Product Dev Ops Playbook — Cross-Functional Sprint Alignment SOP
Complete Product × Engineering × Operations alignment SOP — from unified backlog to 10-day sprint cadence to veto power rules.
📦 Install on ClawHub
clawhub install product-dev-ops-playbook
Then ask your AI agent:
"Design a 10-day sprint cadence for our 8-person product+eng team"
Installs the complete Product × Engineering × Operations alignment SOP — dual-layer Kanban, 10-day sprint cadence, issue templates with reproducibility rules, ops-veto-on-release framework, user feedback → product iteration closed loop.
🔗 View on ClawHub · All Gingiris skills · Author blog
🚀 30-Second Preview
You: 8-person team (3 PM/design, 4 eng, 1 ops). Design our sprint cadence.
Agent (with product-dev-ops-playbook):
Cadence: 10-day sprint (5-day half doesn't fit AI prototype work)
Day 1 (Mon) — Sprint planning + kickoff:
Backlog grooming (45min) → 10-day commitments
Engineering: pick 3-5 stories with clear acceptance criteria
Ops: surface customer-blocking issues (auto-escalates if reported ≥3x)
Veto rules: P0 bugs from ops block any new story acceptance
Day 2-5 — Build phase:
Daily standup (15min, async-first via Discord/Slack thread)
PM unblocks design questions, eng pairs on hard problems
Day 6 — Testable build deadline:
Eng ships to staging; ops + PM smoke-test
Bug triage: P0/P1 fix-in-sprint, P2 defer
Day 7-9 — Polish + edge cases:
User feedback batched daily, sprint scope locked
Day 10 (Fri) — Ship + retro:
Ops has FINAL release veto if P0 bug present
Retro: 3 things working, 3 things to fix next sprint
Real cadence with embedded governance — not abstract Agile theater.
What's Inside
- Dual-layer Kanban system (master backlog + sprint board with unified tagging)
- 10-day sprint standard process (Day 1 dev → Day 6 testable build → Day 10 ship)
- Issue template with reproducibility requirements (3x reported = auto-severe)
- Tri-party alignment meetings (daily standup / sprint planning / sprint review)
- Operations veto power on releases (P0 bug = block shipping)
- User feedback → product iteration closed loop (beta testing + interview SOP)
- Core metrics framework (acquisition → activation → retention → monetization → referral)
- Technical debt management (20-30% sprint capacity reserved)
- Ready-to-use templates: Bug Report, Sprint Planning, Responsibility Matrix
Languages
| Language | File |
|---|---|
| 中文 (Chinese) | SKILL.md |
| English | references/en/README.md |
| 日本語 (Japanese) | references/ja/README.md |
| 한국어 (Korean) | references/ko/README.md |
Install (Cola / ClawHub)
clawhub install product-dev-ops-playbook
Author
By @WeiYipei