content
stringlengths
0
24.8k
The Health Sciences Building is the first building constructed in accordance with the newest campus master plan, and serves as a cornerstone in the redevelopment of the CGCC campus. The facility supports CGCC's nationally recognized Rural Clinical Nursing Program. The classrooms and laboratories are designed for flexib...
The new Columbia Gorge Community College Hood River Center-Indian Creek Campus celebrates the College’s official presence in the town of Hood River, Oregon, emphasizing educational accessibility and connectivity on a pristine 10-acre site. The new campus building houses a mini student services hub, instructional spac...
The booster funded project, scheduled for completion by March 1, 2012 is the year round training facility for the Oregon Duck Baseball team. Located beyond the right outfield wall, the stunning facility provides a roof covering over the Ducks bullpen, highly flexible training facilities and a jumbo sized branding opp...
The Nestucca High School project is a story about revitalizing a community icon and meeting modern educational demands. Set on a hill overlooking Oregon’s dairyland, and backed by the coastal range mountains, Nestucca High School is a much-loved south county landmark. When it became evident that a new  school wo...
Add service to 74-11105-00 to complete the record drawings for the PK Park Player Development Area.
Design Achievement – With nearly two-thirds of district facilities built before 1968, Albany and neighboring communities have seen the deterioration of many of the Greater Albany Public Schools. With the changing educational requirements, many schools are outdated and unable to complement the district’s transition to...
Add service to 74-11105-00 to complete the record drawings for the PK Park Player Development Area.
The new 60,000 SF Aumsville Elementary School is designed for flexibility, active learning and high performance. Based on a prototype developed by DLR Group, Aumsville features classroom pods with central learning commons that are arranged in a spoke formation around a central administration core. This arrangement fac...
The Cascade High School secondary campus creates a strong sense of identity for the school with its prominent placement at the corner of a County highway intersection. The building's clarity of circulation, forms and entry are simply defined on the exterior while remaining harmonious with the human scale. The Auditor...
this project cancelled. All project data under: #74-12104-00
Design Achievement – As one of the fastest growing communities in the metropolitan Portland area, Happy Valley had outgrown its existing City Hall and three additional modular structures. The City wanted its new building to celebrate community involvement and commitment to governmental transparency. In addition to effi...
Design Achievement - The Oregon Youth Authority (OYA) is transforming the lives of the youth each day. DLR Group and Chinn Planning assisted OYA to envision new criteria for how youth should live, learn and heal. The resulting Master Plan and Phase 1 concept plan provides improved facilities across 9 OYA campus locat...
DLR Group provided pre-bond planning and community outreach services for district-wide improvements for a district of approximately 11,000 students. After the District’s $291.2 million bond passed in 2016, DLR Group was hired to design East Gresham Elementary School. DLR Group worked with the district steering commi...
Design Achievement – With projections tied to growth and need for long-range planning, a key component of Beaverton School District’s capital improvement program was to develop a successful elementary school prototype design. DLR Group’s design began with the identification of three significant criteria: housing up t...
Design Achievement – With projections tied to growth and need for long-range planning, a key component of Beaverton School District’s capital improvement program was to develop a successful elementary school prototype design. DLR Group’s design began with the identification of three significant criteria: housing up t...
Design Achievement – An authentic local experience is at the forefront of what contemporary travelers desire. DLR Group’s design for this modern hotel achieves this goal in unique and progressive ways. First, the building meets the ground in a way that engages the public and enlivens the site with huge, operable glas...
Design Achievement - At nearly 70 years old, West Albany High School was in critical need of repair and expansion. Funded by the 2017 capital projects bond, DLR Group's design for this re-imagined campus includes a significant building addition containing a new administration wing, auxiliary gym, Career and Technical...
Design Achievement - On November 10, 2009 fire destroyed the east wing of the Marysville K-8 School, robbing the Foster-Powell, Lents and Mt. Scott neighborhood of their beloved icon. DLR Group's design restored and expanded this community school, while working within a tight schedule and budget. Maintaining the Coloni...
Conger Elementary’s student population has grown, necessitating the creative use and, in many cases, re-purposing of auxiliary and support spaces. The school staff has accomplished significant gains in the delivery of education through these innovations, but some infrastructure issues remained that only additional squa...
Made possible by community support, the bond projects at South Albany High School included the development of a new multi-purpose auxiliary gym, the renovation and addition of classrooms for the Career Technical Education (CTE) program, and a variety of theater upgrades including a new lobby, concessions, elevator ad...
