4543f0c8-d01f-44e4-be2f-185d2b07c595
|
First and third (final) inspections: To verify that the manufactured home is properly attached to the permanent foundation as specified in the construction exhibits, and that all onsite and offsite improvements are properly completed.
|
VA_Guidelines.txt
|
3d2cbb74-66de-4872-bba3-3b746b303d62
|
Special inspections: As discussed in the topic Inspection Stages in this chapter, and as necessitated by the construction of other onsite improvements financed with the VA guaranteed loan.
Note: Second stage inspections are not generally required since manufactured homes are factory fabricated.
|
VA_Guidelines.txt
|
17f3ea6b-251c-403a-bad2-3570b156b4e6
|
Additional In cases involving a used manufactured home moved to the purchaser’s lot to Inspections for be affixed to a permanent foundation, all of the following additional Used manufactured home inspection reports are required to ensure the safety of the Manufactured dwelling: Homes Water-Plumbing Systems Inspection Report, VA Form 26-8731a Electrical Systems Inspection Report, VA Form 26-8731b
|
VA_Guidelines.txt
|
ee644063-edda-4e9c-b7d9-6dd75647fd11
|
Systems Inspection Report, VA Form 26-8731b Fuel and Heating Systems Inspection Report, VA Form 26-8731c, and certification that the roof was coated after set-up on the site
|
VA_Guidelines.txt
|
dd9fa81f-a4a3-4ed1-9ca3-bf57eefcf1b6
|
.
|
VA_Guidelines.txt
|
16dc4e91-a188-4879-ae55-98533de841ac
|
These reports must be completed by qualified third-party inspectors, for example, experienced plumbers, electricians, heating and air-conditioning contractors and manufactured home service personnel, following the installation and setup of the manufactured home on the lot.
The roof coating certification can be made by the lender.
|
VA_Guidelines.txt
|
c1d08cff-16e6-4939-8c95-52cac7f8dc73
|
Continued on next page January 1, 2001 14-111 VA Pamphlet 26-7, Revised Chapter 14: Construction Inspections 14.04 Manufactured Homes Classified as Real Estate Required The following inspections are required on manufactured homes classified as Inspections real estate.
|
VA_Guidelines.txt
|
2ad66e77-df28-4a8f-9647-829b91c27c4b
|
First and third (final) inspections: To verify that the manufactured home is properly attached to the permanent foundation as specified in the construction exhibits, and that all onsite and offsite improvements are properly completed.
|
VA_Guidelines.txt
|
f1110fd2-11ae-48bf-8661-ff45e4352572
|
Special inspections: As discussed in the topic Inspection Stages in this chapter, and as necessitated by the construction of other onsite improvements financed with the VA guaranteed loan.
Note: Second stage inspections are not generally required since manufactured homes are factory fabricated.
|
VA_Guidelines.txt
|
7096177b-5488-4da9-9368-4cb7d2664b7f
|
Additional In cases involving a used manufactured home moved to the purchaser’s lot to Inspections for be affixed to a permanent foundation, all of the following additional Used manufactured home inspection reports are required to ensure the safety of the Manufactured dwelling: Homes Water-Plumbing Systems Inspection Report, VA Form 26-8731a Electrical Systems Inspection Report, VA Form 26-8731b
|
VA_Guidelines.txt
|
522d6f61-f9db-4657-8e51-7c1495210a31
|
Systems Inspection Report, VA Form 26-8731b Fuel and Heating Systems Inspection Report, VA Form 26-8731c, and certification that the roof was coated after set-up on the site
|
VA_Guidelines.txt
|
0609eaa0-6051-4a2f-b378-e1ff6f7286b9
|
.
|
VA_Guidelines.txt
|
45235dc3-855f-45b5-8956-a4effa371fd7
|
These reports must be completed by qualified third-party inspectors, for example, experienced plumbers, electricians, heating and air-conditioning contractors and manufactured home service personnel, following the installation and setup of the manufactured home on the lot.
