input stringlengths 93 39k | output stringlengths 1 117 |
|---|---|
Julie, Please look at the following which includes the 3 changes we discussed.
If I don't hear from you by 5:00 p.m., I'll send the attached version to Bruno.
Steve
| Lastest Revisions |
Dear Mr. Kvetinskas, Per the instructions of Julie Gomez, I am forwarding you a marked version of the above referenced LOI containing the changes that Ms. Gomez discussed with you this afternoon.
Please feel free to call me at 713-853-7238 with any questions regarding the attached.
Steve Van Hooser
| ENA's suggested revisions to SSI's Draft of 11:54 today. |
Here is my rendition of our To-do Lists: Rusk County Provide 1) Short circuit mVa, 2) allowable voltage dip, 3) substation design and 1-line diagram 4) schedule for power line, 5) schedule for substation 6) transformer sizing, efficiency/loss, etc.
General Electric Will provide an all encompassing package from the low side of the transformer to the output shaft of the electric motors.
Motors will be delivered to Hanover's shop for packaging and all other components will be communicated and delivered to the OGS East Texas location for Hanover to install.
GE will provide system load study, engineering and design, equipment pricing, and a 10-yr Service & Maintenance contract that accommodates all parts, labor, engineering, etc.
for all the equipment they provided into the project.
These quotes will be provided to ECS and Hanover.
GE needs the system and design details from Rusk Co. to formalize the package design and pricing GE will act as a sub for Hanover who will roll-up the total package of services to ECS.
GE will provide a Draft Service & Maintenance Agreement to HCC and ECS.
Hanover Compression HCC will package the skids and provide all the equipment & materials on this skids as well as the on-site installation.
HCC will provide ECS with a detail description of the installation, services and pricing for the project.
HCC will provide a Maintenance Quote for the compression equipment and materials that HCC provided into the project.
(Jim, we probably need a detail description of this so that we can demonstrate how this service compliments the OGS resources rather than appearing to be a replacement perception).
HCC will provide ECS with a project schedule that will become part of the agreement package.
HCC will provide or perform any torsional studies, equipment testing and start-up resources for the project.
(Jim, lets discuss to establish an overall schedule that incorporates GE, HCC and Rusk Co.) My big picture look tells me that Rusk Co. will need to begin ordering & sizing transformers next month to ensure a Firm in-service date of like 10/01/02.
I want to target a 9/01/02 available for service date and an expectation to have electrical service ready and available for Testing and Torsional Analysis work.
HCC will provide a set of Draft Contracts for the project (Operating Lease & Service and Maintenance Agreements) As you guys know, I need everything yesterday.
Obviously all the pricing is critical as well as the Contract language because the agreements with OGS will need to be specific and represent the services that each of you are providing.
Our schedule is critical not just for a successful 2nd Quarter close but also to accomplish an 8/02 date for testing and a 9/02 available for service date.
I am establishing a FIRM In-Service date of 10/01/02 where all the commodity arrangements will take effect.
I'm expecting that Dave Owen and Jimo will be running point with HCC and GE for all the technical and scheduling coordination.
I also need to have the Draft Contracts early next week if not before.
Thanks mk
| OGS - East Texas Project |
Last week you were sent an EWS Human Resources survey.
Your input is very valuable to us.
Please take a moment to complete this survey by Friday, June 15th.
Please direct any replies to "EWS Human Resources" Please click on the link below.
Experiencing technical problems?
If this link does not automatically launch the questionnaire: 1.
Launch by copying the link into your browser, or 2.
If you continue to have technical difficulties, please send an email message to confirmit@enron.com 3.
Please do not forward this link to anyone else, as it is unique for each respondent.
Thank you
| EWS Client Satisfaction Survey - Reminder |
Donna and Shane, As I mentioned to you previously, Gerald Nemec will be handling the trading partner agreements upon my departure.
His extension is 33512.
As has been the practice in the past, Gerald should initial all trading partner agreements and any amendments prior to execution by a VP.
I understand that Suzanne Calcagno has initialed some of these agreements without authorization from legal and while I understand she has recently received her law degree and awaits bar results, since she is not part of our legal department we would ask that you continue to abide by the procedures we have set in place to come through our legal department until such time as Barbara Gray authorizes a different procedure.
If you have any questions about that please feel free to contact Barbara Gray at ext.
36832.
Thanks and it has been a pleasure working with you!
| Legal initials for TPA's |
FYI, Here is a copy of the Draft agreement with the addition of text in red that Barbara wanted to incorporate as part of our "template".
Oakhill will not get the red in this draft.
The text in blue is what I added or changed with Barbara's input.
We've incorporated a few new concepts: - we have a "date certain" for our deal to start - I've provided for operation before our "Start Date" (because we've mitigated construction risk by pushing the Start Date back).
This is termed the "Pre-Start Date Period" which can begin after we have completed the "Facility Testing" and deemed the facility suitable and ready for commercial operation.
- I've reduced the most of the response and notifications timing from the customer to ECS.
Comments?
mk
| OGS (Oakhill) CSA Drat |
FAMILY COURTS TEMPORARY QUARTERS Harris County Civil District Judges have offered to share courtrooms temporarily with Family District Judges.
The arrangements are as follows: 245th Family Court will be located in the 11th District Court, 301 Fannin, 2nd floor, Room 212, ext.
#5-6253 246th Family Court will be located in the Ceremonial Courtroom, 301 Fannin, 3rd Floor, Room 310, ext.
#5-4753 247th Family Court will be located in the 269th District Court, 301 Fannin, 3rd Floor, Room 304, ext.
#5-5513 257th Family Court will be located in the 151st District Court, 301 Fannin, 6th Floor, Room 604, ext.
#5-6289 308th Family Court will be located in the 113th District Court, 301 Fannin, 2nd Floor, Room 211, ext.
#5-6294 309th Family Court will be located in the 165th District Court, 301 Fannin, 3rd Floor, Room 312, ext.
#5-6321 310th Family Court will be located in the 333rd District Court, 301 Fannin, 5th Floor, Room 510, ext.
#5-7760 311th Family Court will be located in the 270th District Court, 301 Fannin, 6th Floor, Room 607, ext.
#5-5509 312th Family Court will be located in the Ceremonial Courtroom, 301 Fannin, 3rd Floor, Room 310, ext.
#5-4753 All hearing times will be as per that court's normal policy.
All uncontested divorces must be scheduled one day in advance to allow for files to be pulled.
| Family Courts Info. from Judge Squier |
Attached are the following forms for ENA Upstream Company, LLC to use for wellhead purchases.
They can be found in my directory-s.flynn under ENA UPSTREAM FORMS.
I can be reached on my cell phone for the next few weeks (713)306-2926 or leave a message in my voice mail at Enron ext.34891.
It really has been a pleasure working with all of you and I wish you all the best.
Take care-Shawna
| ENA Upstream Company, LLC Attorney Forms |
Dear Gerald, Where do you want to go this summer?
