content
stringlengths
0
24.8k
Together, Balfour Beatty and DLR Group are currently working on the $4.4 M Grand Avenue Enhancement & Blue Line Station Extension at Los Angeles Trade Technical College. The Los Angeles Trade Technical College Grand Avenue Enhancement – Blue Line Station Extension (Project) is a streetscape and campus entry landscap...
Design Achievement - Located on the north side of the picturesque Cal Poly campus, Baggett Stadium is framed by scenic coastal hills and mountains, and provides an amazing setting for college baseball. Inaugurated in 2001, the facility has witnessed many great Mustang teams and victories; however, the current clubhou...
Design Achievement – The renovation of the existing Hilton Hotel includes a full ground floor/public space and guestroom update with minor exterior upgrades to the porte-cochere, patio and pool areas. The project was completed in collaboration with Hilton’s ownership and brand team. DLR Group’s design created a moder...
Design Achievement — Longfellow Elementary School, constructed in 1947, is one of Riverside USD's oldest schools.  It faces complex challenges due to its small footprint of six acres and no on-site parking lots.  Furthermore, the site was originally divided by a road that has since been turned into a cul-de-sac with ...
Design Achievement - Suite 1500 at 456 Montgomery Street is an office space located in the center of the Financial District in downtown San Francisco, CA. For this tenant improvement, the client requested for the modernization of the workplace while allowing flexibility for future tenants to change the space as neede...
DLR Group is working with the City of Fairfield to provide a needs assessment for the Fairfield Police Department over the city’s 10-year planning horizon toward projected build-out of the city.  Needs assessment and strategic projections were also provided for the city’s IT department, as well as fleet management an...
Project Achievement - CA Technologies approached DLR Group to help solve a complex problem; how do you design a workplace that inspires remote employees to come back into the office? Their former space did not reflect their mission, to eliminate the barriers between ideas and business outcomes, and pushed 75% of empl...
Fee Proposal attached to the files tab with the project narrative included.
Design Achievement - Compton is well known for producing music and athletic prodigies, and now this community has an opportunity to set the standard for educational excellence with a new high school. DLR Group’s design will transform the District’s oldest high school campus into a 21st Century learning environment th...
DLR Group is working with the City of Fairfield to provide a needs assessment for the Fairfield Police Department over the city’s 10-year planning horizon toward projected build-out of the city.  Needs assessment and strategic projections were also provided for the city’s IT department, as well as fleet management an...
Design Achievement - Compton is well known for producing music and athletic prodigies, and now this community has an opportunity to set the standard for educational excellence with a new high school. DLR Group’s design will transform the District’s oldest high school campus into a 21st Century learning environment th...
NEWCASTLE ELEMENTARY SCHOOL SITE IMPROVEMENTS - INCLUDES THE RENOVATION OF EXISTING SITE WORK. IMPROVEMENTS TO INCLUDE NEW PARKING LOT, STUDENT & BUS DROP-OFF, PATH OF TRAVEL, TRASH ENCLOSURE AND FENCING.
 Originally constructed in 1950 Westmont Elementary School is one of the school district’s most challenging campuses. Westmont Elementary School’s three key drivers for this campus modernization are: installing outdoor learning features, re-branding the school, and cultivating Westmont pride within the campus and com...
Design Achievement - Compton is well known for producing music and athletic prodigies, and now this community has an opportunity to set the standard for educational excellence with a new high school. DLR Group’s design will transform the District’s oldest high school campus into a 21st Century learning environment th...
Fee Proposal attached to the files tab with the project narrative included.
DESIGN ACHIEVEMENT: Compton is well known for producing music and athletic prodigies, and now this community has an opportunity to set the standard for educational excellence with a new high school. DLR Group’s design will transform the District’s oldest high school campus into a 21st Century learning environment tha...
Design Achievement: The modernization of Newcastle Elementary School addresses infrastructure, maintenance and accessibility concerns and renews existing classrooms with interior upgrades. As a part of the modernization, new interior finishes provide a welcoming and inviting learning environment. Each modernized cla...
Fee Proposal attached to the files tab with the project narrative included.
Design Achievement: Originally constructed in 1965 and modified by additions, College View Elementary School was a maze of spaces, lacking organization and a cohesive identity. DLR Group’s design approach for this modernization completely re-imagined the interiors by removing interior partitions and rerouting circul...
This is an Interim Site for Ocean View School District during their modernization process. It consists of new Relocatable buildings and some infrastructure upgrades.   Pegah Rezai worked on the design of this project.
