# Experiment Protocol ## Runs - Run ID format: YYYYMMDD-HHMMSS__seed ## Training - Train structured S and dense D_a side-by-side on the same batch stream. - Update order per step: 1) forward/backward/step S 2) forward/backward/step D_a - Eval cadence: every 500–1000 steps (fixed). ## Splits - Fixed IID eval set - Fixed OOD eval set - Fixed structure-break eval set (e.g., bind-shuffle) ## Metrics Primary: - IID accuracy/loss - OOD accuracy/loss - structure-break accuracy/loss Secondary (structured-only): - expert usage entropy - hemisphere disagreement vs error (simple AUROC) ## Early-kill criteria PoC success if ANY: 1) S > D_a on OOD by clear margin at same budget. 2) S degrades less under structure-break perturbation. 3) Disagreement is a useful error signal. PoC failure: - No meaningful separation on OOD/robustness and no disagreement signal within a small budget. ## Artifacts All outputs must go under: /store/speedy/dualbrain/out/bihmoe-poc//