Hello all! As a final confirmation and reminder for Friday/Saturday's course, here are the details: When: Friday, August 24th and Saturday, August 25th Time: 8:30am start (both days), ending around 4:30 at the latest Where: 2WTC Oregon Room Directions: Take the skybridge toward building 2 and go down one level. Go through the two sets of double doors and turn left. The Oregon room is the 2nd conference room on the right (in the corner, just past Mezzanine 5). What to bring: Paper and a pen/pencil There will be breaks in the morning and afternoon, and breakfast and lunch will be served. If you have any questions, please let me know! Thanks,
CONFIRMATION: Electric System Operation for the Non-Engineer
To all who use Curve Manager, As you know, we have been experiencing technical difficulties with Curve Manager on Terminal Server. As of right now, please use Curve Manager locally. This application runs just as fast as on terminal server as it does locally. Also, it seems to be more stable running locally. However, if you DO experience difficulty running this application locally, please let me know ASAP. thanks,
Curve Manager
I regret to announce that Greg Wolfe has tendered his resignation. His last day with Enron was yesterday. Greg has made tremendous contributions to Enron over the last eight years and this office in the last four years. I am sorry to see him go. Greg has not yet indicated what he will be doing next, although he has told me that he intends to stay in Portland. Please join me in wishing Greg well in his future endeavors. Tim Belden
Greg Wolfe Departure
Steve & Christian, After talking with the Southwest desk here is what is happening with Azusa. Deal #831407.1 Paloverde Heavy Load 10mw Purchase from Azusa at $32.50 1/1/02 thru 3/31/02 Deal #537901.1 Paloverde Heavy Load 10mw Sale to Azusa at $139.00 1/1/02 thru 12/31/02 These two deals are the only ones active for January and are being performed on. They are booked out financially. All other deals I found are for Q3 '02 and beyond. I hope this clarifies some things. PP
City of Azusa
Great news! As of yesterday afternoon, we have a juice machine installed in the break room. There are 2 juice flavors available: orange and cranberry. Real juice--hooray!
FYI: We now have a juice machine
Dear Traders, I spoke with Don at Public Service Company of New Mexico again today regarding the Schedule 9 Loss Compensation Service charges. He re-confirmed that the market price that is part of the Schedule 9 equation (Loss Compensation Service = # MW wheeled x market price x 3%) is a market price that he obtains from his marketers. I re-confirmed that his 'marketers' are his traders, though I do not know whether these are Long Term, Cash, or Real-Time Traders. He is going to talk to his traders to find out where this price came from. I brought up the point that there has been a price cap of $91.87 in the west and asked that he bring that point forward in his discussions. He should respond to me on Monday 8-20-01, on which day the bill is due. I will keep you posted on my findings. Virginia
PNM Loss Charges, Schedule 9
There is a computer virus currently infecting the Houston office that is very serious. If for any reason, your system shuts off and reboots itself, don't do anything to the computer and come and get one of us in IT. Thank you for your cooperation
Computer Virus
All, The viewing of the All Employee Meeting today was not a complete success despite our successful testing yesterday. There were several IT teams (your local IT Support as well as Houston based Web and Network teams) that worked together to troubleshoot the audio and video feeds while watching the performance of your sites communication links with Houston to ensure your trading business was not compromised. I would like to provide you some history as well as go forward actions to provide better audio/video streaming services. You may have noticed that the medium for viewing the meeting has changed from the previous IPTV application to a web based application. This new medium has been in the development stages with the production target of October 2001 which was set by business. Last Friday business approached IT infrastructure and advised that there would be an All Employee Meeting on Aug, 16 (today). This didn't provide much time for preparation and testing. During the troubleshooting for each of your sites, the Network team (Scott Shishido and George Nguyen) were able to determine some but not all causes to the poor performance. I will be meeting with the Web (Edward Ray) and Network (Steve Hardy and Scott Shishido) teams to determine what the action plan is for resolving the performance issues. My understanding is that the meeting will be available for viewing if you wish to do so. I will be communicating to you when your site will be able to view this replay of the All Employee Meeting. Please contact me if you have any questions or concerns. Regards,
Viewing of All Employee Meeting
PGE is currently working on a problem with the inability to call international numbers. If you need to make an international call you can use 10 10 555 then the number. For example: 10 10 555 011 44 207 375 8762 If you have any questions give Chip a call at x8916.
International calling work around
[ANCFFWANC/997881789] ZCZC ANCFFWANC WRAK01 PANC 151326 CCA FFWANC B U L L E T I N - IMMEDIATE BROADCAST REQUESTED. FLASH FLOOD WARNING FOR VALDEZ GLACIER STREAM NATIONAL WEATHER SERVICE, ANCHORAGE AK 4 AM ADT WED AUG 15 1901 THE NATIONAL WEATHER SERVICE IN ANCHORAGE HAS ISSUED A FLASH FLOOD WARNING EFFECTIVE UNTIL NOON WEDNESDAY FOR PEOPLE IN THE FOLLOWING LOCATION... ...RESIDENTS ALONG THE VALDEZ GLACIER STREAM... VERY WARM CONDITIONS AND HIGH FREEZING LEVELS MAY HAVE RESULTED IN A GLACIER DAMMED LAKE ON THE VALDEZ GLACIER RELEASING. REPORTS THIS MORNING INDICATE WATER LEVELS RISING IN EXCESS OF TWO FEET ALONG THE GLACIER STREAM BETWEEN MIDNIGHT AND 4 AM. REMEMBER...SAFETY FIRST... PERSONS IN THE FLOOD WARNING AREAS SHOULD BE ALERT FOR RISING FLOOD WATERS AND BE PREPARED TO TAKE ACTION IF LIFE OR PROPERTY IS THREATENED. THE NEXT STATEMENT WILL BE ISSUED AT 10 AM ADT WEDNESDAY OR OR SOONER. NNNN [ANCFFWANC/997881789] EDIS-08-15-01 0623 PDT
[EDIS] ZCZC ANCFFWANC [Urgent: Statewide]
[ANCFFWANC/997881138] ZCZC ANCFFWANC WRAK01 PANC 151315 FFWANC B U L L E T I N - IMMEDIATE BROADCAST REQUESTED. FLASH FLOOD WARNING FOR VALDEZ GLACIER STREAM NATIONAL WEATHER SERVICE, ANCHORAGE AK 4 AM ADT WED AUG 15 1901 THE NATIONAL WEATHER SERVICE IN ANCHORAGE HAS ISSUED A FLASH FLOOD WARNING EFFECTIVE UNTIL NOON WEDNESDAY FOR PEOPLE IN THE FOLLOWING LOCATION... ...RESIDENTS ALONG THE VALDEZ GLACIER STREAM... VERY WARM CONDITIONS AND HIGH FREEZING LEVELS MAY HAVE RESULTED IN A GLACIER DAMNED LAKE ON THE VALDEZ GLACIER RELEASING. REPORTS THIS MORNING INDICATE WATER LEVELS RISING IN EXCESS OF TWO FEET ALONG THE GLACIER STREAM BETWEEN MIDNIGHT AND 4 AM. REMEMBER...SAFETY FIRST... PERSONS IN THE FLOOD WARNING AREAS SHOULD BE ALERT FOR RISING FLOOD WATERS AND BE PREPARED TO TAKE ACTION IF LIFE OR PROPERTY IS THREATENED. THE NEXT STATEMENT WILL BE ISSUED AT 10 AM ADT WEDNESDAY OR OR SOONER. NNNN [ANCFFWANC/997881138] EDIS-08-15-01 0612 PDT
[EDIS] ZCZC ANCFFWANC [Urgent: Statewide]
It is with regret that I have to announce that Jeff Skilling is leaving Enron. Today, the Board of Directors accepted his resignation as President and CEO of Enron. Jeff is resigning for personal reasons and his decision is voluntary. I regret his decision, but I accept and understand it. I have worked closely with Jeff for more than 15 years, including 11 here at Enron, and have had few, if any, professional relationships that I value more. I am pleased to say that he has agreed to enter into a consulting arrangement with the company to advise me and the Board of Directors. Now it's time to look forward. With Jeff leaving, the Board has asked me to resume the responsibilities of President and CEO in addition to my role as Chairman of the Board. I have agreed. I want to assure you that I have never felt better about the prospects for the company. All of you know that our stock price has suffered substantially over the last few months. One of my top priorities will be to restore a significant amount of the stock value we have lost as soon as possible. Our performance has never been stronger; our business model has never been more robust; our growth has never been more certain; and most importantly, we have never had a better nor deeper pool of talent throughout the company. We have the finest organization in American business today. Together, we will make Enron the world's leading company. On Thursday at 10:00 a.m. Houston time, we will hold an all employee meeting at the Hyatt. We will broadcast the meeting to our employees around the world where technically available, and I look forward to seeing many of you there.
Organizational Announcement
I would like to talk to you about the Rockies, and just how you see it progressing. I need to do some workload mitigation stuff, and wanted to pick your brain this afternoon if I can. I am starting Susie taking care of Midway as of tomorrow, and am thinking about moving the Mead responsiblities to the COB scheduler because COB is so small.