Lewis & Clark College contracted DLR Group to provide master planning services the school's Athletics and Physical Education programs. The planning process engaged a core Planning Committee (including the Director and Associate Director of Athletics Development and Physical Education, AVP for Facilities and FM) to ...
Lewis & Clark College contracted DLR Group to provide master planning services the school's Athletics and Physical Education programs. The planning process engaged a core Planning Committee (including the Director and Associate Director of Athletics Development and Physical Education, AVP for Facilities and FM) to ...
Design Achievement: With nearly two-thirds of district facilities built before 1968, Albany and neighboring communities have seen the deterioration of many of the Greater Albany Public Schools. With the changing educational requirements, many schools are outdated and unable to complement the district’s transition to...
Design Achievement – The state of Oregon’s rich tradition of exceptional track and field competitors can be traced back to OSU’s first gold medal Olympian in 1908. After a 16-year hiatus, OSU revived its track program and needed a new complex. DLR Group completed a design which is being implemented in phases. With p...
Design Achievement – With projections tied to growth and need for long-range planning, a key component of Beaverton School District’s capital improvement program was to develop a successful elementary school prototype design. DLR Group’s design began with the identification of three significant criteria: housing up t...
Design Achievement: With nearly two-thirds of district facilities built before 1968, Albany and neighboring communities have seen the deterioration of many of the Greater Albany Public Schools. With the changing educational requirements, many schools are outdated and unable to complement the district’s transition to...
Lewis & Clark College contracted DLR Group to provide master planning services the school's Athletics and Physical Education programs. The planning process engaged a core Planning Committee (including the Director and Associate Director of Athletics Development and Physical Education, AVP for Facilities and FM) to ...
Design Achievement – With projections tied to growth and need for long-range planning, a key component of Beaverton School District’s capital improvement program was to develop a successful elementary school prototype design. DLR Group’s design began with the identification of three significant criteria: housing up t...
Design Achievement – With projections tied to growth and need for long-range planning, a key component of Beaverton School District’s capital improvement program was to develop a successful elementary school prototype design. DLR Group’s design began with the identification of three significant criteria: housing up t...
DLR Group provided master planning and community outreach services for district-wide improvements for a district of approximately 1,800 students. The firm was also responsible for pre-bond communications. The District’s $42.2 million bond successfully passed in Nov. 2017. DLR Group is providing the follow-on design s...
DLR Group’s design for the new Salem Police Station reunites all police units and departments under one roof and offers a safe, welcoming building for their staff and the public. Visioning sessions and a fundamental needs assessment with police stakeholders established goals to provide a community-oriented facility a...
Design Achievement – Papé Field Athletic Complex is the home field for the University of Oregon’s women’s soccer and lacrosse teams and one of the finest and most advanced facilities of its type in the country. The DLR Group design adds to the University’s collection of nationally-recognized sports facilities, provid...
RENOVATION OF EXISTING FACILITY, INCLUDING: RECONFIGURATION OF EXISTING SPACES AND UPGRADES TO ADA ACCESSIBILITY , ARCHITECTURAL FINISHES, MECHANICAL SYSTEMS,ELECTRICAL SYSTEMS, PLUMBING SYSTEMS, LIGHTING SYSTEMS, COMMUNICATIONSYSTEMS, AND OTHER MISCELLANEOUS FACILITY REPAIRS. ADDITION TO THE EXISTING FACILITY TO IN...
Provide Construction Documents to replace existing 28,000 sf ballasted single membrane roof with a fully adhered non-ballasted single ply roof membrane with Owner preferred green roof media. 
RENOVATION OF EXISTING FACILITY, INCLUDING: RECONFIGURATION OF EXISTING SPACES AND  UPGRADES TP ADA ACCESSIBILITY, ARCHITECTURAL FINISHES, MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS, PLUMBING SYSTEMS, LIGHTING SYSTEMS, COMMUNICATION SYSTEMS, AND OTHER MISC. FACILITY REPAIRS. ADDITION TO THE EXISTING FACILITY TO INCLUDE ...
Provide Construction Documents to replace existing 28,000 sf ballasted single membrane roof with a fully adhered non-ballasted single ply roof membrane with Owner preferred green roof media. 
Design Achievement: With nearly two-thirds of district facilities built before 1968, Albany and neighboring communities have seen the deterioration of many of the Greater Albany Public Schools. With the changing educational requirements, many schools are outdated and unable to complement the district’s transition to...
Hood River County is in need of a new courthouse. The existing courthouse is home to a number of departments – Circuit Court, District Attorney, Sheriff and Prevention – each of which has outgrown its allotted space within the building. In addition, the County owns an Administration Building which houses the remainin...
