You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 19:00 - 20:00: Well handed over from production department. Held brief prior to leaktest XMT cross.
20:00 - 21:00: Found out that DHSV was open. Closed DHSV and bleed down pressure above to closed drain.
21:00 - 22:30: Leak tested XMT cross to 20/120 bar for 5/10 min.
22:30 - 00:00: Skidded rig in position.
| Well handed over from production department. Leak tested XMT cross. Skidded rig in position. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:45: Changed to workover hatch.
00:45 - 01:30: Held dop meeting on drill floor prior to r/u on well.
01:30 - 03:00: Removed XMT top cap and installed lower riser and BOP. Installed chiksan manifold on KWV.
03:00 - 04:00: Leak tested lower riser/bop connections to 20/120 bar for 5/10 min and function tested BO... | R/u wireline equipment on well. Installed RST toolstring in lubricator. Tested r/u. Opened well and RIH. Logged RST-D in sigma mode and RST-D in IC mode. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Logged RST-D in IC mode pass#2 from 3600 3460 m 0. 5m/min. WHP 42 bar.
06:00 - 06:25: RIH to 3637 m.
06:25 - 16:00: Logged RST-D in IC mode pass#3 from 3637 3460 m 0. 5m/min. WHP 42 bar.
16:00 - 18:30: POOH with BHA#1 from 3460 m to surface.
18:30 - 19:50: OOH. WHP 42 bar. Closed well and inflow tested H... | Logged RST-D in IC mode pass 2 and 3. POOH. Inflow tested HMV,SV and DHSV. L/d BHA#1, RST toolstring. R/d upper lubricator and GIH. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:45: Held brief prior to r/d lower lubricator and BOP.
00:45 - 04:50: Lifted lower lubricator to rig floor with top drive. Lifted BOP away in moon pool. RD lower riser. Installed tree cap. R/d manifold on KWV. Installed KWV cap. Lifted out grease pump and n2 bottles from rig floor. Lifted out BOP from moon po... | R/d wireline equipment and back loaded equipment. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 18:00 - 20:00: Skid rig from f-11 b to f-5.
20:00 - 22:00: Changed 7/16" add-on drum, due to cable strands outside criteria for building new cable head. Meanwhile received well from production.
22:00 - 00:00: Had to wait for rigging on XMT due to leak in header valve on water injection line. Meanwhile rigged up new add... | Skidded rig from f-11b to f-5. Received well from production. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Waited on production department to isolate injection line. Meanwhile rigged up new add on drum.
01:30 - 04:40: Rigged up KWV manifold. Inflow tested swab valve to 140 bar for 10 min. Leak tested KWV manifold to 20/140 bar for 5/10 min. Meanwhile built new GIH and threaded cable. Schlumberger built cable ... | Rigged up WL equipment in f-5. Installed BHA and RIH. Logged RST- d sigma pass across 3625 3450 m. Started to log RST-D IC pass across 3525 3470 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:10: Logged fourth RST-D IC pass across interval 3525 3470 m. Completed logging.
02:10 - 03:45: POOH from 3470 m to surface WHP bar. 54 bar.
03:45 - 05:10: Closed SV HMV and inflow tested same. Purged lubricator with n2. Observed grease in bleed off hose.
05:10 - 05:45: Found empty container to drain grease, ... | Logged RST-D IC pass across interval 3525 3470 m. Rigged down WL equipment. Tested XMT valves and DHSV. Handed well back to production. Started to rig down for demobilization. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:00: Packed wireline winch and 7/16" add-on.
03:00 - 07:00: Packed altus work container. Cleaned and tidy area. end of operation
| Packed wireline equipment ready for backload. Cleaned and tidy area. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 21:00 - 00:00: Wow to skid rig to f-7. Wind 41-53 kt.
| Wow to skid rig to f-7. Skidded to f-7. Started to skid out to remove riser tie-in winch. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:30: Wow to skid rig to f-7. Wind 41-53 kt.
03:30 - 06:00: Held tool box meeting prior to skidding. Removed main staircase and baskets to be able to skid. Skidded rig to f-7. Had decreasing trend on weather 25-38 kt, morning forcast 17-22 kt) and decided to to skid all the way out to remove riser tie-in winch... | Skidded rig to f-7 and removed riser equipment from drill floor. Lo 12 singles of 5 1/2" HWDP and 6 singles of 8 1/4" DC. PU and MU 12 singles of 5 1/2" HWDP and RB in derrick as dedicated landing string. MU and RIH with 36" BHA and centralizing bushing" to 145 m MD. Started washing down with sea water and no rotation. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: MU 36" BHA from 17 m to 26 m.
00:30 - 01:00: Skidded cantilever 11 cm forward to adjust rig floor on f-7.
01:00 - 03:00: MU 36" BHA from 26 m to 122 m.
03:00 - 04:00: Performed derrick inspection prior to spudding the hole. Meanwhile ROV checked template and got in position for stab-in.
04:00 - 05:00: MU... | No progress on washing down to start drilling 36" hole at 145 m. POOH Changed to 26" BHA and RIH. Drilled down to 149 m. POOH and re-run 36" ho assembly. Entered 26" hole with 17 1/2" bit and 26"/36" ho assembly. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 04:00: Removed master bushing and outer ring. RIH with 36" ho assembly to 9 m and re-instated outer ring and bushing. MU 36" BHA from 9 m to 142 m. Stabbed into funnel on template guided by ROV and washed down 600 LPM/1 bar to 145 m.
04:00 - 06:00: Attempted to enter 26" hole washing down 600 LPM/1 bar. Inspect... | Drilled 36" hole from 149 m to 208 m MD. Circulated hole clean and displaced hole to 1. 40 SG bentonite mud. POOH and LD 36" ho assy. RU for running 30" conductor. MU 30" conductor shoe. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 04:30: PU cart assembly and RB in derrick. MU CMT assembly and lo same. Removed 5 1/2" elevators and bails. RU for running 30" conductor.
04:30 - 06:00: Held tool box meeting with all personnel involved prior to running conductors. PU 30" shoe joint and checked float for flow through by flushing with water.
06:... | MU 30" conductor and conductor housing. Installed UWG top-up system on upper 25 m of conductor. RU c-plate and MU cement stinger and cart. RIH with 30" conductor on dedicated landing string. ROV manipulated conductor to be able to pass f-12 DCI valve and assisted stabbing into f-7 template funnel. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: Changed dies on pipe handler.
00:30 - 01:00: RIH with 30" conductor on 5 1/2" HWDP landing string from 118 m to 138 m.
01:00 - 03:00: Stopped RIH with 30" conductor at 138 m due to possible collision with f-12 DCI valve. Monitored and evalutated situation.