The roof coating certification can be made by the lender.
|
VA_Guidelines.txt
|
7daecb58-b29d-4213-a5f1-d9fb35b477a5
|
Continued on next page January 1, 2001 14-111 VA Pamphlet 26-7, Revised Chapter 14: Construction Inspections 14.04 Manufactured Homes Classified as Real Estate, Continued Qualified While inspectors will perform only those inspections for which they are Inspectors qualified, licensed manufactured home service personnel will be permitted to perform any of the required inspections.
|
VA_Guidelines.txt
|
4e300bd1-9c57-47b0-b458-990b4d654c5e
|
Lenders must order the inspections and retain the original of the reports in their loan origination file.
No loan on a manufactured home with unsatisfactory inspections is eligible for VA guaranty.
|
VA_Guidelines.txt
|
57eed947-e9d0-4ae5-83d8-befa1806918b
|
January 1, 2001 14-122 VA Pamphlet 26-7, Revised Chapter 14: Construction Inspections Change 3 14
|
VA_Guidelines.txt
|
7ee86f99-dd8d-49f5-922a-f1c3d534aef6
|
.05 Delayed Installation of Appliances and Finished Floor Covering What is With the exception of floor covering in bathrooms and wood finish flooring, Required installation of appliances and finished floor covering may be delayed until as late as just prior to loan closing, provided the third-stage inspection report includes the following: In Section 1, a description of all appliances and finish
|
VA_Guidelines.txt
|
f8caaf59-ac1a-4af8-b02c-91867f38d913
|
1, a description of all appliances and finish floor covering to be installed as identified in the specifications, for example, carpet manufacturer’s name and carpet quality code number, and the living area(s) involved, if not obvious
|
VA_Guidelines.txt
|
4825fed7-151c-4c6b-a9e6-51262b591285
|
.
|
VA_Guidelines.txt
|
0cea9a85-ef66-48da-afa4-f8b25ed97c01
|
In Section 6, check “Prefinal Report Approved,” and “Certification is required that lender’s inspection prior to loan closing reveals satisfactory installation of specified appliances and finish floor covering as described in Item 1 in the area(s) identified in Item 1.” What is not A revised VA Value Notice is not required.
|
VA_Guidelines.txt
|
79104f46-69f7-4380-8a17-12c986e2a3a9
|
Required July 14, 2003 14-133 VA Pamphlet 26-7, Revised Chapter 14: Construction Inspections Change 3 14
|
VA_Guidelines.txt
|
4486bc7b-3936-4ba8-a482-ba8384812168
|
.06 Lender Use of Inspection Reports Receipt of If construction is acceptable and there are no deviations or substitutions, the Inspection compliance inspector will submit the inspection report (VA Form 26-1839) in Reports the following manner: If the lender is known: Provide the lender with a copy, Provide the builder with a copy, and Keep a copy for his/her file.
|
VA_Guidelines.txt
|
3ee48c8a-7886-4515-af49-a366ebdd0be0
|
If the lender is not known: Provide the builder with two copies, one of which the builder will forward to the lender when known, and Keep a copy for his/her file.
|
VA_Guidelines.txt
|
0900f264-78e9-4304-8ae1-c2973d21b449
|
Use of Considering the requirements to obtain VA loan guaranty, before the loan is Inspection closed, the lender should ensure that Reports all VA value notice requirements regarding inspections are met any deviations and/or noncompliance items listed on the third-stage inspection report are resolved to VA’s satisfaction any appliances or floor coverings installed under Section 14
|
VA_Guidelines.txt
|
13de28ac-0b6a-4a1e-9318-96c5d740054f
|
.05 are the same as those described in Section 1 of the third-stage inspection report, and the third stage inspection report includes all of the information required for a final inspection.
|
VA_Guidelines.txt
|
32ad402a-765c-40a3-892e-719feb80257c
|
Retention of The lender must retain all inspection-related material in their loan origination Inspection file.
Reports July 14, 2003 14-144 VA Pamphlet 26-7, Revised Chapter 14: Construction Inspections Change 3 14.07 Changes to Construction Exhibits How to Request Use the table below to request a change to construction exhibits after the a Change appraisal.
When a Veteran is ...
|
VA_Guidelines.txt
|
0b5ca1d3-beaf-40e1-b052-d3f14f6decf3
|
When a Veteran is ...
