events listlengths 4 8 | priority listlengths 4 8 | severity listlengths 4 8 | optimal_score int64 540 7.62k | prompt stringlengths 263 695 |
|---|---|---|---|---|
[
[
"Level grind",
"2 hours"
],
[
"Sawcut edges",
"2 hours"
],
[
"Wet cure",
"1 hours"
],
[
"Breakout spalls",
"1.5 hours"
],
[
"Polymer mortar",
"2 hours"
],
[
"Clean substrate",
"2 hours"
],
[
"Feather edge",
"0.5 hours"
]
] | [
[
"Level grind",
"Fire station: Shear wall"
],
[
"Sawcut edges",
"Office building: Shear wall"
],
[
"Wet cure",
"School: Ground slab"
],
[
"Breakout spalls",
"School: Beam"
],
[
"Polymer mortar",
"Electrical substation: Reinforced concrete column"
],
[
... | [
[
"Level grind",
"3"
],
[
"Sawcut edges",
"3"
],
[
"Wet cure",
"4"
],
[
"Breakout spalls",
"3"
],
[
"Polymer mortar",
"1"
],
[
"Clean substrate",
"2"
],
[
"Feather edge",
"2"
]
] | 6,000 | Events:
- Level grind (2 hours)
- Sawcut edges (2 hours)
- Wet cure (1 hours)
- Breakout spalls (1.5 hours)
- Polymer mortar (2 hours)
- Clean substrate (2 hours)
- Feather edge (0.5 hours)
Priorities:
- Level grind (Fire station: Shear wall)
- Sawcut edges (Office building: Shear wall)
- Wet cure (School: Ground slab)
- Breakout spalls (School: Beam)
- Polymer mortar (Electrical substation: Reinforced concrete column)
- Clean substrate (Shopping mall: Roof)
- Feather edge (Shopping mall: Pile cap) |
[
[
"Breakout patch",
"0.5 hours"
],
[
"Compact base",
"2 hours"
],
[
"Drill dowels",
"1.5 hours"
],
[
"Rapid set mix",
"1.5 hours"
],
[
"Seal joints",
"1.5 hours"
]
] | [
[
"Breakout patch",
"Apartment: Shear wall"
],
[
"Compact base",
"Hospital: Roof"
],
[
"Drill dowels",
"Tool shed: Roof"
],
[
"Rapid set mix",
"Apartment: Pile cap"
],
[
"Seal joints",
"Tool shed: Parapets"
]
] | [
[
"Breakout patch",
"3"
],
[
"Compact base",
"3"
],
[
"Drill dowels",
"2"
],
[
"Rapid set mix",
"3"
],
[
"Seal joints",
"5"
]
] | 2,250 | Events:
- Breakout patch (0.5 hours)
- Compact base (2 hours)
- Drill dowels (1.5 hours)
- Rapid set mix (1.5 hours)
- Seal joints (1.5 hours)
Priorities:
- Breakout patch (Apartment: Shear wall)
- Compact base (Hospital: Roof)
- Drill dowels (Tool shed: Roof)
- Rapid set mix (Apartment: Pile cap)
- Seal joints (Tool shed: Parapets) |
[
[
"Joint reseal",
"1 hours"
],
[
"Breathable seal",
"1.5 hours"
],
[
"Steam clean",
"1 hours"
],
[
"Crack seal",
"0.5 hours"
],
[
"Repoint joints",
"2 hours"
]
] | [
[
"Joint reseal",
"Apartment: Cladding panels"
],
[
"Breathable seal",
"Shopping mall: Cladding panels"
],
[
"Steam clean",
"Apartment: Parapets"
],
[
"Crack seal",
"Fire station: Floor"
],
[
"Repoint joints",
"Office building: Precast window sills"
]
] | [
[
"Joint reseal",
"2"
],
[
"Breathable seal",
"4"
],
[
"Steam clean",
"4"
],
[
"Crack seal",
"5"
],
[
"Repoint joints",
"3"
]
] | 1,110 | Events:
- Joint reseal (1 hours)
- Breathable seal (1.5 hours)
- Steam clean (1 hours)
- Crack seal (0.5 hours)
- Repoint joints (2 hours)
Priorities:
- Joint reseal (Apartment: Cladding panels)
- Breathable seal (Shopping mall: Cladding panels)
- Steam clean (Apartment: Parapets)
- Crack seal (Fire station: Floor)
- Repoint joints (Office building: Precast window sills) |
[
[
"Bond coat",
"1 hours"
],
[
"Polymer mortar",
"2 hours"
],
[
"Surface seal",
"1.5 hours"
],
[
"Breakout spalls",
"0.5 hours"
],
[
"Clean substrate",
"2 hours"
]
] | [
[
"Bond coat",
"Fire station: Load-bearing masonry wall"
],
[
"Polymer mortar",
"Tool shed: Shear wall"
],
[
"Surface seal",
"School: Staircase"
],
[
"Breakout spalls",
"Office building: Ground slab"
],
[
"Clean substrate",
"Shopping mall: Floor"
]
] | [
[
"Bond coat",
"3"
],
[
"Polymer mortar",
"2"
],
[
"Surface seal",
"3"
],
[
"Breakout spalls",
"1"
],
[
"Clean substrate",
"5"
]
] | 2,430 | Events:
- Bond coat (1 hours)
- Polymer mortar (2 hours)
- Surface seal (1.5 hours)
- Breakout spalls (0.5 hours)
- Clean substrate (2 hours)
Priorities:
- Bond coat (Fire station: Load-bearing masonry wall)
- Polymer mortar (Tool shed: Shear wall)
- Surface seal (School: Staircase)
- Breakout spalls (Office building: Ground slab)
- Clean substrate (Shopping mall: Floor) |
[
[
"Sawcut edges",
"0.5 hours"
],
[
"Breakout spalls",
"0.5 hours"
],
[
"Level grind",
"0.5 hours"
],
[
"Clean substrate",
"2 hours"
]
] | [
[
"Sawcut edges",
"Tool shed: Ground slab"
],
[
"Breakout spalls",
"Shopping mall: Shear wall"
],
[
"Level grind",
"Hospital: Load-bearing masonry wall"
],
[
"Clean substrate",
"Shopping mall: Floor"
]
] | [
[
"Sawcut edges",
"2"
],
[
"Breakout spalls",
"1"
],
[
"Level grind",
"3"
],
[
"Clean substrate",
"5"
]
] | 1,080 | Events:
- Sawcut edges (0.5 hours)
- Breakout spalls (0.5 hours)
- Level grind (0.5 hours)
- Clean substrate (2 hours)
Priorities:
- Sawcut edges (Tool shed: Ground slab)
- Breakout spalls (Shopping mall: Shear wall)
- Level grind (Hospital: Load-bearing masonry wall)
- Clean substrate (Shopping mall: Floor) |
[
[
"Tie rebar",
"2 hours"
],
[
"Grit blast rebar",
"2 hours"
],
[
"Rebar passivation",
"2 hours"
],
[
"Replace rebar",
"0.5 hours"
]
] | [
[
"Tie rebar",
"School: Precast window sills"
],
[
"Grit blast rebar",
"Electrical substation: Balcony slabs"
],
[
"Rebar passivation",
"Tool shed: Shear wall"
],
[
"Replace rebar",
"Electrical substation: Beam"
]
] | [
[
"Tie rebar",
"2"
],
[
"Grit blast rebar",
"2"
],
[
"Rebar passivation",
"2"
],
[
"Replace rebar",
"1"
]
] | 1,290 | Events:
- Tie rebar (2 hours)
- Grit blast rebar (2 hours)
- Rebar passivation (2 hours)
- Replace rebar (0.5 hours)
Priorities:
- Tie rebar (School: Precast window sills)
- Grit blast rebar (Electrical substation: Balcony slabs)
- Rebar passivation (Tool shed: Shear wall)
- Replace rebar (Electrical substation: Beam) |
[
[
"Neutralize surface",
"1 hours"
],
[
"Breathable seal",
"0.5 hours"
],
[
"Pore blocker",
"0.5 hours"
],
[
"Hydrophobic coat",
"1 hours"
],
[
"Acid wash",
"1.5 hours"
],
[
"Joint reseal",
"1 hours"
],
[
"Pressure wash",
"0.5 hours"
]... | [
[
"Neutralize surface",
"Tool shed: Precast window sills"
],
[
"Breathable seal",
"Office building: Cladding panels"
],
[
"Pore blocker",
"Electrical substation: Footing"
],
[
"Hydrophobic coat",
"Shopping mall: Load-bearing masonry wall"
],
[
"Acid wash",
"El... | [
[
"Neutralize surface",
"5"
],
[
"Breathable seal",
"5"
],
[
"Pore blocker",
"2"
],
[
"Hydrophobic coat",
"3"
],
[
"Acid wash",
"3"
],
[
"Joint reseal",
"3"
],
[
"Pressure wash",
"2"
],
[
"Crack seal",
"5"
]
] | 3,420 | Events:
- Neutralize surface (1 hours)
- Breathable seal (0.5 hours)
- Pore blocker (0.5 hours)
- Hydrophobic coat (1 hours)
- Acid wash (1.5 hours)
- Joint reseal (1 hours)
- Pressure wash (0.5 hours)
- Crack seal (1.5 hours)
Priorities:
- Neutralize surface (Tool shed: Precast window sills)
- Breathable seal (Office building: Cladding panels)
- Pore blocker (Electrical substation: Footing)
- Hydrophobic coat (Shopping mall: Load-bearing masonry wall)
- Acid wash (Electrical substation: Reinforced concrete column)
- Joint reseal (School: Roof)
- Pressure wash (Fire station: Landing slabs)
- Crack seal (Fire station: Reinforced concrete column) |
[
[
"Epoxy injection",
"2 hours"
],
[
"Joint reseal",
"0.5 hours"
],
[
"Install crack staples",
"1.5 hours"
],
[
"Polyurethane injection",
"2 hours"
],
[
"Stitch cracks",
"1 hours"
],
[
"Grind and seal",
"1 hours"
],
[
"Backer rod install",
... | [
[
"Epoxy injection",
"School: Balcony slabs"
],
[
"Joint reseal",
"Office building: Pile cap"
],
[
"Install crack staples",
"Hospital: Ground slab"
],
[
"Polyurethane injection",
"Apartment: Precast window sills"
],
[
"Stitch cracks",
"Tool shed: Reinforced co... | [
[
"Epoxy injection",
"1"
],
[
"Joint reseal",
"1"
],
[
"Install crack staples",
"4"
],
[
"Polyurethane injection",
"2"
],
[
"Stitch cracks",
"4"
],
[
"Grind and seal",
"1"
],
[
"Backer rod install",
"1"
]
] | 2,910 | Events:
- Epoxy injection (2 hours)
- Joint reseal (0.5 hours)
- Install crack staples (1.5 hours)
- Polyurethane injection (2 hours)
- Stitch cracks (1 hours)
- Grind and seal (1 hours)
- Backer rod install (0.5 hours)
Priorities:
- Epoxy injection (School: Balcony slabs)
- Joint reseal (Office building: Pile cap)
- Install crack staples (Hospital: Ground slab)
- Polyurethane injection (Apartment: Precast window sills)
- Stitch cracks (Tool shed: Reinforced concrete column)
- Grind and seal (School: Parapets)
- Backer rod install (Shopping mall: Landing slabs) |
[
[
"Breathable seal",
"0.5 hours"
],
[
"Pressure wash",
"2 hours"
],
[
"Steam clean",
"0.5 hours"
],
[
"Crack seal",
"1 hours"
],
[
"Repoint joints",
"1.5 hours"
],
[
"Joint reseal",
"1 hours"
],
[
"Neutralize surface",
"0.5 hours"
],
... | [
[
"Breathable seal",
"Office building: Beam"
],
[
"Pressure wash",
"Shopping mall: Roof"
],
[
"Steam clean",
"Tool shed: Beam"
],
[
"Crack seal",
"Shopping mall: Balcony slabs"
],
[
"Repoint joints",
"Tool shed: Beam"
],
[
"Joint reseal",
"Tool she... | [
[
"Breathable seal",
"4"
],
[
"Pressure wash",
"5"
],
[
"Steam clean",
"2"
],
[
"Crack seal",
"2"
],
[
"Repoint joints",
"4"
],
[
"Joint reseal",
"1"
],
[
"Neutralize surface",
"1"
],
[
"Acid wash",
"3"
]
] | 4,140 | Events:
- Breathable seal (0.5 hours)
- Pressure wash (2 hours)
- Steam clean (0.5 hours)
- Crack seal (1 hours)
- Repoint joints (1.5 hours)
- Joint reseal (1 hours)
- Neutralize surface (0.5 hours)
- Acid wash (2 hours)
Priorities:
- Breathable seal (Office building: Beam)
- Pressure wash (Shopping mall: Roof)
- Steam clean (Tool shed: Beam)
- Crack seal (Shopping mall: Balcony slabs)
- Repoint joints (Tool shed: Beam)
- Joint reseal (Tool shed: Parapets)
- Neutralize surface (Fire station: Landing slabs)
- Acid wash (Fire station: Beam) |
[
[
"Route and seal",
"1.5 hours"
],
[
"Stitch cracks",
"2 hours"
],
[
"Epoxy injection",
"1.5 hours"
],
[
"Polyurethane injection",
"0.5 hours"
]
] | [
[
"Route and seal",
"Apartment: Landing slabs"
],
[
"Stitch cracks",
"Fire station: Reinforced concrete column"
],
[
"Epoxy injection",
"Hospital: Beam"
],
[
"Polyurethane injection",
"Apartment: Pile cap"
]
] | [
[
"Route and seal",
"5"
],
[
"Stitch cracks",
"5"
],
[
"Epoxy injection",
"5"
],
[
"Polyurethane injection",
"5"
]
] | 1,830 | Events:
- Route and seal (1.5 hours)
- Stitch cracks (2 hours)
- Epoxy injection (1.5 hours)
- Polyurethane injection (0.5 hours)
Priorities:
- Route and seal (Apartment: Landing slabs)
- Stitch cracks (Fire station: Reinforced concrete column)
- Epoxy injection (Hospital: Beam)
- Polyurethane injection (Apartment: Pile cap) |
[
[
"Sawcut edges",
"1 hours"
],
[
"Bond coat",
"2 hours"
],
[
"Polymer mortar",
"1.5 hours"
],
[
"Wet cure",
"0.5 hours"
],
[
"Feather edge",
"1 hours"
],
[
"Clean substrate",
"2 hours"
],
[
"Level grind",
"2 hours"
],
[
"Breakou... | [
[
"Sawcut edges",
"Electrical substation: Landing slabs"
],
[
"Bond coat",
"Fire station: Beam"
],
[
"Polymer mortar",
"Office building: Pile cap"
],
[
"Wet cure",
"Tool shed: Roof"
],
[
"Feather edge",
"Office building: Precast window sills"
],
[
"Cle... | [
[
"Sawcut edges",
"5"
],
[
"Bond coat",
"2"
],
[
"Polymer mortar",
"2"
],
[
"Wet cure",
"2"
],
[
"Feather edge",
"2"
],
[
"Clean substrate",
"1"
],
[
"Level grind",
"4"
],
[
"Breakout spalls",
"3"
]
] | 5,340 | Events:
- Sawcut edges (1 hours)
- Bond coat (2 hours)
- Polymer mortar (1.5 hours)
- Wet cure (0.5 hours)
- Feather edge (1 hours)
- Clean substrate (2 hours)
- Level grind (2 hours)
- Breakout spalls (0.5 hours)
Priorities:
- Sawcut edges (Electrical substation: Landing slabs)
- Bond coat (Fire station: Beam)
- Polymer mortar (Office building: Pile cap)
- Wet cure (Tool shed: Roof)
- Feather edge (Office building: Precast window sills)
- Clean substrate (Hospital: Roof)
- Level grind (Hospital: Shear wall)
- Breakout spalls (Hospital: Parapets) |
[
[
"Pressure wash",
"0.5 hours"
],
[
"Steam clean",
"1.5 hours"
],
[
"Hydrophobic coat",
"1.5 hours"
],
[
"Repoint joints",
"2 hours"
],
[
"Joint reseal",
"1 hours"
]
] | [
[
"Pressure wash",
"Fire station: Landing slabs"
],
[
"Steam clean",
"Hospital: Balcony slabs"
],
[
"Hydrophobic coat",
"Office building: Load-bearing masonry wall"
],
[
"Repoint joints",
"Fire station: Beam"
],
[
"Joint reseal",
"Apartment: Beam"
]
] | [
[
"Pressure wash",
"5"
],
[
"Steam clean",
"2"
],
[
"Hydrophobic coat",
"5"
],
[
"Repoint joints",
"2"
],
[
"Joint reseal",
"2"
]
] | 2,460 | Events:
- Pressure wash (0.5 hours)
- Steam clean (1.5 hours)
- Hydrophobic coat (1.5 hours)
- Repoint joints (2 hours)
- Joint reseal (1 hours)
Priorities:
- Pressure wash (Fire station: Landing slabs)
- Steam clean (Hospital: Balcony slabs)
- Hydrophobic coat (Office building: Load-bearing masonry wall)
- Repoint joints (Fire station: Beam)
- Joint reseal (Apartment: Beam) |
[
[
"Clean pothole",
"1.5 hours"
],
[
"Sawcut edges",
"1 hours"
],
[
"Set forms",
"2 hours"
],
[
"Rapid set mix",
"1 hours"
],
[
"Compact base",
"1.5 hours"
],
[
"Drill dowels",
"0.5 hours"
],
[
"Seal joints",
"2 hours"
],
[
"Appl... | [
[
"Clean pothole",
"Office building: Footing"
],
[
"Sawcut edges",
"Hospital: Balcony slabs"
],
[
"Set forms",
"Fire station: Ground slab"
],
[
"Rapid set mix",
"Hospital: Footing"
],
[
"Compact base",
"Shopping mall: Pile cap"
],
[
"Drill dowels",
... | [
[
"Clean pothole",
"2"
],
[
"Sawcut edges",
"5"
],
[
"Set forms",
"1"
],
[
"Rapid set mix",
"3"
],
[
"Compact base",
"2"
],
[
"Drill dowels",
"5"
],
[
"Seal joints",
"2"
],
[
"Apply tack coat",
"1"
]
] | 5,970 | Events:
- Clean pothole (1.5 hours)
- Sawcut edges (1 hours)
- Set forms (2 hours)
- Rapid set mix (1 hours)
- Compact base (1.5 hours)
- Drill dowels (0.5 hours)
- Seal joints (2 hours)
- Apply tack coat (1 hours)
Priorities:
- Clean pothole (Office building: Footing)
- Sawcut edges (Hospital: Balcony slabs)
- Set forms (Fire station: Ground slab)
- Rapid set mix (Hospital: Footing)
- Compact base (Shopping mall: Pile cap)
- Drill dowels (Electrical substation: Parapets)
- Seal joints (Shopping mall: Parapets)
- Apply tack coat (Office building: Reinforced concrete column) |
