hash
stringlengths
32
32
doc_id
stringlengths
5
12
section
stringlengths
5
1.47k
content
stringlengths
0
6.67M
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.1.3.1 Conformance requirements
While in dedicated mode, the establishment of an uplink packet resource may be initiated by the RR entity of the mobile station using the packet request procedure. The procedure is triggered by a request from upper layers to transfer an LLC PDU; see 3GPP TS 24.007. Access to the network is allowed: - if dual transfer m...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.1.3.2 Test purpose
To verify that the MS: - understands the SI6 Rest Octets information element, containing the DTM support field, which indicates network support of DTM; - does not attempt to establish an uplink TBF whilst in DM and in a cell that indicates that DTM is unsupported.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.1.3.3 Method of test
Initial Conditions System Simulator: - 1 cell with DTM not supported Mobile Station: - The MS is in the active state (U10) of a call. - The MS is in packet idle mode, with a P-TMSI allocated and PDP context 1 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS, whilst in dedicated mode, is tr...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2 Downlink TBF establishment
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.1 Whilst in Ready State
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.1.1 Downlink TBF establishment in Ready State / Successful case
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.1.1.1 Conformance requirements
This procedure is only applicable to a mobile station in dedicated mode and with no TBF allocated. If the mobile station already has an ongoing TBF, the establishment of the downlink packet resource is performed on the PACCH; see 3GPP TS 04.60. The establishment of a downlink packet resource is initiated by the RR enti...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.1.1.2 Test purpose
To test that while in dedicated mode and in ready state, the MS can decode and act upon the allocation of downlink packet resources and enter dual transfer mode.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.1.1.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported. Mobile Station: The MS is in the active state (U10) of a call. The MS is in the GMM READY state, with a P-TMSI allocated and PDP context 1 activated. Specific PICS Statements - PIXIT Statements - Test Procedure Whilst in an active call on timeslot N, the MS re...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.1.2 Downlink TBF establishment in Ready State / Abnormal cases / No cell allocation available
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.1.2.1 Conformance requirements
If a failure occurs on the mobile station side before the packet downlink assignment procedure is completed (packet establishment failure), all the allocated packet resources are released and the mobile station remains on the current channel. In the following cases a packet resource establishment failure has occurred: ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.1.2.2 Test purpose
To verify that when the MS is unable analyse a DTM ASSIGNMENT COMMAND message, it returns a DTM ASSIGNMENT FAILURE message with the cause value set to “no cell allocation available”.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.1.2.3 Method of test
Initial Conditions System Simulator: 1 cell no SYSTEM INFORMATION TYPE 1 message (some other SI message is sent with TC=0),, with GPRS and DTM support. Mobile Station: The MS is in the active state (U10) of a call and is also in GMM-READY state. Specific PICS Statements - PIXIT Statements - Test Procedure The SS attemp...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.2 Whilst in Standby State / Packet Notification
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.2.1 Conformance requirements
3GPP TS 04.18/44.018 sub-clause 3.4.22.2: Upon receipt of the PACKET NOTIFICATION message, the RR sublayer of the MS indicates the receipt of a packet paging request to the GMM sublayer. 3GPP TS 23.060 sub-clause 8.1.4: 4) Upon receipt of a GPRS Paging Request message, the MS shall respond with either any single valid ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.2.2 Test purpose
To test that an MS in an active call and also in GMM Standby state, can respond to a PACKET NOTIFICATION message sent on the main DCCH, with a Cell Update.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.1.2.2.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported. Mobile Station: The MS is in the active state (U10) of a call. The DTM MS in GMM Standby state, with a P-TMSI allocated and PDP context 1 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS, in an active call using timeslot N, upon ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2 CS establishment whilst in packet transfer mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.1 MT CS establishment whilst in packet transfer mode with a downlink TBF established
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.1.1 Conformance requirements
Paging initiation using PACCH applies when sending a paging request message to a mobile station that is GPRS attached, when the mobile station is in packet transfer mode and the network is able to co-ordinate the paging request with the radio resources allocated for the mobile station on a PDCH. This kind of paging co-...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.1.3 Method of test
Initial Conditions System Simulator: - 1 cell, DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - GPRS Release (TSPC_MS_GPRS_RELEASE) - Support of Immediate Connect (TSPC_AddInfo_ImmCon...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.2 MT CS establishment whilst in packet transfer mode with a uplink TBF established