The upgrades and modernization to Alameda County’s Santa Rita Jail will provide improvements in access for people with disabilities, create a new medical wing to provide improved healthcare and mental health services to inmates, and enhance jail security. The extensive capital improvement program for the jail incorpo...
Evaluation of existing Santa Rita Jail Complex facilities to develop master plan options to add new special needs housing and medical/mental health capability at that location.  Detailed programming, planning, and design for medical/mental health services building and conversion of existing housing unit for medical/m...
Fee Proposal attached to the files tab with the project narrative included.
Design Achievement - Compton is well known for producing music and athletic prodigies, and now this community has an opportunity to set the standard for educational excellence with a new high school. DLR Group’s design will transform the District’s oldest high school campus into a 21st Century learning environment th...
Design Achievement: DLR Group led an integrated design team for the major campus modernization of Sheldon Academy of Innovation. As part of the campus modernization, the new entry to the administration is located closer to the multi-purpose room and a new entry plaza puts a fresh face on the school welcoming the com...
Design Achievement DLR Group is leading an integrated design team for the major campus modernization of Sheldon Academy. As part of the campus modernization, the new entry to the Administration is located closer to the multi-purpose room and a new entry plaza will be created to welcome the community and visitors to ...
Design Achievement - The Otay Mesa Detention Center Expansion is constructed as one single building, mainly organized around a central hallway running the entire length of the building. The façade facing the public parking lot and serves as the public entry point is designed to provide a non-hostile appearance and gr...
Design Achievement DLR Group is leading an integrated design team for the major campus modernization of Sheldon Academy. As part of the campus modernization, the new entry to the Administration is located closer to the multi-purpose room and a new entry plaza will be created to welcome the community and visitors to ...
The entire program for this 414,062 SF facility will be constructed as one single building, mainly organized around a central hallway running the entire length of the building. The façade facing the public parking lot and serves as the public entry point is designed to provide a non-hostile appearance and greet the v...
Design Achievement - Compton is well known for producing music and athletic prodigies, and now this community has an opportunity to set the standard for educational excellence with a new high school. DLR Group’s design will transform the District’s oldest high school campus into a 21st Century learning environment th...
Design Achievement – LT Platinum Center is an urban, mixed-use project located in Anaheim, California. The 14.8 acres development is adjacent to Angel Stadium at the corner of State College Boulevard and Orangewood Avenue. The development is based around the city’s 820-acre master land-use plan Platinum Triangle comp...
Design Achievement - Compton is well known for producing music and athletic prodigies, and now this community has an opportunity to set the standard for educational excellence with a new high school. DLR Group’s design will transform the District’s oldest high school campus into a 21st Century learning environment th...
Design Achievement - The new Career Technical Education (CTE) building called the "Discovery Lab" at the Antelope Valley College creates a new gateway at the campus. The building’s primary goal is to consolidate the learning spaces currently housed in separate buildings to create an environment that expresses the ide...
Design Achievement - The new Career Technical Education (CTE) building called the "Discovery Lab" at the Antelope Valley College creates a new gateway at the campus. The building’s primary goal is to consolidate the learning spaces currently housed in separate buildings to create an environment that expresses the ide...
Design Achievement – LT Platinum Center is an urban, mixed-use project located in Anaheim, California. The 14.8 acres development is adjacent to Angel Stadium at the corner of State College Boulevard and Orangewood Avenue. The development is based around the city’s 820-acre master land-use plan Platinum Triangle comp...
Design Achievement – LT Platinum Center is an urban, mixed-use project located in Anaheim, California. The 14.8 acres development is adjacent to Angel Stadium at the corner of State College Boulevard and Orangewood Avenue. The development is based around the city’s 820-acre master land-use plan Platinum Triangle comp...
Design Achievement - The Creative Arts and Social Sciences Classroom Building at Skyline College welcomes the public on the exterior of the campus and embraces the campus community with an iconic face on the interior of campus. The design of exterior spaces respects the existing fabric and landscape palette but is de...
Design Achievement - The Creative Arts and Social Sciences Classroom Building at Skyline College is a design-build collaboration between DLR Group as Architect of Record, Snøhetta as Design Architect and Turner Construction as Builder. The client’s desire for this facility is to create a structure that both welcomes ...
Design: Long Beach Unified School District desired to convert its old elementary facility into a safe and beautiful state-of-the-art middle school. transformation of the elementary school facility into Helen Keller Middle School consisted of the addition of new classrooms, ADA improvements, safety improvements and t...
