Dataset Viewer
Auto-converted to Parquet Duplicate
matrix_size
stringclasses
3 values
severity_level
int64
1
5
severity_descriptor
stringlengths
45
64
likelihood_level
int64
1
5
likelihood_descriptor
stringlengths
4
82
risk_score
int64
1
25
risk_band
stringclasses
5 values
alarp_zone
stringclasses
3 values
recommended_action
stringlengths
28
93
5x5
1
Insignificant (no injury / negligible damage)
1
Rare (may occur only in exceptional circumstances — less than once in 10 years)
1
Very Low
Broadly Acceptable
Routine management; no special controls required; retain existing controls
5x5
1
Insignificant (no injury / negligible damage)
2
Unlikely (could occur but not expected — once in 5-10 years)
2
Very Low
Broadly Acceptable
Routine management; monitor periodically
5x5
1
Insignificant (no injury / negligible damage)
3
Possible (might occur occasionally — once in 1-5 years)
3
Low
Broadly Acceptable
Low priority; existing controls probably adequate; note for periodic review
5x5
1
Insignificant (no injury / negligible damage)
4
Likely (will probably occur in most circumstances — once per year)
4
Low
ALARP (Tolerable)
Manage by routine procedures; ensure controls maintained
5x5
1
Insignificant (no injury / negligible damage)
5
Almost Certain (expected to occur in most circumstances — more than once per year)
5
Medium
ALARP (Tolerable)
Moderate priority; additional controls may be justified; management responsibility
5x5
2
Minor (first aid injury / minor property damage < $10K)
1
Rare
2
Low
Broadly Acceptable
Low priority; manage by routine procedures
5x5
2
Minor (first aid injury / minor property damage < $10K)
2
Unlikely
4
Low
ALARP (Tolerable)
Manage by routine procedures; monitor
5x5
2
Minor (first aid injury / minor property damage < $10K)
3
Possible
6
Medium
ALARP (Tolerable)
Moderate priority; consider additional controls; supervisor responsibility
5x5
2
Minor (first aid injury / minor property damage < $10K)
4
Likely
8
High
ALARP (Tolerable)
Senior management attention required; implement additional controls
5x5
2
Minor (first aid injury / minor property damage < $10K)
5
Almost Certain
10
High
ALARP (Tolerable)
Urgent attention; additional controls required before continuation
5x5
3
Moderate (medical treatment / significant damage $10K-$100K)
1
Rare
3
Low
Broadly Acceptable
Manage by routine procedures
5x5
3
Moderate (medical treatment / significant damage $10K-$100K)
2
Unlikely
6
Medium
ALARP (Tolerable)
Moderate priority; specify controls; management responsibility
5x5
3
Moderate (medical treatment / significant damage $10K-$100K)
3
Possible
9
High
ALARP (Tolerable)
Senior management attention; additional controls required; implement within defined timescale
5x5
3
Moderate (medical treatment / significant damage $10K-$100K)
4
Likely
12
High
ALARP (Tolerable)
Urgent additional controls required; escalate to senior management
5x5
3
Moderate (medical treatment / significant damage $10K-$100K)
5
Almost Certain
15
Very High
Intolerable
Stop activity; work must not continue until risk is reduced to ALARP
5x5
4
Major (serious injury / LTI / significant damage $100K-$1M)
1
Rare
4
Low
ALARP (Tolerable)
Manage by specific procedures; ensure effective controls exist
5x5
4
Major (serious injury / LTI / significant damage $100K-$1M)
2
Unlikely
8
High
ALARP (Tolerable)
Senior management attention; additional controls required within defined timescale
5x5
4
Major (serious injury / LTI / significant damage $100K-$1M)
3
Possible
12
High
ALARP (Tolerable)
Urgent; senior management action; must reduce risk as a priority
5x5
4
Major (serious injury / LTI / significant damage $100K-$1M)
4
Likely
16
Very High
Intolerable
Stop activity; extensive risk reduction required before resuming
5x5
4
Major (serious injury / LTI / significant damage $100K-$1M)
5
Almost Certain
20
Very High
Intolerable
Prohibit activity; fundamental redesign or alternative method required
5x5
5
Catastrophic (fatality or multiple fatalities / damage >$1M)
1
Rare
5
Medium
ALARP (Tolerable)
Senior management attention; ALARP demonstration required; monitor controls closely
5x5
5
Catastrophic (fatality or multiple fatalities / damage >$1M)
2
Unlikely
10
High
ALARP (Tolerable)
Urgent additional controls required; ALARP demonstration; escalate to management
5x5
5
Catastrophic (fatality or multiple fatalities / damage >$1M)
3
Possible
15
Very High
Intolerable
Stop activity; work must not proceed without fundamental control improvement
5x5
5
Catastrophic (fatality or multiple fatalities / damage >$1M)
4
Likely
20
Very High
Intolerable
Prohibit activity; Executive / Board level decision required to proceed
5x5
5
Catastrophic (fatality or multiple fatalities / damage >$1M)
5
Almost Certain
25
Very High
Intolerable
Prohibit absolutely; activity cannot be performed at present design / method
4x4
1
Low severity (no / minor injury — first aid; negligible damage)
1
Improbable (not expected to occur — once in 10+ years)
1
Very Low
Broadly Acceptable
No immediate action; existing controls adequate
4x4
1
Low severity (no / minor injury — first aid; negligible damage)
2
Remote (occurs rarely — once in 5-10 years)