[
[
"Stitch cracks",
"1.5 hours"
],
[
"Polyurethane injection",
"1 hours"
],
[
"Grind and seal",
"2 hours"
],
[
"Joint reseal",
"1.5 hours"
],
[
"Hairline sealing",
"1 hours"
],
[
"Backer rod install",
"0.5 hours"
],
[
"Epoxy injection",
... | [
[
"Stitch cracks",
"Fire station: Cladding panels"
],
[
"Polyurethane injection",
"Apartment: Load-bearing masonry wall"
],
[
"Grind and seal",
"Fire station: Ground slab"
],
[
"Joint reseal",
"Tool shed: Cladding panels"
],
[
"Hairline sealing",
"Fire station... | [
[
"Stitch cracks",
"2"
],
[
"Polyurethane injection",
"5"
],
[
"Grind and seal",
"1"
],
[
"Joint reseal",
"4"
],
[
"Hairline sealing",
"1"
],
[
"Backer rod install",
"2"
],
[
"Epoxy injection",
"2"
]
] | 3,780 | Events:
- Stitch cracks (1.5 hours)
- Polyurethane injection (1 hours)
- Grind and seal (2 hours)
- Joint reseal (1.5 hours)
- Hairline sealing (1 hours)
- Backer rod install (0.5 hours)
- Epoxy injection (1 hours)
Priorities:
- Stitch cracks (Fire station: Cladding panels)
- Polyurethane injection (Apartment: Load-bearing masonry wall)
- Grind and seal (Fire station: Ground slab)
- Joint reseal (Tool shed: Cladding panels)
- Hairline sealing (Fire station: Floor)
- Backer rod install (Office building: Footing)
- Epoxy injection (Fire station: Ground slab) |
[
[
"Steam clean",
"1 hours"
],
[
"Crack seal",
"2 hours"
],
[
"Neutralize surface",
"0.5 hours"
],
[
"Pressure wash",
"1 hours"
],
[
"Acid wash",
"1 hours"
],
[
"Hydrophobic coat",
"1.5 hours"
],
[
"Joint reseal",
"1.5 hours"
],
[
... | [
[
"Steam clean",
"Office building: Beam"
],
[
"Crack seal",
"Hospital: Parapets"
],
[
"Neutralize surface",
"Apartment: Staircase"
],
[
"Pressure wash",
"Apartment: Parapets"
],
[
"Acid wash",
"Hospital: Pile cap"
],
[
"Hydrophobic coat",
"Electric... | [
[
"Steam clean",
"4"
],
[
"Crack seal",
"5"
],
[
"Neutralize surface",
"3"
],
[
"Pressure wash",
"5"
],
[
"Acid wash",
"1"
],
[
"Hydrophobic coat",
"2"
],
[
"Joint reseal",
"3"
],
[
"Repoint joints",
"3"
]
] | 3,990 | Events:
- Steam clean (1 hours)
- Crack seal (2 hours)
- Neutralize surface (0.5 hours)
- Pressure wash (1 hours)
- Acid wash (1 hours)
- Hydrophobic coat (1.5 hours)
- Joint reseal (1.5 hours)
- Repoint joints (1 hours)
Priorities:
- Steam clean (Office building: Beam)
- Crack seal (Hospital: Parapets)
- Neutralize surface (Apartment: Staircase)
- Pressure wash (Apartment: Parapets)
- Acid wash (Hospital: Pile cap)
- Hydrophobic coat (Electrical substation: Landing slabs)
- Joint reseal (Shopping mall: Beam)
- Repoint joints (Apartment: Footing) |
[
[
"Tie rebar",
"2 hours"
],
[
"Replace rebar",
"0.5 hours"
],
[
"Protective coating",
"1.5 hours"
],
[
"Cover breakout",
"1.5 hours"
]
] | [
[
"Tie rebar",
"Electrical substation: Pile cap"
],
[
"Replace rebar",
"Hospital: Reinforced concrete column"
],
[
"Protective coating",
"Electrical substation: Pile cap"
],
[
"Cover breakout",
"Electrical substation: Pile cap"
]
] | [
[
"Tie rebar",
"3"
],
[
"Replace rebar",
"4"
],
[
"Protective coating",
"3"
],
[
"Cover breakout",
"4"
]
] | 1,410 | Events:
- Tie rebar (2 hours)
- Replace rebar (0.5 hours)
- Protective coating (1.5 hours)
- Cover breakout (1.5 hours)
Priorities:
- Tie rebar (Electrical substation: Pile cap)
- Replace rebar (Hospital: Reinforced concrete column)
- Protective coating (Electrical substation: Pile cap)
- Cover breakout (Electrical substation: Pile cap) |
[
[
"Route and seal",
"1.5 hours"
],
[
"Overband sealing",
"0.5 hours"
],
[
"Joint reseal",
"2 hours"
],
[
"Stitch cracks",
"0.5 hours"
],
[
"Polyurethane injection",
"2 hours"
],
[
"Epoxy injection",
"1 hours"
],
[
"Hairline sealing",
"1... | [
[
"Route and seal",
"Electrical substation: Precast window sills"
],
[
"Overband sealing",
"Hospital: Cladding panels"
],
[
"Joint reseal",
"School: Balcony slabs"
],
[
"Stitch cracks",
"Fire station: Floor"
],
[
"Polyurethane injection",
"Shopping mall: Parap... | [
[
"Route and seal",
"4"
],
[
"Overband sealing",
"1"
],
[
"Joint reseal",
"1"
],
[
"Stitch cracks",
"2"
],
[
"Polyurethane injection",
"1"
],
[
"Epoxy injection",
"4"
],
[
"Hairline sealing",
"2"
]
] | 2,700 | Events:
- Route and seal (1.5 hours)
- Overband sealing (0.5 hours)
- Joint reseal (2 hours)
- Stitch cracks (0.5 hours)
- Polyurethane injection (2 hours)
- Epoxy injection (1 hours)
- Hairline sealing (1 hours)
Priorities:
- Route and seal (Electrical substation: Precast window sills)
- Overband sealing (Hospital: Cladding panels)
- Joint reseal (School: Balcony slabs)
- Stitch cracks (Fire station: Floor)
- Polyurethane injection (Shopping mall: Parapets)
- Epoxy injection (Apartment: Precast window sills)
- Hairline sealing (Office building: Shear wall) |
[
[
"Install anodes",
"0.5 hours"
],
[
"Grit blast rebar",
"2 hours"
],
[
"Tie rebar",
"1.5 hours"
],
[
"Rebar passivation",
"1.5 hours"
]
] | [
[
"Install anodes",
"Electrical substation: Beam"
],
[
"Grit blast rebar",
"School: Beam"
],
[
"Tie rebar",
"Electrical substation: Staircase"
],
[
"Rebar passivation",
"Hospital: Load-bearing masonry wall"
]
] | [
[
"Install anodes",
"4"
],
[
"Grit blast rebar",
"5"
],
[
"Tie rebar",
"5"
],
[
"Rebar passivation",
"1"
]
] | 1,470 | Events:
- Install anodes (0.5 hours)
- Grit blast rebar (2 hours)
- Tie rebar (1.5 hours)
- Rebar passivation (1.5 hours)
Priorities:
- Install anodes (Electrical substation: Beam)
- Grit blast rebar (School: Beam)
- Tie rebar (Electrical substation: Staircase)
- Rebar passivation (Hospital: Load-bearing masonry wall) |
[
[
"Route and seal",
"1.5 hours"
],
[
"Polyurethane injection",
"0.5 hours"
],
[
"Grind and seal",
"1.5 hours"
],
[
"Joint reseal",
"0.5 hours"
],
[
"Hairline sealing",
"0.5 hours"
],
[
"Backer rod install",
"1 hours"
],
[
"Overband sealing"... | [
[
"Route and seal",
"Hospital: Beam"
],
[
"Polyurethane injection",
"Hospital: Staircase"
],
[
"Grind and seal",
"School: Ground slab"
],
[
"Joint reseal",
"School: Balcony slabs"
],
[
"Hairline sealing",
"Tool shed: Precast window sills"
],
[
"Backer ... | [
[
"Route and seal",
"1"
],
[
"Polyurethane injection",
"1"
],
[
"Grind and seal",
"2"
],
[
"Joint reseal",
"3"
],
[
"Hairline sealing",
"5"
],
[
"Backer rod install",
"2"
],
[
"Overband sealing",
"5"
],
[
"Stitch cracks",
"2... | 4,140 | Events:
- Route and seal (1.5 hours)
- Polyurethane injection (0.5 hours)
- Grind and seal (1.5 hours)
- Joint reseal (0.5 hours)
- Hairline sealing (0.5 hours)
- Backer rod install (1 hours)
- Overband sealing (1 hours)
- Stitch cracks (1.5 hours)
Priorities:
- Route and seal (Hospital: Beam)
- Polyurethane injection (Hospital: Staircase)
- Grind and seal (School: Ground slab)
- Joint reseal (School: Balcony slabs)
- Hairline sealing (Tool shed: Precast window sills)
- Backer rod install (Hospital: Floor)
- Overband sealing (Hospital: Precast window sills)
- Stitch cracks (Fire station: Parapets) |
[
[
"Sawcut edges",
"0.5 hours"
],
[
"Rapid set mix",
"2 hours"
],
[
"Place patch",
"1 hours"
],
[
"Set forms",
"2 hours"
],
[
"Clean pothole",
"1.5 hours"
],
[
"Breakout patch",
"2 hours"
]
] | [
[
"Sawcut edges",
"School: Shear wall"
],
[
"Rapid set mix",
"Apartment: Floor"
],
[
"Place patch",
"Fire station: Cladding panels"
],
[
"Set forms",
"School: Parapets"
],
[
"Clean pothole",
"Electrical substation: Reinforced concrete column"
],
[
"Bre... | [
[
"Sawcut edges",
"5"
],
[
"Rapid set mix",
"3"
],
[
"Place patch",
"2"
],
[
"Set forms",
"3"
],
[
"Clean pothole",
"3"
],
[
"Breakout patch",
"4"
]
] | 3,420 | Events:
- Sawcut edges (0.5 hours)
- Rapid set mix (2 hours)
- Place patch (1 hours)
- Set forms (2 hours)
- Clean pothole (1.5 hours)
- Breakout patch (2 hours)
Priorities:
- Sawcut edges (School: Shear wall)
- Rapid set mix (Apartment: Floor)
- Place patch (Fire station: Cladding panels)
- Set forms (School: Parapets)
- Clean pothole (Electrical substation: Reinforced concrete column)
- Breakout patch (Office building: Footing) |
[
[
"Sawcut edges",
"1 hours"
],
[
"Polymer mortar",
"2 hours"
],
[
"Surface seal",
"0.5 hours"
],
[
"Shotcrete patch",
"0.5 hours"
],
[
"Wet cure",
"1.5 hours"
],
[
"Level grind",
"0.5 hours"
],
[
"Bond coat",
"0.5 hours"
],
[
"B... | [
[
"Sawcut edges",
"Tool shed: Pile cap"
],
[
"Polymer mortar",
"School: Beam"
],
[
"Surface seal",
"Shopping mall: Pile cap"
],
[
"Shotcrete patch",
"School: Ground slab"
],
[
"Wet cure",
"Electrical substation: Beam"
],
[
"Level grind",
"Office bu... | [
[
"Sawcut edges",
"3"
],
[
"Polymer mortar",
"5"
],
[
"Surface seal",
"1"
],
[
"Shotcrete patch",
"1"
],
[
"Wet cure",
"3"
],
[
"Level grind",
"1"
],
[
"Bond coat",
"1"
],
[
"Breakout spalls",
"1"
]
] | 3,120 | Events:
- Sawcut edges (1 hours)
- Polymer mortar (2 hours)
- Surface seal (0.5 hours)
- Shotcrete patch (0.5 hours)
- Wet cure (1.5 hours)
- Level grind (0.5 hours)
- Bond coat (0.5 hours)
- Breakout spalls (2 hours)
Priorities:
- Sawcut edges (Tool shed: Pile cap)
- Polymer mortar (School: Beam)
- Surface seal (Shopping mall: Pile cap)
- Shotcrete patch (School: Ground slab)
- Wet cure (Electrical substation: Beam)
- Level grind (Office building: Precast window sills)
- Bond coat (Tool shed: Beam)
- Breakout spalls (Office building: Cladding panels) |
[
[
"Zinc primer",
"2 hours"
],
[
"Protective coating",
"2 hours"
],
[
"Rebar passivation",
"1 hours"
],
[
"Install anodes",
"1 hours"
],
[
"Mortar patch",
"0.5 hours"
],
[
"Grit blast rebar",
"0.5 hours"
]
] | [
[
"Zinc primer",
"Office building: Landing slabs"
],
[
"Protective coating",
"Hospital: Pile cap"
],
[
"Rebar passivation",
"Electrical substation: Footing"
],
[
"Install anodes",
"Fire station: Floor"
],
[
"Mortar patch",
"Fire station: Footing"
],
[
... | [
[
"Zinc primer",
"4"
],
[
"Protective coating",
"4"
],
[
"Rebar passivation",
"5"
],
[
"Install anodes",
"3"
],
[
"Mortar patch",
"1"
],
[
"Grit blast rebar",
"5"
]
] | 2,670 | Events:
- Zinc primer (2 hours)
- Protective coating (2 hours)
- Rebar passivation (1 hours)
- Install anodes (1 hours)
- Mortar patch (0.5 hours)
- Grit blast rebar (0.5 hours)
Priorities:
- Zinc primer (Office building: Landing slabs)
- Protective coating (Hospital: Pile cap)
- Rebar passivation (Electrical substation: Footing)
- Install anodes (Fire station: Floor)
- Mortar patch (Fire station: Footing)
- Grit blast rebar (Fire station: Staircase) |
[
[
"Bond coat",
"2 hours"
],
[
"Clean substrate",
"1 hours"
],
[
"Feather edge",
"1.5 hours"
],
[
"Polymer mortar",
"2 hours"
],
[
"Sawcut edges",
"1.5 hours"
],
[
"Level grind",
"0.5 hours"
]
] | [
[
"Bond coat",
"Tool shed: Load-bearing masonry wall"
],
[
"Clean substrate",
"School: Cladding panels"
],
[
"Feather edge",
"Tool shed: Landing slabs"
],
[
"Polymer mortar",
"Electrical substation: Reinforced concrete column"
],
[
"Sawcut edges",
"Fire statio... | [
[
"Bond coat",
"4"
],
[
"Clean substrate",
"5"
],
[
"Feather edge",
"4"
],
[
"Polymer mortar",
"5"
],
[
"Sawcut edges",
"3"
],
[
"Level grind",
"4"
]
] | 2,550 | Events:
- Bond coat (2 hours)
- Clean substrate (1 hours)
- Feather edge (1.5 hours)
- Polymer mortar (2 hours)
- Sawcut edges (1.5 hours)
- Level grind (0.5 hours)
Priorities:
- Bond coat (Tool shed: Load-bearing masonry wall)
- Clean substrate (School: Cladding panels)
- Feather edge (Tool shed: Landing slabs)
- Polymer mortar (Electrical substation: Reinforced concrete column)
- Sawcut edges (Fire station: Cladding panels)
- Level grind (Electrical substation: Floor) |
[
[
"Polyurethane injection",
"2 hours"
],
[
"Epoxy injection",
"2 hours"
],
[
"Overband sealing",
"2 hours"
],
[
"Stitch cracks",
"1 hours"
],
[
"Hairline sealing",
"0.5 hours"
],
[
"Grind and seal",
"1 hours"
]
] | [
[
"Polyurethane injection",
"Electrical substation: Landing slabs"
],
[
"Epoxy injection",
"Fire station: Reinforced concrete column"
],
[
"Overband sealing",
"Hospital: Roof"
],
[
"Stitch cracks",
"Apartment: Footing"
],
[
"Hairline sealing",
"Hospital: Footi... | [
[
"Polyurethane injection",
"5"
],
[
"Epoxy injection",
"5"
],
[
"Overband sealing",
"5"
],
[
"Stitch cracks",
"2"
],
[
"Hairline sealing",
"3"
],
[
"Grind and seal",
"5"
]
] | 3,300 | Events:
- Polyurethane injection (2 hours)
- Epoxy injection (2 hours)
- Overband sealing (2 hours)
- Stitch cracks (1 hours)
- Hairline sealing (0.5 hours)
- Grind and seal (1 hours)
Priorities:
- Polyurethane injection (Electrical substation: Landing slabs)
- Epoxy injection (Fire station: Reinforced concrete column)
- Overband sealing (Hospital: Roof)
- Stitch cracks (Apartment: Footing)
- Hairline sealing (Hospital: Footing)
- Grind and seal (Shopping mall: Roof) |
[
[
"Install anodes",
"1 hours"
],
[
"Zinc primer",
"0.5 hours"
],
[
"Grit blast rebar",
"2 hours"
],
[
"Protective coating",
"0.5 hours"
]
] | [
[
"Install anodes",
"Electrical substation: Staircase"
],
[
"Zinc primer",
"Apartment: Shear wall"
],
[
"Grit blast rebar",
"School: Precast window sills"
],
[
"Protective coating",
"Office building: Beam"
]
] | [
[
"Install anodes",
"3"
],
[
"Zinc primer",
"2"
],
[
"Grit blast rebar",
"1"
],
[
"Protective coating",
"4"
]
] | 810 | Events:
- Install anodes (1 hours)
- Zinc primer (0.5 hours)
- Grit blast rebar (2 hours)
- Protective coating (0.5 hours)
Priorities:
- Install anodes (Electrical substation: Staircase)
- Zinc primer (Apartment: Shear wall)
- Grit blast rebar (School: Precast window sills)
- Protective coating (Office building: Beam) |
[
[
"Install crack staples",
"2 hours"
],
[
"Epoxy injection",
"0.5 hours"
],
[
"Joint reseal",
"0.5 hours"
],
[
"Route and seal",
"0.5 hours"
],
[
"Stitch cracks",
"1 hours"
],
[
"Overband sealing",
"1 hours"
],
[
"Backer rod install",
"... | [
[
"Install crack staples",
"Apartment: Cladding panels"
],
[
"Epoxy injection",
"Office building: Footing"
],
[
"Joint reseal",
"Tool shed: Ground slab"
],
[
"Route and seal",
"Fire station: Balcony slabs"
],
[
"Stitch cracks",
"Hospital: Balcony slabs"
],
... | [
[
"Install crack staples",
"5"
],
[
"Epoxy injection",
"2"
],