This is not about the new sheet
Holden,=20 =20 My name is Stuart Wright and I am the Director of Marketing and Sales for F= riedWire Inc. I check our use log everyday and throughout the day and not= ice that you are always among the most intensive users of our Traffic Repor= t System. I am very thankful for this and was wondering if you could tell = me what you do at Enron and (since you are such a great user) if you have i= deas for enhancing the Traffic Report? We would value your feedback highly= . =20 =20 We are building two new tools that you should be aware of. One is a greatl= y expanded version of the Traffic Report that will contain the real-time pr= icing and news from a major provider of this information. We will be annou= ncing more on this shortly and plan to deliver the new version in September= . Additionally, FriedWire is building a PJM information module similar to = the California tab now contained in the Traffic Report, which presents regi= on-specific information; in the case of PJM, mostly the LMP and FTR informa= tion. Following PJM, we will be developing similar detailed regional module= s for NY/NE and ERCOT (in order). A very rough draft of the information co= ntent in the PJM Module is outlined here in the attached PowerPoint file. = Some of the features you see may not be available in the very first release= , but we'd love to hear your opinion on what features would be most useful.= We debated internally over whether or not our first independently releas= ed PowerSurge product should cover PJM or some other region. We chose PJM = despite the fact that the PJM ISO already does a decent job of presenting/s= haring market information and because PJM is such a liquid trading region a= mong many of our existing clients. Our goal, however is to build a product= that is so much more powerful than the PJM information interfaces (such as= eData) that in selling the product we never get asked the question "why sh= ould I buy this when I can get eData for free?" That means a fair bit of w= ork, but it's also the kind of work that we're good at: charting, geographi= c displays, interface design, e-mail and wireless paging notification, and = integrating various data sources. Some of the areas we think will be valua= ble and set us apart from eData are =20 } Combining real-time and day-ahead LMP data with the public FTR d= ata to provide a real-time estimate of FTR value } Easy interface for querying FTR data for the sake of competitive= intelligence in the primary and secondary FTR markets } LMP charts and maps } Eastern Interconnect frequency monitoring } Histogram displays of historical and real-time load and LMP data } Mapping of planned and unplanned transmission constraints =20 FriedWire would be especially interested in knowing Enron's interest in the= FTR features. In fact, if you have a PJM expert that would be willing to = talk to our lead product developer, we would be grateful. We know that PJM= does very little with their display of the FTR information and we know tha= t there is a lot of competitive intelligence to be gained from it, but we'r= e not sure how many traders are interested in FTRs. Our understanding is t= hat there's not a lot of liquidity in the FTR markets and therefore, there = may not be lots of money to be made/saved there. We also are going back an= d forth about how to market and sell the PJM data. Whether we integrate it= straight into the Traffic Report or make it the first of a series of regio= nal intelligence modules in a larger product called "PowerSurge" is current= ly unknown. Also, the pricing for the product is not yet determined. =20 Take Care,=20 =20 Stuart Wright
Checking in...
We have another new addition to the Portland West Desk: Mike Mier has recently joined the Real Time Trading Group. Prior to working at Enron, Mike worked as a Financial Consultant at Merrill Lynch Private Client Group. He is a '99 graduate of the University of Oregon, where he majored in Economics and minored in Business Administration. Please join us in welcoming Mike to our Portland office!! !
Welcome New Hire: Mike Mier
Good morning Just wanted to give you a heads up that WTC voicemail was down for a short time this morning. The link between WTC and the Qwest CO was down. The link was reset and it seems to be back-up and working. What happens when the link goes down: 1) The message waiting light won't go off after you retrieve your messages. If this occurs just have the person lift the handset, hear dial tone and dial, 113. This will clear the message waiting light. 2) The message waiting light is not on and you could have a message. Have employees check their mailbox just in case they are expecting critical messages. The next voicemail will activate the message waiting light. Please let me know if you have questions or concerns.
More WTC Voicemail Issues This Morning
This is just to let everyone who is using the New Curve Manager in Enpower: The Curve Manager is having a problem in Terminal Server 2. (NAHOU-TRDTS2) The problem is currently being diagnosed by both the Enpower Team and Terminal Server Team in Houston. As Soon as it is fixed, I will let everyone know. For now you can use any other terminal server session (i.e. TRDTS1, or TRDTS03 - TRDTS5) for running the Curve Manager. Michael Tully Application Support, Portland (503)464-7790 Desk (503)807-7862 michael.tully@enron.com
Curve Manager
I regret to inform you that Glenn Surowiec has decided to leave Enron to pursue other career opportunities. Glenn has been a welcome addition to the West Power Structuring Desk and his presence and contribution will be missed. Please join me in wishing Glenn the best of luck in his future career.
Glenn Surowiec
Good Morning, If you are changing any deals that are currently flowing, please notify prescheduling of the change and deal number. Small changes can cost us hours of work trying to find a change in balance. The Preschedulers have a distribution list DL-Portland Prescheduling. If you have any questions, please see me. Cara
Deal Change Request
PARTY @ STACY'S SATURDAY AUG 18TH!!!!!! FESTIVITIES BEGIN AROUND 7:00 P.M. 13848 S.W. 159TH TER. IN TIGARD THERE WILL BE FOOD, AND BEVERAGES FOR EVERYONE (INCLUDING A KEG) DON'T BE SHY! DIRECTIONS Off of Hwy. 217 take the Scholls Ferry Exit, go West Head down Scholls Ferry about 1-1/2 miles, go Left on Borrows (if you have reached the Murray Hill shopping center, you have gone too far) Follow Borrows Rd. about 1 mile, go Left on 160th After the 3rd stop sign turn left on Tuscany Go Right on 159th Ter., Green House on Left If there is anyone I am forgetting please feel free to pass the word...
House warming bash @ Stacy's
Dear Enron Employees: I'm sorry to report that a third Enron employee has died in the hospital as a result of injuries from yesterday's explosion and fire at Teesside Power Station. To lose another employee is a devastating blow to all of us. A fourth employee remains in the hospital and is in stable condition. Please keep these employees and their families in your thoughts and prayers. We will release their names as soon as all family members and relatives have been notified. I'm in the U.K. now and will be visiting with the employees and families who've been affected by this tragic accident. I will also visit the site and will meet with authorities in order to determine the cause of the explosion. I will keep you posted on any new developments.
Teesside Update
Please join us in welcoming Julie Kearney to the Human Resources department in Portland effective September 17, 2001. Julie has been working as a Manager in Human Resources for EBS since April of 1999. Prior to joining EBS, Julie was a recruiting manager for Triad Technology Group. In the meantime, if you have any questions or need assistance, please do not hesitate to see Amy or Grace.
Human Resources Organizational Announcement
We just experienced an outage of around 7 servers for 1.5 minutes. Cause: One of our master network switches crashed and rebooted itself making the device attached to them unavailable. The Servers themselves did not crash, just there connection to the network. The Network Team is looking into why this happened. Regards
Server Outage In PDX
All, We have seen some symptoms of problems with the voicemail system. The Problem: The Message Waiting Indicator (MWT) on the Meridian phones is not lighting for several hours after new messages are received. What we are doing about it: I have contacted PGE Telephone Services and they have opened a trouble ticket to have the problem looked into. The workaround: If you are expecting messages or if you have not checked your messages in a while because you have not seen the MWT light, please proactively check your voicemail box by dialing x7600, hit the # key for you mailbox, and enter your password. I will send out an update message when I have more news. Regards
Voicemail Issues
Here are the short positions our desk is taking for Wednesday, Aug. 8 - 1. EPE Lending: We're short under the STWBOM book, 25 mw on peak @ PV. Price is $72. Reduce purchase price to $4 after procuring energy elsewhere and sell back to EPE @ $0. Deals are.... 721708 - STWBOM buys EPE 25 mw @ $72 721729 - STWBOM sells STSW 25 mw @ $72 721734 - STSW buys EPE 25 mw @ $72 2. Day-Ahead Short: We're short a total of 50 mw @ SP15 in the day-ahead market - 25 mw has been sold for $67.72 at SP15 by the STCA desk 25 mw has been sold for $72 at PV by the STSW desk. Make Real Time purchases to fill the short and sell back to the Imbalance @ $0. Deals are.... 721547 - STWBOM buys Cal-Imbalance SP15/On Peak 50 mw @ $0 721584 - STWBOM buys EPMI-CAL-POOL SP15 to PV/On Peak 25 mw @ $0 722024 - STWBOM sells STSW PV/On Peak 25 mw @ $72 Deal # TBA - STWBOM sells STCA SP15/On Peak 25 mw @ $67.72
EPE Lending/Day-Ahead Short Positions for 8/8
Heather, Do you know : If there are 3 strips in a deal that cover different time periods, say April 1 for a strip, April 2 for another strip, and April 3 - 31 for a third strip....if we plug in a price on only one of the strips, are the days from the other strips going to get valued properly? In the instances that we have had, all three strips were filled in and Risk valued the deal properly; it was just CARP and UNIFY that were reading three times the MW Month amount, which I guess in the end is a simple problem. Holden brought up this point and I wonder the same...do you know? Virginia
EnPower Deal Entry question
Sandy Ragnetti is our newest administrative professional in West Power Trading. She is a temp from OfficeTeam and has been doing a phenomenal job for us the last few weeks. Sandy has been working with me, and she will be assisting the administrative team when we have absences. Sandy's last position was as an account manager at a market research firm, and she has a diverse background in advertising and marketing. Please make Sandy feel welcome!
Welcome Sandy Ragnetti to West Power Trading
We are pleased to announce a new addition to the Portland West Desk: Darin Presto has recently joined the Real Time Trading Group. Prior to working at Enron, Darin was a Biology teacher in Richland, Washington. He is a graduate of Concordia University (Portland) & Eastern Washington University, where he received Bachelors degrees in Biology & Exercise Science (respectively). He also received a Master of Arts in Teaching degree at Concordia. Please join us in welcoming Darin to our Portland office!
Welcome new hire: Darin Presto
I will be holding an information session on the midyear PRC process. The purpose of the information session is to provide an overview of the PRC process from selecting reviewers to final PRC meetings in Houston. New employees may find it useful as I will try to explain how the process works and will attempt to provide some useful background. People who have been here for a while may also find it useful. This year I am on the company-wide Performance Review Committee, so I have had the opportunity to provide input into the process and sit in on PRC meetings throughout the company. I will discuss changes to this year's PRC process and share my observations of how the system works throughout the company. Most importantly, I want to answer any questions that people have about the PRC process.
