Dataset Viewer
Auto-converted to Parquet Duplicate
Index
float64
Well
string
Reservoir
string
Perforation interval
string
Production method
string
Marka nasosa Proizvoditelnost nasosa
string
Commissioning date
string
Tubing diameter
float64
Pump setting depth
float64
Current frequency, Hz
float64
chastota do izmeneniya, GTs
float64
data izmeneniya
string
Sila toka, A
float64
Moshchnost el. dvigatelya
float64
Chislo kachanii polirovannogo shtoka
float64
Chislo kachanii polirovannogo shtoka do izmeneniya
float64
data izmeneniya chislo kachaniya
string
Dlina khoda polirovannogo shtoka
float64
Dlina khoda polirovannogo shtoka do izmeneniya
float64
data izmeneniya dliny khoda
string
Ndin/Nst predposledniy otbivki
float64
data predposledney otbivki
string
Davlenie trubnoe kgs
float64
Davlenie zatrubnoe kgs
float64
Qzhid, m³/sut
float64
Qnefti, m³/sut
float64
Obvodnennost %
float64
Plot-nost nefti
float64
Perforatsiya_verkh_m
float64
Perforatsiya_niz_m
float64
Perforatsiya_tolshchina_m
float64
Data vvoda v ekspluatatsiyu_year
float64
Data vvoda v ekspluatatsiyu_month
float64
Data vvoda v ekspluatatsiyu_day
float64
Change date (year)
float64
Change date (month)
float64
Change date (day)
float64
Stroke count change (year)
float64
Stroke count change (month)
float64
Stroke count change (day)
float64
Stroke length change (year)
float64
Stroke length change (month)
float64
Stroke length change (day)
float64
Previous shutdown date (year)
int64
Previous shutdown date (month)
int64
Previous shutdown date (day)
int64
1
NK-3
M-II
1286,4-1292,4
SRP
25-150-RHAM-15-5-2-2
2021-11-07
73
1,256.48
42.48
36.7
2025-12-07
null
30
6
5
2025-09-06
3
3
2025-09-06
1,207
2025-09-25
6
22
3.017445
2.929558
3
0.8759
1,286.4
1,292.4
6
2,021
11
7
2,025
12
7
2,025
9
6
2,025
9
6
2,025
9
25
2
NK-7
M-II
1288,5-1296
SRP
25-150-RNAM-15-5-2-2
2023-07-10
73
1,266.94
45.2
25.74
null
null
30
6
5
null
3
4
null
1,175
2025-09-25
4
12
6.439758
6.430113
0.15
0.8342
1,288.5
1,296
7.5
2,023
7
10
null
null
null
null
null
null
null
null
null
2,025
9
25
3
NK-8
M-II
1282,5-1289
SRP
25-150-RNAM-15-5-2-2
2023-07-10
73
1,278.79
32
40.4
2025-12-07
null
30
5
4
2025-09-06
3
3
2025-09-06
1,216
2025-09-25
1
16
7.984267
5.11812
56
0.8339
1,282.5
1,289
6.5
2,023
7
10
2,025
12
7
2,025
9
6
2,025
9
6
2,025
9
25
4
NK-9
M-II
1285,5-1290
SRP
25-150-RNAM-15-5-2-2
2023-09-25
73
1,272.6
54.57
56.5
2025-12-07
null
30
7
4
null
3
4
null
165
2025-08-19
7
15
6.628977
6.595997
0.5
0.8443
1,285.5
1,290
4.5
2,023
9
25
2,025
12
7
null
null
null
null
null
null
2,025
8
19
5
NK-31
M-II
1284-1289
SRP
25-106 RHAM 15-5-2-2
2023-01-22
73
1,269.21
39.03
32.86
2025-09-07
null
30
5
4
2025-09-07
1.8
3
null
620
2025-10-18
0
8
0
0
0
0.8316
1,284
1,289
5
2,023
1
22
2,025
9
7
2,025
9
7
null
null
null
2,025
10
18
6
NK-66
M-II
1297-1307
SRP
25-150 RHAM 15-5-2-2
2022-12-20
73
1,283
55.9
47.5
2025-12-07
null
30
7
4
null
3
4
null
1,231
2025-09-26
6
29
13.479817
11.521211
17
0.8651
1,297
1,307
10
2,022
12
20
2,025
12
7
null
null
null
null
null
null
2,025
9
26
7
NK-68
M-II
1328-1336
SRP
25-106 RHAM 15-5-2-2
2023-01-18
73
1,317.8
39.71
48.08
2025-12-07
null
30
5
6
null
2.4
1.8
null
1,284
2025-09-21
0
27
4.666192
4.66386
0.05
0.8315
1,328
1,336
8
2,023
1
18
2,025
12
7
null
null
null
null
null
null
2,025
9
21
8
NK-74
M-II
1355,5-1359m, 1360-1362m, 1363-1365 m
SRP
20-106-RHAM 14-4-2-2
2024-06-15
73
1,330.79