[
"Joint reseal",
"2"
],
[
"Route and seal",
"3"
],
[
"Stitch cracks",
"4"
],
[
"Overband sealing",
"2"
],
[
"Backer rod install",
"2"
]
] | 1,830 | Events:
- Install crack staples (2 hours)
- Epoxy injection (0.5 hours)
- Joint reseal (0.5 hours)
- Route and seal (0.5 hours)
- Stitch cracks (1 hours)
- Overband sealing (1 hours)
- Backer rod install (1.5 hours)
Priorities:
- Install crack staples (Apartment: Cladding panels)
- Epoxy injection (Office building: Footing)
- Joint reseal (Tool shed: Ground slab)
- Route and seal (Fire station: Balcony slabs)
- Stitch cracks (Hospital: Balcony slabs)
- Overband sealing (Apartment: Roof)
- Backer rod install (Electrical substation: Parapets) |
[
[
"Seal joints",
"1.5 hours"
],
[
"Compact base",
"2 hours"
],
[
"Rapid set mix",
"1 hours"
],
[
"Sawcut edges",
"0.5 hours"
],
[
"Place patch",
"1.5 hours"
]
] | [
[
"Seal joints",
"Fire station: Precast window sills"
],
[
"Compact base",
"Hospital: Floor"
],
[
"Rapid set mix",
"Shopping mall: Landing slabs"
],
[
"Sawcut edges",
"Fire station: Ground slab"
],
[
"Place patch",
"Fire station: Pile cap"
]
] | [
[
"Seal joints",
"3"
],
[
"Compact base",
"3"
],
[
"Rapid set mix",
"5"
],
[
"Sawcut edges",
"3"
],
[
"Place patch",
"4"
]
] | 2,490 | Events:
- Seal joints (1.5 hours)
- Compact base (2 hours)
- Rapid set mix (1 hours)
- Sawcut edges (0.5 hours)
- Place patch (1.5 hours)
Priorities:
- Seal joints (Fire station: Precast window sills)
- Compact base (Hospital: Floor)
- Rapid set mix (Shopping mall: Landing slabs)
- Sawcut edges (Fire station: Ground slab)
- Place patch (Fire station: Pile cap) |
[
[
"Steam clean",
"2 hours"
],
[
"Repoint joints",
"2 hours"
],
[
"Hydrophobic coat",
"2 hours"
],
[
"Acid wash",
"0.5 hours"
],
[
"Crack seal",
"2 hours"
],
[
"Neutralize surface",
"1 hours"
],
[
"Pore blocker",
"1 hours"
]
] | [
[
"Steam clean",
"School: Reinforced concrete column"
],
[
"Repoint joints",
"Shopping mall: Cladding panels"
],
[
"Hydrophobic coat",
"Fire station: Ground slab"
],
[
"Acid wash",
"School: Parapets"
],
[
"Crack seal",
"Fire station: Reinforced concrete column... | [
[
"Steam clean",
"4"
],
[
"Repoint joints",
"4"
],
[
"Hydrophobic coat",
"1"
],
[
"Acid wash",
"4"
],
[
"Crack seal",
"5"
],
[
"Neutralize surface",
"3"
],
[
"Pore blocker",
"4"
]
] | 5,400 | Events:
- Steam clean (2 hours)
- Repoint joints (2 hours)
- Hydrophobic coat (2 hours)
- Acid wash (0.5 hours)
- Crack seal (2 hours)
- Neutralize surface (1 hours)
- Pore blocker (1 hours)
Priorities:
- Steam clean (School: Reinforced concrete column)
- Repoint joints (Shopping mall: Cladding panels)
- Hydrophobic coat (Fire station: Ground slab)
- Acid wash (School: Parapets)
- Crack seal (Fire station: Reinforced concrete column)
- Neutralize surface (Electrical substation: Shear wall)
- Pore blocker (Shopping mall: Shear wall) |
[
[
"Breakout patch",
"1 hours"
],
[
"Seal joints",
"2 hours"
],
[
"Clean pothole",
"1.5 hours"
],
[
"Rapid set mix",
"2 hours"
],
[
"Set forms",
"0.5 hours"
],
[
"Drill dowels",
"2 hours"
],
[
"Compact base",
"2 hours"
]
] | [
[
"Breakout patch",
"School: Precast window sills"
],
[
"Seal joints",
"Tool shed: Cladding panels"
],
[
"Clean pothole",
"Electrical substation: Balcony slabs"
],
[
"Rapid set mix",
"Office building: Shear wall"
],
[
"Set forms",
"Hospital: Pile cap"
],
[... | [
[
"Breakout patch",
"5"
],
[
"Seal joints",
"4"
],
[
"Clean pothole",
"4"
],
[
"Rapid set mix",
"1"
],
[
"Set forms",
"2"
],
[
"Drill dowels",
"2"
],
[
"Compact base",
"3"
]
] | 3,660 | Events:
- Breakout patch (1 hours)
- Seal joints (2 hours)
- Clean pothole (1.5 hours)
- Rapid set mix (2 hours)
- Set forms (0.5 hours)
- Drill dowels (2 hours)
- Compact base (2 hours)
Priorities:
- Breakout patch (School: Precast window sills)
- Seal joints (Tool shed: Cladding panels)
- Clean pothole (Electrical substation: Balcony slabs)
- Rapid set mix (Office building: Shear wall)
- Set forms (Hospital: Pile cap)
- Drill dowels (Apartment: Landing slabs)
- Compact base (Electrical substation: Shear wall) |
[
[
"Place patch",
"0.5 hours"
],
[
"Clean pothole",
"1 hours"
],
[
"Sawcut edges",
"1 hours"
],
[
"Set forms",
"1.5 hours"
],
[
"Rapid set mix",
"1 hours"
]
] | [
[
"Place patch",
"Fire station: Shear wall"
],
[
"Clean pothole",
"School: Pile cap"
],
[
"Sawcut edges",
"Hospital: Load-bearing masonry wall"
],
[
"Set forms",
"Fire station: Roof"
],
[
"Rapid set mix",
"Apartment: Ground slab"
]
] | [
[
"Place patch",
"3"
],
[
"Clean pothole",
"5"
],
[
"Sawcut edges",
"3"
],
[
"Set forms",
"5"
],
[
"Rapid set mix",
"4"
]
] | 2,340 | Events:
- Place patch (0.5 hours)
- Clean pothole (1 hours)
- Sawcut edges (1 hours)
- Set forms (1.5 hours)
- Rapid set mix (1 hours)
Priorities:
- Place patch (Fire station: Shear wall)
- Clean pothole (School: Pile cap)
- Sawcut edges (Hospital: Load-bearing masonry wall)
- Set forms (Fire station: Roof)
- Rapid set mix (Apartment: Ground slab) |
[
[
"Replace rebar",
"1 hours"
],
[
"Protective coating",
"1.5 hours"
],
[
"Cover breakout",
"1.5 hours"
],
[
"Grit blast rebar",
"0.5 hours"
],
[
"Mortar patch",
"1.5 hours"
],
[
"Zinc primer",
"1.5 hours"
],
[
"Expose rebar",
"1.5 hours... | [
[
"Replace rebar",
"Tool shed: Floor"
],
[
"Protective coating",
"Electrical substation: Landing slabs"
],
[
"Cover breakout",
"School: Footing"
],
[
"Grit blast rebar",
"Office building: Ground slab"
],
[
"Mortar patch",
"Fire station: Shear wall"
],
[
... | [
[
"Replace rebar",
"3"
],
[
"Protective coating",
"1"
],
[
"Cover breakout",
"3"
],
[
"Grit blast rebar",
"4"
],
[
"Mortar patch",
"5"
],
[
"Zinc primer",
"2"
],
[
"Expose rebar",
"5"
],
[
"Tie rebar",
"5"
]
] | 4,740 | Events:
- Replace rebar (1 hours)
- Protective coating (1.5 hours)
- Cover breakout (1.5 hours)
- Grit blast rebar (0.5 hours)
- Mortar patch (1.5 hours)
- Zinc primer (1.5 hours)
- Expose rebar (1.5 hours)
- Tie rebar (0.5 hours)
Priorities:
- Replace rebar (Tool shed: Floor)
- Protective coating (Electrical substation: Landing slabs)
- Cover breakout (School: Footing)
- Grit blast rebar (Office building: Ground slab)
- Mortar patch (Fire station: Shear wall)
- Zinc primer (Fire station: Cladding panels)
- Expose rebar (Shopping mall: Reinforced concrete column)
- Tie rebar (Shopping mall: Beam) |
[
[
"Mortar patch",
"0.5 hours"
],
[
"Install anodes",
"0.5 hours"
],
[
"Replace rebar",
"1.5 hours"
],
[
"Grit blast rebar",
"1 hours"
]
] | [
[
"Mortar patch",
"Shopping mall: Parapets"
],
[
"Install anodes",
"Electrical substation: Precast window sills"
],
[
"Replace rebar",
"School: Beam"
],
[
"Grit blast rebar",
"Hospital: Roof"
]
] | [
[
"Mortar patch",
"1"
],
[
"Install anodes",
"2"
],
[
"Replace rebar",
"5"
],
[
"Grit blast rebar",
"5"
]
] | 1,080 | Events:
- Mortar patch (0.5 hours)
- Install anodes (0.5 hours)
- Replace rebar (1.5 hours)
- Grit blast rebar (1 hours)
Priorities:
- Mortar patch (Shopping mall: Parapets)
- Install anodes (Electrical substation: Precast window sills)
- Replace rebar (School: Beam)
- Grit blast rebar (Hospital: Roof) |
[
[
"Place patch",
"2 hours"
],
[
"Seal joints",
"1 hours"
],
[
"Set forms",
"1 hours"
],
[
"Breakout patch",
"2 hours"
],
[
"Compact base",
"1.5 hours"
],
[
"Drill dowels",
"0.5 hours"
],
[
"Apply tack coat",
"1.5 hours"
],
[
"Ra... | [
[
"Place patch",
"Apartment: Cladding panels"
],
[
"Seal joints",
"Fire station: Footing"
],
[
"Set forms",
"Electrical substation: Reinforced concrete column"
],
[
"Breakout patch",
"Tool shed: Reinforced concrete column"
],
[
"Compact base",
"Shopping mall: ... | [
[
"Place patch",
"4"
],
[
"Seal joints",
"2"
],
[
"Set forms",
"3"
],
[
"Breakout patch",
"2"
],
[
"Compact base",
"3"
],
[
"Drill dowels",
"1"
],
[
"Apply tack coat",
"1"
],
[
"Rapid set mix",
"2"
]
] | 5,520 | Events:
- Place patch (2 hours)
- Seal joints (1 hours)
- Set forms (1 hours)
- Breakout patch (2 hours)
- Compact base (1.5 hours)
- Drill dowels (0.5 hours)
- Apply tack coat (1.5 hours)
- Rapid set mix (2 hours)
Priorities:
- Place patch (Apartment: Cladding panels)
- Seal joints (Fire station: Footing)
- Set forms (Electrical substation: Reinforced concrete column)
- Breakout patch (Tool shed: Reinforced concrete column)
- Compact base (Shopping mall: Reinforced concrete column)
- Drill dowels (Fire station: Precast window sills)
- Apply tack coat (Hospital: Reinforced concrete column)
- Rapid set mix (Hospital: Beam) |
[
[
"Acid wash",
"1 hours"
],
[
"Hydrophobic coat",
"1.5 hours"
],
[
"Repoint joints",
"0.5 hours"
],
[
"Joint reseal",
"0.5 hours"
],
[
"Neutralize surface",
"1.5 hours"
],
[
"Crack seal",
"1.5 hours"
],
[
"Pressure wash",
"1.5 hours"
... | [
[
"Acid wash",
"School: Staircase"
],
[
"Hydrophobic coat",
"Electrical substation: Staircase"
],
[
"Repoint joints",
"Fire station: Balcony slabs"
],
[
"Joint reseal",
"School: Ground slab"
],
[
"Neutralize surface",
"Fire station: Shear wall"
],
[
"C... | [
[
"Acid wash",
"4"
],
[
"Hydrophobic coat",
"3"
],
[
"Repoint joints",
"4"
],
[
"Joint reseal",
"4"
],
[
"Neutralize surface",
"4"
],
[
"Crack seal",
"2"
],
[
"Pressure wash",
"1"
],
[
"Steam clean",
"3"
]
] | 4,020 | Events:
- Acid wash (1 hours)
- Hydrophobic coat (1.5 hours)
- Repoint joints (0.5 hours)
- Joint reseal (0.5 hours)
- Neutralize surface (1.5 hours)
- Crack seal (1.5 hours)
- Pressure wash (1.5 hours)
- Steam clean (2 hours)
Priorities:
- Acid wash (School: Staircase)
- Hydrophobic coat (Electrical substation: Staircase)
- Repoint joints (Fire station: Balcony slabs)
- Joint reseal (School: Ground slab)
- Neutralize surface (Fire station: Shear wall)
- Crack seal (Electrical substation: Balcony slabs)
- Pressure wash (Electrical substation: Roof)
- Steam clean (Apartment: Reinforced concrete column) |
[
[
"Rebar passivation",
"1.5 hours"
],
[
"Protective coating",
"1.5 hours"
],
[
"Cover breakout",
"0.5 hours"
],
[
"Replace rebar",
"2 hours"
],
[
"Install anodes",
"1 hours"
],
[
"Tie rebar",
"1 hours"
],
[
"Zinc primer",
"0.5 hours"
... | [
[
"Rebar passivation",
"Hospital: Shear wall"
],
[
"Protective coating",
"Shopping mall: Ground slab"
],
[
"Cover breakout",
"Shopping mall: Floor"
],
[
"Replace rebar",
"School: Beam"
],
[
"Install anodes",
"Shopping mall: Shear wall"
],
[
"Tie rebar"... | [
[
"Rebar passivation",
"2"
],
[
"Protective coating",
"1"
],
[
"Cover breakout",
"4"
],
[
"Replace rebar",
"5"
],
[
"Install anodes",
"3"
],
[
"Tie rebar",
"4"
],
[
"Zinc primer",
"2"
]
] | 4,260 | Events:
- Rebar passivation (1.5 hours)
- Protective coating (1.5 hours)
- Cover breakout (0.5 hours)
- Replace rebar (2 hours)
- Install anodes (1 hours)
- Tie rebar (1 hours)
- Zinc primer (0.5 hours)
Priorities:
- Rebar passivation (Hospital: Shear wall)
- Protective coating (Shopping mall: Ground slab)
- Cover breakout (Shopping mall: Floor)
- Replace rebar (School: Beam)
- Install anodes (Shopping mall: Shear wall)
- Tie rebar (Fire station: Parapets)
- Zinc primer (School: Parapets) |
[
[
"Backer rod install",
"1 hours"
],
[
"Stitch cracks",
"1 hours"
],
[
"Hairline sealing",
"1.5 hours"
],
[
"Joint reseal",
"2 hours"
],
[
"Grind and seal",
"2 hours"
],
[
"Overband sealing",
"1.5 hours"
],
[
"Epoxy injection",
"1 hours... | [
[
"Backer rod install",
"Electrical substation: Precast window sills"
],
[
"Stitch cracks",
"Office building: Pile cap"
],
[
"Hairline sealing",
"Fire station: Load-bearing masonry wall"
],
[
"Joint reseal",
"Shopping mall: Load-bearing masonry wall"
],
[
"Grind a... | [
[
"Backer rod install",
"1"
],
[
"Stitch cracks",
"3"
],
[
"Hairline sealing",
"5"
],
[
"Joint reseal",
"5"
],
[
"Grind and seal",
"2"
],
[
"Overband sealing",
"2"
],
[
"Epoxy injection",
"3"
],
[
"Install crack staples",
"2... | 5,280 | Events:
- Backer rod install (1 hours)
- Stitch cracks (1 hours)
- Hairline sealing (1.5 hours)
- Joint reseal (2 hours)
- Grind and seal (2 hours)
- Overband sealing (1.5 hours)
- Epoxy injection (1 hours)
- Install crack staples (0.5 hours)
Priorities:
- Backer rod install (Electrical substation: Precast window sills)
- Stitch cracks (Office building: Pile cap)
- Hairline sealing (Fire station: Load-bearing masonry wall)
- Joint reseal (Shopping mall: Load-bearing masonry wall)
- Grind and seal (Tool shed: Load-bearing masonry wall)
- Overband sealing (School: Parapets)
- Epoxy injection (Office building: Ground slab)
- Install crack staples (Shopping mall: Load-bearing masonry wall) |
[
[
"Zinc primer",
"0.5 hours"
],
[
"Grit blast rebar",
"2 hours"
],
[
"Mortar patch",
"0.5 hours"
],
[
"Expose rebar",
"1.5 hours"
],
[
"Protective coating",
"1.5 hours"
],
[
"Rebar passivation",
"1.5 hours"
],
[
"Tie rebar",
"1 hours"
... | [
[
"Zinc primer",
"Tool shed: Load-bearing masonry wall"
],
[
"Grit blast rebar",
"School: Beam"
],
[
"Mortar patch",
"Shopping mall: Footing"
],
[
"Expose rebar",
"Apartment: Landing slabs"
],
[
"Protective coating",
"Electrical substation: Load-bearing masonr... | [
[
"Zinc primer",
"4"
],
[
"Grit blast rebar",
"2"
],
[
"Mortar patch",
"2"
],
[
"Expose rebar",
"2"
],
[
"Protective coating",
"3"
],
[
"Rebar passivation",
"4"
],
[
"Tie rebar",
"2"
]
] | 3,300 | Events:
- Zinc primer (0.5 hours)
- Grit blast rebar (2 hours)
- Mortar patch (0.5 hours)
- Expose rebar (1.5 hours)
- Protective coating (1.5 hours)
- Rebar passivation (1.5 hours)
- Tie rebar (1 hours)
Priorities:
- Zinc primer (Tool shed: Load-bearing masonry wall)
- Grit blast rebar (School: Beam)
- Mortar patch (Shopping mall: Footing)
- Expose rebar (Apartment: Landing slabs)
- Protective coating (Electrical substation: Load-bearing masonry wall)
- Rebar passivation (Tool shed: Precast window sills)
- Tie rebar (School: Footing) |
[
[
"Route and seal",
"1.5 hours"
],
[
"Joint reseal",
"1.5 hours"
],
[
"Backer rod install",
"0.5 hours"
],
[
"Overband sealing",
"1 hours"
],
[
"Install crack staples",
"1.5 hours"
],
[
"Grind and seal",
"1 hours"
],
[
"Hairline sealing",
... | [
[
"Route and seal",
"Fire station: Cladding panels"
],
[
