OdinDB / knowledge_base /raw_text /wiki_Well_completion.txt
KoopaK's picture
Upload all Odin DB
334768f verified
Source: https://en.wikipedia.org/wiki/Well_completion
Last operation for oil and gas wells
An editor has determined that
sufficient sources exist
to establish the subject's
notability
.
Please help
improve this article
by
adding citations to reliable sources
. Unsourced material may be challenged and removed.
Find sources:
"Completion" oil and gas wells
news
·
newspapers
·
books
·
scholar
·
JSTOR
(
December 2024
)
(
Learn how and when to remove this message
)
Well completion
is the process of making a
well
ready for production (or injection) after drilling operations. This principally involves preparing the bottom of the hole to the required specifications, running in the
production tubing
and its associated down hole tools as well as perforating and stimulating as required. Sometimes, the process of running in and cementing the
casing
is also included. After a well has been drilled, should the drilling fluids be removed, the well would eventually close in upon itself. Casing ensures that this will not happen while also protecting the wellstream from outside incumbents, like water or sand.
[
1
]
Perforated shoe
Lower completion (downhole completion)
[
edit
]
This refers to the portion of the well across the production or injection zone. The well designer has many tools and options available to design the lower completion (downhole completion) according to the conditions of the
reservoir
. Typically, the lower completion is set across the productive zone using a liner hanger system, which anchors the lower completion to the production casing string. The broad categories of lower completion are listed below.
Barefoot completion
[
edit
]
This type is the most basic, but can be a good choice for hard rock, multi-laterals and underbalance drilling. It involves leaving the productive reservoir section without any tubulars. This effectively removes control of flow of fluids from the formation; it is not suitable for weaker formations which might require sand control, nor for formations requiring selective isolation of oil, gas and water intervals. However, advances in interventions such as coiled tubing and tractors means that barefoot wells can be successfully produced.
Open hole
[
edit
]
The production casing is set above the zone of interest before drilling the zone. The zone is open to the well bore. In this case little expense is generated with perforations. Log interpretation is not critical. The well can be deepened easily and it is easily converted to screen and liner. However, excessive gas and water production is difficult to control, and may require frequent clean outs. Also the interval cannot be selectively stimulated.
Open hole completion
[
edit
]
This designation refers to a range of completions where no casing or liner is cemented in place across the production zone. In competent formations, the zone might be left entirely bare, but some sort of sand-control and/or flow-control means are usually incorporated.
Openhole completions have seen significant uptake in recent years, and there are many configurations, often developed to address specific reservoir challenges. There have been many recent developments that have boosted the success of openhole completions, and they also tend to be popular in horizontal wells, where cemented installations are more expensive and technically more difficult. The common options for openhole completions are:
Pre-holed liner
[
edit
]
Also often called
pre-drilled liner
. The liner is prepared with multiple small drilled holes, then set across the production zone to provide wellbore stability and an intervention conduit. Pre-holed liner is often combined with openhole packers, such as swelling elastomers, mechanical packers or external casing packers, to provide zonal segregation and isolation. It is now quite common to see a combination of pre-holed liner, solid liner and swelling elastomer packers to provide an initial isolation of unwanted water or gas zones. Multiple sliding sleeves can also be used in conjunction with openhole packers to provide considerable flexibility in zonal flow control for the life of the wellbore.
This type of completion is also being adopted in some water injection wells, although these require a much greater performance envelope for openhole packers, due to the considerable pressure and temperature changes that occur in water injectors.
Openhole completions (in comparison with cemented pipe) require better understanding of formation damage, wellbore clean-up and fluid loss control. A key difference is that perforating penetrates through the first 6–18 inches (15–46 centimetres) of formation around the wellbore, whilst openhole completions require the reservoir fluids to flow through all of the filtrate-invaded zone around the wellbore and lift-off of the mud filter cake.
Many openhole completions will incorporate fluid loss valves at the top of the liner to provide well control whilst the upper completion is run.
There are an increasing number of ideas coming into the market place to extend the options for openhole completions; for example, electronics can be used to actuate a self-opening or self-closing liner valve. This might be used in an openhole completion to improve clean-up, by bringing the well onto production from the toe-end for 100 days, then self-opening the heel-end. Inflow control devices and intelligent completions are also installed as openhole completions.
Pre-holed liner may provide some basic control of solids production, where the wellbore is thought to fail in aggregated chunks of rubble, but it is not typically regarded as a sand control completion.