Then ... under contract the veteran under contract must make a written request for any changes. not under contract the builder, lender, or sponsor making the written request for modification must certify that the property is not under contract to a veteran.
|
VA_Guidelines.txt
|
48b54323-49a6-4174-8f78-0b25760523c5
|
Change VA Form 26-1844, Request For Acceptance of Changes in Approved Request Form Drawings and Specifications must be used to request the change.
|
VA_Guidelines.txt
|
939bf31d-2a14-4f13-881e-2bc912014878
|
There are two exceptions: If there is no veteran-purchaser involved and the change is limited to substitution of mechanical equipment of equal value, then the fee inspector may check VA Form 26-1839, Section 1B, Substitutions or Deviations, describe the change of equipment and the value attributed to the substituted equipment and note the change on the related plans and specifications.
|
VA_Guidelines.txt
|
786d2df8-5ab5-48a4-9b28-2feaa11c2d7e
|
If the property was inspected by HUD, provided the additions, substitutions or variations are clearly described on the HUD inspection report the veteran-purchaser has signed his/her acceptance of the changes, and the change items are of a minor nature with no additional cost to the veteran involved and no change in reasonable value is indicated.
|
VA_Guidelines.txt
|
72f243e5-8b4d-4624-9348-72377136621c
|
Example: Substitution of water heater, furnace, hardware, bath fixtures and/or relocation of electrical outlets, windows, etc.
|
VA_Guidelines.txt
|
93f01aec-e441-4d30-a082-04809532458c
|
Continued on next page July 14, 2003 14-155 VA Pamphlet 26-7, Revised Chapter 14: Construction Inspections Change 3 14.07 Changes to Construction Exhibits, Continued Approval of Fee inspectors may approve and distribute a properly completed VA Form Changes not 26-1844, containing all required signatures, which does not involve deletions Affecting or a change in value.
|
VA_Guidelines.txt
|
1fc2dee8-8ee0-4256-ae3d-0a4919cd9330
|
In these cases, the builder must complete VA Form 26- Property Value 1844 in duplicate and have the form at the job site at the time of the scheduled inspection.
|
VA_Guidelines.txt
|
4147b45e-ed7b-49bc-a4be-6b81b846dd92
|
The inspector confirms the above information inspects the property according to the plans, specifications and change order signs the change order in the appropriate space gives the builder the original counter-signed change order to forward to the lender, and retains one copy.
|
VA_Guidelines.txt
|
07cf327a-6649-41b8-b967-4ad077075254
|
Approval of VA staff must approve any VA Form 26-1844, Request for Acceptance of Changes Which Changes in Approved Drawings and Specifications, including deletions or a Affect Property change in value, by issuing an amended NOV.
|
VA_Guidelines.txt
|
f014a9cf-0c9e-4b16-bbf2-dfd0310f42c7
|
Value VA will generally find it more appropriate to pursue this action in cases which also involve changes in notice of value conditions or legal requirements, legal descriptions substitution of plan types, etc… Continued on next page July 14, 2003 14-166 VA Pamphlet 26-7, Revised Chapter 14: Construction Inspections Change 3 14
|
VA_Guidelines.txt
|
536c33a4-f0c0-4e61-85ca-cbb5862f1eca
|
.07 Changes to Construction Exhibits, Continued Notification For changes approved by the VA staff, VA mails a copy of the amended NOV directly to the veteran-purchaser, places copy of amended NOV in the VA loan file, and notifies the lender that the amended NOV is available through TAS.
|
VA_Guidelines.txt
|
bb4ead43-6c6d-4831-ab01-5f4461c54100
|
If no veteran is under contract, a copy will be attached to the veteran’s copy of the notice of value in the loan file and mailed to him/her upon receipt of a loan application or loan report.
