""2026-05-12"",""manpower"":""5"",""cost"":""20000""}"
"this one is a drop ceiling on fp2 at the data center floor make it medium priority maria handles it by end of month budget around 2000",edit_task,"{""title"":""Install ceiling grid and tiles"",""plan"":""FP-2"",""location"":""data center floor"",""assignee"":""Maria"",""end_date"":""2026-05-29"",""priority"":""p2"",""cost"":""2000""}"
"budget is 2000 and category is demolition",edit_task,"{""category"":""demolition"",""cost"":""2000""}"
"set priority low location penthouse level cost 7000",edit_task,"{""location"":""penthouse level"",""priority"":""p3"",""cost"":""7000""}"
"sal is leading the new sprinkler heads on mep1 budget about 5000 mark it verified",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""MEP-1"",""assignee"":""Sal"",""status"":""verified"",""cost"":""5000""}"
"mark this closed it's demoing the interior wall in mechanical room level 3",edit_task,"{""title"":""Demolish interior partition"",""location"":""mechanical room level 3"",""status"":""closed""}"
"assign omar make it high priority and due by may 10",edit_task,"{""assignee"":""Omar"",""end_date"":""2026-05-10"",""priority"":""p1""}"
"nadia and her crew of 10 are framing a new partition in room 412 category framing budget around 3500 need it by may 20 checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate document everything",edit_task,"{""title"":""Frame new partition wall"",""location"":""room 412"",""category"":""framing"",""assignee"":""Nadia"",""end_date"":""2026-05-20"",""manpower"":""10"",""cost"":""3500"",""items"":[""snap chalk lines"",""lay bottom plate"",""stand studs 16 OC"",""install top plate"",""document everything""]}"
"mark this tracked it's demoing the interior wall in the cafeteria",edit_task,"{""title"":""Demolish interior partition"",""location"":""cafeteria"",""status"":""tracked""}"
"need new sprinkler heads installed in the loading dock put reza on it should be done by may 7 cost around 1500",edit_task,"{""title"":""Install sprinkler heads"",""location"":""loading dock"",""assignee"":""Reza"",""end_date"":""2026-05-07"",""cost"":""1500""}"
"this one is water leaking from the pipes under the sink on m3 at bay 12 make it medium priority gus handles it by next tuesday budget around 4000 category plumbing",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""M-3"",""location"":""bay 12"",""category"":""plumbing"",""assignee"":""Gus"",""end_date"":""2026-05-12"",""priority"":""p2"",""cost"":""4000""}"
"drywall damage on the ceiling in level 5 budget about 10000 assign steve",edit_task,"{""title"":""Patch drywall ceiling"",""location"":""level 5"",""assignee"":""Steve"",""cost"":""10000""}"
"move to fp2 location stairwell c and mark open",edit_task,"{""plan"":""FP-2"",""location"":""stairwell C"",""status"":""open""}"
"need data and av cabling installed in north corridor put hector on it cost around 2500",edit_task,"{""title"":""Install low voltage cabling"",""location"":""north corridor"",""assignee"":""Hector"",""cost"":""2500""}"
"trade is concrete",edit_task,"{""category"":""concrete""}"
"we've got an ac unit shot that needs replacing assign that to nadia low priority end of next week is fine",edit_task,"{""title"":""Replace broken HVAC unit"",""assignee"":""Nadia"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"this one should be urgent",edit_task,"{""priority"":""p1""}"
"we've got a roof membrane leak assign it to tony crew of 3 cost around 7000 start tomorrow and finish end of month checklist locate the breach clean and dry the area apply primer cut patch membrane final walkthrough with the gc",edit_task,"{""title"":""Repair roof membrane"",""assignee"":""Tony"",""start_date"":""2026-05-06"",""end_date"":""2026-05-29"",""manpower"":""3"",""cost"":""7000"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""cut patch membrane"",""final walkthrough with the GC""]}"
"title should be repair cracked concrete",edit_task,"{""title"":""Repair cracked concrete""}"
"assign juan make it low priority and due by may 7",edit_task,"{""assignee"":""Juan"",""end_date"":""2026-05-07"",""priority"":""p3""}"
"pat is leading the cracked toilet replacement in the east lobby start next tuesday finish may 14 cost 5000 need 2 workers mark it tracked",edit_task,"{""title"":""Replace broken plumbing fixture"",""location"":""east lobby"",""assignee"":""Pat"",""status"":""tracked"",""start_date"":""2026-05-12"",""end_date"":""2026-05-14"",""manpower"":""2"",""cost"":""5000""}"
"gotta get a new partition wall up in parking garage level 1 by thursday make it high priority",edit_task,"{""title"":""Frame new partition wall"",""location"":""parking garage level 1"",""end_date"":""2026-05-07"",""priority"":""p1""}"
"tearing down the partition wall on c1 starts may 2 and wraps up by end of day wednesday 9 guys on the crew cost 1500",edit_task,"{""title"":""Demolish interior partition"",""plan"":""C-1"",""start_date"":""2026-05-02"",""end_date"":""2026-05-06"",""manpower"":""9"",""cost"":""1500""}"
"tearing down the partition wall on c1 starts may 2 wraps up by end of day wednesday 9 guys on the crew cost 1500",edit_task,"{""title"":""Demolish interior partition"",""plan"":""C-1"",""start_date"":""2026-05-02"",""end_date"":""2026-05-06"",""manpower"":""9"",""cost"":""1500""}"
"install the suspended ceiling grid in the south corridor on id101 the gc wants it done by end of month put sal and a crew of 2 on it budget around 1200 bump it to high priority",edit_task,"{""title"":""Install suspended ceiling grid"",""plan"":""ID-101"",""location"":""south corridor"",""assignee"":""Sal"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""2"",""cost"":""1200""}"
"update the name to insulate attic space",edit_task,"{""title"":""Insulate attic space""}"
"happening at unit 7",edit_task,"{""location"":""unit 7""}"
"begin may 4",edit_task,"{""start_date"":""2026-05-04""}"
"gotta get the shower pan waterproofed in unit 23 by thursday make it medium priority",edit_task,"{""title"":""Apply waterproofing membrane"",""location"":""unit 23"",""end_date"":""2026-05-07"",""priority"":""p2""}"
"we need attic insulation added assign it to omar crew of 3 cost around 12000 start tomorrow and finish end of month checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth final walkthrough with the gc",edit_task,"{""title"":""Insulate attic space"",""assignee"":""Omar"",""start_date"":""2026-05-06"",""end_date"":""2026-05-29"",""manpower"":""3"",""cost"":""12000"",""items"":[""check existing R-value"",""seal air leaks"",""install baffles at eaves"",""blow insulation to target depth"",""final walkthrough with the GC""]}"
"mark this pending inspection the toilet is cracked and needs replacing in elevator shaft b",edit_task,"{""title"":""Replace broken plumbing fixture"",""location"":""elevator shaft B"",""status"":""pending inspection""}"
"carlos and his team of 2 are on the water leak under the sink in the north corridor category plumbing budget 10000 need it by may 5 checklist shut off water supply remove p trap inspect drain line replace gaskets document everything",edit_task,"{""title"":""Fix water leak under sink"",""location"":""north corridor"",""category"":""plumbing"",""assignee"":""Carlos"",""end_date"":""2026-05-05"",""manpower"":""2"",""cost"":""10000"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""document everything""]}"
"set start date to may 4 and due date to may 16",edit_task,"{""start_date"":""2026-05-04"",""end_date"":""2026-05-16""}"
"need the hvac duct pulling apart fixed in level 3 put juan on it should be done by next tuesday cost around 6000",edit_task,"{""title"":""Fix HVAC ductwork leak"",""location"":""level 3"",""assignee"":""Juan"",""end_date"":""2026-05-12"",""cost"":""6000""}"
"gotta get the exterior paint job in unit 12 done by next tuesday make it high priority",edit_task,"{""title"":""Paint exterior facade"",""location"":""unit 12"",""end_date"":""2026-05-12"",""priority"":""p1""}"
"new pull station install in level 5 put omar on it make it low priority get it done by may 19",edit_task,"{""title"":""Install fire alarm pull station"",""location"":""level 5"",""assignee"":""Omar"",""end_date"":""2026-05-19"",""priority"":""p3""}"
"felix and his team of 5 are on the roof membrane leak at the pool deck category roofing budget 3500 need it by may 18 checklist locate the breach clean and dry the area apply primer cut patch membrane document everything",edit_task,"{""title"":""Repair roof membrane"",""location"":""pool deck"",""category"":""roofing"",""assignee"":""Felix"",""end_date"":""2026-05-18"",""manpower"":""5"",""cost"":""3500"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""cut patch membrane"",""document everything""]}"
"we're scheduling the concrete slab pour for parking garage level 1 on the roof level plan need a team of 6 starting tomorrow through may 15 ballpark cost 6000",edit_task,"{""title"":""Pour concrete slab"",""plan"":""roof level"",""location"":""parking garage level 1"",""start_date"":""2026-05-06"",""end_date"":""2026-05-15"",""manpower"":""6"",""cost"":""6000""}"
"we're blowing insulation in the attic in the mezzanine put vic on it have it wrapped before the inspection make it medium priority checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take a photo for the record",edit_task,"{""title"":""Insulate attic space"",""location"":""mezzanine"",""assignee"":""Vic"",""end_date"":""2026-05-15"",""priority"":""p2"",""items"":[""check existing R-value"",""seal air leaks"",""install baffles at eaves"",""blow insulation to target depth"",""verify depth with ruler"",""take a photo for the record""]}"
"start tomorrow end next friday manpower crew of 4 and cost 2500",edit_task,"{""start_date"":""2026-05-06"",""end_date"":""2026-05-15"",""manpower"":""4"",""cost"":""2500""}"
"we're fixing the hvac ductwork leak on plumbing p4 in room 412 starting this monday and wrapping thursday 3 workers on it cost 12000 category hvac steve is leading it checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed test system airflow",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""plumbing P4"",""location"":""room 412"",""category"":""HVAC"",""assignee"":""Steve"",""start_date"":""2026-05-04"",""end_date"":""2026-05-07"",""manpower"":""3"",""cost"":""12000"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""wrap with foil tape"",""re-insulate if needed"",""test system airflow""]}"
"mark this complete it's tile flooring in room 412",edit_task,"{""title"":""Install tile flooring"",""location"":""room 412"",""status"":""complete""}"
"this one is data and av cabling on mep1 make it medium priority felix handles it by friday budget around 10000 location level 2 category low voltage",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""MEP-1"",""location"":""level 2"",""category"":""low voltage"",""assignee"":""Felix"",""end_date"":""2026-05-08"",""priority"":""p2"",""cost"":""10000""}"
"slab pour is scheduled assign it to omar crew of 3 cost around 2500 start next tuesday checklist set forms place rebar order concrete pour slab final walkthrough with the gc",edit_task,"{""title"":""Pour concrete slab"",""assignee"":""Omar"",""start_date"":""2026-05-12"",""manpower"":""3"",""cost"":""2500"",""items"":[""set forms"",""place rebar"",""order concrete"",""pour slab"",""final walkthrough with the GC""]}"
"this is demoing the interior wall in the mechanical room on fp3 mark it open reza is handling it due by next friday checklist verify no electrical or plumbing in wall shut off circuits remove door patch floor",edit_task,"{""title"":""Demolish interior partition"",""plan"":""FP-3"",""location"":""mechanical room"",""assignee"":""Reza"",""status"":""open"",""end_date"":""2026-05-15"",""items"":[""verify no electrical or plumbing in wall"",""shut off circuits"",""remove door"",""patch floor""]}"
"recaulking the facade joints in unit 7 budget about 3000 assign brenda",edit_task,"{""title"":""Install exterior caulking"",""location"":""unit 7"",""assignee"":""Brenda"",""cost"":""3000""}"
"install low voltage cabling on e4 put eddie on it make it medium priority by end of next week team of 8 budget about 4000 checklist pull permits if required route cable path drill penetrations pull cable terminate at patch panel",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""E4"",""assignee"":""Eddie"",""end_date"":""2026-05-15"",""priority"":""p2"",""manpower"":""8"",""cost"":""4000"",""items"":[""pull permits if required"",""route cable path"",""drill penetrations"",""pull cable"",""terminate at patch panel""]}"
"mike and his team of 6 are on the ac unit replacement in the lobby category hvac budget 15000 need it by may 15 checklist shut down power to unit remove old unit install new unit check refrigerant lines document everything",edit_task,"{""title"":""Replace broken HVAC unit"",""location"":""lobby"",""category"":""HVAC"",""assignee"":""Mike"",""end_date"":""2026-05-15"",""manpower"":""6"",""cost"":""15000"",""items"":[""shut down power to unit"",""remove old unit"",""install new unit"",""check refrigerant lines"",""document everything""]}"
"new sprinkler heads need to go in on a201 mark it medium priority danny handles it by end of day wednesday budget around 15000 location room 305 category sprinkler",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""A201"",""location"":""room 305"",""category"":""sprinkler"",""assignee"":""Danny"",""end_date"":""2026-05-06"",""priority"":""p2"",""cost"":""15000""}"
"put cost down as about 2500",edit_task,"{""cost"":""2500""}"
"replace the broken plumbing fixture on s2 put danny on it make it medium priority by end of month team of 4 budget about 2500 checklist shut off water remove old fixture clean mounting surface install new fixture reconnect supply lines",edit_task,"{""title"":""Replace broken plumbing fixture"",""plan"":""S-2"",""assignee"":""Danny"",""end_date"":""2026-05-29"",""priority"":""p2"",""manpower"":""4"",""cost"":""2500"",""items"":[""shut off water"",""remove old fixture"",""clean mounting surface"",""install new fixture"",""reconnect supply lines""]}"
"we're fixing the leak under the sink on civil sheet 3 in room 305 starting may 4 and wrapping thursday 10 workers on it cost around 2000 category plumbing lena is leading it checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap run water test",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""civil sheet 3"",""location"":""room 305"",""category"":""plumbing"",""assignee"":""Lena"",""start_date"":""2026-05-04"",""end_date"":""2026-05-07"",""manpower"":""10"",""cost"":""2000"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""reinstall p-trap"",""run water test""]}"
"replace the broken glass panel on level 4 put tony on it have it wrapped by friday make it low priority checklist measure opening order replacement glass remove broken pane clean frame install new glass take a photo for the record",edit_task,"{""title"":""Replace broken window glazing"",""location"":""level 4"",""assignee"":""Tony"",""end_date"":""2026-05-08"",""priority"":""p3"",""items"":[""measure opening"",""order replacement glass"",""remove broken pane"",""clean frame"",""install new glass"",""take a photo for the record""]}"
"assign pat low priority cost about 800 and due by next friday",edit_task,"{""assignee"":""Pat"",""end_date"":""2026-05-15"",""priority"":""p3"",""cost"":""800""}"
"start date is tomorrow",edit_task,"{""start_date"":""2026-05-06""}"
"mobilize tomorrow",edit_task,"{""start_date"":""2026-05-06""}"
"we're applying waterproofing membrane in stairwell a put troy on it have it wrapped by next friday make it high priority checklist clean substrate apply primer coat let cure apply first membrane coat let cure take a photo for the record",edit_task,"{""title"":""Apply waterproofing membrane"",""location"":""stairwell A"",""assignee"":""Troy"",""end_date"":""2026-05-15"",""priority"":""p1"",""items"":[""clean substrate"",""apply primer coat"",""let cure"",""apply first membrane coat"",""let cure"",""take a photo for the record""]}"
"put brenda and 3 workers on applying waterproofing membrane start may 3 and have it done by may 11",edit_task,"{""title"":""Apply waterproofing membrane"",""assignee"":""Brenda"",""start_date"":""2026-05-03"",""end_date"":""2026-05-11"",""manpower"":""3""}"
"set the start date to this monday and the due date to friday",edit_task,"{""start_date"":""2026-05-04"",""end_date"":""2026-05-08""}"
"we're running the electrical rough in on a201 on level 5 starting may 6 and wrapping thursday crew of 7 cost around 3500 category electrical jake is leading it checklist pull permits mark box locations per plan drill studs pull wire stub out boxes install panel rough",edit_task,"{""title"":""Run electrical rough-in"",""plan"":""A201"",""location"":""level 5"",""category"":""electrical"",""assignee"":""Jake"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""7"",""cost"":""3500"",""items"":[""pull permits"",""mark box locations per plan"",""drill studs"",""pull wire"",""stub out boxes"",""install panel rough""]}"
"lena is taking the exterior paint job over at a301 budget around 800 mark it verified",edit_task,"{""title"":""Paint exterior facade"",""plan"":""A301"",""assignee"":""Lena"",""status"":""verified"",""cost"":""800""}"
"we're running the electrical rough in on p2 in the mechanical room starting this monday and wrapping before the owner review team of 2 cost 3500 category electrical lena is leading it checklist pull permits mark box locations per plan drill studs pull wire stub out boxes install panel rough",edit_task,"{""title"":""Run electrical rough-in"",""plan"":""P-2"",""location"":""mechanical room"",""category"":""electrical"",""assignee"":""Lena"",""start_date"":""2026-05-04"",""end_date"":""2026-05-10"",""manpower"":""2"",""cost"":""3500"",""items"":[""pull permits"",""mark box locations per plan"",""drill studs"",""pull wire"",""stub out boxes"",""install panel rough""]}"
"start tomorrow finish by end of day wednesday put eddie on it",edit_task,"{""assignee"":""Eddie"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06""}"
"install the fire suppression heads on the ground floor start tomorrow wrap up by friday team of 9 cost 7000",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""ground floor"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""9"",""cost"":""7000""}"
"move to a4 location grid line b2 and mark tracked",edit_task,"{""plan"":""A-4"",""location"":""grid line B2"",""status"":""tracked""}"
"set cost to around 3000 manpower to crew of 2 and category to electrical",edit_task,"{""category"":""electrical"",""manpower"":""2"",""cost"":""3000""}"
"set cost to around 15000 and manpower to 6 workers",edit_task,"{""manpower"":""6"",""cost"":""15000""}"
"tony is taking the old hvac swap in unit 7 this is hvac work can wait done by friday manpower team of 10 budget 8000 mark open",edit_task,"{""title"":""Replace broken HVAC unit"",""location"":""unit 7"",""category"":""HVAC"",""assignee"":""Tony"",""status"":""open"",""end_date"":""2026-05-08"",""priority"":""p3"",""manpower"":""10"",""cost"":""8000""}"
"set cost to about 12000 manpower to 5 workers and category to sprinkler",edit_task,"{""category"":""sprinkler"",""manpower"":""5"",""cost"":""12000""}"
"steve is taking new carpet in the office over at e2 budget around 4000 mark it pending inspection",edit_task,"{""title"":""Replace carpet in office"",""plan"":""E-2"",""assignee"":""Steve"",""status"":""pending inspection"",""cost"":""4000""}"
"relabel this as fix hvac ductwork leak",edit_task,"{""title"":""Fix HVAC ductwork leak""}"