2
Very Low
Broadly Acceptable
Low priority; record and monitor
4x4
1
Low severity (no / minor injury — first aid; negligible damage)
3
Occasional (occurs from time to time — once in 1-5 years)
3
Low
ALARP (Tolerable)
Manage by routine procedure; verify controls
4x4
1
Low severity (no / minor injury — first aid; negligible damage)
4
Probable (expected to occur — more than once per year)
4
Medium
ALARP (Tolerable)
Management attention; consider additional controls
4x4
2
Medium severity (medical treatment; significant damage < $100K)
1
Improbable
2
Very Low
Broadly Acceptable
Low priority; manage by routine procedure
4x4
2
Medium severity (medical treatment; significant damage < $100K)
2
Remote
4
Medium
ALARP (Tolerable)
Moderate priority; management review; additional controls may be needed
4x4
2
Medium severity (medical treatment; significant damage < $100K)
3
Occasional
6
High
ALARP (Tolerable)
Management action required; additional controls within defined timeframe
4x4
2
Medium severity (medical treatment; significant damage < $100K)
4
Probable
8
High
ALARP (Tolerable)
Urgent; senior management attention; priority risk reduction
4x4
3
High severity (serious injury / LTI; major damage $100K-$1M)
1
Improbable
3
Low
ALARP (Tolerable)
Management review; ensure ALARP; verify barriers are effective
4x4
3
High severity (serious injury / LTI; major damage $100K-$1M)
2
Remote
6
High
ALARP (Tolerable)
Senior management attention; additional controls required; ALARP demonstration
4x4
3
High severity (serious injury / LTI; major damage $100K-$1M)
3
Occasional
9
Very High
Intolerable
Stop task; implement immediate risk reduction; executive sign-off to resume
4x4
3
High severity (serious injury / LTI; major damage $100K-$1M)
4
Probable
12
Very High
Intolerable
Prohibit activity; fundamental control improvement required
4x4
4
Catastrophic (fatality or multiple fatalities; damage >$1M)
1
Improbable
4
Medium
ALARP (Tolerable)
Senior management attention; ALARP demonstration required; escalate
4x4
4
Catastrophic (fatality or multiple fatalities; damage >$1M)
2
Remote
8
High
ALARP (Tolerable)
Urgent; additional risk controls required; ALARP demonstration; executive awareness
4x4
4
Catastrophic (fatality or multiple fatalities; damage >$1M)
3
Occasional
12
Very High
Intolerable
Stop activity; executive / board decision required before resuming
4x4
4
Catastrophic (fatality or multiple fatalities; damage >$1M)
4
Probable
16
Very High
Intolerable
Prohibit absolutely; activity must not proceed
3x3
1
Low (minor injury / near miss; negligible damage)
1
Low probability (unlikely in normal operations)
1
Low
Broadly Acceptable
Acceptable risk; existing controls adequate; note for review
3x3
1
Low (minor injury / near miss; negligible damage)
2
Medium probability (reasonably foreseeable)
2
Low
Broadly Acceptable
Low priority; monitor; confirm controls in place
3x3
1
Low (minor injury / near miss; negligible damage)
3
High probability (likely to occur)
3
Medium
ALARP (Tolerable)
Moderate priority; management attention; additional controls to be considered
3x3
2
Medium (medical treatment / significant injury; moderate damage)
1
Low probability
2
Low
Broadly Acceptable
Low priority; manage by specific procedure; review controls
3x3
2
Medium (medical treatment / significant injury; moderate damage)
2
Medium probability
4
High
ALARP (Tolerable)
Management attention required; additional controls within defined timeframe
3x3
2
Medium (medical treatment / significant injury; moderate damage)
3
High probability
6
High
ALARP (Tolerable)
Urgent; senior management action; priority risk reduction required
3x3
3
High (fatality or serious injury; major damage)
1
Low probability
3
Medium
ALARP (Tolerable)
Management attention; ALARP review; ensure barriers are robust
3x3
3
High (fatality or serious injury; major damage)
2
Medium probability
6
High
ALARP (Tolerable)
Urgent; senior management action; additional controls; ALARP demonstration
3x3
3
High (fatality or serious injury; major damage)
3
High probability
9
Very High
Intolerable
Stop activity immediately; executive approval required; fundamental redesign

Risk Matrix Reference 2026 — 5x5, 4x4, and 3x3 with ALARP Zones

Fully populated risk matrices in 5x5 (25 cells), 4x4 (16 cells), and 3x3 (9 cells) configurations. Each cell: severity level + descriptor, likelihood level + descriptor, risk score, risk band (Very Low / Low / Medium / High / Very High), ALARP zone (Broadly Acceptable / Tolerable / Intolerable), and recommended management action. Follows ISO 31000, UK HSE five-step, and IOGP ALARP conventions.

Dataset details

Suggested citation

SmartQHSE Ltd (2026). Risk Matrix Reference 2026 — 5x5, 4x4, and 3x3 with ALARP Zones [dataset]. Zenodo. https://doi.org/10.5281/zenodo.20171695

Related SmartQHSE resources

Disclaimer

This dataset is published for reference, training, and research. Regulatory text and action levels are summarised; consult the authoritative source listed before basing operational or compliance decisions on this dataset. SmartQHSE Ltd accepts no liability for errors or omissions.

Downloads last month
7