Design Achievement - Faced with the need for major upgrades and increased educational space, Banks Middle School has recently completed an addition and renovation - the second (and final) phase of the junior high school replacement and conversion to a middle school serving grades six through ...
Design Achievement: Elmira Elementary School was in need of a new structure that would unify the student body; a single structure that enables the students and teachers to engage in a collaborative environment that is both personalized for the users and accessible for community use. DLR Group’s design focuses on the ...
NOT TO SPEC   Renovation of the existing facility, including: reconfiguration of existing spaces and upgrades to ADA accessibility, architectural finishes, mechanical systems, electrical systems, plumbing systems, lighting systems, communication systems, and other miscellaneous facility repairs. Addition to the exi...
Design Achievement – Arts & Communication Magnet Academy (ACMA) is a publicly funded arts magnet school for grades 6-12 within the Beaverton School District. ACMA’s innovative educational community engages students and staff in achieving academic and artistic excellence. The design will deliver a flexible space to ig...
Garfield Elementary is a dual language immersion school that focuses on the needs of the whole child in a positive and caring learning environment. This 59,000 SF Facility recent underwent an addition and renovation to reconfigure existing spaces, provide ADA accessibility, and extensive replacement of building syste...
RENOVATION OF EXISTING FACILITY, INCLUDING: RECONFIGURATION OF EXISTING SPACES, ADA ACCESSIBILITY, ARCHITECTURAL FINISHES, MECHANICAL SYSTEMS, ELECTRICAL SYSTEMS, PLUMING SYSTEMS, LIGHTING SYSTEMS, COMMUNICATION SYSTEMS, SEISMIC UPGRADES, AND OTHER MISC. FACILITY REPAIRS. ADDITION TO THE EXISTING FACILITY TO INCLUDE...
Design Achievement: Students and teachers alike at Fern Ridge Middle School have need of a secured campus with better supervision of school access. They also are in need of a more functional area dedicated for library use in terms of sound control, access and functionality. DLR Group’s design reconfigures the classro...
Design Achievement:   Corvallis School District wanted to address the overcrowding issues that nearby schools were facing by creating a new two-story elementary school. DLR Group’s design for Bessie Coleman Elementary School achieves the district’s vision by designing a new progressive building to accommodate 500 s...
Design Achievement: With nearly two-thirds of district facilities built before 1968, Albany and neighboring communities have seen the deterioration of many of the Greater Albany Public Schools. With the changing educational requirements, many schools are outdated and unable to complement the district’s transition to...
An educational specification will be provided that identifies the core requirements of the physical education facilities for the Beaverton School District's K-5, K-8, 6-8, and 9-12 school sites.
An educational specification will be provided that identifies the core requirements of the physical education facilities for the Beaverton School District's K-5, K-8, 6-8, and 9-12 school sites.
An educational specification will be provided that identifies the core requirements of the physical education facilities for the Beaverton School District's K-5, K-8, 6-8, and 9-12 school sites.
Design Achievement This confidential client is a multifaceted insurance organization established over 60 years ago. The client moved into the newly constructed tower in downtown Portland in the late 1990’s and established the penthouse floor as the home of their executive and team and comprehensive boardroom suite a...
DLR Group was then selected for A/E design services work on two replacement elementary schools and significant renovations and additions to the rest of the district’s elementary schools. The various renovations/additions will replace 21 modular classrooms across the District’s elementary schools with permanent classr...
An educational specification will be provided that identifies the core requirements of the physical education facilities for the Beaverton School District's K-5, K-8, 6-8, and 9-12 school sites.
Design Achievement: The Portland Building (Michael Graves, 1982) is an icon of Postmodern architecture. Extreme budget pressures at the time of construction impacted construction quality, materials and systems. This led to numerous problems during the past 35+ years that simple maintenance and repairs failed to resol...
A replacement Community Health Clinic serving Benton and Linn Counties providing Acute Primary Care, Behavioral Health, Chronic Disease Management, Health Screening and Specialty Pediatric Services. The project is a joint venture between Corvallis School District, who ownes the building, and Benton County, who will o...
Two potenial lease and TI Build out options in Salem.
Design Achievement - Established in 1866, the rich heritage of Gaston School District is a source of pride within its tightly-knit community. In spite of various additions over the years, the town has seen exponential growth causing a need for a larger campus. DLR Group’s design for Gaston’s K-12 Campus emphasizes ac...