03:00 - 05:15: RU tugger from moonpool and insta... | Continued RIH with 30" conductor on 5 1/2" HWDP landing string to TD. ROV actuated conductor centralizer. Cemented 30" conductor. Waited 10 hours on cement to set. Performed remedial cement job. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:30: WOC while holding landing string in tension at correct depth.
02:30 - 03:15: Held tool box meeting in cement control room prior to pumping down the top-up pipe. Lined up to to pump down top-up pipe. Tested line and manifold 100bar/5 min. Stepped up pressure pumping at 50 l/min. At 52 bar psi) differentia... | Released cart and POOH. LD cement stinger and running tool. Cleared rig floor. Installed CTS funnel and DCI hose on f-7 using ROV. MU and RIH with 17 1/2" BHA to 144 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: MU and RIH with 17 1/2" BHA from 9 m to 129 m. Stabbed into 30" conductor housing at 139. 7 m assisted by ROV. RIH with 17 1/2" BHA to 144 m.
06:00 - 07:45: MU and RIH with 17 1/2" BHA from 144 m to 188 m. Started circulating and attempted to take survey without sucess.
07:45 - 09:45: RB 1 STD and topped... | RIH with 17 1/2" BHA from 144 m and tagged CMT at 196 m. Drill out 30" shoe using SW and hi-vis pills. Clean out rathole. Drill to 215 m MD while attempting to take surveys. Spotted 10 m3 1. 40 SG pill on bottom and POOH. Changed 17 1/2" BHA and RIH to 200 m. RU gyro unit to run single shot survey through DP. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:00: MU and RIH with new 17 1/2" BHA from 36 m to 129 m. Stabbed into 30" conductor housing at 139. 7 m assisted by ROV. RIH with new 17 1/2" BHA from 140 m to 200 m. Weight under jar is 13 MT.
03:00 - 06:00: RU gyro unit in v-door to be able to run single shot survey through DP.
06:00 - 07:00: Changed electr... | Continued RU WL gyro. Drill 17 1/2" hole from 215 m to 280 m taking gyro singel-shot survey every single drilled. Had possible small screw/t-bar dropped down hole drill string) at 276 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:00: Drilled 17 1/2" hole from 266 m to 276 m 3000-3500 LPM, 60-92 bar, 70 RPM, 2-5 KNM, 3-5 MT wob. Pumped 10 m3 hi-vis sweep and spotted 10m3 hi-vis on bottom. Performed gyro survey at 262 m.
03:00 - 05:00: Dropped t-bar 5 cm x 2. 5 cm extended screw) from gyro goose-neck. It was probably lost down hole dri... | Drill 17 1/2" hole from 280 m to 308 m taking gyro singel-shot survey every single drilled. POOH to change to BHA with MWD gyro. RIH with new 17 1/2" BHA. Attempted to take survey before starting to drill 17 1/2" hole. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: RIH with new 17 1/2" BHA from 83 to 122 m.
00:30 - 01:00: Surfaced ROV to repair hydraulic leak.
01:00 - 02:00: RIH with new 17 1/2" BHA from 122 to 129 m. Stabbed into 30" conductor housing at 139. 7 m assisted by ROV. RIH with new 17 1/2" BHA from 140 m to 227 m.
02:00 - 03:00: Surfaced ROV to repair h... | POOH to change MWD gyro. RIH with 17 1/2" BHA from surface to 308 m. Drilled 17 1/2" hole from 308 m to 328 m while attempting to take survey with GMWD. Drilled 17 1/2" hole from 328 m to 353 m taking gyro singel-shot survey every single drilled. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Drilled 17 1/2" hole from 328 m to 353 m using 5 1/2" HWDP as drilling stand 4000 LPM, 139 bar, 70 RPM, 2-5 KNM, 1-2 MT wob. Up weight 102 MT/DOWN weight 100 MT. Pumped 10 m3 hi-vis sweep and spotted 10m3 hi-vis on bottom prior to each WL gyro run. Performed WL gyro surveys at 331m, 339m, and 353 m. Each... | Drilled/surveyed 17 1/2" hole from 353 m to 759 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 05:15: Drilled 17 1/2" hole from 650 m to 759 m 4000-4500 LPM, 130-160 bar, 80 RPM, 1-3 KNM, 3-4 MT wob, ROP 33-55 m/hr. Pumped 3 x 10 m3 hi-vis sweeps and reamed one single PR STD. Performed gyromwd survey every STD. Slided in following intervals 675-690m, 745-760m. Up weight 114 MT/DOWN weight 109 MT. Continu... | Drilled 17 1/2" hole from 759 m to TD at 915 m taking gyromwd survey every STD. Circulated well clean. Displaced open hole and conductor to 1. 40 SG bentonite mud. POOH and RB 17 1/2" BHA. RU for running 20 x 13 3/8" CSG. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:30: Continued laying out 17 1/2" BHA. Cleaned and cleared drill floor. Meanwhile prepared tugger for removing funnel.
02:30 - 06:00: RU for running 20 x 13 3/8" casing. Changed elevators and bails. Installed x-overs to peak circ tool and installed flex hose.
06:00 - 08:15: Continued rigging up surface equipm... | RIH with 13 3/8" casing from surface to 773m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:00: Continued RIH with 13 3/8" casing from 536 m to 582 m. Laid out 3 joints of pipe.
03:00 - 03:30: The casing tong were unable to make up high torque. Trouble shooted the casing tong, the tong were repaired and operation was resumed.
03:30 - 05:30: Continued RIH, with 13 3/8" casing from 582 m to 773 m, fi... | Ran with 18 3/4" well head, installed same and cemented the 13 3/4" casing. POOH w/ cart and l/o same. Prepared and started to run production riser. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:45: The riser spider were brought in to the rig floor.
00:45 - 01:45: Transported the riser spider to near the rotary, removed the master bushing and adapter ring. Installed the spider and hooked up hydraulic hoses and function tested same.
01:45 - 02:30: Picked up TBC and stress joint and landed of in the s... | Function tested the TBC. Ran in with the production riser, landed and installed same. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: Aligned the TBC over the well head and ran down with the TBC over the well head.
00:30 - 04:00: Landed and connected the TBC as per vetco procedure. Weight prior to landing 100 MT. Installed hot stab for locking the TBC set down 15mt. As moving the hot stab the umbilical came off the shackle attached to ... | Pressure tested production riser to 10/70bars 5/10 mins. Installed centralizers and tension ring assembly and tension cylinders. Cut production riser at 1360 mm above machined ring on tension deck. Bevelled the top of the production riser. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:00: Continued rigging up cutting device for cutting the production riser. Simultaneously had the top drive serviced.
02:00 - 04:45: Cut the production riser 1360 mm above machined ring on tension deck. Simultaneously serviced PRS.