INVITATION: Wednesday, August 8, 2 p.m.-PRC Information Session
Mark, Tom, and Holden, In reference to the DPR impacts of $ 132,000 (WAPA) and $133,000 (SRP) that you were expecting, here is an explanation of why you will not be seeing that in your PMA's: The 2 deals listed below were put in as a MW month, each with 3 strips in the deal separating out April 1, April 2, and the rest of the month. The reason for the 3 strips was to catch the April 1 time change from PST to PDT. deal # 539126: 3 strips @ 2216 = 199,500 charge for the month in CARP (true value is - $66,500). deal # 538832: 3 strips @ 2180 = 196,200 charge for the month in CARP (true value is - $65,400) . Typically, I provide you with a report that tells you what $ amount to look for coming thru in your PMA's, according to the changes that I am making on the back end. You then see the change in DPR come thru on a PMA report that Risk provides for you. When these deals hit Settlements, we recognized that the CARP was calculating both deals at 3 times their monthly value (and since we are purchasing, that is a negative three times against your books). When the above + DPR impacts didn't come thru in your PMA's, we started looking at the deals to figure out why they didn't. Here is a discription of the Risk - Settlements process: Risk values a deal on the day of liquidation. Any intra-month changes, even if they happen after the day of flow, get trued up by Risk and changed in the DPR. Anything that gets changed after the end of the month, Settlements recognizes as a DPR variance and reports this to Risk and you see it affect your DPR as reported in the PMA report. So the question was: When it came to recognizing a variance in Settlements, why weren't we seeing a + amount back to your books for 2 of the strips that I zero'd out? Houston Settlements looked into it and were seeing that these deals were originally valued at ($66,500) and ($65,400), even though CARP was showing that they were calculating at ($199,500) and ($196,200) .... Heather Dunton and I did alot of searching for the answer and we found that: When Risk flashed these deals in April, they flashed them according to a single MW month charge. Regardless of how many strips there are, the deal is set up as a MW month and should, therefore, calculate as one single charge for the month. We found that CARP is reading these incorrectly and causing the confusion, (as I was seeing that the deals were calculating 3 times because that is how CARP and UNIFY were reading the deal). The IT people in Houston are now working on fixing that glitch. When it comes to DPR, your book originally recognized an impact of (66,500) and (65,400), which is correct. Since your April DPR was correct, you will not see an adjustment in your PMA's. I recognize that this is not gratification for the + DPR impact that you were expecting and I apologize for the confusion and mis-information that I gave you in my report. This has, however, helped us to hi-light a technical error that will save us alot of work in the future. Thanks for your patience while we figured this out. Let me know if you have any questions. Thanks,
DPR on your PMA's
An old scam has surfaced recently with renewed vigor. The Nigerian-419 fraud letter, so called because it violates section 419 of Nigerian law, is sent in many variations, by surface and airmail as well as by fax and email. Generally the form it takes is to ask the unsuspecting victim to provide their bank account information in return for a promise to deposit a very large sum of money into that account under some pretext. Employees should be advised that any information given will be used to further promote the scam through the emptying out of bank accounts, counterfeit and forged checks being written against the accounts, and for other illegal purposes. If you receive what you believe to be one of these letters, forward it to Mike Hicks (Michael.Hicks@enron.com). Corporate Security maintains a file on them, and works with the US Secret Service to reduce the number of letters received by our employees. For more information on these letters, please email or call Mike at (713) 853-6198.
Corporate Security Message
Please see the below job description for a position on the Services Desk with primary responsibility for El Pas Electric Day Ahead Schedules. Cara Semperger will be holding an information session on Monday, August 6th at 11:00am in Mt. Hood. If you are interested in this position, please let Amy FitzPatrick know by close of business Wednesday, August 8, 2001. This position will be responsible for the day-to-day management of all preschedules for El Paso Electric. Responsibilities include communicating with EPE's counter parties regarding transactions; monitoring all NERC tags that pertain to EPE's schedules; and completing internal communication and accounting. This position will be working closely with real-time to assure that all of EPE's preschedules are managed effectively and to deal with problems when they occur. Responsibilities may include purchasing transmission, coordinating options, entering daily deals and balancing the deal accounting system. Following up with settlements on behalf of EPE is also part of this position. Additional tasks will include managing other services customers based upon the needs of the Services Desk. This will include tagging, scheduling, deal entry, settlements, and transmission associated with existing and new Services customers. Computer Proficiency: Must be skilled with MS Excel. Must be proficient in OATI tagging, and able to query and understand all tags that impact EPE schedules. Must be proficient in Enpower, able to enter a variety of deals into the dbase and understand a variety of reports that pertain to scheduling for EPE. Proficient with transmission OASIS systems. Communication Skills: Must effectively communicate with the preschedulers in order to keep them informed of any problems or changes. Must have a professional phone manner, able to answer questions and deal with crisis situations. Be able to meet deadlines consistently. Preferred Experience: 1-2 years prescheduling in the WSCC, Southwest experience essential.
Services Desk Position - El Pas Electric Day Ahead Schedules
WHAT GOES AROUND COMES AROUND... ...so if you GO to the Associate/ Analyst sponsored Day of Caring then good fortune (and a free t-shirt) are sure to COME your way! Wednesday, August 8th Morning shift: 8:30 - 11:30 AM Afternoon shift: 1:00 - 4:00 PM Enron Body Shop has offered its showers so you can return to work clean. Volunteer activities include: ***If you are unable to volunteer your time, painting please volunteer your tools. We need: landscaping rakes, clippers, chainsaws, lawnmowers, carpentry ladders, utility knives, wire brushes, shovels, HAVING FUN!!! etc. Please respond to me with the following: shift availability shirt size available tools
United Way Day of Caring
We are happy to announce the arrival of several new Employees to the ENA-Portland office! Serena Bishop began working with the Short Term California Desk late last week. She is a '01 graduate from the University of Portland, with a degree in Business Administration. James Bruce is one of the most recent additions to the Structuring Group. He graduated in June '01 from the University of Oregon, where he received his Bachelors degree in Business Administration--emphasis on Finance.
WELCOME NEW EMPLOYEES!!!
Good Morning, EPE has agreed to pay a scheduling fee for all MWh we schedule for them and prepare on their sheet. Greg Wolfe has included language in the contract that all deals we do directly with them need to be adjusted by .25 in our favor for scheduling fees. Please talk to me if you have any questions about our new EPE scheduling deal, it is going to cause some changes on this side of the row. C
Re-Vamping of EPE pricing to fold in new scheduling charges
The following deals were done on eol, the upper time zone says PPT, but in the strip it says PST. These have all been changed 568049.1 568051.1 568052.1 568053.1 568054.1 568055.1 568056.1 568057.1 Why do these deals show up as physical at all? They are cross-portfolio deals. I know we have had problems with them before,but I do not understand how a trade within the company is showing physical. c
Cross-Portfolio Deals causing problems
ABZCZC-CIV-CEM-0060130000-2102325- There has been a mistaken activation of the Contra Costa CWS. Sirens may have been sounded in North Concord, Clyde & Vine Hill. Please advise the public that there is no known incident or hazard in North Concord, Clyde & Vine Hill. If additional information is needed please page the Hazardous Materials Program at 925-295-8234 ABNNNN EDIS-07-30-01 1619 PDT
[EDIS] COMMUNITY WARNING SYSTEM MESSAGE [Urgent: San Francisco Bay]
EFCU's E-Survey Results are In! Thanks to everyone who completed the Credit Union's recent E-Survey. We received over 3,000 responses, and we appreciate the time each of you took to provide us with your honest opinions. Please help us congratulate our contest winner, Rick Loveless, of Amarillo, TX. Rick is now $200 richer! You will find the results to our E-survey in your e-mail box soon.
EFCU - E-Survey Winner Announcement
To Our Valued Traffic Report Clients, Today, FriedWire's Traffic Report experienced a disruption in service as a result of network and general connectivity problems caused by third parties. We apologize for this inconvenience and are working with all of our partners to insure that this does not happen again. As always, we remain committed to providing you power markets information around-the-clock. Product Update FriedWire has just added significant new content and capability to the Traffic Report, which are outlined below. Please contact us for brief, online tutorials on how to use the new features. NOAA Climate Prediction Center (CPC) Weather Forecasts 3-7 day Maximum Temperatures 6-10 day Outlook and Temperature Probability 8-14 day Prognostic Temperature Anomaly Excessive Heat Outlooks (for the same time periods listed above) Precipitation Outlooks and Anomalies ***You may also be able to set up e-mail notification services to alert you when the new forecasts become available so that you don't have to continually check to see if the new data have been posted. Available Transmission Capacity FriedWire has developed a new interface that will allow you to search for available transmission by path. The new geographic interface will allow you to choose a path and then view the detailed ATC offerings and then navigate to easily see reverse-path information, thru-path offerings, offerings from non-path providers and more. ***E-mail and wireless text-paging notification services are now available along with the new ATC interface. Now, you can be automatically notified when new ATCs are posted by providers or on paths that you track ongoingly. You can custom define your alerts according to the provider, path, service increment, time period, class, etc.that you're interested in, as well as define when you want to be contacted (days of the week, time of day, times per day, etc.). The following additional product upgrades have been deployed: All hourly offerings are now reflected in military time designations. Hourly ATC selection reflected now as a range (i.e. ; 13:00 - 14:00) instead of hour-beginning 1:00 PM. Eight new flowgates have been added for Sierra-Pacific Power and 74 for MidAmerican Energy. They all have Intertie Profiles and can be located by selecting "View All Interties". All will be located and plotted on the power flow maps in the next couple of weeks. You can now add one (or multiple) e-mail and text-page addresses easily in order to get Alerts from the Traffic Report. Simply click on the link that says "My Account" at the top right-hand corner of any Traffic Report screen and look for the link just to the right of the E-mail * input field that says Enter additional e-mails. Go to the Add an E-mail Contact link at the bottom of the next screen. We hope you enjoy and find useful the new version of the Traffic Report. Please stay tuned for more exciting additions in the near future. Sincerely,
Traffic Report outage and new product enhancements
Holden, Can you confirm this deal with PNM -Deal is through Prebon Energy, Jim Thomas was the trader. 622275.1. Month long deal starting in June 1, deal was done on May 24 Tom Alonso
Deal confirmation
We regret to announce that Amy Fitzpatrick will be leaving Enron's Portland office in September. Amy's husband, Simon, has accepted a job in New Jersey, and it didn't make sense for them to "commute" coast to coast. Amy will continue to work here for the next month or two to hire her replacement and to make sure that her responsibilities have been completely handed over. We really appreciate having such long lead time to effectuate this transition. Amy has made tremendous contributions to our office over the last 14 months. We really appreciate her efforts. We realize that Amy has become integral to the efficient operation of the Portland office and want to make her transition as smooth as possible. If you have any concerns or wish to get any issues on to the "transition list" please let your manager and/or Amy know. Tim Belden and Chris Calger
Amy Fitzpatrick Departure
Please consider hosting the Enron Suite while we help the community!! We have donated our Suite to Metropolitan Family Services on Monday, and need an Enron representative! I have 2 tickets and one parking pass available for the Beavers Game at PGE Park on Monday. Please see me if you are interested. Thank you!