"cost 12000 crew of 7 category waterproofing due by next friday",edit_task,"{""category"":""waterproofing"",""end_date"":""2026-05-15"",""manpower"":""7"",""cost"":""12000""}"
"gotta get the bathroom tile in room 412 done by end of day wednesday make it low priority",edit_task,"{""title"":""Install tile flooring"",""location"":""room 412"",""end_date"":""2026-05-06"",""priority"":""p3""}"
"we're installing low voltage cabling on m2 in the data center floor starting next tuesday 3 guys on it cost 1200 category low voltage carlos is leading it checklist pull permits if required route cable path drill penetrations pull cable terminate at patch panel test all runs",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""M2"",""location"":""data center floor"",""category"":""low voltage"",""assignee"":""Carlos"",""start_date"":""2026-05-12"",""manpower"":""3"",""cost"":""1200"",""items"":[""pull permits if required"",""route cable path"",""drill penetrations"",""pull cable"",""terminate at patch panel"",""test all runs""]}"
"gotta get the busted window pane in grid line c4 replaced by end of month make it medium priority",edit_task,"{""title"":""Replace broken window glazing"",""location"":""grid line C4"",""end_date"":""2026-05-29"",""priority"":""p2""}"
"call it put in fire alarm pull station",edit_task,"{""title"":""Put in fire alarm pull station""}"
"this one is the hvac unit replacement on the roof level at mechanical room level 3 make it medium priority omar handles it by may 6 budget around 8000 category hvac",edit_task,"{""title"":""Replace broken HVAC unit"",""plan"":""roof level"",""location"":""mechanical room level 3"",""category"":""HVAC"",""assignee"":""Omar"",""end_date"":""2026-05-06"",""priority"":""p2"",""cost"":""8000""}"
"start may 4 finish by next friday put maria on it",edit_task,"{""assignee"":""Maria"",""start_date"":""2026-05-04"",""end_date"":""2026-05-15""}"
"start wednesday morning finish by thursday put brenda on it",edit_task,"{""assignee"":""Brenda"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07""}"
"set start date to tomorrow and due date to end of month",edit_task,"{""start_date"":""2026-05-06"",""end_date"":""2026-05-29""}"
"there's a slow drip under the kitchen sink on fp3 at level 4 the gc wants it done by next tuesday put gus and a team of 10 on it budget around 6000 make it medium priority category plumbing",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""FP-3"",""location"":""level 4"",""category"":""plumbing"",""assignee"":""Gus"",""end_date"":""2026-05-12"",""priority"":""p2"",""manpower"":""10"",""cost"":""6000""}"
"there's a hole in the drywall ceiling assign that to ray low priority end of next week is fine",edit_task,"{""title"":""Patch drywall ceiling"",""assignee"":""Ray"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"hector and his team of 8 are on waterproofing the deck in room 412 category waterproofing budget 5000 need it by may 6 checklist clean substrate apply primer coat let cure apply first membrane coat document everything",edit_task,"{""title"":""Apply waterproofing membrane"",""location"":""room 412"",""category"":""waterproofing"",""assignee"":""Hector"",""end_date"":""2026-05-06"",""manpower"":""8"",""cost"":""5000"",""items"":[""clean substrate"",""apply primer coat"",""let cure"",""apply first membrane coat"",""document everything""]}"
"we need the busted fixture in the bathroom replaced assign it to sal crew of 3 cost around 1500 start next tuesday and finish end of day wednesday checklist shut off water remove old fixture clean mounting surface install new fixture final walkthrough with the gc",edit_task,"{""title"":""Replace broken plumbing fixture"",""location"":""bathroom"",""assignee"":""Sal"",""start_date"":""2026-05-12"",""end_date"":""2026-05-13"",""manpower"":""3"",""cost"":""1500"",""items"":[""shut off water"",""remove old fixture"",""clean mounting surface"",""install new fixture"",""final walkthrough with the GC""]}"
"install ceiling grid and tiles on a301 put ray on it make it medium priority by end of next week team of 6 budget about 1500 checklist snap layout lines install wall angle hang main tees install cross tees cut perimeter tiles",edit_task,"{""title"":""Install ceiling grid and tiles"",""plan"":""A301"",""assignee"":""Ray"",""end_date"":""2026-05-15"",""priority"":""p2"",""manpower"":""6"",""cost"":""1500"",""items"":[""snap layout lines"",""install wall angle"",""hang main tees"",""install cross tees"",""cut perimeter tiles""]}"
"flip it to tracked",edit_task,"{""status"":""tracked""}"
"set category to waterproofing",edit_task,"{""category"":""waterproofing""}"
"bump this to high priority",edit_task,"{""priority"":""p1""}"
"mark this needs review it's installing the fire suppression heads in the data center floor",edit_task,"{""title"":""Install sprinkler heads"",""location"":""data center floor"",""status"":""needs review""}"
"have felix take care of it",edit_task,"{""assignee"":""Felix""}"
"relabel this as repair roof membrane",edit_task,"{""title"":""Repair roof membrane""}"
"the roof membrane has a leak on s2 start wednesday morning wrap up by end of day wednesday need 5 guys cost around 6000",edit_task,"{""title"":""Repair roof membrane"",""plan"":""S-2"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06"",""manpower"":""5"",""cost"":""6000""}"
"the exhaust fan needs replacing on s2 start next tuesday wrap up next tuesday crew of 4 cost about 5000",edit_task,"{""title"":""Replace exhaust fan"",""plan"":""S-2"",""start_date"":""2026-05-12"",""end_date"":""2026-05-12"",""manpower"":""4"",""cost"":""5000""}"
"move to a201 location data center floor and mark pending inspection",edit_task,"{""plan"":""A201"",""location"":""data center floor"",""status"":""pending inspection""}"
"update status to needs review",edit_task,"{""status"":""needs review""}"
"patch the drywall ceiling on p2 put bobby on it make it medium priority by end of month 3 guys budget about 12000 checklist cut out damaged section install backing hang new drywall tape and mud sand smooth",edit_task,"{""title"":""Patch drywall ceiling"",""plan"":""P-2"",""assignee"":""Bobby"",""end_date"":""2026-05-29"",""priority"":""p2"",""manpower"":""3"",""cost"":""12000"",""items"":[""cut out damaged section"",""install backing"",""hang new drywall"",""tape and mud"",""sand smooth""]}"
"we're replacing the fire alarm pull station in unit 7 on p3 the gc wants it done before the walkthrough put hector and a team of 6 on it budget about 1500 make it top priority category fire alarm",edit_task,"{""title"":""Install fire alarm pull station"",""plan"":""P-3"",""location"":""unit 7"",""category"":""fire alarm"",""assignee"":""Hector"",""end_date"":""2026-05-15"",""priority"":""p1"",""manpower"":""6"",""cost"":""1500""}"
"assign gus cost 2000 and bump it to high priority",edit_task,"{""assignee"":""Gus"",""priority"":""p1"",""cost"":""2000""}"
"we're scheduling cracked concrete repair for room 201 on a301 need 6 guys starting tomorrow through thursday ballpark cost around 20000",edit_task,"{""title"":""Repair cracked concrete"",""plan"":""A301"",""location"":""room 201"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""6"",""cost"":""20000""}"
"steve is taking the data and av cabling on a202 budget 2000 mark it on hold",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""A202"",""assignee"":""Steve"",""status"":""on hold"",""cost"":""2000""}"
"tag urgent and safety",edit_task,"{""tags"":[""urgent"",""safety""]}"
"put zack and a crew of 8 on the hvac ductwork leak start next tuesday and have it done by next friday",edit_task,"{""title"":""Fix HVAC ductwork leak"",""assignee"":""Zack"",""start_date"":""2026-05-12"",""end_date"":""2026-05-15"",""manpower"":""8""}"
"we're installing sprinkler heads on the mezzanine at stairwell a starting may 2 and wrapping next friday team of 3 cost 800 category sprinkler carlos is leading it checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test inspector sign off",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""mezzanine"",""location"":""stairwell A"",""category"":""sprinkler"",""assignee"":""Carlos"",""start_date"":""2026-05-02"",""end_date"":""2026-05-15"",""manpower"":""3"",""cost"":""800"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""pressure test"",""inspector sign-off""]}"
"we need attic insulation in the main lobby put felix on it have it wrapped by next tuesday make it low priority checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take a photo for the record",edit_task,"{""title"":""Insulate attic space"",""location"":""main lobby"",""assignee"":""Felix"",""end_date"":""2026-05-12"",""priority"":""p3"",""items"":[""check existing R-value"",""seal air leaks"",""install baffles at eaves"",""blow insulation to target depth"",""verify depth with ruler"",""take a photo for the record""]}"
"close out by end of month",edit_task,"{""end_date"":""2026-05-29""}"
"sal and his team of 9 are on the exterior caulking failure in suite 101 category waterproofing budget 4000 need it by next tuesday checklist remove old caulk clean and dry joint apply backer rod apply caulk bead document everything",edit_task,"{""title"":""Install exterior caulking"",""location"":""suite 101"",""category"":""waterproofing"",""assignee"":""Sal"",""end_date"":""2026-05-12"",""manpower"":""9"",""cost"":""4000"",""items"":[""remove old caulk"",""clean and dry joint"",""apply backer rod"",""apply caulk bead"",""document everything""]}"
"belongs on plumbing p4",edit_task,"{""plan"":""plumbing P4""}"
"this one is a new partition wall on plumbing p4 mark it medium maria handles it by next tuesday budget around 3500 location bay 4 category framing",edit_task,"{""title"":""Frame new partition wall"",""plan"":""plumbing P4"",""location"":""bay 4"",""category"":""framing"",""assignee"":""Maria"",""end_date"":""2026-05-12"",""priority"":""p2"",""cost"":""3500""}"
"this is low voltage cabling in the mechanical room on a201 mark it needs review ray is handling it due by next friday checklist pull permits if required route cable path drill penetrations sign off",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""A201"",""location"":""mechanical room"",""assignee"":""Ray"",""status"":""needs review"",""end_date"":""2026-05-15"",""items"":[""pull permits if required"",""route cable path"",""drill penetrations"",""sign off""]}"
"gotta get the exhaust fan replaced by end of month just one guy should be enough make it high priority and assign steve",edit_task,"{""title"":""Replace exhaust fan"",""assignee"":""Steve"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""1""}"
"we need that hole in the drywall ceiling fixed assign it to hector crew of 3 cost around 2000 start this monday and finish thursday checklist cut out damaged section install backing hang new drywall tape and mud final walkthrough with the gc",edit_task,"{""title"":""Patch drywall ceiling"",""assignee"":""Hector"",""start_date"":""2026-05-04"",""end_date"":""2026-05-07"",""manpower"":""3"",""cost"":""2000"",""items"":[""cut out damaged section"",""install backing"",""hang new drywall"",""tape and mud"",""final walkthrough with the GC""]}"
"get it done by may 16",edit_task,"{""end_date"":""2026-05-16""}"
"estimate is 6000",edit_task,"{""cost"":""6000""}"
"got a leak under the sink on s2 starts may 6 wraps up by next tuesday team of 3 cost around 2500",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""S-2"",""start_date"":""2026-05-06"",""end_date"":""2026-05-12"",""manpower"":""3"",""cost"":""2500""}"
"ray and his 8 workers are on recessed lights in the data center floor category electrical budget 10000 need it by thursday checklist run romex to junction box mount the housing cans connect wiring install trim rings document everything",edit_task,"{""title"":""Install recessed lighting"",""location"":""data center floor"",""category"":""electrical"",""assignee"":""Ray"",""end_date"":""2026-05-07"",""manpower"":""8"",""cost"":""10000"",""items"":[""run romex to junction box"",""mount the housing cans"",""connect wiring"",""install trim rings"",""document everything""]}"
"we're applying waterproofing membrane on the roof level in unit 23 starting may 3 and wrapping may 8 team of 6 cost 2000 category waterproofing nadia is leading it checklist clean substrate apply primer coat let cure apply first membrane coat let cure apply second coat",edit_task,"{""title"":""Apply waterproofing membrane"",""plan"":""roof level"",""location"":""unit 23"",""category"":""waterproofing"",""assignee"":""Nadia"",""start_date"":""2026-05-03"",""end_date"":""2026-05-08"",""manpower"":""6"",""cost"":""2000"",""items"":[""clean substrate"",""apply primer coat"",""let cure"",""apply first membrane coat"",""let cure"",""apply second coat""]}"
"put ray and a crew of 8 on tearing down the partition wall start may 2 and have it done by may 10",edit_task,"{""title"":""Demolish interior partition"",""assignee"":""Ray"",""start_date"":""2026-05-02"",""end_date"":""2026-05-10"",""manpower"":""8""}"
"this is patching the roof membrane in the basement on a301 bump it to high priority due by end of day wednesday",edit_task,"{""title"":""Repair roof membrane"",""plan"":""A301"",""location"":""basement"",""end_date"":""2026-05-06"",""priority"":""p1""}"
"we need new sprinkler heads installed assign it to hector crew of 3 cost around 7000 start may 2 and finish may 7 checklist confirm pipe layout with plan drill ceiling openings install drops attach heads final walkthrough with the gc",edit_task,"{""title"":""Install sprinkler heads"",""assignee"":""Hector"",""start_date"":""2026-05-02"",""end_date"":""2026-05-07"",""manpower"":""3"",""cost"":""7000"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""final walkthrough with the GC""]}"
"due next tuesday",edit_task,"{""end_date"":""2026-05-12""}"
"we need attic insulation blown in assign it to sal crew of 2 cost around 3000 start may 4 and finish may 21 checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth final walkthrough with the gc",edit_task,"{""title"":""Insulate attic space"",""assignee"":""Sal"",""start_date"":""2026-05-04"",""end_date"":""2026-05-21"",""manpower"":""2"",""cost"":""3000"",""items"":[""check existing R-value"",""seal air leaks"",""install baffles at eaves"",""blow insulation to target depth"",""final walkthrough with the GC""]}"
"this is a broken exhaust fan in the bathroom in the main lobby on a201 mark it pending inspection nadia is handling it due by friday checklist shut off circuit at panel remove old fan install new housing take finished photo",edit_task,"{""title"":""Replace exhaust fan"",""plan"":""A201"",""location"":""main lobby bathroom"",""assignee"":""Nadia"",""status"":""pending inspection"",""end_date"":""2026-05-08"",""items"":[""shut off circuit at panel"",""remove old fan"",""install new housing"",""take finished photo""]}"
"opening day is tomorrow",edit_task,"{""start_date"":""2026-05-06""}"
"we're installing sprinkler heads on structural s2 in the loading dock starting may 3 and wrapping before the inspection 4 guys on it cost 10000 category sprinkler bobby is leading it checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test inspector sign off",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""structural S2"",""location"":""loading dock"",""category"":""sprinkler"",""assignee"":""Bobby"",""start_date"":""2026-05-03"",""end_date"":""2026-05-14"",""manpower"":""4"",""cost"":""10000"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""pressure test"",""inspector sign-off""]}"
"we're installing data and av cabling on a202 omar is on this make it top priority before the inspection",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""A202"",""assignee"":""Omar"",""end_date"":""2026-05-14"",""priority"":""p1""}"
"we need the ceiling drywall patched assign it to danny crew of 2 cost around 10000 start wednesday morning and finish friday checklist cut out damaged section install backing hang new drywall tape and mud final walkthrough with the gc",edit_task,"{""title"":""Patch drywall ceiling"",""assignee"":""Danny"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""2"",""cost"":""10000"",""items"":[""cut out damaged section"",""install backing"",""hang new drywall"",""tape and mud"",""final walkthrough with the GC""]}"
"mark this pending inspection there's a hole in the drywall ceiling in suite 3b",edit_task,"{""title"":""Patch drywall ceiling"",""location"":""suite 3B"",""status"":""pending inspection""}"
"this one is recaulking the facade joints on a201 mark it low priority juan handles it before the gc walkthrough budget around 4000 location loading dock category waterproofing",edit_task,"{""title"":""Install exterior caulking"",""plan"":""A201"",""location"":""loading dock"",""category"":""waterproofing"",""assignee"":""Juan"",""end_date"":""2026-05-13"",""priority"":""p3"",""cost"":""4000""}"
"danny is taking the waterproofing membrane on a deck on a4 budget around 3500 mark it verified",edit_task,"{""title"":""Apply waterproofing membrane"",""plan"":""A-4"",""assignee"":""Danny"",""status"":""verified"",""cost"":""3500""}"
"cost 12000 crew of 7 category carpentry due by end of day wednesday",edit_task,"{""category"":""carpentry"",""end_date"":""2026-05-06"",""manpower"":""7"",""cost"":""12000""}"
"drawing mep1 location unit 7 category tile and assign juan",edit_task,"{""plan"":""MEP-1"",""location"":""unit 7"",""category"":""tile"",""assignee"":""Juan""}"
"this one is sprinkler heads on sheet 9 mark it high priority juan handles it before the gc walkthrough budget around 1500 location mezzanine category sprinkler",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""Sheet 9"",""location"":""mezzanine"",""category"":""sprinkler"",""assignee"":""Juan"",""end_date"":""2026-05-13"",""priority"":""p1"",""cost"":""1500""}"
"category framing drawing mep1 and set status to tracked",edit_task,"{""plan"":""MEP-1"",""category"":""framing"",""status"":""tracked""}"
"troy is taking the low voltage pull above the ceiling over at a3 budget 2500 mark it open",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""A-3"",""assignee"":""Troy"",""status"":""open"",""cost"":""2500""}"
"there's a hole in the drywall ceiling in stairwell a on a3 the gc wants it done by friday put mike and 10 workers on it budget 6000 make it high priority this is drywall",edit_task,"{""title"":""Patch drywall ceiling"",""plan"":""A-3"",""location"":""stairwell A"",""category"":""drywall"",""assignee"":""Mike"",""end_date"":""2026-05-08"",""priority"":""p1"",""manpower"":""10"",""cost"":""6000""}"
"patch the drywall ceiling on mep1 put nadia on it make it high priority by end of month team of 8 budget about 7000 checklist cut out damaged section install backing hang new drywall tape and mud sand smooth",edit_task,"{""title"":""Patch drywall ceiling"",""plan"":""MEP-1"",""assignee"":""Nadia"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""8"",""cost"":""7000"",""items"":[""cut out damaged section"",""install backing"",""hang new drywall"",""tape and mud"",""sand smooth""]}"
"eddie is taking the slow drip under the kitchen sink on the roof deck this is plumbing work critical done by next tuesday manpower team of 5 budget 5000 mark needs review",edit_task,"{""title"":""Fix water leak under sink"",""location"":""roof deck"",""category"":""plumbing"",""assignee"":""Eddie"",""status"":""needs review"",""end_date"":""2026-05-12"",""priority"":""p1"",""manpower"":""5"",""cost"":""5000""}"