04:45 - 05:30: Pulled out landing string and broke out pup joints and landing ... | Installed well head and surface riser, had to cut off 25 cm of the surface riser. M/u 12 ¼" drilling BHA and RIH same. Tagged TOC at 880 m drilled from 880 m to 881 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:15: Continued changing out the wash pipe, pressure tested same to 207 bars
00:15 - 02:15: Attempted to install 10" diverter elements, not possible due to damaged elements. Changed master bushing for PS 21 slips.
02:15 - 04:45: Continued RIH with 12 ¼" drilling BHA on 5½" DP to 859 m, made up to TDS, establis... | Drilled out shoe track from 881m to 908m. Displaced well to WBM 1. 26 SG. Drilled ahead to 978m. Mp1, 2 3 malfunctioned, pulled out into the shoe, rectified MP failures. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:00: Continued working on mud pumps.
01:00 - 01:45: Pulled out and into the shoe, monitored well over the trip tank. Meanwhile continued working on mud pumps.
01:45 - 06:00: Investigated failures on mud pumps and carried out repairs. Failures located MP-1 swab in line, MP-2 fluid end problems, MP-3 liner prob... | Drilled from 978 m to 1083 m, performed wiper trip to the shoe and back to TD, no tight spots. Circulated well clean, POOH with 12 ¼" BHA. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 04:00: Continued POOH with 5½" DP and 12 ¼" drilling BHA from 275 m to surface, pulled out wet and laid out 12 ¼" drilling BHA.
04:00 - 04:30: Cleared and cleaned rig floor prior to picking up clean out BHA.
04:30 - 06:00: Started to make up cleanout BHA.
06:00 - 07:00: Continued making up scraper BHA.
07:00 - ... | Attempted to RIH with 13 3/8" scarper clean BHA. Unable to pass 87 m. RIH with clean up BHA without scraper and cleaned well. POOH with clean up BHA. Performed drift run with liner hanger to 145 m. Started rigging up for running 9 5/8" screens. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:15: Continued POOH with clean up from 130 m to surface. Laid out bull nose. Metal shavings recovered with magnet.
00:15 - 00:30: Held tool box talk prior to perform drift run with liner hanger to 145 m.
00:30 - 03:00: Performed drift run with liner hanger to 145 m. No obstruction observed.
03:00 - 04:00: POO... | RU for running 9 5/8" sand screen. RIH with 9 5/8" sand screen on 5 ½" DP, installed same. Displaced well to 1. 03 SG nacl brine. POOH with 9 5/8" sand screen running tool from 825 m to 810 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:30: Continued RIH with 9 5/8" screens from 500 m to 738 m. Took weight at 738 m sat down weight 9 MT and picked up free. Made up TDS. Broke circulation 500 LPM, 5 bars, RIH passed obstruction at 738m. Continued RIH with 9 5/8" screens from 738 m to 907 m
02:30 - 03:15: Continued to RIH with 9 5/8" screens in... | POOH with 9 5/8" liner hanger BHA from 810 m to surface and laid out same. During PU of swab assembly, a part of the aft upper PRS support arm came off and dropped on to the rig floor. Operation was stopped until safe operation could continue. RIH with swab assembly on 5½" DP to swab in well to achieve good losses rate... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:45: Continued swabbing the well 3 times using 3 strokes at the time with stroke length of 35 m. Swabbing speed 40 and 50 m/min. Losses 1200, 700 and 600 LPM. Filled up trip tank and observed final loss rate of 300 LPM.
02:45 - 03:00: Pressured up the string and bursted the burst disk sub at 250 bars.
03:00 -... | POOH with the swab assembly. RIH with swab new assemblie. Pumped 14,5 m of citric acid SG). Displaced citric acid with 8,6 m 1. 03 SG nacl. Let citirc acid soak. Lined up to trip tank and established loss rate, loss rate 450 LPM. Pulled the string up to 840 m above the PBR. Lined up to trip tank and established loss ra... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Pulled the string up to 1026 m, having the upper swab cup inside the 9 5/8" blank pipe. Opened stand pipe valve. Pumped 30 m 1. 03 SG brine, to ensure that the remaining citric acid was bull headed into the formation. Pumping rate 420 LPM 5 bars SPP.
01:30 - 03:15: Pulled the string to 900 m having the b... | POOH with the swabbing assemblies from 530 m to surface. RIH and retrieved the bowl protector at 20. 61 m. Jet washed the surface well head. Perform dummy run with the tubing hanger, landed same and documented orientation. Racked tubing hanger back in the derrick. Rigged up surface equipment for handling the ESP equipm... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:15: Installed hydraulic line to phoenix multisensor at motor and leak tested connection to 207 bars psi) 10 min.
01:15 - 06:00: Connected up the electrical cable to the motor and tested out same.
06:00 - 07:00: Continued testing of the cabling to the ESP motor.
07:00 - 07:45: Made up ¼" hydraulic line from m... | Completed testing of the cabling to the ESP motor. RIH with ESP on 7 5/8" tubing from surface m to 760m. Installed cable clamps every joint. Laid out 4 joints. Checked the phoenix connection every hours. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Continued RIH with ESP on 7 5/8" tubing from 500 m to 760 m. Installed cable clamps every joint. Checked the phoenix connection every hours.
06:00 - 07:00: Continued RIH with ESP on 7 5/8" tubing from 760 m to 800 m. Installed cable clamps every joint.
07:00 - 07:30: Changed to 5½" DP inserts. Picked up,... | Continued RIH with ESP on 7 5/8" tubing from 760 m to 800 m. Installed the tubing hanger and released from same. N/d the diverter and the riser. Installed the tubing bonnet, spacer spool and ball valve assembly. Leak tested cable penetrator seals in tubing bonnet to 69 bar psi). Leak tested the tubing bonnet cavity to ... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Prepared the surface well head for installation of the tubing bonnet, spacer spool and ball valve assembly. Installed same.
01:30 - 02:30: Leak tested cable penetrator seals in tubing bonnet to 69 bar psi). Meanwhile changed out valve on TDS.
02:30 - 03:15: Leak tested the tubing bonnet cavity to 69 bar ... | None |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 03:30 - 04:00: Well f-7 handed over from production to d&w. Performed TBT for skidding rig with personnel from drilling, marine and technical departments.
04:00 - 05:30: Skidded the cantilever from f-9 to f-7
05:30 - 09:30: Unbolted weather deck hatches on f-7. Moved split hatches in moonpool. Meanwhile prepared for ni... | Skidded catilever to f-7. Installed hatches. Nippled down flowline. Attempted to disconnect and pull tubing bonnet, spacer spool and ball valve. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:45: Continued working tension up/down to release tubing bonnet. Managed to level out the travel evenly around bonnet. Slacked off tension and lowered soft slings to XMT-DECK to remove braided wire slings and connect soft slings directly to ball valve. Dropped 1ea 2m 2 1/2" braided wire sling into tubing whil... | Released and pulled tubing bonnet, spacer spool and ball valve. Installed surface riser and diverter. Released tubing hanger and pulled ESP assemblies on 7 5/8" tubing to 141 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:15: Continued POOH with ESP assemblies on 7 5/8" tubing from 141 m to 21 m. Avg pulling speed 5 joints/hrs. Recovered total 67 tubing clamps, no clamps left in hole.