Wherever it is, chances are there's a Travelocity Deal to help you make it happen.
Alaska, Hawaii, Mexico, Florida, Europe?we can help you save money when traveling to all these locations and more.
So what are you waiting for?
Read more to see how we can help you get the most out of your vacation dollars.
Featured this Week * Experience the True Spirit of Hawaii from $575!
* Save up to 20% at Your Favorite Restaurants!
Air * Fly to South America for Less on LanChile!
* Fly ANA to Japan for as little as $590 round-trip!
* Fly Aeromexico, Mexicana, or Aero California and Put Pesos in the Bank!
* Great Savings on Hawaiian Airlines from the West Coast!
Cruises * Set Your Sights on the Caribbean and Upgrade Your Cabin for Only $99!
* Experience the True Spirit of Hawaii from $575!
* Experience Alaska's Untamed Spirit from Only $599!
* Explore the Wonders of Northern Europe This Summer from Only $1005!
Vacations * Experience the Caribbean--$100 Back Plus Bonus Miles!
| Real Deals from Travelocity.com |
Also, if you have any paper work on the "promotional funds" contract it would be good to see.
I can't remember if it is a one time payment or yearly or a lump sum over a term.
I want to make sure that obligation goes with AEP and its one of those "deals" that could have fallen in the cracks.
| Afterthought |
Mary Cook has requested that you attend a meeting tomorrow morning (Tuesday, October 30) from 10:00 to 11:00 in EB38C2 to discuss master netting agreements.
The directive Mary has presently been given is that we will be preparing various master netting agreements and she would like to solicit as much additional help as she can.
If the directive changes before the meeting tomorrow, we will advise everyone.
Please review the below attachments prior to the meeting if your schedule allows.
Thanks!
| Meeting regarding Master Netting Agreements |
Gerald, Here is what I have so far for the draft confirmation for Mariner.
As we discussed, I need you to add the language that states that at the Seller's option, we will release a given property for the remainder of the term of the contract if we are unable to move the gas from that property due to transportation.
Thanks,
| Mariner Draft Confirm |
Dear Steve: The Texas Railroad Commission doesn't have anything in its records that certain assets held by the subject company were divested to KN Processing, Inc., a subsidiary of KN Energy, Inc. on 3/31/1997.
We've tried to tell the Texas Railroad Commission that we no longer own this company, but since KN hasn't filed the proper reports for a number of wells for which it is shown to be a gas nominator and/or gas gatherer, the Commission is still looking to us to file reports like the P-5 for this entity.
Do you remember who handled the sale of this company to KN Processing, Inc.?
I don't know where to begin to do the research about this company or these wells.
Please advise, and thanks, Mary x37796
| Enron Gas Processing Company |
To: Ms. Cheryl Dudley, Houston Pipe Line Company Dear Cheryl: I'm sending you this information to follow-up regarding our brief discussion today about the subject company.
As I mentioned, the Texas Railroad Commission still shows this company as active.
We have written to the TxRRC before saying that all the facilites and contracts for Enron Industrial Natural Gas Company were sold to HPL, but they can't "de-activate" the company yet because their records show it as "active" due to the acitvity shown by another company.
Apparently the company that needs to file corrected P-4s showing that HPL or another company is involved in these leases is:
| Enron Industrial Natural Gas Company |
Dave and Gerald, I just wanted to say hi and see how you were doing.
Did the flood give you any problems?
I hope all is well.
Thanks,
| Houston |
Gerald, This is a follow-up to my earlier e-mail about the discovery request from John Haswell, 352-376-5226.
Perhaps you have already spoken to him.
I'm traveling today and tomorrow.
On vacation next week.
I am in the office Friday and reachable much of the week (when not on an airplane).
Call when you can.
Bill
| West Florida Discovery |
If you have not already done so, please RSVP by 3:00 p.m. Wednesday, June 20, to the invitation to the Star Wars event at the Museum Fine Arts Houston on Sunday, June 24.
This invitation is extended to employees in the EWS Legal Department, their spouse or guest, and your children under the age of 18.
Please click on the link below for the invitation to the museum.
When the invitation has finished playing, wait a moment or two for the RSVP box to appear.
Thank you.
| Action Required - Museum Fine Arts Houston - Star Wars |
I will be bringing you a letter regarding West Florida Electric Cooperative Association, Inc. vs. Gulf Power Company - Territorial Dispute from Gerald Nemec.
Gerald would like to set up a meeting with both of you to discuss this on Wednesday.
Please call me at 3-9282 or e-mail me (Rae Meadows) and let me know when you will be available to meet with Gerald.
Thank you for your assistance.
Rae Meadows, Administrative Assistant to Gerald Nemec
| ON BEHALF OF GERALD NEMEC |
So I'm here in my office compiling some production data off the shared drive this morning and listening to a little of the Best of the D cd that Eric was so kind to cut for me.
Of course due to the unruly nature of the D I was using my headphones.
About 2 hours later I get a phone call and I take off my headphones to answer it only to find that my computer speakers were blasting the D and I couldn't tell because of the headphones.
Maybe I'll be employing the message of the D sooner than I'd like.
Ps.
Welcome back.
Ryan F. Ruppert Geologist Saudi Arabia Gas Resources ExxonMobil Exploration GPP3-389 P.O.
Box 4778 Houston, Texas 77210
| Major Party Foul |
Any member who would like to have his or her photo taken may come by the Houston Bar Association office between the hours of 8:30 a.m. and 5:00 p.m. on June 19 or June 20.
There is no charge for the photo, no appointment is necessary, and the photo sessions will take only a few minutes.
The Houston Bar Association office is located downtown at 1001 Fannin, Suite 1300.
The HBA hopes to have as many current photos as possible in the new Roster, so please take advantage of this opportunity.
| Reminder: June 19 and 20 - HBA Pictorial Roster Photos - Free |
Gerald, I understand that you will be taking on some of Sandi's projects since she left the company.
I have been working with Sandi on an agency agreemtent between ENA and Tenaska IV Partners, related to the gas supply for the Cleburne Plant.
Has she brought you up to speed on what we need?
We are looking into selling our stake in the plant and need to finalize the agreement as soon as we can.
Please let me know what you need to finish this.
Thanks.
Daren
| Tenaska IV - Cleburne Plant |
Per my previous voice mail, could you please prepare CA's for both: Anadarko Petroleum Corporation, 1200 Timberloch Place, The Woodlands, TX 77251 and Duke Energy Field Services, 5718 Westheimer, Ste 2000, Houston, TX 77057.
As mentioned both CA's are for the purposes of data sharing relative to Elec.
compression projects.
| CA's |
We are disappointed to announce that Philippe Bibi, president and CEO of Enron Net Works, has resigned from Enron.
Philippe will be joining Putnam Investments in Boston, Mass.
as Chief Technology Officer.
Philippe joined Enron in 1995, as Chief Information Officer for Enron Capital & Trading, and has been a key member of the team that built Enron's IT organization, including our numerous successful e-commerce initiatives.
