caiotheodoro/plumb-handseeded
Text Generation • Updated
task_id stringlengths 17 17 | seed int64 777 777 | payapp dict | context dict | image_payapp_sha256 stringlengths 64 64 | expected dict | signature stringlengths 64 64 | difficulty float64 0 1 | partition stringclasses 1
value |
|---|---|---|---|---|---|---|---|---|
pay-777-404422868 | 777 | {
"lines": [
{
"description": "Plumbing",
"contract_amount": 282944.47,
"percent_complete": 0.816,
"this_period": 63296.58,
"cumulative": 230921.41,
"balance": 52023.06
},
{
"description": "Insulation",
"contract_amount": 301213.45,
"percent_complete":... | {
"contract_sum": 1954674.06,
"retainage_pct": 0.1,
"prior_cumulative": {
"Plumbing": 167624.83,
"Insulation": 179337.58,
"Structural Steel": 90327.21,
"Millwork": 29676.08,
"Sitework": 144980.57,
"Landscaping": 36363.92,
"Electrical": 41461.21,
"Tile": 74995.18,
"Glass & Glazi... | cc4fe455b7abb55e6b4a57d8659d4ae74a150b60cad78bac96f4320d2d8114d7 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PRIOR_PAYMENT_ERROR",
"severity": "MEDIUM",
"line": "G702 (8)",
"observed": "current due 148286",
"corrected": "current due 147536",
"citation": "G702 (8)",
"correction": "restate current due as 147536"
}
]
} | c8c3135be3f7bf4a42a6b37bb5f9fba91c35ff5390438781fd50cfb000e8d341 | 0.45 | benchmark |
pay-777-056492137 | 777 | {
"lines": [
{
"description": "Sitework",
"contract_amount": 396788.31,
"percent_complete": 0.243,
"this_period": 8819.81,
"cumulative": 96385.92,
"balance": 300402.39
},
{
"description": "Insulation",
"contract_amount": 32854.38,
"percent_complete": 0... | {
"contract_sum": 1573275.47,
"retainage_pct": 0.1,
"prior_cumulative": {
"Sitework": 87566.11,
"Insulation": 24539.39,
"Plumbing": 29682.51,
"Landscaping": 184851.22,
"HVAC": 87914.53,
"Structural Steel": 61520.65
},
"change_orders": [
{
"number": "CO-001",
"approved_a... | c290f3718ec11e73889e71e9f4d035f61a51bed8a783232c0f995f4073f93ce3 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "DOUBLE_COUNT",
"severity": "MEDIUM",
"line": "Sitework",
"observed": "listed 2x at 396788",
"corrected": "listed once",
"citation": "G703",
"correction": "remove the duplicated line"
}
]
} | afbdfe34288b94930e0ae989492ff451a6007be0c9e5a9ed76e9c3d017e2e8bf | 0.81 | benchmark |
pay-777-579057534 | 777 | {
"lines": [
{
"description": "Tile",
"contract_amount": 280249.14,
"percent_complete": 0.83,
"this_period": 16273.73,
"cumulative": 232513.28,
"balance": 47735.86
},
{
"description": "Elevator",
"contract_amount": 24827.51,
"percent_complete": 0.361,
... | {
"contract_sum": 1506167.08,
"retainage_pct": 0.1,
"prior_cumulative": {
"Tile": 216239.55,
"Elevator": 7073.17,
"Demolition": 55187.49,
"Electrical": 104474.41,
"Landscaping": 181190.67,
"Fire Protection": 34003.68,
"Plumbing": 41051.72,
"Drywall": 21915.99
},
"change_orders"... | ae3aacaf5310c3b4463644594faafc6f9e81730a960f549554527a565d6098fe | {
"verdict": "PASS",
"exceptions": []
} | df81d66f258c0b1b5cae93f3cd032c5cb4e211af356fdc21e9aec8fa1702f097 | 0.89 | benchmark |
pay-777-749945348 | 777 | {
"lines": [
{
"description": "Demolition",
"contract_amount": 333253.49,
"percent_complete": 0.641,
"this_period": 39033.19,
"cumulative": 213546.11,
"balance": 119707.38
},
{
"description": "Glass & Glazing",
"contract_amount": 44328.35,
"percent_com... | {
"contract_sum": 1045969.95,
"retainage_pct": 0.1,
"prior_cumulative": {
"Demolition": 174512.92,
"Glass & Glazing": 6647.19,
"Fire Protection": 51297.61,
"Paint": 8629.97,