01:15 - 02:00: Performed TBT for changing handling equipment. Removed compact auto slips. Installed master bushings. Set manual slips on pup jo... | L/d ESP assemblies. TOFS due to dropped eps cable. R/u WL. Performed multifinger caliper log. Installed me-plug in screen section. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:15: Cleaned and cleared rig floor.
00:15 - 00:30: Installed rotator arm on elevator. Installed bowls.
00:30 - 00:45: Performed TBT for changing RT on primary th assy.
00:45 - 01:00: Changed BX inserts to 9 5/8".
01:00 - 02:30: P/u primary th/rt assy and landed same in rotary. Released running tool and l/d sa... | Installed RT on th assembly. M/u ESP assemblies and RIH with same on 7 5/8" tubing to 323 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 05:45: RIH with ESP assemblies on 7 5/8" tubing from 323 m to 771 m. M/u control line clamp on every connection. Schlumberger megger tested power cable at 323 m, 455 m and 624 m. Avg running speed 6,9 joints/hr.
05:45 - 06:00: Performed TBT for removing compact auto slips. Removed compact auto slips and install... | RIH with ESP assemblies on 7 5/8" tubing. P/u and m/u tubing hanger, spliced ESP cable to same. Landed th. Nippled down diverter and surface riser. Installed tubing bonnet, spacer spool and ball valve. Commenced final pressure tests at WH. Bolted flowline to ball valve. Installed hatch covers. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:15: Continued pressure testing cable penetrator seals 69 bar 10 min, tubing bonnet cavity 69 bar 10 min and annulus insert valve 69 bar 10 min. Meanwhile performed TBT and installed diverter and master bushings. Set th RT with pup joint in foxhole, b/o and l/d same. Cleaned and cleared rig floor. end of oper... | Performed final tests of tubing bonnet after landing th. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 06:30 - 07:45: Performed toolbox. Removed hatches and fenced off all levels in WH module. Picked up and hung off 36" hole opener.
07:45 - 09:00: Made up powerpulse and drilcollar. RIH with 36" hole opener from 8 m to 50 m MD. Observed leakage on elevator.
09:00 - 09:15: Changed leaking fitting on DP elevator.
09:15 - 1... | Made up and RIH with 36" hole opener BHA. Drilled 36" x 26" x 17 1/2" hole from 144 m to 226 m MD. Circulated well clean and displaced to 1,40 SG WBM. POOH with 36" hole opener BHA to 50 m MD. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:45: Drilled 36" hole section from 210 m to 17 1/2" TD at 226 m MD. 36" hole section TD 223 m MD. Drilling parameters flow 4400 LPM SPP 72 bar rotation 90 RPM wob 0-3 MT torque 2-9 KNM. Performed survey every 10 m drilled. Final survey at 226 m MD 0,44 deg.
01:45 - 02:30: Circulated 1,5 times bottoms up while... | Racked back BHA and laid out holeopener. Rigged up conductor running equipment. Ran 30" conductor with cementing innerstring. Landed conductor and checked elavation. Installed cement stand and adjusted elevation. Tested cement line. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Ran in with 30" conductor on dedicated landing string to 132 m MD. Filled conductor with 20 m2 seawater until returns thorugh shoe observed. Hookload after filling 109 MT.
01:30 - 02:00: Stung 30" conductor into funnel on f-9 while observing with ROV.
02:00 - 03:00: Ran in with 30" conductor from 148 m t... | Operated conductor centralizer pistons. Circulated well to seawater. Mixed and pumped 54 m3 cement and displaced with 6,5 m3 seawater. WOC. Made measurements on conductor. Released cart. Retrieved cart and innerstring. Installed hatches and prepared for skidding to f-1. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:45: Broke out and racked back cement stand. Pumped 2 ea sponge balls at 2200 LPM to clean string.
00:45 - 03:30: Broke out an set back running cart. Pulled 4 3/4" aluminium inner string using tugger, c-plate and clamps. Meanwhile made digiquartz measurement of conductor housing elevation with ROV. F-9 24 mm ... | None |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:00: Removed hatch on f-9 and installed hatch on f-14 in wellhead module. Meanwhile carried out pre-skidding checklist. Held toolbox talk prior to skidding rig from f-14 to f-9. Skidded rig 1. 5 m port.
03:00 - 04:15: Cleared drilling areas and checked FWD PRS. Checked that all decks were in alignment. Rearra... | Removed scaffolding below centralizer deck. MU and RIH with 17 1/2" BHA. Drilled out 30" shoe and cleaned out rathole. Repaired hydraulic leak in TDS. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:45: Drilled 1 m new formation from 226 m to 227 m MD. Reamed hole and shoe track 3 times. No obstruction. Pulled through shoe track with no rotation. No obstruction. Pumped 10 m3 hi-vis and circulated bu while reciprocating 17 1/2" BHA.
00:45 - 01:15: Drilled 17 1/2" hole from 227 m to 229 m MD. Drilling par... | Drilled 17 1/2" section from 229 m to 784 m MD using SW and hi-vis pills. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Drilled 17 1/2" section from 652 m to 784 m MD. Drilling parameters flow 3440 LPM SPP 99-100 bar wob 2-8 MT torque 2-8 KNM string RPM 40 bit RPM 143. ROP 30-50 m/hr, average ROP 22,0 m/ hrs. Pumped 10 m3 hi-vis sweep for every singel drilled. Performed GMWD survey on connections. Sliding intervals 676 69... | Drilled 17 1/2" section from 784 m to TD at 919 m. Circulated well clean. Displaced open hole and conductor to 1. 40 SG bentonite mud. POOH and RB 17 1/2" BHA. RU for running 20 x 13 3/8" CSG. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:15: Continued MU and RB CMT stand.
00:15 - 06:00: Held tool box meeting prior to RU CSG equipment. RU casing running equipment, 20 ft bails, elevators, CSG tong, slips and FAC tool. Tested CSG tong and checked torque/turn.
06:00 - 12:30: Troubleshot torque/turn fault on m rsk casing tong. No sucess. RD m rsk... | Changed to odfjell casing tong. MU and ran 20 x 13 3/8" CSG to 754 m MD. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: RIH with 13 3/8" CSG from 405 m to 754 m MD. Filled every joint with SW. Average running speed 6 jnts/hr. No tight spots encountered. Up weight 127 MT down weight 108 MT. Changed worn dies on FJE on PRS.