Philippe has been a great asset to Enron and our IT efforts.
For six years, his creativity, intelligence, and focus have benefited the company in many ways.
He will be missed.
Philippe has agreed to make himself available to assist in the transition of his responsibilities.
In the interim, all of the employees who report to Philippe will continue reporting to the Office of the Chairman for Enron Net Works.
Please join us in thanking Philippe for his many years of service to the company and in wishing him the very best.
| Philippe Bibi |
David, I called our Credit Group to look into how large Enron's corporate guaranty is with the Duke pipelines (i.e.
TETCO and Algonquin) to make sure that we will pass the credit check that will occur when the capacity is released to us.
Two counter-parties, ENA and ENA Upstream, are set up to do capacity release and other transport deals with Duke with a maximum guaranty of $16 million.
TETCO has ENA down for$1.7 million that has to cover three months of demand charges.
ENA has no other TETCO capacity at the present time, so there should be no problems passing TETCO's automatic credit check during the capacity release process.
Please note that for the two structures we just discussed, the capacity needs to be both recallable and reputtable.
If Yankee and Legal gets comfortable with the other features of the proposed structure, the gas sales price should also include the TETCO commodity cost reimbursement when Yankee calls on the gas and ENA elects to not re-release the capacity back to Yankee.
I will be back on Tuesday.
If you need to get me on Friday or Monday, page me at 1-877-347-3186.
Good luck on your quest, Ruth
| Yankee Capacity Transport Structures |
Bruno, Per our telephone conversation of this morning, I am forwarding you marked and clean versions of the revised LOI that addresses the open issues relative to the $50,000 breakage fee.
Please keep in mind that Julie Gomez has not yet had a chance to review this version of the document.
Please feel free to contact me or have your counsel contact me with any questions regarding the attached.
Steve Van Hooser
| ENA Draft of LOI--June 19,2001 |
I have copied the GTC and confirm templates for ENA Upstream Committed Reserves and Wellhead Pooling Point deals into our common drive under the O:/Global_Data/Contracts/ENA Upstream subdirectory.
I am still waiting to get a finalized version of the Point Specific GTC from Gerald.
I will copy that in the copy drive once it is finalized and approved by legal.
Gerald, can you please let me know the status on that???
Please let me know if you have any questions.
Please note that the pooling point version is the revised version provided by Gerald.
Thanks,
| ENA Upstream GTCs and confirms |
I want to let you know that I'll be on vacation for the next two weeks (June 25 through July 6).
I'm going to Washington, D.C. to take Wes to the Naval Academy, visit my parents and show Sheila some colleges on the way back to Houston.
I'll check my office voice mail periodically, so please leave messages there if you need me.
Also, Vanessa has my itinerary and can reach me.
I'll also be available by cell phone.
Thanks,
| MCO Vacation Plans |
Hey guys.
I went to Expedia.com and found the Delta Flights Referenced below for $226/person.
This is still a really good deal and I would jump all over it if I were you.
Here are the flights: Friday, August 24 Delta #4516 IAH to ATL (departs 10:10am, arrives 1:15pm) Delta #4107 ATL to MYR (departs 2:55pm, arrives 4:36pm) Sunday, August 26 Delta #4684 MYR to ATL (departs 11:40am, arrives 12:55pm) Delta #2063 ATL to IAH (departs 3:50pm, arrives 4:56pm) For those of you who don't know how to use Expedia.com.
Just go to the website (www.expedia.com) , search flights from Houston to Myrtle Beach on the above dates and select the flights that work best for you.
You can input your frequent flier number and pay online via credit card.
Good luck and let me know if I can help at all.
Bruce PS - If you can schedule your flights at the same time, you can share a rental car out of Myrtle Beach, SC as well.
It is about a 40 mile drive north to Ocean Isle, NC .
.
.
site of the wedding.
| Flights - Houston to Myrtle Beach |
Dear Gerald: I called Judy Thorn, ENA Upstream staff.
She said that as far as tax matters went, she wasn't sure who set up the structure for the company.
She said, however, that she'd had dealings with Chris Bystriansky in the tax department about the severance taxes.
He shows up as a senior tax analyst at ext.
53040.
Is he the person who called you?
If not, maybe he'll have the answer your tax contact requested.
--MCO
| ENA Upstream |
In case anyone was wondering..... RE: Tax Refunds The amount of your payment is based on the taxable income shown on your 2000 return.
The amount is 5% of your taxable income up to a maximum of $300 for a single taxpayer, $500 for head of household and $600 for a married couple filing jointly.
If your tax liability after nonrefundable credits is less than these maximum amounts, your limit is the smaller of this amount or 5% of your taxable income.
If you did not have a tax liability for 2000 but do have one for 2001, you may be able to claim the tax credit on your 2001 return.
This means for those of you who made at least $6000 in taxable income last year (2000), you will receive $300 back on the date scheduled below: Receive your check by: Last two digits of your SSN: July 23 00-09 July 30 10-19 August 6 20-29 August 13 30-39 August 20 40-49 August 27 50-59 Sept 3 60-69 Sept 10 70-79 Sept 17 80-89 Sept 24 90-99 See you at the liquor store!
Ryan F. Ruppert Geologist Saudi Arabia Gas Resources ExxonMobil Exploration GPP3-389 P.O.
Box 4778 Houston, Texas 77210
| Thanks Uncle Sam...Bock.....Bock.... |
Have you completed the Houston Fire Department's certification training for highrise evacuations?
If you have, please contact Ed Hearn at ext.
31592.
Ed is looking for new members to add to the 38th floor Emergency Response Team.
Thanks for your participation in this program.
| Emergency Response Team for 38th Floor |
John, Thanks for your help with the TGP deal.
Corey wants you to send him a confirmation by Tuesday of next week.
Gerald Nemec has the GISB and is reviewing it, he will get back to us asap on it.
( I told him to contact you with any questions) Please let me know if you need anything else.
Regards,
| Virtual Compression Deal with TGP |
Here is an update on Oakhill power sourcing: Wholesale Generation + Ancillaries ?
Electric cooperatives and municipalities are exempt from retail deregulation.
We can not directly contract with AEP or whoever the wholesale generation provider would be because it constitutes a retail sale in a non-deregulated area.
The prevailing utility in the area must be the buyer of the power.
?
Generation + ancillaries will be provided by the chosen entity, through NTEC, and then through Rusk.
The wholesale generation + ancillaries contract will be a three party agreement between AEP (or whoever is chosen), NTEC, and Rusk.
?
Swing - There are consumption penalties for using more or less than the contracted 5.0 MW 7x24 block (meaning there is no free swing).
These penalties are part of the ancillary services, which means that we will not have the exact specifications until Rusk receives the bids on their RFP on 6/27/01.
T&D ?
T&D is provided directly by Rusk County Electric Co-Op.
?
NTEC is charging us $0.20 / MW as an administrative fee (mark up), which is why the fixed T&D cost from Rusk County is $10.20/MW and not $10.00/MW.
?