"Joint reseal",
"Fire station: Landing slabs"
],
[
"Backer rod install",
"Office building: Footing"
],
[
"Overband sealing",
"School: Load-bearing masonry wall"
],
[
"Install crack staples",
"Apartment: ... | [
[
"Route and seal",
"3"
],
[
"Joint reseal",
"4"
],
[
"Backer rod install",
"4"
],
[
"Overband sealing",
"2"
],
[
"Install crack staples",
"5"
],
[
"Grind and seal",
"4"
],
[
"Hairline sealing",
"5"
],
[
"Stitch cracks",
"2"... | 4,920 | Events:
- Route and seal (1.5 hours)
- Joint reseal (1.5 hours)
- Backer rod install (0.5 hours)
- Overband sealing (1 hours)
- Install crack staples (1.5 hours)
- Grind and seal (1 hours)
- Hairline sealing (2 hours)
- Stitch cracks (1 hours)
Priorities:
- Route and seal (Fire station: Cladding panels)
- Joint reseal (Fire station: Landing slabs)
- Backer rod install (Office building: Footing)
- Overband sealing (School: Load-bearing masonry wall)
- Install crack staples (Apartment: Staircase)
- Grind and seal (Tool shed: Cladding panels)
- Hairline sealing (Shopping mall: Pile cap)
- Stitch cracks (Shopping mall: Footing) |
[
[
"Set forms",
"0.5 hours"
],
[
"Rapid set mix",
"2 hours"
],
[
"Place patch",
"0.5 hours"
],
[
"Breakout patch",
"0.5 hours"
],
[
"Sawcut edges",
"2 hours"
],
[
"Clean pothole",
"1 hours"
]
] | [
[
"Set forms",
"Tool shed: Reinforced concrete column"
],
[
"Rapid set mix",
"School: Ground slab"
],
[
"Place patch",
"Hospital: Shear wall"
],
[
"Breakout patch",
"Electrical substation: Landing slabs"
],
[
"Sawcut edges",
"Shopping mall: Roof"
],
[
... | [
[
"Set forms",
"1"
],
[
"Rapid set mix",
"3"
],
[
"Place patch",
"5"
],
[
"Breakout patch",
"3"
],
[
"Sawcut edges",
"4"
],
[
"Clean pothole",
"2"
]
] | 2,310 | Events:
- Set forms (0.5 hours)
- Rapid set mix (2 hours)
- Place patch (0.5 hours)
- Breakout patch (0.5 hours)
- Sawcut edges (2 hours)
- Clean pothole (1 hours)
Priorities:
- Set forms (Tool shed: Reinforced concrete column)
- Rapid set mix (School: Ground slab)
- Place patch (Hospital: Shear wall)
- Breakout patch (Electrical substation: Landing slabs)
- Sawcut edges (Shopping mall: Roof)
- Clean pothole (Tool shed: Landing slabs) |
[
[
"Pore blocker",
"2 hours"
],
[
"Joint reseal",
"1 hours"
],
[
"Neutralize surface",
"0.5 hours"
],
[
"Hydrophobic coat",
"1 hours"
],
[
"Acid wash",
"2 hours"
],
[
"Pressure wash",
"1.5 hours"
]
] | [
[
"Pore blocker",
"Apartment: Floor"
],
[
"Joint reseal",
"Electrical substation: Ground slab"
],
[
"Neutralize surface",
"School: Balcony slabs"
],
[
"Hydrophobic coat",
"Apartment: Load-bearing masonry wall"
],
[
"Acid wash",
"Tool shed: Pile cap"
],
[
... | [
[
"Pore blocker",
"4"
],
[
"Joint reseal",
"3"
],
[
"Neutralize surface",
"4"
],
[
"Hydrophobic coat",
"5"
],
[
"Acid wash",
"1"
],
[
"Pressure wash",
"4"
]
] | 3,030 | Events:
- Pore blocker (2 hours)
- Joint reseal (1 hours)
- Neutralize surface (0.5 hours)
- Hydrophobic coat (1 hours)
- Acid wash (2 hours)
- Pressure wash (1.5 hours)
Priorities:
- Pore blocker (Apartment: Floor)
- Joint reseal (Electrical substation: Ground slab)
- Neutralize surface (School: Balcony slabs)
- Hydrophobic coat (Apartment: Load-bearing masonry wall)
- Acid wash (Tool shed: Pile cap)
- Pressure wash (Shopping mall: Ground slab) |
[
[
"Sawcut edges",
"1.5 hours"
],
[
"Breakout patch",
"2 hours"
],
[
"Set forms",
"1.5 hours"
],
[
"Drill dowels",
"1 hours"
],
[
"Clean pothole",
"0.5 hours"
],
[
"Apply tack coat",
"1.5 hours"
],
[
"Seal joints",
"0.5 hours"
]
] | [
[
"Sawcut edges",
"Shopping mall: Parapets"
],
[
"Breakout patch",
"Shopping mall: Pile cap"
],
[
"Set forms",
"Shopping mall: Balcony slabs"
],
[
"Drill dowels",
"Apartment: Staircase"
],
[
"Clean pothole",
"Electrical substation: Ground slab"
],
[
"A... | [
[
"Sawcut edges",
"3"
],
[
"Breakout patch",
"3"
],
[
"Set forms",
"4"
],
[
"Drill dowels",
"4"
],
[
"Clean pothole",
"5"
],
[
"Apply tack coat",
"5"
],
[
"Seal joints",
"1"
]
] | 3,690 | Events:
- Sawcut edges (1.5 hours)
- Breakout patch (2 hours)
- Set forms (1.5 hours)
- Drill dowels (1 hours)
- Clean pothole (0.5 hours)
- Apply tack coat (1.5 hours)
- Seal joints (0.5 hours)
Priorities:
- Sawcut edges (Shopping mall: Parapets)
- Breakout patch (Shopping mall: Pile cap)
- Set forms (Shopping mall: Balcony slabs)
- Drill dowels (Apartment: Staircase)
- Clean pothole (Electrical substation: Ground slab)
- Apply tack coat (Apartment: Floor)
- Seal joints (Hospital: Beam) |
[
[
"Set forms",
"0.5 hours"
],
[
"Breakout patch",
"1.5 hours"
],
[
"Clean pothole",
"2 hours"
],
[
"Rapid set mix",
"1 hours"
],
[
"Drill dowels",
"2 hours"
],
[
"Compact base",
"0.5 hours"
]
] | [
[
"Set forms",
"School: Parapets"
],
[
"Breakout patch",
"Hospital: Load-bearing masonry wall"
],
[
"Clean pothole",
"Fire station: Roof"
],
[
"Rapid set mix",
"School: Roof"
],
[
"Drill dowels",
"Apartment: Parapets"
],
[
"Compact base",
"Office b... | [
[
"Set forms",
"3"
],
[
"Breakout patch",
"1"
],
[
"Clean pothole",
"3"
],
[
"Rapid set mix",
"2"
],
[
"Drill dowels",
"2"
],
[
"Compact base",
"4"
]
] | 2,640 | Events:
- Set forms (0.5 hours)
- Breakout patch (1.5 hours)
- Clean pothole (2 hours)
- Rapid set mix (1 hours)
- Drill dowels (2 hours)
- Compact base (0.5 hours)
Priorities:
- Set forms (School: Parapets)
- Breakout patch (Hospital: Load-bearing masonry wall)
- Clean pothole (Fire station: Roof)
- Rapid set mix (School: Roof)
- Drill dowels (Apartment: Parapets)
- Compact base (Office building: Pile cap) |
[
[
"Backer rod install",
"0.5 hours"
],
[
"Joint reseal",
"1 hours"
],
[
"Install crack staples",
"1 hours"
],
[
"Stitch cracks",
"1 hours"
],
[
"Route and seal",
"1.5 hours"
],
[
"Epoxy injection",
"1 hours"
],
[
"Overband sealing",
"2 ... | [
[
"Backer rod install",
"Shopping mall: Precast window sills"
],
[
"Joint reseal",
"Shopping mall: Shear wall"
],
[
"Install crack staples",
"Office building: Floor"
],
[
"Stitch cracks",
"Apartment: Landing slabs"
],
[
"Route and seal",
"Hospital: Staircase"
... | [
[
"Backer rod install",
"2"
],
[
"Joint reseal",
"2"
],
[
"Install crack staples",
"4"
],
[
"Stitch cracks",
"3"
],
[
"Route and seal",
"2"
],
[
"Epoxy injection",
"3"
],
[
"Overband sealing",
"4"
],
[
"Grind and seal",
"1"
... | 4,470 | Events:
- Backer rod install (0.5 hours)
- Joint reseal (1 hours)
- Install crack staples (1 hours)
- Stitch cracks (1 hours)
- Route and seal (1.5 hours)
- Epoxy injection (1 hours)
- Overband sealing (2 hours)
- Grind and seal (0.5 hours)
Priorities:
- Backer rod install (Shopping mall: Precast window sills)
- Joint reseal (Shopping mall: Shear wall)
- Install crack staples (Office building: Floor)
- Stitch cracks (Apartment: Landing slabs)
- Route and seal (Hospital: Staircase)
- Epoxy injection (Hospital: Reinforced concrete column)
- Overband sealing (Office building: Reinforced concrete column)
- Grind and seal (Hospital: Load-bearing masonry wall) |
[
[
"Set forms",
"1 hours"
],
[
"Seal joints",
"2 hours"
],
[
"Drill dowels",
"1.5 hours"
],
[
"Apply tack coat",
"0.5 hours"
],
[
"Breakout patch",
"2 hours"
],
[
"Place patch",
"2 hours"
]
] | [
[
"Set forms",
"Tool shed: Cladding panels"
],
[
"Seal joints",
"Electrical substation: Shear wall"
],
[
"Drill dowels",
"Electrical substation: Beam"
],
[
"Apply tack coat",
"School: Cladding panels"
],
[
"Breakout patch",
"Office building: Parapets"
],
[... | [
[
"Set forms",
"3"
],
[
"Seal joints",
"5"
],
[
"Drill dowels",
"2"
],
[
"Apply tack coat",
"2"
],
[
"Breakout patch",
"3"
],
[
"Place patch",
"3"
]
] | 2,460 | Events:
- Set forms (1 hours)
- Seal joints (2 hours)
- Drill dowels (1.5 hours)
- Apply tack coat (0.5 hours)
- Breakout patch (2 hours)
- Place patch (2 hours)
Priorities:
- Set forms (Tool shed: Cladding panels)
- Seal joints (Electrical substation: Shear wall)
- Drill dowels (Electrical substation: Beam)
- Apply tack coat (School: Cladding panels)
- Breakout patch (Office building: Parapets)
- Place patch (Shopping mall: Landing slabs) |
[
[
"Level grind",
"1.5 hours"
],
[
"Clean substrate",
"2 hours"
],
[
"Polymer mortar",
"1 hours"
],
[
"Shotcrete patch",
"1 hours"
],
[
"Feather edge",
"1.5 hours"
],
[
"Bond coat",
"0.5 hours"
],
[
"Surface seal",
"2 hours"
],
[
... | [
[
"Level grind",
"Office building: Balcony slabs"
],
[
"Clean substrate",
"Fire station: Parapets"
],
[
"Polymer mortar",
"Shopping mall: Balcony slabs"
],
[
"Shotcrete patch",
"Tool shed: Parapets"
],
[
"Feather edge",
"Shopping mall: Balcony slabs"
],
[
... | [
[
"Level grind",
"3"
],
[
"Clean substrate",
"1"
],
[
"Polymer mortar",
"5"
],
[
"Shotcrete patch",
"3"
],
[
"Feather edge",
"2"
],
[
"Bond coat",
"5"
],
[
"Surface seal",
"5"
],
[
"Wet cure",
"1"
]
] | 4,380 | Events:
- Level grind (1.5 hours)
- Clean substrate (2 hours)
- Polymer mortar (1 hours)
- Shotcrete patch (1 hours)
- Feather edge (1.5 hours)
- Bond coat (0.5 hours)
- Surface seal (2 hours)
- Wet cure (1 hours)
Priorities:
- Level grind (Office building: Balcony slabs)
- Clean substrate (Fire station: Parapets)
- Polymer mortar (Shopping mall: Balcony slabs)
- Shotcrete patch (Tool shed: Parapets)
- Feather edge (Shopping mall: Balcony slabs)
- Bond coat (Tool shed: Parapets)
- Surface seal (Electrical substation: Reinforced concrete column)
- Wet cure (Apartment: Pile cap) |
[
[
"Level grind",
"1 hours"
],
[
"Breakout spalls",
"0.5 hours"
],
[
"Polymer mortar",
"1 hours"
],
[
"Bond coat",
"1.5 hours"
],
[
"Surface seal",
"2 hours"
],
[
"Wet cure",
"2 hours"
],
[
"Sawcut edges",
"0.5 hours"
],
[
"Clean... | [
[
"Level grind",
"Apartment: Ground slab"
],
[
"Breakout spalls",
"Electrical substation: Staircase"
],
[
"Polymer mortar",
"Shopping mall: Cladding panels"
],
[
"Bond coat",
"Fire station: Load-bearing masonry wall"
],
[
"Surface seal",
"School: Balcony slabs... | [
[
"Level grind",
"3"
],
[
"Breakout spalls",
"2"
],
[
"Polymer mortar",
"2"
],
[
"Bond coat",
"5"
],
[
"Surface seal",
"4"
],
[
"Wet cure",
"4"
],
[
"Sawcut edges",
"4"
],
[
"Clean substrate",
"4"
]
] | 4,950 | Events:
- Level grind (1 hours)
- Breakout spalls (0.5 hours)
- Polymer mortar (1 hours)
- Bond coat (1.5 hours)
- Surface seal (2 hours)
- Wet cure (2 hours)
- Sawcut edges (0.5 hours)
- Clean substrate (1.5 hours)
Priorities:
- Level grind (Apartment: Ground slab)
- Breakout spalls (Electrical substation: Staircase)
- Polymer mortar (Shopping mall: Cladding panels)
- Bond coat (Fire station: Load-bearing masonry wall)
- Surface seal (School: Balcony slabs)
- Wet cure (Shopping mall: Load-bearing masonry wall)
- Sawcut edges (Tool shed: Floor)
- Clean substrate (Fire station: Precast window sills) |
[
[
"Install crack staples",
"0.5 hours"
],
[
"Backer rod install",
"1 hours"
],
[
"Overband sealing",
"1.5 hours"
],
[
"Polyurethane injection",
"1.5 hours"
],
[
"Epoxy injection",
"2 hours"
],
[
"Hairline sealing",
"0.5 hours"
],
[
"Route a... | [
[
"Install crack staples",
"Hospital: Floor"
],
[
"Backer rod install",
"Shopping mall: Reinforced concrete column"
],
[
"Overband sealing",
"School: Balcony slabs"
],
[
"Polyurethane injection",
"Hospital: Footing"
],
[
"Epoxy injection",
"Hospital: Pile cap"... | [
[
"Install crack staples",
"2"
],
[
"Backer rod install",
"1"
],
[
"Overband sealing",
"2"
],
[
"Polyurethane injection",
"2"
],
[
"Epoxy injection",
"3"
],
[
"Hairline sealing",
"1"
],
[
"Route and seal",
"4"
]
] | 4,620 | Events:
- Install crack staples (0.5 hours)
- Backer rod install (1 hours)
- Overband sealing (1.5 hours)
- Polyurethane injection (1.5 hours)
- Epoxy injection (2 hours)
- Hairline sealing (0.5 hours)
- Route and seal (2 hours)
Priorities:
- Install crack staples (Hospital: Floor)
- Backer rod install (Shopping mall: Reinforced concrete column)
- Overband sealing (School: Balcony slabs)
- Polyurethane injection (Hospital: Footing)
- Epoxy injection (Hospital: Pile cap)
- Hairline sealing (Electrical substation: Ground slab)
- Route and seal (School: Floor) |
[
[
"Set forms",
"1.5 hours"
],
[
"Seal joints",
"1 hours"
],
[
"Clean pothole",
"0.5 hours"
],
[
"Breakout patch",
"1 hours"
],
[
"Rapid set mix",
"2 hours"
]
] | [
[
"Set forms",
"Office building: Cladding panels"
],
[
"Seal joints",
"Shopping mall: Cladding panels"
],
[
"Clean pothole",
"School: Staircase"
],
[
"Breakout patch",
"Tool shed: Precast window sills"
],
[
"Rapid set mix",
"Apartment: Footing"
]
] | [
[
"Set forms",
"3"
],
[
"Seal joints",
"4"
],
[
"Clean pothole",
"3"
],
[
"Breakout patch",
"4"
],
[
"Rapid set mix",
"5"
]
] | 1,500 | Events:
- Set forms (1.5 hours)
- Seal joints (1 hours)
- Clean pothole (0.5 hours)
- Breakout patch (1 hours)
- Rapid set mix (2 hours)
Priorities:
- Set forms (Office building: Cladding panels)
- Seal joints (Shopping mall: Cladding panels)
- Clean pothole (School: Staircase)
- Breakout patch (Tool shed: Precast window sills)
- Rapid set mix (Apartment: Footing) |
[
[
"Set forms",
"2 hours"
],
[
"Seal joints",
"1 hours"
],
[
"Apply tack coat",
"1.5 hours"
],
[
"Breakout patch",
"0.5 hours"
],
[
"Compact base",
"1 hours"
]
] | [
[
"Set forms",
"Fire station: Landing slabs"
],
[
"Seal joints",
"Shopping mall: Landing slabs"
],
[
"Apply tack coat",
"School: Pile cap"
],
[
"Breakout patch",
"Fire station: Ground slab"
],
[
"Compact base",
"Fire station: Load-bearing masonry wall"
]
] | [
[
"Set forms",
"4"
],
[
"Seal joints",
"2"
],
[
"Apply tack coat",
"2"
],
[
"Breakout patch",
"3"
],
[
"Compact base",
"5"
]
] | 2,100 | Events:
- Set forms (2 hours)
- Seal joints (1 hours)
- Apply tack coat (1.5 hours)
- Breakout patch (0.5 hours)
- Compact base (1 hours)
Priorities:
- Set forms (Fire station: Landing slabs)
- Seal joints (Shopping mall: Landing slabs)
- Apply tack coat (School: Pile cap)
- Breakout patch (Fire station: Ground slab)
- Compact base (Fire station: Load-bearing masonry wall) |
[
[
"Install anodes",
"1 hours"
],
[
"Grit blast rebar",
"0.5 hours"
],
[
"Protective coating",
"2 hours"
],
[
"Tie rebar",
"1 hours"
],
[
"Replace rebar",
"0.5 hours"
],
[
"Rebar passivation",
"2 hours"