06:00 - 08:00: RD 13 3/8" CSG handling equipment and RU 5 1/2" handling equipment.
08:00 - 09:15: PU ... | Changed to 5 1/2" handling equipment. MU x-over and 18 3/4" wellhead housing assembly. RIH and landed 20 x 13 3/8" CSG. Circulated, pumped and displaced cement. Released cart and POOH. RB landing string and LD cart. Cleared rig floor and prepared for skidding to f-5. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Continued RB landing string in derrick and lo 18 3/4" cart. Cleared and cleaned rig floor area. Prepared for skidding rig to f-5.
| None |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 12:00 - 14:00: Prepared to skid rig. Skidded rig 2. 25 m FWD and 1. 5 m starboard to f-9. Meanwhile MU riser RT to DP STD and RB same.
14:00 - 17:15: Lifted riser spider in to rig floor. Changed 5 1/2" handling equipment to long slings. Transported riser spider close to rotary, removed the master bushing and adapter ri... | Skidded rig from f-5 to f-9. RU for running production riser. Installed riser spider. RIH with TBC and second riser double. Installed guide wires. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Continued to open hatch covers on all levels for f-8, f-9 and f-10.
01:30 - 02:15: Lowered boat collision stool down to centralizer deck. Prepared and lowered flow line hose down to XMT deck.
02:15 - 04:15: RIH with production riser to put guidewire clamp in convenient working height at centralizer deck.... | Continued MU and RIH with production riser. Landed riser and locked tie-back connector. Installed centralizers, boat collision stool and tension ring. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Measured and marked groves on tensioner joint. Installed centralizer and boat collision stool in centralizer deck. Made up contact ring. Made up tensioner assembly half hubs. Raised tensioner assembly to contact ring using tensioner cylinders.
06:00 - 13:30: Continued raising tensioner assembly to contac... | Installed tension cylinders. Cut and beveled riser. Installed multibowl and surface riser. Installed diverter. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: PU 7 MT overpull on riser/multibowl to ensure slips was locked. Released slings from TDS.
00:30 - 02:15: Secured surface riser with BOP horizontal tension system in moonpool. Removed handling slings from surface riser and installed split covers. Meanwhile removed rollers and trolly on HTS.
02:15 - 04:00:... | MU and RIH with 12 1/4" BHA from surface to 862. Washed down with 12 1/4" BHA to 879 m. Drilled out 13 3/8" shoe and rat-hole using SW and hi-vis down to 919 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 04:00: Drilled on cement from 895 m to 909,3 m MD. Drilling parameters flow 3100 LPM SPP 95 bar string RPM 65 wob 2-3 MT torque 4-12 KNM ECD 1. 05 SG. Picked off bottom every 10-15 min to clean bit. Pumped 10 m3 hi-vis before connection at 902 m. Meanwhile MU and RB 9 5/8" CSG. Stds.
04:00 - 06:00: Drilled out ... | Drilled 12 1/4" hole from 919 m to 1083 m MD. Circulated well clean using 3 x btms up. Performed flow check and POOH. LD 12 1/4" BHA. MU and RIH with clean out BHA from surface to 547 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:15: Bo and LD 12 1/4" BHA from 135 m to OOH. Cleaned and cleared rig floor prior to PU clean out BHA.
01:15 - 01:45: Serviced top drive.
01:45 - 03:30: Held tool box meeting. PU and MU bullnose assembly. MU and RIH with 5 1/2" DP from surface to 221 m.
03:30 - 05:15: MU magnet and CSG brush assembly. MU SABS... | Continued RIH with clean out BHA on 5 1/2" DP from 547 m to 1082 m. Circulated well while reciprocating string. Displaced well to salt saturated 1. 20 SG nacl brine. Verified that well was stable. POOH and LD clean out BHA. RU for running 9 5/8" sand screens. MU and RIH with 14 joints of bakerweld screens and 3 joints ... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 05:00: PU and RIH with 9 5/8" 13 cr bakerweld 250 HD screens from 36 to 168 m. Lifted screens from basket on cantilever onto HTS using soft slings. Removed screen protection on rig floor. Installed centralizer and stop collar on box end on each joint.
05:00 - 06:00: PU and RIH with 9 5/8" blank pipe from 168 m ... | None |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 04:45: RIH with 5 STD 5½" HWDP and 5½" DP from 218m to 1050m
04:45 - 05:00: Picked up and made up 6 and 3 m pups.
05:00 - 05:30: Held tool box talk and picked up and made up drop ball sub assy.
05:30 - 05:45: Took up/down weight 125/107 MT. At 1064m.
05:45 - 06:00: Dropped ball and chased same at 200 LPM.
06:00... | Set screen hanger. POOH with screen hanger RT. RIH swab cups. Pumped citric acid and swabbed well. Loss rate from 700, 520, 320, 220, 110 and finally 80 LPM. Total losses during swabbing 93 m POOH to 890m. Located lower swab cup inside the blank pipe. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: Loss rate 320lpm. Filled trip tanks.
00:30 - 01:30: Pulled the upper cup into the blank pipe and swabbed the well for 10mins, 8 times with 20 m strokes 50 m/min. Ran back to 1050 m. Opened the stand pipe valve. Pumped 0. 5 m down DP and displaced clean acid into well bore. Closed stand pipe valve. Let ci... | Pumped 20 m 1. 03 SG nacl packer fluid. Took loss rate at 840m 540 LPM. POOH and l/d BHA. RIH, retrieved bowl protector. Performed tubing hanger dummy run. Lost polypac seal ring in well. Disconnected riser and verified no in well head. Made up riser and diverter. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 04:15: Unable to release riser from well head. Trouble shoot problem. Worked snap ring several times. Found the 12 threaded holes of the riser connector to be damaged, re-cutted the threaded holes. Made up the 12 bolt to correct distance to be able to collapse snap ring probably.
04:15 - 05:00: Pulled surface r... | MU ESP assemblies and connected cable. RIH with ESP from surface to 699m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 06:00: Continued RIH with ESP on 7 5/8" casing in stand from 163m to 699m. Installed cable clamps every joint. Checked the phoenix connection frequently. Running speed 90 m/hr. Parallel activity injected slop in well f14.
06:00 - 09:30: Held tool box and continued RIH with ESP on 7 5/8" casing, picked up single... | Continued RIH with ESP on 7 5/8" tubing from 699m to 806m. Made up tubing hanger and penetrator. Installed the tubing hanger and released RT from same. Nippled down diverter and surface riser. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:15: Rigged down ESP electrical cable and sheave from derrick.
01:15 - 01:45: Held tool box talk, removed redundant equipment from rig floor.
01:45 - 03:15: Rigged up to nipple down diverter and surface riser. Bled off diverter insert and overshot pressure.
