Product Dev Ops Playbook — Cross-Functional Sprint Alignment SOP

Complete Product × Engineering × Operations alignment SOP — from unified backlog to 10-day sprint cadence to veto power rules.

📦 Install on ClawHub

clawhub install product-dev-ops-playbook

Then ask your AI agent:

"Design a 10-day sprint cadence for our 8-person product+eng team"

Installs the complete Product × Engineering × Operations alignment SOP — dual-layer Kanban, 10-day sprint cadence, issue templates with reproducibility rules, ops-veto-on-release framework, user feedback → product iteration closed loop.

🔗 View on ClawHub · All Gingiris skills · Author blog

🚀 30-Second Preview

You: 8-person team (3 PM/design, 4 eng, 1 ops). Design our sprint cadence.
Agent (with product-dev-ops-playbook):

  Cadence: 10-day sprint (5-day half doesn't fit AI prototype work)

  Day 1 (Mon) — Sprint planning + kickoff:
    Backlog grooming (45min) → 10-day commitments
    Engineering: pick 3-5 stories with clear acceptance criteria
    Ops: surface customer-blocking issues (auto-escalates if reported ≥3x)
    Veto rules: P0 bugs from ops block any new story acceptance

  Day 2-5 — Build phase:
    Daily standup (15min, async-first via Discord/Slack thread)
    PM unblocks design questions, eng pairs on hard problems

  Day 6 — Testable build deadline:
    Eng ships to staging; ops + PM smoke-test
    Bug triage: P0/P1 fix-in-sprint, P2 defer

  Day 7-9 — Polish + edge cases:
    User feedback batched daily, sprint scope locked

  Day 10 (Fri) — Ship + retro:
    Ops has FINAL release veto if P0 bug present
    Retro: 3 things working, 3 things to fix next sprint

Real cadence with embedded governance — not abstract Agile theater.


What's Inside

  • Dual-layer Kanban system (master backlog + sprint board with unified tagging)
  • 10-day sprint standard process (Day 1 dev → Day 6 testable build → Day 10 ship)
  • Issue template with reproducibility requirements (3x reported = auto-severe)
  • Tri-party alignment meetings (daily standup / sprint planning / sprint review)
  • Operations veto power on releases (P0 bug = block shipping)
  • User feedback → product iteration closed loop (beta testing + interview SOP)
  • Core metrics framework (acquisition → activation → retention → monetization → referral)
  • Technical debt management (20-30% sprint capacity reserved)
  • Ready-to-use templates: Bug Report, Sprint Planning, Responsibility Matrix

Languages

Language File
中文 (Chinese) SKILL.md
English references/en/README.md
日本語 (Japanese) references/ja/README.md
한국어 (Korean) references/ko/README.md

Install (Cola / ClawHub)

clawhub install product-dev-ops-playbook

Author

By @WeiYipei