Beavers Tickets for MONDAY, 30 July
The approval process initiated in 1998 for all meeting and event expenditures in excess of $5,000 has enabled Enron Americas to better assess the business value of events, accurately track our activities and save money. These events include customer and employee meetings, and trade shows. EA has made some modifications to the process, which are described in this memo. The $5,000 threshold remains in effect for all customer events. However, the threshold for approval for employee meetings and events has been lowered to $500, and some additional requirements must be met prior to approval. Please be sure to follow the procedures described below for all meetings and events, so we can continue to successfully manage these events. 1) Prior to making any commitments to customers or vendors, all customer events with anticipated costs in excess of $5,000, and all employee events with anticipated costs in excess of $500 must be reviewed by the Enron Americas Public Relations department and approved by the Enron Americas Office of the Chairman 2) The PR department will handle the site search and hotel contract negotiations for all such events. Once this is completed, the PR department will work with you to plan and produce your event in its entirety; or they can provide as much or as little assistance as you require. The PR department will be responsible for helping you achieve the best value for your program and EA. 3) A completed expenditure request form (see attached) and supporting documentation is required for each event. Employee meetings require a detailed agenda as part of the event documentation prior to approval. Please submit the completed expenditure request form and documentation to the PR department at EB 3642, or work with PR department employees to complete the form. 4) After PR review, the expenditure will be submitted to the EA Office of the Chairman for final approval. Additionally, the PR department can assist in the procurement of tickets for various local sporting events and concerts. If you have any questions regarding this process, would like assistance planning an event, or need tickets for a Houston event, please contact Dorie Hitchcock in the PR department at (713) 853-6978. Thank you for your cooperation.
Meeting and Event Expenditure
Houston has requested we sit down with them on the phone and go over all the in-the-money contracts we have. By their count we have about 50. They want to account for each and understand why we may not be delivering on them. Ed Baughman will be sending his master list in advance of a 11:30 call in Mt. Bachelor. Please send at least one representative from each of the regional desks to discuss the list. Thanks,
Conference Call with Houston
Are you creative? Do you have a great imagination? Can you create something out of nothing? Are you fast on your feet? If you answered yes to any or all of these questions, then I have a challenge for you! We are looking to create a team of 7-10 people to build a model of Enron's attributes: Smart, Innovative, Bold, Ambitious, and United. You will be provided with the building materials and you will have a total of 45 minutes to work along with your teammates to get your model completed. Oh, did I mention that your materials will consist only of Legos? That's right - LEGOS. Here is the layout - Friday, August 10th 11:00 a.m. Teams assemble to begin construction. 11:45 a.m. Construction is complete. 12:00 p.m. Ken Lay will host - The Applause Meter. The winning team will then be recognized by Mr. Lay and he will follow up with an e-mail to all Houston employees. Here are the guidelines - 1. Teams must consist of 7-10 members from your Business Unit. I need to have at least 3 executives (Directors, Vice Presidents, or Managing Directors) to this team. 2. The model must be free-standing. 3. Your choice of other materials may be used! Be sure to encourage your co-workers to come and cheer you on! Please give me a call or e-mail me if you are interested in participating. After the competition, the Legos will be donated to local non-profit child care centers. Thank you,
Are you up for the Challenge?
The technical difficulties with the SAP Security email box have been resolved. You may once again follow the normal submission process as noted in the instructions for the SAP Security Request Form and the IBuyit eProcurement Request Form. If you submitted a request for security during the week of July 16-20 and have NOT received a notification of it's receipt, please resubmit the form. We can not be certain that all mail directed to the box during this period was actually received. We apologize for any inconvenience that this may have caused you.
SAP Security Mailbox functional again
U.S. GEOLOGICAL SURVEY NATIONAL EARTHQUAKE INFORMATION CENTER World Data Center for Seismology, Denver Reply to: sedas@neis.cr.usgs.gov or neic@usgs.gov The following is a release by the United States Geological Survey, National Earthquake Information Center: A light earthquake occurred about 10 miles east-northeast of Olympia, Washington at 9:13 AM MDT today, Jul 22, 2001 (8:13 AM PDT in Washington). A PRELIMINARY MAGNITUDE OF 4.3 WAS COMPUTED FOR THIS EARTHQUAKE. The magnitude and location may be revised when additional data and further analysis results are available. The earthquake was felt in the Seattle-Tacoma-Olympia area. There have been no reports of damage. The location and magnitude for this earthquake were furnished by the Geophysics Program, University of Washington, Seattle. EDIS-07-22-01 0918 PDT
[EDIS] EQ MAG 4 3 WASHINGTON [News: Statewide]
Hey guys, Just FYI- I entered transmission deal # 696342.1 for $192.19 to account for line losses on PAC transmission for the month of April. Please see me if you have any questions. Virginia
April trany loss annuity
A position has recently become available in the Real Time Trading group reporting to Bill Williams. Bill will be holding an information session on Wednesday, July 25, 2001 at 4:00 pm in Mt Hood for anyone who is interested in learning more about this opportunity. If you would like to be considered for this role, please let Amy FitzPatrick know by close of business on Friday, July 27, 2001. West Hourly Enron Online Trader The Short Term West Hourly group is responsible for the physical and financial integrity of prescheduled energy transactions. This includes managing curtailed schedules and preserving Enron's financial rights with trading counterparties. The group is required to maintain records and update databases that explain supply or market interruptions in order to minimize customer disputes The Hourly group interacts with the Services and Middle Marketing groups to administer terms of Service Desk contracts, which may include the selling of excess generation and/or the purchasing of energy to meet customers' requirements. Also, each trader is responsible for gathering and reporting information on unit outages, transmission line derations and other information pertaining to all West Desk Trading activity. The West Hourly EOL Trader will be responsible for helping to lead the transition of hourly trading of energy in the California ISO and bilateral markets to Enron Online. The trader is expected to initiate profitable trades while managing the company's risk exposure. The trader is expected to understand all settlements procedures and be familiar with charges related to each type of trade. The trader will proactively work to bring new hourly customers to Enron Online and will respond to internal and external billing inquiries. This position is anticipated to last 3-6 months, with the trader moving to a shift rotation at that time. Description of Function ? Trade hourly physical and/or financial products on Enron Online ? Work closely with Services Trader to integrate service and middle marketing customer positions ? Physically schedule trades including tagging where appropriate ? Enter trades and reconcile company accounting system where appropriate ? Assist in the resolution of volume/price discrepancies ? Work closely with Information Technology and Fundamentals groups to maintain and develop Real-Time tools and systems Requirements ? Bachelors in Finance, Business, Accounting or related field ? 1 to 2 years of previous power trading or industry experience in WSCC is preferred ? Excellent problem solving and communication skills ? Working knowledge of Excel, Access, Visual Basic and SQL ? Self motivated Detail oriented
Available Opportunity - July 20, 2001 (West Hourly Enron Online)
We are 25 mws long HE 7-22 at palo verde in the real-time position manager. I printed a forward obligation report for the 20th and that report does not reflect this length. After checking every deal at PV for the 20th against the forward obligation report it appears that our deals have been entered correctly. I discussed this with Holden and he agrees there is no reason we should be long at PV for that day. Therefore, the correct position at PV for the 20th is flat. The length is false. If you are aware of any deals that may have caused the real-time position manager to reflect this length, please let me know. Thanks,
Length at PV heavy for the 20th
Per several conversations with Mirant (our upstream) and Pinwest (our downstream) the following situation occurred on July 19th between 2:30 p.m. and 4:00 p.m. Deal #694398 $41.00 our purchase from Mirant Deal #693496 $40.75 our sale to Pinwest Mirant(G)sp15-Ciso(t)sp15/pv5#scem_sp15_pv-Mirant-Epmi-Pinwest-aps(t)pv/ww#gf-Pinwest Mirant was cut by the CISO per Dan at the Mirant Real-time group. He was unable to re-supply an upstream. Pinwest would not allow the schedule to flow on a real-time basis per Carla on the scheduling desk. Enron agreed to bookout out with Pinwest and bill LD's to Mirant. I spoke with Glen Ryan at Pinwest at about 3:30 to agree on a price at which Enron would buy back the power in order to bookout. He said it would have to be the purchase price which was $345.00. In a later conversation about 3:45, I told Pinwest that we would not agree to the purchase price of $345.00 and that the current market price was around $45.00 - $50.00 per mw hour. They would not agree to the current market price and will bill us L.D. 's.
Liquidated Damages that need to be passed on to Mirant
7/20, HLH, 19MW: BPA C#23634-EPMI-MORGAN-PINW-CPS-PPLM-SNOH(T)BPAP/HTSP #96092NF-PPLM PPLM failed to buy the transmission for Friday. This path will go real-time. Our real-time just needs to monitor and make sure PPLM gets the tranny purchased and calls it in to BPA in a timely manner. The Saturday path is fine. Thanks.
Preschedule path going Real-Time for Friday, 07/20/01.