03:15 - 03:45: Pulled diverter, parked and secured s... | Installed tubing bonnet. Leak tested tubing bonnet cavity to 69 bar 10 min. Pressure tested penetrator to 69 bar 10 min. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 06:00 - 06:30: Well handed over from production.
06:30 - 09:30: Performed pre job meeting with involved personnel. Prepared for and disconnected surface cable.
09:30 - 10:15: Disconnected flow line and secured same on XMT deck.
10:15 - 10:45: Prepared for lifting of spacer spool.
10:45 - 11:00: Performed TBT prior to c... | Well handed over from production. Removed flowline. Pulled spacer spool and tubing bonnet. Installed surface riser and diverter. RU and pulled 7 5/8" tubing with ESP and cable from 834 m to 746 m. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: RIH to 20 m and engaged hanger. Picked up 36 ton to release hanger. Pulled up, marked landing string and racked back same.
00:30 - 02:00: Positioned and rigged up casing tong.
02:00 - 03:00: Pulled hanger through rotary. Installed master bushing. Cut cable and removed penetrator.
03:00 - 03:30: Broke out... | Prior to pulling tubing out of the hole attempted to break circulation. Found tubing to be plugged and consequently pulled 7-5/8" tubing wet. Retrieved 7-5/8" tubing from 746 m to 21m, disconnected clamps and spooled power cable back on spooling unit. Found tubing fluid to be gradually more solid filled by depth and fi... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:45: Run back in with ESP assemblies. Disconnect bolt on discharge head c/w XO assy, pump, protector assy and motor.
02:45 - 03:15: Rig down schlumberger handling equipment and weatherford casing equipment
03:15 - 04:30: Clean and clear rig floor.
04:30 - 05:30: Picked up wear bushing c/w running tool. RIH to... | Ran in in hole with open ended 5-1/2" DP to 850,1 m and hang up slightly on top of PBR. At 854,5 m took weight and had no further progress. Rotated and washed down from 854,5 m to 892 m. Rigged up seawell and schlumberger surface equipment for WL logging. Picked up tool string and ran in hole with USIT CBL logging stri... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:30: Continued repeat logging pass from 695 m to surface.
03:30 - 04:45: Laid out logging string and rigged down wireline equipment. Discussed barrier situation with onshore. Log interpretation to be found in 14. Logging remarks".
04:45 - 05:45: Changed handling equipment for 5-1/2" DP and rigged up for runni... | Ran in hole with EZSV plug to 878 m and sat same. Pulled running out of the hole. Ran in hole with RTTS test packer and sat same at 222 m. Tested the EZSV from above to 126 bar. Released and retrieve RTTS. Made up cement stinger and ran in hole to 875 m. Circulated btms up with 138 bar/4000 LPM. Pumped 20 m3 of DW spac... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:45: Mixed and pumped 16,8 m3 1,9 SG slurry 800 LPM with cement unit. Displaced cement with 5,1 m3 of DW with cement pump LPM). Cement plug set in the interval 650-878 m.
00:45 - 02:00: Removed cement hose and racked back cementing assembly. Flushed lines. Pulled out of hole from 875 m to 540 m. 3 min/std.
02... | Ran in hole with 12-1/4" mill assembly to 480 m to drift the 13-3/8" casing before whip stock installation. Observed no obstructions. Pulled out of the hole and laid down assembly. Ran in hole with cement stinger on 3-1/2" and 5-1/2" DP and load tested cement plug at 878 650 m. Found solid cement at 655 m and load test... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:15: Pumped 4,5bar/500 LPM, 4,5bar/1000 LPM, 12bar/1500 LPM, 26bar/2000 LPM. Tool failed to operate. Repeated pressure sequences a second time with no success. Made two pressure cycles with 26 bar/2000 LPM and 40bar/2500 LPM. Tool failed to operate.
01:15 - 02:00: Decided to change to back-up tool. Changed ou... | Due to operational problems with multicycle by-pass valve held meeting with service contractors and town to agree on a modified whipstock BHA and setting procedure. Made up and ran in hole trackmaster whipstock and 12-1/4" mill BHA to final setting depth 432 m. Made two wireline/gyro runs and confirmed final toolface t... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:15: Made up string to TDS. Took off bottom parameters up/down 105/102 tons. Tagged whipstock at 421,5 m. top of window). Commenced drilling window. Initially exprienced heavy vibration in string. Experienced an hydraulic leak on TDS.
01:15 - 01:45: Observed hydraulic leak on elevator. Pulled back to 417 m an... | Milled window from 423,8 m to 424,3 m with slow progress. Observed a 50 bar instant drop in SPP. Decided to pull out of hole and found 8-1/8" XO had parted, leaving 7 m of BHA mill watermelon mill) in hole. Top of fish at 417 m. Prepared and modified fishing tool overshot with extension sub and 9" grapple). Ran in hole... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:45: Made up fishing BHA and installed PS-21 slips and sensor on ar.
00:45 - 01:45: Ran in with overshot from surface to 410 m.
01:45 - 02:30: Made up TDS to string and took up/down weight 83/80 ton and free rotation 750 NM. Ran in to 415 m and circulated 2000 LPM/4,4 bar over fish. Reduced flow rate to 1000 ... | Ran in hole with 12-1/4" trackmaster milling assembly and milled window from 424,3 m to 428,2 m. Continued to drill formation and mill window with string mills to 436, 5 m. Water melon mill 2 m out of window. Reamed and dressed the window from 421,5 m to 428,2 m Slided through window with milling assembly. Picking up a... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:00: Continued to drill formation to 436,5 m and reamed window according to instructions from smith rep. Reamed window several times from 421m to 436m 2500 LPM 42 bar RPM 5-9 KNM. Stopped pumping and rotation and slided in from 421m. Taking weight and held up at 421 m and 425 m. Positioned water melon string ... | Pulled out of hole with milling assembly from 200 m to surface. Performed safety check on TDS. Made up and ran in hole with milling assembly and polished window. Pulled out of hole with milling assembly from 435 m to surface. Lo milling assembly. Made up and ran in hole with 12 ¼" BHA to 190 m. Repaired power slips. Ra... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:30: Ran in hole with 12 ¼" BHA from 32 m to 190 m.
02:30 - 03:00: Installed hydraulic power slips. Found leak on hydraulic connection.
03:00 - 03:30: Repaired power slips.
03:30 - 04:00: Ran in hole with 12 ¼" BHA on 5 ½" DP from 190 m to 400 m. Filled pipe.
04:00 - 04:45: Ran in hole from 402 m to 430 m. No... | None |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 04:45 - 05:30: Established circulation with 2800 LPM, 86 bar. Oriented tool face.
05:30 - 06:00: Drilled/oriented 12 1/4" hole from 436 m to 459 m with 2800 LPM, 89 bar, wob 3-5 ton. ROP 45-60 m/hr.