Slotted liner
[
edit
]
Slotted liners can be selected as an alternative to pre-holed liner, sometimes as a personal preference or from established practice on a field. It can also be selected to provide a low cost control of sand/solids production. The slotted liner is machined with multiple longitudinal slots, for example 2 mm × 50 mm, spread across the length and circumference of each joint. Recent advances in laser cutting means that slotting can now be done much cheaper to much smaller slot widths and in some situation slotted liner is now used for the same functionality as sand control screens.
Openhole sand control
[
edit
]
This is selected where the liner is required to mechanically hold back the movement of formation sand. There are many variants of openhole sand control, the three popular choices being stand-alone screens, openhole gravel packs (also known as external gravel packs, where a sized sand 'gravel' is placed as an annulus around the sand control screen) and expandable screens. Screen designs are mainly wire-wrap or premium; wire-wrap screens use spiral-welded corrosion-resistant wire wrapped around a drilled basepipe to provide a consistent small helical gap (such as 0.012-inch (0.30 mm), termed 12 gauge). Premium screens use a woven metal cloth wrapped around a basepipe. Expandable screens are run to depth before being mechanically swaged to a larger diameter. Ideally, expandable screens will be swaged until they contact the wellbore wall.
Horizontal open hole completions
[
edit
]
This is the most common open hole completion used today. It is basically the same described on the vertical open hole completion but on a horizontal well it enlarges significantly the contact with the reservoir, increasing the production or injection rates of your well. Sand control on a horizontal well is completely different from a vertical well. We can no longer rely on the gravity for the gravel placement. Most service companies uses an alpha and beta wave design to cover the total length of the horizontal well with gravel. It's known that very long wells (around 6000 ft) were successfully gravel packed in many occasions, including deepwater reservoirs in Brazil.
Liner completions
[
edit
]
In this case the casing is set above the primary zone. An un-cemented screen and liner assembly is installed across the pay section. This technique minimizes formation damage and gives the ability to control sand. It also makes cleanout easy. Perforating expense is also low to non-existent. However, gas and water build up is difficult to control and selective stimulation not possible the well can't be easily deepened and additional rig time may be needed.
Perforated liner
[
edit
]
Casing is set above the producing zone, the zone is drilled and the liner casing is cemented in place. The liner is then perforated for production. This time additional expense in perforating the casing is incurred, also log interpretation is critical and it may be difficult to obtain good quality cement jobs.
Perforated casing
[
edit
]
Production casing is cemented through the zone and the pay section is selectively perforated. Gas and water are easily controlled as is sand. The formation can be selectively stimulated and the well can be deepened. This selection is adaptable to other completion configurations and logs are available to assist casing decisions. Much better primary casing. It can however cause damage to zones and needs good log interpretation. The perforating cost can be very high.
Cased hole completion
[
edit
]
This involves running
casing
and a liner down through the production zone, and cementing it in place. Connection between the well bore and the formation is made by
perforating
. Because perforation intervals can be precisely positioned, this type of completion affords good control of fluid flow, although it relies on the quality of the cement to prevent fluid flow behind the liner. As such it is the most common form of completion...
Conventional completions
[
edit
]
Casing flow
: means that the producing fluid flow has only one path to the surface through the casing.
Casing and tubing flow
: means that there is tubing within the casing that allows fluid to reach the surface. This tubing can be used as a kill string for chemical injection. The tubing may have a "no-go" nipple at the end as a means of pressure testing.
Pumping flow
: the tubing and pump are run to a depth beneath the working fluid. The pump and rod string are installed concentrically within the tubing. A tubing anchor prevents tubing movement while pumping.
Tubing flow
: a tubing string and a production packer are installed. The packer means that all the flow goes through the tubing. Within the tubing you can mount a combination of tools that will help to control fluid flow through the tubing.
Gas lift
well
: gas is fed into valves installed in mandrels in the tubing strip. The hydrostatic head is lowered and the fluid is gas lifted to the surface.
Single-well alternate completions
: in this instance there is a well with two zones. In order to produce from both the zones are isolated with packers. Blast joints may be used on the tubing within the region of the perforations. These are thick walled subs that can withstand the fluid abrasion from the producing zone. This arrangement can also work if you have to produce from a higher zone given the depletion of a lower zone. The tubing may also have flow control mechanism.
Single-well concentric kill string
: within the well a small diameter concentric kill string is used to circulate kill fluids when needed.
Single-well 2-tubing completion
: in this instance 2 tubing strings are inserted down 1 well. They are connected at the lower end by a circulating head. Chemicals can be circulated down one tube and production can continue up the other.
Completion components
[
edit
]
The upper completion refers to all components from the bottom of the
production tubing
upwards. Proper design of this "completion string" is essential to ensure the
well
can flow properly given the
reservoir
conditions and to permit any operations as are deemed necessary for enhancing production and safety.