U.S. GEOLOGICAL SURVEY NATIONAL EARTHQUAKE INFORMATION CENTER World Data Center for Seismology, Denver Reply to: sedas@neis.cr.usgs.gov or neic@usgs.gov The following is from the United States Geological Survey, National Earthquake Information Center: Preliminary hypocenter for earthquake of 2001 Jul 19, UTAH, about 25 miles (40 km) NNE of Loa, Utah: latitude 38.7 degrees north, longitude 111.5 degrees west, origin time 20 15 34.0 utc, depth 3 km, magnitude 4.3. The magnitude and location may be revised when additional data and further analysis results are available. There have been no reports of damage. The location and magnitude for this earthquake were furnished by the University of Utah, Salt Lake City. Stations used: MSU eP 201544.3 MVU eP 201545.2 SRU eP 201550.5 PV10 P 201552.5 MPU eP 201557.9 DUG eP 201605.0 DAU eP 201605.2 ARUT eP 201606.5 NOQ eP 201608.3 CTU P 201609.0 PV01 P 201616.1 ELK P 201629.7 TPNV P 201639.8 BW06 P 201641.5 BMN P 201648.6 ISCO P 201648.9 HAYW P 201650.8 HLID eP 201654.8 ANMO eP 201658.3 LAZ P 201659.8 LENM P 201703.8 LPM P 201705.7 BNM P 201706.9 MCMT P 201709.3 JLDW P 201709.4 TUC qPn 201710.6 WVOR ePn 201713.7 BOZ eP 201718.7 CHMT P 201738.9 WALA eP 201808.8 WMOK eP 201814.0 MIAR eP 201908.8 ULM P 201920.8 SIUC P 201943.4 PWLA P 202001.5 LRAL P 202016.8 GOGA P 202043.8 EDIS-07-19-01 1443 PDT
[EDIS] EQ MAG 4 3 UTAH [News: Statewide]
Holden & Lisa - Per Holden, I've changed deal 630176 from a price of $170 to $197. Terms and reasons are as follows: 6/4/01 STSW buys EPE 49 mw/HLH The other side of this deal is a sale to El Paso for $204. Kathy questioned the invoice she received from Houston this month, because the breakdown of transmission costs and fees we had given her (regarding buy-resales done by your desk on 6/1, 6/2, and 6/4) amounted to a spread of $14.06. The deals we entered into our system, and subsequently billed El Paso for, amounted to spreads of $14.06 for 6/1, $11.06 for 6/2, and $34 for 6/4. To remedy this, and extend a gesture of apology for the mistake, we've changed our buy from El Paso on the 4th to a price of $197, leaving a spread of $7 to cover our transmission costs. I've explained this to Kathy at El Paso and Amy in Settlements, and wanted to give both of you a record of the change as well. Please let me know if you have any questions. Thanks,
June EPE Buy-Resales
Do you like golf? Do you like kids? How would you like to put the two together, AND earn a free day-pass to the 2001 Fred Meyer Challenge at The Reserve Vineyards & Golf Club?
Fred Meyer Challenge, August 5-7 at The Reserve
We are pleased to announce the addition of David Guillaume to ENA-Portland. David comes to us from EBS-Portland Enterprise Origination. He began at Enron in mid-'00 as an Associate with ENA's North East Power Origination group in Houston. He will be transitioning into his new position with West Origination. Please join us in welcoming David to ENA!
Welcome new hire: David Guillaume
Real time desk is short 5 mw HE 1-24 on Saturday 7/14 thru Monday 7/16 at Hot Springs to Cenex (a middle marketing customer in MPC control area.) This power can be filled with the Frontier Energy if you chose and give them prevailing Mid C price . If you fill it with the Frontier just use the account number for MPCO that is in the Frontier sheet when you call BPA. If not pruchase this power at Hot Springs as I have told Cenex we will be delivering it there. In any event Real Time MUST CALL MPCO AND INFORM THEM AS SOON AS YOU KNOW WHERE YOU ARE FILLING THIS FROM. I have already discussed this with Mike at MPC and they are aware that we are purchasing on behalf of Cenex but you still must call. We are short at the follwing prices: 7/14 Short 5MW at $55 HE 1-24 7/15 Short 5MW at $50 HE 1-24 7/16 Short 5MW at $60 HE 1-24 If you have any questions please feel free to call me on my cell.
Short at Hot Springs 7/14 thru 7/16
1. When you buy from the imbalance(Services 2mw for HE 17-22) please make sure that you buy from the correct zone(i.e. if finals have sp load dec'd then the buy from the imbalance in enpower needs to be in sp). Day shift, assumed the ISO would make a buy from NP and for 3 hours they dec'd SP load. Even better if you know that you are going to buy from the imbalance then submit a schedule that is BALANCED, in this case they should have created a new load zone in SP under the Services book and inserted a -2 for HE 17-22. As always we don't want to buy from the imbalance but if all other options have been exhausted then at least submit your preferred zone to purchase from rather than leaving the ISO to roll the dice and force balance you how ever they want.
Deals for 7/12/01
All, Tonight we are having the large 'TV' removed from the SE Corner of the floor and the one in the SW corner moved out of the walkway space. The removal of the large screen is due to how low it hangs and the hazard it presents to people walking in the area. Since we do not use that screen, and we do not have a good place to put it, we will store it until a suitable use is identified. The smaller screen will be move North and East about 3 feet to get it out of the walkway. Regards,
*Information Only* Work on the floor tonight
Dear ST_SW Traders, FYI - I have entered APS deal # 683887.1 and .2 to true up APS tranny for June 2001 and to account for scheduling fees on that transmission. Please see the comments on the deal ticket for an explanation. The total for the deal is ($2,332.94). Thanks,
APS ancillary June 2001
Chris and Sue Calger are the prooud parents of a baby boy! Christopher was born July 11 and weighed in at 4 lb. 9 oz. Both Mom and Baby are doing fine.
Baby Announcement
All We had 2 service outages today, the External Internet and Email both became unavailable at about 11:00 am today, service was restored in after about 15-20 minutes. The fact that both services went down at the same time is only coincidence. Below are the basic causes for the outages: The Internet outage was caused by an error in one of our Network Routers. The device was rebooted and service was restored. The Email outage was caused by a bug in Exchange that is remedied by rebooting the server. Sorry for the inconvenience these outages may have caused. Dave Steiner
**Information Only** Internet and Email Outage
We'll be paying APS for line losses 7/11 at HE 7. I've entered two deals to cover this - a buy from El Paso (Deal #679653) and a sale to Arizona (Deal #679693). PLEASE ENTER A PRICE INTO THE BUY FROM EL PASO - 679653 - AND NOTE THAT PRICE IN THE EL PASO MODEL. LAST TIME WE PAID BACK LINE LOSSES THIS DID NOT HAPPEN. Let me know if you have questions. Thanks,
Line Loss Payback Deals - PLEASE READ
In addition to the people you're already sending the EES sheet to, please copy Bill and myself when you send this out each day. Let me know if you have any questions. Thanks,
EES Sheet - PLEASE READ
In an effort to continually improve the overall quality of the Analyst/Associate Programs, the Program Management would appreciate your feedback on the current state of the programs. In order to insure confidentiality, Executive Leadership Associates has been engaged to receive your feedback and summarize it for the Program Management. Please reply to this email with your answers to the questions below no later than Friday, July 20, 2001 to insure your views are included in the summary of survey data.
Analyst/Associate Program: 2 Minutes of Your Time
I invite you to provide feedback on the Analyst & Associate Program, using a very short, anonymous and confidential survey. In the very near future, you will receive an email from ramabile@execlead.com asking for feedback on your overall satisfaction with the Program, and your suggestion of one thing we should focus on for improvement. To insure confidentiality of your responses, Executive Leadership has been engaged to conduct and compile the results of the survey. The survey is designed to be completed in about two minutes, and your participation is important. We plan to do short surveys like this a couple of times each year, in addition to the all employee survey. As always, I invite each of you to contact me or anyone on my team if you'd like to discuss ideas or issues in person. Thank you in advance for your participation, Billy Lemmons
Analyst & Associate Program - Short Survey
U.S. GEOLOGICAL SURVEY NATIONAL EARTHQUAKE INFORMATION CENTER World Data Center for Seismology, Denver Reply to: sedas@neis.cr.usgs.gov or neic@usgs.gov The following is a release by the United States Geological Survey, National Earthquake Information Center: A major earthquake occurred NEAR THE COAST OF PERU about 70 miles (110 km) south-southwest of Arequipa at 3:38 AM MDT today, Jul 7, 2001 (4:38 AM local time in Peru). A PRELIMINARY MAGNITUDE OF 7.2 WAS COMPUTED FOR THIS EARTHQUAKE. The magnitude and location may be revised when additional data and further analysis results are available. This earthquake is an aftershock of the magnitude 8.4 event of June 23. No reports of damage or casualties have been received at this time; however, this earthquake may have caused substantial damage and casualties due to its location and size. EDIS-07-07-01 0451 PDT
[EDIS] EQ MAG 7 2 NEAR COAST OF PERU [News: Statewide]
Hey Guys. The ISO cutting our off-peak imports from PV has been an ongoing problem. Now that we are doing congestion wheels again we can finally do something to avoid these cuts using congestion wheels. Normally the ISO will cut our Import and shift our load from NP15 (PGE1&2&3) across the path to relieve the congestion. If you submit a congestion wheel there cannot be $30 cong, thus they will not cut your schedule going in at PV. Instead of shifting your load the ISO will award your congestion wheel and everybody will be happy. It is important to make your wheel larger then your import to ensure that part of your import not getting cut. I would recommend to put in the max number of MW's you think you can buy in the North and get rid of in the Desert. Go big in the off-peak, we submitted 200MW wheels Saturday and I think its safe to do similar size most nights. Geir
Congestion Wheels.
Hey Guys! I went through all the templates and removed the RT prefix for all the templates. You can now sort them alphabetically making the process of finding the right template a lot easier. From now on please do no use the RT prefix when creating new templates. Geir
TAG TEMPLATES
We regret to announce that Rick Bergsieker has decided to leave Enron to pursue other interests. Rick has led our commercial activities in the Middle East for the past several years. Rick is a highly respected individual within the company as well as within the energy sector, and we will miss his contributions. With Rick's departure, we are realigning the Global LNG group into the following four separate functional areas: Americas Origination, European and Pacific Origination, New Asset Implementation and Trading and Logistics. These functional areas will report to Eric Gonzales who will be assuming lead responsibility for the Global LNG business unit. Within the Americas Origination effort, Doug Arnell will take the group leadership for activities within the Atlantic Basin. The priorities for Doug's group include the continued development of the Bahamas Terminal and the implementation of the Elba terminal agreement. The current teams focused on the VLNG project and North American West Coast project are also part of the Americas effort and will continue reporting directly to Eric. Clay Harris will expand his role to lead the European and Pacific Origination function from the London office. Reporting to Clay will be the existing Pacific Origination team as well as the members of the London based LNG team. The New Asset Implementation group will be led by Greg Curran. Greg's group will be focusing on the successful implementation of construction and initial operations of our LNG assets under development. The Trading and Logistics groups will continue reporting to Jonathan Whitehead. Please join us in wishing Rick well for the future, and congratulating Eric, Doug, Clay, and Greg on their new and expanded roles. Mike McConnell & Jeff Shankman
Organization Announcement
Just a reminder - I still have not received your check for $25.00. Please make your check payable to Enron Corp and leave with either me or Grace. Thanks!
