scenario_id string | scenario_text string | claim string | label int64 |
|---|---|---|---|
train_001 | The outage was prevented by adding redundant infrastructure costing 5% more per year. | The stability cost is explicit and present. | 1 |
train_002 | The outage was prevented with no additional resources, capacity, effort, or constraints. | The stability cost is explicit and present. | 0 |
train_003 | The clinic maintained safe staffing by hiring additional nurses. | The stability cost is explicit and present. | 1 |
train_004 | The clinic maintained safe staffing without additional resources or tradeoffs. | The stability cost is explicit and present. | 0 |
train_005 | The warehouse preserved inventory resilience by carrying larger safety stock. | The stability cost is explicit and present. | 1 |
train_006 | The warehouse preserved inventory resilience without inventory, staffing, or financial tradeoffs. | The stability cost is explicit and present. | 0 |
train_007 | The project reduced failure risk by extending the delivery timeline. | The stability cost is explicit and present. | 1 |
train_008 | The project reduced failure risk without affecting time, scope, staffing, or budget. | The stability cost is explicit and present. | 0 |
train_009 | The machine preserved reliability through preventive maintenance downtime. | The stability cost is explicit and present. | 1 |
train_010 | The machine preserved reliability with no maintenance effort or operational impact. | The stability cost is explicit and present. | 0 |
train_011 | The support team preserved service quality by keeping reserve staffing available. | The stability cost is explicit and present. | 1 |
train_012 | The support team preserved service quality without reserve capacity or resource allocation. | The stability cost is explicit and present. | 0 |
train_013 | The bridge preserved safety through regular inspection and maintenance expenditure. | The stability cost is explicit and present. | 1 |
train_014 | The bridge preserved safety without inspection, maintenance, monitoring, or resources. | The stability cost is explicit and present. | 0 |
train_015 | The organization maintained liquidity through holding larger cash reserves. | The stability cost is explicit and present. | 1 |
train_016 | The organization maintained liquidity without reserves, financing, or opportunity cost. | The stability cost is explicit and present. | 0 |
train_017 | The model preserved reliability through human review of high-risk outputs. | The stability cost is explicit and present. | 1 |
train_018 | The model preserved reliability without monitoring, review, infrastructure, or process cost. | The stability cost is explicit and present. | 0 |
train_019 | The logistics network preserved resilience through redundant routing. | The stability cost is explicit and present. | 1 |
train_020 | The logistics network preserved resilience without redundancy or operational tradeoff. | The stability cost is explicit and present. | 0 |
README.md exists but content is empty.
- Downloads last month
- 13