Wellhead with situation control
[
edit
]
Main article:
Wellhead
This is the pressure containing equipment at the surface of the well where casing strings are suspended and the
blowout preventer
or
Christmas tree
is connected.
Christmas tree
[
edit
]
Main article:
Christmas tree (oil well)
This is the main assembly of valves that controls flow from the
well
to the
process plant
(or the other way round for injection wells) and allows access for chemical squeezes
[
clarification needed
(definition)
]
and
well interventions
.
Tubing hanger
[
edit
]
Main article:
Tubing hanger
This component sits in the upper portion of the
wellhead
, within the tubing head
flange
and serves as the main support for the
production tubing
. The tubing hanger may be manufactured with rubber or polymer sealing rings to isolate the tubing from the annulus. The tubing hanger is secured within the tubing head flange with
lag bolts
. These lag bolts apply a downward pressure on the tubing hanger to compress the sealing
gaskets
and to prevent the tubing from being hydrostatically or mechanically ejected from the annulus.
[
2
]
Production tubing
[
edit
]
Main article:
Production tubing
Production tubing is the main conduit for transporting hydrocarbons from the
reservoir
to surface (or injection material the other way). It runs from the tubing hanger at the top of the
wellhead
down to a point generally just above the top of the production zone. Production tubing is available in various diameters, typically ranging from 2 inches to 4.5 inches. Production tubing may be manufactured using various grades of alloys to achieve specific hardness, corrosion resistance or tensile strength requirements. Tubing may be internally coated with various rubber or plastic coatings to enhance corrosion and/or erosion resistance.
Downhole safety valve (DHSV)
[
edit
]
Main article:
Downhole safety valve
This component is intended as a last-resort method of protecting the surface from the uncontrolled release of hydrocarbons. It is a cylindrical valve with either a ball or flapper closing mechanism. It is installed in the production tubing and is held in the open position by a
high-pressure
hydraulic line from surface contained in a
6.35 mm (
1
4
in) control line that is attached to the DHSV's hydraulic chamber and terminated at surface to a hydraulic actuator. The high pressure is needed to overcome the production pressure in the tubing upstream of the choke on the tree. The valve will operate if the umbilical HP line is cut or the wellhead/tree is destroyed.
This valve allows fluids to pass up or be pumped down the production tubing. When closed the DHSV forms a barrier in the direction of hydrocarbon flow, but fluids can still be pumped down for well kill operations. It is placed as far below the surface as is deemed safe from any possible surface disturbance including cratering caused by the wipeout of the platform. Where hydrates are likely to form (most production is at risk of this), the depth of the SCSSV (surface-controlled, sub-surface safety valve) below the
seabed
may be as much as 1 km: this will allow for the geothermal temperature to be high enough to prevent hydrates from blocking the valve.
Annular safety valve
[
edit
]
On wells with
gas lift
capability, many operators consider it prudent to install a valve, which will isolate the
A
annulus for the same reasons a DHSV may be needed to isolate the
production tubing
in order to prevent the inventory of natural gas downhole from becoming a hazard as it became on
Piper Alpha
.
Side pocket mandrel
[
edit
]
This is a welded/machined product which contains a "side pocket" alongside the main tubular conduit. The side pocket, typically 1" or 1½" diameter is designed to contain
gas lift
valve, which allows flow of High pressure gas into the tubing there by reducing the tubing pressure and allowing the hydrocarbons to move upwards.
Electrical submersible pump
[
edit
]
Main article:
Submersible pump
This device is used for
artificial lift
to help provide energy to drive hydrocarbons to surface if reservoir pressure is insufficient. Electrical Submersible Pumps, or ESPs, are installed at the bottom of the production tubing or inside the production tubing (Through Tubing ESP). Being electrically powered, ESPs require an electrical communications conduit to be run from surface, through a specialized wellhead and tubing hanger, to provide the required power to function. During installation, the power cable is spliced into the ESP then attached to the outside of the tubing by corrosion resistant metal bands as it is run in the hole. Specialized guards, called cannon guards, may be installed over each tubing collar to prevent the cable from rubbing on the casing walls which can cause premature cable failure. Installation and workover processes require careful consideration to prevent any damage to the power cable. Like many other artificial lift methods, the ESP reduces the bottom hole pressure at the tubing bottom to allow hydrocarbons to flow into the tubing.
Landing nipple
[
edit
]
A completion component fabricated as a short section of heavy wall tubular with a machined internal surface that provides a seal area and a locking profile. Landing nipples are included in most completions at predetermined intervals to enable the installation of flow-control devices, such as plugs and chokes. Three basic types of landing nipple are commonly used: no-go nipples, selective-landing nipples and ported or safety-valve nipples.
