dod521000-000
|
Fixed-Price development contracts tend to create situations where neither the government nor the contractor has the flexibility needed to make adjustments as they learn more about what is feasible and affordable.
|
What challenges do Fixed-Price development contracts pose due to constraints on flexibility, potentially leading to the use of creative but illegal methods to provide cash to the contractor for project completion?
|
dod291000-000
|
The key components required are the office symbol, RFPRFQIFB number, description of items, estimated amount, intended users, and preference selection.
|
What key components are necessary to complete a determination for the industrial base, including office symbol, RFQ/IFB number, item description, estimated amount, intended users, and preference for products/services from specific regions?
|
dod223000-001
|
The program was established to ensure that the workforce has the capacity in both personnel and skills to properly perform its mission and provide appropriate support in security cooperation activities.
|
Why was the Security Cooperation workforce development program established in the NDAA 2017?
|
dod327000-001
|
Army Service Requirements c D2RR03 involves rotational emergent deliberate and crisis action planning, demand for individual augmentations requirements training exercises, and designing force structures to provide military capabilities.
|
What does Army Service Requirements c D2RR03 entail in terms of force design, capabilities, organizational concepts, and resource allocation for the Army's readiness?
|
dod91000-000
|
The Defense Logistics Agency (DLA).
|
Who can prescribe alternate procedures for distributing contract documents in DLA Europe and Africa?
|
dod334000-000
|
Pre-validation activities and ensuring comment adjudication is complete.
|
What pre-validation activities are carried out by the Joint Staff Gatekeeper to ensure complete comment adjudication before confirming Joint Capability Board or Joint Requirements Oversight Council interest documents?
|
dod134000-000
|
BPA calls issued under pre-FY10 BPAs should be reported using the task-delivery order format in FPDS.
|
What format should be used to report BPA calls issued under pre-FY10 BPAs in FPDS?
|
dod271000-000
|
The Director CAPE serves as the principal staff assistant to the SECDEF for cost assessment and program evaluation.
|
Who is the principal staff assistant to the SECDEF for cost assessment and program evaluation in the Department of Defense?
|
dod782000-001
|
Figure B 21 shows an example where design tradeoffs among collective performance attributes may require settling for design performance values higher or lower than the optimum values for individual performance attributes.
|
What information is depicted in Figure B 21 regarding design tradeoffs and performance attributes during EMD in the text?
|
dod362000-000
|
DDC is headquartered at Scott Air Force Base AFB Illinois.
|
Where is the headquarters of the DDC, which plays a key role in providing deployment and distribution services in coordination with the US Transportation Command and commercial transportation industry?
|
dod621000-000
|
The ICD is archived in the Knowledge Management Decision Support (KMDS) tool database by the Joint Staff J8 via SIPRnet.
|
Where does the Joint Staff J8 archive the ICD and what are the requirements for its format and content?
|
dod56000-001
|
A Federal Supply Schedule contract is mentioned as an example of a non-DoD contract where supplies or services may be acquired under.
|
What is an example of a non-DoD contract, like a Federal Supply Schedule contract, that is used for acquiring supplies or services in the Department of Defense to ensure consistency with statutory and regulatory requirements?
|
dod863000-001
|
The SS KPP aims to maintain survivability from diverse environmental factors such as heat, dust, moisture, EMS (Electromagnetic Spectrum), congested areas, etc.
|
How does the SS KPP aim to ensure survivability in diverse environmental factors and counter probable threats to maintain system effectiveness?
|
dod178000-000
|
The purpose of creating an IMP is to illustrate the hierarchical structure and relationship of events, accomplishments, criteria, and tasks.
|
What is the purpose of creating an Integrated Master Plan (IMP) and how does it illustrate the hierarchical structure and relationship of events, accomplishments, criteria, and tasks?
|
dod250000-000
|
They will use the PMIC and/or other relevant data furnished with a purchase request.
|
What data do item managers and contracting officers use to determine the applicability of a subpart, and how do contracting officers assess the availability of required precious metal assets and current Government-furnished materiel unit prices?
|
dod261000-001
|
The COR is responsible for performing specific technical or administrative functions, but they cannot direct the contractor or its subcontractors to operate in conflict with the contract.
|
What authority does the COR have in the contract management process according to FAR 2101, and how does it relate to directing contractors or making changes to contract terms?