Payment for Enron Chair
Several generators will have energy available for the weekend because day ahead prices did not reach their thresholds so they scheduled less than the amount available. If Real TIme prices do exceed their thresholds, please call them and buy their power and ramp them up. Sunday looks like it will happen for a good piece of the peak hours so focus on Sunday. You will need to inc their gen schedules. Saturday Delano: 15 MW Off Peak Only. Price Threshold $45. Pre-schedule 30 MW, increase to 45 Wheelabrator Martell 6 MW Off Peak Only. Price Threshold $50. Pre-schedule 7MW, increase to 13 Wheelabrator Shasta 2 MW Off Peak Only. Price Threshold $70. Pre-schedule 0 MW, increase to 2 Sunday Delano: 15 MW All Day. Price Threshold $45. Pre-schedule 30 MW, increase to 45 Wheelabrator Martell 6 MW All Day. Price Threshold $50. Pre-schedule 7MW, increase to 13 Wheelabrator Shasta 2 MW All Day. Price Threshold $70 Pre-schedule 0 MW, increase to 2 Monday Delano: 15 MW Off Peak Only. Price Threshold $45. Pre-schedule 30 MW, increase to 45 Wheelabrator Martell 6 MW Off Peak Only. Price Threshold $50. Pre-schedule 7MW, increase to 13 Wheelabrator Shasta 2 MW Off Peak Only. Price Threshold $70 Pre-schedule 0 MW, increase to 2 In addition, it is possible that any of these units, or Harbor could be dispatched by the ISO pursuant to the FERC order. This will probably not occur as the ISO will not need their energy over the weekend, but if it does, we should relay these instructions to the generator, ramp them up and put a deal in the system as we would a supplemental. This should be a pass through for EPMI. Thanks
Real Time Activity Over the Weekend of Jul 7/8
Guys, I need a copy of your PMA's for May, June, and July (or whatever document you have from Risk) that is showing improper debits and credits to your book. I have an appointment with Risk at 2 pm and I will try to get this all sorted out today, but I need to know exactly what you're seeing. Virginia
I need a copy of your PMA's
Our upstream is Dynegy deal # 570332.1 Mid C HLH Our Downstream is WWP deal # 339963.1 The path: West Kootenai (G)-BCH(T)JUANITA/BCUS O#M335781A-WKPL-DYPMI-SNPD(T)BPA(T)BCUS/AVA O#96062 HNF-DYPMI-EPMI-WWP MONTH LONG TAG 26019 HE 0700-0800 we are warned by SNPD that the transmission MAY BE curtailed to Zero. When I spoke with Susan at WWP she finds this very suspicious, as it was described to her as a "West of Hatwai" problem she is suspicious of this and is investigating. Please get with DYPMI and get their re-supplied transmission before this schedule flows in the morning. Cara
Schedule cut on a "west of Hatwai" problem for 7/06/01
Hello all! Hope you had a good 4th! Just a reminder that Ted Bland, Director of Career Development for the Associate/Analyst Program, will be in the Mt. Hood conference room at 11:00am today to discuss the changes that have taken place in the program, and to answer any questions you may have. Lunch will be provided (Baja Fresh). Please let me know if you have any questions! Thanks,
REMINDER: Analyst/Associate meeting TODAY at 11am in Mt. Hood
I have some tickets available for the soccer game and fireworks, TONIGHT at 7:00 PM! Please let me know if you are interested. Mollie Gustafson ext. 3817
TONIGHT - Soccer
Effective July 16, Andy Zipper will join the Natural Gas Derivatives group in Enron Americas reporting to John Arnold. Andy and his team have done an excellent job developing EnronOnline, as well as creating a significant commercial focus. Please join us in thanking him for his many contributions and in wishing him the best in his new role. Savita Puthigai, who is responsible for the EnronOnline operations group and reported to Andy, will now report to Jay Webb. In addition to leading the platform development efforts, Jay's role will be expanded to include the EnronOnline operations group. In his expanded role, Jay will work closely with all Enron commercial groups to continue developing the platform. The EnronOnline e-Commerce Marketing and Origination group will report to Brad Richter, who will join Net Works from EBS. In his new role, Brad will continue the growth and expansion of the commercial activities for EnronOnline. Please join us in congratulating everyone on their new roles. We look forward to their continued contributions toward the success of Enron.
Organizational Announcement
PRELIMINARY EARTHQUAKE REPORT Rapid Earthquake Location Service U.S. Geological Survey, Menlo Park, California U.C. Berkeley Seismological Laboratory, Berkeley, California Version 2: Updates lower and earlier versions of this earthquake report A MINOR EARTHQUAKE OCCURRED AT 02:57 PM PDT Tuesday, Jul 03, 2001. THE MAGNITUDE 3.8 (ML) EVENT IS LOCATED 7 MILES S OF TRES PINOS, CA THE HYPOCENTRAL DEPTH IS 2.7 MILES. This event has been reviewed by Steve Walter - USGS. PRINCIPAL EARTHQUAKE PARAMETERS
[EDIS] EARTHQUAKE INFORMATION [News: Statewide]
=20 BUSINESS HIGHLIGHTS Enron Mexico Jaime Williams will head up the Monterrey office with responsibility for Ri= sk Management and Trading. Steve Irvin will take over responsibility for a= ll origination activities in Mexico and will be based in Houston. Both Jai= me and Steve will report directly to the Office of the Chair, Enron America= s. Weather The weather desk is rapidly expanding. With a presence in Houston, London,= Sydney, and Tokyo (and possibly in New York), the desk has expanded from a= bout 15 people in January to a current count of over 40 globally. Mark Taw= ney recently went to Tokyo to explore joint marketing efforts with signific= ant Japanese corporations and to meet with the newest additions to the Toky= o weather team. Paul Murray (reporting to Mark) is leading the European ef= fort out of London and has already increased the staffing there from 1 to 5= . If you're in the London office, please take him out to a pub or two - ap= parently he's had trouble finding them on his own. If you have interest in= joining an exciting new industry, please feel free to call Dave Hill at x3= 4218.=20 IN THE NEWS Goldman Sachs Analysts, David Fleischer, David Maccarrone and Eric Mandelbl= att on Enron in their latest analyst comment, "A LOT Better Than it Feels; = Prospects Never Better: Raising Estimates": "Our confidence in the direction of ENE's strategy and our conviction in th= e continuing strong execution of its business plan continue to be extremely= high. " =20 "... investors have cast doubt about both the company's strategy and manage= ment's execution of its wide ranging and ambitious business plans. We have = no such doubt." "We absolutely believe that Enron's very broad capabilities are transferabl= e to a wide variety of products and commodities and also see it as critical= to emphasize that the company's wholesale operation is much more than the = trading business may view it as being. . ." WELCOME New Hires EGM - Richard Friedman, Vivek Kumar, Alex McElreath, Fred Radvansky, Jonat= han Sarley, Pat Twohy=20 EIM - Tim Reed, Sonia Trevino, Greg Worsham ENA - Alisha Mahabir, Jennifer Smith, Nancy Turner NUGGETS & NOTES Travel tip of the week: Car rental contracts for year 2001 have been awarded to National Car Rental= and Alamo Rent-a-Car. Please communicate the contract identification numb= er at the time the reservation is made. =09Alamo=09=09 143974 =09National=09=095000838 Insurance is included in Enron's negotiated rates; if asked please decline = the Optional Liability Insurance and Collision Damage Waver offered by the = gate agent. Coverage applies only if the appropriate contract identificati= on number has been communicated. Negotiated discounts represent 20% off cu= stomary rates. Congratulations to Derrick and Paula Harris, manager in Business Analysis a= nd Reporting, on the birth of daughter, Jazmine Kay on June 14, 2001. Congratulations to Shannon and Greg Whiting, director in BA&R, on the birth= of their daughter, Irene Elizabeth, on Friday, June 22, 2001. EnronOnline Statistics Below are the latest figures for EnronOnline as of June 29, 2001 =09*Total Life to Date Transactions > 1,150,000 =09*Life to Date Notional Value of Transactions > $684 billion NEWS FROM THE GLOBAL FLASH EES Europe Lands First Outsourcing Deal Congratulations to EES Europe who recently clinched their first outsourcing= transaction with supermarket giant, Sainsbury's. The deal means EES will = provide gas and electricity to all 493 Sainsbury's properties in the UK inc= luding stores, offices and depots. EES will also manage a program of energy= reduction measures designed to improve energy efficiency at Sainsbury's fa= cilities. Stuart Rexrode, Vice President of EES Europe, said: "This was a sensational= team effort - a fantastic achievement for EES Europe and a truly groundbre= aking transaction in the marketplace. The whole group should all be extrem= ely proud and I am confident that this is the start of many more outsourcin= g deals to come." EBS Europe EBS Europe has just completed its 100th transaction. The transaction involv= es a 12-month contract for an STM-4 circuit from London to Madrid. This cap= acity is equivalent to approximately 830 DSL lines or Internet connections = into the home. Commenting on the achievement, Matthew Scrimshaw, President= of EBS Europe said, "This is just one of the many milestones that EBS will= achieve, as we continue to create a market for bandwidth trading and origi= nation." Pioneering International Coal Agreements Signed Enron has signed a five-year agreement with Spanish utility HidroElectrica = del Cantabrico for the import of at least 600,000 tonnes of steam coal per = annum in Enron's first long-term coal import deal into Spain. The agreemen= t gives Enron full optionality with regard to sourcing, timing and quantity= of coal supply, which will be delivered via the port of Gijon in northern = Spain and transported by rail and truck to a number of coal-fired power sta= tions, predominantly in the north of the country. Gijon itself could becom= e a trading hub for Spain's rapidly expanding coal market. "Spain is experi= encing strong demand growth for electricity generation and with an annual p= roduction of only 17 million tonnes of expensive, low-quality coal at its d= isposal, the country has a need for new, flexible sources of supply - so th= ere's lots of opportunity for us to extend the scope of our agreement," say= s Sam Grossman, Enron's coal group director who led the team which included= Katrina Bensadon and Janet Wood with support from the coal and freight tea= ms. In a separate agreement Enron's first foray into the US coal import market = is delivering a cargo of Colombian coal to Dynergy via the Mississippi and = two further cargoes of 45,000-60,000 tonnes to northeastern US utilities vi= a Charleston, south Carolina. With coal supplying the fuel for more than h= alf of the USA's power generation and the domestic coal market showing high= prices - the Nymex coal price has doubled over the past year - this is an = excellent time for Enron to help meet customer demand. "This is a classic = Enron deal exploiting optionality," says Sam Grossman. "We were able to re= direct one of our coal cargoes bound for Europe and find an alternative sou= rce to fulfill the European order." The import agreement is expected to en= courage other counterparties into the US coal import market. Congratulatio= ns to Sam, Peter Bradley, Lenny Hochschild and the Enron freight desk. LEGAL STUFF The information contained in this newsletter is confidential and proprietar= y to Enron Corp. and its subsidiaries. It is intended for internal use onl= y and should not be disclosed.