Sliding sleeve
[
edit
]
Main article:
Sliding sleeve
The sliding sleeve is hydraulically or mechanically actuated to allow communication between the tubing and the 'A'
annulus
. They are often used in multiple reservoir wells to regulate flow to and from the zones.
Production packer
[
edit
]
Main article:
Production packer
The packer isolates the annulus between the
tubing
and the inner
casing
and the foot of the well. This is to stop reservoir fluids from flowing up the full length of the casing and damaging it. It is generally placed close to the foot of the tubing, shortly above the production zone.
Downhole gauges
[
edit
]
This is an electronic or
fiberoptic
sensor to provide continuous monitoring of downhole pressure and temperature. Gauges either use a 1/4" control line clamped onto the outside of the tubing string to provide an electrical or fiberoptic communication to surface, or transmit measured data to surface by acoustic signal in the tubing wall. The information obtained from these monitoring devices can be used to model reservoirs or predict the life or problems in a specific wellbore.
Perforated joint
[
edit
]
This is a length of
tubing
with holes punched into it. If used, it will normally be positioned below the packer and will offer an alternative entry path for reservoir fluids into the tubing in case the shoe becomes blocked, for example, by a stuck
perforation
gun.
Formation isolation valve
[
edit
]
This component, placed towards the foot of the completion string, is used to provide two way isolation from the formation for completion operations without the need for
kill weight fluids
. Their use is sporadic as they do not enjoy the best reputation for reliability when it comes to opening them at the end of the completion process.
Centralizer
[
edit
]
In highly deviated wells, this component may be included towards the foot of the completion. It consists of a large collar, which keeps the completion string centralised within the hole while cementing.
Wireline entry guide
[
edit
]
This component is often installed at the end of the tubing, or "the shoe". It is intended to make pulling out wireline tools easier by offering a guiding surface for the toolstring to re-enter the tubing without getting caught on the side of the shoe.
Perforating and stimulating
[
edit
]
In cased hole completions (the majority of wells), once the completion string is in place, the final stage is to make a connection between the wellbore and the formation. This is done by running
perforation guns
to blast holes in the
casing
or liner to make a connection. Modern perforations are made using shaped explosive charges, similar to the armor-penetrating charge used on antitank rockets (bazookas).
Sometimes once the
well
is fully completed, further stimulation is necessary to achieve the planned productivity. There are a number of stimulation techniques.
Acidizing
[
edit
]
This involves the injection of chemicals to eat away at any skin damage, "cleaning up" the formation, thereby improving the flow of reservoir fluids. A strong acid (usually
hydrochloric acid
) is used to dissolve rock formations, but this acid does not react with the
Hydrocarbons
. As a result, the Hydrocarbons are more accessible. Acid can also be used to clean the wellbore of some
scales
that form from mineral laden produced water.
Fracturing
[
edit
]
This means creating and extending fractures from the
perforation
tunnels deeper into the formation, increasing the surface area for formation fluids to flow into the
well
, as well as extending past any possible damage near the wellbore. This may be done by injecting fluids at high pressure (
hydraulic fracturing
), injecting fluids laced with round granular material (
proppant
fracturing), or using explosives to generate a high pressure and high speed gas flow (TNT or PETN up to 1,900,000 psi (13,000,000 kPa) ) and (propellant stimulation up to 4,000 psi (28,000 kPa) ).
Acidizing and fracturing (combined method)
[
edit
]
This involves use of explosives and injection of chemicals to increase acid-rock contact.
Nitrogen circulation
[
edit
]
Sometimes, productivity may be hampered due to the residue of completion fluids, heavy
brines
, in the wellbore. This is particularly a problem in
gas
wells
. In these cases,
coiled tubing
may be used to pump
nitrogen
at high pressure into the bottom of the borehole to circulate out the
brine
.
See also
[
edit
]
Oil well
– Well drilled to extract crude oil and/or gas
Well intervention
– Operation on a deteriorating oil well
References
[
edit
]
^
"How Does Well Completion Work?"
.
www.rigzone.com
. Retrieved
2018-07-05
.
^
"tubing_hanger"
.
glossary.slb.com
.