06:00 - 07:15: Drilled/oriented 12 1/4" hole from 459 m to 500 m with 2800 LPM, 89-92 bar, wob 4-7 ton. ROP 45 m/hr.
07:1... | Drilled/oriented 12 1/4" hole from 459 m to 500 m. Removed cuttings blocking auger in lower shakers. Drilled/oriented 12 1/4" hole from 500 m to 511 m. Reamed from 511 m to 473 m to reduce dog leg from 7 deg to 3 deg. Drilled/oriented 12 1/4" hole from 511 m to 553 m. Reamed from 553 m to 525 m to smoothen the well pat... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 05:45: Drilled/oriented 12 1/4" hole from 822 m to 940 m with 3500 LPM, 147-155 bar, 0-40 RPM, 6-12 KNM, wob 4-10 ton. ROP 30-45 m/hr.
05:45 - 06:00: Circulated hole clean prior to drill into utsira formation. 3500 LPM, 150 bar, 40 RPM, 6-10 KNM.
06:00 - 06:30: Circulated hole clean prior to drill into utsira f... | Circulated hole clean prior to drill into utsira formation. Drilled/oriented 12 1/4" hole from 940 m to 997 m. Spotted LCM pill across utsira formation. Pulled out of hole to 915 m. Circulated the hole clean. Displaced well to 1, 40 SG WBM. Pulled out of hole from 915 m to 230 m. Flow checked well. Performed safety che... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:45: Continued to rig up 9 5/8" liner handling equipment on rig floor.
00:45 - 01:30: Picked up 9 5/8" liner shoe and filled same with 1. 40 SG mud and verified integrity of float OK. Made up and ran in hole with 9 5/8" liner intermediate joint tube-locked connection.
01:30 - 02:00: Made up and ran in hole wi... | Changed hose on hydraulic power slips. Made up and ran in hole with 9 5/8" liner from 330 m to 375 m. Changed out joy stick on drillers chair. Made up and ran in hole with 9 5/8" liner from 375 m to 589 m. liner through casing window). Installed liner hanger. RIH with 9 5/8" liner on 5 ½" landing string from 589 m to 9... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: Reduced pump rate to 200 LPM 8 bar, dropped setting ball and pumped same down pipe until landed out in ball seat. Set 9 3/8" liner hanger pressured up to 165 bars for 2 min, than reduced pressure to 70 bars. Set down 25 tons and bled off pressure. Released liner hanger r/t according to weatherford repres... | Pulled out of hole with liner running tool from 370 m to surface. Broke out and laid out liner hanger running tool. Waited on cement, meanwhile, LD 12 ¼" BHA from derrick, PU and racked 8 1/2" BHA, made up and ran in hole with RTTS to 219 m, performed maintenance and service on drilling and pipe handling equipment, cle... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 05:00: Waited on cement. Meanwhile performed maintenance and service on drilling and pipe handling equipment. Cleaned and prepared pits for packer fluid.
05:00 - 06:00: Circulated with 400 LPM, 5 bar to clean RTTS setting area from 215 m to 220 m. Set RTTS at 219 m, installed cement hose. Pressure tested surfac... | Pressure tested TSP liner packer and 9 5/8" liner to 90 bars with sea water. Released and pulled out of hole with RTTS. Picked up and ran in hole with 8 ½" BHA. Drilled out shoe track and cleaned out rat hole. Displaced well to 1. 26 SG soludrill-n WBM. Drilled 8 ½" hole from 997 m to 1206 m. Circulated the hole clean. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 04:45: Drilled/oriented 8 1/2" hole from 1051 m to 1206 m with 1900 LPM, 105-110 bar, 60 RPM, 8-10 KNM, wob 5-9 ton. ROP 40-60 m/hr. ECD 1. 41-1. 43 SG.
04:45 - 05:30: Racked back stand. Attempted to take cluster shot survey, observed torque peaks up to 19 KNM and 20 ton over pull when moving string after 2nd s... | Circulated the hole clean. Attempted to take cluster shot survey. Pulled out of hole and laid out 8 ½" BHA. Made up and ran in hole with cleanout assembly. Displaced well to 1. 20 SG brine. Pumped and displaced wash train, circulated the well clean. Flow checked well. Pulled out of hole with cleanout assembly from 1205... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:15: Dropped 13/4" SABS opening ball. Displaced ball down with 400 LPM, 10 bar. Observed 55 bar pressure increase when ball sheared out ball seat.
00:15 - 00:30: Continued displacing well from 1. 26 SG soludrill to 1. 20 SG nacl brine. 3000 LPM, 38 bar, 40 RPM, 6 KNM.
00:30 - 01:45: Swept well with 15 m3 soap... | Pulled out of hole with cleanout assembly from 743 m to surface. Rigged up liner handling equipment. Ran 6 5/8" screens and liner to 263 m. Ran in hole with liner on 5 ½" DP from 263 m to 1201 m. Set liner hanger and liner hanger packer. Pulled liner running tool out of PBR. Prepared 1. 03 SG brine in pits. Displaced 9... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:00: Continued mixing 1. 03 SG nacl brine. Meanwhile performed general rig maintenance.
02:00 - 02:30: Displaced 9 5/8" and 13 3/8" casing to 1. 03 SG nacl with 3000 LPM, 63 bars.
02:30 - 05:15: Pulled out of hole from 935 m to 15 m. Tripped with reduced speed due to high friction in the well causing vibratio... | Bo and LD liner hanger running tool. Ran in hole with swab cups. Circulated 1 time bu. Pumped citric acid and swabbed well. Monitored loss rate 1. 5 2. 0 m3. Cut and slipped drill line. Repaired gear on dead mans anchor. Reset and tested anti-collision system after cut and slip. Bo side entry sub and kelly cock. Pulled... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:30: Changed out broken bolts in gearbox on dead mans anchor.
02:30 - 03:15: Continued cut and slip operation. Found lock pin on dead mans anchor to be broken.
03:15 - 05:00: Repaired lock pin on dead mans anchor.
05:00 - 05:15: Reset and tested anti collision system.
05:15 - 06:00: Bo side entry sub and kell... | Pumped/bull-headed 30 m3 of 1. 03 SG nacl brine. Pulled lower cup into blank pipe and pumped/bull-headed 20 m3 of 1. 03 SG nacl packer fluid. Pulled above screen hanger and filled annulus with 1. 03 SG packer fluid. Observed that loss rate decreased from 2 m3/min to 40 l/min. Ran in hole and re-swabbed the well. Pulled... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:15: Rigged up and spot ESP equipment.