Design Achievement - Crook County needed a new jail to provide treatment and proper classification for a growing inmate population. DLR Group's design of the new Crook County Public Safety Facility meets the evolving public safety needs of this rural community and serves as a civic landmark. The new facility houses t...
With a pressing need for beds and ambitious space program goals, a better jail facility had long been a priority for Clatsop County. When the Oregon Youth Authority closed their North Coast Youth Facility in Warrenton, Oregon, the county saw an opportunity to achieve their goals. Clatsop County hired DLR Group to asses...
Design Achievement This confidential client is a multifaceted insurance organization established over 60 years ago. The client moved into the newly constructed tower in downtown Portland in the late 1990’s and established the penthouse floor as the home of their executive and team and comprehensive boardroom suite a...
Two potenial lease and TI Build out options in Salem.
NTP on plans for two hotels at this point.
NTP on plans for two hotels at this point.
Design Achievement – Beginning as a partner leading a robust community outreach and a district-wide long-range plan aligning standards, program, and pedagogy, DLR Group was hired for the replacement of East Gresham Elementary School, following a successful $291M bond passed by Gresham-Barlow School District located j...
Two potenial lease and TI Build out options in Salem.
Sunnyside ELementary School project is an addition and renovation to an existing elementary school in North Clackamas. The project includes redesigning the student drop-off areas to provide a safe access to the entry of the school for students, parents, and staff. The new addition includes a new entry, kindergarten c...
DLR Group was selected to provide work order design services for the City of Salem. We provide architectural, structural, mechanical and electrical services for projects as needed to support the main project discipline.  
NTP on plans for two hotels at this point.
Design Achievement This confidential client is a multifaceted insurance organization established over 60 years ago. The client moved into the newly constructed tower in downtown Portland in the late 1990’s and established the penthouse floor as the home of their executive and team and comprehensive boardroom suite a...
Design Achievement - As the first phase of a Pre-K through 12th grade campus, DLR Group's design for the new Warrenton-Hammond  middle school includes varying sized educational spaces around an open media center. The media center and commons are interlinked and act as the central organizing HUB. Project labs, science...
Design Achievement This confidential client is a multifaceted insurance organization established over 60 years ago. The client moved into the newly constructed tower in downtown Portland in the late 1990’s and established the penthouse floor as the home of their executive and team and comprehensive boardroom suite a...
DLR Group was selected to provide work order design services for the City of Salem. We provide architectural, structural, mechanical and electrical services for projects as needed to support the main project discipline.  
DLR Group was selected to provide work order design services for the City of Salem. We provide architectural, structural, mechanical and electrical services for projects as needed to support the main project discipline.  There are two contract awarded under this proposal, one for the City of Salem Municipal...
Design Achievement - Operating in a former high school and struggling to provide adequate programming for middle school curriculum the new Alder Creek Middle School is the result of a community-focused, phased, construction renovation. Selected by North Clackamas School District to support the district in a variety o...
DLR Group was selected to provide work order design services for the City of Salem. We provide architectural, structural, mechanical and electrical services for projects as needed to support the main project discipline.  There are two contract awarded under this proposal, one for the City of Salem Municipal...
Design Achievement - Serving more than 20,000 students, Hillsboro School District prides itself in providing an inclusive environment for all students to excel. To promote continued academic excellence amidst community growth, the district hired DLR Group to design a prototype elementary for three sites focused on th...
Design Achievement - With multiple offsite departmental units housed in aging and undersized facilities across the city, the Salem Police Department needed a new headquarters that could accommodate all their functions and serve as an essential facility for the community. DLR Group’s design for the new Salem Police St...
Design Achievement - Serving more than 20,000 students, Hillsboro School District prides itself in providing an inclusive environment for all students to excel. To promote continued academic excellence amidst community growth, the district hired DLR Group to design a prototype elementary for three sites focused on th...
Design Acheivment:  Rain the Growth Agency, a branding firm in downtown Portland, partnered with DLR Group to revamp their downtown campus for their return to work. The design vision creates a flexible, collaborative, and branded workspace that adapts to the needs of the team while promoting inclusivity for remote...
Design Achievement - Serving more than 20,000 students, Hillsboro School District prides itself in providing an inclusive environment for all students to excel. To promote continued academic excellence amidst community growth, the district hired DLR Group to design a prototype elementary for three sites focused on th...
DLR Group was selected to provide work order design services for the Oregon Youth Authority. We provide architectural, structural, mechanical and electrical services for projects as needed to support the main project discipline.
DLR Group was selected to provide work order design services for the Oregon Youth Authority. We provide architectural, structural, mechanical and electrical services for projects as needed to support the main project discipline.