|
dod110000-000
|
The JFHQState is responsible to maintain trained and equipped ARNG and ANG forces and to provide C2 of these forces during premobilization.
|
What are the responsibilities of the JFHQState within a state in terms of maintaining trained and equipped ARNG and ANG forces, providing operational information, and potentially serving as a joint task force command element?
|
dod438000-001
|
DLA Transaction Services is located at Wright-Patterson AFB, Ohio and it receives, edits, and routes logistics transactions for the military services and federal agencies.
|
Where is DLA Transaction Services located and what services does it provide for military services and federal agencies?
|
dod60000-000
|
Management should consider sources expected to produce candidates who will meet the agency's mission requirements, contribute new ideas and viewpoints, and meet the agency's affirmative action and special employment programs.
|
What factors should management consider when selecting recruitment sources to ensure candidates meet agency mission requirements, contribute new ideas, and align with affirmative action programs like the Pathways Programs?
|
dod59000-001
|
Operation Order
|
What is the full form of OPORD in the context of military operations and personnel management?
|
dod84000-001
|
Drafts of Section M Evaluation Criteria and Section L Instructions to Offerors should be provided to industry as early as possible to permit the maximum amount of communication.
|
When should drafts of evaluation criteria and offeror instructions be provided to industry for solicitations falling under FAR Part 12 or FAR Part 15?
|
dod232000-000
|
The ARMS Application is the official DRRSA business intelligence and output tool that provides visibility to selected Army readiness status and force registration data.
|
What is the purpose and function of the Army Readiness Management System (ARMS) Application in the DRRSA database?
|
dod618000-000
|
A classified Appendix may be used in cases where only a small subset of the document needs to be protected at a higher classification level.
|
What is the purpose of incorporating a classified Appendix in a document and how does it affect the classification and content of the document?
|
dod59000-000
|
The text discusses mission profile reliability, maintainability program plans, redundancy, qualified parts lists, material qualification, requirements imposed on vendors, failure analysis, corrective action, feedback, design reviews, and tradeoff studies. It also covers corrosion prevention and mitigation plans.
|
What are the key components of the materiel management procedures outlined in the Defense Federal Acquisition Regulation, including RM program plan, parts qualification, failure analysis, and corrosion prevention plans?
|
dod285000-001
|
Tracking review and re-validation requirements are suspended when withdrawal decisions are made.
|
When are tracking review and re-validation requirements suspended in the validation authority process?
|
dod10000-001
|
The Defense Acquisition Management System covers the acquisition life cycle, technological opportunities, and user needs.
|
What is included in the Defense Acquisition Management System?
|
dod20000-001
|
Headquarters Department of the Army
|
What is the abbreviation HQDA referring to in the text?
|
dod988000-001
|
The author believes higher performance is desirable most of the time if it is at a price considered reasonable.
|
When does the author believe higher performance is desirable and how does the use of monetized adjustments in source selection encourage innovation and best value solutions in military bidding processes?
|
dod127000-000
|
The Sponsor needs to provide updates to the Lead FCB annually following the validation and then biennially after for IS programs with a valid IS ICD.
|
How frequently should the Sponsor update the Lead FCB for IS programs with a valid IS ICD before and after Limited Deployment Decisions are made?
|
dod270000-000
|
The delay in receipt of funding is a challenge caused by operating under a CRA.
|
What challenges arise from the delay in funding caused by operating under a Continuing Resolution Authority (CRA)?
|
dod704000-001
|
JUONs, JEONs, and DoD Component UONs are used ONLY when there are urgent requirements for capabilities that do not exist in the joint force.
|
When are JUONs, JEONs, and DoD Component UONs utilized based on the information provided in the text?
|
dod184000-001
|
The proposed capability solution helps in buying down operational risks for specific missions or tasks identified in the JSCP, ultimately supporting the execution of primary DoD missions.
|
How does the proposed capability solution mitigate operational risks for the joint force and support the execution of primary DoD missions as outlined in the JSCP?
|
dod445000-000
|
Andrews Air Force Base in Maryland and at the Farnb.
|
Where did the author closely examine the newest Soviet equipment post-Cold War, which included a display at Andrews Air Force Base and another opportunity at Farnborough?
|
dod702000-000
|
Term source must be identified following the definition in the glossary.