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.2.1 Conformance requirements
3GPP TS 04.60/44.060 Paging initiation using PACCH applies when sending a paging request message to a mobile station that is GPRS attached, when the mobile station is in packet transfer mode and the network is able to co-ordinate the paging request with the radio resources allocated for the mobile station on a PDCH. Th...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.2.2 Test purpose
To verify that the MS reacts to CS paging on the PACCH, whilst in packet transfer mode, by releasing the uplink TBF and then establishing the RR connection. The MS may request the re-establishment of the packet resources by sending a DTM Request message on the DCCH.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.2.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported. Mobile Station: The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. The MS is in the GMM READY state. Specific PICS Statements - Support of Immediate Connect (TSPC_AddInfo_ImmConn) PIXIT Statements - Test Procedure The MS ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.3 MO CS establishment whilst in packet transfer mode with uplink and downlink TBFs established
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.3.1 Conformance requirements
3GPP TS 04.60/44.060 Paging initiation using PACCH applies when sending a paging request message to a mobile station that is GPRS attached, when the mobile station is in packet transfer mode and the network is able to co-ordinate the paging request with the radio resources allocated for the mobile station on a PDCH. Th...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.3.2 Test purpose
To verify that the MS reacts to MO call whilst in packet transfer mode by releasing both uplink and downlink TBFs and then establishing an RR connection. The MS may request the re-establishment of the packet resources by sending a DTM Request message on the DCCH.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.3.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported. Mobile Station: The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. The MS is in the GMM READY state. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is brought into packet transfer mode with the establ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.4 MO CS establishment whilst in packet transfer mode and DTM is not supported in current cell
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.4.1 Conformance requirements
The GPRS suspension procedure shall be used to suspend GPRS services: a) when the mobile station in a class A mode of operation is handed over to a cell where the support of Class A mode of operation is not possible (e.g. a DTM mobile station entering a cell not supporting DTM) In case a), when the mobile station concl...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.4.2 Test purpose
When an MS supporting DTM is operating in packet transfer mode in a cell that does not support DTM, the MS may be required to establish a CS connection. Upon receipt of the CS establishment request the MS completes the GPRS suspension procedure, establishes an RR connection and does not re-establish PS resources i.e. i...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.2.4.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM not supported, GPRS supported Mobile Station: The MS is in packet idle mode with a TMSI, P-TMSI allocated and PDP context 1 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is brought into packet transfer mode. A CS call is established .The ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3 PS establishment whilst in dual transfer mode
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.1 Uplink TBF establishment with a downlink TBF established
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.1.1 Uplink TBF establishment with a downlink TBF established and no PS downlink reallocation
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.1.1.1 Conformance requirements
The mobile station may request establishment of one or more uplink TBFs when there are one or more ongoing downlink TBFs by including a Channel Request Description or the Extended Channel Request Description information element in the (EGPRS) PACKET DOWNLINK ACK/NACK message. Initiation is triggered by a request from ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.1.1.2 Test purpose
To verify that the MS can be assigned uplink PS resources, when no reallocation of the existing CS and downlink PS resources is required.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.1.1.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported. Mobile Station: The MS is in the state "idle, updated, GMM-registered, GPRS attached" with a TMSI, P-TMSI allocated and PDP context 1 has been established. The MS is also in the active state (U10) of a call on the cell. Specific PICS Statements - PIXIT Stateme...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.1.2 Uplink TBF establishment with a downlink TBF established and PS downlink reallocation
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.1.2.1 Conformance requirements
The mobile station may request establishment of an uplink transfer during a downlink TBF by including a Channel Request Description information element in the PACKET DOWNLINK ACK/NACK message Initiation is triggered by a request from upper layers to transfer a LLC PDU. The mobile station initiates the packet access pro...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.1.2.2 Test purpose