00:15 - 05:00: Picked up and made up ESP assembly 1 and 2. Connected control lines to motor. Made up ¼" hydraulic line from multisensor gauge. Pumped oil into the motor by a hand pump. Serviced the motor and evacuated the air. Connected up the electrical cable to the mot... | Made up ESP assemblies. Ran in hole with ESP assembly on 7 5/8" tubing to 357 m. Lo totally 8 joints due to bad connections. Installed and oriented tubing hanger. Removed hydraulic power slips and installed master bushing. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:30: Ran 7 5/8" tubing from 273 m to 357 m.
02:30 - 02:45: Performed electrical check of down hole system. Changed inserts in elevator. Confirmed remaining liner joints on deck-ok.
02:45 - 03:15: Made up tubing hanger/swivel assembly.
03:15 - 05:00: Broke fast connection. Oriented the tubing hanger. Made up f... | Installed penetrator incluning seals through hanger. Spaced out and spliced cable. Attached and pressure tested peneterator o-ring to 69 bar 10 min. OK. RIH and landed hanger 20,92m in on landing string. L/d tubing hanger. Removed casing tong. Made several attempts to disconnect riser, no go. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 05:00: Continued attempts to pull riser. Moved riser, adjusted bolts, tried to re-position lock ring.
05:00 - 06:00: Could not disconnect riser from well head. Contacted town, trouble shot.
06:00 - 07:15: Troubleshot problems with lock ring between riser and wellhead. TBT with on comming crew.
07:15 - 11:15: Ad... | Troubleshot problems with lock ring between riser and wellhead. Adjusted release bolts to press lock ring in centre. Took 3 ton over pull, slacked off to neutral. Continued to adjust stroke of bolts. Riser free. Installed spacer spool according to vetco procedures. Took 1 ton overpull verification test. Leak tested cab... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 15:30 - 16:00: Well handed over from production. Held pre-job meeting for removal of flowline and ball valve. Lifted off f-9 hatch cover in moonpool.
16:00 - 18:00: Disconnected flowline from f-9. Secured same on XMT deck.
18:00 - 19:00: Prepared to remove ball valve from flow head assembly.
19:00 - 19:45: Prepared to ... | Well handed over from production. Disconnected flowline. Removed ball valve from spacer spool. Prepared to lift spacer spool and tubing bonnet. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:30: Reconfigured rig up and installed a 5 ton chain hoist for better control over weight taken. Simultaneously loosened alt-2 release bolts. Attempted to lift tubing bonnet and spacer spool, 4 ton overpull, little movement observed, but still not free.
01:30 - 01:45: Removed chain hoist and re-attached doubl... | Removed spacer spool and tubing bonnet. Installed riser and diverter. RIH with tubing hanger RT and m/u same to tubing hanger neck. Released tubing hanger and pulled same above rotary. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:00: Continued installing casing handling equipment. Meanwhile checked banana sheave in derrick. Removed clamp from first tubing joint and cut ESP control cable.
03:00 - 03:15: Performed TBT for l/d hanger and POOH with 7 5/8" tubing.
03:15 - 03:45: B/o tubing hanger assembly with RT. L/d and secured same on ... | L/d tubing hanger and RT to deck. POOH and l/d 5 7/8" tubing with control line. Commenced l/d ESP assemblies. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:30: Pulled out and l/d ESP assemblies. Removed power cable and instrument line to multi sensor. Disconnected power cable from motor. Recovered 4 ea protectorlisers and 1 ea special XO-CLAMP none left in hole.
02:30 - 03:00: Removed casing tong to set back area. Cleaned and cleared rig floor.
03:00 - 04:00: P... | L/d ESP assemblies. Performed multifinger caliper log. Installed boreprotector. RIH and set timelock plug on DP. Attempted to pressure test casing. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:15: Continued troubleshoot loss off pressure. Narrowed causes to a open needle valve on surface wellhead. Closed needle valve.
01:15 - 01:45: Lined rig pumps down string and pumped drill water to above diverter packer and closed same.
01:45 - 02:45: Lined up cement unit to drill string. Pressured up well to ... | Attempted to pressure test casing to 34 bar without success. Released timelock plug and RIH to top of screen hanger with same to drift 9 5/8" liner. Re-set timelock plug in 9 5/8" liner. Made new attempt to pressure test casing. No good test. Released timelock plug and POOH with same. M/u and RIH backup timelock plug t... |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 01:45: Continued RIH with timelock plug on 5 1/2" DP from 168 m to 409 m. Avg. Tripping speed 138 m/hr. Electrical technician had to override/force singnal into control system to be able to operate PRS.
01:45 - 02:15: M/u TDS and washed down to setting depth, 300 LPM. Recorded up/down weights 78 t 86 ton and fr... | Installed back-up timelock plug in 9 5/8" liner. Attempted to pressure test casing without success. POOH with plug RT. Pulled diverter and surface riser. Installed and blinded off tubing bonnet. Lined up cement unit to WH and pressure test well against timelock plug and tubing to 35 bar. Good test. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:45: Released tubing bonnet from wellhead ustilising slings in TDS bails. Pulled tubing bonnet to drill floor.
00:45 - 01:15: P/u surface riser from HTS with assistance from crane. Tailed riser in to well centre. Lowered riser through rotary and landed off in WH. Took overpull to confirm latch. Production dep... | Installed surface riser and diverter. Installed boreprotector. Retrieved timelock plug from 9 5/8" liner. R/u WL and installed me plug in 6 5/8" screen section. Retrived boreprotector. R/u for running tubing and commenced m/u ESP assemblies. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 02:00: Connected pothead to ESP motor
02:00 - 03:15: Serviced seal on protector and filled with oil.
03:15 - 04:15: Installed protectolizer clamps and terminated hydraulic lines. Secured string with manual slips.
04:15 - 04:30: Performed TBT for running 7 5/8" tubing with cable.
04:30 - 05:15: P/u first 7 5/8" ... | RIH with ESP assemblies and cable on 7 5/8" tubing. P/u tubing hanger, m/u and oriented same. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 00:30: M/u fast sleeve to tubing hanger.
00:30 - 00:45: Performed TBT for removing compact spider.
00:45 - 01:00: Removed compact spider and parked same in set back.
01:00 - 01:45: RIH with tubing hanger to working hight. Mounted penetrator in th, measured cable cutting point. Disassembled penetrator and spaced... | Spliced ESP cable below tubing hanger. RIH, landed and tested th. Pulled diverter and surface riser. Installed tubing bonnet, spacer spool and ball valve. Commenced nippling up flowline. |
You are a Rig Supervisor working at an oil and gas offshore drilling operation. Your company is currently on a drilling campaign and you are the on-site Drilling Engineer (DE). As a DE, one of your jobs is to oversee the operations at the drilling rigs. As such, you know the ins and outs of the operation, down to the h... | 00:00 - 03:30: Continued nippling up flow line. Meanwhile installed hatches above f-9. ESP workover on f-9 a finalized. Commisioning to be performed offline.
| Nippled up flowline. ESP workover on f-9 finalized. |