hash stringlengths 32 32 | doc_id stringlengths 5 12 | section stringlengths 5 1.47k | content stringlengths 0 6.67M |
|---|---|---|---|
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.1.3.1 Conformance requirements | While in dedicated mode, the establishment of an uplink packet resource may be initiated by the RR entity of the mobile station using the packet request procedure. The procedure is triggered by a request from upper layers to transfer an LLC PDU; see 3GPP TS 24.007.
Access to the network is allowed:
- if dual transfer m... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.1.3.2 Test purpose | To verify that the MS:
- understands the SI6 Rest Octets information element, containing the DTM support field, which indicates network support of DTM;
- does not attempt to establish an uplink TBF whilst in DM and in a cell that indicates that DTM is unsupported. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.1.3.3 Method of test | Initial Conditions
System Simulator:
- 1 cell with DTM not supported
Mobile Station:
- The MS is in the active state (U10) of a call.
- The MS is in packet idle mode, with a P-TMSI allocated and PDP context 1 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS, whilst in dedicated mode, is tr... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2 Downlink TBF establishment | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.1 Whilst in Ready State | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.1.1 Downlink TBF establishment in Ready State / Successful case | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.1.1.1 Conformance requirements | This procedure is only applicable to a mobile station in dedicated mode and with no TBF allocated. If the mobile station already has an ongoing TBF, the establishment of the downlink packet resource is performed on the PACCH; see 3GPP TS 04.60.
The establishment of a downlink packet resource is initiated by the RR enti... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.1.1.2 Test purpose | To test that while in dedicated mode and in ready state, the MS can decode and act upon the allocation of downlink packet resources and enter dual transfer mode. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.1.1.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM supported.
Mobile Station:
The MS is in the active state (U10) of a call.
The MS is in the GMM READY state, with a P-TMSI allocated and PDP context 1 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
Whilst in an active call on timeslot N, the MS re... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.1.2 Downlink TBF establishment in Ready State / Abnormal cases / No cell allocation available | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.1.2.1 Conformance requirements | If a failure occurs on the mobile station side before the packet downlink assignment procedure is completed (packet establishment failure), all the allocated packet resources are released and the mobile station remains on the current channel.
In the following cases a packet resource establishment failure has occurred:
... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.1.2.2 Test purpose | To verify that when the MS is unable analyse a DTM ASSIGNMENT COMMAND message, it returns a DTM ASSIGNMENT FAILURE message with the cause value set to “no cell allocation available”. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.1.2.3 Method of test | Initial Conditions
System Simulator:
1 cell no SYSTEM INFORMATION TYPE 1 message (some other SI message is sent with TC=0),, with GPRS and DTM support.
Mobile Station:
The MS is in the active state (U10) of a call and is also in GMM-READY state.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The SS attemp... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.2 Whilst in Standby State / Packet Notification | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.2.1 Conformance requirements | 3GPP TS 04.18/44.018 sub-clause 3.4.22.2:
Upon receipt of the PACKET NOTIFICATION message, the RR sublayer of the MS indicates the receipt of a packet paging request to the GMM sublayer.
3GPP TS 23.060 sub-clause 8.1.4:
4) Upon receipt of a GPRS Paging Request message, the MS shall respond with either any single valid ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.2.2 Test purpose | To test that an MS in an active call and also in GMM Standby state, can respond to a PACKET NOTIFICATION message sent on the main DCCH, with a Cell Update. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.1.2.2.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM supported.
Mobile Station:
The MS is in the active state (U10) of a call.
The DTM MS in GMM Standby state, with a P-TMSI allocated and PDP context 1 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS, in an active call using timeslot N, upon ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2 CS establishment whilst in packet transfer mode | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.1 MT CS establishment whilst in packet transfer mode with a downlink TBF established | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.1.1 Conformance requirements | Paging initiation using PACCH applies when sending a paging request message to a mobile station that is GPRS attached, when the mobile station is in packet transfer mode and the network is able to co-ordinate the paging request with the radio resources allocated for the mobile station on a PDCH. This kind of paging co-... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.1.3 Method of test | Initial Conditions
System Simulator:
- 1 cell, DTM supported.
Mobile Station:
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
- The MS is in the GMM READY state.