"bobby and his crew of 2 are on the electrical rough in for the new space in the west wing category electrical budget 2500 need it by end of day wednesday checklist pull permits mark box locations per plan drill studs pull wire document everything",edit_task,"{""title"":""Run electrical rough-in"",""location"":""west wing"",""category"":""electrical"",""assignee"":""Bobby"",""end_date"":""2026-05-06"",""manpower"":""2"",""cost"":""2500"",""items"":[""pull permits"",""mark box locations per plan"",""drill studs"",""pull wire"",""document everything""]}"
"mike is taking the broken window pane replacement in the mezzanine this is glazing work high priority done by friday manpower team of 9 budget 12000 mark in progress",edit_task,"{""title"":""Replace broken window glazing"",""location"":""mezzanine"",""category"":""glazing"",""assignee"":""Mike"",""status"":""in progress"",""end_date"":""2026-05-08"",""priority"":""p1"",""manpower"":""9"",""cost"":""12000""}"
"reza and his crew of 2 are on the cracked window glazing in basement level 2 category glazing budget 800 need it by end of month checklist measure opening order replacement glass remove broken pane clean frame document everything",edit_task,"{""title"":""Replace broken window glazing"",""location"":""basement level 2"",""category"":""glazing"",""assignee"":""Reza"",""end_date"":""2026-05-29"",""manpower"":""2"",""cost"":""800"",""items"":[""measure opening"",""order replacement glass"",""remove broken pane"",""clean frame"",""document everything""]}"
"move to s2 location suite 3b and mark in progress",edit_task,"{""plan"":""S-2"",""location"":""suite 3B"",""status"":""in progress""}"
"assign ray cost around 12000 and bump it to high priority",edit_task,"{""assignee"":""Ray"",""priority"":""p1"",""cost"":""12000""}"
"escalate to not urgent but soon",edit_task,"{""priority"":""p2""}"
"this is tile flooring in the bathroom in elevator shaft b on e1 mark it high priority due by may 5",edit_task,"{""title"":""Install tile flooring"",""plan"":""E1"",""location"":""elevator shaft B"",""end_date"":""2026-05-05"",""priority"":""p1""}"
"put two guys on it",edit_task,"{""manpower"":""2""}"
"we're pouring the concrete slab on sheet 9 in suite 101 starting this monday and wrapping thursday crew of 4 cost about 15000 category concrete kim is leading it checklist set forms place rebar order concrete pour slab screed and float apply curing compound",edit_task,"{""title"":""Pour concrete slab"",""plan"":""Sheet 9"",""location"":""suite 101"",""category"":""concrete"",""assignee"":""Kim"",""start_date"":""2026-05-04"",""end_date"":""2026-05-07"",""manpower"":""4"",""cost"":""15000"",""items"":[""set forms"",""place rebar"",""order concrete"",""pour slab"",""screed and float"",""apply curing compound""]}"
"put eddie on it",edit_task,"{""assignee"":""Eddie""}"
"fix the hvac ductwork leak on structural s2 put hector on it low priority by end of next week 3 guys budget about 7000 checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""structural S2"",""assignee"":""Hector"",""end_date"":""2026-05-15"",""priority"":""p3"",""manpower"":""3"",""cost"":""7000"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""wrap with foil tape"",""re-insulate if needed""]}"
"priority needs to be critical",edit_task,"{""priority"":""p1""}"
"this is recessed lighting in break room floor 2 on p3 bump it to high priority due by end of day wednesday",edit_task,"{""title"":""Install recessed lighting"",""plan"":""P-3"",""location"":""break room floor 2"",""end_date"":""2026-05-06"",""priority"":""p1""}"
"ceiling tile system going in on a301 starts may 3 wraps up by end of day wednesday 6 workers on the crew cost around 5000",edit_task,"{""title"":""Install ceiling grid and tiles"",""plan"":""A301"",""start_date"":""2026-05-03"",""end_date"":""2026-05-06"",""manpower"":""6"",""cost"":""5000""}"
"there's a slow drip under the kitchen sink assign that to sal low priority end of next week is fine",edit_task,"{""title"":""Fix water leak under sink"",""assignee"":""Sal"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"this falls under glazing",edit_task,"{""category"":""glazing""}"
"this one is caulking around the windows on a301 mark it high priority gus handles it before the inspection budget around 2500 location penthouse level category waterproofing",edit_task,"{""title"":""Install exterior caulking"",""plan"":""A301"",""location"":""penthouse level"",""category"":""waterproofing"",""assignee"":""Gus"",""end_date"":""2026-05-15"",""priority"":""p1"",""cost"":""2500""}"
"we're fixing the electrical panel on structural s2 in the east lobby starting may 4 and wrapping may 9 team of 5 cost 800 category electrical danny is leading it checklist identify tripped breaker check load on circuit inspect wiring connections replace breaker if faulty test under load document findings",edit_task,"{""title"":""Fix electrical panel issue"",""plan"":""structural S2"",""location"":""east lobby"",""category"":""electrical"",""assignee"":""Danny"",""start_date"":""2026-05-04"",""end_date"":""2026-05-09"",""manpower"":""5"",""cost"":""800"",""items"":[""identify tripped breaker"",""check load on circuit"",""inspect wiring connections"",""replace breaker if faulty"",""test under load"",""document findings""]}"
"set start date to wednesday morning and due date to may 6",edit_task,"{""start_date"":""2026-05-06"",""end_date"":""2026-05-06""}"
"bill it at 4000",edit_task,"{""cost"":""4000""}"
"we're insulating the attic on the roof level in suite 101 starting next tuesday and wrapping end of day wednesday crew of 7 cost 3500 category insulation reza is leading it checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take documentation photos",edit_task,"{""title"":""Insulate attic space"",""plan"":""roof level"",""location"":""suite 101"",""category"":""insulation"",""assignee"":""Reza"",""start_date"":""2026-05-12"",""end_date"":""2026-05-13"",""manpower"":""7"",""cost"":""3500"",""items"":[""check existing R-value"",""seal air leaks"",""install baffles at eaves"",""blow insulation to target depth"",""verify depth with ruler"",""take documentation photos""]}"
"it's waterproofing",edit_task,"{""category"":""waterproofing""}"
"this goes on sheet 7",edit_task,"{""plan"":""Sheet 7""}"
"we've got attic insulation in break room floor 2 put eddie on it have it wrapped by next tuesday make it medium priority checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take a photo for the record",edit_task,"{""title"":""Insulate attic space"",""location"":""break room floor 2"",""assignee"":""Eddie"",""end_date"":""2026-05-12"",""priority"":""p2"",""items"":[""check existing R-value"",""seal air leaks"",""install baffles at eaves"",""blow insulation to target depth"",""verify depth with ruler"",""take a photo for the record""]}"
"we're looking at 1200 for this",edit_task,"{""cost"":""1200""}"
"move this to c1 and set the location to north corridor",edit_task,"{""plan"":""C-1"",""location"":""north corridor""}"
"close it out as needs review",edit_task,"{""status"":""needs review""}"
"7 guys on this one",edit_task,"{""manpower"":""7""}"
"gotta get the roof membrane patched in the mechanical room by end of day wednesday make it low priority",edit_task,"{""title"":""Repair roof membrane"",""location"":""mechanical room"",""end_date"":""2026-05-06"",""priority"":""p3""}"
"set cost to around 8000 manpower to team of 3 and category to framing",edit_task,"{""category"":""framing"",""manpower"":""3"",""cost"":""8000""}"
"exhaust fan needs replacing in room 412 put kim on that make it urgent get it done by next friday",edit_task,"{""title"":""Replace exhaust fan"",""location"":""room 412"",""assignee"":""Kim"",""end_date"":""2026-05-15"",""priority"":""p1""}"
"this is a cracked concrete slab in the loading dock on fp3 mark it needs review ray is handling it due by may 5 checklist rout crack to proper width blow out dust apply bond breaker if needed document",edit_task,"{""title"":""Repair cracked concrete"",""plan"":""FP-3"",""location"":""loading dock"",""assignee"":""Ray"",""status"":""needs review"",""end_date"":""2026-05-05"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""document""]}"
"move to a202 location elevator shaft b and mark verified",edit_task,"{""plan"":""A202"",""location"":""elevator shaft B"",""status"":""verified""}"
"drawing e1 location east lobby category concrete and assign brenda",edit_task,"{""plan"":""E1"",""location"":""east lobby"",""category"":""concrete"",""assignee"":""Brenda""}"
"we're running rough in wiring on structural s2 steve is on this make it low priority by may 20",edit_task,"{""title"":""Run electrical rough-in"",""plan"":""structural S2"",""assignee"":""Steve"",""end_date"":""2026-05-20"",""priority"":""p3""}"
"set start to may 5",edit_task,"{""start_date"":""2026-05-05""}"
"new carpet is going into the office in break room floor 2 put tony on it make it high priority get it done before the owner review",edit_task,"{""title"":""Replace carpet in office"",""location"":""break room floor 2"",""assignee"":""Tony"",""end_date"":""2026-05-15"",""priority"":""p1""}"
"we need new sprinkler heads run assign it to danny crew of 3 cost around 10000 start this monday and finish end of day wednesday checklist confirm pipe layout with plan drill ceiling openings install drops attach heads final walkthrough with the gc",edit_task,"{""title"":""Install sprinkler heads"",""assignee"":""Danny"",""start_date"":""2026-05-04"",""end_date"":""2026-05-06"",""manpower"":""3"",""cost"":""10000"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""final walkthrough with the GC""]}"
"we've got a slab pour assign that to vic low priority end of next week is fine",edit_task,"{""title"":""Pour concrete slab"",""assignee"":""Vic"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"carlos and his team of 9 are on the slab pour in the basement category concrete budget 800 need it by next friday checklist set forms place rebar order concrete pour slab document everything",edit_task,"{""title"":""Pour concrete slab"",""location"":""basement"",""category"":""concrete"",""assignee"":""Carlos"",""end_date"":""2026-05-15"",""manpower"":""9"",""cost"":""800"",""items"":[""set forms"",""place rebar"",""order concrete"",""pour slab"",""document everything""]}"
"send a team of 8 over",edit_task,"{""manpower"":""8""}"
"bump it to high priority and push the deadline to thursday",edit_task,"{""end_date"":""2026-05-07"",""priority"":""p1""}"
"replace the broken faucet on fp3 start may 5 wrap up by friday 6 workers on the crew cost about 7000",edit_task,"{""title"":""Replace broken plumbing fixture"",""plan"":""FP-3"",""start_date"":""2026-05-05"",""end_date"":""2026-05-08"",""manpower"":""6"",""cost"":""7000""}"
"mark it on hold",edit_task,"{""status"":""on hold""}"
"gotta get the floor tile installed by thursday team of 10 should be enough make it top priority and assign mike",edit_task,"{""title"":""Install tile flooring"",""assignee"":""Mike"",""end_date"":""2026-05-07"",""priority"":""p1"",""manpower"":""10""}"
"budget is 8000 and category is sprinkler",edit_task,"{""category"":""sprinkler"",""cost"":""8000""}"
"carlos is taking the facade joint recaulk on m3 budget 10000 mark it open",edit_task,"{""title"":""Install exterior caulking"",""plan"":""M-3"",""assignee"":""Carlos"",""status"":""open"",""cost"":""10000""}"
"new pull station install in the server room budget about 1200 assign pat",edit_task,"{""title"":""Install fire alarm pull station"",""location"":""server room"",""assignee"":""Pat"",""cost"":""1200""}"
"we're installing sprinkler heads on the mezzanine in elevator shaft b starting next tuesday team of 3 on it cost around 15000 category sprinkler lena is leading it checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test inspector sign off",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""mezzanine"",""location"":""elevator shaft B"",""category"":""sprinkler"",""assignee"":""Lena"",""start_date"":""2026-05-12"",""manpower"":""3"",""cost"":""15000"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""pressure test"",""inspector sign-off""]}"
"move to p2 location exterior facade east and mark tracked",edit_task,"{""plan"":""P-2"",""location"":""exterior facade east"",""status"":""tracked""}"
"set cost to 15000 manpower to crew of 3 and category to tile",edit_task,"{""category"":""tile"",""manpower"":""3"",""cost"":""15000""}"
"push the due date to next tuesday",edit_task,"{""end_date"":""2026-05-12""}"
"install fire alarm pull station on e1 put pat on it make it medium priority by end of month 4 workers budget about 3000 checklist shut off fire alarm circuit remove old device run new conduit if needed mount backbox wire new device",edit_task,"{""title"":""Install fire alarm pull station"",""plan"":""E1"",""assignee"":""Pat"",""end_date"":""2026-05-29"",""priority"":""p2"",""manpower"":""4"",""cost"":""3000"",""items"":[""shut off fire alarm circuit"",""remove old device"",""run new conduit if needed"",""mount backbox"",""wire new device""]}"
"set priority top priority location boiler room cost about 20000",edit_task,"{""location"":""boiler room"",""priority"":""p1"",""cost"":""20000""}"
"set cost to 1500 manpower to crew of 6 and category to plumbing",edit_task,"{""category"":""plumbing"",""manpower"":""6"",""cost"":""1500""}"
"rename this to install tile flooring",edit_task,"{""title"":""install tile flooring""}"
"sal is taking the partition wall demo on s1 budget about 10000 mark it in progress",edit_task,"{""title"":""Demolish interior partition"",""plan"":""S-1"",""assignee"":""Sal"",""status"":""in progress"",""cost"":""10000""}"
"we need the broken glass panel replaced assign it to mike crew of 2 cost around 2000 start may 4 and finish end of month checklist measure opening order replacement glass remove broken pane clean frame final walkthrough with the gc",edit_task,"{""title"":""Replace broken window glazing"",""assignee"":""Mike"",""start_date"":""2026-05-04"",""end_date"":""2026-05-29"",""manpower"":""2"",""cost"":""2000"",""items"":[""measure opening"",""order replacement glass"",""remove broken pane"",""clean frame"",""final walkthrough with the GC""]}"
"we've got sprinkler heads to run assign that to brenda low priority end of next week is fine",edit_task,"{""title"":""Install sprinkler heads"",""assignee"":""Brenda"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"gotta get the partition wall demo done before the owner review 2 workers should be enough make it high priority and assign kim",edit_task,"{""title"":""Demolish interior partition"",""assignee"":""Kim"",""end_date"":""2026-05-15"",""priority"":""p1"",""manpower"":""2""}"
"we're insulating the attic on a201 in the server room starting tomorrow and wrapping next tuesday team of 5 cost 6000 category insulation steve is leading it checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take documentation photos",edit_task,"{""title"":""Insulate attic space"",""plan"":""A201"",""location"":""server room"",""category"":""insulation"",""assignee"":""Steve"",""start_date"":""2026-05-06"",""end_date"":""2026-05-12"",""manpower"":""5"",""cost"":""6000"",""items"":[""check existing R-value"",""seal air leaks"",""install baffles at eaves"",""blow insulation to target depth"",""verify depth with ruler"",""take documentation photos""]}"
"we're replacing the broken window glazing on p2 in bay 4 starting tomorrow and wrapping may 7 5 workers on it cost about 800 category glazing kim is leading it checklist measure opening order replacement glass remove broken pane clean frame install new glass apply glazing compound",edit_task,"{""title"":""Replace broken window glazing"",""plan"":""P-2"",""location"":""bay 4"",""category"":""glazing"",""assignee"":""Kim"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""5"",""cost"":""800"",""items"":[""measure opening"",""order replacement glass"",""remove broken pane"",""clean frame"",""install new glass"",""apply glazing compound""]}"
"fix electrical panel issue on a101 put danny on it low priority by end of next week 8 guys budget about 6000 checklist identify tripped breaker check load on circuit inspect wiring connections replace breaker if faulty test under load",edit_task,"{""title"":""Fix electrical panel issue"",""plan"":""A101"",""assignee"":""Danny"",""end_date"":""2026-05-15"",""priority"":""p3"",""manpower"":""8"",""cost"":""6000"",""items"":[""identify tripped breaker"",""check load on circuit"",""inspect wiring connections"",""replace breaker if faulty"",""test under load""]}"
"we're pouring the concrete slab on id101 in bay 4 starting wednesday morning and wrapping next friday 5 guys on it cost 2000 category concrete zack is leading it checklist set forms place rebar order concrete pour slab screed and float apply curing compound",edit_task,"{""title"":""Pour concrete slab"",""plan"":""ID-101"",""location"":""bay 4"",""category"":""concrete"",""assignee"":""Zack"",""start_date"":""2026-05-06"",""end_date"":""2026-05-15"",""manpower"":""5"",""cost"":""2000"",""items"":[""set forms"",""place rebar"",""order concrete"",""pour slab"",""screed and float"",""apply curing compound""]}"
"we're applying waterproofing membrane on a101 in the courtyard starting this monday and wrapping before the inspection team of 8 cost about 2500 category waterproofing omar is leading it checklist clean substrate apply primer coat let cure apply first membrane coat let cure apply second coat",edit_task,"{""title"":""Apply waterproofing membrane"",""plan"":""A101"",""location"":""courtyard"",""category"":""waterproofing"",""assignee"":""Omar"",""start_date"":""2026-05-04"",""end_date"":""2026-05-15"",""manpower"":""8"",""cost"":""2500"",""items"":[""clean substrate"",""apply primer coat"",""let cure"",""apply first membrane coat"",""let cure"",""apply second coat""]}"
"we've got a foundation pour in the basement put omar on it make it medium priority have it wrapped by next friday checklist set forms place rebar order concrete pour slab screed and float take a photo for the record",edit_task,"{""title"":""Pour concrete slab"",""location"":""basement"",""assignee"":""Omar"",""end_date"":""2026-05-15"",""priority"":""p2"",""items"":[""set forms"",""place rebar"",""order concrete"",""pour slab"",""screed and float"",""take a photo for the record""]}"
"invoice will be about 10000",edit_task,"{""cost"":""10000""}"
"we've got shower pan waterproofing in elevator shaft b put dave on it have it wrapped by friday make it low priority checklist clean substrate apply primer coat let cure apply first membrane coat let cure take a photo for the record",edit_task,"{""title"":""Apply waterproofing membrane"",""location"":""elevator shaft B"",""assignee"":""Dave"",""end_date"":""2026-05-08"",""priority"":""p3"",""items"":[""clean substrate"",""apply primer coat"",""let cure"",""apply first membrane coat"",""let cure"",""take a photo for the record""]}"
"trade is painting",edit_task,"{""category"":""painting""}"
"we've got a broken glass panel in stairwell b put nadia on it have it done by thursday make it urgent checklist measure opening order replacement glass remove broken pane clean frame install new glass take a photo for the record",edit_task,"{""title"":""Replace broken window glazing"",""location"":""stairwell B"",""assignee"":""Nadia"",""end_date"":""2026-05-07"",""priority"":""p1"",""items"":[""measure opening"",""order replacement glass"",""remove broken pane"",""clean frame"",""install new glass"",""take a photo for the record""]}"