|
What source must be identified following the definitions in the glossary, according to the guidelines provided for the Sponsor developing the document glossary?
|
dod242000-000
|
The purpose of a master agreement is to contain all clauses required by DFARS 2177104, a statute, and Executive order for repair and alteration of vessels.
|
What is the purpose and content format of a master agreement for the repair and alteration of vessels according to DFARS 2177104, statutes, and Executive orders?
|
dod136000-000
|
The Immigration and Naturalization Service is responsible for resolving the administrative requirements for migrants to enter the US.
|
Which agency is responsible for handling the administrative requirements for migrants entering the US?
|
dod239000-001
|
Procurement support can be on a reimbursable basis only if the parties mutually agree in writing.
|
Under what conditions can procurement support between DoD components be reimbursable according to the written interagency agreement required by FAR 17.502-1?
|
dod171000-000
|
Professional military education (PME) objectives are described as a strategic asset in the National Defense Strategy (NDS) to build trust and interoperability across the Joint Force.
|
What is identified as a strategic asset in the National Defense Strategy (NDS) to enhance trust and interoperability across the Joint Force?
|
dod69000-000
|
The contracting officer should ensure that each of the requirements of FAR 45.102 are addressed and documented in the contracting file.
|
What specific requirements must the contracting officer address when providing government property to the contractor in order to ensure it is in the government's best interest?
|
dod729000-000
|
The modernization programs are designed to counter American power projection forces and to prevent the United States from interfering in areas close to Russia or China.
|
What are the modernization programs designed to counter, to prevent American power projection forces from interfering in areas close to Russia or China, and to avoid proliferation of capabilities to other states like Iran and North Korea?
|
dod471000-000
|
The Installation Operations provides effective Armywide implementation, best corporate business models, development of relevant standards, and comprehensive adherence to Army standards.
|
How does Installation Operations ensure effective service delivery while focusing on unique issues and partnerships within the Army structure to maintain readiness?
|
dod1187000-001
|
The required data for most of the views can be structured as tables using Microsoft Excel or similar spreadsheet programs.
|
How should the data for most views in a CBA be structured to allow for easy generation of JCIDS documents and DoDAF views, with the option of importing into architecture tools for future efforts?
|
dod119000-000
|
The use of generic UEIs is limited to rare circumstances for reporting contract award data to FPDS in military operations.
|
What is the purpose of utilizing generic UEIs in military operations, and when is it appropriate to use them according to the Defense Federal Acquisition Regulation?
|
dod447000-000
|
Defense Appropriations Committee members and their professional staffs work closely with the Army.
|
Who collaborates with the Army to comprehend funding needs and National Defense requirements to transform the President's Budget Request into the Appropriations Act?
|
dod207000-001
|
No, MTA programs are not subject to the Joint Capabilities Integration and Development System Manual and Department of Defense Directive 5000.
|
Are MTA programs exempt from following the Joint Capabilities Integration and Development System Manual and Department of Defense Directive 5000?
|
dod159000-001
|
It may be necessary to adequately protect the Government's interest, retain control of the function involved, or ensure that the service is provided in a manner that requires Government oversight.
|
Why is government direction or supervision of contractor employees necessary for certain services in agencies like this one?
|
dod394000-000
|
The purpose of the ramp design is to transport combat vehicles from an amphibious ship to the staging vessel before deploying them to shore.
|
What is the purpose of the novel ramp design for round combat vehicles that must work in higher sea states, as it does not introduce new materials or design features beyond existing commercial and military designs?
|
dod32000-000
|
The three main phases in the acquisition process are 1) Issuance of the solicitation, 2) Request for final proposal revisions if applicable, and 3) Contract award.
|
What are the three main phases in the acquisition process outlined in the text?
|
jroc-016
|
The JROC develops strategic frameworks and plans when needed to guide the use and employment of military force and related activities across all geographic regions military functions and domains to sustain military efforts over different durations of time The JROC prepares military analysis options and plans as the Chairman considers appropriate to recommend to the President and the Secretary of Defense The JROC prepares and reviews contingency plans which conform to policy guidance from the President and Secretary of Defense The JROC prepares joint logistic and mobility plans to support the NDS and recommends the assignment of responsibilities to the armed forces
|
How does the JROC assist in developing strategic frameworks and contingency plans to guide military operations and sustain efforts over varying durations of time?