To verify that the MS can be assigned uplink PS resources, when reallocation of the already downlink PS resources is required.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.1.2.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported. Mobile Station: The MS is in the state "idle, updated, GMM-registered, GPRS attached" with a TMSI, P-TMSI allocated and PDP context 1 has been established. The MS is also in the active state (U10) of a call on the cell. Specific PICS Statements - PIXIT Stateme...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.2 Downlink TBF establishment with a uplink established
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.2.1 Downlink TBF establishment with a uplink TBF established and no PS uplink reallocation
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.2.1.1 Conformance requirements
During uplink transfer, the network may initiate a downlink TBF by sending a PACKET DOWNLINK ASSIGNMENT message, or a PACKET TIMESLOT RECONFIGURE, to the mobile station on the PACCH. If a PACKET TIMESLOT RECONFIGURE message is sent, then the message shall contain the DOWNLINK_TFI_ASSIGNMENT field. The multislot restric...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.2.1.2 Test purpose
To verify that a downlink TBF can be established without reallocation of uplink PS resources, whilst maintaining DTM.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.2.1.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported Mobile Station: The MS is in the active state (U10) of a call. The MS is GPRS idle with a P-TMSI allocated and the PDP context 1 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS, whilst in dedicated mode, is triggered to initiate p...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.2.2 Downlink TBF establishment with a uplink TBF established and PS uplink reallocation
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.2.2.1 Conformance requirements
During uplink transfer, the network may initiate a downlink TBF by sending a PACKET TIMESLOT RECONFIGURE message to the MS on the PACCH. If uplink and downlink TBFs are already established, then the network may send a PACKET TIMESLOT RECONFIGURE message without DOWNLINK_TFI_ASSIGNMENT. The MS shall interpret this as a ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.2.2.2 Test purpose
To verify that a downlink TBF can be established with reallocation of the uplink PS resources, whilst maintaining DTM.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.3.2.2.3 Method of test
Initial Conditions System Simulator: 1 cell, DTM supported Mobile Station: The MS is in the active state (U10) of a call The MS is GPRS idle with a P-TMSI allocated and the PDP context 1 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS, whilst in dedicated mode, is triggered to initiate pa...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4 Enhanced DTM CS Establishment
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.1 MT Call Establishment - No Reallocation of PS Resources
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.1.1 Conformance Requirements
The network initiates the RR connection establishment procedure by sending a PACKET CS COMMAND message to the mobile station on PACCH, encapsulating one of the following RR messages: - DTM ASSIGNMENT COMMAND message (see sub-clause 8.9.2.1); The network may allocate both a dedicated channel and radio resources on one o...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.1.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - Support of Immediate Connect (TSPC_AddInfo_ImmConn) PIXIT Statements - Test Pr...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.2 MT Call Establishment - Reallocation of PS Resources - Allocation of New Downlink TBF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.2.1 Conformance Requirements
The network initiates the RR connection establishment procedure by sending a PACKET CS COMMAND message to the mobile station on PACCH, encapsulating one of the following RR messages: - DTM ASSIGNMENT COMMAND message (see sub-clause 8.9.2.1); The network may allocate both a dedicated channel and radio resources on one o...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.2.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - Support of Immediate Connect (TSPC_AddInfo_ImmConn) PIXIT Statements - Test Pr...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.3 MT Call Establishment - Allocation of CS Resources Only - Downlink TBF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.3.1 Conformance Requirements
The network initiates the RR connection establishment procedure by sending a PACKET CS COMMAND message to the mobile station on PACCH, encapsulating one of the following RR messages: - IMMEDIATE ASSIGNMENT message (see sub-clause 8.9.2.2). The network may allocate only a dedicated channel to the mobile station and shal...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.3.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - Support of Immediate Connect (TSPC_AddInfo_ImmConn) PIXIT Statements - Test Pr...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.4 MO Call Establishment - No Reallocation of PS Resources
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.4.1 Conformance Requirements
The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH. Upon receipt of a PACKET CS REQUEST message, the network shall answer to the mobile station by encapsulating one of the following RR messages in the PACKET CS COMMAND message, and sending the PACKET CS ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.4.2 Test Purpose
To verify that following the sending of the PACKET CS REQUEST on PACCH whilst in packet transfer mode, the MS establishes an RR connection on the allocated circuit switched resources. To verify that the MS continues to maintain an ongoing uplink TBF throughout the enhanced DTM CS establishment procedure.