"Structural Steel": 185172.19
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 7042.27... | 22c93484da6acdd3a0659c7049aa994d7e35af733523e74cbe230c007fd74e17 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "TOTAL_MISMATCH",
"severity": "HIGH",
"line": "G702 (2)",
"observed": "sum of cumulative 517606 vs completed+stored 518606",
"corrected": "completed+stored = 517606",
"citation": "G702 / G703",
"correction": "tie completed+... | b6a30c97098ba1f81ad91894f46452b89d32253296958e984c38465b16171e90 | 0.04 | benchmark |
pay-777-868885353 | 777 | {
"lines": [
{
"description": "HVAC",
"contract_amount": 182758.97,
"percent_complete": 0.256,
"this_period": 13896.04,
"cumulative": 46801.1,
"balance": 135957.87
},
{
"description": "Structural Steel",
"contract_amount": 263247.07,
"percent_complete"... | {
"contract_sum": 1618427.44,
"retainage_pct": 0.1,
"prior_cumulative": {
"HVAC": 32905.06,
"Structural Steel": 190649.7,
"Paint": 34718.8,
"Sitework": 6867.35,
"Insulation": 84367.9,
"Drywall": 106706.99,
"Door Frames": 52117.08,
"Electrical": 101359.42
},
"change_orders": [
... | 2a05fbe512679801820cb3147a2dd12090a02a8ab67a0923f27a1cc648adff5a | {
"verdict": "FLAG",
"exceptions": [
{
"type": "DOUBLE_COUNT",
"severity": "MEDIUM",
"line": "HVAC",
"observed": "listed 2x at 182759",
"corrected": "listed once",
"citation": "G703",
"correction": "remove the duplicated line"
}
]
} | 88d2a7279c46fde5dde085e8176108d61e1c18d47f776a9e748395173e470229 | 0.92 | benchmark |
pay-777-616665647 | 777 | {
"lines": [
{
"description": "Speculaing",
"contract_amount": 397426.47,
"percent_complete": 0.89,
"this_period": 19090.96,
"cumulative": 353610.8,
"balance": 43815.67
},
{
"description": "Demolition",
"contract_amount": 249747.67,
"percent_complete":... | {
"contract_sum": 1643973.44,
"retainage_pct": 0.1,
"prior_cumulative": {
"Speculaing": 334519.84,
"Demolition": 99295.69,
"Millwork": 244879.05,
"Fire Protection": 162245.05,
"Landscaping": 92583.84,
"Structural Steel": 38435.41
},
"change_orders": [
{
"number": "CO-001",
... | 586f9d9669eda6eb3feda1d6900683368a73f48a7646eff865327819f84d8f36 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PRIOR_PAYMENT_ERROR",
"severity": "MEDIUM",
"line": "G702 (8)",
"observed": "current due 115622",
"corrected": "current due 114872",
"citation": "G702 (8)",
"correction": "restate current due as 114872"
}
]
} | 5266f2af172b6db9ed6c14d4f4ba48daf8e0b946501e9a76149081a38ae21dbf | 0.57 | benchmark |
pay-777-095921678 | 777 | {
"lines": [
{
"description": "Paint",
"contract_amount": 385850.53,
"percent_complete": 0.162,
"this_period": 11763.94,
"cumulative": 62662.04,
"balance": 323188.49
},
{
"description": "Roofing",
"contract_amount": 179470.98,
"percent_complete": 0.629... | {
"contract_sum": 2019522.42,
"retainage_pct": 0,
"prior_cumulative": {
"Paint": 50898.1,
"Roofing": 102813.37,
"Landscaping": 224416.01,
"HVAC": 61412.95,
"Masonry": 40616.89,
"Elevator": 170573.39,
"Plumbing": 170344.3,
"Insulation": 35442.17
},
"change_orders": [
{
... | 1a0fb844de48c29e2e10b1f4c171264f583dcef9b5a19cc2c1c9195735ab3018 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PRIOR_PAYMENT_ERROR",
"severity": "MEDIUM",
"line": "G702 (8)",
"observed": "current due 279238",
"corrected": "current due 278488",
"citation": "G702 (8)",
"correction": "restate current due as 278488"
}
]
} | b417ac94ea0418e5d6aea263ac066766bdd9bb36090fdeea7c6d7c717e68dde5 | 0.49 | benchmark |
pay-777-557366330 | 777 | {
"lines": [
{
