thirdloss-study / registration /planned-runs.md
BurnyCoder's picture
Record prospective protocol and scientific references
dedcddc verified
|
Raw History Blame Contribute Delete
1.94 kB

Planned runs

Stage Trainable coordinates Data Confirmatory target tokens Effective windows per update
stories Four causal blocks, width 192, four heads, gated SiLU MLP width 512, tied embeddings and 4,096 tokens TinyStories 16,777,216 32
abstracts Pythia-410M with rank-eight QKV LoRA in every block, scale alpha 16 2024 arXiv abstracts 524,288 8

AdamW peaks at 0.0003 for stories and 0.0001 for adapters, with betas 0.9 and 0.95, weight decay 0.1 on matrices, gradient norm clip 1, 5% warmup and cosine decay to 10% of peak. Use full-precision parameter derivatives and eager attention. Physical microbatching can change to fit GPU memory while preserving the effective batch and two-window derivative estimate. Data order and optimizer settings are paired. These are experimental design choices.

Phase Seed Arms and budget
Untrained controls 0 Evaluate initial checkpoint and training-token unigram on development text.
Pilot and development 0 Run third-order 3% first. Run ordinary AdamW and both derivative baselines on the same initial one-eighth of the stage horizon. Complete the equal 1%, 3%, 10% grid for trace and third order. Measure cost before confirmatory training.
Secondary controls 0 Squared Hessian norm at 3%, sign-scrambled third-order update, combined selected trace and third order. Use the development horizon and report them as pilot comparisons.
Confirmation 1–8 Ordinary, signed trace, and third order at the selected strength, each at the full stage horizon.

Evaluate seed-paired final test predictions only when the stage has all planned confirmatory checkpoints. Preserve every development candidate. The one-week allocation prioritizes the two registered stages and their controls. The first 14 hours target a real one-seed pilot with its untrained controls. Protocol