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.4.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is brought into packet transfer mode ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.5 MO Call Establishment - Reallocation of PS Resources
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.5.1 Conformance Requirements
The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH. Upon receipt of a PACKET CS REQUEST message, the network shall answer to the mobile station by encapsulating one of the following RR messages in the PACKET CS COMMAND message, and sending the PACKET CS ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.5.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is brought into packet transfer mode ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.6 MO Call Establishment - Allocation of CS Resources Only - Downlink TBF
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.6.1 Conformance Requirements
The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH. Upon receipt of a PACKET CS REQUEST message, the network shall answer to the mobile station by encapsulating one of the following RR messages in the PACKET CS COMMAND message, and sending the PACKET CS ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.6.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is brought into packet transfer mode ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.7 MO Call Establishment – IMMEDIATE ASSIGNMENT REJECT
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.7.1 Conformance Requirements
The mobile station shall initiate the RR connection establishment by sending PACKET CS REQUEST messages on the PACCH. Upon receipt of a PACKET CS REQUEST message, the network shall answer to the mobile station by encapsulating one of the following RR messages in the PACKET CS COMMAND message, and sending the PACKET CS ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.7.2 Test Purpose
To verify that when the MS receives an IMMEDIATE ASSIGNMENT REJECT encapsulated in a PACKET CS COMMAND following an attempt to originate a non-emergency call, it does not attempt to originate a further non-emergency call whilst T3122 is running. To verify that the MS does attempt to originate an emergency call whilst T...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.7.3 Method of Test
Initial Condition System simulator - 1 cell, Enhanced DTM supported Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - PIXIT Statements - Procedure 1 Test Procedure The MS is brought into packet trans...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.8 MO Call Establishment - Dedicated Channel Establishment Failure
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.8.1 Conformance Requirements
The network may allocate both a dedicated channel and radio resources on one or more PDCHs to be used by the mobile station and shall in this case send a DTM ASSIGNMENT COMMAND encapsulated in a PACKET CS COMMAND message. Having sent the DTM ASSIGNMENT COMMAND message, the network starts timer T3107, specified in 3GPP ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.8.2 Test Purpose
To verify that MS aborts all TBF in progress when it fails to establish the main signalling link after receiving the PACKET CS COMMAND. To verify that during procedure of establishment of the main DCCH link MS is using the new PS resources re-allocated in PACKET CS COMMAND. To verify MS initiate establishment of circ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.4.8.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. - The MS is in the GMM READY state. Specific PICS Statements - PIXIT Statements - Test Procedure The MS is brought into packet transfer mode ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5 Enhanced DTM CS Release
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.1 SI Acquisition - No Reallocation of PS Resources
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.1.1 Conformance Requirements
If the mobile station and the network support enhanced DTM CS release procedure, the network may delay the release of the RR connection until the mobile station has received the needed system information, in order to maintain the radio resources on the PDCH(s) after the release of the RR connection. The network initiat...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.1.2 Test Purpose
To verify that the MS performs the acquisition of system information in response to the PACKET CS RELEASE INDCATION message from the NW with the ENHANCED_DTM_CS_RELEASE_INDICATION indicating that the RR connection is released. To verify that during the acquisition of system information procedure performed as part of th...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.1.3 Method of Test
