BurnyCoder's picture
Record development results for stories-pilot-s00-trace-r10
ff0bcd7 verified
|
Raw History Blame
746 Bytes
# Study progress
Updated 2026-11-25T06:52:26+00:00.
7 training/control records and 0 final evaluations are complete. This is 5.8% of 120 planned model milestones.
## Current record
**stories** has 7 completed runs. The next milestone is determined by the run matrix.
Statistical status: pending. Awaiting confirmatory runs.
**abstracts** has 0 completed runs. The next milestone is determined by the run matrix.
Statistical status: pending. Awaiting confirmatory runs.
## Monitoring
Inspect runs lasting over 10, 30 and 60 minutes at 5, 15 and 30 minute intervals respectively. The live dashboard refreshes between those checks. [Study design](plan.md) · [Run matrix](planned-runs.md) · [Experiment ledger](experiments/experiments.md)