Specific PICS Statements
- GPRS Release (TSPC_MS_GPRS_RELEASE)
- Support of Immediate Connect (TSPC_AddInfo_ImmCon... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.2 MT CS establishment whilst in packet transfer mode with a uplink TBF established | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.2.1 Conformance requirements | 3GPP TS 04.60/44.060
Paging initiation using PACCH applies when sending a paging request message to a mobile station that is GPRS attached, when the mobile station is in packet transfer mode and the network is able to co-ordinate the paging request with the radio resources allocated for the mobile station on a PDCH. Th... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.2.2 Test purpose | To verify that the MS reacts to CS paging on the PACCH, whilst in packet transfer mode, by releasing the uplink TBF and then establishing the RR connection. The MS may request the re-establishment of the packet resources by sending a DTM Request message on the DCCH. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.2.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM supported.
Mobile Station:
The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
The MS is in the GMM READY state.
Specific PICS Statements
- Support of Immediate Connect (TSPC_AddInfo_ImmConn)
PIXIT Statements
-
Test Procedure
The MS ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.3 MO CS establishment whilst in packet transfer mode with uplink and downlink TBFs established | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.3.1 Conformance requirements | 3GPP TS 04.60/44.060
Paging initiation using PACCH applies when sending a paging request message to a mobile station that is GPRS attached, when the mobile station is in packet transfer mode and the network is able to co-ordinate the paging request with the radio resources allocated for the mobile station on a PDCH. Th... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.3.2 Test purpose | To verify that the MS reacts to MO call whilst in packet transfer mode by releasing both uplink and downlink TBFs and then establishing an RR connection. The MS may request the re-establishment of the packet resources by sending a DTM Request message on the DCCH. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.3.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM supported.
Mobile Station:
The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
The MS is in the GMM READY state.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is brought into packet transfer mode with the establ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.4 MO CS establishment whilst in packet transfer mode and DTM is not supported in current cell | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.4.1 Conformance requirements | The GPRS suspension procedure shall be used to suspend GPRS services:
a) when the mobile station in a class A mode of operation is handed over to a cell where the support of Class A mode of operation is not possible (e.g. a DTM mobile station entering a cell not supporting DTM)
In case a), when the mobile station concl... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.4.2 Test purpose | When an MS supporting DTM is operating in packet transfer mode in a cell that does not support DTM, the MS may be required to establish a CS connection. Upon receipt of the CS establishment request the MS completes the GPRS suspension procedure, establishes an RR connection and does not re-establish PS resources i.e. i... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.2.4.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM not supported, GPRS supported
Mobile Station:
The MS is in packet idle mode with a TMSI, P-TMSI allocated and PDP context 1 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is brought into packet transfer mode. A CS call is established .The ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3 PS establishment whilst in dual transfer mode | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.1 Uplink TBF establishment with a downlink TBF established | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.1.1 Uplink TBF establishment with a downlink TBF established and no PS downlink reallocation | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.1.1.1 Conformance requirements | The mobile station may request establishment of one or more uplink TBFs when there are one or more ongoing downlink TBFs by including a Channel Request Description or the Extended Channel Request Description information element in the (EGPRS) PACKET DOWNLINK ACK/NACK message. Initiation is triggered by a request from ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.1.1.2 Test purpose | To verify that the MS can be assigned uplink PS resources, when no reallocation of the existing CS and downlink PS resources is required. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.1.1.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM supported.
Mobile Station:
The MS is in the state "idle, updated, GMM-registered, GPRS attached" with a TMSI, P-TMSI allocated and PDP context 1 has been established. The MS is also in the active state (U10) of a call on the cell.
Specific PICS Statements
-
PIXIT Stateme... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.1.2 Uplink TBF establishment with a downlink TBF established and PS downlink reallocation | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.1.2.1 Conformance requirements | The mobile station may request establishment of an uplink transfer during a downlink TBF by including a Channel Request Description information element in the PACKET DOWNLINK ACK/NACK message Initiation is triggered by a request from upper layers to transfer a LLC PDU.
The mobile station initiates the packet access pro... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.1.2.2 Test purpose | To verify that the MS can be assigned uplink PS resources, when reallocation of the already downlink PS resources is required. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.1.2.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM supported.