There will be a minimum T&D charge from Rusk, above which we pay for only what we use: o For example: We pay the minimum charge or actual usage, whichever is higher.
Ricki is constructing the T&D only contract (which he claims will be similar in structure to the previous contract), with the inclusion of T&D pricing and swing.
I also reminded him that he needs to provide the audited financial statements to us.
Attached is a deal diagram with the most current information that we have.
Please let me know if you have any questions.
Regards,
| Oakhill Power Update |
Gerald, Per our recent discussions, I need to get two CAs as outlined below: Power Pipeline Partners Address: Power Pipeline Partners L.P. 10000 Memorial Drive Suite 200 Houston, TX 77024-3409 Contact: Randy Schorre-Vice President & COO I would like to put language in that protects either of us (non-circumvention?)
for deal leads that are divulged to the other party if they were not already known to either party or could be reasonably found out in the "open" market.
I would also like to protect any proprietary deal structuring exposed by ECS.
Energy Transfer Group Energy Transfer Company 2838 Woodside St. Dallas, TX 75204 Contact: Kelcy L. Warren-Partner I would like to put language in that protects either of us (non-circumvention?)
for deal leads that are divulged to the other party if they were not already known to either party or could be reasonably found out in the "open" market.
I would also like to protect any proprietary deal structuring exposed by ECS as well as any electric motor drive technology exposed by the Energy Transfer Group.
Please start on putting these together and I will call you this afternoon.
I'm trying to get these out int the next day or so as I dragged my feet on this last week.
Sorry for the squeeze.
Thanks,
| Power Pipeline Partners/Energy Transfer Group CAs |
When: Monday, June 25, 2001 3:15 PM-4:00 PM (GMT-06:00) Central Time (US & Canada).
Where: Gerald's Office EB - 3883 *~*~*~*~*~*~*~*~*~* Discussion of default and contract fulfillment risk between: 1.
Wholesale generation + ancillaries provider 2.
NTEC 3.
Rusk County Electric Co-op
| Oakhill Default Risk Issues |
Dave, let's discuss.. Jay, I know that this does not represent the definative agreement but as a starter we would easily do part 1, and part 2 is where the complicated issues lie.
We clearly need to understand the contractual arrangements they have with the third party.... if we go with part 2.
Dave, what are their plans to liquidate their july position?
Do they have any hedges on now?
What generation asset are they delaying... ( important info).
Get ENA a copy of all purchase and sale agreements including ( executed copies/originals).
Make sure that they do not have confidentiality issues related to the confirms...
If they do not, then we can look at them... if they do have CA issues then Gerald is advising me that they will need the consent of the seller to let ENA look at agreements.
BT
| Draft of proposed structure - Energy Solutions |
- G Attached is a contract from Colorado Springs Utilities for your review.
I've made a couple of changes already that you will see red-lined.
Let me know what you think.
Thanks,
| CSU contract for your review |
I am pleased to announce the following changes in the Global Risk Management Operations organization: Bob Hall will lead operations for Enron Americas.
Bob previously served as one of the business controllers for gas operations for Enron Americas, with direct responsibility for Gas Logistics and Volume Management.
The leadership team reporting to Bob will include Peggy Hedstrom (Calgary Operations), Jeff Gossett ( U.S. Gas Risk and South America Operations), Stacey White (U.S. Power Risk), Leslie Reeves (U.S. Gas and Power Confirmations and Settlements), and Bob Superty (U.S. Gas Logistics).
Brent Price will continue to lead Operations for Enron Global Markets and fulfill his dual role as Chief Accounting Officer for Enron Global Markets.
I am very pleased to announce that Kevin Sweeney will lead Operations for Enron Industrial Markets.
Kevin brings to his new role extensive risk and operations experience from stints in our Houston, London and Singapore offices.
Kevin fills the role that was previously held by Brenda Herod, who will now report directly to Beth Apollo.
Beth Apollo will be the Operations Project Manager for the assimilation of EES Wholesale.
This will include Deal Capture, Risk Analysis, Confirmations, and Global Data functions which have been moved into EWS under Global Risk Management Operations.
Successfully leveraging the infrastructure to support the EES business plan will also require close coordination with Gas Logistics, Settlements and the Operational Analysis (OA) process, and Beth will actively coordinate operations efforts with these teams and the commercial teams.
I have asked Beth to project manage the effort to look for opportunities to streamline and improve systems, processes and controls, and to consider alignment, where it makes sense, with existing EWS processes.
Reporting to Beth will be Scott Mills, with a focus on Deal Capture, Risk Analysis and Confirmations, and Brenda Herod, with a focus on invoicing control guidelines and reporting requirements.
Beth will also continue to manage the Global Services function, which includes the consolidated DPR process and Global Operations Standards, led by Shona Wilson, and the Global Data function which is lead by James Scribner.
Mike Jordan will continue to lead operations for Enron Europe, working closely with me and other EWS operations leads to insure the proliferation of best operational practices worldwide for Enron.
Thanks for your continued support especially in exploring and seizing commercial opportunities to strengthen our contributions to Enron.
| Global Risk Management Operations Organization Announcement |
I have received the executed CA from Energy Solutions.
I will return a copy to customer and send a copy to fuller and nemec.
Dave, please coordinate next steps with client including an immediate review of all the commercial details that they can share with us, including any paper that they have or are contemplating.
I am OK with a meeting on monday ( late ) or tues a.m... in L.A. but will insist that we see some paperwork first to determine our next steps.
Pls advise after you have talked to customer.
BT
| Energy Solutions Gas USA Inc - Confidentiality |
ISSUES: Counter party creditworthiness, reliability of power delivery, ability to procure replacement power.
Facts: NTEC has an all requirements G & T contract with Rusk.
NTEC has contracted to provide firm power to RUSk for Enron's contract, barring force majeure.
NTEC has block bid this power on the open market.
Bids are due 6/27/01.
REGULATORY OPTIONS 1.
Alternative Counterparty (a)SWEPCO: It appears that the franchise for the service territory relevant to this deal is dually certified to both RUSK and SWEPCO (I am working to verify this).
If the service territory is singly certified to RUSK, then no alternative counter party is eligible to supply power to the Enron contract.
However, if the territory is dually certified to SWEPCO, then SWEPCO could be an alternative counter party for the Enron contract instead of RUSK.
That should if applicable, resolve the creditworthiness issue and the ability to have recourse against a substantial counterparty in the event of default.
(b).
NTEC: Enron can enter into some 3rd party contractual arrangement with NTEC and a wholesaler, whereby there is direct pay between Enron and wholesaler, though title technically passes through NTEC.
For instance, after the bids come in, Enron can enter into a 3 party arrangement with NTEC and the winning bidder.
NTEC is a more substantial counterparty than RUSK and Enron can have recourse against NTEC in case of default.
2.
Reliability/Replacement Power: (a).
Enron can establish onsite DG as back up.
(b) If the DG is offsite, Enron can, depending on the location of the power, self wheel over NTEC or SWEPCO's transmission lines to contract site.