Design Achievement - The Creative Arts and Social Sciences Classroom Building at Skyline College is a design-build collaboration between DLR Group as Architect of Record, Snøhetta as Design Architect and Turner Construction as Builder. The client’s desire for this facility is to create a structure that both welcomes ...
Design Achievement - ESRI, a GIS mapping company, wanted to bring off-campus technology support employees home with a new building on their global headquarters campus. DLR Group's iconic addition to the campus' primary entry is inspired by the owner’s interest in land conservation and European net-zero offices. Situa...
rmc
rmc
Design Achievement: The students, faculty and community of East Long Beach desire a new premier athletic facility that integrates their school’s colors within the stadium and improves the spectator experience. DLR Group’s design for the spaces achieves this vision by installing a new scoreboard and audio system withi...
Design Achievement - DLR Group was engaged by Long Beach Community College District to develop an Integrated Energy and Sustainability Master Plan (IESMP) to provide a road map and set of design recommendations to achieve Zero Net Energy (ZNE) District-wide. This plan will be fully integrated with the District’s 2041...
Design Achievement - ESRI, a GIS mapping company, wanted to bring off-campus technology support employees home with a new building on their Global Headquarters campus. DLR Group designed an iconic addition to the campus' primary entry, inspired by the owner’s interest in land conservation and European net-zero office...
rmc
*For marketing purposes, client must be listed as CONFIDENTIAL TECHNOLOGY CLIENT; contact Workplace NMM for more details*   Design Achievement - As Google expanded in Southern California, DLR Group engaged their leadership team and employees with surveys, programming, and a visioning session. This surfaced two proj...
Design Achievement - TAWA Services Inc, envisioned an opportunity to attract a whole new generation of young Asian Americans (millennials) to their grocery stores by providing a trendy food hall featuring nine curated food vendors. DLR Group’s design of 99 Ranch Market, a new warehouse-style global grocery store and ...
 
description is in 75-17237-00
Design Achievement - The Creative Arts and Social Sciences Classroom Building at Skyline College is a design-build collaboration between DLR Group as Architect of Record, Snøhetta as Design Architect and Turner Construction as Builder. The client’s desire for this facility is to create a structure that both welcomes ...
 
1.25MW electrical single-line diagram
Design Achievement - Google SoCal engaged DLR Group in early 2017 to realize an expansion on their Irvine campus. Initial engagements through surveys, programming and a visioning session coalesced the project goals for this particular site into focusing on the individual employee workspace used by Googlers for most o...
 
See project 75-17722-01
The Agriculture Education Center will be the new home for the Agriculture (Plant Sciences) Program to provide instructional Classroom and Green House environments. This will allow faculty and students an innovative curriculum to prepare students for gainful employment in the Agricultural industry. The 8,338 gross sq...
Design Achievement - DLR Group was contracted to convert an existing Sheraton Hotel to an AC Hotel in Pleasanton, CA. With the hotel’s unique location neighboring a new high-tech corporate campus and proximity to the BART metro station, the development team sees this property as a destination for visitors and locals ...
Accessibility improvements to address non-compliant conditions in association with the SLE-SOM project (75-17201-20).  Includes parking, path or travel, ramps, railings, signage, etc.
Design Achievement: The goal for this refresh was to move 200+ employees from 8 different business units and 2 different sites into the newly renovated space. Managing the complexity and expectations of all the business units and coalesce into one space was critical. DLR Group’s design engages a few key elements to m...
Modernization improvements to 4 buildings (Business Education, Music, Fine Arts, Performing Arts) which includes lighting, electrical, mechanical, audio/visual and security upgrades.
Design Achievement - Electro Rent, the world’s largest test services company, was looking to update and modernize their dark, tired, outdated space following an acquisition. The company owns their building and had one clear goal for this renovation: unveil a state-of-the art American Headquarters as one organization ...
Design Achievement - West Valley College, situated in the foothills of the Santa Cruz Mountains, has a picturesque campus and an extensive array of existing athletic facilities and fields. The campus has a history of athletic excellence and top-notch coaches with Olympic histories. DLR Group’s design for the Softball...
Softball field and multipurpose complex the project includes the design of a new softball complex and a new multipurpose complex.  The softball complex will be comprised of new dugouts, Spectator seating, restrooms, a press box, storage, batting cages, an outdoor gathering space and 2 artificial turf fields.  The mul...