EnTouch Newsletter
PRELIMINARY EARTHQUAKE REPORT Rapid Earthquake Location Service U.S. Geological Survey, Menlo Park, California U.C. Berkeley Seismological Laboratory, Berkeley, California Version 2: Updates lower and earlier versions of this earthquake report A MINOR EARTHQUAKE OCCURRED AT 12:07 PM PDT Tuesday, Jul 03, 2001. THE MAGNITUDE 3.9 (ML) EVENT IS LOCATED 7 MILES S OF TRES PINOS, CA THE HYPOCENTRAL DEPTH IS 3.6 MILES. This event has been reviewed by Steve Walter - USGS. PRINCIPAL EARTHQUAKE PARAMETERS
[EDIS] EARTHQUAKE INFORMATION [News: Statewide]
A few weeks ago I sent out an e-mail announcing Sean Crandall's departure from Enron. Upon further consideration, Sean has decided to stay with us. Please join me in welcoming him back from his European vacation.
Announcement
Feast your eyes on Enron Business' cool and colorful new look. You'll find it in your mailbox at home and online at home.enron.com under Publications, Enron Business, and "Volume 3, 2001". (And if you're in Houston, you might find a few extra copies at the Plaza Java in the lobby of the Enron Building.) In this issue: ? Reducing the risk (but not the sizzle) of the advertising business ? EBS offers data users cost-effective havens for homeless terabytes ? Stan Horton - a few insights about the man who excels at change management ? Helping Houston recover from the floods - how you can help ? Extreme Enron - adventure racing, fire fighting, arctic driving, 24-hour racing, equine sports. ? Netiquette. How much do you really know about the net? ? The Insider: what happens inside a shareholder meeting ? Find out who won the Cartoon Craziness Contest and $200! Also, enter this issue's contest - top 10 reasons Enron keeps reorganizing. Don't dally - the deadline for entries is Friday, July 27.
3rd Issue of the New Enron Business!
PRELIMINARY EARTHQUAKE REPORT Rapid Earthquake Location Service U.S. Geological Survey, Menlo Park, California U.C. Berkeley Seismological Laboratory, Berkeley, California Version 2: Updates lower and earlier versions of this earthquake report A LIGHT EARTHQUAKE OCCURRED AT 10:33 AM PDT Monday, Jul 02, 2001. THE MAGNITUDE 4.1 (ML) EVENT IS LOCATED 7 MILES S OF TRES PINOS, CA THE HYPOCENTRAL DEPTH IS 3.9 MILES. This event has been reviewed by Steve Walter - USGS. PRINCIPAL EARTHQUAKE PARAMETERS
[EDIS] EARTHQUAKE INFORMATION [News: Statewide]
We are pleased to announce that Greg Piper has been named President and CEO of Enron Net Works effective immediately. Mark Pickering will join Greg in the Enron Net Works Office of the Chair as Chief Technology Officer and will relocate from London to Houston. Mark joined Enron's IT development group in Houston in 1995 and has been Vice President and Chief Information Officer of Enron Europe since January 1998. Mark has had responsibility for Enron's systems development and infrastructure outside of the Americas and has played a key role in supporting the growth and expansion of our business. Paul Freeman, who is currently part of the Enron Metals management team in London, will replace Mark as Chief Information Officer for Enron Europe. Please join us in congratulating Greg, Mark and Paul on their new roles. We look forward to their contributions toward our continued success.
Organizational Announcement
As you should now be aware the preschedulers were unable to get all of their tags in by the tagging deadline on Friday. Cara has left a color coded sheet of delayed tags that the real time group must implement between 4 hours and 1 hour prior to the power flowing. Please take a look at this sheet when coming in on shift. Also, there are two tags that need special attention tomorrow (7/2) evening. Tag numbers 25843 and 25870 have been printed out and attached to Cara's list. These two tags were flowing through the CISO and needed to be checked out day ahead by PacifiCorp and the ISO. Unfortunately the ISO and PAC needed real tags not delayed tags in order to allow PACs schedule to flow. Therefore per my discussion with Dick Dowdy at PAC, he has created a tag showing the total of 35 MW coming out of his system (tag # 9152Y) in order to check out with the ISO. THE REAL TIME GROUP MUST DO THE FOLLOWING ON THE PAC TAGS: 1. send the delayed tags out prior to the times indicated on Cara's sheet but no sooner than 4 hrs prior to energy flow. 2. On the pacificorp tags referenced above, please call PAC after sending the delayed tags and tell them to kill their tag number 9152Y. 3. Call the ISO to inform them of the tag change and give them the delayed tag numbers. 4. call PSCO and inform them you have submitted the tags. Please make sure this is happens ! If this is not taken care of the schedule won't flow and Enron will be charged liquidated damages by PacifiCorp. If you have ANY questions regarding these tags or any other tags on Cara's list, do not hesitate to contact Cara, Bill, or myself on this matter. Cheers,
Tags
This sheet is as complete as possible, and I am worried about it due to the following circumstances; 1. The Dispatch sheet that comes to Real time was 25 MW flat on Sunday and LLH on Monday more than all the preschedules that were tagged today. 2. The Four Corners values on that dispatch sheet changed between 5:15 and 5:42, from 10 mw long to flat. I tried to resolve the four corners schedules with PSCO, who told me they did not have a purchase from EPE in July. I tried calling numerous people at their office and cell phone numbers and got forwarded to Enron each time. Lisa had a buy resale with PNM at four corners, but that booked out and did not seem to match the 10 long that I saw in the dispatch sheet. I spoke with Pete, who assured me that the sale to PSCO was good for the summer. 3. I still was unable to resolve the 25 mw difference between the tags and schedules that we knew, and what the dispatch sheet said we should have for preschedule. No EPE representative was available to tell me what they were expecting for the schedules, and I was referred by a Dispatch person to call on Saturday and speak to Carlos when he came in at 4 pm. I was very uncomfortable doing this, and so in my desperation called Roger at home, who after some discussion with Steve at his home confirmed that the extrat 25 flat Sunday and LLH Monday was a deal that is supposed to begin on July 3. I trust his assesment, and have removed the extra schedule from the sheet. Between all of the preschedulers today at Enron, we have spent over 6 hours dealing with the EPE schedules today. The sheet is as complete as I possibly can find justification for. Cara Semperger West Power Scheduling 503/464-3814
El Paso Schedule for 7/1 and 7/2 - Extremely Problematic
BEWARE - Effective today, we will be taking over BOTH - not just the standard ONE - phone lines for El Paso during off peak hours and on weekends. This means we'll get calls that would previously have been directed to Roger and Steve's cell phones. All calls will still ring in on the EL PASO line. Please read the e-mail in Lotus Notes titled "EPE MARKETING AVAILABILITY" for details. And let me know if you have questions. Thanks,
IMPORTANT EL PASO PHONE CHANGE - PLEASE READ
Preschedule had a heck-u-va day on Friday. Due to many problems, some of our tags were not completed until after the 3pm preschedule deadline. Apparently, some of our counterparties automatically deny late tags, though they may be corrections of tags made prior to the deadline. In any case, we have a list of tags that have been submitted as real-time tags and the schedules should be treated such. The tags and paths are as follows: 25869: DELAYED TAG NEEDS SUBMITTED NO LATER THAN AN HOUR BEFORE SCHEDULE FLOWS. 10MW HE23-34 ON 07/01: PSCO(G)WSYS-PSCO(T)WSYS/CRAIG#GF-DESERRET(T)CRAIG/BONANZA#4869,mnf-DESERRET(T)BONANZA/MONA#4869mnf-PAC(T)MONA/REDBUTTE#133871f-NEVP(T)REDBUTTE/MEAD#1022243mnf-PSCO-EPMI-APS(T)MEAD/PV#22937-EMPI-APS(T)MEAD/WW/PV #22936F-EPMI-PACE-CISO(T)PV/MALIN-PACE(T)MAL/PACE SYS-PACE 25872: DELAYED TAG NEEDS SUBMITTED NO LATER THAN AN HOUR BEFORE SCHEDULE FLOWS. 10MW HE7-22 IN 07/01: PSCO(G)WSYS-PSCO(T)WSYS/CRAIG#GF-DESERET(T)CRAIG/BONANZA#4869,mnf-DESERET(T)BONANZA/MONA#4869mnf-PAC(T)MONA/REDBUTTE#133871f-NEVP(T)REDBUTTE/MEAD#1022243mnf-PSCO-EPMI-APS(T)MEAD/WW/PV #22936F-EPMI-SRP-SRP(T)PV/KYRENE#GF-SRP 25873: DELAYED TAG NEEDS SUBMITTED NO LATER THAN AN HOUR BEFORE SCHEDULE FLOWS. 15MW HE7-22 IN 07/01: PSCO(G)WSYS-PSCO(T)WSYS/CRAIG#GF-DESERET(T)CRAIG/BONANZA#4869,mnf-DESERET(T)BONANZA/MONA#4869mnf-PAC(T)MONA/REDBUTTE#133871f-NEVP(T)REDBUTTE/MEAD#1022243mnf-PSCO-EPMI-APS(T)MEAD/WW/PV #22936F-EPMI-PNM-EPE(T)PV/WW-SRP(T)WW/MEAD-NEVP(MEAD) 25823: 25MW HE7-22 ON 07/01: DGT(MONA)-AEP-PSCO-EPMI-PAC(T)MONA/REDBUTTE-NEVP(T)REDBUTTE/MEAD-NEVP 25824: 15MW HE1-6 ON 07/01: DGT(MONA)-AEP-PSCO-EPMI-PAC(T)MONA/REDBUTTE-NEVP(T)REDBUTTE/MEAD-CRC(MEAD) 25825: 10MW HE1-6 ON 07/01: DGT(MONA)-AEP-PSCO-EPMI-PAC(T)MONA/REDBUTTE-NEVP(T)REDBUTTE/MEAD-CRC(MEAD) 25870: DELAYED TAG NEEDS SUBMITTED NO LATER THAN AN HOUR BEFORE SCHEDULE FLOWS. 10MW HE23-34 ON 07/02: PSCO(G)WSYS-PSCO(T)WSYS/CRAIG#GF-DESERRET(T)CRAIG/BONANZA#4869,mnf-DESERRET(T)BONANZA/MONA#4869mnf-PAC(T)MONA/REDBUTTE#133871f-NEVP(T)REDBUTTE/MEAD#1022243mnf-PSCO-EPMI-APS(T)MEAD/PV#22937-EMPI-APS(T)MEAD/WW/PV #22936F-EPMI-PACE-CISO(T)PV/MALIN-PACE(T)MAL/PACE SYS-PACE Thanks, Donald.