However, this may be inefficient due to increased line losses to back the power onto the grid.
(c) Enron can Enter into a backup power arrangement with a wholesale power provider to supply the power required under the Enron contract.
Once again, this arrangement must be originated through NTEC, because of its all requirements contract with RUSK.
However, if Enron substitutes power at market price for the NTEC power, Enron will bear the cost of the higher priced power.
NTEC has a long term partial requirements contract with SWEPCO, thus their power is much cheaper than market priced power.
3.
Deregulation Options (a) RUSK opts out of Deregulation: Senate Bill 7, Sec.
41.052, states that an Electric Coop that chooses not to opt in to retail choice "retains the right to offer and provide a full range of customer services and pricing programs to the customers within its certificated retail service area and to purchase and sell electric energy at wholesale without geographic restriction."
Depending on the value of this deal and the outstanding term of Rusk's contract with NTEC, Enron can persuade Rusk to renegotiate that contract or buy NTEC out.
Enron can then step in as the wholesale supplier of power to RUSK.
(b) RUSK opts in to deregulation: Enron can persuade RUSK to opt in to retail competition under an arrangement whereby Enron guarantees to RUSK that their current rates will remain at a predetermined stable position.
The downside is that there may be minimal stranded cost issues, and the upside will be that RUSk can market to customers outside its sevice territory yielding potentially higher revenues.
Questions: 1.
What are the terms and conditions of the contract between RUSK and NTEC, what are RUSK's termination or renegotiation rights; and 2.
What are the terms and conditions of the contract betweenNTEC and the wholesale supplier.
| ENRON COMPRESSION SERVICES DEAL |
Please ammend our WIC contract number 41066 to have the term match up to the MDQ.
Currently the MDQ goes to 0 after November 30,2009 but the term continues with a 0 MDQ through November 30, 2013.
We would like to match up the term with the MDQ so that the term expires on Nomber 30,2009.
Your earliest attention to this matter would be greatly appreciated.
Thanks,
| Enron North America WIC contract number 41066 ammendment |
If these changes are acceptable to you, Greely would be willing to sign all the contracts.
You know for the deal we have been flowing gas on since April.
Paul PS Only 7 more days!
| Contracts on Greeley Summer Deal |
Hi Gerald, I hope that things have gone well with your first set of law clerks.
I was writing to confirm that I will be starting work for you next Monday, July 2.
I have been trying to contact the HR representative that I spoke with initially, but she hasn't returned my calls.
I just wanted to make sure that everything was set for me to begin working.
I also wanted to let you know that I heard from the HBA about the photograph you recommended me for.
I wanted to thank you for remembering me.
I think that will be a great opportunity for me.
| Law Clerk Position |
For those of you interesed in volunteering for this event.
Please respond to Twanda Sweet at extension 3-9402.
Enron Wholesale Services Legal Department will be hosting a 4th of July Holiday party on July 3 at 2:00 -3:00 p.m. for the House of Tiny Treasures.
We are currently looking for volunteers to lend a helping hand with this event.
If you are interested in volunteering, please contact Twanda Sweet at extension 3-9402.
If you can't attend, due to vacation or other commitments, we will gladly accept donations from the Wish List below as well as monetary contributions.
| House of Tiny Treasures - Volunteer/Monetary Contributions (respond to Twanda Sweet) |
Gerald and Stacy - Attached is a worksheet for a new master physical with Berry Petroleum Company.
Please prepare draft at your earliest convenience and contact me when ready.
I am getting the email address of the Berry Petroleum person to whom we need to send this.
Thanks,
| New Master Physical |
Hi Gerald, I didn't get a copy of the new Committed Reserves/First Purchaser GTC from you last night.
I didn't know you if you forgot or if there was a problem with the email, so I thought I'd ask again.
Please let me know if you have any questions.
I appreciate your help.
SBR x30569
| New Committed Reserves/First Purchaser GTC |
Bruno, Julie Gomez relayed your concern regarding the last sentence of Article II, Section 2(a).
I have revised the sentence as you requested.
Please forward 2 executed copies of the LOI to Julie, whereupon she will sign and return you a fully executed version.
Thanks for your assistance.
Looking forward to working with you on this matter.
Steve Van Hooser
| Execution Copy of LOI |
We are pleased to announce that Greg Piper has been named President and CEO of Enron Net Works effective immediately.
Mark Pickering will join Greg in the Enron Net Works Office of the Chair as Chief Technology Officer and will relocate from London to Houston.
Mark joined Enron's IT development group in Houston in 1995 and has been Vice President and Chief Information Officer of Enron Europe since January 1998.
Mark has had responsibility for Enron's systems development and infrastructure outside of the Americas and has played a key role in supporting the growth and expansion of our business.
Paul Freeman, who is currently part of the Enron Metals management team in London, will replace Mark as Chief Information Officer for Enron Europe.
Please join us in congratulating Greg, Mark and Paul on their new roles.
We look forward to their contributions toward our continued success.
| Organizational Announcement |
Your comments are needed for Norma Gundersen who sat in for Rae Meadows.
Please return as soon as possible.
Thank you!-Becky Excellent = 5 Above Average = 4 Average = 3 Below Average = 2 Poor = 1 Initiative Cooperation Punctuality Attendance Quality of Work Would you request this person again Y/N?
Comments:
| Comments Needed-Norma Gundersen for Rae Meadows 07/02 |
Gerald - Where we are on getting the amended CSA executed.
When we spoke last - you were going to forward executed copies to me for FGT's signature, so I wanted to make sure they weren't floating around in the inter-office mail or something.
Thanks, Staci
| Amended Compression Services Agreement |
Andy, Per our recent discussions, you will find a proposal from Enron Compression Services to provide HP Services to KNG Energy to meet it growth expectations (either as is or through a new joint venture/ownership structure from the current bidding process).
We have made this proposal to conform with the expansion scenarios outlined in the offering memorandum and have provided flexibility for a 60%-90% load factor to be utilized for both stations.
We would be happy to have a tele-conference to go through this proposal with you.
You will also note that the latter part of the presentation begins to outline additional options (on a notional value basis) that we can put into a deal to increase the value of the deal over the proposed 10-year term.
We took a look at the strategic value of the underlying assets that were offered and were unfortunately not able to come up with a structure that we could support for either the purchase or re-capitalization of KNG Energy's assets.
We appreciate the opportunity to bid on these assets and are happy to work with you to optimize our proposal to fit the ultimate owner's needs for expansion.
I have also attached our group's brochure and a copy of a recent article about our group in Gas Daily.
Once again, thank you for the opportunity and I will call you in the near future to discuss this proposal further.
Chris Hilgert Director Enron Compression Services The parties hereto understand and agree that the PROPOSAL sets forth each party's preliminary understanding of the proposed transactions with KNG EnerGY and Enron compression services.