Atfalati Ridge ES Native American Art Collaboration Serving more than 20,000 students, Hillsboro School District prides itself on providing an inclusive environment for all students. To promote continued academic excellence for its rapidly growing communites, the district hired DLR Group to design a prototype ele...
Clackamas Town Center Building A was originallly construced as a Lifestyle Center addition in 2006.  It is a 2 story structure.  GGP wishes to expand and reconfigure the upper and lower level floor plans, erect new tenant demising walls,  reconfigure the upper level parking area and inner ring road and p...
Clackamas Town Center Building A was originallly construced as a Lifestyle Center addition in 2006.  It is a 2 story structure.  GGP wishes to expand and reconfigure the upper and lower level floor plans, erect new tenant demising walls,  reconfigure the upper level parking area and inner ring road and p...
DESIGN ACHIEVEMENT: Beaverton School District replaced its existing elementary school with a new school to accommodate the growing district. DLR Group’s design for Raleigh Hills Elementary School embraces the future while honoring the community’s history. Different opportunities exist for various educationa...
In light of changing needs and districting, Portland Public Schools hired DLR Group to assess six outdated K-6, K-8, elementary and middle schools (Rose City Park, Roseway Heights, Holiday Center, Youngson, Rice-Pioneer, and Columbia) for conversion into modern middle schools. Under a tight schedule, DLR Group’s prov...
Clackamas Town Center Building A was originallly construced as a Lifestyle Center addition in 2006.  It is a 2 story structure.  GGP wishes to expand and reconfigure the upper and lower level floor plans, erect new tenant demising walls,  reconfigure the upper level parking area and inner ring road and p...
Renovation of an existing building to serve as a new  center for Benton County.  Departments included the Board of Commissioners, Elections, Assessments, Finance, Community Development, Human Resources, and Environmental Health.
Renovation of an existing building to serve as a new  center for Benton County.  Departments included the Board of Commissioners, Elections, Assessments, Finance, Community Development, Human Resources, and Environmental Health.
Design Achievement – Arts & Communication Magnet Academy (ACMA) is a publicly funded arts magnet school for grades 6-12 within the Beaverton School District. ACMA’s innovative educational community engages students and staff in achieving academic and artistic excellence. The design will deliver a flexible space to ig...
Test-Fit
DESIGN ACHIEVEMENT: Nestled in Oregon’s Willamette Valley, Clackamas County is home to nearly half a million people. The existing county courthouse built in 1936 served fewer than 50,000 residents and no longer meets the demands of this rapidly growing region. DLR Group’s design for the new Clackamas County...
Test-Fit
Indoor Air Quality Monitoring - one time setup fee, Monitors  Setup, Kaiterra Sensedge Mini Air Quality monitor hardware fee at $750 ea + 1.15 markup + Freight at cost, Yr 2 Annual sonrai IAQ Subscription $4,500 fee, but zero $ amount shown on the invoice (see 22-21112-00 for example) this will actually end up on a -...
Clackamas Town Center Building A was originallly construced as a Lifestyle Center addition in 2006. It is a 2 story structure. GGP wishes to expand and reconfigure the upper and lower level floor plans, erect new tenant demising walls, reconfigure the upper level parking area and inner ring road and provide upper and l...
Beaverton School District’s Arts and Communications Magnet Academy (ACMA) was founded in 1992, and serves 725 students in grades 6-12. The ACMA program was created to provide its students to participate in a specialized performing, visual, and communication arts integrated program of study including the following...
Indoor Air Quality Monitoring - one time setup fee, Monitors  Setup, Kaiterra Sensedge Mini Air Quality monitor hardware fee at $750 ea + 1.15 markup + Freight at cost, Yr 2 Annual sonrai IAQ Subscription $4,500 fee, but zero $ amount shown on the invoice (see 22-21112-00 for example) this will actually end up on a -...
Clackamas Town Center Building A was originallly construced as a Lifestyle Center addition in 2006. It is a 2 story structure. GGP wishes to expand and reconfigure the upper and lower level floor plans, erect new tenant demising walls, reconfigure the upper level parking area and inner ring road and provide upper and l...
Indoor Air Quality Monitoring - one time setup fee, Monitors  Setup, Kaiterra Sensedge Mini Air Quality monitor hardware fee at $750 ea + 1.15 markup + Freight at cost, Yr 2 Annual sonrai IAQ Subscription $4,500 fee, but zero $ amount shown on the invoice (see 22-21112-00 for example) this will actually end up on a -...