"description": "Roofing",
"contract_amount": 223370.89,
"percent_complete": 0.281,
"this_period": 3634.68,
"cumulative": 62866.59,
"balance": 160504.3
},
{
"description": "Plumbing",
"contract_amount": 55554.46,
"percent_complete": 0.76,... | {
"contract_sum": 2254661.33,
"retainage_pct": 0.1,
"prior_cumulative": {
"Roofing": 59231.91,
"Plumbing": 37561.92,
"Concrete - Foundation": 55508.37,
"Fire Protection": 258927.07,
"Paint": 210117.04,
"Elevator": 141861.6,
"Structural Steel": 49054.8,
"Tile": 106153.76,
"Lands... | 01a44d9313da8e24e5f7c601fc6314121cbb85c86767a347e5cd4121c8b1011e | {
"verdict": "FLAG",
"exceptions": [
{
"type": "WAIVER_MISSING",
"severity": "MEDIUM",
"line": "waivers",
"observed": "requested 171664 > waiver coverage 85832.1",
"corrected": "waiver coverage >= 171664",
"citation": "waiver packet",
"correction": "obtain waiver coveri... | 73dc4b8617340df95a9bce8b6da54c3e91e30f077ded92b090f938e89b145c23 | 0.67 | benchmark |
pay-777-203721291 | 777 | {
"lines": [
{
"description": "Landscaping",
"contract_amount": 387808.39,
"percent_complete": 1.05,
"this_period": 38635.76,
"cumulative": 167187.73,
"balance": 220620.66
},
{
"description": "Tile",
"contract_amount": 321725.28,
"percent_complete": 0.... | {
"contract_sum": 1441447.54,
"retainage_pct": 0.1,
"prior_cumulative": {
"Landscaping": 128551.97,
"Tile": 161920.36,
"Sitework": 75178.52,
"Plumbing": 181360.46,
"Electrical": 15217.37,
"Elevator": 122856.76
},
"change_orders": [
{
"number": "CO-001",
"approved_amount... | 20bf0522f67b2ed0f53334f317a7844765bbda45f23ed6a9f18792731fd8ae28 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PERCENT_OVERSTATED",
"severity": "LOW",
"line": "Landscaping",
"observed": "% complete 1.050",
"corrected": "<= 1.0",
"citation": "G703 line 1",
"correction": "cap percent complete at 100%"
}
]
} | f681eb7670de1ef26d21f377db47f829cdffff191f9387e01c99f2f6a75bbdf0 | 0.24 | benchmark |
pay-777-166791564 | 777 | {
"lines": [
{
"description": "Electrical",
"contract_amount": 297669.54,
"percent_complete": 0.164,
"this_period": 12019.76,
"cumulative": 48847.83,
"balance": 248821.71
},
{
"description": "Masonry",
"contract_amount": 78611.58,
"percent_complete": 0... | {
"contract_sum": 1595858.33,
"retainage_pct": 0.1,
"prior_cumulative": {
"Electrical": 36828.07,
"Masonry": 15378.91,
"Fire Protection": 161463.98,
"Concrete - Foundation": 239875.89,
"Landscaping": 43444.39,
"Plumbing": 259122.76
},
"change_orders": [
{
"number": "CO-001",
... | 3c43ed5eb17f20c963fa8a2f2b2bd4919dce1fbf1fe2acd6ec3ca1992fe8ea86 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "WAIVER_MISSING",
"severity": "MEDIUM",
"line": "waivers",
"observed": "requested 104481 > waiver coverage 52240.5",
"corrected": "waiver coverage >= 104481",
"citation": "waiver packet",
"correction": "obtain waiver coveri... | 4f43e897e44122c5fb4ede553cdb10ba952963e2e0fe138dfec638290c7ba86f | 0.66 | benchmark |
pay-777-930266245 | 777 | {
"lines": [
{
"description": "Landscaping",
"contract_amount": 286941.91,
"percent_complete": 0.368,
"this_period": 13599.42,
"cumulative": 105538.1,
"balance": 181403.81
},
{
"description": "Speculaing",
"contract_amount": 335933.65,
"percent_complet... | {
"contract_sum": 1132002.82,
"retainage_pct": 0,
"prior_cumulative": {
"Landscaping": 91938.68,
"Speculaing": 223438.61,
"Elevator": 76387.91,
"Sitework": 29663.83,
"Drywall": 84353.21
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 37463.25,