This PROPOSAL does not create and is not intended to create a binding and enforceable contract between the parties or a duty on the part of any party hereto to negotiate in good faith toward a binding contract and may not be relied upon by either party as the basis for a contract by estoppel or otherwise, but rather this proposal evidences a non-binding expression of the understanding of each party to endeavor, without obligation, to negotiate the terms of a proposed transaction.
| Enron Compression Services Proposal |
Troy, can you call Jill Mearz with TIE and get the same contract information for Gerald.
Please forward the information to Gerald as well.
Jill (972) 455-2980 Gerald, we are bidding on gas for several IPP's with this company.
They are wanting to get a copy of our contract ASAP to begin the initial review process.
When Troy forwards you the contract information what would be the turn around for a hard copy and email I could send them.
| Texas Independent Energy Contract |
As per Judy Thorne, I believe you are confirming these deals.
Please find below details of the Phy Gas deal with dedicated wells contract: Deal Date: 6/25/01 Deal No: 877838 Buyer: ENA Upstream Company LLC Seller: Pioneer Natural Resources USA, Inc. Start Date: 7/01/01 End Date: 7/31/01 Interruptible Volume: 2,918 / day Price: TENN.500.GDP.D.A Delivery Point: Tennessee Gas Pipeline Co. - Zone L 500 LN Meters 011413, 010442, 011492 Please let me know if you need any more details.
Thanks,
| ENA Upstream deal |
Steve would like to schedule a meeting with all of you regarding the Project Neptune work allocation (divestiture of HPL and LRC remaining assets).
Steve suggested the 18th, 19th or 20th at 10:00 a.m.
Please let me know your availability with regard to this meeting.
Thanks you for your assistance.
Rae Meadows
| ON BEHALF OF STEVE VAN HOOSER |
You are scheduled for a conference call on Monday at 2:00 p.m. with Stephanie Miller regarding PGT.
If this is not convenient for you, please let me or Stephanie Miller know.
Thanks.
Rae
| Conference Call on Monday, July 9th |
Enron's 3rd quarter blood drive will be held on Thursday, July 12, 2001, from 7am-4pm.
For your convenience, two mobile coaches from the M. D. Anderson Blood Center will be parked outside the Enron Building on Andrews Street.
Contact the Enron Health Center at Ext.
3-6100 or via email at: mailto:health.center@enron.com to schedule an appointment.
Walk-ins are welcome.
Through our partnership with M. D. Anderson Cancer Center Enron employees assist not only the Houston community but also our employees and their families.
Let's continue the spirit of giving.
| Enron Blood Drive |
Gerald, Can I get a standard CA put together for the following company: Kinder Morgan CO2 Company, L.P. 500 Dallas Suite 1100 Houston, TX 77002 The topic would be related to "certain compression assets in the SACROC Unit in Scurry County, TX."
I would like to get something to them ASAP, but no later than Monday as we are trying to meet with them on Friday morning next week.
Let me know if you have any questions.
Thanks,
| Kinder-Morgan CO2 L.P. CA |
All - Attached is a worksheet for a new ENFOLIO with Wheelabrator Lassen.
This counterparty is looking to transact on a 5-year deal sometime next week, so we need to get this executed as soon as possible.
Please prepare a draft at your earliest possible convenience.
I will forward the email address of the contact as soon as possible.
Thanks,
| New Master Physical with Wheelabrator Lassen |
Gerald, Please prepare a draft ENFOLIO per the attached for Colorado Springs Utilities.
When available, please forward Jay Williams and myself a copy of the completed document.
If you have any questions, please give me a call.
Sincerely,
| Colorado Springs Utilities Master Physical |
Baby girl Maxwell was born at 2:18 a.m. this morning.
Mother, Daddy and Baby are doing fine.
As soon as I have further information, such as name, weight, etc., I will send out a "follow-up" notice.
Thanks.
| Matt and Gina Maxwell are proud parents AGAIN..... |
Hi Kay, I am sending this to you on behalf of Gerald Nemec.
If there are any problems, you can contact me via email or at extension 52722.
Alisha
| Data Sheet Check |
Dear Chris: At Gerald Nemec's request, please find a confidentiality agreement he has approved between Enron Compression Services Company and Kinder Morgan CO2 Company, L.P.
Please advise when you're ready for the execution originals, and we'll print them out for you.
Best wishes,
| CA - Kinder Morgan CO2 Company, L.P. |
Judy, As discussed in our meeting today, please find attached list of term deals which need to be re-confirmed under Wellhead GTCs.
Please forward to us: Fieldname / county / state Well name Meter No.
/ Pipeline Working interest Please let me know if you have any questions.
Thanks,
| Long Term Deals - ENA Upstream |
As part of the recently negotiated agreement with United Parcel Service (UPS), Enron employees may now utilize two new letter centers when sending packages after hours.
These letter centers are located in Three Allen Center, on the ground level, behind the down escalator, near the U.S.
Postal Services self-service area and in the Enron Building, at the back of the escalators near the automated teller machine.
Letter-sized envelopes, as well as boxes up to 18"x 13" x 3" can be shipped via Next-Day Air, Second-Day Air, Third-Day Select, UPS International and UPS World-Wide Express Service.
In order to eliminate service disruptions, please apply a completed label to the envelope or box, in accordance with previously communicated shipping instructions.
When utilizing the shipping documentation available at the letter center, please include the Enron account number and your company code and cost center in the reference fields.
Pick up times at the letter centers are 7:45 p.m. for Three Allen Center and 8:00 p.m. for the Enron Building, Monday through Friday.
If you have any questions, please feel free to contact Glenn Lewis, Global Strategic Sourcing contract manager at 713-646-7512.
| United Parcel Service (UPS) Letter Centers Now Open |
As discussed in my voice mail, could you please review the Property Description for adequacy (keeping in mind the signer is a "down-home good-ol boy").
I will yield to your judgement.
Thanks!
Regards,
| Crawfish Mowing Letter |
Hey Gerald, I just wanted to update you on what I have been up to.
I have been working on a couple of small assignments for various lawyers and paralegals.
Steve Van Hooser brought me in on a big project that he is trying to wrap up.
The documents are to be executed tomorrow.
Despite the work that I have been given, I don't feel that I have much to work on.
I have been stopping in offices asking for work, but nobody wants me to work.
Any suggestions?
Alisha
| Work Load |
One of the most important credit tools available to help Enron Wholesale Se= rvices (EWS) manage counterparty credit risk is setoff rights.
This is par= ticularly true as our trading business is expanding to include numerous com= modity lines, including gas, power, coal, steel, pulp and paper, each of wh= ich may be traded under different masters with a single counterparty.
This= complexity is further increased as a result of EWS using multiple affiliat= ed entities to trade the various commodities.
Absent express contractual s= etoff rights, EWS may be unable to setoff exposures under different master = contracts.
=09A team of EWS lawyers has been working to assemble setoff language that = will substantially enhance EWS's credit position with counterparties with w= hom we trade multiple commodities.
This setoff language, which is set fort= h below, must be in all EWS trading form contracts.