],
[
"Expose rebar",
"0.5 hours"
... | [
[
"Install anodes",
"Office building: Footing"
],
[
"Grit blast rebar",
"Tool shed: Beam"
],
[
"Protective coating",
"Apartment: Reinforced concrete column"
],
[
"Tie rebar",
"Tool shed: Pile cap"
],
[
"Replace rebar",
"Tool shed: Cladding panels"
],
[
... | [
[
"Install anodes",
"4"
],
[
"Grit blast rebar",
"1"
],
[
"Protective coating",
"1"
],
[
"Tie rebar",
"4"
],
[
"Replace rebar",
"1"
],
[
"Rebar passivation",
"3"
],
[
"Expose rebar",
"5"
]
] | 3,450 | Events:
- Install anodes (1 hours)
- Grit blast rebar (0.5 hours)
- Protective coating (2 hours)
- Tie rebar (1 hours)
- Replace rebar (0.5 hours)
- Rebar passivation (2 hours)
- Expose rebar (0.5 hours)
Priorities:
- Install anodes (Office building: Footing)
- Grit blast rebar (Tool shed: Beam)
- Protective coating (Apartment: Reinforced concrete column)
- Tie rebar (Tool shed: Pile cap)
- Replace rebar (Tool shed: Cladding panels)
- Rebar passivation (School: Pile cap)
- Expose rebar (Office building: Staircase) |
[
[
"Hydrophobic coat",
"1.5 hours"
],
[
"Crack seal",
"1.5 hours"
],
[
"Pressure wash",
"1 hours"
],
[
"Breathable seal",
"2 hours"
],
[
"Joint reseal",
"0.5 hours"
]
] | [
[
"Hydrophobic coat",
"Electrical substation: Roof"
],
[
"Crack seal",
"Shopping mall: Floor"
],
[
"Pressure wash",
"Electrical substation: Load-bearing masonry wall"
],
[
"Breathable seal",
"School: Footing"
],
[
"Joint reseal",
"Tool shed: Precast window sil... | [
[
"Hydrophobic coat",
"3"
],
[
"Crack seal",
"2"
],
[
"Pressure wash",
"5"
],
[
"Breathable seal",
"2"
],
[
"Joint reseal",
"5"
]
] | 2,430 | Events:
- Hydrophobic coat (1.5 hours)
- Crack seal (1.5 hours)
- Pressure wash (1 hours)
- Breathable seal (2 hours)
- Joint reseal (0.5 hours)
Priorities:
- Hydrophobic coat (Electrical substation: Roof)
- Crack seal (Shopping mall: Floor)
- Pressure wash (Electrical substation: Load-bearing masonry wall)
- Breathable seal (School: Footing)
- Joint reseal (Tool shed: Precast window sills) |
[
[
"Drill dowels",
"1.5 hours"
],
[
"Seal joints",
"1 hours"
],
[
"Set forms",
"0.5 hours"
],
[
"Breakout patch",
"0.5 hours"
]
] | [
[
"Drill dowels",
"Hospital: Staircase"
],
[
"Seal joints",
"Tool shed: Balcony slabs"
],
[
"Set forms",
"School: Footing"
],
[
"Breakout patch",
"Apartment: Pile cap"
]
] | [
[
"Drill dowels",
"2"
],
[
"Seal joints",
"1"
],
[
"Set forms",
"2"
],
[
"Breakout patch",
"1"
]
] | 780 | Events:
- Drill dowels (1.5 hours)
- Seal joints (1 hours)
- Set forms (0.5 hours)
- Breakout patch (0.5 hours)
Priorities:
- Drill dowels (Hospital: Staircase)
- Seal joints (Tool shed: Balcony slabs)
- Set forms (School: Footing)
- Breakout patch (Apartment: Pile cap) |
[
[
"Tie rebar",
"2 hours"
],
[
"Grit blast rebar",
"1 hours"
],
[
"Cover breakout",
"1 hours"
],
[
"Zinc primer",
"0.5 hours"
],
[
"Protective coating",
"1 hours"
],
[
"Install anodes",
"0.5 hours"
],
[
"Replace rebar",
"1 hours"
],
... | [
[
"Tie rebar",
"School: Cladding panels"
],
[
"Grit blast rebar",
"Hospital: Cladding panels"
],
[
"Cover breakout",
"Hospital: Cladding panels"
],
[
"Zinc primer",
"School: Reinforced concrete column"
],
[
"Protective coating",
"Hospital: Staircase"
],
[
... | [
[
"Tie rebar",
"5"
],
[
"Grit blast rebar",
"2"
],
[
"Cover breakout",
"2"
],
[
"Zinc primer",
"3"
],
[
"Protective coating",
"1"
],
[
"Install anodes",
"1"
],
[
"Replace rebar",
"1"
],
[
"Rebar passivation",
"4"
]
] | 3,930 | Events:
- Tie rebar (2 hours)
- Grit blast rebar (1 hours)
- Cover breakout (1 hours)
- Zinc primer (0.5 hours)
- Protective coating (1 hours)
- Install anodes (0.5 hours)
- Replace rebar (1 hours)
- Rebar passivation (2 hours)
Priorities:
- Tie rebar (School: Cladding panels)
- Grit blast rebar (Hospital: Cladding panels)
- Cover breakout (Hospital: Cladding panels)
- Zinc primer (School: Reinforced concrete column)
- Protective coating (Hospital: Staircase)
- Install anodes (Office building: Balcony slabs)
- Replace rebar (School: Floor)
- Rebar passivation (Tool shed: Floor) |
[
[
"Neutralize surface",
"2 hours"
],
[
"Hydrophobic coat",
"2 hours"
],
[
"Acid wash",
"0.5 hours"
],
[
"Joint reseal",
"2 hours"
],
[
"Steam clean",
"2 hours"
],
[
"Crack seal",
"2 hours"
]
] | [
[
"Neutralize surface",
"Tool shed: Floor"
],
[
"Hydrophobic coat",
"Tool shed: Load-bearing masonry wall"
],
[
"Acid wash",
"School: Ground slab"
],
[
"Joint reseal",
"Shopping mall: Parapets"
],
[
"Steam clean",
"Hospital: Precast window sills"
],
[
... | [
[
"Neutralize surface",
"5"
],
[
"Hydrophobic coat",
"5"
],
[
"Acid wash",
"4"
],
[
"Joint reseal",
"4"
],
[
"Steam clean",
"1"
],
[
"Crack seal",
"4"
]
] | 4,140 | Events:
- Neutralize surface (2 hours)
- Hydrophobic coat (2 hours)
- Acid wash (0.5 hours)
- Joint reseal (2 hours)
- Steam clean (2 hours)
- Crack seal (2 hours)
Priorities:
- Neutralize surface (Tool shed: Floor)
- Hydrophobic coat (Tool shed: Load-bearing masonry wall)
- Acid wash (School: Ground slab)
- Joint reseal (Shopping mall: Parapets)
- Steam clean (Hospital: Precast window sills)
- Crack seal (School: Reinforced concrete column) |
[
[
"Drill dowels",
"1.5 hours"
],
[
"Rapid set mix",
"1.5 hours"
],
[
"Breakout patch",
"2 hours"
],
[
"Set forms",
"0.5 hours"
]
] | [
[
"Drill dowels",
"Hospital: Roof"
],
[
"Rapid set mix",
"Fire station: Reinforced concrete column"
],
[
"Breakout patch",
"School: Floor"
],
[
"Set forms",
"Apartment: Roof"
]
] | [
[
"Drill dowels",
"1"
],
[
"Rapid set mix",
"3"
],
[
"Breakout patch",
"4"
],
[
"Set forms",
"4"
]
] | 2,040 | Events:
- Drill dowels (1.5 hours)
- Rapid set mix (1.5 hours)
- Breakout patch (2 hours)
- Set forms (0.5 hours)
Priorities:
- Drill dowels (Hospital: Roof)
- Rapid set mix (Fire station: Reinforced concrete column)
- Breakout patch (School: Floor)
- Set forms (Apartment: Roof) |
[
[
"Install anodes",
"0.5 hours"
],
[
"Mortar patch",
"0.5 hours"
],
[
"Protective coating",
"0.5 hours"
],
[
"Expose rebar",
"1 hours"
],
[
"Cover breakout",
"2 hours"
]
] | [
[
"Install anodes",
"Fire station: Reinforced concrete column"
],
[
"Mortar patch",
"Apartment: Cladding panels"
],
[
"Protective coating",
"School: Landing slabs"
],
[
"Expose rebar",
"School: Shear wall"
],
[
"Cover breakout",
"Tool shed: Landing slabs"
]
... | [
[
"Install anodes",
"4"
],
[
"Mortar patch",
"2"
],
[
"Protective coating",
"1"
],
[
"Expose rebar",
"2"
],
[
"Cover breakout",
"4"
]
] | 990 | Events:
- Install anodes (0.5 hours)
- Mortar patch (0.5 hours)
- Protective coating (0.5 hours)
- Expose rebar (1 hours)
- Cover breakout (2 hours)
Priorities:
- Install anodes (Fire station: Reinforced concrete column)
- Mortar patch (Apartment: Cladding panels)
- Protective coating (School: Landing slabs)
- Expose rebar (School: Shear wall)
- Cover breakout (Tool shed: Landing slabs) |
[
[
"Wet cure",
"1 hours"
],
[
"Breakout spalls",
"2 hours"
],
[
"Shotcrete patch",
"1.5 hours"
],
[
"Surface seal",
"1.5 hours"
],
[
"Level grind",
"1 hours"
],
[
"Polymer mortar",
"0.5 hours"
],
[
"Bond coat",
"2 hours"
],
[
"Sa... | [
[
"Wet cure",
"Hospital: Precast window sills"
],
[
"Breakout spalls",
"Shopping mall: Parapets"
],
[
"Shotcrete patch",
"Apartment: Precast window sills"
],
[
"Surface seal",
"Apartment: Floor"
],
[
"Level grind",
"Shopping mall: Parapets"
],
[
"Polym... | [
[
"Wet cure",
"1"
],
[
"Breakout spalls",
"1"
],
[
"Shotcrete patch",
"3"
],
[
"Surface seal",
"4"
],
[
"Level grind",
"3"
],
[
"Polymer mortar",
"2"
],
[
"Bond coat",
"3"
],
[
"Sawcut edges",
"1"
]
] | 4,920 | Events:
- Wet cure (1 hours)
- Breakout spalls (2 hours)
- Shotcrete patch (1.5 hours)
- Surface seal (1.5 hours)
- Level grind (1 hours)
- Polymer mortar (0.5 hours)
- Bond coat (2 hours)
- Sawcut edges (2 hours)
Priorities:
- Wet cure (Hospital: Precast window sills)
- Breakout spalls (Shopping mall: Parapets)
- Shotcrete patch (Apartment: Precast window sills)
- Surface seal (Apartment: Floor)
- Level grind (Shopping mall: Parapets)
- Polymer mortar (Electrical substation: Load-bearing masonry wall)
- Bond coat (Shopping mall: Ground slab)
- Sawcut edges (Tool shed: Shear wall) |
[
[
"Wet cure",
"1.5 hours"
],
[
"Bond coat",
"2 hours"
],
[
"Surface seal",
"2 hours"
],
[
"Polymer mortar",
"0.5 hours"
],
[
"Breakout spalls",
"1.5 hours"
],
[
"Sawcut edges",
"2 hours"
]
] | [
[
"Wet cure",
"Hospital: Footing"
],
[
"Bond coat",
"Hospital: Footing"
],
[
"Surface seal",
"Shopping mall: Pile cap"
],
[
"Polymer mortar",
"School: Cladding panels"
],
[
"Breakout spalls",
"Office building: Staircase"
],
[
"Sawcut edges",
"Tool ... | [
[
"Wet cure",
"2"
],
[
"Bond coat",
"3"
],
[
"Surface seal",
"3"
],
[
"Polymer mortar",
"2"
],
[
"Breakout spalls",
"1"
],
[
"Sawcut edges",
"4"
]
] | 3,690 | Events:
- Wet cure (1.5 hours)
- Bond coat (2 hours)
- Surface seal (2 hours)
- Polymer mortar (0.5 hours)
- Breakout spalls (1.5 hours)
- Sawcut edges (2 hours)
Priorities:
- Wet cure (Hospital: Footing)
- Bond coat (Hospital: Footing)
- Surface seal (Shopping mall: Pile cap)
- Polymer mortar (School: Cladding panels)
- Breakout spalls (Office building: Staircase)
- Sawcut edges (Tool shed: Parapets) |
[
[
"Grit blast rebar",
"0.5 hours"
],
[
"Protective coating",
"1 hours"
],
[
"Mortar patch",
"0.5 hours"
],
[
"Install anodes",
"2 hours"
],
[
"Replace rebar",
"1 hours"
],
[
"Expose rebar",
"1.5 hours"
],
[
"Tie rebar",
"2 hours"
]
] | [
[
"Grit blast rebar",
"School: Beam"
],
[
"Protective coating",
"Electrical substation: Floor"
],
[
"Mortar patch",
"Tool shed: Staircase"
],
[
"Install anodes",
"Hospital: Reinforced concrete column"
],
[
"Replace rebar",
"Tool shed: Precast window sills"
]... | [
[
"Grit blast rebar",
"4"
],
[
"Protective coating",
"2"
],
[
"Mortar patch",
"5"
],
[
"Install anodes",
"1"
],
[
"Replace rebar",
"3"
],
[
"Expose rebar",
"4"
],
[
"Tie rebar",
"4"
]
] | 3,600 | Events:
- Grit blast rebar (0.5 hours)
- Protective coating (1 hours)
- Mortar patch (0.5 hours)
- Install anodes (2 hours)
- Replace rebar (1 hours)
- Expose rebar (1.5 hours)
- Tie rebar (2 hours)
Priorities:
- Grit blast rebar (School: Beam)
- Protective coating (Electrical substation: Floor)
- Mortar patch (Tool shed: Staircase)
- Install anodes (Hospital: Reinforced concrete column)
- Replace rebar (Tool shed: Precast window sills)
- Expose rebar (Electrical substation: Footing)
- Tie rebar (Fire station: Ground slab) |
[
[
"Feather edge",
"0.5 hours"
],
[
"Shotcrete patch",
"1 hours"
],
[
"Sawcut edges",
"0.5 hours"
],
[
"Clean substrate",
"1 hours"
],
[
"Breakout spalls",
"0.5 hours"
],
[
"Bond coat",
"1.5 hours"
],
[
"Polymer mortar",
"2 hours"
]
] | [
[
"Feather edge",
"Electrical substation: Ground slab"
],
[
"Shotcrete patch",
"Electrical substation: Staircase"
],
[
"Sawcut edges",
"Tool shed: Parapets"
],
[
"Clean substrate",
"Fire station: Cladding panels"
],
[
"Breakout spalls",
"Hospital: Pile cap"
... | [
[
"Feather edge",
"2"
],
[
"Shotcrete patch",
"1"
],
[
"Sawcut edges",
"2"
],
[
"Clean substrate",
"4"
],
[
"Breakout spalls",
"5"
],
[
"Bond coat",
"3"
],
[
"Polymer mortar",
"5"
]
] | 2,220 | Events:
- Feather edge (0.5 hours)
- Shotcrete patch (1 hours)
- Sawcut edges (0.5 hours)
- Clean substrate (1 hours)
- Breakout spalls (0.5 hours)
- Bond coat (1.5 hours)
- Polymer mortar (2 hours)
Priorities:
- Feather edge (Electrical substation: Ground slab)
- Shotcrete patch (Electrical substation: Staircase)
- Sawcut edges (Tool shed: Parapets)
- Clean substrate (Fire station: Cladding panels)
- Breakout spalls (Hospital: Pile cap)
- Bond coat (Office building: Staircase)
- Polymer mortar (Fire station: Cladding panels) |
[
[
"Place patch",
"2 hours"
],
[
"Seal joints",
"0.5 hours"
],
[
"Drill dowels",
"1 hours"
],
[
"Apply tack coat",
"2 hours"
],
[
"Clean pothole",
"2 hours"
]
] | [
[
"Place patch",
"Shopping mall: Floor"
],
[
"Seal joints",
"Tool shed: Pile cap"
],
[
"Drill dowels",
"Tool shed: Beam"
],
[
"Apply tack coat",
"Office building: Cladding panels"
],
[
"Clean pothole",
"Shopping mall: Roof"
]
] | [
[
"Place patch",
"5"
],
[
"Seal joints",
"4"
],
[
"Drill dowels",
"2"
],
[
"Apply tack coat",
"3"
],
[
"Clean pothole",
"3"
]
] | 2,310 | Events:
- Place patch (2 hours)
- Seal joints (0.5 hours)
- Drill dowels (1 hours)
- Apply tack coat (2 hours)
- Clean pothole (2 hours)
Priorities:
- Place patch (Shopping mall: Floor)
- Seal joints (Tool shed: Pile cap)
- Drill dowels (Tool shed: Beam)
- Apply tack coat (Office building: Cladding panels)
- Clean pothole (Shopping mall: Roof) |
[
[
"Set forms",
"1.5 hours"
],
[
"Sawcut edges",
"0.5 hours"
],
[
"Compact base",
"1 hours"
],
[
"Place patch",
"2 hours"
],
[
"Drill dowels",
"1 hours"
],
[
"Apply tack coat",
"2 hours"
],
[
"Breakout patch",
"1.5 hours"
],
[
"R... | [
[
"Set forms",
"Hospital: Floor"
],
[
"Sawcut edges",
"Office building: Footing"
],
[
"Compact base",
"Apartment: Balcony slabs"
],
[
"Place patch",
"Apartment: Reinforced concrete column"
],
[
"Drill dowels",
"Shopping mall: Balcony slabs"
],
[
"Apply... | [
[
"Set forms",
"3"
],
[
"Sawcut edges",
"3"
],
[
"Compact base",
"5"
],
[
"Place patch",
"4"
],
[
"Drill dowels",
"5"
],
[
"Apply tack coat",
"3"
],
[
"Breakout patch",
"1"
],
[
"Rapid set mix",
"2"
]
] | 5,400 | Events:
- Set forms (1.5 hours)
- Sawcut edges (0.5 hours)
- Compact base (1 hours)
- Place patch (2 hours)
- Drill dowels (1 hours)
- Apply tack coat (2 hours)
- Breakout patch (1.5 hours)
- Rapid set mix (0.5 hours)
Priorities:
- Set forms (Hospital: Floor)
- Sawcut edges (Office building: Footing)
- Compact base (Apartment: Balcony slabs)
- Place patch (Apartment: Reinforced concrete column)
- Drill dowels (Shopping mall: Balcony slabs)
- Apply tack coat (Tool shed: Beam)
- Breakout patch (Shopping mall: Roof)
- Rapid set mix (Fire station: Pile cap) |
[
[
"Repoint joints",
"1 hours"
],
[
"Hydrophobic coat",
"2 hours"
],
[
"Steam clean",
"2 hours"
],
[
"Pore blocker",
"2 hours"
],
[
"Neutralize surface",
"0.5 hours"
]
] | [
[
"Repoint joints",