33
40.4
2025-12-07
null
30
5
4
2025-09-06
3
2.4
null
995
2025-10-21
1
22
3.327982
3.311424
0.5
0.8368
1,355.5
1,365
7.5
2,024
6
15
2,025
12
7
2,025
9
6
null
null
null
2,025
10
21
9
NK-77
Yu-0-1 A
1284-1296,5
SRP
25-150 RHAM 15-5-2-2
2024-11-23
73
1,293.94
41.89
59.04
null
null
30
5
6
null
3
3
null
1,229
2025-10-21
5
18
9.704363
8.438576
15
0.871
1,284
1,296.5
12.5
2,024
11
23
null
null
null
null
null
null
null
null
null
2,025
10
21
10
NK-79
M-II
1286,5-1297 1299,5-1301
SRP
25-150 RHAM 15-5-2-2
2023-05-28
73
1,278.88
32.48
48.08
2025-12-07
null
30
6
4
null
2.4
1.8
null
1,225
2025-09-28
6
14
3.525256
3.523494
0.05
0.8449
1,286.5
12,971,299.5
12,970,013
2,023
5
28
2,025
12
7
null
null
null
null
null
null
2,025
9
28
11
NK-80
M-II
1282,5-1292,5
SRP
25-106 RHAM 14-5-2-2.
2023-10-13
73
1,271.31
33.63
49.85
2025-05-10
null
30
4
6
2025-05-10
2.4
2.4
null
1,149
2025-10-20
0
28
0
0
1.5
0.8428
1,282.5
1,292.5
10
2,023
10
13
2,025
5
10
2,025
5
10
null
null
null
2,025
10
20
12
NK-82
M-II
1287,5 – 1293,5
SRP
25-150 RNAM 15-5-2-2
2024-12-01
73
1,256.94
55.64
40.4
2025-12-07
null
30
7
5
2025-10-05
3
3
2024-01-12
945
2025-09-29
4
27
7.570176
7.558838
0.15
0.8328
1,287.5
1,293.5
6
2,024
12
1
2,025
12
7
2,025
10
5
2,024
1
12
2,025
9
29
13
NK-84
M-II
1294,5-1301,5
SRP
25-150 RHAM 15-5-2-2
2024-08-16
73
1,270.12
55.5
55
null
null
30
7
5
null
3
3
2025-10-07
812
2025-09-29
0
30
6.177284
3.985345
55
0.8461
1,294.5
1,301.5
7
2,024
8
16
null
null
null
null
null
null
2,025
10
7
2,025
9
29
14
NK-86
M-II
1286,5-1295,5; 1297,5-1299,5; 1304,5-1306,5;
SRP
25-150 RNAM 14-5-2-2
2024-12-23
73
1,258.33
32.2
40.7
2025-05-10
null
30
4
5
2025-05-10
3
2.5
2025-05-10
788
2025-10-21
1
20
10.183092
9.011586
13
0.8286
1,286.5
1,306.5
13
2,024
12
23
2,025
5
10
2,025
5
10
2,025
5
10
2,025
10
21
15
NK-87
M-II
1295,5-1305.
SRP
25-175 RNAM 15-5-2-2
2024-02-27
73
1,265.91
57.64
56.97
2025-12-07
null
30
7
6
null
3
2
null
1,219
2025-09-30
3
28
15.629903
15.614289
0.1
0.8286
1,295.5
1,305
9.5
2,024
2
27
2,025
12
7
null
null
null
null
null
null
2,025
9
30
16
NK-90
M-II
1295,5-1299,5.
SRP
25-150 RHAM 14-5-2-2
2025-02-26
73
1,263.21
33.3
49.5
2025-05-10
null
30
4
6
2025-05-10
3
3
2025-05-10
1,199
2025-09-18
0
27
1.615135
1.6071
0.5
0.8282
1,295.5
1,299.5
4
2,025
2
26
2,025
5
10
2,025
5
10
2,025
5
10
2,025
9
18
17
NK-91
Yu-0-1 A
1310,5-1317,0 (6,5m).
SRP
20-106 RNAM 15-5-2-2
2025-03-23
73
1,297.54
48.42
47.82
2025-12-07
null
30
6
5
null
3
3
null
903
2025-09-28
0
8
2.066962
1.316537
57
0.8454
1,310.5
1,317
6.5
2,025
3
23
2,025
12
7
null
null
null
null
null
null
2,025
9
28
18
NK-92
M-II
1288,5-1295,5 (7 m)
SRP
25-150 RNAM 15-5-2-2
2025-03-30
73
1,272.5
56.67
40.34
null
null
30
7
5
null
3
2
null
1,051
2025-09-28
1
31
5.788601
5.755793
0.57
0.8329
1,288.5
1,295.5
7
2,025
3
30
null
null
null
null
null
null
null
null
null
2,025
9
28
19
NK-93
Yu-0-1A
1309,5-1316 m (6,5 m) 1316-1321 (5 m)
SRP
25-150 RNAM 14-5-2-2.
2025-04-09
73
1,296.65
55.78
47.57
null
null
30
7
6
null
3
1.8
null
529
2025-10-20
1
12
5.215355
5.103087
2.2
0.8391
1,309.5
1,321
11.5
2,025
4
9
null
null
null
null
null
null
null
null
null
2,025
10
20
20
NK-95
M-II
1299-1309 m (10 m)
SRP
25-150 RNAM 15-5-2-2
null
73
1,281.07
56.57
48.45
null
null
30
7
6
null
3
2
null
989
2025-10-20
1
0
21.020767
20.916186
0.5
0.8328
1,299
1,309
10
null
null
null
null
null
null
null
null
null
null
null
null
2,025
10
20