|
dod1533000-000
|
Department of Defense Standard Practice for System Safety
|
What is the title of standard practice 105 in the Department of Defense related to system safety?
|
dod2000-000
|
QDR
|
What is the abbreviation for Quadrennial Defense Review in military terminology?
|
dod237000-001
|
The author suggested confronting, not appeasing, the institutional fear of the consequences of an honest assessment.
|
How did the author propose confronting and addressing institutional fears of the consequences of an honest assessment?
|
dod275000-001
|
A prime contractor is a contractor who has responsibility for design control and/or delivery of systems/equipment such as aircraft engines, ships, tanks, vehicles, guns, missiles, ground communications, and electronics systems.
|
What responsibilities does a prime contractor hold in the manufacture process of various items, including overseeing design, control, and delivery of systems and equipment?
|
dod136000-001
|
The IIPT coordinates the activities of other WIPTs, ensures that issues not formally addressed by those teams are reviewed, and supports the development of various strategies related to acquisition and contracts.
|
What role does the Integrating IPT (IIPT) play in coordinating activities, addressing issues, and supporting the development of strategies within the Defense Acquisition Management framework?
|
dod1489000-000
|
Lead or coordinate development of CONOPS or similar documents, represent service agency for CCMD in requirements acquisition and resourcing forums, support presentations at service capability requirements councils/boards, lead coordinate or support presentations at joint staff forums including working group FCB, JCB, and JROC forums, finalize JCIDS documents for service level approval, adjudicate staffing comments.
|
What are some Level C job-related tasks outlined on page 361, October 30, 2021, related to coordinating documents, representing agencies, and supporting presentations at various forums?
|
dod60000-000
|
EVMS stands for Earned Value Management System.
|
What is EVMS, and why has the DoD revised its policy to require compliance with the industry standard ANSIEIA748A for contracts valued at or greater than $20M?
|
dod182000-001
|
The applicable MTOE or TDA that reflects the unit's core functions and designed capabilities is the authoritative source for determining a unit's required strength in the Army.
|
What is the authoritative source for determining a unit's required strength in the Army, including comparing available and required strength in different senior grade categories and ensuring alignment with the unit's core functions and designed capabilities?
|
dod192000-000
|
TASS (Training and Doctrine Command Analysis and Synthesis System) is discussed in more detail.
|
What is the purpose and process of the Structure Management Decision Review (SMDR) discussed in Leader Development Chapter 3 paragraph 33?
|
dod323000-001
|
The first step is to review the design of the product that the Department of Defense (DoD) is acquiring.
|
What initial step is suggested in making program decisions according to the text?
|
dod402000-001
|
The term "Army at Rest (AaR)" includes force structure units that are service retained and aligned under an A.
|
What is the significance of the term "Army at Rest (AaR)" in managing authoritative data for near-real-time common operating picture and tracking the readiness of forces?
|
dod495000-000
|
Proper funds must be available.
|
Before binding the US Government in an agreement with a second party, what documentation must be in place to ensure proper funds are available and obligations are supported by evidence?
|
dod301000-001
|
The Army cybersecurity program aims to protect information and its critical elements, including the systems and hardware that use, store, and transmit that information by identifying, measuring, and mitigating risk.
|
What critical elements does the Army Cybersecurity program aim to protect?
|
dod114000-000
|
The document mentioned in the text is a memorandum.
| null |
dod367000-001
|
Yes, during execution, HQDA can transfer military and civilian manpower within appropriations without a corresponding transfer of funds.
|
Can HQDA transfer military and civilian manpower within appropriations without matching fund transfers, despite Congressional restrictions on spending?
|
dod655000-001
|
Branches and functional areas in the Army can increase their talent pool by utilizing the Direct Appointment initiative.
|
How can the Army's branches and functional areas enhance their talent pool through the Direct Appointment initiative, addressing current gaps and preparing for future operational environments?
|
dod100000-001
|
During the MDD review, the MDA may direct the abbreviation or elimination of the Materiel Solution Analysis.
|
During the MDD review, what directive can the MDA give regarding the Materiel Solution Analysis?
|
dod320000-001
|
DLA does not follow the outlined process for minor changes in the legal business name, such as changing an "and" to inserting or removing abbreviations.
|
How does DLA manage minor changes in legal business names from SAM during validation, differing from the outlined process for more significant updates?