Cancellation of Any violation of the Conditions of Acceptance printed on the reverse of VA VA Approval Form 26-1844 will be cause to withdraw or cancel VA’s acceptance of the changes.
|
VA_Guidelines.txt
|
96536600-b747-4031-a915-7d2b0a392bb7
|
July 14, 2003 14-177 Additional Inspections, 14-11 Final Inspection, 14-8 Approval of Changes Affecting Property First and Third (final) Inspections, 14-11 Value, 14-16 First Inspection Stage, 14-5 Approval of Changes not Affecting Property How to Request a Change, 14-15 Value, 14-16 Individual Water Supply, 14-8 Assigning an Inspector, 14-3 Inspection Stages, 14-4 Cancellation of VA Approval,
|
VA_Guidelines.txt
|
9ca22628-52a2-45f4-a4fd-fa53e868bc14
|
Stages, 14-4 Cancellation of VA Approval, 14-17 Interior Inspection, 14-7 Change Notification, 14-17 Lender Use of Inspection Reports, 14-14 Change Request Form, 14-15 Lender’s Loan Origination file, 14-10 Completion of Excavation Alternative, 14-5 Manufactured Homes Classified as Real Completion of Foundation Alternative, 14-5 Estate, 14-11 Consequences of Inspections, 14-1 Missed Inspections,
|
VA_Guidelines.txt
|
a864c189-39e3-4a86-becc-f37040d88dc9
|
of Inspections, 14-1 Missed Inspections, 14-9 Construction Exhibits, 14-15
|
VA_Guidelines.txt
|
0259a2a2-f45f-4d2f-a955-ea74a0c61d61
|
.
|
VA_Guidelines.txt
|
8e15e80d-7aaa-4f19-b14c-0b4ca3e10abd
|
See Section Obtaining an Inspection, 14-3 10. 10 Qualified Inspectors, 14-12 Construction Inspections, 14-1.
|
VA_Guidelines.txt
|
e6ba442f-0612-4496-bd4e-486f14c9b5cc
|
See Chapter Re-inspection, 14-9 12, VA Minimum Property Requirements Requesting an Inspection, 14-3 (MPRs) Required Inspections, 14-11 Delayed Installation of Appliances and Second Inspection Stage, 14-6 Finished Floor Covering, 14-13 Sewage Disposal System, 14-8 Delays in starting construction, 14-3 Special Inspections, 14-9, 14-11 Determining the Type of Inspection, 14-1 Specially Adapted
|
VA_Guidelines.txt
|
323d72df-b0fd-4c03-939d-f445de063796
|
the Type of Inspection, 14-1 Specially Adapted Housing Cases, 14-2 Discontinuing Reliance on Local Third Inspection Stage, 14-7 Inspections, 14-10 VA Reliance on Local Building Inspections, Equal Employment Opportunity 14-10 Requirement, 14-4 Waiving First and Second Stage Inspections, 14-10 Exterior Inspection, 14-7 VA Pamphlet 26-7, Revised Chapter 15: Lender Appraisal Processing Program (LAPP)
|
VA_Guidelines.txt
|
9dc640f8-aac9-43c7-af7c-37840bf5f959
|
15: Lender Appraisal Processing Program (LAPP) Chapter 15
|
VA_Guidelines.txt
|
1a4f5144-4c0f-407c-a5ea-893506920b7a
|
.
|
VA_Guidelines.txt
|
6c0407ad-a478-45fc-b98a-9076aad82178
|
Lender Appraisal Processing Program (LAPP) Overview Change Date June 28, 2010, Change 14 This section has been updated to add subsection lettering and to make minor grammatical edits. a.
|
VA_Guidelines.txt
|
92e441dd-5826-4fb9-94d3-85a29a7d1b14
|
Purpose of The purpose of the Lender Appraisal Processing Program (LAPP) is to LAPP speed up the time to loan closing by allowing VA-authorized lenders to receive appraisal reports directly from appraisers and process them without VA involvement. b.