"Electrical substation: Shear wall"
],
[
"Hydrophobic coat",
"Fire station: Parapets"
],
[
"Steam clean",
"Office building: Landing slabs"
],
[
"Pore blocker",
"Shopping mall: Shear wall"
],
[
"Neutralize surface",
"Tool shed: Landing slabs... | [
[
"Repoint joints",
"5"
],
[
"Hydrophobic coat",
"4"
],
[
"Steam clean",
"4"
],
[
"Pore blocker",
"4"
],
[
"Neutralize surface",
"2"
]
] | 2,400 | Events:
- Repoint joints (1 hours)
- Hydrophobic coat (2 hours)
- Steam clean (2 hours)
- Pore blocker (2 hours)
- Neutralize surface (0.5 hours)
Priorities:
- Repoint joints (Electrical substation: Shear wall)
- Hydrophobic coat (Fire station: Parapets)
- Steam clean (Office building: Landing slabs)
- Pore blocker (Shopping mall: Shear wall)
- Neutralize surface (Tool shed: Landing slabs) |
[
[
"Tie rebar",
"1.5 hours"
],
[
"Cover breakout",
"0.5 hours"
],
[
"Protective coating",
"1 hours"
],
[
"Expose rebar",
"0.5 hours"
]
] | [
[
"Tie rebar",
"Office building: Pile cap"
],
[
"Cover breakout",
"Hospital: Landing slabs"
],
[
"Protective coating",
"Hospital: Ground slab"
],
[
"Expose rebar",
"Office building: Landing slabs"
]
] | [
[
"Tie rebar",
"5"
],
[
"Cover breakout",
"4"
],
[
"Protective coating",
"3"
],
[
"Expose rebar",
"5"
]
] | 1,170 | Events:
- Tie rebar (1.5 hours)
- Cover breakout (0.5 hours)
- Protective coating (1 hours)
- Expose rebar (0.5 hours)
Priorities:
- Tie rebar (Office building: Pile cap)
- Cover breakout (Hospital: Landing slabs)
- Protective coating (Hospital: Ground slab)
- Expose rebar (Office building: Landing slabs) |
[
[
"Route and seal",
"0.5 hours"
],
[
"Epoxy injection",
"1 hours"
],
[
"Install crack staples",
"1.5 hours"
],
[
"Joint reseal",
"1 hours"
]
] | [
[
"Route and seal",
"Hospital: Floor"
],
[
"Epoxy injection",
"Fire station: Floor"
],
[
"Install crack staples",
"Fire station: Balcony slabs"
],
[
"Joint reseal",
"Office building: Roof"
]
] | [
[
"Route and seal",
"5"
],
[
"Epoxy injection",
"4"
],
[
"Install crack staples",
"2"
],
[
"Joint reseal",
"2"
]
] | 1,140 | Events:
- Route and seal (0.5 hours)
- Epoxy injection (1 hours)
- Install crack staples (1.5 hours)
- Joint reseal (1 hours)
Priorities:
- Route and seal (Hospital: Floor)
- Epoxy injection (Fire station: Floor)
- Install crack staples (Fire station: Balcony slabs)
- Joint reseal (Office building: Roof) |
[
[
"Rebar passivation",
"0.5 hours"
],
[
"Cover breakout",
"1.5 hours"
],
[
"Tie rebar",
"0.5 hours"
],
[
"Replace rebar",
"0.5 hours"
],
[
"Protective coating",
"0.5 hours"
]
] | [
[
"Rebar passivation",
"Electrical substation: Cladding panels"
],
[
"Cover breakout",
"Tool shed: Roof"
],
[
"Tie rebar",
"Tool shed: Beam"
],
[
"Replace rebar",
"Apartment: Pile cap"
],
[
"Protective coating",
"Apartment: Cladding panels"
]
] | [
[
"Rebar passivation",
"5"
],
[
"Cover breakout",
"1"
],
[
"Tie rebar",
"1"
],
[
"Replace rebar",
"1"
],
[
"Protective coating",
"5"
]
] | 840 | Events:
- Rebar passivation (0.5 hours)
- Cover breakout (1.5 hours)
- Tie rebar (0.5 hours)
- Replace rebar (0.5 hours)
- Protective coating (0.5 hours)
Priorities:
- Rebar passivation (Electrical substation: Cladding panels)
- Cover breakout (Tool shed: Roof)
- Tie rebar (Tool shed: Beam)
- Replace rebar (Apartment: Pile cap)
- Protective coating (Apartment: Cladding panels) |
[
[
"Clean substrate",
"1.5 hours"
],
[
"Level grind",
"2 hours"
],
[
"Breakout spalls",
"1 hours"
],
[
"Bond coat",
"1.5 hours"
],
[
"Shotcrete patch",
"1.5 hours"
],
[
"Polymer mortar",
"0.5 hours"
],
[
"Sawcut edges",
"0.5 hours"
],
... | [
[
"Clean substrate",
"Electrical substation: Precast window sills"
],
[
"Level grind",
"Shopping mall: Staircase"
],
[
"Breakout spalls",
"Office building: Pile cap"
],
[
"Bond coat",
"Shopping mall: Cladding panels"
],
[
"Shotcrete patch",
"Apartment: Floor"
... | [
[
"Clean substrate",
"4"
],
[
"Level grind",
"5"
],
[
"Breakout spalls",
"1"
],
[
"Bond coat",
"2"
],
[
"Shotcrete patch",
"2"
],
[
"Polymer mortar",
"3"
],
[
"Sawcut edges",
"5"
],
[
"Surface seal",
"5"
]
] | 3,420 | Events:
- Clean substrate (1.5 hours)
- Level grind (2 hours)
- Breakout spalls (1 hours)
- Bond coat (1.5 hours)
- Shotcrete patch (1.5 hours)
- Polymer mortar (0.5 hours)
- Sawcut edges (0.5 hours)
- Surface seal (0.5 hours)
Priorities:
- Clean substrate (Electrical substation: Precast window sills)
- Level grind (Shopping mall: Staircase)
- Breakout spalls (Office building: Pile cap)
- Bond coat (Shopping mall: Cladding panels)
- Shotcrete patch (Apartment: Floor)
- Polymer mortar (Tool shed: Shear wall)
- Sawcut edges (Shopping mall: Balcony slabs)
- Surface seal (Apartment: Shear wall) |
[
[
"Pressure wash",
"1 hours"
],
[
"Hydrophobic coat",
"0.5 hours"
],
[
"Acid wash",
"2 hours"
],
[
"Breathable seal",
"1 hours"
],
[
"Pore blocker",
"2 hours"
],
[
"Steam clean",
"1 hours"
],
[
"Neutralize surface",
"1.5 hours"
],
[... | [
[
"Pressure wash",
"Apartment: Ground slab"
],
[
"Hydrophobic coat",
"Shopping mall: Roof"
],
[
"Acid wash",
"Tool shed: Ground slab"
],
[
"Breathable seal",
"Hospital: Parapets"
],
[
"Pore blocker",
"Office building: Roof"
],
[
"Steam clean",
"Off... | [
[
"Pressure wash",
"4"
],
[
"Hydrophobic coat",
"2"
],
[
"Acid wash",
"2"
],
[
"Breathable seal",
"3"
],
[
"Pore blocker",
"1"
],
[
"Steam clean",
"5"
],
[
"Neutralize surface",
"1"
],
[
"Joint reseal",
"2"
]
] | 4,380 | Events:
- Pressure wash (1 hours)
- Hydrophobic coat (0.5 hours)
- Acid wash (2 hours)
- Breathable seal (1 hours)
- Pore blocker (2 hours)
- Steam clean (1 hours)
- Neutralize surface (1.5 hours)
- Joint reseal (1.5 hours)
Priorities:
- Pressure wash (Apartment: Ground slab)
- Hydrophobic coat (Shopping mall: Roof)
- Acid wash (Tool shed: Ground slab)
- Breathable seal (Hospital: Parapets)
- Pore blocker (Office building: Roof)
- Steam clean (Office building: Load-bearing masonry wall)
- Neutralize surface (Office building: Staircase)
- Joint reseal (Office building: Cladding panels) |
[
[
"Feather edge",
"0.5 hours"
],
[
"Wet cure",
"1.5 hours"
],
[
"Sawcut edges",
"2 hours"
],
[
"Level grind",
"0.5 hours"
],
[
"Breakout spalls",
"1 hours"
],
[
"Shotcrete patch",
"0.5 hours"
],
[
"Surface seal",
"1 hours"
],
[
... | [
[
"Feather edge",
"School: Pile cap"
],
[
"Wet cure",
"Shopping mall: Load-bearing masonry wall"
],
[
"Sawcut edges",
"Hospital: Parapets"
],
[
"Level grind",
"School: Reinforced concrete column"
],
[
"Breakout spalls",
"Tool shed: Cladding panels"
],
[
... | [
[
"Feather edge",
"2"
],
[
"Wet cure",
"4"
],
[
"Sawcut edges",
"2"
],
[
"Level grind",
"2"
],
[
"Breakout spalls",
"2"
],
[
"Shotcrete patch",
"2"
],
[
"Surface seal",
"5"
],
[
"Bond coat",
"5"
]
] | 3,960 | Events:
- Feather edge (0.5 hours)
- Wet cure (1.5 hours)
- Sawcut edges (2 hours)
- Level grind (0.5 hours)
- Breakout spalls (1 hours)
- Shotcrete patch (0.5 hours)
- Surface seal (1 hours)
- Bond coat (2 hours)
Priorities:
- Feather edge (School: Pile cap)
- Wet cure (Shopping mall: Load-bearing masonry wall)
- Sawcut edges (Hospital: Parapets)
- Level grind (School: Reinforced concrete column)
- Breakout spalls (Tool shed: Cladding panels)
- Shotcrete patch (Tool shed: Precast window sills)
- Surface seal (Shopping mall: Landing slabs)
- Bond coat (Hospital: Roof) |
[
[
"Breathable seal",
"1 hours"
],
[
"Repoint joints",
"0.5 hours"
],
[
"Steam clean",
"2 hours"
],
[
"Joint reseal",
"1.5 hours"
],
[
"Hydrophobic coat",
"2 hours"
],
[
"Acid wash",
"2 hours"
]
] | [
[
"Breathable seal",
"Shopping mall: Reinforced concrete column"
],
[
"Repoint joints",
"Shopping mall: Pile cap"
],
[
"Steam clean",
"Apartment: Beam"
],
[
"Joint reseal",
"Shopping mall: Pile cap"
],
[
"Hydrophobic coat",
"Shopping mall: Landing slabs"
],
... | [
[
"Breathable seal",
"4"
],
[
"Repoint joints",
"4"
],
[
"Steam clean",
"5"
],
[
"Joint reseal",
"3"
],
[
"Hydrophobic coat",
"1"
],
[
"Acid wash",
"4"
]
] | 3,720 | Events:
- Breathable seal (1 hours)
- Repoint joints (0.5 hours)
- Steam clean (2 hours)
- Joint reseal (1.5 hours)
- Hydrophobic coat (2 hours)
- Acid wash (2 hours)
Priorities:
- Breathable seal (Shopping mall: Reinforced concrete column)
- Repoint joints (Shopping mall: Pile cap)
- Steam clean (Apartment: Beam)
- Joint reseal (Shopping mall: Pile cap)
- Hydrophobic coat (Shopping mall: Landing slabs)
- Acid wash (Shopping mall: Ground slab) |
[
[
"Zinc primer",
"1.5 hours"
],
[
"Protective coating",
"0.5 hours"
],
[
"Install anodes",
"1.5 hours"
],
[
"Expose rebar",
"1 hours"
],
[
"Mortar patch",
"1.5 hours"
]
] | [
[
"Zinc primer",
"Apartment: Landing slabs"
],
[
"Protective coating",
"Electrical substation: Parapets"
],
[
"Install anodes",
"Hospital: Precast window sills"
],
[
"Expose rebar",
"Tool shed: Balcony slabs"
],
[
"Mortar patch",
"Shopping mall: Footing"
]
] | [
[
"Zinc primer",
"5"
],
[
"Protective coating",
"5"
],
[
"Install anodes",
"5"
],
[
"Expose rebar",
"5"
],
[
"Mortar patch",
"5"
]
] | 1,770 | Events:
- Zinc primer (1.5 hours)
- Protective coating (0.5 hours)
- Install anodes (1.5 hours)
- Expose rebar (1 hours)
- Mortar patch (1.5 hours)
Priorities:
- Zinc primer (Apartment: Landing slabs)
- Protective coating (Electrical substation: Parapets)
- Install anodes (Hospital: Precast window sills)
- Expose rebar (Tool shed: Balcony slabs)
- Mortar patch (Shopping mall: Footing) |
[
[
"Sawcut edges",
"0.5 hours"
],
[
"Drill dowels",
"1 hours"
],
[
"Compact base",
"0.5 hours"
],
[
"Clean pothole",
"1.5 hours"
],
[
"Breakout patch",
"1.5 hours"
]
] | [
[
"Sawcut edges",
"Fire station: Cladding panels"
],
[
"Drill dowels",
"Office building: Beam"
],
[
"Compact base",
"Office building: Staircase"
],
[
"Clean pothole",
"Tool shed: Landing slabs"
],
[
"Breakout patch",
"Apartment: Cladding panels"
]
] | [
[
"Sawcut edges",
"1"
],
[
"Drill dowels",
"3"
],
[
"Compact base",
"1"
],
[
"Clean pothole",
"5"
],
[
"Breakout patch",
"4"
]
] | 930 | Events:
- Sawcut edges (0.5 hours)
- Drill dowels (1 hours)
- Compact base (0.5 hours)
- Clean pothole (1.5 hours)
- Breakout patch (1.5 hours)
Priorities:
- Sawcut edges (Fire station: Cladding panels)
- Drill dowels (Office building: Beam)
- Compact base (Office building: Staircase)
- Clean pothole (Tool shed: Landing slabs)
- Breakout patch (Apartment: Cladding panels) |
[
[
"Joint reseal",
"2 hours"
],
[
"Route and seal",
"1 hours"
],
[
"Hairline sealing",
"1 hours"
],
[
"Install crack staples",
"1.5 hours"
],
[
"Backer rod install",
"0.5 hours"
],
[
"Overband sealing",
"2 hours"
],
[
"Grind and seal",
"... | [
[
"Joint reseal",
"Apartment: Reinforced concrete column"
],
[
"Route and seal",
"Apartment: Beam"
],
[
"Hairline sealing",
"School: Cladding panels"
],
[
"Install crack staples",
"Office building: Landing slabs"
],
[
"Backer rod install",
"Office building: Pr... | [
[
"Joint reseal",
"3"
],
[
"Route and seal",
"4"
],
[
"Hairline sealing",
"4"
],
[
"Install crack staples",
"5"
],
[
"Backer rod install",
"3"
],
[
"Overband sealing",
"3"
],
[
"Grind and seal",
"2"
],
[
"Polyurethane injection"... | 5,100 | Events:
- Joint reseal (2 hours)
- Route and seal (1 hours)
- Hairline sealing (1 hours)
- Install crack staples (1.5 hours)
- Backer rod install (0.5 hours)
- Overband sealing (2 hours)
- Grind and seal (1.5 hours)
- Polyurethane injection (1 hours)
Priorities:
- Joint reseal (Apartment: Reinforced concrete column)
- Route and seal (Apartment: Beam)
- Hairline sealing (School: Cladding panels)
- Install crack staples (Office building: Landing slabs)
- Backer rod install (Office building: Precast window sills)
- Overband sealing (Tool shed: Floor)
- Grind and seal (Tool shed: Floor)
- Polyurethane injection (Fire station: Pile cap) |
[
[
"Drill dowels",
"0.5 hours"
],
[
"Compact base",
"1 hours"
],
[
"Sawcut edges",
"0.5 hours"
],
[
"Rapid set mix",
"1.5 hours"
],
[
"Clean pothole",
"1.5 hours"
],
[
"Breakout patch",
"0.5 hours"
]
] | [
[
"Drill dowels",
"Hospital: Ground slab"
],
[
"Compact base",
"Tool shed: Parapets"
],
[
"Sawcut edges",
"School: Floor"
],
[
"Rapid set mix",
"Hospital: Ground slab"
],
[
"Clean pothole",
"School: Beam"
],
[
"Breakout patch",
"Office building: Re... | [
[
"Drill dowels",
"4"
],
[
"Compact base",
"5"
],
[
"Sawcut edges",
"5"
],
[
"Rapid set mix",
"3"
],
[
"Clean pothole",
"3"
],
[
"Breakout patch",
"2"
]
] | 2,220 | Events:
- Drill dowels (0.5 hours)
- Compact base (1 hours)
- Sawcut edges (0.5 hours)
- Rapid set mix (1.5 hours)
- Clean pothole (1.5 hours)
- Breakout patch (0.5 hours)
Priorities:
- Drill dowels (Hospital: Ground slab)
- Compact base (Tool shed: Parapets)
- Sawcut edges (School: Floor)
- Rapid set mix (Hospital: Ground slab)
- Clean pothole (School: Beam)
- Breakout patch (Office building: Reinforced concrete column) |
[
[
"Grind and seal",
"1.5 hours"
],
[
"Install crack staples",
"1 hours"
],
[
"Backer rod install",
"1 hours"
],
[
"Overband sealing",
"2 hours"
],
[
"Epoxy injection",
"1 hours"
],
[
"Hairline sealing",
"0.5 hours"
],
[
"Route and seal",
... | [
[
"Grind and seal",
"Shopping mall: Footing"
],
[
"Install crack staples",
"Office building: Footing"
],
[
"Backer rod install",
"Hospital: Reinforced concrete column"
],
[
"Overband sealing",
"Office building: Beam"
],
[
"Epoxy injection",
"Apartment: Roof"
... | [
[
"Grind and seal",
"4"
],
[
"Install crack staples",
"5"
],
[
"Backer rod install",
"4"
],
[
"Overband sealing",
"1"
],
[
"Epoxy injection",
"5"
],
[
"Hairline sealing",
"3"
],
[
"Route and seal",
"2"
],
[
"Polyurethane injecti... | 4,050 | Events:
- Grind and seal (1.5 hours)
- Install crack staples (1 hours)
- Backer rod install (1 hours)
- Overband sealing (2 hours)
- Epoxy injection (1 hours)
- Hairline sealing (0.5 hours)
- Route and seal (1 hours)
- Polyurethane injection (0.5 hours)
Priorities:
- Grind and seal (Shopping mall: Footing)
- Install crack staples (Office building: Footing)
- Backer rod install (Hospital: Reinforced concrete column)
- Overband sealing (Office building: Beam)
- Epoxy injection (Apartment: Roof)