"bump it to low priority and push the deadline to next tuesday",edit_task,"{""end_date"":""2026-05-12"",""priority"":""p3""}"
"kick off this monday",edit_task,"{""start_date"":""2026-05-04""}"
"gotta get the attic insulation blown in by next tuesday team of 2 should be enough make it high priority and assign troy",edit_task,"{""title"":""Insulate attic space"",""assignee"":""Troy"",""end_date"":""2026-05-12"",""priority"":""p1"",""manpower"":""2""}"
"we're installing the ceiling grid and tiles on structural s2 in parking garage level 1 starting this monday and wrapping next tuesday crew of 9 cost around 2500 category drywall steve is leading it checklist snap layout lines install wall angle hang main tees install cross tees cut perimeter tiles drop in field tiles",edit_task,"{""title"":""Install ceiling grid and tiles"",""plan"":""structural S2"",""location"":""parking garage level 1"",""category"":""drywall"",""assignee"":""Steve"",""start_date"":""2026-05-04"",""end_date"":""2026-05-12"",""manpower"":""9"",""cost"":""2500"",""items"":[""snap layout lines"",""install wall angle"",""hang main tees"",""install cross tees"",""cut perimeter tiles"",""drop in field tiles""]}"
"we're installing tile flooring on m3 in bay 12 starting tomorrow and wrapping end of day wednesday team of 4 cost 3500 category tile sal is leading it checklist demo old flooring level subfloor apply thinset mortar lay tile to pattern cut edge tiles grout",edit_task,"{""title"":""Install tile flooring"",""plan"":""M-3"",""location"":""bay 12"",""category"":""tile"",""assignee"":""Sal"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06"",""manpower"":""4"",""cost"":""3500"",""items"":[""demo old flooring"",""level subfloor"",""apply thinset mortar"",""lay tile to pattern"",""cut edge tiles"",""grout""]}"
"put luis and 9 workers on the low voltage pull above the ceiling start wednesday morning and have it done by may 18",edit_task,"{""title"":""Install low voltage cabling"",""assignee"":""Luis"",""start_date"":""2026-05-06"",""end_date"":""2026-05-18"",""manpower"":""9""}"
"we've got water leaking from the pipes under the sink in the loading dock on fp2 the gc wants it done by thursday put juan and a team of 1 on it budget about 7000 make it low priority category plumbing",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""FP-2"",""location"":""loading dock"",""category"":""plumbing"",""assignee"":""Juan"",""end_date"":""2026-05-07"",""priority"":""p3"",""manpower"":""1"",""cost"":""7000""}"
"maria and her team of 9 are on the exhaust fan swap in bay 12 category mechanical budget around 6000 need it by friday checklist shut off circuit at panel remove old fan install new housing wire new fan document everything",edit_task,"{""title"":""Replace exhaust fan"",""location"":""bay 12"",""category"":""mechanical"",""assignee"":""Maria"",""end_date"":""2026-05-08"",""manpower"":""9"",""cost"":""6000"",""items"":[""shut off circuit at panel"",""remove old fan"",""install new housing"",""wire new fan"",""document everything""]}"
"change category to tile and mark it in progress",edit_task,"{""category"":""tile"",""status"":""in progress""}"
"first day on this is next tuesday",edit_task,"{""start_date"":""2026-05-12""}"
"get it done by may 5",edit_task,"{""end_date"":""2026-05-05""}"
"we've got the old partition demo in the pool deck put zack on it have it wrapped by end of month make it medium priority checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall cut studs take a photo for the record",edit_task,"{""title"":""Demolish interior partition"",""location"":""pool deck"",""assignee"":""Zack"",""end_date"":""2026-05-29"",""priority"":""p2"",""items"":[""verify no electrical or plumbing in wall"",""shut off circuits"",""remove door"",""strip drywall"",""cut studs"",""take a photo for the record""]}"
"dave is taking the water leak under the sink in the courtyard this is plumbing work medium priority done by end of day wednesday manpower crew of 7 budget 800 mark tracked",edit_task,"{""title"":""Fix water leak under sink"",""location"":""courtyard"",""category"":""plumbing"",""assignee"":""Dave"",""status"":""tracked"",""end_date"":""2026-05-06"",""priority"":""p2"",""manpower"":""7"",""cost"":""800""}"
"assign omar set priority to low and due by may 15",edit_task,"{""assignee"":""Omar"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"we're repairing cracked concrete on s2 in the cafeteria starting next tuesday and wrapping next friday team of 1 cost 4000 category concrete nadia is leading it checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure apply surface sealer",edit_task,"{""title"":""Repair cracked concrete"",""plan"":""S-2"",""location"":""cafeteria"",""category"":""concrete"",""assignee"":""Nadia"",""start_date"":""2026-05-12"",""end_date"":""2026-05-15"",""manpower"":""1"",""cost"":""4000"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""fill with epoxy inject"",""grind flush after cure"",""apply surface sealer""]}"
"we've got a leak under the sink assign it to luis crew of 2 cost around 15000 start tomorrow and finish thursday checklist shut off water supply remove p trap inspect drain line replace gaskets final walkthrough with the gc",edit_task,"{""title"":""Fix water leak under sink"",""assignee"":""Luis"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""2"",""cost"":""15000"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""final walkthrough with the GC""]}"
"category structural drawing a3 and set status to on hold",edit_task,"{""plan"":""A-3"",""category"":""structural"",""status"":""on hold""}"
"need a new partition framed in penthouse level put tony on it should be done by may 7 cost around 2000",edit_task,"{""title"":""Frame new partition wall"",""location"":""penthouse level"",""assignee"":""Tony"",""end_date"":""2026-05-07"",""cost"":""2000""}"
"put pat and a team of 7 on the busted fixture in the bathroom start next tuesday and finish end of day wednesday",edit_task,"{""title"":""Replace broken plumbing fixture"",""location"":""bathroom"",""assignee"":""Pat"",""start_date"":""2026-05-12"",""end_date"":""2026-05-13"",""manpower"":""7""}"
"move to e4 location suite 3b and mark tracked",edit_task,"{""plan"":""E4"",""location"":""suite 3B"",""status"":""tracked""}"
"this is replacing the fire alarm pull station in the loading dock on p3 make it medium priority due before the owner review",edit_task,"{""title"":""Install fire alarm pull station"",""plan"":""P-3"",""location"":""loading dock"",""end_date"":""2026-05-14"",""priority"":""p2""}"
"this is on civil sheet 3",edit_task,"{""plan"":""civil sheet 3""}"
"this is a panel with a tripped breaker in the east wing on sheet 4 mark it closed maria is handling it due before the owner review checklist identify tripped breaker check load on circuit inspect wiring connections document findings",edit_task,"{""title"":""Fix electrical panel issue"",""plan"":""Sheet 4"",""location"":""east wing"",""assignee"":""Maria"",""status"":""closed"",""end_date"":""2026-05-09"",""items"":[""identify tripped breaker"",""check load on circuit"",""inspect wiring connections"",""document findings""]}"
"change priority to urgent",edit_task,"{""priority"":""p1""}"
"maria and her team of 6 are on the hvac unit replacement in the east wing category hvac budget 12000 need it by thursday checklist shut down power to unit remove old unit install new unit check refrigerant lines document everything",edit_task,"{""title"":""Replace broken HVAC unit"",""location"":""east wing"",""category"":""HVAC"",""assignee"":""Maria"",""end_date"":""2026-05-07"",""manpower"":""6"",""cost"":""12000"",""items"":[""shut down power to unit"",""remove old unit"",""install new unit"",""check refrigerant lines"",""document everything""]}"
"putting down tile floor on e2 starts may 4 wraps up by friday 9 workers on the crew cost 1200",edit_task,"{""title"":""Install tile flooring"",""plan"":""E-2"",""start_date"":""2026-05-04"",""end_date"":""2026-05-08"",""manpower"":""9"",""cost"":""1200""}"
"this is a hole in the drywall ceiling in parking garage level 1 on a201 mark it pending inspection hector is handling it due by thursday checklist cut out damaged section install backing hang new drywall take photo",edit_task,"{""title"":""Patch drywall ceiling"",""plan"":""A201"",""location"":""parking garage level 1"",""assignee"":""Hector"",""status"":""pending inspection"",""end_date"":""2026-05-07"",""items"":[""cut out damaged section"",""install backing"",""hang new drywall"",""take photo""]}"
"need electrical rough in in the boiler room put felix on it should be done by may 5 cost around 3000",edit_task,"{""title"":""Run electrical rough-in"",""location"":""boiler room"",""assignee"":""Felix"",""end_date"":""2026-05-05"",""cost"":""3000""}"
"it's fire suppression",edit_task,"{""category"":""fire suppression""}"
"it belongs in level 2",edit_task,"{""location"":""level 2""}"
"set priority priority one location room 201 cost about 20000",edit_task,"{""location"":""room 201"",""priority"":""p1"",""cost"":""20000""}"
"we've got new sprinkler heads going in in unit 12 put dave on it have it wrapped before the owner review make it urgent checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test take a photo for the record",edit_task,"{""title"":""Install sprinkler heads"",""location"":""unit 12"",""assignee"":""Dave"",""end_date"":""2026-05-14"",""priority"":""p1"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""pressure test"",""take a photo for the record""]}"
"this is a slow drip under the kitchen sink in the pool deck on e2 mark it verified mike is handling it due by may 6 checklist shut off water supply remove p trap inspect drain line take photo",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""E-2"",""location"":""pool deck"",""assignee"":""Mike"",""status"":""verified"",""end_date"":""2026-05-06"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""take photo""]}"
"set start date to may 4 and due date to friday",edit_task,"{""start_date"":""2026-05-04"",""end_date"":""2026-05-08""}"
"we need the roof membrane patched assign it to luis crew of 2 cost around 12000 start tomorrow and finish thursday checklist locate the breach clean and dry the area apply primer cut patch membrane final walkthrough with the gc",edit_task,"{""title"":""Repair roof membrane"",""assignee"":""Luis"",""start_date"":""2026-05-06"",""end_date"":""2026-05-07"",""manpower"":""2"",""cost"":""12000"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""cut patch membrane"",""final walkthrough with the GC""]}"
"we're replacing the broken window glazing on id101 in the main lobby starting may 4 and wrapping thursday team of 2 cost about 1500 category glazing pat is leading it checklist measure opening order replacement glass remove broken pane clean frame install new glass apply glazing compound",edit_task,"{""title"":""Replace broken window glazing"",""plan"":""ID-101"",""location"":""main lobby"",""category"":""glazing"",""assignee"":""Pat"",""start_date"":""2026-05-04"",""end_date"":""2026-05-07"",""manpower"":""2"",""cost"":""1500"",""items"":[""measure opening"",""order replacement glass"",""remove broken pane"",""clean frame"",""install new glass"",""apply glazing compound""]}"
"we've got a cracked concrete slab at grid line b2 put sarah on it have it wrapped by may 9 make it medium priority checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject grind flush after cure take a photo for the record",edit_task,"{""title"":""Repair cracked concrete"",""location"":""grid line B2"",""assignee"":""Sarah"",""end_date"":""2026-05-09"",""priority"":""p2"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""fill with epoxy inject"",""grind flush after cure"",""take a photo for the record""]}"
"the roof membrane has a leak in the east wing budget about 15000 assign kim",edit_task,"{""title"":""Repair roof membrane"",""location"":""east wing"",""assignee"":""Kim"",""cost"":""15000""}"
"mark this pending inspection it's shower pan waterproofing on the ground floor",edit_task,"{""title"":""Apply waterproofing membrane"",""location"":""ground floor"",""status"":""pending inspection""}"
"we're scheduling an hvac ductwork leak fix in unit 7 on e2 need 5 workers starting wednesday morning through before the gc walkthrough ballpark cost 1200",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""E-2"",""location"":""unit 7"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""5"",""cost"":""1200""}"
"mark this needs review it's a slab pour in level 3",edit_task,"{""title"":""Pour concrete slab"",""location"":""level 3"",""status"":""needs review""}"
"belongs to mechanical",edit_task,"{""category"":""mechanical""}"
"update to in progress please",edit_task,"{""status"":""in progress""}"
"gotta get the electrical rough in done by friday team of 5 should be enough make it medium priority and assign dave",edit_task,"{""title"":""Run electrical rough-in"",""assignee"":""Dave"",""end_date"":""2026-05-08"",""priority"":""p2"",""manpower"":""5""}"
"assign to sarah and set priority to medium",edit_task,"{""assignee"":""Sarah"",""priority"":""p2""}"
"juan is taking the interior wall demo on m2 budget around 12000 mark it pending inspection",edit_task,"{""title"":""Demolish interior partition"",""plan"":""M2"",""assignee"":""Juan"",""status"":""pending inspection"",""cost"":""12000""}"
"assign pat set priority to can wait and due by end of day wednesday",edit_task,"{""assignee"":""Pat"",""end_date"":""2026-05-06"",""priority"":""p3""}"
"troy and his team of 3 are on attic insulation in bay 7 category insulation budget around 4000 need it by may 8 checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth document everything",edit_task,"{""title"":""Insulate attic space"",""location"":""bay 7"",""category"":""insulation"",""assignee"":""Troy"",""end_date"":""2026-05-08"",""manpower"":""3"",""cost"":""4000"",""items"":[""check existing R-value"",""seal air leaks"",""install baffles at eaves"",""blow insulation to target depth"",""document everything""]}"
"total cost is 2000",edit_task,"{""cost"":""2000""}"
"there's a hole in the drywall ceiling in room 201 on sheet 4 the gc wants it done by thursday put danny and 3 guys on it budget about 2000 make it low priority this is drywall",edit_task,"{""title"":""Patch drywall ceiling"",""plan"":""Sheet 4"",""location"":""room 201"",""category"":""drywall"",""assignee"":""Danny"",""end_date"":""2026-05-07"",""priority"":""p3"",""manpower"":""3"",""cost"":""2000""}"
"start this monday finish by next friday put eddie on it",edit_task,"{""assignee"":""Eddie"",""start_date"":""2026-05-04"",""end_date"":""2026-05-15""}"
"it's in unit 23 and status is needs review",edit_task,"{""location"":""unit 23"",""status"":""needs review""}"
"sarah is leading the slab pour in stairwell b start may 6 finish next tuesday cost 10000 need 7 guys mark it open",edit_task,"{""title"":""Pour concrete slab"",""location"":""stairwell B"",""assignee"":""Sarah"",""status"":""open"",""start_date"":""2026-05-06"",""end_date"":""2026-05-12"",""manpower"":""7"",""cost"":""10000""}"
"lena is taking attic insulation over at p2 budget 2000 mark it tracked",edit_task,"{""title"":""Insulate attic space"",""plan"":""P-2"",""assignee"":""Lena"",""status"":""tracked"",""cost"":""2000""}"
"felix is taking the broken fire alarm pull station in level 5 this is fire alarm work urgent done by may 16 manpower team of 9 budget 800 mark needs review",edit_task,"{""title"":""Install fire alarm pull station"",""location"":""level 5"",""category"":""fire alarm"",""assignee"":""Felix"",""status"":""needs review"",""end_date"":""2026-05-16"",""priority"":""p1"",""manpower"":""9"",""cost"":""800""}"
"need some recessed lighting put in in the main lobby put reza on it should be done by thursday cost around 5000",edit_task,"{""title"":""Install recessed lighting"",""location"":""main lobby"",""assignee"":""Reza"",""end_date"":""2026-05-07"",""cost"":""5000""}"
"we're doing the exterior paint in the penthouse level put maria on it have it wrapped by next friday make it medium priority checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat take a photo for the record",edit_task,"{""title"":""Paint exterior facade"",""location"":""penthouse level"",""assignee"":""Maria"",""end_date"":""2026-05-15"",""priority"":""p2"",""items"":[""pressure wash surface"",""scrape loose paint"",""apply primer"",""caulk gaps and cracks"",""roll first coat"",""take a photo for the record""]}"
"we're scheduling an electrical panel fix for room 201 on c1 need a team of 6 starting next tuesday through friday ballpark cost 7000",edit_task,"{""title"":""Fix electrical panel issue"",""plan"":""C-1"",""location"":""room 201"",""start_date"":""2026-05-12"",""end_date"":""2026-05-15"",""manpower"":""6"",""cost"":""7000""}"
"this one is fire suppression heads on m2 bump it to high priority brenda handles it by end of day wednesday budget around 6000 location suite 3b category sprinkler",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""M2"",""location"":""suite 3B"",""category"":""sprinkler"",""assignee"":""Brenda"",""end_date"":""2026-05-06"",""priority"":""p1"",""cost"":""6000""}"
"kick off wednesday morning",edit_task,"{""start_date"":""2026-05-06""}"
"fix water leak under sink on e1 put ray on it make it high priority by may 16 crew of 9 budget about 15000 checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""E1"",""assignee"":""Ray"",""end_date"":""2026-05-16"",""priority"":""p1"",""manpower"":""9"",""cost"":""15000"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""reinstall p-trap""]}"
"we're pouring the slab in suite 3b put felix on it have it wrapped by may 19 make it medium priority checklist set forms place rebar order concrete pour slab screed and float take a photo for the record",edit_task,"{""title"":""Pour concrete slab"",""location"":""suite 3B"",""assignee"":""Felix"",""end_date"":""2026-05-19"",""priority"":""p2"",""items"":[""set forms"",""place rebar"",""order concrete"",""pour slab"",""screed and float"",""take a photo for the record""]}"
"category fire suppression drawing plumbing p4 and set status to verified",edit_task,"{""plan"":""plumbing P4"",""category"":""fire suppression"",""status"":""verified""}"
"assign gus priority medium cost 1200 and due by friday",edit_task,"{""assignee"":""Gus"",""end_date"":""2026-05-08"",""priority"":""p2"",""cost"":""1200""}"
"done by may 19",edit_task,"{""end_date"":""2026-05-19""}"
"set cost to 10000 manpower to 9 workers and category to low voltage",edit_task,"{""category"":""low voltage"",""manpower"":""9"",""cost"":""10000""}"
"run electrical rough in on the ground floor put mike on it make it medium priority by end of next week 9 workers budget about 800 checklist pull permits mark box locations per plan drill studs pull wire stub out boxes",edit_task,"{""title"":""Run electrical rough-in"",""plan"":""ground floor"",""assignee"":""Mike"",""end_date"":""2026-05-15"",""priority"":""p2"",""manpower"":""9"",""cost"":""800"",""items"":[""pull permits"",""mark box locations per plan"",""drill studs"",""pull wire"",""stub out boxes""]}"
"budget is 6000 and category is insulation",edit_task,"{""category"":""insulation"",""cost"":""6000""}"
"set priority asap assign eddie mark open and due by may 21",edit_task,"{""assignee"":""Eddie"",""status"":""open"",""end_date"":""2026-05-21"",""priority"":""p1""}"
"assign zack on it and get it done by thursday",edit_task,"{""assignee"":""Zack"",""end_date"":""2026-05-07""}"