Kazakhstan Oil Well Operational Dataset

Description

This dataset contains structured operational and production parameters of sucker rod pump (SRP) oil wells in Kazakhstan. It is intended for industrial AI research, oil production analysis, production forecasting, and predictive modeling of well performance under real field operating conditions. Location: North-West Konys oil field, Kyzylorda Region, Kazakhstan (≈150 km NW of Kyzylorda city).

Dataset Structure

The repository includes:

  • train.csv – training split
  • test.csv – testing split
  • dataset_cleaned.csv – cleaned full dataset
  • dataset_ml_ready_onehot.csv – one-hot encoded ML-ready dataset

Intended Use

  • Oil production forecasting
  • Regression modeling
  • Industrial AI research
  • Performance optimization of rod pump wells

License

Apache 2.0

Authors

  • Arailym Tleubayeva – PhD student at Astana IT University, Researcher at Viridi Navitas LLP, Kazakhstan

Citation

If you use this dataset in your research, please cite:

@dataset{tleubayeva2026kazoilwellops, author = {Arailym Tleubayeva}, title = {Kazakhstan Oil Well Operational Dataset (KazOilWellOps)}, year = {2026}, publisher = {Hugging Face}, url = {https://huggingface.co/datasets/Arailym-tleubayeva/kaz-oilwell-operational-dataset}, license = {Apache-2.0} }

Downloads last month
27