How LAPP There are basically four steps in processing LAPP cases.
|
VA_Guidelines.txt
|
a601f277-aa74-4811-8b63-fbc50af032f7
|
Works Stage Description 1 The LAPP lender requests VA assignment of a fee appraiser and a VA loan number (same as any other case) and identifies the case as “LAPP.” 2 The VA-assigned appraiser sends the appraisal report directly to the LAPP lender’s VA-approved staff appraisal reviewer (SAR)
|
VA_Guidelines.txt
|
8ae8b5d2-86d9-4927-b8f3-04ca61bd0f31
|
. 3 The LAPP lender’s SAR reviews the appraisal report for completeness and conformity with industry-accepted appraisal practices and techniques as well as other VA requirements, determines the reasonable value of the property and any conditions which must be met prior to VA guaranty of the loan, and sends the veteran buyer a written notice of the value which includes any conditions or
|
VA_Guidelines.txt
|
855431a9-3236-4c21-bf23-cf09836931a4
|
of the value which includes any conditions or requirements upon which the VA loan guaranty is contingent
|
VA_Guidelines.txt
|
2b2c553d-9208-4e71-b02d-6e871fa4b0ec
|
. 4 The LAPP lender then underwrites and closes the loan on the automatic basis and requests VA guaranty.
|
VA_Guidelines.txt
|
862dd033-1383-4ecc-876c-90cb07797faf
|
Continued on next page 15-1 Continued from previous page 15-1 VA Pamphlet 26-7, Revised Chapter 15: Lender Appraisal Processing Program (LAPP) Overview, Continued c.
|
VA_Guidelines.txt
|
a760b860-a4d5-4899-ae1b-494fcc16a6c4
|
In this This chapter contains the following topics: Chapter Topic See Page 15.01 LAPP Eligibility 15-3 15.02 Lender Quality Control System Requirements 15-5 15.03 Applying for LAPP Authority 15-7 15.04 SAR Training and Initial Case Reviews 15-8 15.05 Changes in SAR’s Employment of Lender’s Status 15-12 15.06 Lender Responsibilities Under LAPP 15-13 15.07 LAPP Processing Procedures 15-14 15
|
VA_Guidelines.txt
|
cc5ce71d-9798-423e-901c-c14696dfa3ab
|
.07 LAPP Processing Procedures 15-14 15.08 Affiliates and Agents 15-15 15-2 VA Pamphlet 26-7, Revised Chapter 15: Lender Appraisal Processing Program (LAPP) 15.01 LAPP Eligibility Change Date June 28, 2010, Change 14 This section has been updated to add subsection lettering and to make minor grammatical edits. a.
|
VA_Guidelines.txt
|
59266fc8-0500-475e-b718-6001e8d779ce
|
Lender VA may grant Lender Appraisal Processing Program (LAPP) authority to any Requirements automatic lender that requests it and meets the qualification criteria outlined in this chapter, including the Lender Quality Control System Requirements. b.
Role of Staff The lender exercises its LAPP authority through an employee who is a VA- Appraisal approved staff appraisal reviewer (SAR).
|
VA_Guidelines.txt
|
709f6b75-5417-48c4-bc0e-c4cd4ac00cd4
|
Reviewer c.
SAR A lender’s staff appraisal SAR must: Requirements be a full-time salaried employee of the lender, and have at least 3 years of work experience which qualifies him or her to competently perform administrative appraisals reviews in conjunction with underwriting loans for VA loan guaranty purposes. d.
|
VA_Guidelines.txt
|
406a57d0-b610-4b3b-9810-4f96a7d9a97f
|
SAR’s Work The SAR’s work experience must indicate that he or she has: Experience general knowledge of the principles, methods, practices and techniques of Requirements appraising and the ability to apply that knowledge, the ability to review the work of others and recognize deviations from accepted appraisal principles and practices, the ability to detect errors in computations, and ability to
|
VA_Guidelines.txt
|
bc1db4ce-eca5-435f-828c-34931143199a
|
to detect errors in computations, and ability to detect conclusions which are not supported
|
VA_Guidelines.txt
|
b0a6927c-8ae9-4185-9fb8-554e0dbd8e29
|
.
|
VA_Guidelines.txt
|
6cfadf23-f29c-4d93-ad9f-ff3d6243a860
|
It is also desirable for the SAR to have: knowledge of general realty practices and principles related to real property valuation, skill in collecting and assembling data, and ability to prepare clear and concise reports.
Note: Three years of experience related to the HUD Direct Endorsement program satisfies the experience requirement provided all other application requirements are satisfied.
|
VA_Guidelines.txt
|
e305ac3e-f1ad-446d-a14e-c465d8e9b899
|
Continued on next page 15-3 VA Pamphlet 26-7, Revised Chapter 15: Lender Appraisal Processing Program (LAPP) 15.01 LAPP Eligibility, Continued e.