***Narrative approved from Google (NO CHANGES ALLOWED please keep link to learn more at the end for each use)***   Google Bay View takes green building and workspace design to futuristic levels. On the forefront of design innovation, this 1.1 million-square-foot-campus features a first-of-its-kind solar design solu...
Design Achievement: To support growing enrollment and student culture, Campbell Union High School District USD wanted to re-envision the student union. DLR Group was brought in by Finney Architects as the design experts. The new two-story student union replaced the existing cafeteria which created versatility for prese...
Design Achievement - For almost a decade, a high visibility block along the iconic Santa Monica Boulevard in West Hollywood has sat underutilized and lacking a primary tenant. By 2021, it will be transformed into an urban infill community hub that activates the street and provides new neighborhood amenities. Phase I,...
Design Achievement - DLR Group was contracted to convert an existing Sheraton Hotel to an AC Hotel in Pleasanton, CA. With the hotel’s unique location neighboring a new high-tech corporate campus and proximity to the BART metro station, the development team sees this property as a destination for visitors and locals ...
Design Achievement - In consultation with DLR Group, Santa Maria Bonita School District recently developed flexible and forward-looking Education Specifications for TK-6 Elementary School design. DLR Group was selected as architect for the new Bill Libbon Tk-6 Elementary School to carry this vision forward. The new c...
Design Achievement-With the campus booming, CSU Sacramento will be transforming the campus in ways it has not seen before for current and future generations of students. The hope is to transform lives as well as the campus. As part of the CSU Sacramento Master Plan and the development of the Academic Core precinct, a...
The Venado Middle School science program needed more appropriate lab spaces. Classes were taught in either generic classrooms or in a space originally designed as the home economics lab with no utilities or storage to support the program. DLR Group worked with the school to design a new science lab building consistin...
Design Achievement - A strong partnership with parent company Vista Equity Partners has allowed DLR Group to continue working with this team across the nation. An office TI near Houston had nearly identical requirements and program as Vista’s first project in Austin, allowing the process to be extremely efficient. DL...
The Venado Middle School science program needed more appropriate lab spaces. Classes were taught in either generic classrooms or in a space originally designed as the home economics lab with no utilities or storage to support the program. DLR Group worked with the school to design a new science lab building consistin...
Design Achievement – The design of the $2.6-billion Automated People Mover (APM) at Los Angeles International Airport (LAX) will expedite and streamline passenger movement by transporting more than 30 million travelers annually between terminals. The APM is an elevated railway that connects passengers to all LAX term...
Design Achievement - Calbee Fairfield Campus is situated in the city of Fairfield, California, at the midpoint of San Francisco and Sacramento. Calbee is a major Japanese snack manufacturer, and expanded to Calbee North America in 1970. Their Fairfield campus is experiencing subsequent growth since the facility’s ori...
DLR Group re-envisioned the District’s master plan for the Eastshore Elementary School campus with a primary focus on creating new kindergarten facilities. The team’s solution was to design an addition and renovate an existing wing of the school to maintain architectural compatibility with the original neighborhood ...
Design Achievement - DLR Group was contracted to convert an existing Sheraton Hotel to an AC Hotel in Pleasanton, CA. With the hotel’s unique location neighboring a new high-tech corporate campus and proximity to the BART metro station, the development team sees this property as a destination for visitors and locals ...
DLR Group re-envisioned the District’s master plan for the Eastshore Elementary School campus with a primary focus on creating new kindergarten facilities. The team’s solution was to design an addition and renovate an existing wing of the school to maintain architectural compatibility with the original neighborhood ...
Design Achievement — Located in a rural area of the Coachella Valley, the new North Shore Elementary School will serve a community that is currently bused 45 minutes to neighboring schools. DLR Group's design process began with early community charrettes, where members of our integrated design team led brainstorming ...
Design Achievement - Opened in 1976 and without a major renovation since, the SAFE Credit Union Performing Arts Center (formerly Sacramento Community Center Theater) is a professional performing arts center in dire need of a transformation. The aging brutalist structure is closed off from view and separated from the ...
Design Achievement DLR Group’s design of the new kindergarten building celebrates one of Chico’s earliest educators with a passion for art, Emma Wilson, the school’s namesake. Our concept incorporates art in the architecture and provides areas for students to express their art talents. The entry and front facade int...
DESIGN ACHIEVEMENT: Located in a rural area of the Coachella Valley, the new North Shore Elementary School will serve a community that is currently bused 45 minutes to neighboring schools. DLR Group's design process began with early community charrettes where members of our integrated design team led brainstorming wo...