Preschedule paths going real-time for Sunday and Monday, 07/01 and 07/02.
If you are interested in borrowing a video tape of the PBS Frontline broadcast titled, "Blackout," please see me. This video features interviews with Ken Lay, Jeff Skilling and other energy industry executives. Best regards,
PBS "Blackout" Broadcast Video Available
ABZCZC-CIV-CEM-0060130000-178196- This is Contra Costa Health Services. No sirens have sounded in the City of Richmond. There have been no fires or explosions at the Chevron Refinery. Please contact Hazardous Materials Programs if you have any questions at (925) 646-2286 or (925) 646-2879. HHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHHH ABNNNN EDIS-06-28-01 1202 PDT
[EDIS] COMMUNITY WARNING SYSTEM MESSAGE [Urgent: San Francisco Bay]
I'm working with IT to get an EES mailing list set up so we can send the Real Time sheets to them each night with only the click of a button. In the meantime, they'll need you to click just a few more and send the sheet to..... EES Power Settlements Ainsley Gaddis Neil Bresnan Jubran Whalan Judy Dyer Michael Spruiell This is only temporary. Don't worry. Thanks,
EES Sheet Mailing List - PLEASE READ
Zou, I am requesting a log-in for clicktrip.com please. I arrange travel for the following employees, and will need access to their travel profile. Thank you,
Travel on Clicktrip
I am pleased to announce the following changes in the Global Risk Management Operations organization: Bob Hall will lead operations for Enron Americas. Bob previously served as one of the business controllers for gas operations for Enron Americas, with direct responsibility for Gas Logistics and Volume Management. The leadership team reporting to Bob will include Peggy Hedstrom (Calgary Operations), Jeff Gossett ( U.S. Gas Risk and South America Operations), Stacey White (U.S. Power Risk), Leslie Reeves (U.S. Gas and Power Confirmations and Settlements), and Bob Superty (U.S. Gas Logistics). Brent Price will continue to lead Operations for Enron Global Markets and fulfill his dual role as Chief Accounting Officer for Enron Global Markets. I am very pleased to announce that Kevin Sweeney will lead Operations for Enron Industrial Markets. Kevin brings to his new role extensive risk and operations experience from stints in our Houston, London and Singapore offices. Kevin fills the role that was previously held by Brenda Herod, who will now report directly to Beth Apollo. Beth Apollo will be the Operations Project Manager for the assimilation of EES Wholesale. This will include Deal Capture, Risk Analysis, Confirmations, and Global Data functions which have been moved into EWS under Global Risk Management Operations. Successfully leveraging the infrastructure to support the EES business plan will also require close coordination with Gas Logistics, Settlements and the Operational Analysis (OA) process, and Beth will actively coordinate operations efforts with these teams and the commercial teams. I have asked Beth to project manage the effort to look for opportunities to streamline and improve systems, processes and controls, and to consider alignment, where it makes sense, with existing EWS processes. Reporting to Beth will be Scott Mills, with a focus on Deal Capture, Risk Analysis and Confirmations, and Brenda Herod, with a focus on invoicing control guidelines and reporting requirements. Beth will also continue to manage the Global Services function, which includes the consolidated DPR process and Global Operations Standards, led by Shona Wilson, and the Global Data function which is lead by James Scribner. Mike Jordan will continue to lead operations for Enron Europe, working closely with me and other EWS operations leads to insure the proliferation of best operational practices worldwide for Enron. Thanks for your continued support especially in exploring and seizing commercial opportunities to strengthen our contributions to Enron.
Global Risk Management Operations Organization Announcement
Please add Ainsley Gaddis to your EES mailing list. She needs to begin receving our daily EES trade log ASAP. Let me know if you have questions. Thanks,
EES Mailing List - PLEASE READ
Group, A reminder. My email address is bill.williams.iii@enron.com. Bill Williams III needs to appear in the outlook box, otherwise I do not receive the email. I should be copied on the EES sheets, and any cut notes to volume managament, the services desk, or other traders. Thank you for making this correction. Bill
Email Address
There are no changes... There will be no substantial heat in California this week. In fact, temperatures wil actually average below normal for Monday-Wednesday before warming at the end of the week. Although there is some possibility of above to much above normal temperatures in California and the Desert Southwest, it seems more likely that at least a partial start to the monsoon thunderstorms will occur. Since the normal high is 104 in Phoenix, I would opt for 1-2 degrees above normal as an average for the week. The Pacific Northwest will see below normal temperatures for the next 10-14 days on average. Above normal precipitation for the time of year... Dave
Sunday Update
U.S. GEOLOGICAL SURVEY NATIONAL EARTHQUAKE INFORMATION CENTER World Data Center for Seismology, Denver Reply to: sedas@neis.cr.usgs.gov or neic@usgs.gov The following is a release by the United States Geological Survey, National Earthquake Information Center: A major earthquake occurred NEAR THE COAST OF SOUTHERN PERU, about 120 miles (190 km) west of Arequipa or about 375 miles (600 km) southeast of Lima at 2:33 PM MDT today, Jun 23, 2001 (3:33 PM local time in Peru). A PRELIMINARY MAGNITUDE OF 7.9 WAS COMPUTED FOR THIS EARTHQUAKE. The magnitude and location may be revised when additional data and further analysis results are available. No reports of damage or casualties have been received at this time; however, this earthquake may have caused substantial damage and casualties due to its location and size. EDIS-06-23-01 1523 PDT
[EDIS] EQ MAG 7 9 NEAR COAST OF PERU [News: Statewide]
You are invited to attend an informational brown-bag regarding FERC's June 19th Order. (order attached) Alan Comnes and Steve Hall will be on-hand in the Mt. Hood Conference Room to give an overview of the order and answer any questions you might have. The session will begin promptly at noon. For those of you not in the Portland Office, I will be happy to arrange a conference call number, if you decide to participate. Please advise your participation by 3:00pm Monday, June 25th.
Informational Brown-Bag, Tuesday, June 26th - Mt. Hood
Bill; Spoke to Mike Cashell again this morning. If you remember when we met with him this Spring, he mentioned that Idaho Power had the right to demand energy and or wheel through MPC's system that could cause them to be out-of-balance up to 25% of the time. Starting yesterday Idaho initiated this process. Mike has requested Idaho express their intentions on a preschedule basis where he in turn will notify you. Today (6/22) and throughout the weekend MPC plans to be in a deficit position. You might want to contact Mike (406) 497-4575 to work out a pre-notification process so as to help to identify "trends" so that our Real-Time group will be able to better anticipate MPC's needs. Thanks, John
MPC Energy Imbalance II
Bill; Mike Cashell (MPC's Transmission Mgr.) just phoned me concerned, beca= use MPC's Real-Time group requested EPMI purchase energy for them under our= existing Energy Imbalance structure, and was notified by our Real-Time gro= up that due to the newly implemented FERC price cap, we were have difficult= y securing any resources. Just to clarify things, we are settling MPC's Ch= oice customers Energy Imbalance position, and PP&L Montana has the right to= any length resulting from MPC's "domestic" load Energy Imbalance. In othe= r words MPC is settling two separate Energy Imbalance accounts, so during t= he hour they may be turning energy back to PP&L Montana, while at the same = time finding themselves short for the Choice loads. During the recent bull= ish pricing conditions, Choice customer were leaving themselves long, as of= late, MPC is experiencing the Choice customers doing the opposite, positio= ning themselves short. The net result is that MPC will most likely be expe= cting us to fill a short position from this point on, so I'd really like to= see what we can do to honor their requests, mindful of the favorable posit= ion we've enjoyed over the last several months. Let me know if you'd like t= o discuss this further, or better yet if you've got a workable solution to = the problem. In the meantime, thanks again to you and your staff for the o= utstanding performance thus far in dealing with MPC. John
Montana Power Company (MPC) Energy Imbalance