- Hairline sealing (Hospital: Footing)
- Route and seal (Tool shed: Cladding panels)
- Polyurethane injection (Hospital: Ground slab) |
[
[
"Overband sealing",
"2 hours"
],
[
"Route and seal",
"2 hours"
],
[
"Grind and seal",
"2 hours"
],
[
"Polyurethane injection",
"0.5 hours"
],
[
"Install crack staples",
"0.5 hours"
]
] | [
[
"Overband sealing",
"Office building: Staircase"
],
[
"Route and seal",
"Apartment: Roof"
],
[
"Grind and seal",
"Hospital: Staircase"
],
[
"Polyurethane injection",
"Office building: Footing"
],
[
"Install crack staples",
"Fire station: Reinforced concrete ... | [
[
"Overband sealing",
"4"
],
[
"Route and seal",
"1"
],
[
"Grind and seal",
"2"
],
[
"Polyurethane injection",
"5"
],
[
"Install crack staples",
"4"
]
] | 2,070 | Events:
- Overband sealing (2 hours)
- Route and seal (2 hours)
- Grind and seal (2 hours)
- Polyurethane injection (0.5 hours)
- Install crack staples (0.5 hours)
Priorities:
- Overband sealing (Office building: Staircase)
- Route and seal (Apartment: Roof)
- Grind and seal (Hospital: Staircase)
- Polyurethane injection (Office building: Footing)
- Install crack staples (Fire station: Reinforced concrete column) |
[
[
"Grit blast rebar",
"2 hours"
],
[
"Cover breakout",
"2 hours"
],
[
"Tie rebar",
"0.5 hours"
],
[
"Protective coating",
"2 hours"
],
[
"Rebar passivation",
"1 hours"
],
[
"Mortar patch",
"2 hours"
],
[
"Zinc primer",
"2 hours"
],
... | [
[
"Grit blast rebar",
"Shopping mall: Shear wall"
],
[
"Cover breakout",
"Tool shed: Load-bearing masonry wall"
],
[
"Tie rebar",
"Electrical substation: Ground slab"
],
[
"Protective coating",
"Office building: Roof"
],
[
"Rebar passivation",
"School: Parapet... | [
[
"Grit blast rebar",
"2"
],
[
"Cover breakout",
"3"
],
[
"Tie rebar",
"3"
],
[
"Protective coating",
"3"
],
[
"Rebar passivation",
"3"
],
[
"Mortar patch",
"2"
],
[
"Zinc primer",
"5"
],
[
"Replace rebar",
"4"
]
] | 6,480 | Events:
- Grit blast rebar (2 hours)
- Cover breakout (2 hours)
- Tie rebar (0.5 hours)
- Protective coating (2 hours)
- Rebar passivation (1 hours)
- Mortar patch (2 hours)
- Zinc primer (2 hours)
- Replace rebar (1 hours)
Priorities:
- Grit blast rebar (Shopping mall: Shear wall)
- Cover breakout (Tool shed: Load-bearing masonry wall)
- Tie rebar (Electrical substation: Ground slab)
- Protective coating (Office building: Roof)
- Rebar passivation (School: Parapets)
- Mortar patch (Fire station: Load-bearing masonry wall)
- Zinc primer (Hospital: Reinforced concrete column)
- Replace rebar (Tool shed: Balcony slabs) |
[
[
"Acid wash",
"1 hours"
],
[
"Crack seal",
"2 hours"
],
[
"Hydrophobic coat",
"1.5 hours"
],
[
"Repoint joints",
"1 hours"
],
[
"Steam clean",
"0.5 hours"
],
[
"Pore blocker",
"1 hours"
],
[
"Breathable seal",
"1 hours"
]
] | [
[
"Acid wash",
"Tool shed: Landing slabs"
],
[
"Crack seal",
"Tool shed: Parapets"
],
[
"Hydrophobic coat",
"Hospital: Pile cap"
],
[
"Repoint joints",
"Apartment: Cladding panels"
],
[
"Steam clean",
"Hospital: Landing slabs"
],
[
"Pore blocker",
... | [
[
"Acid wash",
"2"
],
[
"Crack seal",
"1"
],
[
"Hydrophobic coat",
"2"
],
[
"Repoint joints",
"1"
],
[
"Steam clean",
"4"
],
[
"Pore blocker",
"5"
],
[
"Breathable seal",
"1"
]
] | 2,640 | Events:
- Acid wash (1 hours)
- Crack seal (2 hours)
- Hydrophobic coat (1.5 hours)
- Repoint joints (1 hours)
- Steam clean (0.5 hours)
- Pore blocker (1 hours)
- Breathable seal (1 hours)
Priorities:
- Acid wash (Tool shed: Landing slabs)
- Crack seal (Tool shed: Parapets)
- Hydrophobic coat (Hospital: Pile cap)
- Repoint joints (Apartment: Cladding panels)
- Steam clean (Hospital: Landing slabs)
- Pore blocker (Shopping mall: Shear wall)
- Breathable seal (Apartment: Load-bearing masonry wall) |
[
[
"Wet cure",
"1.5 hours"
],
[
"Feather edge",
"0.5 hours"
],
[
"Clean substrate",
"1.5 hours"
],
[
"Level grind",
"2 hours"
]
] | [
[
"Wet cure",
"Electrical substation: Cladding panels"
],
[
"Feather edge",
"Electrical substation: Landing slabs"
],
[
"Clean substrate",
"Apartment: Load-bearing masonry wall"
],
[
"Level grind",
"Tool shed: Footing"
]
] | [
[
"Wet cure",
"3"
],
[
"Feather edge",
"3"
],
[
"Clean substrate",
"3"
],
[
"Level grind",
"5"
]
] | 1,200 | Events:
- Wet cure (1.5 hours)
- Feather edge (0.5 hours)
- Clean substrate (1.5 hours)
- Level grind (2 hours)
Priorities:
- Wet cure (Electrical substation: Cladding panels)
- Feather edge (Electrical substation: Landing slabs)
- Clean substrate (Apartment: Load-bearing masonry wall)
- Level grind (Tool shed: Footing) |
[
[
"Route and seal",
"1 hours"
],
[
"Epoxy injection",
"1.5 hours"
],
[
"Backer rod install",
"0.5 hours"
],
[
"Joint reseal",
"1 hours"
],
[
"Polyurethane injection",
"1.5 hours"
],
[
"Overband sealing",
"2 hours"
],
[
"Install crack staple... | [
[
"Route and seal",
"Electrical substation: Load-bearing masonry wall"
],
[
"Epoxy injection",
"Office building: Floor"
],
[
"Backer rod install",
"Electrical substation: Floor"
],
[
"Joint reseal",
"Tool shed: Cladding panels"
],
[
"Polyurethane injection",
"... | [
[
"Route and seal",
"3"
],
[
"Epoxy injection",
"5"
],
[
"Backer rod install",
"3"
],
[
"Joint reseal",
"1"
],
[
"Polyurethane injection",
"2"
],
[
"Overband sealing",
"1"
],
[
"Install crack staples",
"2"
]
] | 3,510 | Events:
- Route and seal (1 hours)
- Epoxy injection (1.5 hours)
- Backer rod install (0.5 hours)
- Joint reseal (1 hours)
- Polyurethane injection (1.5 hours)
- Overband sealing (2 hours)
- Install crack staples (2 hours)
Priorities:
- Route and seal (Electrical substation: Load-bearing masonry wall)
- Epoxy injection (Office building: Floor)
- Backer rod install (Electrical substation: Floor)
- Joint reseal (Tool shed: Cladding panels)
- Polyurethane injection (Apartment: Balcony slabs)
- Overband sealing (Office building: Balcony slabs)
- Install crack staples (Hospital: Balcony slabs) |
[
[
"Tie rebar",
"1 hours"
],
[
"Grit blast rebar",
"1.5 hours"
],
[
"Mortar patch",
"0.5 hours"
],
[
"Zinc primer",
"1 hours"
]
] | [
[
"Tie rebar",
"Office building: Beam"
],
[
"Grit blast rebar",
"Tool shed: Precast window sills"
],
[
"Mortar patch",
"Tool shed: Shear wall"
],
[
"Zinc primer",
"Apartment: Ground slab"
]
] | [
[
"Tie rebar",
"2"
],
[
"Grit blast rebar",
"4"
],
[
"Mortar patch",
"4"
],
[
"Zinc primer",
"2"
]
] | 870 | Events:
- Tie rebar (1 hours)
- Grit blast rebar (1.5 hours)
- Mortar patch (0.5 hours)
- Zinc primer (1 hours)
Priorities:
- Tie rebar (Office building: Beam)
- Grit blast rebar (Tool shed: Precast window sills)
- Mortar patch (Tool shed: Shear wall)
- Zinc primer (Apartment: Ground slab) |
[
[
"Zinc primer",
"2 hours"
],
[
"Mortar patch",
"1.5 hours"
],
[
"Expose rebar",
"1 hours"
],
[
"Replace rebar",
"0.5 hours"
],
[
"Protective coating",
"2 hours"
],
[
"Grit blast rebar",
"1 hours"
],
[
"Tie rebar",
"1.5 hours"
],
[
... | [
[
"Zinc primer",
"Hospital: Roof"
],
[
"Mortar patch",
"Fire station: Ground slab"
],
[
"Expose rebar",
"School: Floor"
],
[
"Replace rebar",
"Apartment: Beam"
],
[
"Protective coating",
"Office building: Ground slab"
],
[
"Grit blast rebar",
"Offi... | [
[
"Zinc primer",
"3"
],
[
"Mortar patch",
"3"
],
[
"Expose rebar",
"5"
],
[
"Replace rebar",
"2"
],
[
"Protective coating",
"4"
],
[
"Grit blast rebar",
"4"
],
[
"Tie rebar",
"4"
],
[
"Cover breakout",
"1"
]
] | 4,620 | Events:
- Zinc primer (2 hours)
- Mortar patch (1.5 hours)
- Expose rebar (1 hours)
- Replace rebar (0.5 hours)
- Protective coating (2 hours)
- Grit blast rebar (1 hours)
- Tie rebar (1.5 hours)
- Cover breakout (0.5 hours)
Priorities:
- Zinc primer (Hospital: Roof)
- Mortar patch (Fire station: Ground slab)
- Expose rebar (School: Floor)
- Replace rebar (Apartment: Beam)
- Protective coating (Office building: Ground slab)
- Grit blast rebar (Office building: Precast window sills)
- Tie rebar (Electrical substation: Landing slabs)
- Cover breakout (Office building: Landing slabs) |
[
[
"Grind and seal",
"1 hours"
],
[
"Stitch cracks",
"1 hours"
],
[
"Joint reseal",
"0.5 hours"
],
[
"Polyurethane injection",
"1.5 hours"
]
] | [
[
"Grind and seal",
"Electrical substation: Parapets"
],
[
"Stitch cracks",
"Tool shed: Precast window sills"
],
[
"Joint reseal",
"Apartment: Ground slab"
],
[
"Polyurethane injection",
"Tool shed: Floor"
]
] | [
[
"Grind and seal",
"4"
],
[
"Stitch cracks",
"1"
],
[
"Joint reseal",
"4"
],
[
"Polyurethane injection",
"1"
]
] | 750 | Events:
- Grind and seal (1 hours)
- Stitch cracks (1 hours)
- Joint reseal (0.5 hours)
- Polyurethane injection (1.5 hours)
Priorities:
- Grind and seal (Electrical substation: Parapets)
- Stitch cracks (Tool shed: Precast window sills)
- Joint reseal (Apartment: Ground slab)
- Polyurethane injection (Tool shed: Floor) |
[
[
"Apply tack coat",
"2 hours"
],
[
"Place patch",
"1.5 hours"
],
[
"Drill dowels",
"0.5 hours"
],
[
"Sawcut edges",
"2 hours"
],
[
"Set forms",
"1.5 hours"
],
[
"Rapid set mix",
"1 hours"
]
] | [
[
"Apply tack coat",
"Apartment: Floor"
],
[
"Place patch",
"Office building: Footing"
],
[
"Drill dowels",
"Shopping mall: Shear wall"
],
[
"Sawcut edges",
"Hospital: Cladding panels"
],
[
"Set forms",
"Hospital: Footing"
],
[
"Rapid set mix",
"El... | [
[
"Apply tack coat",
"2"
],
[
"Place patch",
"4"
],
[
"Drill dowels",
"1"
],
[
"Sawcut edges",
"3"
],
[
"Set forms",
"5"
],
[
"Rapid set mix",
"4"
]
] | 3,420 | Events:
- Apply tack coat (2 hours)
- Place patch (1.5 hours)
- Drill dowels (0.5 hours)
- Sawcut edges (2 hours)
- Set forms (1.5 hours)
- Rapid set mix (1 hours)
Priorities:
- Apply tack coat (Apartment: Floor)
- Place patch (Office building: Footing)
- Drill dowels (Shopping mall: Shear wall)
- Sawcut edges (Hospital: Cladding panels)
- Set forms (Hospital: Footing)
- Rapid set mix (Electrical substation: Pile cap) |
[
[
"Protective coating",
"0.5 hours"
],
[
"Cover breakout",
"2 hours"
],
[
"Rebar passivation",
"1.5 hours"
],
[
"Tie rebar",
"1.5 hours"
]
] | [
[
"Protective coating",
"Tool shed: Parapets"
],
[
"Cover breakout",
"Fire station: Landing slabs"
],
[
"Rebar passivation",
"Fire station: Shear wall"
],
[
"Tie rebar",
"Hospital: Balcony slabs"
]
] | [
[
"Protective coating",
"4"
],
[
"Cover breakout",
"5"
],
[
"Rebar passivation",
"1"
],
[
"Tie rebar",
"3"
]
] | 1,470 | Events:
- Protective coating (0.5 hours)
- Cover breakout (2 hours)
- Rebar passivation (1.5 hours)
- Tie rebar (1.5 hours)
Priorities:
- Protective coating (Tool shed: Parapets)
- Cover breakout (Fire station: Landing slabs)
- Rebar passivation (Fire station: Shear wall)
- Tie rebar (Hospital: Balcony slabs) |
[
[
"Overband sealing",
"1.5 hours"
],
[
"Epoxy injection",
"2 hours"
],
[
"Stitch cracks",
"1.5 hours"
],
[
"Grind and seal",
"2 hours"
],
[
"Hairline sealing",
"2 hours"
],
[
"Backer rod install",
"2 hours"
],
[
"Polyurethane injection",
... | [
[
"Overband sealing",
"Tool shed: Parapets"
],
[
"Epoxy injection",
"Hospital: Staircase"
],
[
"Stitch cracks",
"Electrical substation: Parapets"
],
[
"Grind and seal",
"Tool shed: Balcony slabs"
],
[
"Hairline sealing",
"School: Balcony slabs"
],
[
"B... | [
[
"Overband sealing",
"5"
],
[
"Epoxy injection",
"1"
],
[
"Stitch cracks",
"1"
],
[
"Grind and seal",
"4"
],
[
"Hairline sealing",
"1"
],
[
"Backer rod install",
"4"
],
[
"Polyurethane injection",
"4"
],
[
"Install crack staple... | 3,960 | Events:
- Overband sealing (1.5 hours)
- Epoxy injection (2 hours)
- Stitch cracks (1.5 hours)
- Grind and seal (2 hours)
- Hairline sealing (2 hours)
- Backer rod install (2 hours)
- Polyurethane injection (1.5 hours)
- Install crack staples (0.5 hours)
Priorities:
- Overband sealing (Tool shed: Parapets)
- Epoxy injection (Hospital: Staircase)
- Stitch cracks (Electrical substation: Parapets)
- Grind and seal (Tool shed: Balcony slabs)
- Hairline sealing (School: Balcony slabs)
- Backer rod install (Tool shed: Parapets)
- Polyurethane injection (Apartment: Floor)
- Install crack staples (School: Load-bearing masonry wall) |
[
[
"Feather edge",
"2 hours"
],
[
"Clean substrate",
"1 hours"
],
[
"Shotcrete patch",
"0.5 hours"
],
[
"Breakout spalls",
"1 hours"
],
[
"Surface seal",
"1.5 hours"
],
[
"Wet cure",
"2 hours"
],
[
"Polymer mortar",
"2 hours"
]
] | [
[
"Feather edge",
"Hospital: Parapets"
],
[
"Clean substrate",
"Fire station: Staircase"
],
[
"Shotcrete patch",
"Office building: Shear wall"
],
[
"Breakout spalls",
"School: Pile cap"
],
[
"Surface seal",
"School: Footing"
],
[
"Wet cure",
"Elect... | [
[
"Feather edge",
"3"
],
[
"Clean substrate",
"5"
],
[
"Shotcrete patch",
"2"
],
[
"Breakout spalls",
"2"
],
[
"Surface seal",
"1"
],
[
"Wet cure",
"2"
],
[
"Polymer mortar",
"2"
]
] | 4,260 | Events:
- Feather edge (2 hours)
- Clean substrate (1 hours)
- Shotcrete patch (0.5 hours)
- Breakout spalls (1 hours)
- Surface seal (1.5 hours)
- Wet cure (2 hours)
- Polymer mortar (2 hours)
Priorities:
- Feather edge (Hospital: Parapets)
- Clean substrate (Fire station: Staircase)
- Shotcrete patch (Office building: Shear wall)
- Breakout spalls (School: Pile cap)
- Surface seal (School: Footing)
- Wet cure (Electrical substation: Beam)
- Polymer mortar (School: Cladding panels) |
[
[
"Sawcut edges",
"1.5 hours"
],
[
"Apply tack coat",
"1 hours"
],
[
"Rapid set mix",
"1.5 hours"
],
[
"Seal joints",
"1.5 hours"
],
[
"Breakout patch",
"1.5 hours"
],
[
"Place patch",
"0.5 hours"
],
[
"Set forms",
"0.5 hours"
],
[
... | [
[
"Sawcut edges",
"Apartment: Footing"
],
[
"Apply tack coat",
"School: Staircase"
],
[
"Rapid set mix",
"Electrical substation: Beam"
],
[
"Seal joints",
"Apartment: Pile cap"
],
[
"Breakout patch",
"Office building: Footing"
],
[
"Place patch",
"... | [
[
"Sawcut edges",
"5"
],
[
"Apply tack coat",
"2"
],
[
"Rapid set mix",
"4"
],
[
"Seal joints",
"4"
],
[
"Breakout patch",
"4"
],
[
"Place patch",
"3"
],
[
"Set forms",
"2"
],
[
"Drill dowels",
"5"
]
] | 5,130 | Events:
- Sawcut edges (1.5 hours)
- Apply tack coat (1 hours)
- Rapid set mix (1.5 hours)
- Seal joints (1.5 hours)
- Breakout patch (1.5 hours)