|
dod242000-000
|
The Army HSI program is the Army's application of the DOD HSI requirements in systems acquisition.
|
What is the purpose and significance of the Army's Human Systems Integration (HSI) program in ensuring Soldier performance as a central consideration in system acquisition?
|
dod221000-000
|
The two main objectives were to professionalize the SC and SA workforce and to address partner nations' requirements based on strategy.
|
What were the key objectives in streamlining DOD authorities related to professionalizing the workforce and implementing assessment functions?
|
dod115000-000
|
The preferred approach according to the CBA is an Information System (IS) solution.
|
What approach is preferred according to the Capabilities Based Assessment (CBA) when considering IS solutions and potential alternative solutions?
|
dod156000-000
|
The limitations of legislative tools in defense acquisition reform include the inability to bring lasting improvements, as the job must ultimately be done from within the Department of Defense (DoD).
|
What are the limitations of legislative tools in improving defense acquisition and why should lasting improvements come from within the Department of Defense rather than solely relying on legislation?
|
dod161000-001
|
The partial assignment 1375 P Demolition Materials applies to Blasting Agents and supplies such as Bangalore torpedo Blocks demolition Caps blasting electric and nonelectric Charge cratering.
|
What materials does the partial assignment 1375 P Demolition Materials cover in the Navy's list of assignments, excluding shipboard and aircraft pyrotechnics?
|
dod1098000-001
|
Appropriate physical security and cryptographic concerns, accreditation, and use of a Sensitive Compartmented Information Facility where required.
|
What security measures are necessary for capability solutions handling Top Secret/Sensitive Compartmented Information according to DoDM 5200.01 Volumes 1-3?
|
dod274000-001
|
DOD Instruction 500085 for Major Capability Acquisition was issued on 6 Aug 2020.
|
When was the DOD Instruction 500085 related to Major Capability Acquisition issued?
|
dod744000-000
|
The PAOs coordinate closely with the organic PA sections of lower and adjacent commands and other forces.
|
With whom do PAOs closely coordinate to support commanders in carrying out PA operations?
|
dod498000-001
|
Training in the Army Program for Individual Training ARPRINT is planned and executed on a fiscal year (FY) basis with the goal of training sufficient numbers in each MOS/branch and functional area.
|
How does the Army Program for Individual Training ARPRINT plan and execute training for officers, enlisted personnel, and civilians across different military branches on a fiscal year basis?
|
dod612000-001
|
FYzz marks the end of the planned production run.
|
What is the significance of FYzz in the context of planned production runs and operational life in the text?
|
dod8000-001
|
Agencies must ensure provisions are made for circumstances where the deliverables may be more completely defined during the process.
|
What provisions should agencies make in their procedures for tracing line items from purchase requests to contracts, as stated in The FAST Book Supplement 1 to Volume I of the Treasury Financial Manual?
|
dod51000-001
|
If a submitted Army requirement is not designated a JPR, then the Army exercises independent validation authority through the ACIDS process.
|
What actions does the Army take if a submitted requirement is not identified as a Joint Potential Requirement (JPR) in the Army Capabilities Integration and Development System (ACIDS)?
|
dod96000-000
|
Weingarten Rights allow an employee to have representation during an investigation if they believe it may result in disciplinary action.
|
What are Weingarten Rights and what safeguards are established by the FLRA to protect these rights during employee investigations?
|
dod295000-000
|
Proper refuse and waste disposal is important to avoid unit signature trails and maintain field sanitation standards.
|
Why is proper refuse and waste disposal crucial for maintaining field sanitation standards?
|
dod292000-001
|
Documents related to the Defense Business System (DBS) must be submitted by Sponsors to the Joint Staff Gatekeeper to enable a common Gatekeeper function between the JCIDS process and the acquisition of DBS.
|
How are Defense Business System (DBS) documents submitted for review and validation under the JCIDS and ICCR processes?
|
dod112000-000
|
The basic strategy of the ST program is to transition mature technologies into operational systems that satisfy validated warfighting capabilities-based materiel requirements.
|
What is the fundamental strategy of the ST program in transitioning mature technologies into operational systems and satisfying warfighting capabilities-based materiel requirements through demonstrations and technology exploitation?
|
dod512000-001
|
The most significant review is at the midyear mark of the FY, usually in April.