"applied_... | a8089a05656056982c135406acba6c3b2e23ca7e9cd0ee9cc2bb169cf5753c99 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "RETAINAGE_ERROR",
"severity": "MEDIUM",
"line": "G702 (4)",
"observed": "less retainage 500",
"corrected": "less retainage 0",
"citation": "G702 / 0% retainage",
"correction": "restate retainage as 0"
}
]
} | 36c4e0f160ec1a425cc67988c05435e8b246631832a074d6241fe75886b286e0 | 0.38 | benchmark |
pay-777-217913792 | 777 | {
"lines": [
{
"description": "Masonry",
"contract_amount": 183378.94,
"percent_complete": 1.05,
"this_period": 7833.59,
"cumulative": 39051.25,
"balance": 144327.69
},
{
"description": "Glass & Glazing",
"contract_amount": 37298.68,
"percent_complete"... | {
"contract_sum": 937182.2,
"retainage_pct": 0,
"prior_cumulative": {
"Masonry": 31217.66,
"Glass & Glazing": 27060.22,
"Speculaing": 130859.23,
"Fire Protection": 67120.67,
"Demolition": 152670.47
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 7291.72,
... | bc31d9c042236447dc11be461a00f924d70f1607ec740c650c1704b79c66762f | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PERCENT_OVERSTATED",
"severity": "LOW",
"line": "Masonry",
"observed": "% complete 1.050",
"corrected": "<= 1.0",
"citation": "G703 line 1",
"correction": "cap percent complete at 100%"
},
{
"type": "WAIVER_M... | 8252b584000db7a471fe73cfdd3a80ced4fe8743d8d89c16d39685c6b20b6c2b | 0.07 | benchmark |
pay-777-597507000 | 777 | {
"lines": [
{
"description": "Plumbing",
"contract_amount": 224021.52,
"percent_complete": 0.482,
"this_period": 25635.21,
"cumulative": 107912.54,
"balance": 116108.98
},
{
"description": "Glass & Glazing",
"contract_amount": 217203.52,
"percent_comp... | {
"contract_sum": 1691895.73,
"retainage_pct": 0,
"prior_cumulative": {
"Plumbing": 82277.33,
"Glass & Glazing": 116172.5,
"Drywall": 33698.52,
"Roofing": 150641.92,
"HVAC": 62387.36,
"Landscaping": 269494.78,
"Elevator": 84472.73
},
"change_orders": [
{
"number": "CO-001... | de24341093aa68528c615c3ef6226653322c815c4b09885a87f0e80e87db043d | {
"verdict": "FLAG",
"exceptions": [
{
"type": "TOTAL_MISMATCH",
"severity": "HIGH",
"line": "G702 (2)",
"observed": "sum of cumulative 952506 vs completed+stored 953506",
"corrected": "completed+stored = 952506",
"citation": "G702 / G703",
"correction": "tie completed+... | 3152acf7e06c6a8f15982face688bad1621755017d7fbfa7b4785a68004217d3 | 0.44 | benchmark |
pay-777-738199055 | 777 | {
"lines": [
{
"description": "Roofing",
"contract_amount": 172018.62,
"percent_complete": 0.411,
"this_period": 13939.46,
"cumulative": 70674.85,
"balance": 101343.77
},
{
"description": "HVAC",
"contract_amount": 364981.73,
"percent_complete": 0.799,... | {
"contract_sum": 1071719.06,
"retainage_pct": 0.1,
"prior_cumulative": {
"Roofing": 56735.39,
"HVAC": 258239.63,
"Sitework": 128462.01,
"Door Frames": 11650.87,
"Electrical": 114419.7
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 13850.77,
"applied_a... | 61d0cf19f2d512048d87c066408a38fb58d536e87538f7e9ab710fd70ed4fc06 | {
"verdict": "PASS",
"exceptions": []
} | ef5f9db2718c9f8c61a038771f01356430f608f57391b078970626f03648a76e | 0.05 | benchmark |
pay-777-928028770 | 777 | {
"lines": [
{
"description": "Elevator",
"contract_amount": 343480.61,
"percent_complete": 0.466,
"this_period": 35029.77,
"cumulative": 159918.61,
"balance": 183562
},
{
"description": "Plumbing",
"contract_amount": 186687.62,
"percent_complete": 0.3... | {
"contract_sum": 1700240.75,
"retainage_pct": 0.1,
"prior_cumulative": {
"Elevator": 124888.84,
"Plumbing": 62687.23,