"change category to demolition and mark it open",edit_task,"{""category"":""demolition"",""status"":""open""}"
"maria is taking shower pan waterproofing in the penthouse level this is waterproofing work medium priority done by next friday manpower team of 6 budget 1200 mark complete",edit_task,"{""title"":""Apply waterproofing membrane"",""location"":""penthouse level"",""category"":""waterproofing"",""assignee"":""Maria"",""status"":""complete"",""end_date"":""2026-05-15"",""priority"":""p2"",""manpower"":""6"",""cost"":""1200""}"
"tony is taking the breaker issue in the main lobby this is electrical work medium priority done by next tuesday manpower 8 workers budget 5000 mark complete",edit_task,"{""title"":""Fix electrical panel issue"",""location"":""main lobby"",""category"":""electrical"",""assignee"":""Tony"",""status"":""complete"",""end_date"":""2026-05-12"",""priority"":""p2"",""manpower"":""8"",""cost"":""5000""}"
"this is a new wall that needs framing in parking garage level 1 on a101 mark it verified kim is handling it due by next tuesday checklist snap chalk lines lay bottom plate stand studs 16 oc rough inspection",edit_task,"{""title"":""Frame new partition wall"",""plan"":""A101"",""location"":""parking garage level 1"",""assignee"":""Kim"",""status"":""verified"",""end_date"":""2026-05-12"",""items"":[""snap chalk lines"",""lay bottom plate"",""stand studs 16 OC"",""rough inspection""]}"
"cost 1200 crew of 9 category concrete due before the inspection",edit_task,"{""category"":""concrete"",""end_date"":""2026-05-14"",""manpower"":""9"",""cost"":""1200""}"
"set priority critical location loading dock cost 8000",edit_task,"{""location"":""loading dock"",""priority"":""p1"",""cost"":""8000""}"
"target completion may 17",edit_task,"{""end_date"":""2026-05-17""}"
"reza is handling this one",edit_task,"{""assignee"":""Reza""}"
"the ac unit is shot in the pool deck on e2 the gc wants it done by end of day wednesday put eddie and 9 workers on it budget 6000 make it urgent this is hvac",edit_task,"{""title"":""Replace broken HVAC unit"",""plan"":""E-2"",""location"":""pool deck"",""category"":""HVAC"",""assignee"":""Eddie"",""end_date"":""2026-05-06"",""priority"":""p1"",""manpower"":""9"",""cost"":""6000""}"
"gotta get the suspended ceiling grid installed in unit 7 by end of month make it medium priority",edit_task,"{""title"":""Install ceiling grid and tiles"",""location"":""unit 7"",""end_date"":""2026-05-29"",""priority"":""p2""}"
"we've got a leak under the sink assign it to brenda crew of 2 cost around 4000 start this monday and finish may 9 checklist shut off water supply remove p trap inspect drain line replace gaskets final walkthrough with the gc",edit_task,"{""title"":""Fix water leak under sink"",""assignee"":""Brenda"",""start_date"":""2026-05-04"",""end_date"":""2026-05-09"",""manpower"":""2"",""cost"":""4000"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""final walkthrough with the GC""]}"
"mobilize wednesday morning",edit_task,"{""start_date"":""2026-05-06""}"
"floor tile installation in the boiler room budget about 10000 assign vic",edit_task,"{""title"":""Install tile flooring"",""location"":""boiler room"",""assignee"":""Vic"",""cost"":""10000""}"
"set start to may 4",edit_task,"{""start_date"":""2026-05-04""}"
"this one is water leaking from the pipes under the sink on fp3 mark it medium pat handles it by end of day wednesday budget around 12000 location roof deck category plumbing",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""FP-3"",""location"":""roof deck"",""category"":""plumbing"",""assignee"":""Pat"",""end_date"":""2026-05-06"",""priority"":""p2"",""cost"":""12000""}"
"mark it asap",edit_task,"{""priority"":""p1""}"
"send a team of 10 over",edit_task,"{""manpower"":""10""}"
"move it to the west wing",edit_task,"{""location"":""west wing""}"
"this is recessed cans in bay 4 on civil sheet 3 mark it on hold brenda is handling it due by end of month checklist run romex to junction box mount the housing cans connect wiring take finished photo",edit_task,"{""title"":""Install recessed lighting"",""plan"":""civil sheet 3"",""location"":""bay 4"",""assignee"":""Brenda"",""status"":""on hold"",""end_date"":""2026-05-29"",""items"":[""run romex to junction box"",""mount the housing cans"",""connect wiring"",""take finished photo""]}"
"vic and his team of 2 are on crack repair on the parking deck in the mezzanine category concrete budget 800 need it by end of month checklist rout crack to proper width blow out dust apply bond breaker if needed fill with epoxy inject document everything",edit_task,"{""title"":""Repair cracked concrete"",""location"":""mezzanine"",""category"":""concrete"",""assignee"":""Vic"",""end_date"":""2026-05-29"",""manpower"":""2"",""cost"":""800"",""items"":[""rout crack to proper width"",""blow out dust"",""apply bond breaker if needed"",""fill with epoxy inject"",""document everything""]}"
"put troy and a team of 9 on floor tile installation start next tuesday and have it done by friday",edit_task,"{""title"":""Install tile flooring"",""assignee"":""Troy"",""start_date"":""2026-05-12"",""end_date"":""2026-05-15"",""manpower"":""9""}"
"we've got a broken glass panel replacement assign that to bobby low priority end of next week is fine",edit_task,"{""title"":""Replace broken window glazing"",""assignee"":""Bobby"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"this falls under hvac",edit_task,"{""category"":""HVAC""}"
"cost 2000 crew of 9 category plumbing due by thursday",edit_task,"{""category"":""plumbing"",""end_date"":""2026-05-07"",""manpower"":""9"",""cost"":""2000""}"
"gus is leading the foundation pour in suite 101 start tomorrow finish may 21 cost 12000 need a team of 3 mark it closed",edit_task,"{""title"":""Pour concrete slab"",""location"":""suite 101"",""assignee"":""Gus"",""status"":""closed"",""start_date"":""2026-05-06"",""end_date"":""2026-05-21"",""manpower"":""3"",""cost"":""12000""}"
"tag vic as assignee",edit_task,"{""assignee"":""Vic""}"
"put bobby and 8 workers on installing the suspended ceiling grid start next tuesday and have it done by friday",edit_task,"{""title"":""Install ceiling grid and tiles"",""assignee"":""Bobby"",""start_date"":""2026-05-12"",""end_date"":""2026-05-15"",""manpower"":""8""}"
"want it wrapped by next tuesday",edit_task,"{""end_date"":""2026-05-12""}"
"we're scheduling the concrete slab pour for grid line b2 on the ground floor need a crew of 10 starting may 3 through before the gc walkthrough ballpark cost 7000",edit_task,"{""title"":""Pour concrete slab"",""plan"":""ground floor"",""location"":""grid line B2"",""start_date"":""2026-05-03"",""end_date"":""2026-05-13"",""manpower"":""10"",""cost"":""7000""}"
"task is in the courtyard",edit_task,"{""location"":""courtyard""}"
"send a crew of 8 over",edit_task,"{""manpower"":""8""}"
"gotta get the exterior paint job in level 4 done by may 20 make it medium priority",edit_task,"{""title"":""Paint exterior facade"",""location"":""level 4"",""end_date"":""2026-05-20"",""priority"":""p2""}"
"push the due date to end of month",edit_task,"{""end_date"":""2026-05-29""}"
"we're installing the ceiling grid and tiles on p2 in room 201 starting this monday and wrapping may 5 2 workers on it cost about 8000 category drywall juan is leading it checklist snap layout lines install wall angle hang main tees install cross tees cut perimeter tiles drop in field tiles",edit_task,"{""title"":""Install ceiling grid and tiles"",""plan"":""P-2"",""location"":""room 201"",""category"":""drywall"",""assignee"":""Juan"",""start_date"":""2026-05-04"",""end_date"":""2026-05-05"",""manpower"":""2"",""cost"":""8000"",""items"":[""snap layout lines"",""install wall angle"",""hang main tees"",""install cross tees"",""cut perimeter tiles"",""drop in field tiles""]}"
"name it fix electrical panel issue",edit_task,"{""title"":""Fix electrical panel issue""}"
"category is insulation",edit_task,"{""category"":""insulation""}"
"we've got the partition wall demo assign that to kim low priority end of next week is fine",edit_task,"{""title"":""Demolish interior partition"",""assignee"":""Kim"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"need sprinkler heads run in the loading dock put pat on it should be done by end of month cost around 2500",edit_task,"{""title"":""Install sprinkler heads"",""location"":""loading dock"",""assignee"":""Pat"",""end_date"":""2026-05-29"",""cost"":""2500""}"
"it belongs in the south corridor",edit_task,"{""location"":""south corridor""}"
"deadline is end of month",edit_task,"{""end_date"":""2026-05-29""}"
"we're installing tile flooring on m3 in unit 7 starting may 2 and wrapping before the inspection crew of 9 cost 12000 category tile eddie is leading it checklist demo old flooring level subfloor apply thinset mortar lay tile to pattern cut edge tiles grout",edit_task,"{""title"":""Install tile flooring"",""plan"":""M-3"",""location"":""unit 7"",""category"":""tile"",""assignee"":""Eddie"",""start_date"":""2026-05-02"",""end_date"":""2026-05-15"",""manpower"":""9"",""cost"":""12000"",""items"":[""demo old flooring"",""level subfloor"",""apply thinset mortar"",""lay tile to pattern"",""cut edge tiles"",""grout""]}"
"we're looking at 4000 for this",edit_task,"{""cost"":""4000""}"
"we're replacing the plumbing fixture on s1 in the main lobby starting may 2 and wrapping thursday 10 workers on it cost 15000 category plumbing kim is leading it checklist shut off water remove old fixture clean mounting surface install new fixture reconnect supply lines test for leaks",edit_task,"{""title"":""Replace broken plumbing fixture"",""plan"":""S-1"",""location"":""main lobby"",""category"":""plumbing"",""assignee"":""Kim"",""start_date"":""2026-05-02"",""end_date"":""2026-05-07"",""manpower"":""10"",""cost"":""15000"",""items"":[""shut off water"",""remove old fixture"",""clean mounting surface"",""install new fixture"",""reconnect supply lines"",""test for leaks""]}"
"gus is leading the recessed can install in bay 12 start tomorrow finish end of month cost around 3500 need a team of 7 mark it open",edit_task,"{""title"":""Install recessed lighting"",""location"":""bay 12"",""assignee"":""Gus"",""status"":""open"",""start_date"":""2026-05-06"",""end_date"":""2026-05-29"",""manpower"":""7"",""cost"":""3500""}"
"begin this monday",edit_task,"{""start_date"":""2026-05-04""}"
"this is a duct leak in the plenum in the east lobby on a101 mark it closed hector is handling it due by next tuesday checklist locate all leak points clean duct surface apply mastic sealant document fix",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""A101"",""location"":""east lobby"",""assignee"":""Hector"",""status"":""closed"",""end_date"":""2026-05-12"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""document fix""]}"
"this is demoing the interior wall in room 201 on structural s2 bump it to high priority due by friday",edit_task,"{""title"":""Demolish interior partition"",""plan"":""structural S2"",""location"":""room 201"",""end_date"":""2026-05-08"",""priority"":""p1""}"
"we've got a leak under the sink in unit 23 put hector on it have it wrapped by may 7 make it low priority checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap take a photo for the record",edit_task,"{""title"":""Fix water leak under sink"",""location"":""unit 23"",""assignee"":""Hector"",""end_date"":""2026-05-07"",""priority"":""p3"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""reinstall p-trap"",""take a photo for the record""]}"
"we're scheduling recessed lighting in unit 12 on the roof level plan need 1 guy starting this monday through may 5 ballpark cost about 3500",edit_task,"{""title"":""Install recessed lighting"",""plan"":""roof level"",""location"":""unit 12"",""start_date"":""2026-05-04"",""end_date"":""2026-05-05"",""manpower"":""1"",""cost"":""3500""}"
"we're scheduling ceiling grid and tile install for stairwell a on the roof level plan need 3 workers starting may 3 through may 7 ballpark cost around 15000",edit_task,"{""title"":""Install ceiling grid and tiles"",""plan"":""roof level"",""location"":""stairwell A"",""start_date"":""2026-05-03"",""end_date"":""2026-05-07"",""manpower"":""3"",""cost"":""15000""}"
"put bobby and a team of 10 on the old hvac swap start tomorrow and have it done by may 16",edit_task,"{""title"":""Replace broken HVAC unit"",""assignee"":""Bobby"",""start_date"":""2026-05-06"",""end_date"":""2026-05-16"",""manpower"":""10""}"
"set start date to next tuesday and due date to may 16",edit_task,"{""start_date"":""2026-05-12"",""end_date"":""2026-05-16""}"
"bump it to high priority and push the deadline to end of day wednesday",edit_task,"{""end_date"":""2026-05-06"",""priority"":""p1""}"
"end date is before the owner review",edit_task,"{""end_date"":""2026-05-08""}"
"we're scheduling partition demo for the server room on e1 need a team of 1 starting wednesday morning through friday ballpark cost about 4000",edit_task,"{""title"":""Demolish interior partition"",""plan"":""E1"",""location"":""server room"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""1"",""cost"":""4000""}"
"we're scheduling sprinkler head install for grid line b2 on the ground floor need a team of 9 starting wednesday morning through next friday ballpark cost 1500",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""ground floor"",""location"":""grid line B2"",""start_date"":""2026-05-06"",""end_date"":""2026-05-15"",""manpower"":""9"",""cost"":""1500""}"
"sarah is leading the interior wall demo in elevator shaft b start tomorrow finish end of day wednesday cost about 4000 need a crew of 7 mark it open",edit_task,"{""title"":""Demolish interior partition"",""location"":""elevator shaft B"",""assignee"":""Sarah"",""status"":""open"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06"",""manpower"":""7"",""cost"":""4000""}"
"set cost to 5000 and manpower to a team of 6",edit_task,"{""manpower"":""6"",""cost"":""5000""}"
"move this to a4 and set location to suite 3b",edit_task,"{""plan"":""A-4"",""location"":""suite 3B""}"
"start may 4 end may 6 manpower team of 6 and cost about 7000",edit_task,"{""start_date"":""2026-05-04"",""end_date"":""2026-05-06"",""manpower"":""6"",""cost"":""7000""}"
"we've got an hvac ductwork leak in suite 3b on the mezzanine plan the gc wants it done by end of month put troy and a team of 9 on it budget 3500 make it high priority category hvac",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""mezzanine"",""location"":""suite 3B"",""category"":""HVAC"",""assignee"":""Troy"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""9"",""cost"":""3500""}"
"assign steve on it and get it done by may 19",edit_task,"{""assignee"":""Steve"",""end_date"":""2026-05-19""}"
"it's in suite 101 and status is open",edit_task,"{""location"":""suite 101"",""status"":""open""}"
"we've got drywall damage on the ceiling on e2 felix is on this make it low priority by end of month",edit_task,"{""title"":""Patch drywall ceiling"",""plan"":""E-2"",""assignee"":""Felix"",""end_date"":""2026-05-29"",""priority"":""p3""}"
"eddie and his crew of 2 are on the ac unit replacement in the north corridor category hvac budget 7000 need it by may 7 checklist shut down power to unit remove old unit install new unit check refrigerant lines document everything",edit_task,"{""title"":""Replace broken HVAC unit"",""location"":""north corridor"",""category"":""HVAC"",""assignee"":""Eddie"",""end_date"":""2026-05-07"",""manpower"":""2"",""cost"":""7000"",""items"":[""shut down power to unit"",""remove old unit"",""install new unit"",""check refrigerant lines"",""document everything""]}"
"we've got carpet replacement in suite 4b assign that to sal low priority end of next week is fine",edit_task,"{""title"":""Replace carpet in office"",""location"":""suite 4B"",""assignee"":""Sal"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"we've got water leaking from the pipes under the sink in bay 7 put tony on it have it wrapped by end of day wednesday make it high priority checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap take a photo for the record",edit_task,"{""title"":""Fix water leak under sink"",""location"":""bay 7"",""assignee"":""Tony"",""end_date"":""2026-05-06"",""priority"":""p1"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""reinstall p-trap"",""take a photo for the record""]}"
"category carpentry drawing m3 and set status to complete",edit_task,"{""plan"":""M-3"",""category"":""carpentry"",""status"":""complete""}"
"we need the fire suppression heads installed assign it to jake crew of 3 cost around 12000 start wednesday morning and finish end of day wednesday checklist confirm pipe layout with plan drill ceiling openings install drops attach heads final walkthrough with the gc",edit_task,"{""title"":""Install sprinkler heads"",""assignee"":""Jake"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06"",""manpower"":""3"",""cost"":""12000"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""final walkthrough with the GC""]}"
"start may 3 finish by friday put reza on it",edit_task,"{""assignee"":""Reza"",""start_date"":""2026-05-03"",""end_date"":""2026-05-08""}"
"this one is new carpet going into the office on s1 mark it low priority omar handles it by may 21 budget around 7000 location mechanical room",edit_task,"{""title"":""Replace carpet in office"",""plan"":""S-1"",""location"":""mechanical room"",""assignee"":""Omar"",""end_date"":""2026-05-21"",""priority"":""p3"",""cost"":""7000""}"
"assign vic cost around 20000 and mark it medium priority",edit_task,"{""assignee"":""Vic"",""priority"":""p2"",""cost"":""20000""}"
"brenda and her 8 guys are on the electrical rough in in room 201 category electrical budget 3500 need it by next tuesday checklist pull permits mark box locations per plan drill studs pull wire document everything",edit_task,"{""title"":""Run electrical rough-in"",""location"":""room 201"",""category"":""electrical"",""assignee"":""Brenda"",""end_date"":""2026-05-12"",""manpower"":""8"",""cost"":""3500"",""items"":[""pull permits"",""mark box locations per plan"",""drill studs"",""pull wire"",""document everything""]}"
"status is closed",edit_task,"{""status"":""closed""}"
"staffing this with 9 workers",edit_task,"{""manpower"":""9""}"
"assign hector high priority cost 12000 and due by end of day wednesday",edit_task,"{""assignee"":""Hector"",""end_date"":""2026-05-06"",""priority"":""p1"",""cost"":""12000""}"
"gotta get a new partition framed in the data center floor by thursday make it high priority",edit_task,"{""title"":""Frame new partition wall"",""location"":""data center floor"",""end_date"":""2026-05-07"",""priority"":""p1""}"
"assign mike make it medium priority and due by end of month",edit_task,"{""assignee"":""Mike"",""end_date"":""2026-05-29"",""priority"":""p2""}"
"fixing the cracks in the floor slab in the server room budget about 1200 assign troy",edit_task,"{""title"":""Repair cracked concrete"",""location"":""server room"",""assignee"":""Troy"",""cost"":""1200""}"
"gotta get the electrical rough in in level 4 done by next tuesday make it high priority",edit_task,"{""title"":""Run electrical rough-in"",""location"":""level 4"",""end_date"":""2026-05-12"",""priority"":""p1""}"
"move this to a202 and set location to the courtyard",edit_task,"{""plan"":""A202"",""location"":""courtyard""}"
"category fire suppression drawing s1 and set status to closed",edit_task,"{""plan"":""S-1"",""category"":""fire suppression"",""status"":""closed""}"
