| # Slow detailed routing convergence | |
| Tool: Detailed Routing | |
| Subcategory: Performance issue | |
| ## Conversation | |
| ### oharboe | |
| I was curious what was difficult about detailed routing for a design, so I stopped detailed routing after 4 iterations, using https://github.com/The-OpenROAD-Project/OpenROAD-flow-scripts/pull/791, then looked at 5_route_drc.rpt. | |
| Here it seems like there is a lot of congestion at the top of macros because the power strip is running inside the halo (?) of the macro. | |
|  | |
| Howevever here is a macro, just like the one above where detailed routing doesn't seem to have a problem dealing with this issue: | |
|  | |
| Perhaps nothing is wrong here and it just takes a while to do detailed routing. | |
| Is there anything to learn or that I can do different here? | |
| ### maliberty | |
| How many iterations does it take to complete? In general drt is the slowest step of the flow but it also looks like something is going on here. | |
| In the lower picture the wires appear to go straight in on m5 but in the upper the go up to a higher layer and then try to drop down (which is blocked by the strap). I'm not clear why they can't go straight in from the image. Can you tell? | |
| ### oharboe | |
| I can see the same problem on https://github.com/The-OpenROAD-Project/OpenROAD-flow-scripts/tree/master/flow/designs/asap7/mock-array-big | |
|  | |
| Zooming in, we can see that different metal is being used: | |
|  | |
| To reproduce the image above, first build, but abort after 5 iterations in detailed routing, then load the 5_route_drc.rpt and zoom in: | |
| ``` | |
| make DESIGN_CONFIG=designs/asap7/mock-array-big/Element/config.mk generate_abstract | |
| make DESIGN_CONFIG=designs/asap7/mock-array-big/config.mk DETAILED_ROUTE_ARGS=\"-bottom_routing_layer M2 -top_routing_layer M7 -save_guide_updates -verbose 1 -droute_end_iter 5\" | |
| make DESIGN_CONFIG=designs/asap7/mock-array-big/config.mk | |
| ``` | |
| ### maliberty | |
| @osamahammad21 I think looking at this issue in the context of asap7/mock-array-big fits with your other drt performance work. | |
| ### maliberty | |
| Your pins are off the routing grid: | |
|  | |
| which I guess is why the router is gyrating to hit them. | |
| ### maliberty | |
| @osamahammad21 with the PRs from this morning this case now finishes with 0 drvs. However it reaches 2 drvs by the end of iter 4 but takes until iter 13 to reach zero. At the end of iter5 I see two cut spacing violations. They both look easy to fix, eg | |
|  | |
| you should readily move the via to the right by one track. I guess this is a costing issue. | |
| ### antonblanchard | |
| I missed this because it was hiding in discussions. I have noticed various issues with via spacing in drt, eg https://github.com/The-OpenROAD-Project/OpenROAD/issues/2827 and https://github.com/The-OpenROAD-Project/OpenROAD/pull/2844, so likely issues in both route cost and GC (drc). | |
| ### oharboe | |
| Near as I know all of these issues are resolved on master. | |