"Structural Steel": 55423.27,
"Masonry": 25166.97,
"Millwork": 137728.49,
"Sitework": 190927.99,
"Glass & Glazing": 39140.58,
"Demolition": 18404.71,
"Paint": ... | 72a68e601d219126e186883de5b9af0aeacff79fe280eee36fc5fa7c23e6222c | {
"verdict": "FLAG",
"exceptions": [
{
"type": "OVERPAYMENT",
"severity": "HIGH",
"line": "Paint",
"observed": "cumulative 108004 > contract 98185.8",
"corrected": "cumulative <= 98185.8",
"citation": "G703 line 9",
"correction": "reduce cumulative to the contract amoun... | b17408b9600156be92909faf537b722e0cd713d9cdc7902d54a8b0393683df16 | 0.21 | benchmark |
pay-777-264540246 | 777 | {
"lines": [
{
"description": "HVAC",
"contract_amount": 380835.98,
"percent_complete": 1.001,
"this_period": 33223.64,
"cumulative": 114067.87,
"balance": 266768.11
},
{
"description": "Paint",
"contract_amount": 273407.55,
"percent_complete": 0.744,
... | {
"contract_sum": 1534703.11,
"retainage_pct": 0.05,
"prior_cumulative": {
"HVAC": 80844.23,
"Paint": 146694.96,
"Masonry": 44732.58,
"Drywall": 42035.23,
"Insulation": 13406.37,
"Landscaping": 31571.36,
"Roofing": 14645.16,
"Tile": 23476.71,
"Structural Steel": 75630.85
},
... | 79301f87be09935751ec4848dd52a98fd258af5717d5cc88aa748dcafe125157 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PERCENT_OVERSTATED",
"severity": "LOW",
"line": "HVAC",
"observed": "% complete 1.001",
"corrected": "<= 1.0",
"citation": "G703 line 1",
"correction": "cap percent complete at 100%"
}
]
} | de332ac1f905a323458ed51fb1c84de23dd6f34343c19aa17edac6c86bc19959 | 0.62 | benchmark |
pay-777-378390088 | 777 | {
"lines": [
{
"description": "Drywall",
"contract_amount": 124851.56,
"percent_complete": 0.262,
"this_period": 8381.76,
"cumulative": 32725.61,
"balance": 92125.95
},
{
"description": "Insulation",
"contract_amount": 111208.15,
"percent_complete": 0.... | {
"contract_sum": 996776.69,
"retainage_pct": 0.05,
"prior_cumulative": {
"Drywall": 24343.85,
"Insulation": 44741.46,
"Sitework": 62870.4,
"Speculaing": 24155.82,
"Paint": 111129.06,
"Door Frames": 97223.94
},
"change_orders": [
{
"number": "CO-001",
"approved_amount":... | 7bfa09da30ee0066d863a7591a16d9736e0e36f99f0d81cde00cf548875b3ecd | {
"verdict": "PASS",
"exceptions": []
} | 12878c3ac64b31f7225d7c3cac5c5d56e07b2014a6822d66a1352398f31d6871 | 0.43 | benchmark |
pay-777-104325542 | 777 | {
"lines": [
{
"description": "Paint",
"contract_amount": 397382.31,
"percent_complete": 0.609,
"this_period": 18526.6,
"cumulative": 241905.89,
"balance": 155476.42
},
{
"description": "Drywall",
"contract_amount": 208571.31,
"percent_complete": 0.847... | {
"contract_sum": 2263533.03,
"retainage_pct": 0.1,
"prior_cumulative": {
"Paint": 223379.29,
"Drywall": 127809.6,
"Roofing": 132498.65,
"HVAC": 143337.69,
"Plumbing": 51838.29,
"Landscaping": 61579.53,
"Door Frames": 87996.28,
"Electrical": 7341.39
},
"change_orders": [
{
... | e4268840788bcda75faac7039fe6ae5441ff0fc0c0e3faaafcedc1f0197de9ca | {
"verdict": "FLAG",
"exceptions": [
{
"type": "TOTAL_MISMATCH",
"severity": "HIGH",
"line": "G702 (2)",
"observed": "sum of cumulative 1.02325e+06 vs completed+stored 1.02325e+06",
"corrected": "completed+stored = 1.02325e+06",
"citation": "G702 / G703",
"correction": ... | ea49dd52abce13ebe35e821eeda9023949499370bdf0b8fb3b9bbd6239c8dccb | 0.75 | benchmark |
pay-777-979360236 | 777 | {
"lines": [
{
"description": "Sitework",
"contract_amount": 273719.83,
"percent_complete": 0.259,
"this_period": 21259.76,
"cumulative": 70971.73,
"balance": 202748.1