External links
[
edit
]
Intelligent completion technology
Defining Completions: The science of oil and gas well construction
v
t
e
Petroleum industry
Petroleum
Primary energy
Benchmarks
Argus Sour
Bonny Light
Brent
Dubai
Indian Basket
Indonesian
Isthmus-34 Light
Japan Cocktail
OPEC Reference Basket
Tapis
Urals
West Texas Intermediate
Western Canadian Select
Data
Natural gas
Consumption
Production
Reserves
Imports
Exports
Price
Petroleum
Consumption
Production
Reserves
Imports
Exports
Posted oil price
Price
of gasoline and diesel
Exploration
Core sampling
Geophysics
Integrated asset modelling
Petroleum engineering
Reservoir simulation
Reservoir modeling
Petroleum geology
Petrophysics
Reflection seismology
Seismic inversion
Seismic source
Drilling
Blowout
Completion
Squeeze job
Differential sticking
Directional drilling
Geosteering
Drill stem test
Drilling engineering
Drilling fluid
invasion
Lost circulation
Measurement
Shale oil extraction
Ljungström method
Tracers
Underbalanced drilling
Well logging
Production
Petroleum fiscal regime
Concessions
Production sharing agreements
Artificial lift
Gas lift
Pumpjack
Submersible pump (ESP)
Downstream
Enhanced oil recovery (EOR)
Gas reinjection
Steam injection
Midstream
Petroleum product
Pipeline
Refining
Upstream
Water injection
Well intervention
XT
History
1967 Oil Embargo
1973 oil crisis
1979 oil crisis
1980s oil glut
1990 oil price shock
2000s energy crisis
2010s oil glut
2020 Russia–Saudi Arabia oil price war
Nationalization
GECF
OPEC
Seven Sisters
Standard Oil
Canada
France
India
Iraq
Norway
Saudi Arabia
United States
Venezuela
Provinces
and fields
List of natural gas fields
List of oil fields
Caspian Sea
Daqing Oil Field
East Midlands Oil Province
East Texas
Gulf of Mexico
Niger Delta
North Sea
Permian Basin
Persian Gulf
Prudhoe Bay
Russia
Venezuela
Shengli Oil Field
Western Canada Sedimentary Basin
Other topics
Abbreviations
Classification
sweet oil
sour oil
Oil shale gas
Orphan wells
Peak oil
fossil fuel phase-out
timing
Petrocurrency
Petrodollar recycling
Petrofiction
Shale band
Shale gas
Swing producer
Unconventional (oil and gas) reservoir
light crude
heavy crude
oil sands
oil shale
tight oil
Companies and
organisations
Major
petroleum
companies
Supermajors
BP
Chevron
Eni
ExxonMobil
Shell
TotalEnergies
National oil
companies
Abu Dhabi National Oil Company
ANCAP
Bharat Petroleum
China National Offshore Oil Corporation
China National Petroleum Corporation
Ecopetrol
Equinor
Gazprom
Hindustan Petroleum
Indian Oil Corporation
Iraq National Oil Company
KazMunayGas
Kuwait Petroleum Corporation
Lotos
Naftogaz
National Iranian Oil Company
National Iranian South Oil Company
NNPC Limited
Oil & Gas Development Company
Oil and Natural Gas Corporation
Orlen
PDVSA
Pemex
Pertamina
Petrobangla
Petrobras
PetroChina
Petronas
Petrovietnam
PTT Public Company Limited
QatarEnergy
Rosneft
Saudi Aramco
Sinopec
SOCAR
Sonangol
Sonatrach
TPAO
YPF
Energy trading
Enron
Glencore
Gunvor
Mercuria
Naftiran Intertrade
Trafigura
Vitol
Others
APA Corporation
Cenovus Energy
Cepsa
ConocoPhillips
Devon Energy
Eneos Holdings
Galp Energia
Hess Corporation
Husky Energy
Imperial Oil
Lukoil
Marathon Oil
Marathon Petroleum
Occidental Petroleum
OMV
Phillips 66
Port Harcourt Refining Company
Reliance Industries
Repsol
Suncor Energy
Sunoco
Surgutneftegas
TechnipFMC
TNK-BP
Tullow Oil
Tüpraş
Valero Energy
Major
services
companies
Amec Foster Wheeler
Baker Hughes
Cameron International
CGG
CH2M
Chicago Bridge & Iron Company
China Oilfield Services
Enbridge
GE Power
Halliburton
Nabors Industries
Naftiran Intertrade
NOV Inc.
Petrofac
Saipem
Schlumberger
Snam
Subsea 7
TC Energy
Transocean
Valaris Limited
Weatherford International
John Wood Group
Others
American Petroleum Institute
Canadian petroleum companies
Intercontinental Exchange Futures
International Association of Oil & Gas Producers
International Energy Agency
Society of Petroleum Engineers
World Petroleum Council
Category
Retrieved from "
https://en.wikipedia.org/w/index.php?title=Completion_(oil_and_gas_wells)&oldid=1315646449
"