Mobile Station:
The MS is in the state "idle, updated, GMM-registered, GPRS attached" with a TMSI, P-TMSI allocated and PDP context 1 has been established. The MS is also in the active state (U10) of a call on the cell.
Specific PICS Statements
-
PIXIT Stateme... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.2 Downlink TBF establishment with a uplink established | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.2.1 Downlink TBF establishment with a uplink TBF established and no PS uplink reallocation | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.2.1.1 Conformance requirements | During uplink transfer, the network may initiate a downlink TBF by sending a PACKET DOWNLINK ASSIGNMENT message, or a PACKET TIMESLOT RECONFIGURE, to the mobile station on the PACCH. If a PACKET TIMESLOT RECONFIGURE message is sent, then the message shall contain the DOWNLINK_TFI_ASSIGNMENT field. The multislot restric... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.2.1.2 Test purpose | To verify that a downlink TBF can be established without reallocation of uplink PS resources, whilst maintaining DTM. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.2.1.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM supported
Mobile Station:
The MS is in the active state (U10) of a call.
The MS is GPRS idle with a P-TMSI allocated and the PDP context 1 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS, whilst in dedicated mode, is triggered to initiate p... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.2.2 Downlink TBF establishment with a uplink TBF established and PS uplink reallocation | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.2.2.1 Conformance requirements | During uplink transfer, the network may initiate a downlink TBF by sending a PACKET TIMESLOT RECONFIGURE message to the MS on the PACCH. If uplink and downlink TBFs are already established, then the network may send a PACKET TIMESLOT RECONFIGURE message without DOWNLINK_TFI_ASSIGNMENT. The MS shall interpret this as a ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.2.2.2 Test purpose | To verify that a downlink TBF can be established with reallocation of the uplink PS resources, whilst maintaining DTM. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.3.2.2.3 Method of test | Initial Conditions
System Simulator:
1 cell, DTM supported
Mobile Station:
The MS is in the active state (U10) of a call
The MS is GPRS idle with a P-TMSI allocated and the PDP context 1 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS, whilst in dedicated mode, is triggered to initiate pa... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4 Enhanced DTM CS Establishment | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.1 MT Call Establishment - No Reallocation of PS Resources | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.1.1 Conformance Requirements | The network initiates the RR connection establishment procedure by sending a PACKET CS COMMAND message to the mobile station on PACCH, encapsulating one of the following RR messages:
- DTM ASSIGNMENT COMMAND message (see sub-clause 8.9.2.1);
The network may allocate both a dedicated channel and radio resources on one o... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.1.3 Method of Test | Initial Conditions
System Simulator:
- 1 cell, Enhanced DTM supported.
Mobile Station:
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
- The MS is in the GMM READY state.
Specific PICS Statements
- Support of Immediate Connect (TSPC_AddInfo_ImmConn)
PIXIT Statements
-
Test Pr... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.2 MT Call Establishment - Reallocation of PS Resources - Allocation of New Downlink TBF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.2.1 Conformance Requirements | The network initiates the RR connection establishment procedure by sending a PACKET CS COMMAND message to the mobile station on PACCH, encapsulating one of the following RR messages:
- DTM ASSIGNMENT COMMAND message (see sub-clause 8.9.2.1);
The network may allocate both a dedicated channel and radio resources on one o... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.2.3 Method of Test | Initial Conditions
System Simulator:
- 1 cell, Enhanced DTM supported.
Mobile Station:
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
- The MS is in the GMM READY state.
Specific PICS Statements
- Support of Immediate Connect (TSPC_AddInfo_ImmConn)
PIXIT Statements
-
Test Pr... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.3 MT Call Establishment - Allocation of CS Resources Only - Downlink TBF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.3.1 Conformance Requirements | The network initiates the RR connection establishment procedure by sending a PACKET CS COMMAND message to the mobile station on PACCH, encapsulating one of the following RR messages:
- IMMEDIATE ASSIGNMENT message (see sub-clause 8.9.2.2).
The network may allocate only a dedicated channel to the mobile station and shal... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.3.3 Method of Test | Initial Conditions
System Simulator:
- 1 cell, Enhanced DTM supported.