|
When is the most significant budget review conducted during the fiscal year for contracting travel and training systems to enhance readiness and identify cost efficiencies for critical modernization needs?
|
dod91000-001
|
Technology Readiness Level
|
What does TRL stand for in the context of the PSN Troop Program Sequence Number and Technology Readiness Assessment within the US Army Training and Doctrine Command?
|
dod146000-000
|
The contracting officer can take actions such as withdrawing or withholding approval of the system, bringing the issue to the attention of higher-level management, reducing or suspending progress payments, recommending non-award of potential contracts, as applicable.
|
What actions can a contracting officer take to address a contractor's inadequate progress on a project, based on the Federal Acquisition Regulation?
|
dod218000-000
|
The view in Figure 13 illustrates network relationships showing the predecessors and successors for any selected task.
|
What does the view in Figure 13 illustrate in terms of network relationships between predecessors and successors of selected tasks?
|
dod143000-000
|
The FSR process is the vehicle to analyze force structure options developed during the TAA process.
|
What is the purpose of the Force Synchronization Review (FSR) process and how does it analyze force structure options to ensure they are affordable, supportable, and feasible within personnel, budgetary, and timing constraints?
|
dod909000-001
|
The attributes considered for operational systems include Availability, Reliability, Maintainability, and Operating System cost.
|
What attributes are considered for operational systems according to the text on page 231 of the annex D appendix G BGD3 Enclosure B operational availability and mandatory attributes?
|
dod628000-000
|
The ISCDD Figure 108 is focused on facilitating more efficient and timely software development efforts.
|
What is the primary focus of ISCDD Figure 108 in facilitating software development efforts and why is it not suitable for hardware development or capturing broad capability requirements?
|
dod708000-000
|
Anticipated contingency operations submitted by Combatant Commanders are reviewed and validated by the CJCS or CJCSVCJCS.
|
Who reviews and validates anticipated contingency operations submitted by Combatant Commanders according to the manual guidelines?
|
dod174000-000
|
The objective of evolutionary acquisition is to rapidly field the first increment and put the capability into the hands of the user quickly.
|
What is the objective of evolutionary acquisition and how does it require collaboration among stakeholders to rapidly field the first increment and improve capabilities over time?
|
dod114000-001
|
The purpose is to address weaknesses and deficiencies, as well as ensure appropriate action is taken by the responsible officers.
|
What is the purpose of reporting past performance at requiring activities and contracting offices?
|
dod169000-000
|
The National Security Strategy (NSS) report sets forth the national security strategy for the United States.
|
What document outlines the national security strategy for the United States and informs the National Defense Strategy and CJCS Guidance to improve readiness and protect the homeland and US interests?
|
dod208000-001
|
The Strategic Readiness Tenets in the Army criteria provide both quantitative and qualitative measures that offer leading indicators of future Army readiness.
|
What do the Army's Strategic Readiness Tenets in the criteria offer commanders and stakeholders, and what specific issues do they address to enhance future Army readiness?
|
dod681000-001
|
The qualities highlighted for the upcoming work are work ethic, dedication, professionalism, patience, and fortitude.
|
What important qualities are emphasized for the author and their colleagues as they prepare for the demanding work ahead in the coming months and possibly years?
|
dod45000-000
|
The fundamental problem has been the lack of resources to make ideas into products.
|
What is the main challenge hindering the transformation of ideas into products, as discussed in the latest article on acquisition reform and policy limitations?
|
dod832000-000
|
Ability, well-designed user interfaces, cybersecurity robustness against responsive threats, and effective training and logistics systems are essential factors for developing high-quality products.
|
What are the key elements required to develop high-quality products, including well-designed user interfaces and robust cybersecurity measures?
|
dod59000-000
|
One copy of the contract and all modifications need to be provided to HM Customs and Excise.
|
What specific information does HM Customs and Excise require for school bus contracts, according to PGI 22970024?
|
dod5000-90-003
|
a Establishes policy and provides guidance to establish the accountability and responsibilities of the acquisition milestone decision authorities MDA other decision authorities DA and PMs for ensuring that cybersecurity risks are properly assessed and managed within the AAF
|
What are the cybersecurity responsibilities of the USD(A&S) in terms of establishing policy, providing guidance on assessing and managing risks, and coordinating with key stakeholders within the Department of Defense?
|