Location of There is no restriction on the location of a lender’s SAR.
SAR f.
|
VA_Guidelines.txt
|
86850815-ce8c-429e-9ced-6e4b6508e914
|
SAR f.
Geographic Once a SAR has satisfied the LAPP training and initial case review Extent of LAPP requirements (SAR Training and Initial Case Reviews in this chapter), their LAPP authority may be used for properties in any state in which the lender has authority to close loans under the automatic procedure.
|
VA_Guidelines.txt
|
f41a4efe-c24f-4c7d-b60a-b5ee935dabd5
|
If a lender’s automatic authority is extended into a new state, their SAR’s LAPP authority is immediately extended as well.
Note: It is the SAR’s responsibility to stay informed about any local VA processing requirements unique to the VA jurisdiction in which a property is located. g.
|
VA_Guidelines.txt
|
4713861c-d5f0-47e3-9db2-aaf472dc9e87
|
SAR There must not be a conflict of interest between the SAR’s role as SAR Conflicts of and any other activities that he or she conducts.
|
VA_Guidelines.txt
|
161403f4-6473-49b6-947f-1531249066fb
|
Examples of other Interest activities which would be a conflict of interest include: SAR is on the VA fee appraisal panel, or SAR is employed by or performs appraisal review services for another lender. 15-4 VA Pamphlet 26-7, Revised Chapter 15: Lender Appraisal Processing Program (LAPP) 15
|
VA_Guidelines.txt
|
982c5a14-937e-420d-9fe4-5801c89e477e
|
.02 Lender Quality Control System Requirements Change Date June 28, 2010, Change 14 This section has been updated to add subsection lettering, add hyperlinks, and to make minor grammatical edits. a.
|
VA_Guidelines.txt
|
db1329a4-a9c4-4016-a67c-13e64cae1258
|
Introduction To qualify for LAPP authority, the lender must have an effective quality control (QC) system which ensures the adequacy and quality of its staff appraisal reviews.
This QC system must be independent of the lender’s loan production operation.
Upon request, the lender must agree to furnish VA with findings and information about the system.
|
VA_Guidelines.txt
|
bc602dd8-06e1-4904-8bf0-086b9ffc60ff
|
The senior officer must certify on each SAR’s Lender's Staff Appraisal Reviewer Application (SAR) Application, VA Form 26-0785, that the QC system meets the requirements detailed in this section. b.
QC Reviews of the SARs’ work may be performed by an independent party or Reviewers independent internal audit division which reports directly to the lender’s chief executive officer.
|
VA_Guidelines.txt
|
99884f26-ed23-4a27-91a3-4da4d08c9d9e
|
QC personnel should possess a basic familiarity with appraisal theory and techniques and the ability to prescribe appropriate corrective actions when problems in the appraisal review process are identified. c.
Frequency Perform desk reviews of each SAR’s appraisal reviews on a routine basis and Scope of (monthly or quarterly).
|
VA_Guidelines.txt
|
152bbea2-d022-4128-868c-037584fcb20a
|
The sample size should be no less than 5 percent of Reviews the SAR’s LAPP cases processed monthly or a minimum number of cases (for example, five cases).
There must be a procedure for expanding the scope of the reviews if a pattern of deficiencies is identified.
|
VA_Guidelines.txt
|
5f0431e1-12e3-41d1-90e2-6db14727bc36
|
Continued on next page 15-5 VA Pamphlet 26-7, Revised Chapter 15: Lender Appraisal Processing Program (LAPP) 15.02 Lender Quality Control System Requirements, Continued d.
|
VA_Guidelines.txt
|
fd2d0157-1e68-4a9b-840f-a03f94a93b96
|
QC Review QC reviews should consider the: Criteria overall quality of the SAR’s appraisal review, acceptability of the property in light of VA minimum property requirements, and appropriateness of the reasonable value determination. e.
|
VA_Guidelines.txt
|
0e7acc07-096d-42aa-9e06-1393386fb89a
|
Maintenance The QC system must provide assurance that all current pertinent VA of VA regulations, directives, and other releases are maintained and immediately Publications available to the quality control personnel and SARs. f.
|
VA_Guidelines.txt
|
acdab233-c90d-48cc-aa3e-d06be1ea1394
|
Management The QC system must provide for written notification of deficiencies cited as a Notification result of audits or reviews at least quarterly to the lender's senior management and Corrective or chief executive officer.
