Add D&C QA/QC configs (dc_development_summary/dc_bores/dc_vintage_diff); source v21_kc sha256=a6fdd82382ef
25b89d5 verified | license: cc-by-4.0 | |
| pretty_name: World Energy Field Explorer — analysis projection | |
| tags: | |
| - energy | |
| - oil-and-gas | |
| - offshore | |
| - bsee | |
| - gulf-of-mexico | |
| configs: | |
| - config_name: fields | |
| data_files: fields.parquet | |
| - config_name: wells | |
| data_files: wells.parquet | |
| - config_name: countries | |
| data_files: countries.parquet | |
| - config_name: parametric_economics | |
| data_files: parametric_economics.parquet | |
| - config_name: dc_development_summary | |
| data_files: dc_development_summary.parquet | |
| - config_name: dc_bores | |
| data_files: dc_bores.parquet | |
| - config_name: dc_vintage_diff | |
| data_files: dc_vintage_diff.parquet | |
| # World Energy Field Explorer — analysis projection | |
| Tabular projection of the **World Energy Field Explorer** analysis results, published so the | |
| Hugging Face dataset viewer and the **datasets-server API** can render visualizations directly. | |
| Live Explorer: https://vamseeachanta.github.io/worldenergydata/field-atlas/ | |
| ## Tables (viewer configs) | |
| | Config | Rows | What | | |
| |---|---|---| | |
| | `fields` | 10 | Lower-Tertiary fields — economics, reservoir, HPHT/decommission risk, concept, landman | | |
| | `wells` | 56 | Producing wells — spud/TD/first-oil, rig-days, cumulative oil, uptime | | |
| | `countries` | 84 | Global offshore funnel — per-country field counts + data-density badge | | |
| | `parametric_economics` | 30 | WTI price-multiplier x discount-rate NPV grid (jack_st_malo, julia) | | |
| ## Economics basis | |
| - `npv_mm` / `breakeven_wti` are **life-to-date**, pre-tax, 10%-discounted: full sunk capex | |
| charged against oil produced to date, not full-cycle EUR. Fields early in life are withheld | |
| (`economics_status = early_life`, values null) rather than surfaced as absurd numbers. | |
| - `eur_mmbbl` is **curated published/booked recoverable reserves** with `eur_source` + | |
| `eur_confidence` — NOT a decline-fit extrapolation. Null where no credible public figure | |
| exists. | |
| - `parametric_economics` sweeps a uniform multiplier on the historical monthly WTI deck and | |
| the annual discount rate over the same sanctioned cashflow model. NPV is exact (affine) in | |
| the price multiplier. Fields with withheld economics are excluded from the grid. | |
| ## Provenance | |
| Schema version `1.0.0`. Derived from the committed Explorer results bundle | |
| (`reports/field-atlas/results/explorer_results_bundle.json`), itself a projection of | |
| `_explorer.json` + `_atlas_feed.json`. Source snapshots (sha256): | |
| - `reports/field-atlas/results/explorer_results_bundle.json` — sha256 `05f2864caca2ba08…` | |
| - `reports/lower_tertiary/lifecycle/_performance.json` — sha256 `0959bfd07588b8c1…` | |
| - parametric grid: code revision `af2482fd842d`, config | |
| `config/parametric/lt_economics_sweep.yml` (sha256 `8ffad49934092964…`), data window through | |
| `2026-04-30`, model `worldenergydata.lower_tertiary.v30_financial_reproducer.build_field_npv_timeline` | |
| ## Revision notes | |
| - **Economics refresh**: `eur_mmbbl` corrected to curated published reserves (the previous | |
| revision carried inflated decline-fit values, since retired); life-to-date NPV / break-even | |
| columns added for fields whose economics are surfaced; `parametric_economics` grid added. | |
| ## D&C days QA/QC tables | |
| Bore-level drilling & completion days behind the World Oil April 2026 | |
| reconciliation (hub: https://vamseeachanta.github.io/worldenergydata/wo-april-2026-qaqc-hub.html). | |
| | Config | Rows | What | | |
| |---|---|---| | |
| | `dc_development_summary` | 11 | Per-development rollup vs the article (7 exact, 3 explained) | | |
| | `dc_bores` | 253 | Per-bore spud/TD, drill vs completion split, producer/sidetrack | | |
| | `dc_vintage_diff` | 253 | Frozen-V30 vs wed — drilling changed on 0 of 253 bores | | |
| Basis: canonical extractor output, BSEE WAR vintage 2026-02-19. Drilling days = | |
| spud to TD; completion days = all post-TD rig time including later servicing | |
| (the open #846 boundary question). Known caveat: DRILLING_DAYS mixes calendar | |
| days (spans <=250 d) with WAR-union rig-days (longer spans), so batch-drilled | |
| wells undercount — tracked in the QA/QC hub. | |