"cost 15000 crew of 3 category glazing due by next tuesday",edit_task,"{""category"":""glazing"",""end_date"":""2026-05-12"",""manpower"":""3"",""cost"":""15000""}"
"assign maria set priority to medium and due by may 6",edit_task,"{""assignee"":""Maria"",""end_date"":""2026-05-06"",""priority"":""p2""}"
"set category to fire alarm",edit_task,"{""category"":""fire alarm""}"
"we're scheduling low voltage cabling for stairwell a on s1 need a crew of 1 starting tomorrow through before the owner review ballpark cost around 1200",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""S-1"",""location"":""stairwell A"",""start_date"":""2026-05-06"",""end_date"":""2026-05-09"",""manpower"":""1"",""cost"":""1200""}"
"budget is 6000 and category is structural",edit_task,"{""category"":""structural"",""cost"":""6000""}"
"we're demoing the partition on id101 in the east lobby starting wednesday morning and wrapping end of day wednesday 9 workers on it cost 10000 category demolition bobby is leading it checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall cut studs remove plates",edit_task,"{""title"":""Demolish interior partition"",""plan"":""ID-101"",""location"":""east lobby"",""category"":""demolition"",""assignee"":""Bobby"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06"",""manpower"":""9"",""cost"":""10000"",""items"":[""verify no electrical or plumbing in wall"",""shut off circuits"",""remove door"",""strip drywall"",""cut studs"",""remove plates""]}"
"this is recessed lighting in basement level 2 on plumbing p4 mark it needs review hector is handling it due before the gc walkthrough checklist run romex to junction box mount the housing cans connect wiring take finished photo",edit_task,"{""title"":""Install recessed lighting"",""plan"":""plumbing P4"",""location"":""basement level 2"",""assignee"":""Hector"",""status"":""needs review"",""end_date"":""2026-05-14"",""items"":[""run romex to junction box"",""mount the housing cans"",""connect wiring"",""take finished photo""]}"
"we need the interior wall demo assign it to danny crew of 3 cost around 4000 start this monday and finish friday checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall final walkthrough with the gc",edit_task,"{""title"":""Demolish interior partition"",""assignee"":""Danny"",""start_date"":""2026-05-04"",""end_date"":""2026-05-08"",""manpower"":""3"",""cost"":""4000"",""items"":[""verify no electrical or plumbing in wall"",""shut off circuits"",""remove door"",""strip drywall"",""final walkthrough with the GC""]}"
"gotta get the old carpet pulled up in suite 3b by next friday make it medium priority",edit_task,"{""title"":""Replace carpet in office"",""location"":""suite 3B"",""end_date"":""2026-05-15"",""priority"":""p2""}"
"we're replacing the broken window glazing on a101 in the data center floor starting next tuesday and wrapping next friday team of 3 cost about 15000 category glazing troy is leading it checklist measure opening order replacement glass remove broken pane clean frame install new glass apply glazing compound",edit_task,"{""title"":""Replace broken window glazing"",""plan"":""A101"",""location"":""data center floor"",""category"":""glazing"",""assignee"":""Troy"",""start_date"":""2026-05-12"",""end_date"":""2026-05-15"",""manpower"":""3"",""cost"":""15000"",""items"":[""measure opening"",""order replacement glass"",""remove broken pane"",""clean frame"",""install new glass"",""apply glazing compound""]}"
"we've got attic insulation in stairwell a put reza on it have it wrapped by end of day wednesday make it low priority checklist check existing r value seal air leaks install baffles at eaves blow insulation to target depth verify depth with ruler take a photo for the record",edit_task,"{""title"":""Insulate attic space"",""location"":""stairwell A"",""assignee"":""Reza"",""end_date"":""2026-05-06"",""priority"":""p3"",""items"":[""check existing R-value"",""seal air leaks"",""install baffles at eaves"",""blow insulation to target depth"",""verify depth with ruler"",""take a photo for the record""]}"
"we've got a partition wall demo assign that to omar low priority end of next week is fine",edit_task,"{""title"":""Demolish interior partition"",""assignee"":""Omar"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"install ceiling grid and tiles on c1 put kim on it low priority by end of month team of 4 budget about 1500 checklist snap layout lines install wall angle hang main tees install cross tees cut perimeter tiles",edit_task,"{""title"":""Install ceiling grid and tiles"",""plan"":""C-1"",""assignee"":""Kim"",""end_date"":""2026-05-29"",""priority"":""p3"",""manpower"":""4"",""cost"":""1500"",""items"":[""snap layout lines"",""install wall angle"",""hang main tees"",""install cross tees"",""cut perimeter tiles""]}"
"we've got water getting through the roof membrane assign it to bobby crew of 2 cost around 1200 start may 5 and finish before the inspection checklist locate the breach clean and dry the area apply primer cut patch membrane final walkthrough with the gc",edit_task,"{""title"":""Repair roof membrane"",""assignee"":""Bobby"",""start_date"":""2026-05-05"",""end_date"":""2026-05-15"",""manpower"":""2"",""cost"":""1200"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""cut patch membrane"",""final walkthrough with the GC""]}"
"assign hector set priority to medium and due by thursday",edit_task,"{""assignee"":""Hector"",""end_date"":""2026-05-07"",""priority"":""p2""}"
"this one is floor tile installation on s1 bump it to high priority dave handles it by may 19 budget around 15000 location level 4 category tile",edit_task,"{""title"":""Install tile flooring"",""plan"":""S-1"",""location"":""level 4"",""category"":""tile"",""assignee"":""Dave"",""end_date"":""2026-05-19"",""priority"":""p1"",""cost"":""15000""}"
"we're painting the exterior facade on a301 bobby is on this make it low priority by may 16",edit_task,"{""title"":""Paint exterior facade"",""plan"":""A301"",""assignee"":""Bobby"",""end_date"":""2026-05-16"",""priority"":""p3""}"
"we're fixing the hvac ductwork leak on p2 on the ground floor starting next tuesday team of 8 on it cost about 2000 category hvac pat is leading it checklist locate all leak points clean duct surface apply mastic sealant wrap with foil tape reinsulate if needed test system airflow",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""P-2"",""location"":""ground floor"",""category"":""HVAC"",""assignee"":""Pat"",""start_date"":""2026-05-12"",""manpower"":""8"",""cost"":""2000"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""wrap with foil tape"",""re-insulate if needed"",""test system airflow""]}"
"move to e1 location unit 7 and mark tracked",edit_task,"{""plan"":""E1"",""location"":""unit 7"",""status"":""tracked""}"
"we've got a broken faucet replacement on the roof deck put danny on it have it wrapped by next friday make it medium priority checklist shut off water remove old fixture clean mounting surface install new fixture reconnect supply lines take a photo for the record",edit_task,"{""title"":""Replace broken plumbing fixture"",""location"":""roof deck"",""assignee"":""Danny"",""end_date"":""2026-05-15"",""priority"":""p2"",""items"":[""shut off water"",""remove old fixture"",""clean mounting surface"",""install new fixture"",""reconnect supply lines"",""take a photo for the record""]}"
"we've got a new partition wall going in on level 4 put reza on it have it wrapped by may 15 make it high priority checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate frame door opening take a photo for the record",edit_task,"{""title"":""Frame new partition wall"",""location"":""level 4"",""assignee"":""Reza"",""end_date"":""2026-05-15"",""priority"":""p1"",""items"":[""snap chalk lines"",""lay bottom plate"",""stand studs 16 OC"",""install top plate"",""frame door opening"",""take a photo for the record""]}"
"update the name to replace broken hvac unit",edit_task,"{""title"":""replace broken hvac unit""}"
"budget is around 3500 and category is low voltage",edit_task,"{""category"":""low voltage"",""cost"":""3500""}"
"assign to dave and set priority to p2",edit_task,"{""assignee"":""Dave"",""priority"":""p2""}"
"move to sheet 4 location parking garage level 1 and mark needs review",edit_task,"{""plan"":""Sheet 4"",""location"":""parking garage level 1"",""status"":""needs review""}"
"this is a ductwork leak in level 3 on fp3 mark it complete hector is handling it due by may 5 checklist locate all leak points clean duct surface apply mastic sealant document fix",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""FP-3"",""location"":""level 3"",""assignee"":""Hector"",""status"":""complete"",""end_date"":""2026-05-05"",""items"":[""locate all leak points"",""clean duct surface"",""apply mastic sealant"",""document fix""]}"
"juan is taking the electrical rough in on a202 budget around 2000 mark it in progress",edit_task,"{""title"":""Run electrical rough-in"",""plan"":""A202"",""assignee"":""Juan"",""status"":""in progress"",""cost"":""2000""}"
"maria is leading a new wall framing job in the penthouse level start wednesday morning finish may 17 cost about 1200 need a team of 3 mark it open",edit_task,"{""title"":""Frame new partition wall"",""location"":""penthouse level"",""assignee"":""Maria"",""status"":""open"",""start_date"":""2026-05-06"",""end_date"":""2026-05-17"",""manpower"":""3"",""cost"":""1200""}"
"we're pouring the slab in bay 4 put eddie on it have it wrapped by friday make it medium priority checklist set forms place rebar order concrete pour slab screed and float take a photo for the record",edit_task,"{""title"":""Pour concrete slab"",""location"":""bay 4"",""assignee"":""Eddie"",""end_date"":""2026-05-08"",""priority"":""p2"",""items"":[""set forms"",""place rebar"",""order concrete"",""pour slab"",""screed and float"",""take a photo for the record""]}"
"assign sarah low priority cost roughly 1500 and due by may 8",edit_task,"{""assignee"":""Sarah"",""end_date"":""2026-05-08"",""priority"":""p3"",""cost"":""1500""}"
"change category to roofing and mark it needs review",edit_task,"{""category"":""roofing"",""status"":""needs review""}"
"assign reza cost about 1200 and mark it medium priority",edit_task,"{""assignee"":""Reza"",""priority"":""p2"",""cost"":""1200""}"
"move to fp2 location loading dock and mark on hold",edit_task,"{""plan"":""FP-2"",""location"":""loading dock"",""status"":""on hold""}"
"we've got water leaking from the pipes under the sink assign it to omar crew of 2 cost around 8000 start next tuesday and finish may 21 checklist shut off water supply remove p trap inspect drain line replace gaskets final walkthrough with the gc",edit_task,"{""title"":""Fix water leak under sink"",""assignee"":""Omar"",""start_date"":""2026-05-12"",""end_date"":""2026-05-21"",""manpower"":""2"",""cost"":""8000"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""final walkthrough with the GC""]}"
"category tile drawing sheet 7 and set status to open",edit_task,"{""plan"":""Sheet 7"",""category"":""tile"",""status"":""open""}"
"move it to verified",edit_task,"{""status"":""verified""}"
"start wednesday morning end may 17 manpower team of 6 and cost around 10000",edit_task,"{""start_date"":""2026-05-06"",""end_date"":""2026-05-17"",""manpower"":""6"",""cost"":""10000""}"
"set start date to next tuesday and due date to end of month",edit_task,"{""start_date"":""2026-05-12"",""end_date"":""2026-05-29""}"
"it's in the server room and status is pending inspection",edit_task,"{""location"":""server room"",""status"":""pending inspection""}"
"assign to lena and set priority to not a rush",edit_task,"{""assignee"":""Lena"",""priority"":""p3""}"
"we're scheduling the hvac unit replacement for level 5 on the ground floor need 8 guys starting tomorrow through before the inspection ballpark cost 20000",edit_task,"{""title"":""Replace broken HVAC unit"",""plan"":""ground floor"",""location"":""level 5"",""start_date"":""2026-05-06"",""end_date"":""2026-05-14"",""manpower"":""8"",""cost"":""20000""}"
"we've got a roof membrane leak on the ground floor put dave on it have it wrapped before the owner review make it high priority checklist locate the breach clean and dry the area apply primer cut patch membrane adhere patch take a photo for the record",edit_task,"{""title"":""Repair roof membrane"",""location"":""ground floor"",""assignee"":""Dave"",""end_date"":""2026-05-12"",""priority"":""p1"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""cut patch membrane"",""adhere patch"",""take a photo for the record""]}"
"call it paint exterior facade",edit_task,"{""title"":""Paint exterior facade""}"
"mark this verified it's replacing the broken faucet in the mezzanine",edit_task,"{""title"":""Replace broken plumbing fixture"",""location"":""mezzanine"",""status"":""verified""}"
"new pull station install in bay 7 put juan on that make it medium priority get it done by may 11",edit_task,"{""title"":""Install fire alarm pull station"",""location"":""bay 7"",""assignee"":""Juan"",""end_date"":""2026-05-11"",""priority"":""p2""}"
"steve and his team of 7 are on carpet replacement in suite 4b in bay 7 budget 2500 need it by may 15 checklist move furniture remove old carpet pull tack strips prep subfloor document everything",edit_task,"{""title"":""Replace carpet in office"",""location"":""suite 4B"",""assignee"":""Steve"",""end_date"":""2026-05-15"",""manpower"":""7"",""cost"":""2500"",""items"":[""move furniture"",""remove old carpet"",""pull tack strips"",""prep subfloor"",""document everything""]}"
"set priority medium assign sarah mark complete and due by end of day wednesday",edit_task,"{""assignee"":""Sarah"",""status"":""complete"",""end_date"":""2026-05-06"",""priority"":""p2""}"
"we're scheduling plumbing fixture replacement for unit 23 on s1 need a crew of 6 starting tomorrow through friday ballpark cost 10000",edit_task,"{""title"":""Replace broken plumbing fixture"",""plan"":""S-1"",""location"":""unit 23"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""6"",""cost"":""10000""}"
"gotta get the recessed cans installed by friday team of 8 should be enough make it low priority and assign kim",edit_task,"{""title"":""Install recessed lighting"",""assignee"":""Kim"",""end_date"":""2026-05-08"",""priority"":""p3"",""manpower"":""8""}"
"assign maria set priority to low and due by may 9",edit_task,"{""assignee"":""Maria"",""end_date"":""2026-05-09"",""priority"":""p3""}"
"install ceiling grid and tiles on structural s2 put gus on it make it high priority by end of month 7 workers budget about 8000 checklist snap layout lines install wall angle hang main tees install cross tees cut perimeter tiles",edit_task,"{""title"":""Install ceiling grid and tiles"",""plan"":""structural S2"",""assignee"":""Gus"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""7"",""cost"":""8000"",""items"":[""snap layout lines"",""install wall angle"",""hang main tees"",""install cross tees"",""cut perimeter tiles""]}"
"window glazing is cracked on a301 start this monday wrap up before the owner review team of 10 cost around 7000",edit_task,"{""title"":""Replace broken window glazing"",""plan"":""A301"",""start_date"":""2026-05-04"",""end_date"":""2026-05-12"",""manpower"":""10"",""cost"":""7000""}"
"set priority to high assign nadia mark verified and due by end of month",edit_task,"{""assignee"":""Nadia"",""status"":""verified"",""end_date"":""2026-05-29"",""priority"":""p1""}"
"need 3 guys for this",edit_task,"{""manpower"":""3""}"
"we're scheduling an electrical panel fix for the loading dock on m2 need a team of 4 starting tomorrow through may 8 ballpark cost 2000",edit_task,"{""title"":""Fix electrical panel issue"",""plan"":""M2"",""location"":""loading dock"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""4"",""cost"":""2000""}"
"we're installing the fire suppression heads in the courtyard put luis on it have it wrapped by next friday make it high priority checklist confirm pipe layout with plan drill ceiling openings install drops attach heads pressure test take a photo for the record",edit_task,"{""title"":""Install sprinkler heads"",""location"":""courtyard"",""assignee"":""Luis"",""end_date"":""2026-05-15"",""priority"":""p1"",""items"":[""confirm pipe layout with plan"",""drill ceiling openings"",""install drops"",""attach heads"",""pressure test"",""take a photo for the record""]}"
"we're pouring the concrete slab on plumbing p4 at grid line b2 starting wednesday morning and wrapping may 6 team of 3 cost about 6000 category concrete mike is leading it checklist set forms place rebar order concrete pour slab screed and float apply curing compound",edit_task,"{""title"":""Pour concrete slab"",""plan"":""plumbing P4"",""location"":""grid line B2"",""category"":""concrete"",""assignee"":""Mike"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06"",""manpower"":""3"",""cost"":""6000"",""items"":[""set forms"",""place rebar"",""order concrete"",""pour slab"",""screed and float"",""apply curing compound""]}"
"set cost to 12000 and manpower to 7 workers",edit_task,"{""manpower"":""7"",""cost"":""12000""}"
"we've got an ac unit shot that needs replacing assign that to maria low priority end of next week is fine",edit_task,"{""title"":""Replace broken HVAC unit"",""assignee"":""Maria"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"we've got a duct leak in the plenum on a3 brenda is on this make it urgent by end of month",edit_task,"{""title"":""Fix HVAC ductwork leak"",""plan"":""A-3"",""assignee"":""Brenda"",""end_date"":""2026-05-29"",""priority"":""p1""}"
"this is sprinkler heads in the west wing on p2 mark it low priority due by may 19",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""P-2"",""location"":""west wing"",""end_date"":""2026-05-19"",""priority"":""p3""}"
"put troy and a team of 8 on attic insulation start may 6 and have it done by friday",edit_task,"{""title"":""Insulate attic space"",""assignee"":""Troy"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08"",""manpower"":""8""}"
"we need new sprinkler heads on m3 kim is on this make it top priority by next friday",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""M-3"",""assignee"":""Kim"",""end_date"":""2026-05-15"",""priority"":""p1""}"
"assign gus bump it to high priority and due by next tuesday",edit_task,"{""assignee"":""Gus"",""end_date"":""2026-05-12"",""priority"":""p1""}"
"assign brenda cost about 3000 and mark it low priority",edit_task,"{""assignee"":""Brenda"",""priority"":""p3"",""cost"":""3000""}"
"we've got an exhaust fan swap in elevator shaft b on a101 the gc wants it done by next tuesday put zack and a team of 7 on it budget 6000 make it medium priority category mechanical",edit_task,"{""title"":""Replace exhaust fan"",""plan"":""A101"",""location"":""elevator shaft B"",""category"":""mechanical"",""assignee"":""Zack"",""end_date"":""2026-05-12"",""priority"":""p2"",""manpower"":""7"",""cost"":""6000""}"
"budget is 5000 and category is fire suppression",edit_task,"{""category"":""fire suppression"",""cost"":""5000""}"
"we've got fire suppression heads in the boiler room on m2 the gc wants it done by end of month put danny and a team of 1 on it budget 8000 make it low priority category sprinkler",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""M2"",""location"":""boiler room"",""category"":""sprinkler"",""assignee"":""Danny"",""end_date"":""2026-05-29"",""priority"":""p3"",""manpower"":""1"",""cost"":""8000""}"
"status update to needs review",edit_task,"{""status"":""needs review""}"