Mobile Station:
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
- The MS is in the GMM READY state.
Specific PICS Statements
- Support of Immediate Connect (TSPC_AddInfo_ImmConn)
PIXIT Statements
-
Test Pr... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.4 MO Call Establishment - No Reallocation of PS Resources | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.4.1 Conformance Requirements | The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH.
Upon receipt of a PACKET CS REQUEST message, the network shall answer to the mobile station by encapsulating one of the following RR messages in the PACKET CS COMMAND message, and sending the PACKET CS ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.4.2 Test Purpose | To verify that following the sending of the PACKET CS REQUEST on PACCH whilst in packet transfer mode, the MS establishes an RR connection on the allocated circuit switched resources.
To verify that the MS continues to maintain an ongoing uplink TBF throughout the enhanced DTM CS establishment procedure. |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.4.3 Method of Test | Initial Conditions
System Simulator:
- 1 cell, Enhanced DTM supported.
Mobile Station:
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
- The MS is in the GMM READY state.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is brought into packet transfer mode ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.5 MO Call Establishment - Reallocation of PS Resources | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.5.1 Conformance Requirements | The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH.
Upon receipt of a PACKET CS REQUEST message, the network shall answer to the mobile station by encapsulating one of the following RR messages in the PACKET CS COMMAND message, and sending the PACKET CS ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.5.3 Method of Test | Initial Conditions
System Simulator:
- 1 cell, Enhanced DTM supported.
Mobile Station:
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
- The MS is in the GMM READY state.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is brought into packet transfer mode ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.6 MO Call Establishment - Allocation of CS Resources Only - Downlink TBF | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.6.1 Conformance Requirements | The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH.
Upon receipt of a PACKET CS REQUEST message, the network shall answer to the mobile station by encapsulating one of the following RR messages in the PACKET CS COMMAND message, and sending the PACKET CS ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.6.3 Method of Test | Initial Conditions
System Simulator:
- 1 cell, Enhanced DTM supported.
Mobile Station:
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
- The MS is in the GMM READY state.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is brought into packet transfer mode ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.7 MO Call Establishment – IMMEDIATE ASSIGNMENT REJECT | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.7.1 Conformance Requirements | The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH.
Upon receipt of a PACKET CS REQUEST message, the network shall answer to the mobile station by encapsulating one of the following RR messages in the PACKET CS COMMAND message, and sending the PACKET CS ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.7.2 Test Purpose | To verify that when the MS receives an IMMEDIATE ASSIGNMENT REJECT encapsulated in a PACKET CS COMMAND following an attempt to originate a non-emergency call, it does not attempt to originate a further non-emergency call whilst T3122 is running.
To verify that the MS does attempt to originate an emergency call whilst T... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.7.3 Method of Test | Initial Condition
System simulator
- 1 cell, Enhanced DTM supported
Mobile Station:
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
- The MS is in the GMM READY state.
Specific PICS Statements
-
PIXIT Statements
-
Procedure 1
Test Procedure
The MS is brought into packet trans... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.8 MO Call Establishment - Dedicated Channel Establishment Failure | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.8.1 Conformance Requirements | The network may allocate both a dedicated channel and radio resources on one or more PDCHs to be used by the mobile station and shall in this case send a DTM ASSIGNMENT COMMAND encapsulated in a PACKET CS COMMAND message. Having sent the DTM ASSIGNMENT COMMAND message, the network starts timer T3107, specified in 3GPP ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.8.2 Test Purpose | To verify that MS aborts all TBF in progress when it fails to establish the main signalling link after receiving the PACKET CS COMMAND.
To verify that during procedure of establishment of the main DCCH link MS is using the new PS resources re-allocated in PACKET CS COMMAND.
To verify MS initiate establishment of circ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.4.8.3 Method of Test | Initial Conditions
System Simulator:
- 1 cell, Enhanced DTM supported.
Mobile Station:
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
- The MS is in the GMM READY state.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS is brought into packet transfer mode ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5 Enhanced DTM CS Release | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.1 SI Acquisition - No Reallocation of PS Resources | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.1.1 Conformance Requirements | If the mobile station and the network support enhanced DTM CS release procedure, the network may delay the release of the RR connection until the mobile station has received the needed system information, in order to maintain the radio resources on the PDCH(s) after the release of the RR connection.