Initial Conditions System Simulator: - 2 cells A and B with the same MCC/MNC/LAC/RAC, Enhanced DTM supported. Mobile Station: - The MS is in the active state (U10) of a call on Cell A on timeslot N. - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. Specific PICS Statements - PI...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.2 Reallocation of PS Resources for Uplink and Downlink TBFs
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.2.1 Conformance Requirements
The network may at any time during uplink packet transfer initiate a change of resources by sending on the downlink PACCH monitored by the MS, an unsolicited uplink assignment message (e.g. PACKET UPLINK ASSIGNMENT, MULTIPLE TBF UPLINK ASSIGNMENT, PACKET TIMESLOT RECONFIGURE, MULTIPLE TBF TIMESLOT RECONFIGURE or PACKET...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.2.2 Test Purpose
To verify that the MS continues to maintain an ongoing uplink TBF and downlink TBF throughout the Enhanced DTM CS Release procedure. To verify that the MS correctly implements the reallocation of the PS resources, including a change of TFI, for an ongoing uplink TBF upon completion of the Enhanced DTM CS Release proced...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.2.3 Method of Test
Initial Conditions System Simulator: - 1 cell, Enhanced DTM supported. Mobile Station: - The MS is in the active state (U10) of a call on timeslot N. - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. Specific PICS Statements - PIXIT Statements - Test Procedure The MS, whilst in...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.3 Change of LA in NW Mode II
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.3.1 Conformance Requirements
If the MS and the network in mode II or III support enhanced DTM CS release procedure and the location area of the MS has changed while in dual transfer mode, the MS may perform the enhanced DTM CS release procedure and, after the release of the RR connection, request CS resources via the enhanced DTM CS Establishment ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.3.3 Method of Test
Initial Conditions System Simulator: - 2 cells, A and B operating in NW Mode II with different LAC, without PBCCHs, both supporting Enhanced DTM. Mobile Station: - The MS is in the active state (U10) of a call on Cell A on timeslot N. - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 acti...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.4 Change of LA in NW Mode I
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.4.1 Conformance Requirements
If the MS and the network in mode I support enhanced DTM CS release procedure and the location area of the MS has changed while in dual transfer mode, the MS shall send an indication to the network that in this case the enhanced DTM CS release procedure shall not be used. This indication is sent in the PACKET SI STATUS...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.4.2 Test Purpose
To verify that in response to the NW initiating the Enhanced CS Release procedure the MS requests that the procedure shall not be used following a change of location area whilst the MS was in dedicated mode in a network using network mode I. To verify that following the release of packet and circuit switched resources ...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.5.5.4.3 Method of Test
Initial Conditions System Simulator: - 2 cells, A and B operating in NW Mode I with different LAC, both supporting Enhanced DTM. Mobile Station: - The MS is in the active state (U10) of a call on Cell A on timeslot N. - The MS is in packet idle mode, with a TMSI, P-TMSI allocated and PDP context 1 activated. Specific P...
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6 Intra SGSN PS Handover
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1 Intra SGSN PS Handover / Synchronized cell case
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.1 Intra SGSN PS Handover / Synchronized cell case / successful
683b5b8a98f7b1390ddd5516ea9247a2
51.010-1
41.6.1.1.1 Conformance requirements
The following synchronisation mechanisms are used for PS handover: - Non-synchronised. - Synchronised. - Pre-Synchronised. The synchronised and pre-synchronised cases are shown in figures 23 and 25 and have different mechanisms for the provision of the timing advance that are described in 3GPP TS 45.010 [26]. NOTE: The...