},
{
"description": "Concrete - Foundation",
"contract_amount": 176909.68,
"percent_... | {
"contract_sum": 1423052.4,
"retainage_pct": 0.1,
"prior_cumulative": {
"Sitework": 49711.97,
"Concrete - Foundation": 79687.06,
"Elevator": 83148.55,
"Glass & Glazing": 122896.01,
"Door Frames": 191494.8,
"Millwork": 41834.99
},
"change_orders": [
{
"number": "CO-001",
... | 704fc693c56c3b4572118b18fb7840bb0a4ffa8caac7bc346f112296aad7e5eb | {
"verdict": "FLAG",
"exceptions": [
{
"type": "RETAINAGE_ERROR",
"severity": "MEDIUM",
"line": "G702 (4)",
"observed": "less retainage 71869.9",
"corrected": "less retainage 71369.9",
"citation": "G702 / 10% retainage",
"correction": "restate retainage as 71369.9"
... | 15bbbcea0f873fc4347e20d7dd65f9b6502b3cae1decf294996457563b58bbc8 | 0.09 | benchmark |
pay-777-636395862 | 777 | {
"lines": [
{
"description": "HVAC",
"contract_amount": 326105.04,
"percent_complete": 0.527,
"this_period": 21628.69,
"cumulative": 171907.03,
"balance": 154198.01
},
{
"description": "Door Frames",
"contract_amount": 377772.44,
"percent_complete": 0... | {
"contract_sum": 2465538.11,
"retainage_pct": 0.1,
"prior_cumulative": {
"HVAC": 150278.34,
"Door Frames": 191036.73,
"Electrical": 6778.2,
"Speculaing": 273679.7,
"Drywall": 65663.48,
"Structural Steel": 65613.76,
"Landscaping": 17312.72,
"Insulation": 197295.11,
"Sitework": ... | 40ca580f75cb0fb9ab6c09d8c7410c9d79fdf9175662004e1ed09e5cea679a5d | {
"verdict": "FLAG",
"exceptions": [
{
"type": "WAIVER_MISSING",
"severity": "MEDIUM",
"line": "waivers",
"observed": "requested 101662 > waiver coverage 50830.9",
"corrected": "waiver coverage >= 101662",
"citation": "waiver packet",
"correction": "obtain waiver coveri... | 9a83a03dd902a4e56fd1ef79b515a678280f211ab9f0c86752c2651b79009c32 | 0.54 | benchmark |
pay-777-966776345 | 777 | {
"lines": [
{
"description": "Millwork",
"contract_amount": 224560.58,
"percent_complete": 0.309,
"this_period": 19959.53,
"cumulative": 69389.33,
"balance": 155171.25
},
{
"description": "Masonry",
"contract_amount": 120926.1,
"percent_complete": 0.3... | {
"contract_sum": 2008769.27,
"retainage_pct": 0.05,
"prior_cumulative": {
"Millwork": 49429.8,
"Masonry": 28870.96,
"Speculaing": 47729.22,
"Roofing": 84586.24,
"Insulation": 99563.68,
"Structural Steel": 43885.79,
"Concrete - Foundation": 35300.58,
"HVAC": 21811.18,
"Door Fra... | d98c25192221b6224a2fc8ca9634fa7a1686bff7e5e094a1e7eaccb626519078 | {
"verdict": "PASS",
"exceptions": []
} | 8e2b82c2dd304d0bb5d56c5b60e8cd30db80d82cbdd0bcf9562032ef6d48658d | 0.88 | benchmark |
pay-777-883030816 | 777 | {
"lines": [
{
"description": "Fire Protection",
"contract_amount": 62233.85,
"percent_complete": 0.238,
"this_period": 869.71,
"cumulative": 14833.18,
"balance": 47400.67
},
{
"description": "Tile",
"contract_amount": 45157.89,
"percent_complete": 0.3... | {
"contract_sum": 1500215.2,
"retainage_pct": 0,
"prior_cumulative": {
"Fire Protection": 13963.47,
"Tile": 12025.71,
"Landscaping": 77893.74,
"Door Frames": 104409.71,
"Speculaing": 51228.06,
"Sitework": 60939.85,
"Drywall": 190663.79,
"Electrical": 38859.76,
"Concrete - Found... | 7fb50f9b2dc8ae3c1283c68264afa84cad593de1b6b056dcbf0bf01995db3783 | {
"verdict": "PASS",
"exceptions": []
} | e0735d02021f30ea3bba56657a44382f170aa21bbd54fbf92dadd132cc73f8fe | 0.5 | benchmark |
pay-777-489155162 | 777 | {
"lines": [
{
"description": "Speculaing",
"contract_amount": 399984.42,
"percent_complete": 0.653,
"this_period": 55048.21,