Design Achievement DLR Group’s design of the new kindergarten building celebrates one of Chico’s earliest educators with a passion for art, Emma Wilson, the school’s namesake. Our concept incorporates art in the architecture and provides areas for students to express their art talents. The entry and front facade int...
Design Achievement – DLR Group|Kwan Henmi worked closely with the client and San Jose officials to deliver a design featuring an innovative façade that conforms with the architecture of the historic St. James Historic District location. Designed to reference the colonnades and strong base, middle and top transition c...
Design Achievement DLR Group’s design of the new kindergarten building celebrates one of Chico’s earliest educators with a passion for art, Emma Wilson, the school’s namesake. Our concept incorporates art in the architecture and provides areas for students to express their art talents. The entry and front facade int...
NOT TO DLR GROUP STANDARD - NARRATIVE FROM JOHNSON CONSULTING   Johnson Consulting and DLR Group are collaborating on an Amphitheater Feasibility Study for the City of Brentwood. The study includes two areas of focus—analysis of the market, a feasibility study and operational model for the proposed outdoor Amphithe...
   Design Achievement - The new Roosevelt Elementary School replaces outdated facilities built in 1957. The master plan calls for the complete demolition of the existing campus with a new school to be built in its place that focuses on Science, Technical, Engineering (Art)and Math. When a visitor arrives at the new ...
Design Achievement- The new Roosevelt Elementary School replaces outdated facilities built in 1957. The master plan calls for the complete demolition of the existing campus with a new school to be built in its place that focuses on Science, Technical, Engineering (Art)and Math. When a visitor arrives at the new Roose...
Design Achievement - Opened in 1974 and without a major renovation since, the Sacramento Community Center Theater is a professional performing arts center in dire need of a transformation. The aging brutalist structure is closed off from view and separated from the surrounding urban fabric. The building has aging inf...
The new one-story Automotive and Technical Instruction building at Pierce College includes an alternative fuel vehicle lab, an advanced diagnostics and emissions vehicle lab, a hybrid technology/electric vehicles lab, a dyno-cell room, central tool storage, classrooms, and faculty office and work areas.
Design Achievement - Originally built in the 80’s and renovated once since in 2005, Encino Courtyard is a landmark in the San Fernando Valley because of its visibility on Ventura Blvd and features in Hollywood blockbusters like in '40 Year Old Virgin.'  DLR Group was commissioned to transform the dated center with a ...
Design Achievement - Victor Valley Community College focused on two main goals for the new Student Services Center: the first was to greatly improve the student services experience for prospective and enrolled students, and the second was to create an iconic building that would serve as a gateway to the campus. To im...
Design Achievement - DLR Group’s design for the Campus Center Marketplace will revitalize the student life experience at the heart for the Cal Poly Pomona University Quad. As the historical hub of the University Quad, the Campus Center Marketplace in Building 97 has provided student support services since the mid-20t...
The faculty and community of John Muir Fundamental Elementary School desired a new two-story classroom building to give their students a permanent and next generation collaboration environment. This was one of Santa Ana Unified School District’s first projects in their P2P (portable-to-permanent) initiative. DLR Grou...
Design Achievement: As Advanced Energy, a high-tech power supply company, looked to connect with a Silicon Valley client base, they needed a new showcase office that puts their technical capabilities on display. At the entry, a landmark logo wall and lounge seating set the tone for the progressive workplace. Sales, E...
 Project is in three phases - Modernization (completed), 2-story modular Classroom Building (completed), 3-story Multipurpose Building (construction 11.1.21 - 1.15.23)     Design Achievement:   To better serve the community, Manhattan Beach Unified School District hoped to modernize the existing campus of Grand ...
Design Achievement:     Originally constructed in 1937, Dixie Canyon Community Charter Elementary School is one of the top elementary schools in Los Angeles. Dixie Canyon is a STEAM school with a strong curriculum in Science, Technology, Engineering, Arts and Math. Dixie Canyon is desiring a modernization that accu...
Design Achievement: Amid the downturn in traditional retail, Seritage Growth Properties saw an opportunity to redevelop and repurpose approximately 3,000 acres of land and 42M SF of former Sears and K-Mart retail spaces into dynamic multi-tenant shopping destinations, as well as large scale mixed-use developments. DL...
LAUSD - Dixie Canyon Community Charter Elementary School Site Analysis      Design Achievement:     Originally constructed in 1937, Dixie Canyon Community Charter Elementary School is one of the top elementary schools in Los Angeles. Dixie Canyon is a STEAM school with a strong curriculum in Science, Technology,...