"mark this complete it's running low voltage cable in stairwell b",edit_task,"{""title"":""Install low voltage cabling"",""location"":""stairwell B"",""status"":""complete""}"
"file it under mechanical",edit_task,"{""category"":""mechanical""}"
"we're demoing the partition on fp3 in the main lobby starting may 4 and wrapping may 19 7 workers on it cost 3500 category demolition mike is leading it checklist verify no electrical or plumbing in wall shut off circuits remove door strip drywall cut studs remove plates",edit_task,"{""title"":""Demolish interior partition"",""plan"":""FP-3"",""location"":""main lobby"",""category"":""demolition"",""assignee"":""Mike"",""start_date"":""2026-05-04"",""end_date"":""2026-05-19"",""manpower"":""7"",""cost"":""3500"",""items"":[""verify no electrical or plumbing in wall"",""shut off circuits"",""remove door"",""strip drywall"",""cut studs"",""remove plates""]}"
"change category to drywall and mark it pending inspection",edit_task,"{""category"":""drywall"",""status"":""pending inspection""}"
"this is a roof membrane leak in the boiler room on e1 mark it needs review zack is handling it due by thursday checklist locate the breach clean and dry the area apply primer document repair",edit_task,"{""title"":""Repair roof membrane"",""plan"":""E1"",""location"":""boiler room"",""assignee"":""Zack"",""status"":""needs review"",""end_date"":""2026-05-07"",""items"":[""locate the breach"",""clean and dry the area"",""apply primer"",""document repair""]}"
"set priority to low location ground floor cost around 15000",edit_task,"{""location"":""ground floor"",""priority"":""p3"",""cost"":""15000""}"
"set priority medium location level 4 cost 7000",edit_task,"{""location"":""level 4"",""priority"":""p2"",""cost"":""7000""}"
"bump it to high priority and push the deadline to end of month",edit_task,"{""end_date"":""2026-05-29"",""priority"":""p1""}"
"assign jake make it urgent and due by next friday",edit_task,"{""assignee"":""Jake"",""end_date"":""2026-05-15"",""priority"":""p1""}"
"drawing roof level location stairwell b category low voltage and assign ray",edit_task,"{""plan"":""roof level"",""location"":""stairwell B"",""category"":""low voltage"",""assignee"":""Ray""}"
"we need a new partition wall put up assign it to omar crew of 2 cost around 3000 start tomorrow and finish may 11 checklist snap chalk lines lay bottom plate stand studs 16 oc install top plate final walkthrough with the gc",edit_task,"{""title"":""Frame new partition wall"",""assignee"":""Omar"",""start_date"":""2026-05-06"",""end_date"":""2026-05-11"",""manpower"":""2"",""cost"":""3000"",""items"":[""snap chalk lines"",""lay bottom plate"",""stand studs 16 OC"",""install top plate"",""final walkthrough with the GC""]}"
"drawing fp3 location bay 4 category roofing and assign ray",edit_task,"{""plan"":""FP-3"",""location"":""bay 4"",""category"":""roofing"",""assignee"":""Ray""}"
"set priority urgent assign luis mark in progress and due by end of month",edit_task,"{""assignee"":""Luis"",""status"":""in progress"",""end_date"":""2026-05-29"",""priority"":""p1""}"
"set priority medium location unit 7 cost roughly 1500",edit_task,"{""location"":""unit 7"",""priority"":""p2"",""cost"":""1500""}"
"we've got a leak under the sink in bay 12 put bobby on it have it wrapped by next friday make it medium priority checklist shut off water supply remove p trap inspect drain line replace gaskets reinstall p trap take a photo for the record",edit_task,"{""title"":""Fix water leak under sink"",""location"":""bay 12"",""assignee"":""Bobby"",""end_date"":""2026-05-15"",""priority"":""p2"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""replace gaskets"",""reinstall p-trap"",""take a photo for the record""]}"
"move it to open",edit_task,"{""status"":""open""}"
"gotta get attic insulation blown in at bay 12 by next friday make it urgent",edit_task,"{""title"":""Insulate attic space"",""location"":""bay 12"",""end_date"":""2026-05-15"",""priority"":""p1""}"
"update to needs review please",edit_task,"{""status"":""needs review""}"
"assign juan cost around 6000 and mark it asap",edit_task,"{""assignee"":""Juan"",""priority"":""p1"",""cost"":""6000""}"
"budget is around 6000 and category is painting",edit_task,"{""category"":""painting"",""cost"":""6000""}"
"pulling low voltage through the ceiling on the mezzanine starts this monday wraps up by may 4 just one guy on the crew cost 3500",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""mezzanine"",""start_date"":""2026-05-04"",""end_date"":""2026-05-04"",""manpower"":""1"",""cost"":""3500""}"
"category sprinkler drawing sheet 7 and set status to on hold",edit_task,"{""plan"":""Sheet 7"",""category"":""sprinkler"",""status"":""on hold""}"
"this one is at the lobby",edit_task,"{""location"":""lobby""}"
"set cost to around 20000 and manpower to 10 guys",edit_task,"{""manpower"":""10"",""cost"":""20000""}"
"assign steve cost about 3500 and mark it medium priority",edit_task,"{""assignee"":""Steve"",""priority"":""p2"",""cost"":""3500""}"
"assign sal on it and get it done by may 15",edit_task,"{""assignee"":""Sal"",""end_date"":""2026-05-15""}"
"manpower is 5 guys",edit_task,"{""manpower"":""5""}"
"nadia is taking a drop ceiling install in room 305 this is drywall work high priority done by end of month manpower crew of 7 budget 7000 mark open",edit_task,"{""title"":""Install ceiling grid and tiles"",""location"":""room 305"",""category"":""drywall"",""assignee"":""Nadia"",""status"":""open"",""end_date"":""2026-05-29"",""priority"":""p1"",""manpower"":""7"",""cost"":""7000""}"
"set cost to around 12000 and manpower to a team of 1",edit_task,"{""manpower"":""1"",""cost"":""12000""}"
"we've got water getting through the roof membrane in suite 3b on civil sheet 3 the gc wants it done by end of day wednesday put nadia and 2 guys on it budget 3000 make it low priority category roofing",edit_task,"{""title"":""Repair roof membrane"",""plan"":""civil sheet 3"",""location"":""suite 3B"",""category"":""roofing"",""assignee"":""Nadia"",""end_date"":""2026-05-06"",""priority"":""p3"",""manpower"":""2"",""cost"":""3000""}"
"this needs a team of 8",edit_task,"{""manpower"":""8""}"
"pat is leading the suspended ceiling grid install in the north corridor start tomorrow finish end of day wednesday cost 3500 and we need a team of 6 mark it on hold",edit_task,"{""title"":""Install ceiling grid and tiles"",""location"":""north corridor"",""assignee"":""Pat"",""status"":""on hold"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06"",""manpower"":""6"",""cost"":""3500""}"
"materials came out to around 3500",edit_task,"{""cost"":""3500""}"
"flag it as can wait",edit_task,"{""priority"":""p3""}"
"update status to tracked",edit_task,"{""status"":""tracked""}"
"this one is floor tile installation on sheet 4 mark it low priority pat handles it by next tuesday budget around 4000 location room 201 category tile",edit_task,"{""title"":""Install tile flooring"",""plan"":""Sheet 4"",""location"":""room 201"",""category"":""tile"",""assignee"":""Pat"",""end_date"":""2026-05-12"",""priority"":""p3"",""cost"":""4000""}"
"set cost to 10000 manpower to a team of 1 and category to carpentry",edit_task,"{""category"":""carpentry"",""manpower"":""1"",""cost"":""10000""}"
"this one is at the penthouse level",edit_task,"{""location"":""penthouse level""}"
"move it to e4",edit_task,"{""plan"":""E4""}"
"assign to zack and set priority to medium",edit_task,"{""assignee"":""Zack"",""priority"":""p2""}"
"bump it up on this",edit_task,"{""priority"":""p1""}"
"update to pending inspection please",edit_task,"{""status"":""pending inspection""}"
"set start date to may 4 and due date to next tuesday",edit_task,"{""start_date"":""2026-05-04"",""end_date"":""2026-05-12""}"
"update location to unit 23",edit_task,"{""location"":""unit 23""}"
"trade is mechanical",edit_task,"{""category"":""mechanical""}"
"we've got electrical rough in for the new space assign that to tony low priority end of next week is fine",edit_task,"{""title"":""Run electrical rough-in"",""assignee"":""Tony"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"start wednesday morning finish by may 8 put dave on it",edit_task,"{""assignee"":""Dave"",""start_date"":""2026-05-06"",""end_date"":""2026-05-08""}"
"assign zack cost 2000 and mark it medium",edit_task,"{""assignee"":""Zack"",""priority"":""p2"",""cost"":""2000""}"
"install recessed lighting on a202 put eddie on it low priority by end of month 10 workers budget about 1200 checklist run romex to junction box mount the housing cans connect wiring install trim rings test all fixtures",edit_task,"{""title"":""Install recessed lighting"",""plan"":""A202"",""assignee"":""Eddie"",""end_date"":""2026-05-29"",""priority"":""p3"",""manpower"":""10"",""cost"":""1200"",""items"":[""run romex to junction box"",""mount the housing cans"",""connect wiring"",""install trim rings"",""test all fixtures""]}"
"we've got an hvac unit replacement in unit 12 put carlos on it have it wrapped by may 6 make it medium priority checklist shut down power to unit remove old unit install new unit check refrigerant lines test thermostat take a photo for the record",edit_task,"{""title"":""Replace broken HVAC unit"",""location"":""unit 12"",""assignee"":""Carlos"",""end_date"":""2026-05-06"",""priority"":""p2"",""items"":[""shut down power to unit"",""remove old unit"",""install new unit"",""check refrigerant lines"",""test thermostat"",""take a photo for the record""]}"
"cost 1200 crew of 1 category low voltage due by next tuesday",edit_task,"{""category"":""low voltage"",""end_date"":""2026-05-12"",""manpower"":""1"",""cost"":""1200""}"
"set cost to around 12000 manpower to a team of 6 and category to carpentry",edit_task,"{""category"":""carpentry"",""manpower"":""6"",""cost"":""12000""}"
"this one should be medium priority",edit_task,"{""priority"":""p2""}"
"opening day is may 6",edit_task,"{""start_date"":""2026-05-06""}"
"start may 2 end may 4 manpower team of 5 and cost about 3500",edit_task,"{""start_date"":""2026-05-02"",""end_date"":""2026-05-04"",""manpower"":""5"",""cost"":""3500""}"
"set category to low voltage",edit_task,"{""category"":""low voltage""}"
"budget is about 3000 and category is roofing",edit_task,"{""category"":""roofing"",""cost"":""3000""}"
"connect to drawing e4",edit_task,"{""plan"":""E4""}"
"start may 3 finish before the owner review put carlos on it",edit_task,"{""assignee"":""Carlos"",""start_date"":""2026-05-03"",""end_date"":""2026-05-15""}"
"work is in the courtyard",edit_task,"{""location"":""courtyard""}"
"this is water leaking from the pipes under the sink in the west wing on civil sheet 3 mark it closed jake is handling it due by friday checklist shut off water supply remove p trap inspect drain line take photo",edit_task,"{""title"":""Fix water leak under sink"",""plan"":""civil sheet 3"",""location"":""west wing"",""assignee"":""Jake"",""status"":""closed"",""end_date"":""2026-05-08"",""items"":[""shut off water supply"",""remove p-trap"",""inspect drain line"",""take photo""]}"
"we're replacing the hvac unit on e1 in the cafeteria starting may 4 and wrapping may 15 crew of 1 cost about 5000 category hvac pat is leading it checklist shut down power to unit remove old unit install new unit check refrigerant lines test thermostat verify airflow",edit_task,"{""title"":""Replace broken HVAC unit"",""plan"":""E1"",""location"":""cafeteria"",""category"":""HVAC"",""assignee"":""Pat"",""start_date"":""2026-05-04"",""end_date"":""2026-05-15"",""manpower"":""1"",""cost"":""5000"",""items"":[""shut down power to unit"",""remove old unit"",""install new unit"",""check refrigerant lines"",""test thermostat"",""verify airflow""]}"
"we've got new sprinkler heads to install assign that to maria low priority end of next week is fine",edit_task,"{""title"":""Install sprinkler heads"",""assignee"":""Maria"",""end_date"":""2026-05-15"",""priority"":""p3""}"
"assign pat high priority cost 12000 and due before the owner review",edit_task,"{""assignee"":""Pat"",""end_date"":""2026-05-14"",""priority"":""p1"",""cost"":""12000""}"
"bump this to high priority",edit_task,"{""priority"":""p1""}"
"it's in the east wing and status is open",edit_task,"{""location"":""east wing"",""status"":""open""}"
"hand it off to brenda",edit_task,"{""assignee"":""Brenda""}"
"belongs on sheet 9",edit_task,"{""plan"":""Sheet 9""}"
"set due date to before the owner review",edit_task,"{""end_date"":""2026-05-08""}"
"set plan to p3",edit_task,"{""plan"":""P-3""}"
"we're scheduling sprinkler head install for the east lobby on a101 need a team of 10 starting wednesday morning through end of month ballpark cost 8000",edit_task,"{""title"":""Install sprinkler heads"",""plan"":""A101"",""location"":""east lobby"",""start_date"":""2026-05-06"",""end_date"":""2026-05-29"",""manpower"":""10"",""cost"":""8000""}"
"allocate a crew of 7 to this",edit_task,"{""manpower"":""7""}"
"labor and materials around 6000",edit_task,"{""cost"":""6000""}"
"flip it to pending inspection",edit_task,"{""status"":""pending inspection""}"
"we'll have a team of 4 on site",edit_task,"{""manpower"":""4""}"
"assign jake low priority cost 10000 and due by end of day wednesday",edit_task,"{""assignee"":""Jake"",""end_date"":""2026-05-06"",""priority"":""p3"",""cost"":""10000""}"
"set cost to around 1500 manpower to a team of 9 and category to fire suppression",edit_task,"{""category"":""fire suppression"",""manpower"":""9"",""cost"":""1500""}"
"complete this before the inspection",edit_task,"{""end_date"":""2026-05-09""}"
"it's fire alarm",edit_task,"{""category"":""fire alarm""}"
"set cost to 15000 manpower to a team of 1 and category to low voltage",edit_task,"{""category"":""low voltage"",""manpower"":""1"",""cost"":""15000""}"
"set it to pending inspection",edit_task,"{""status"":""pending inspection""}"
"start no later than may 6",edit_task,"{""start_date"":""2026-05-06""}"
"assign nadia cost about 6000 and mark it urgent",edit_task,"{""assignee"":""Nadia"",""priority"":""p1"",""cost"":""6000""}"
"we're doing the exterior paint in stairwell a put gus on it have it wrapped by may 8 make it medium priority checklist pressure wash surface scrape loose paint apply primer caulk gaps and cracks roll first coat take a photo for the record",edit_task,"{""title"":""Paint exterior facade"",""location"":""stairwell A"",""assignee"":""Gus"",""end_date"":""2026-05-08"",""priority"":""p2"",""items"":[""pressure wash surface"",""scrape loose paint"",""apply primer"",""caulk gaps and cracks"",""roll first coat"",""take a photo for the record""]}"
"team of 10 on this one",edit_task,"{""manpower"":""10""}"
"want it wrapped by end of month",edit_task,"{""end_date"":""2026-05-29""}"
"set priority asap location east wing cost 4000",edit_task,"{""location"":""east wing"",""priority"":""p1"",""cost"":""4000""}"
"set priority to low assign danny mark open and due by next tuesday",edit_task,"{""assignee"":""Danny"",""status"":""open"",""end_date"":""2026-05-12"",""priority"":""p3""}"
"set cost to around 12000 manpower to a team of 1 and category to hvac",edit_task,"{""category"":""HVAC"",""manpower"":""1"",""cost"":""12000""}"
"priority two on this",edit_task,"{""priority"":""p2""}"
"assign to hector and set priority to medium",edit_task,"{""assignee"":""Hector"",""priority"":""p2""}"
"this one is a new partition wall on a4 mark it medium priority ray handles it by friday budget around 5000 location mechanical room category framing",edit_task,"{""title"":""Frame new partition wall"",""plan"":""A-4"",""location"":""mechanical room"",""category"":""framing"",""assignee"":""Ray"",""end_date"":""2026-05-08"",""priority"":""p2"",""cost"":""5000""}"
"connect to drawing a101",edit_task,"{""plan"":""A101""}"
"we're installing low voltage cabling on m2 in stairwell c starting wednesday morning and wrapping may 6 9 guys on it cost 10000 category low voltage bobby is leading it checklist pull permits if required route cable path drill penetrations pull cable terminate at patch panel test all runs",edit_task,"{""title"":""Install low voltage cabling"",""plan"":""M2"",""location"":""stairwell C"",""category"":""low voltage"",""assignee"":""Bobby"",""start_date"":""2026-05-06"",""end_date"":""2026-05-06"",""manpower"":""9"",""cost"":""10000"",""items"":[""pull permits if required"",""route cable path"",""drill penetrations"",""pull cable"",""terminate at patch panel"",""test all runs""]}"
"move to a3 and make it high priority",edit_task,"{""plan"":""A-3"",""priority"":""p1""}"
"assign troy on it and get it done by may 8",edit_task,"{""assignee"":""Troy"",""end_date"":""2026-05-08""}"
"move it to a301",edit_task,"{""plan"":""A301""}"
"set priority p2 location stairwell b cost about 7000",edit_task,"{""location"":""stairwell B"",""priority"":""p2"",""cost"":""7000""}"
"category sprinkler drawing fp2 and set status to verified",edit_task,"{""plan"":""FP-2"",""category"":""sprinkler"",""status"":""verified""}"
"set start date to may 2 and due date to thursday",edit_task,"{""start_date"":""2026-05-02"",""end_date"":""2026-05-07""}"
"that's on tony",edit_task,"{""assignee"":""Tony""}"
"materials came out to about 3500",edit_task,"{""cost"":""3500""}"
"juan should own this",edit_task,"{""assignee"":""Juan""}"
"flag it as urgent",edit_task,"{""priority"":""p1""}"
"hand it off to omar",edit_task,"{""assignee"":""Omar""}"
"assign brenda medium priority cost about 2500 and due by next tuesday",edit_task,"{""assignee"":""Brenda"",""end_date"":""2026-05-12"",""priority"":""p2"",""cost"":""2500""}"
"put cost down as 20000",edit_task,"{""cost"":""20000""}"
"estimate is 2000",edit_task,"{""cost"":""2000""}"
"labor and materials around 8000",edit_task,"{""cost"":""8000""}"
"status update to in progress",edit_task,"{""status"":""in_progress""}"
"pulling low voltage through the ceiling in the mechanical room budget about 3000 assign bobby",edit_task,"{""title"":""Install low voltage cabling"",""location"":""mechanical room"",""assignee"":""Bobby"",""cost"":""3000""}"
"felix is taking the new pull station install on the ground floor this is fire alarm work low priority done by may 8 manpower team of 3 budget 20000 mark tracked",edit_task,"{""title"":""Install fire alarm pull station"",""location"":""ground floor"",""category"":""fire alarm"",""assignee"":""Felix"",""status"":""tracked"",""end_date"":""2026-05-08"",""priority"":""p3"",""manpower"":""3"",""cost"":""20000""}"
"assign to omar and set priority to priority two",edit_task,"{""assignee"":""Omar"",""priority"":""p2""}"
"move it to complete",edit_task,"{""status"":""complete""}"
"connect to drawing sheet 7",edit_task,"{""plan"":""Sheet 7""}"
"tag it to id101",edit_task,"{""plan"":""ID-101""}"
"assign to sarah and set priority to can wait",edit_task,"{""assignee"":""Sarah"",""priority"":""p3""}"
"assign luis cost 15000 and mark it not critical",edit_task,"{""assignee"":""Luis"",""priority"":""p3"",""cost"":""15000""}"
"update plan to e2",edit_task,"{""plan"":""E-2""}"
"opening day is may 4",edit_task,"{""start_date"":""2026-05-04""}"
"set start date to wednesday morning and due date to may 7",edit_task,"{""start_date"":""2026-05-06"",""end_date"":""2026-05-07""}"
"set start date to may 3 and due date to end of month",edit_task,"{""start_date"":""2026-05-03"",""end_date"":""2026-05-29""}"
"change category to glazing and mark it complete",edit_task,"{""category"":""glazing"",""status"":""complete""}"
"assign ray high priority cost 800 and due by may 6",edit_task,"{""assignee"":""Ray"",""end_date"":""2026-05-06"",""priority"":""p1"",""cost"":""800""}"