"cumulative": 261227.93,
"balance": 138756.49
},
{
"description": "Millwork",
"contract_amount": 185238.23,
"percent_complete"... | {
"contract_sum": 1168057.6,
"retainage_pct": 0.1,
"prior_cumulative": {
"Speculaing": 206179.72,
"Millwork": 34464.14,
"Roofing": 15601.22,
"Elevator": 156481.43,
"Concrete - Foundation": 105518.4,
"Paint": 47346.06
},
"change_orders": [
{
"number": "CO-001",
"approved... | c0489c174b9853cd180d77cbb0186677f65e64fe7fb4fc6c0dc5b0d26b029f33 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "WAIVER_MISSING",
"severity": "MEDIUM",
"line": "waivers",
"observed": "requested 50128.2 > waiver coverage 25064.1",
"corrected": "waiver coverage >= 50128.2",
"citation": "waiver packet",
"correction": "obtain waiver cove... | 2ea8f47eb0c6bda476df3248785b8fb53ef89b9f42dc4817fd5b92447402e077 | 0.05 | benchmark |
pay-777-330726673 | 777 | {
"lines": [
{
"description": "Tile",
"contract_amount": 58427.77,
"percent_complete": 0.775,
"this_period": 12356.46,
"cumulative": 45280.2,
"balance": 13147.57
},
{
"description": "Insulation",
"contract_amount": 49262.9,
"percent_complete": 0.734,
... | {
"contract_sum": 1761860.57,
"retainage_pct": 0.05,
"prior_cumulative": {
"Tile": 32923.74,
"Insulation": 31661.18,
"Glass & Glazing": 153536.16,
"Plumbing": 42866.91,
"Paint": 12736.52,
"Fire Protection": 78755.46,
"HVAC": 10639.1,
"Sitework": 23200.51,
"Masonry": 154527.29,
... | 48d90b917b092bfcded9e959f6507748971e0f7a203df10d4dd3f5ddd4b411be | {
"verdict": "PASS",
"exceptions": []
} | e7c50877f38e83dff0d2aa5bf0edc28a41cd51d666d9eeced49a909aa8fceb40 | 0.92 | benchmark |
pay-777-465212467 | 777 | {
"lines": [
{
"description": "Landscaping",
"contract_amount": 144854.64,
"percent_complete": 0.266,
"this_period": 6954.7,
"cumulative": 38477.86,
"balance": 106376.78
},
{
"description": "Plumbing",
"contract_amount": 90885.23,
"percent_complete": 0... | {
"contract_sum": 1453859.7,
"retainage_pct": 0.05,
"prior_cumulative": {
"Landscaping": 31523.16,
"Plumbing": 44720.73,
"Drywall": 41339.19,
"Masonry": 67890.77,
"Fire Protection": 26752.15,
"Sitework": 12465.92,
"Glass & Glazing": 99284.96,
"Elevator": 110125.04
},
"change_or... | 95524ef8e0041004f00a4e7a6bc443b165545b1d52919b2b967122aeec8a5520 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "CO_EXCEEDED",
"severity": "HIGH",
"line": "CO CO-001",
"observed": "applied 18324.4 > approved 15270.3",
"corrected": "applied <= 15270.3",
"citation": "CO CO-001",
"correction": "cap applied to the approved entitlement"
... | 7430cb364c145e8f43626d336d0a54062f3ca00eb241ba73f8d9aefac930e024 | 0.54 | benchmark |
pay-777-501767296 | 777 | {
"lines": [
{
"description": "Millwork",
"contract_amount": 20967.5,
"percent_complete": 0.634,
"this_period": 1114.13,
"cumulative": 13291.5,
"balance": 7676
},
{
"description": "Demolition",
"contract_amount": 320491.11,
"percent_complete": 0.396,
... | {
"contract_sum": 991683.7,
"retainage_pct": 0.1,
"prior_cumulative": {
"Millwork": 12177.37,
"Demolition": 103811.17,
"HVAC": 28856.9,
"Electrical": 95343.02,
"Concrete - Foundation": 51808.82
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 18429.04,
"... | 3fa6ccc7fc0a2f1b70a7fff21b2d17e52c620bb75e8d238e09cd7145ac698b0e | {
"verdict": "PASS",
"exceptions": []
} | d9feada86c4205bbd31d3ab9f9dea925099a92ffe927e8f98f8596cba8fd67bd | 0.75 | benchmark |
pay-777-267369079 | 777 | {
"lines": [
{
"description": "Drywall",
"contract_amount": 333800.13,
"percent_complete": 0.439,
"this_period": 39994.03,