The network initiat... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.1.2 Test Purpose | To verify that the MS performs the acquisition of system information in response to the PACKET CS RELEASE INDCATION message from the NW with the ENHANCED_DTM_CS_RELEASE_INDICATION indicating that the RR connection is released.
To verify that during the acquisition of system information procedure performed as part of th... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.1.3 Method of Test | Initial Conditions
System Simulator:
- 2 cells A and B with the same MCC/MNC/LAC/RAC, Enhanced DTM supported.
Mobile Station:
- The MS is in the active state (U10) of a call on Cell A on timeslot N.
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
Specific PICS Statements
-
PI... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.2 Reallocation of PS Resources for Uplink and Downlink TBFs | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.2.1 Conformance Requirements | The network may at any time during uplink packet transfer initiate a change of resources by sending on the downlink PACCH monitored by the MS, an unsolicited uplink assignment message (e.g. PACKET UPLINK ASSIGNMENT, MULTIPLE TBF UPLINK ASSIGNMENT, PACKET TIMESLOT RECONFIGURE, MULTIPLE TBF TIMESLOT RECONFIGURE or PACKET... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.2.2 Test Purpose | To verify that the MS continues to maintain an ongoing uplink TBF and downlink TBF throughout the Enhanced DTM CS Release procedure.
To verify that the MS correctly implements the reallocation of the PS resources, including a change of TFI, for an ongoing uplink TBF upon completion of the Enhanced DTM CS Release proced... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.2.3 Method of Test | Initial Conditions
System Simulator:
- 1 cell, Enhanced DTM supported.
Mobile Station:
- The MS is in the active state (U10) of a call on timeslot N.
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
Specific PICS Statements
-
PIXIT Statements
-
Test Procedure
The MS, whilst in... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.3 Change of LA in NW Mode II | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.3.1 Conformance Requirements | If the MS and the network in mode II or III support enhanced DTM CS release procedure and the location area of the MS has changed while in dual transfer mode, the MS may perform the enhanced DTM CS release procedure and, after the release of the RR connection, request CS resources via the enhanced DTM CS Establishment ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.3.3 Method of Test | Initial Conditions
System Simulator:
- 2 cells, A and B operating in NW Mode II with different LAC, without PBCCHs, both supporting Enhanced DTM.
Mobile Station:
- The MS is in the active state (U10) of a call on Cell A on timeslot N.
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 acti... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.4 Change of LA in NW Mode I | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.4.1 Conformance Requirements | If the MS and the network in mode I support enhanced DTM CS release procedure and the location area of the MS has changed while in dual transfer mode, the MS shall send an indication to the network that in this case the enhanced DTM CS release procedure shall not be used. This indication is sent in the PACKET SI STATUS... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.4.2 Test Purpose | To verify that in response to the NW initiating the Enhanced CS Release procedure the MS requests that the procedure shall not be used following a change of location area whilst the MS was in dedicated mode in a network using network mode I.
To verify that following the release of packet and circuit switched resources ... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.5.5.4.3 Method of Test | Initial Conditions
System Simulator:
- 2 cells, A and B operating in NW Mode I with different LAC, both supporting Enhanced DTM.
Mobile Station:
- The MS is in the active state (U10) of a call on Cell A on timeslot N.
- The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated.
Specific P... |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.6 Intra SGSN PS Handover | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.6.1 Intra SGSN PS Handover / Synchronized cell case | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.6.1.1 Intra SGSN PS Handover / Synchronized cell case / successful | |
683b5b8a98f7b1390ddd5516ea9247a2 | 51.010-1 | 41.6.1.1.1 Conformance requirements | The following synchronisation mechanisms are used for PS handover:
- Non-synchronised.
- Synchronised.
- Pre-Synchronised.
The synchronised and pre-synchronised cases are shown in figures 23 and 25 and have different mechanisms for the provision of the timing advance that are described in 3GPP TS 45.010 [26].
NOTE: The... |
Subsets and Splits
No community queries yet
The top public SQL queries from the community will appear here once available.