Similarly, when negoti= ating on third party paper, we should request that this additional setoff l= anguage be added.
MANDATORY SETOFF LANGUAGE FOR=20 EWS TRADING CONTRACTS =09(A) Upon the designation or deemed designation of an Early Termination D= ate, the Non-Defaulting Party ("X") may, at its option and in its discretio= n, setoff, against any amounts Owed to the Defaulting Party ("Y") by X or a= ny Affiliate of X under this Agreement or under any other agreement(s), ins= trument(s) or undertaking(s), any amounts Owed by Y to X or any of X's Affi= liates under this Agreement or under any other agreement(s), instrument(s) = or undertaking(s).
The obligations of Y and X under this Agreement in resp= ect of such amounts shall be deemed satisfied and discharged to the extent = of any such setoff exercised by X and/or X's Affiliates.
X will give Y not= ice of any setoff effected under this section as soon as practicable after = the setoff is effected provided that failure to give such notice shall not = affect the validity of the setoff.
For purposes of this Section __, "Owed"=
| Mandatory Setoff Language for Inclusion in all EWS Trading Contracts |
Attached is a copy of the revised Confidentiality Agreement in connection with the North Carolina project.
I have incorporated the comments you sent via fax with the exception of those for Section 5 and have inserted our comments regarding this section.
If you would like to discuss our proposed language, please call Gerald Nemec at (713) 853-3517 in our legal department.
| Enron North America Confidentiality Agreement |
Gary, Per our conversation on July 11, I would like to reiterate that an Enron entity is interested in selling approximately 330 acres of land at the Napoleonville salt dome in Louisiana.
This land is divided into two tracts, one of about 256 acres and the other about 73 acres in size.
Enron recently received $15,000 per acre in a separate land transaction at Napoleonville, and this sets the market price that we expect to receive in the above proposed land sale.
Does Dow have interest in this land?
Is this price within your range?
If so, I would encourage you to draft a proposal from Dow within the next two weeks, if possible.
This email does not constitute an offer, but is solely provided for informational purposes.
Let's discuss this at your earliest convenience.
Thanks again for taking the time to meet with me last Thursday, and I look forward to hearing from you soon!
Sincerely,
| Napoleonville land sale |
Trevor, I created an amendment to the Energy Services Agreement based on Paul's letter of April 19.
I think that this amendment is a much cleaner way to revised the Schedules to the Agreement.
Please review the amendment and schedules.
I revised the schedules further to make the base line calculations clearer.
If OK, lets fax a copy to Paul for his review before I prepare executables.
Let me know if you have any questions.
Note: We will also need to have a declaration of HPL and Managing Partner of HCC to review and approve this amendment.
Kevin Howard can sign and I have already prepared this document.
| Planergy Amendment |
Ken, Attached is a revised draft of the Hanover Agreement based on all our discussions to date.
Please review.
I would prefer one more internal review prior to forwarding to Hanover.
Please note where information is still needed concerning the specific units for the schedule forms.
Sorry for the delay.
| Hanover Compression Agreement |
Dan, Attached are the Field Services and Purchase Agreement with the changes we discussed.
As we further discussed, there will be a letter agreement between Independent and Neidigger (??)
which gives independent the right to produce and market his gas in accordance with the terms of the attached agreements.
Do you have Niedigger real name and type of entity?
| Independent |
David, Attached is a construction agreement draft for a $750,000 gathering system between Sapphire Bay.LLC (of which ECT, Jedi II, and Independent are members) and Independent as contractor.
Sappire Bay will own the gathering system.
Please give me a call to discuss.
| Construction Agreement |
Ken, Attached is a redline that might make your review easier.
I didn't want to forward this one to Hanover.
Let me know if you have any questions.
| Compression Agreement |
Lisa, It is extremely hard to watch you struggle through this.
It is hard for me also.
I sit up here trying to work when the reality of our current situation weighs on me like a ton of bricks.
It is hard for me not to break down a couple of times a day, but the pace of my work usually forces me through those times.
I don't know if my calling you, asking you to lunch, or holding your hand, helps or hurts at this time.
But I am not going to let us give up on each other.
My feelings for you run too deep to just try and bury them so that I don't have to think about all the pain.
We are both struggling to find a place to start.
I want to start by just letting you know that not a day goes by without me thinking of a time when we can put this behind us.
I am not sure how to get there right now either.
However, during those few precious time lately when I get to look into your eyes, I see the true Lisa (changed as she is by the last couple of years), but still Lisa nonetheless.
I need to get to know this changed true Lisa, whatever happens in the near future.
I felt I just to had to write this email.
Gerald
| Derivatives |
Brian, Attached is a draft of the termination letter.
The letter assumes the letter agreement was executed.
There also appears to be an agency agreement which appointed Merrick as agent for ROW acquisition.
This is also terminated by the letter.
I haven't heard from Shonnie yet.
Please review and add any comments you have.
Thanks
| Merrick Termination |
Greg, Attached is a clean and redlined version of the Gateway Interconnect Agreement.
Please review before forwarding to Pace to make sure the ownership concept is in accordance with your negotiations.
Please call me if you have any questions and I will forward the Rio Nogales later today.
| Gateway Project |
Dan, Attached are the drafts with the Collection Facilities language.
Blank exhibits for the Security Agreement Form and Insurance requirements.
Will forward as soon as I am able to obtain them.
Let me know if you have any questions.
Dan, Could you ask Denise if all the Lease Agreement are the same form.
If not, I need to see all of them.
| MTG Drafts |
Tony, The following steps follow the contract amendment (assumes Bloomfield contract): 1.
Calculate the number of hours that the driver was down for force majeure.
2.
Subtract the hours in #1 from the total hours in the month.
3.
Calculate the Monthly Contract Quantity as defined in the amendment (Bloomfield -- 7000 times # of hours developed in #2 above)
| Compression Services Agreement Calculation |
I know love isn't enough by itself.
We have to give each other more.
The types of things that make the other feel full and complete in life.
We have focused on material things, when really more meaningful things, such telling the other that you have an interesting way of looking or thinking about some facet of life are what fills each other.
We are both bright and ambituous people who should be able to enjoy the finer things in life, but in the right context.
Not as direction, but as background to connecting as husband and wife.
Husband and wife means many things; friends, supporters, providers, sounding boards, lovers, shoulder to cry on, someone to just hold onto, or walk hand in hand on the beach.
I want to do these things for you and want you to do them for me.
Hope you can think of me.
Love,
| Thoughts |
Attached is the security document form.
Section 5.4 is missing and I will provide tommorrow.
However, in the interest of time I am forwarding the agreement for review.
| Security Document |
GT, I will be coming to this game w/o Lisa.
I plan on driving in Friday night and probably getting there about 9:00 pm.
If its okay I'll crash at your place.
Let me know how your schedule looks.
Since Lisa isn't coming I'll have an extra ticket with me on the 35.
Interested?
| Ready for some football |
Attached is a clean and redline version of the documents.
I have the Powder River Basin Exhibit and can fax if you want to review.