- Place patch (0.5 hours)
- Set forms (0.5 hours)
- Drill dowels (1 hours)
Priorities:
- Sawcut edges (Apartment: Footing)
- Apply tack coat (School: Staircase)
- Rapid set mix (Electrical substation: Beam)
- Seal joints (Apartment: Pile cap)
- Breakout patch (Office building: Footing)
- Place patch (School: Precast window sills)
- Set forms (Tool shed: Landing slabs)
- Drill dowels (Fire station: Roof) |
[
[
"Hairline sealing",
"2 hours"
],
[
"Stitch cracks",
"1 hours"
],
[
"Route and seal",
"0.5 hours"
],
[
"Polyurethane injection",
"1.5 hours"
],
[
"Overband sealing",
"1 hours"
],
[
"Grind and seal",
"1.5 hours"
],
[
"Backer rod install",
... | [
[
"Hairline sealing",
"Fire station: Floor"
],
[
"Stitch cracks",
"School: Balcony slabs"
],
[
"Route and seal",
"Fire station: Beam"
],
[
"Polyurethane injection",
"School: Landing slabs"
],
[
"Overband sealing",
"Hospital: Footing"
],
[
"Grind and se... | [
[
"Hairline sealing",
"4"
],
[
"Stitch cracks",
"1"
],
[
"Route and seal",
"5"
],
[
"Polyurethane injection",
"5"
],
[
"Overband sealing",
"1"
],
[
"Grind and seal",
"5"
],
[
"Backer rod install",
"1"
],
[
"Epoxy injection",
... | 6,120 | Events:
- Hairline sealing (2 hours)
- Stitch cracks (1 hours)
- Route and seal (0.5 hours)
- Polyurethane injection (1.5 hours)
- Overband sealing (1 hours)
- Grind and seal (1.5 hours)
- Backer rod install (1.5 hours)
- Epoxy injection (2 hours)
Priorities:
- Hairline sealing (Fire station: Floor)
- Stitch cracks (School: Balcony slabs)
- Route and seal (Fire station: Beam)
- Polyurethane injection (School: Landing slabs)
- Overband sealing (Hospital: Footing)
- Grind and seal (Shopping mall: Load-bearing masonry wall)
- Backer rod install (Shopping mall: Load-bearing masonry wall)
- Epoxy injection (Apartment: Staircase) |
[
[
"Protective coating",
"2 hours"
],
[
"Install anodes",
"0.5 hours"
],
[
"Cover breakout",
"2 hours"
],
[
"Tie rebar",
"0.5 hours"
],
[
"Grit blast rebar",
"1.5 hours"
],
[
"Mortar patch",
"2 hours"
],
[
"Zinc primer",
"1 hours"
]
] | [
[
"Protective coating",
"Tool shed: Roof"
],
[
"Install anodes",
"Hospital: Load-bearing masonry wall"
],
[
"Cover breakout",
"Office building: Reinforced concrete column"
],
[
"Tie rebar",
"Tool shed: Pile cap"
],
[
"Grit blast rebar",
"School: Beam"
],
[... | [
[
"Protective coating",
"3"
],
[
"Install anodes",
"2"
],
[
"Cover breakout",
"1"
],
[
"Tie rebar",
"1"
],
[
"Grit blast rebar",
"1"
],
[
"Mortar patch",
"4"
],
[
"Zinc primer",
"1"
]
] | 4,680 | Events:
- Protective coating (2 hours)
- Install anodes (0.5 hours)
- Cover breakout (2 hours)
- Tie rebar (0.5 hours)
- Grit blast rebar (1.5 hours)
- Mortar patch (2 hours)
- Zinc primer (1 hours)
Priorities:
- Protective coating (Tool shed: Roof)
- Install anodes (Hospital: Load-bearing masonry wall)
- Cover breakout (Office building: Reinforced concrete column)
- Tie rebar (Tool shed: Pile cap)
- Grit blast rebar (School: Beam)
- Mortar patch (Fire station: Shear wall)
- Zinc primer (Office building: Load-bearing masonry wall) |
[
[
"Polyurethane injection",
"0.5 hours"
],
[
"Backer rod install",
"1.5 hours"
],
[
"Hairline sealing",
"0.5 hours"
],
[
"Epoxy injection",
"0.5 hours"
]
] | [
[
"Polyurethane injection",
"School: Beam"
],
[
"Backer rod install",
"Electrical substation: Floor"
],
[
"Hairline sealing",
"Tool shed: Load-bearing masonry wall"
],
[
"Epoxy injection",
"Tool shed: Balcony slabs"
]
] | [
[
"Polyurethane injection",
"3"
],
[
"Backer rod install",
"1"
],
[
"Hairline sealing",
"3"
],
[
"Epoxy injection",
"3"
]
] | 660 | Events:
- Polyurethane injection (0.5 hours)
- Backer rod install (1.5 hours)
- Hairline sealing (0.5 hours)
- Epoxy injection (0.5 hours)
Priorities:
- Polyurethane injection (School: Beam)
- Backer rod install (Electrical substation: Floor)
- Hairline sealing (Tool shed: Load-bearing masonry wall)
- Epoxy injection (Tool shed: Balcony slabs) |
[
[
"Zinc primer",
"1 hours"
],
[
"Replace rebar",
"0.5 hours"
],
[
"Tie rebar",
"1.5 hours"
],
[
"Install anodes",
"1.5 hours"
],
[
"Grit blast rebar",
"1.5 hours"
],
[
"Rebar passivation",
"0.5 hours"
]
] | [
[
"Zinc primer",
"Hospital: Floor"
],
[
"Replace rebar",
"Electrical substation: Pile cap"
],
[
"Tie rebar",
"Electrical substation: Staircase"
],
[
"Install anodes",
"Electrical substation: Ground slab"
],
[
"Grit blast rebar",
"Shopping mall: Parapets"
],
... | [
[
"Zinc primer",
"1"
],
[
"Replace rebar",
"5"
],
[
"Tie rebar",
"3"
],
[
"Install anodes",
"5"
],
[
"Grit blast rebar",
"2"
],
[
"Rebar passivation",
"4"
]
] | 1,980 | Events:
- Zinc primer (1 hours)
- Replace rebar (0.5 hours)
- Tie rebar (1.5 hours)
- Install anodes (1.5 hours)
- Grit blast rebar (1.5 hours)
- Rebar passivation (0.5 hours)
Priorities:
- Zinc primer (Hospital: Floor)
- Replace rebar (Electrical substation: Pile cap)
- Tie rebar (Electrical substation: Staircase)
- Install anodes (Electrical substation: Ground slab)
- Grit blast rebar (Shopping mall: Parapets)
- Rebar passivation (School: Ground slab) |
[
[
"Polyurethane injection",
"1 hours"
],
[
"Overband sealing",
"2 hours"
],
[
"Grind and seal",
"1.5 hours"
],
[
"Route and seal",
"1.5 hours"
],
[
"Joint reseal",
"1.5 hours"
],
[
"Hairline sealing",
"1 hours"
],
[
"Epoxy injection",
"... | [
[
"Polyurethane injection",
"Tool shed: Footing"
],
[
"Overband sealing",
"Electrical substation: Floor"
],
[
"Grind and seal",
"Tool shed: Beam"
],
[
"Route and seal",
"Electrical substation: Precast window sills"
],
[
"Joint reseal",
"School: Precast window ... | [
[
"Polyurethane injection",
"3"
],
[
"Overband sealing",
"4"
],
[
"Grind and seal",
"3"
],
[
"Route and seal",
"2"
],
[
"Joint reseal",
"4"
],
[
"Hairline sealing",
"1"
],
[
"Epoxy injection",
"3"
]
] | 3,210 | Events:
- Polyurethane injection (1 hours)
- Overband sealing (2 hours)
- Grind and seal (1.5 hours)
- Route and seal (1.5 hours)
- Joint reseal (1.5 hours)
- Hairline sealing (1 hours)
- Epoxy injection (0.5 hours)
Priorities:
- Polyurethane injection (Tool shed: Footing)
- Overband sealing (Electrical substation: Floor)
- Grind and seal (Tool shed: Beam)
- Route and seal (Electrical substation: Precast window sills)
- Joint reseal (School: Precast window sills)
- Hairline sealing (School: Pile cap)
- Epoxy injection (School: Precast window sills) |
[
[
"Place patch",
"1.5 hours"
],
[
"Compact base",
"1.5 hours"
],
[
"Set forms",
"2 hours"
],
[
"Sawcut edges",
"0.5 hours"
],
[
"Apply tack coat",
"2 hours"
],
[
"Clean pothole",
"2 hours"
]
] | [
[
"Place patch",
"School: Parapets"
],
[
"Compact base",
"Office building: Floor"
],
[
"Set forms",
"Hospital: Ground slab"
],
[
"Sawcut edges",
"Office building: Load-bearing masonry wall"
],
[
"Apply tack coat",
"Tool shed: Reinforced concrete column"
],
... | [
[
"Place patch",
"3"
],
[
"Compact base",
"3"
],
[
"Set forms",
"5"
],
[
"Sawcut edges",
"1"
],
[
"Apply tack coat",
"1"
],
[
"Clean pothole",
"5"
]
] | 3,150 | Events:
- Place patch (1.5 hours)
- Compact base (1.5 hours)
- Set forms (2 hours)
- Sawcut edges (0.5 hours)
- Apply tack coat (2 hours)
- Clean pothole (2 hours)
Priorities:
- Place patch (School: Parapets)
- Compact base (Office building: Floor)
- Set forms (Hospital: Ground slab)
- Sawcut edges (Office building: Load-bearing masonry wall)
- Apply tack coat (Tool shed: Reinforced concrete column)
- Clean pothole (Tool shed: Precast window sills) |
[
[
"Place patch",
"1 hours"
],
[
"Set forms",
"1 hours"
],
[
"Apply tack coat",
"1.5 hours"
],
[
"Drill dowels",
"1 hours"
]
] | [
[
"Place patch",
"Fire station: Reinforced concrete column"
],
[
"Set forms",
"Hospital: Balcony slabs"
],
[
"Apply tack coat",
"Apartment: Staircase"
],
[
"Drill dowels",
"School: Load-bearing masonry wall"
]
] | [
[
"Place patch",
"5"
],
[
"Set forms",
"3"
],
[
"Apply tack coat",
"2"
],
[
"Drill dowels",
"4"
]
] | 1,440 | Events:
- Place patch (1 hours)
- Set forms (1 hours)
- Apply tack coat (1.5 hours)
- Drill dowels (1 hours)
Priorities:
- Place patch (Fire station: Reinforced concrete column)
- Set forms (Hospital: Balcony slabs)
- Apply tack coat (Apartment: Staircase)
- Drill dowels (School: Load-bearing masonry wall) |
[
[
"Drill dowels",
"2 hours"
],
[
"Compact base",
"1 hours"
],
[
"Seal joints",
"0.5 hours"
],
[
"Rapid set mix",
"0.5 hours"
],
[
"Sawcut edges",
"0.5 hours"
],
[
"Place patch",
"1.5 hours"
],
[
"Breakout patch",
"2 hours"
],
[
... | [
[
"Drill dowels",
"Shopping mall: Precast window sills"
],
[
"Compact base",
"Hospital: Roof"
],
[
"Seal joints",
"School: Precast window sills"
],
[
"Rapid set mix",
"Electrical substation: Parapets"
],
[
"Sawcut edges",
"Office building: Ground slab"
],
... | [
[
"Drill dowels",
"3"
],
[
"Compact base",
"3"
],
[
"Seal joints",
"3"
],
[
"Rapid set mix",
"5"
],
[
"Sawcut edges",
"1"
],
[
"Place patch",
"2"
],
[
"Breakout patch",
"1"
],
[
"Clean pothole",
"3"
]
] | 5,160 | Events:
- Drill dowels (2 hours)
- Compact base (1 hours)
- Seal joints (0.5 hours)
- Rapid set mix (0.5 hours)
- Sawcut edges (0.5 hours)
- Place patch (1.5 hours)
- Breakout patch (2 hours)
- Clean pothole (2 hours)
Priorities:
- Drill dowels (Shopping mall: Precast window sills)
- Compact base (Hospital: Roof)
- Seal joints (School: Precast window sills)
- Rapid set mix (Electrical substation: Parapets)
- Sawcut edges (Office building: Ground slab)
- Place patch (Shopping mall: Ground slab)
- Breakout patch (Fire station: Beam)
- Clean pothole (School: Beam) |
[
[
"Route and seal",
"1.5 hours"
],
[
"Epoxy injection",
"1 hours"
],
[
"Polyurethane injection",
"1.5 hours"
],
[
"Grind and seal",
"1 hours"
],
[
"Backer rod install",
"2 hours"
],
[
"Hairline sealing",
"0.5 hours"
],
[
"Joint reseal",
... | [
[
"Route and seal",
"Apartment: Landing slabs"
],
[
"Epoxy injection",
"Office building: Cladding panels"
],
[
"Polyurethane injection",
"School: Shear wall"
],
[
"Grind and seal",
"Tool shed: Balcony slabs"
],
[
"Backer rod install",
"Hospital: Parapets"
],... | [
[
"Route and seal",
"2"
],
[
"Epoxy injection",
"4"
],
[
"Polyurethane injection",
"3"
],
[
"Grind and seal",
"5"
],
[
"Backer rod install",
"1"
],
[
"Hairline sealing",
"5"
],
[
"Joint reseal",
"4"
]
] | 2,760 | Events:
- Route and seal (1.5 hours)
- Epoxy injection (1 hours)
- Polyurethane injection (1.5 hours)
- Grind and seal (1 hours)
- Backer rod install (2 hours)
- Hairline sealing (0.5 hours)
- Joint reseal (0.5 hours)
Priorities:
- Route and seal (Apartment: Landing slabs)
- Epoxy injection (Office building: Cladding panels)
- Polyurethane injection (School: Shear wall)
- Grind and seal (Tool shed: Balcony slabs)
- Backer rod install (Hospital: Parapets)
- Hairline sealing (Apartment: Footing)
- Joint reseal (School: Parapets) |
[
[
"Place patch",
"1 hours"
],
[
"Set forms",
"1 hours"
],
[
"Drill dowels",
"0.5 hours"
],
[
"Breakout patch",
"1.5 hours"
],
[
"Clean pothole",
"1.5 hours"
],
[
"Sawcut edges",
"2 hours"
],
[
"Compact base",
"2 hours"
]
] | [
[
"Place patch",
"Apartment: Beam"
],
[
"Set forms",
"Office building: Balcony slabs"
],
[
"Drill dowels",
"Electrical substation: Beam"
],
[
"Breakout patch",
"Shopping mall: Pile cap"
],
[
"Clean pothole",
"Fire station: Floor"
],
[
"Sawcut edges",
... | [
[
"Place patch",
"4"
],
[
"Set forms",
"3"
],
[
"Drill dowels",
"2"
],
[
"Breakout patch",
"1"
],
[
"Clean pothole",
"2"
],
[
"Sawcut edges",
"5"
],
[
"Compact base",
"2"
]
] | 5,310 | Events:
- Place patch (1 hours)
- Set forms (1 hours)
- Drill dowels (0.5 hours)
- Breakout patch (1.5 hours)
- Clean pothole (1.5 hours)
- Sawcut edges (2 hours)
- Compact base (2 hours)
Priorities:
- Place patch (Apartment: Beam)
- Set forms (Office building: Balcony slabs)
- Drill dowels (Electrical substation: Beam)
- Breakout patch (Shopping mall: Pile cap)
- Clean pothole (Fire station: Floor)
- Sawcut edges (School: Load-bearing masonry wall)
- Compact base (Shopping mall: Roof) |
[
[
"Wet cure",
"1.5 hours"
],
[
"Level grind",
"1 hours"
],
[
"Clean substrate",
"2 hours"
],
[
"Polymer mortar",
"0.5 hours"
],
[
"Feather edge",
"1.5 hours"
],
[
"Breakout spalls",
"2 hours"
],
[
"Surface seal",
"1.5 hours"
]
] | [
[
"Wet cure",
"Tool shed: Roof"
],
[
"Level grind",
"Tool shed: Ground slab"
],
[
"Clean substrate",
"Tool shed: Shear wall"
],
[
"Polymer mortar",
"Apartment: Precast window sills"
],
[
"Feather edge",
"Hospital: Staircase"
],
[
"Breakout spalls",
... | [
[
"Wet cure",
"2"
],
[
"Level grind",
"4"
],
[
"Clean substrate",
"5"
],
[
"Polymer mortar",
"5"
],
[
"Feather edge",
"4"
],
[
"Breakout spalls",
"1"
],
[
"Surface seal",
"2"
]
] | 3,570 | Events:
- Wet cure (1.5 hours)
- Level grind (1 hours)
- Clean substrate (2 hours)
- Polymer mortar (0.5 hours)
- Feather edge (1.5 hours)
- Breakout spalls (2 hours)
- Surface seal (1.5 hours)
Priorities:
- Wet cure (Tool shed: Roof)
- Level grind (Tool shed: Ground slab)
- Clean substrate (Tool shed: Shear wall)
- Polymer mortar (Apartment: Precast window sills)
- Feather edge (Hospital: Staircase)
- Breakout spalls (Electrical substation: Landing slabs)
- Surface seal (Shopping mall: Pile cap) |
[
[
"Expose rebar",
"0.5 hours"
],
[
"Zinc primer",
"0.5 hours"
],
[
"Rebar passivation",
"2 hours"
],
[
"Protective coating",
"1 hours"
]
] | [
[
"Expose rebar",
"Apartment: Cladding panels"
],
[
"Zinc primer",
"School: Load-bearing masonry wall"
],
[
"Rebar passivation",
"Electrical substation: Cladding panels"
],
[
"Protective coating",
"Electrical substation: Reinforced concrete column"
]
] | [
[
"Expose rebar",
"4"
],
[
"Zinc primer",
"3"
],
[
"Rebar passivation",
"5"
],
[
"Protective coating",
"3"
]
] | 630 | Events:
- Expose rebar (0.5 hours)
- Zinc primer (0.5 hours)
- Rebar passivation (2 hours)
- Protective coating (1 hours)
Priorities:
- Expose rebar (Apartment: Cladding panels)
- Zinc primer (School: Load-bearing masonry wall)
- Rebar passivation (Electrical substation: Cladding panels)
- Protective coating (Electrical substation: Reinforced concrete column) |