"move this to a3 and set location to mezzanine",edit_task,"{""plan"":""A-3"",""location"":""mezzanine""}"
"move to fp2 location level 5 and mark pending inspection",edit_task,"{""plan"":""FP-2"",""location"":""level 5"",""status"":""pending inspection""}"
"pass it to vic",edit_task,"{""assignee"":""Vic""}"
"set priority high priority location grid line b2 cost about 2000",edit_task,"{""location"":""grid line B2"",""priority"":""p1"",""cost"":""2000""}"
"set priority to p1 location boiler room cost 8000",edit_task,"{""location"":""boiler room"",""priority"":""p1"",""cost"":""8000""}"
"move to fp3 location room 201 and mark closed",edit_task,"{""plan"":""FP-3"",""location"":""room 201"",""status"":""closed""}"
"assign dave cost 2500 and mark it not a rush",edit_task,"{""assignee"":""Dave"",""priority"":""p3"",""cost"":""2500""}"
"set start date to next tuesday and due date to next tuesday",edit_task,"{""start_date"":""2026-05-12"",""end_date"":""2026-05-12""}"
"start may 4 finish by friday put danny on it",edit_task,"{""assignee"":""Danny"",""start_date"":""2026-05-04"",""end_date"":""2026-05-08""}"
"bump it to medium and push deadline to may 21",edit_task,"{""end_date"":""2026-05-21"",""priority"":""p2""}"
"expected finish may 16",edit_task,"{""end_date"":""2026-05-16""}"
"set priority to p1 location parking garage level 1 cost about 20000",edit_task,"{""location"":""parking garage level 1"",""priority"":""p1"",""cost"":""20000""}"
"assign nadia cost 12000 and mark it medium priority",edit_task,"{""assignee"":""Nadia"",""priority"":""p2"",""cost"":""12000""}"
"set location to mechanical room",edit_task,"{""location"":""mechanical room""}"
"budget is around 8000 and category is sprinkler",edit_task,"{""category"":""sprinkler"",""cost"":""8000""}"
"tag mike as assignee",edit_task,"{""assignee"":""Mike""}"
"budget is 15000",edit_task,"{""cost"":""15000""}"
"category insulation drawing mep1 and set status to in progress",edit_task,"{""plan"":""MEP-1"",""category"":""insulation"",""status"":""in progress""}"
"set start to next tuesday",edit_task,"{""start_date"":""2026-05-12""}"
"move to e2 location break room floor 2 and mark verified",edit_task,"{""plan"":""E-2"",""location"":""break room floor 2"",""status"":""verified""}"
"set priority to low",edit_task,"{""priority"":""p3""}"
"assign juan set priority to top priority and due by friday",edit_task,"{""assignee"":""Juan"",""end_date"":""2026-05-08"",""priority"":""p1""}"
"update location to mechanical room",edit_task,"{""location"":""mechanical room""}"
"put it at south corridor",edit_task,"{""location"":""south corridor""}"
"assign bobby cost 8000 and mark it low priority",edit_task,"{""assignee"":""Bobby"",""priority"":""p3"",""cost"":""8000""}"
"pass it to nadia",edit_task,"{""assignee"":""Nadia""}"
"status is in progress",edit_task,"{""status"":""in progress""}"
"bump it to p1 assign omar mark open and due by next tuesday",edit_task,"{""assignee"":""Omar"",""status"":""open"",""end_date"":""2026-05-12"",""priority"":""p1""}"
"move to a301 and make it low",edit_task,"{""plan"":""A301"",""priority"":""p3""}"
"start wednesday morning finish before the gc walkthrough put pat on it",edit_task,"{""assignee"":""Pat"",""start_date"":""2026-05-06"",""end_date"":""2026-05-15""}"
"set cost to 2500 and manpower to a crew of 5",edit_task,"{""manpower"":""5"",""cost"":""2500""}"
"change title to steel staircase handrail install",edit_task,"{""title"":""steel staircase handrail install""}"
"change title to foundation waterproofing phase 1",edit_task,"{""title"":""foundation waterproofing phase 1""}"
"change title to lobby tile replacement",edit_task,"{""title"":""lobby tile replacement""}"
"change title to rooftop equipment pad pour",edit_task,"{""title"":""rooftop equipment pad pour""}"
"change title to exterior window caulking east wall",edit_task,"{""title"":""exterior window caulking east wall""}"
"change title to bathroom exhaust fan replacement and assign to hector",edit_task,"{""title"":""bathroom exhaust fan replacement"",""assignee"":""Hector""}"
"change title to sprinkler main drain test and mark it p1",edit_task,"{""title"":""sprinkler main drain test"",""priority"":""p1""}"
"change title to concrete crack repair suite 110",edit_task,"{""title"":""concrete crack repair suite 110""}"
"change title to generator transfer switch install",edit_task,"{""title"":""generator transfer switch install""}"
"change title to drywall fire stop above t bar ceiling",edit_task,"{""title"":""drywall fire stop above T-bar ceiling""}"
"rename to roof drain cleaning level 3",edit_task,"{""title"":""roof drain cleaning level 3""}"
"rename to curtain wall panel replacement grid c4",edit_task,"{""title"":""curtain wall panel replacement grid C4""}"
"rename to electrical panel upgrade building b",edit_task,"{""title"":""electrical panel upgrade building B""}"
"rename to fire door hardware repair stairwell 2",edit_task,"{""title"":""fire door hardware repair stairwell 2""}"
"rename to sump pump replacement basement level 2",edit_task,"{""title"":""sump pump replacement basement level 2""}"
"rename to west wing carpet removal and set priority to p2",edit_task,"{""title"":""west wing carpet removal"",""priority"":""p2""}"
"rename to loading dock overhead door service and assign to ray",edit_task,"{""title"":""loading dock overhead door service"",""assignee"":""Ray""}"
"rename to mechanical room pipe insulation wrap",edit_task,"{""title"":""mechanical room pipe insulation wrap""}"
"rename to penthouse terrace membrane patch",edit_task,"{""title"":""penthouse terrace membrane patch""}"
"rename to elevator pit waterproofing",edit_task,"{""title"":""elevator pit waterproofing""}"
"rename this to kitchen hood duct cleaning",edit_task,"{""title"":""kitchen hood duct cleaning""}"
"rename this to glass handrail panel replacement lobby",edit_task,"{""title"":""glass handrail panel replacement lobby""}"
"rename this to fire suppression pipe flush zone 4",edit_task,"{""title"":""fire suppression pipe flush zone 4""}"
"rename this to structural steel touch up coat",edit_task,"{""title"":""structural steel touch-up coat""}"
"rename this to emergency exit light replacement stair b",edit_task,"{""title"":""emergency exit light replacement stair B""}"
"rename this to boiler flue inspection and set end date to may 20",edit_task,"{""title"":""boiler flue inspection"",""end_date"":""2026-05-20""}"
"rename this to perimeter fence repair south lot and assign to felix",edit_task,"{""title"":""perimeter fence repair south lot"",""assignee"":""Felix""}"
"rename this to loading dock concrete apron repair",edit_task,"{""title"":""loading dock concrete apron repair""}"
"rename this to data closet cable tray install floor 4",edit_task,"{""title"":""data closet cable tray install floor 4""}"
"rename this to cooling tower chemical treatment",edit_task,"{""title"":""cooling tower chemical treatment""}"
"set title to plumbing rough in unit 4b",edit_task,"{""title"":""plumbing rough-in unit 4B""}"
"set title to parking garage line striping phase 2",edit_task,"{""title"":""parking garage line striping phase 2""}"
"set title to ahu filter replacement rooftop unit 1",edit_task,"{""title"":""AHU filter replacement rooftop unit 1""}"
"set title to window sill repair south elevation",edit_task,"{""title"":""window sill repair south elevation""}"
"set title to fire rated ceiling patch room 305",edit_task,"{""title"":""fire rated ceiling patch room 305""}"
"set title to compressed air line install shop floor and set manpower to 3",edit_task,"{""title"":""compressed air line install shop floor"",""manpower"":""3""}"
"set title to expansion joint replacement deck level 2 and mark complete",edit_task,"{""title"":""expansion joint replacement deck level 2"",""status"":""complete""}"
"set title to grease trap cleaning cafeteria",edit_task,"{""title"":""grease trap cleaning cafeteria""}"
"set title to stair nosing repair east stairwell",edit_task,"{""title"":""stair nosing repair east stairwell""}"
"set title to rebar placement footing f7",edit_task,"{""title"":""rebar placement footing F7""}"
"update the name to plywood subfloor installation zone c",edit_task,"{""title"":""plywood subfloor installation zone C""}"
"update the name to chilled water pipe insulation level 5",edit_task,"{""title"":""chilled water pipe insulation level 5""}"
"update the name to skylight leak repair grid j9",edit_task,"{""title"":""skylight leak repair grid J9""}"
"update the name to seismic brace install mechanical room",edit_task,"{""title"":""seismic brace install mechanical room""}"
"update the name to exterior stucco patch west wall",edit_task,"{""title"":""exterior stucco patch west wall""}"
"update the name to high bay light fixture swap and assign to tony",edit_task,"{""title"":""high bay light fixture swap"",""assignee"":""Tony""}"
"update the name to overhead door spring replacement bay 3 and set cost to 750",edit_task,"{""title"":""overhead door spring replacement bay 3"",""cost"":""750""}"
"update the name to balcony railing weld repair unit 7",edit_task,"{""title"":""balcony railing weld repair unit 7""}"
"update the name to crawl space vapor barrier install",edit_task,"{""title"":""crawl space vapor barrier install""}"
"update the name to framing inspection punch list",edit_task,"{""title"":""framing inspection punch list""}"
"call it sidewalk saw cut and patch front entry",edit_task,"{""title"":""sidewalk saw cut and patch front entry""}"
"call it retaining wall crack injection and set priority to p2",edit_task,"{""title"":""retaining wall crack injection"",""priority"":""p2""}"
"call it vestibule door closer replacement",edit_task,"{""title"":""vestibule door closer replacement""}"
"label it transformer pad grading and drainage",edit_task,"{""title"":""transformer pad grading and drainage""}"
"label it hvac vibration isolator replacement rooftop and assign to sal",edit_task,"{""title"":""HVAC vibration isolator replacement rooftop"",""assignee"":""Sal""}"
"label it masonry tuck pointing south facade",edit_task,"{""title"":""masonry tuck-pointing south facade""}"
"name it conduit stub up for panel lp2",edit_task,"{""title"":""conduit stub-up for panel LP-2""}"
"name it structural column base plate inspection and mark on hold",edit_task,"{""title"":""structural column base plate inspection"",""status"":""on hold""}"
"name it fire caulk penetration seal third floor and assign to dave",edit_task,"{""title"":""fire caulk penetration seal third floor"",""assignee"":""Dave""}"
"name it air barrier tape sealing north wall",edit_task,"{""title"":""air barrier tape sealing north wall""}"
"assign this to mike and set priority to high",edit_task,"{""assignee"":""Mike"",""priority"":""p1""}"
"change the due date to next friday",edit_task,"{""end_date"":""2026-05-15""}"
"set status to complete",edit_task,"{""status"":""complete""}"
"reassign to sarah and move deadline to may 20",edit_task,"{""assignee"":""Sarah"",""end_date"":""2026-05-20""}"
"this is an electrical job in the basement",edit_task,"{""category"":""electrical"",""location"":""basement""}"
"tag this as urgent and safety",edit_task,"{""tags"":[""urgent"",""safety""]}"
"add a note that we need to order more conduit before starting",edit_task,"{""comments"":""we need to order more conduit before starting""}"
"set manpower to 4",edit_task,"{""manpower"":""4""}"
"cost is 2500",edit_task,"{""cost"":""2500""}"
"start date is monday and due date is wednesday",edit_task,"{""start_date"":""2026-05-11"",""end_date"":""2026-05-13""}"
"change title to hvac install level 3",edit_task,"{""title"":""HVAC install level 3""}"
"mark as verified",edit_task,"{""status"":""verified""}"
"move this to the lobby area and assign to carlos",edit_task,"{""location"":""lobby"",""assignee"":""Carlos""}"
"this is plumbing work on drawing b2",edit_task,"{""category"":""plumbing"",""plan"":""B2""}"
"add checklist items install pipes test pressure seal joints",edit_task,"{""items"":[""install pipes"",""test pressure"",""seal joints""]}"
"change status to in review",edit_task,"{""status"":""in review""}"
"3 workers needed for this one",edit_task,"{""manpower"":""3""}"
"due tomorrow",edit_task,"{""end_date"":""2026-05-06""}"
"assign to the electrical crew and tag it as inspection",edit_task,"{""assignee"":""electrical crew"",""tags"":[""inspection""]}"
"this job is on plan a3 room 101",edit_task,"{""plan"":""A3"",""location"":""room 101""}"
"set cost to 800 and manpower to 2",edit_task,"{""cost"":""800"",""manpower"":""2""}"
"mark as tracked",edit_task,"{""status"":""tracked""}"
"framing work starts next monday",edit_task,"{""category"":""framing"",""start_date"":""2026-05-11""}"
"add note waiting on permit approval",edit_task,"{""comments"":""waiting on permit approval""}"
"change assignee to tom priority is p2",edit_task,"{""assignee"":""Tom"",""priority"":""p2""}"
"location is 2nd floor east wing",edit_task,"{""location"":""2nd floor east wing""}"
"tag urgent",edit_task,"{""tags"":[""urgent""]}"
"title should be roof membrane repair",edit_task,"{""title"":""Roof membrane repair""}"
"set end date to end of month",edit_task,"{""end_date"":""2026-05-29""}"
"hvac work on level 4 assign to dave",edit_task,"{""category"":""HVAC"",""location"":""level 4"",""assignee"":""Dave""}"
"checklist demo old tiles prep surface install new tiles grout",edit_task,"{""items"":[""demo old tiles"",""prep surface"",""install new tiles"",""grout""]}"
"cost 1200 bucks",edit_task,"{""cost"":""1200""}"
"change priority to medium",edit_task,"{""priority"":""p2""}"
"start this on the 10th finish by the 15th",edit_task,"{""start_date"":""2026-05-10"",""end_date"":""2026-05-15""}"
"it's a plumbing issue in room 209 mark it open",edit_task,"{""category"":""plumbing"",""location"":""room 209"",""status"":""open""}"
"add comment inspector coming thursday need this done by wednesday",edit_task,"{""comments"":""inspector coming Thursday need this done by Wednesday""}"
"reassign from mike to jake",edit_task,"{""assignee"":""Jake""}"
"tag this fire safety and blocked",edit_task,"{""tags"":[""fire safety"",""blocked""]}"
"this is on drawing c5",edit_task,"{""plan"":""C5""}"
"set to complete 5 guys on this job cost was 3400",edit_task,"{""status"":""complete"",""manpower"":""5"",""cost"":""3400""}"
"electrical in the server room priority high",edit_task,"{""category"":""electrical"",""location"":""server room"",""priority"":""p1""}"
"move deadline to next week",edit_task,"{""end_date"":""2026-05-12""}"
"assign to maria add note she needs badge access",edit_task,"{""assignee"":""Maria"",""comments"":""she needs badge access""}"
"start date today",edit_task,"{""start_date"":""2026-05-05""}"
"change title to fire suppression inspection and set priority p1",edit_task,"{""title"":""Fire suppression inspection"",""priority"":""p1""}"
"2 workers cost 600",edit_task,"{""manpower"":""2"",""cost"":""600""}"
"mark verified location is stairwell b",edit_task,"{""status"":""verified"",""location"":""stairwell B""}"
"it's on plan d1 level 1 assign to night crew",edit_task,"{""plan"":""D1"",""location"":""level 1"",""assignee"":""night crew""}"
"leave a note that the concrete needs to cure for 48 hours before loading",edit_task,"{""comments"":""concrete needs to cure for 48 hours before loading""}"
"add a comment gc requested this be done before the owner walkthrough",edit_task,"{""comments"":""GC requested this be done before the owner walkthrough""}"
"note that we're waiting on the permit to come through",edit_task,"{""comments"":""waiting on permit to come through""}"
"add note ceiling height in this area is 9 feet not 10",edit_task,"{""comments"":""ceiling height in this area is 9 feet not 10""}"
"put a note that the material is already on site",edit_task,"{""comments"":""material is already on site""}"
"add a comment that the adjacent unit is occupied so keep noise down after 6pm",edit_task,"{""comments"":""adjacent unit is occupied so keep noise down after 6pm""}"
"note asbestos survey required before demo",edit_task,"{""comments"":""asbestos survey required before demo""}"
"add comment the owner wants daily progress photos",edit_task,"{""comments"":""owner wants daily progress photos""}"
"leave a note that access requires escort from building security",edit_task,"{""comments"":""access requires escort from building security""}"
"add a note the existing conduit is undersized might need upsizing",edit_task,"{""comments"":""existing conduit is undersized might need upsizing""}"
"note that the inspector is coming friday morning",edit_task,"{""comments"":""inspector is coming Friday morning""}"
"add comment coordinate with the plumber before roughing in",edit_task,"{""comments"":""coordinate with the plumber before roughing in""}"
"put a note that this is a warranty repair not new work",edit_task,"{""comments"":""this is a warranty repair not new work""}"
"add note we need to order the glass panel it's not in stock",edit_task,"{""comments"":""we need to order the glass panel it's not in stock""}"
"leave a comment that the water shutoff is in the basement mechanical room",edit_task,"{""comments"":""water shutoff is in the basement mechanical room""}"
"note that the gc wants a 2 hour notice before we start demo",edit_task,"{""comments"":""GC wants a 2 hour notice before we start demo""}"
"add a note match existing paint color exactly sample on site",edit_task,"{""comments"":""match existing paint color exactly sample on site""}"
"comment that this task is blocked waiting on structural engineer sign off",edit_task,"{""comments"":""this task is blocked waiting on structural engineer sign off""}"
"assign to jake and add a note he needs a scissor lift for this one",edit_task,"{""assignee"":""Jake"",""comments"":""he needs a scissor lift for this one""}"
"mark it p1 and note that the tenant is complaining every day",edit_task,"{""priority"":""p1"",""comments"":""tenant is complaining every day""}"
"set status to on hold and add note waiting on material delivery",edit_task,"{""status"":""on hold"",""comments"":""waiting on material delivery""}"
"due by friday and leave a note that overtime is approved for this one",edit_task,"{""end_date"":""2026-05-08"",""comments"":""overtime is approved for this one""}"
"bump to p1 and note roof leak is getting worse with the rain",edit_task,"{""priority"":""p1"",""comments"":""roof leak is getting worse with the rain""}"
"set cost to 4500 and add a comment this includes labor and materials",edit_task,"{""cost"":""4500"",""comments"":""this includes labor and materials""}"
"assign to carlos note he needs badge access to get into the server room",edit_task,"{""assignee"":""Carlos"",""comments"":""he needs badge access to get into the server room""}"
"mark it verified and note the inspector signed off this morning",edit_task,"{""status"":""verified"",""comments"":""the inspector signed off this morning""}"
"set manpower to 3 and add note the fourth guy called in sick",edit_task,"{""manpower"":""3"",""comments"":""the fourth guy called in sick""}"
"location is suite 204 and note the elevator is out use the freight entrance",edit_task,"{""location"":""suite 204"",""comments"":""the elevator is out use the freight entrance""}"
"set priority p2 and add a comment this can wait until after the inspection monday",edit_task,"{""priority"":""p2"",""comments"":""this can wait until after the inspection Monday""}"
"push deadline to end of month and note we're waiting on back ordered parts",edit_task,"{""end_date"":""2026-05-29"",""comments"":""we're waiting on back ordered parts""}"