Please note that I added a section that allows Enron to relocate units if they are underutilized at their current location.
This was resultant of the 5 year term for the units contracted for during the initial 2 year period.
| Revised Compression Agreement |
Oooouch!
That one hurt.
We really kicked their butt all over the field.
The defense played well, especially Ahmad Brooks.
I don't think he had one completed on him all night.
What really sucks is that we just gave this game away with the punting team.
I am trying not to get too down about this.
This is a young team that is going to make mental errors and they will improve.
I still thinks we will have a good season.
The only freshman I saw getting any PT was Cory Redding.
He looks fast out there and really crushed somebody on a kick off return.
He also got some snaps at DE on a couple of 3 and longs, but didn't do anything outstanding.
Unfortunately he was also out there on the punt team during the debacles.
Victor Ike should be our starting tailback.
He look big and fast and gets yardages running in the interior.
Ike left a defender looking really stupid on his long TD run.
Sweet moves.
Hodges look about like he did last year.
Had a couple of good runs but doesn't seem to use his blocking very well.
OK, so we will begin our win streak with Stanford.
The thing I really like was that Mack said he takes full responsibility for the punting problems and that he will insure that they get fixed.
Mackovic would have made excuses that essentially put the blame elsewhere.
This season could be an up and down one, but the real prize is next year and the years after.
Did you get any info on the game?
| NC State |
Mark, Attached are the letter agreement and Purchase and Sale Agreement.
Please review.
Note there is a blank date in the letter agreement which needs to be provided.
If OK I will forward to TW.
| WT1 Docs |
Attached is a revised LOI for WT1.
I took out all the language concerning materials and equipment obligations incurred by ECS.
After talking with Knippa, I understand that after the sale of the motor to TW, they will be doing all of the installation.
Please review and provide comments.
| WT1 Docs |
Terry, Attached is a PSA form we have used before with the perspective of Enron as buyer.
Probably a little more detailed than we need for this one since the facilities are only estimated at $200,000.
Kennedy Oil is Seller and Enron Midstream Services, L.L.C.
is Buyer.
Some further detail on the site lease agreement: CounterParty is Black Hills Trucking, Inc Initial 1 year term, then month to month up to 2 years total Fee $800/month Black Hill will provide phone and electricity service hookup and Enron to reimburse Enron will directly pay phone and electricity bills Area is approximately 250 ft. X 400 ft. and is fenced off separately Include is existing 40 ft. X 40 ft. building on site.
Enron reserve right to install any other building reasonably necessary for site to function as an equipment laydown yard Enron reserve right to install septic system for bathroom in buildings used by Enron Enron needs access at all times through Black Hills front gate to get to site.
Enron will remove all equipment and buildings (except existing) upon termination.
| Site Lease and PSA form |
Lisa, I feel so bad right now.
I never wanted anything but to be with you and love you the rest of my life.
I wish we knew how important it was to communicate with each other over the past years.
I think we are both guilty of not communicating.
It is easier to talk to some besides each other about certain things because of certain expectations or assumptions that have been built up over our portion of a lifetime together.
It hurts to now clearly understand this after things have happened.
I am scared of you moving in with Chris because I fear that we both may accept it as final.
I don't want it to be that and I want us to genuinely work on this relationship.
I want us to talk and do things together.
You are my one true love.
| Future |
Melissa, I wasn't able to redline this version, but I added sections 10 and 11 and added futher language to Sections 3 and 6.
Hopefully you can redline it against your old version.
Let me know what you think about environmental indemnity language.
I think is is prudent from the view that Black Hills and has been using the Premises for some time and we are not sure what is out there.
| Revised Black Hills |
Attached are redlined and clean CSA and Gas side agreement.
Please review.
I am going to make further refinements over the weekend before we send to Drew.
| Gallup |
Please replace the prior version of the capacity release with the attached version.
I found a typo.
In the 5th line of the Section 2.1, the number was incorrect.
| Capacity Release |
Mark, I reviewed the contracts for whether the gathering fees are charged on an Mcf vs MMBtu basis.
The following are what the contracts state: Beartooth - MMBtu Crescendo - Mcf D&G Roustabout - MMBtu Hallwood - MMBtu LoneMountain/Premier - MMBtu National Fuels - MMBtu Northstar - MMBtu Tom Brown - Based on their stated intent to renegotiate Trend- MMBtu Wasatch - Not stated in contract.
Rate is as Wildhorse adjusts from month to month Venoco - MMBtu Let me know if you have any questions.
| Gathering Rates |
Attached for your review are drafts of the Capacity Assignment and Release Agreement and the Transaction No.
1 attached to the Master Firm Purchase Sale Enfolio.
Peter, any input you would have on Article 3 of the Assignment Agreement would be greatly appreciated.
Stephanie is trying to get these out as soon as possible tomorrow.
| Calpine Capacity Assignment Docs. |
You had asked for more information regarding Canadian renewal rights.
I found language in tariff in Transcanada's website (www.transcanada..com) under the following: NOVA FTS-R, Sec 12, FTS-D, Sec 10 BC system, Sec 4.9 Bottom line: 12 month notice prior to end of term.
Once notice given, irrevocable!
Must extend for at least one year.
Please call if you have questions.
Please call if you have any question.
Steph
| Canadian Tariffs |
Attached is a clean and redlined version of the Capacity Assignment and Release doc.
for Calpine.
The redline has Calpine changes in light purple with Enron's changes is red.
Please review.
Stephanie, I did not resend the revised confirm which I sent earlier today.
There were no changes to that doc.
since the revised version I sent this morning.
| Revised Assign and Release Doc. |
Larry, I am OK with the form and Robert's changes, except that the proper name is Bridgeline Storage Company, LLC.
No periods after the LLC.
Everything else looks fine.
| Bridgeline Storage Co. 24 " pipeline |
Stephanie, Attached is the clean and redlined revised Capacity Release and Assignment Agreement.
I changed the notification to require that Calpine give us notice and that we would attempt to negotiate with the pipelines to arrange an alternative to the notice.
Please review.
| Revised Capacity Release Agreement |
Stephanie, Attached is a further revision of the Capacity Release Doc.
The comments are from counsel in the Calgary office.
All the comments are consistent with the intent of the prior documents.
They mainly make the Canada section symmetric to the ENA section.
Please review.
| Revised Capacity Release |
Attached are clean versions of the most up to date documents.
The confirm also includes a redline copy with the changes we discussed this morning.
Please note that Calpine needs to execute the following documents: 1.
Capacity Release and Assignment Agreement 2.
Enfolio Master Firm Purchase/Sale Agreement 3.
Guaranty by Calpine Corporation (Included as Exhibit to Enfolio Master Agreement) 4.
Transaction No.
1 to Enfolio (the Confirm) Please let me know if you have any questions.
| Latest Versions |
Attached is latest version - due to quick turnaround, there may be a few typo's.
Julie, Gerald and I will be present.
Talk to you then....
| Doc's for conference call |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.