Action The QC system must require senior management to promptly initiate and document actions to correct deficiencies and provide SARs with corrective instructions. g.
|
VA_Guidelines.txt
|
21808ccb-8a11-4503-96d4-c16a3d1cf61f
|
Review of In addition to reviews of the SARs’ work, random field reviews of VA fee VA Fee Panel panel appraisals should be performed.
These reviews can be done by the Appraisals SAR, or an independent appraiser on a contract basis.
|
VA_Guidelines.txt
|
6e3faf8a-06bd-45ca-a923-87872e3ed7d3
|
Note: Formally report any substantive negative findings to the VA Regional Loan Center where the appraiser is a member of the fee panel. 15-6 VA Pamphlet 26-7, Revised Chapter 15: Lender Appraisal Processing Program (LAPP) 15
|
VA_Guidelines.txt
|
b24aacb6-bfa7-4a30-8b46-3936b8d80d62
|
.03 Applying for LAPP Authority Change Date June 28, 2010, Change 14 This section has been updated to add subsection lettering, add hyperlinks, and to make minor grammatical edits. a.
|
VA_Guidelines.txt
|
2612c2c9-07d4-4d6e-b9c3-2a6397aa1f13
|
Application Submit a separate Lender's Staff Appraisal Reviewer Application (SAR) and Fees Application, VA Form 26-0785, and fee for each SAR approval request to the VA regional office with jurisdiction over the SAR’s physical location.
|
VA_Guidelines.txt
|
f6fcd368-3ebc-490d-a732-13628acdcd06
|
Legitimate requests to submit the application to a VA office more conveniently located for training and other interactions between the SAR and VA will be considered.
|
VA_Guidelines.txt
|
812979d9-40bc-423f-aee5-ad5804ec6efb
|
For each SAR approval request, include a $100 processing fee plus the information, statements and certifications exactly as detailed on the application, either on lender letterhead or attached to a statement on lender letterhead which references it.
The same procedure applies to subsequent requests for VA approval of additional SARs. b.
|
VA_Guidelines.txt
|
a85091de-ad0e-45cf-9575-5d5e1634c4fc
|
Notification The VA regional office will review the application materials submitted and of VA Decision notify the lender of its decision as quickly as possible.
If VA determines that the SAR meets basic LAPP qualification requirements, it will inform the lender that the SAR must fulfill the SAR Training and Initial Case Review requirements detailed in this chapter. c.
|
VA_Guidelines.txt
|
21c94683-f77f-47e3-a965-247776e4c050
|
SAR ID The notice from VA will provide a permanent ID number for each SAR Number approved.
|
VA_Guidelines.txt
|
58be6bdd-6fcf-49be-9296-8fbae13cfc72
|
The SAR always retains the same ID number, even if he or she goes to work for another lender and is approved as a SAR for that lender. 15-7 VA Pamphlet 26-7, Revised Chapter 15: Lender Appraisal Processing Program (LAPP) 15
|
VA_Guidelines.txt
|
605fec17-210f-4aec-98d3-08d3081f5511
|
.04 SAR Training and Initial Case Reviews Change Date June 28, 2010, Change 14 This section has been updated to add subsection lettering, add hyperlinks, and to make minor grammatical edits. a.
|
VA_Guidelines.txt
|
bccc61e7-79c9-4b34-afa2-4a4bc518aa41
|
Training The Staff Appraisal Reviewer (SAR) may not begin performing appraisal and Case reviews independently after VA’s notification of approval until he or she Review fulfills VA training requirements and VA initial case review requirements.
Requirements Generally, VA staff will train the SAR and then conduct the initial case reviews. b.
|
VA_Guidelines.txt
|
099d532c-b035-4160-8b03-20cea0f4a97b
|
Exceptions The following are the three exceptions to the SAR training and initial case to Training and review requirements: Case Review Requirements SAR Training During or After Case Reviews The lender may request that the training be conducted during or after the case review requirement.
|
VA_Guidelines.txt
|
c0193592-ff2d-4ee1-91be-898a65b3230d
|
SAR With Prior LAPP Experience The lender may request a waiver of the training and case review requirements for a SAR who previously satisfied those requirements while employed by another LAPP lender, and has satisfactorily processed LAPP cases within the last year.
|
VA_Guidelines.txt
|
2679697e-404d-4e99-b04e-53a73556c77c
|
Experienced SAR to Train and Supervise New SAR The lender may request that one of its experienced SARs train and review the initial cases of a new SAR.
The experienced SAR must: have full LAPP authority and be performing acceptably, provide adequate training to the new SAR, and review and ensure the acceptability of the new SAR’s initial LAPP cases.
|
VA_Guidelines.txt
|
c8d110db-1556-4065-a2ca-46e548175684
|
Continued on next page 15-8 VA Pamphlet 26-7, Revised Chapter 15: Lender Appraisal Processing Program (LAPP) 15.04 SAR Training and Initial Case Reviews and Initial Case Reviews, Continued c.
|
VA_Guidelines.txt
|
ec4391a1-08b4-4bda-83c4-28b8774f33b6
|
Training and Once the training and case reviews are acceptably completed, the lender’s Case Reviews senior officer must send the VA office a signed and dated notice which Completed by includes Experienced SAR the name and SAR ID number of both the trainee and trainer, and a letter stating that the training covered all VA LAPP requirements, and the trainer reviewed at least five cases successfully
|
VA_Guidelines.txt
|
c21a5e8b-bbd6-4fff-98f5-66a327cce5f1
|
trainer reviewed at least five cases successfully completed by the trainee
|
VA_Guidelines.txt
|
d0441af5-bb7c-4ff0-a0fa-49e9a31c5602
|
.
|
VA_Guidelines.txt
|
46b682d2-ce10-440c-96d2-a479489f237f
|
Note: The letter must include the VA case numbers for at least five cases. d.
Training by If the training and case review requirements are not waived by VA or VA Staff completed by an experienced SAR upon receipt of VA’s notification that the SAR meets the basic LAPP qualification requirements, the lender must call that VA office to arrange for SAR training.
|
VA_Guidelines.txt
|
e3c3fcab-3331-49fd-aa44-2a4df41f924c
|
VA will normally provide the training at the VA office (but may provide it in meetings or seminars at other locations in conjunction with scheduled VA field travel) and within 30 days.
At a minimum, the training by VA staff should consist of a 1 day session to discuss LAPP processing procedures and guidelines and any local VA office requirements and conditions.
|
VA_Guidelines.txt
|
1b4beff3-5d13-4703-8dc6-be2631ecd200
|
Note: Due to the need for consistency between VA offices nationwide, each office is expected to limit local requirements and conditions to only those that are essential.
Continued on next page 15-9 VA Pamphlet 26-7, Revised Chapter 15: Lender Appraisal Processing Program (LAPP) 15.04 SAR Training and Initial Case Reviews and Initial Case Reviews, Continued e.
|
VA_Guidelines.txt
|
905031c9-4c61-4fb6-98cf-e41542d99a4b
|
Procedure Each SAR’s first five cases must be processed as described in the table below for Case Stage Description Reviews 1 SAR fully reviews the fee appraiser’s report. 2 SAR determines the reasonable value of the property. 3 SAR drafts a notice of value (NOV) to the veteran purchaser.
|
VA_Guidelines.txt
|
6e371b99-24e5-4f37-8d4d-689911e5d889
|
Note: SAR should not send it to the veteran purchaser. 4 VA staff or an experienced SAR with VA permission reviews the following items: the NOV, the appraisal request, the appraisal report, and any related documents
|
VA_Guidelines.txt
|
bc7bc886-0e70-4263-b206-998c45374bf0
|
. 5 If the SAR’s work on the case is acceptable VA staff will issue a NOV to the lender within 5 work days of receipt of the package, or The experienced SAR reviewer will also update and sign the SAR certification and mail the NOV to the veteran purchaser.
|