"cumulative": 146675.44,
"balance": 187124.69
},
{
"description": "Millwork",
"contract_amount": 109983.35,
"percent_complete": 0... | {
"contract_sum": 2051598.68,
"retainage_pct": 0,
"prior_cumulative": {
"Drywall": 106681.41,
"Millwork": 56716.1,
"Plumbing": 93025.03,
"HVAC": 3781.21,
"Roofing": 262919.78,
"Tile": 93271.96,
"Concrete - Foundation": 42082.7,
"Electrical": 115980.38,
"Speculaing": 17055.96,
... | d2d2167f1b3bae0c0d8dbf81144bd60036f25007da020639046c79d604ee69ef | {
"verdict": "FLAG",
"exceptions": [
{
"type": "RETAINAGE_ERROR",
"severity": "MEDIUM",
"line": "G702 (4)",
"observed": "less retainage 0.01",
"corrected": "less retainage 0",
"citation": "G702 / 0% retainage",
"correction": "restate retainage as 0"
}
]
} | 9166748d6555856879e4208c2faee6ab7e52a3871d068e8ac1d2ba0943cbbd0c | 0.66 | benchmark |
pay-777-244940883 | 777 | {
"lines": [
{
"description": "Sitework",
"contract_amount": 286411.65,
"percent_complete": 0.644,
"this_period": 11206.57,
"cumulative": 184433.07,
"balance": 101978.58
},
{
"description": "Paint",
"contract_amount": 169973.1,
"percent_complete": 0.71... | {
"contract_sum": 1159353.93,
"retainage_pct": 0.1,
"prior_cumulative": {
"Sitework": 173226.5,
"Paint": 86558.73,
"Masonry": 86890.58,
"Drywall": 90260.74,
"Speculaing": 55257.41
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 15750.21,
"applied_amount... | ea22748be717a558a7cdb86c33931968bd95fd16d6adb360d26f1f6593e66c3c | {
"verdict": "PASS",
"exceptions": []
} | c5650718282554d92eb552508c2b248e7bc41eafd0432c3715e3c69cf2e8fb93 | 0.86 | benchmark |
pay-777-240571666 | 777 | {
"lines": [
{
"description": "Demolition",
"contract_amount": 136548.58,
"percent_complete": 0.634,
"this_period": 22957.84,
"cumulative": 86557.62,
"balance": 49990.96
},
{
"description": "Fire Protection",
"contract_amount": 287528.95,
"percent_comp... | {
"contract_sum": 1549060.12,
"retainage_pct": 0,
"prior_cumulative": {
"Demolition": 63599.78,
"Fire Protection": 188982.54,
"Drywall": 129324.27,
"Concrete - Foundation": 96241.49,
"Elevator": 64261.57,
"Door Frames": 178680.93,
"Plumbing": 42676.48,
"Structural Steel": 5865.88
... | ec822037894cfca618bffb43d8ed7fd2d8207d1714066d24f186b2723f221dc3 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "OVERPAYMENT",
"severity": "HIGH",
"line": "Structural Steel",
"observed": "cumulative 23045.1 > contract 20950.1",
"corrected": "cumulative <= 20950.1",
"citation": "G703 line 8",
"correction": "reduce cumulative to the co... | 849685ffa43459a127ed5a1fbd5297aaa8543c95e9136a08bac847779e36ef37 | 0.94 | benchmark |
pay-777-033075591 | 777 | {
"lines": [
{
"description": "Speculaing",
"contract_amount": 220924.43,
"percent_complete": 0.811,
"this_period": 49246.07,
"cumulative": 179193.63,
"balance": 41730.8
},
{
"description": "Sitework",
"contract_amount": 219430.42,
"percent_complete": ... | {
"contract_sum": 961933.4,
"retainage_pct": 0,
"prior_cumulative": {
"Speculaing": 129947.56,
"Sitework": 93653,
"Elevator": 149889.3,
"Door Frames": 22020.1,
"Fire Protection": 90826.77,
"Roofing": 51636.92
},
"change_orders": [
{
"number": "CO-001",
"approved_amount"... | 0d07e28344e3bcf57b0422b167a3ebd4206cd6781091dd3bd97a179f487c1d57 | {
"verdict": "PASS",
"exceptions": []
} | 0e5664a5fe65ab93a12040c53360236d4b75b00fe47b6fbf21ec588c1ea1a1fe | 0.99 | benchmark |
pay-777-874014082 | 777 | {
"lines": [
{
"description": "Masonry",
"contract_amount": 165499.84,
"percent_complete": 0.874,
"this_period": 23986.68,
"cumulative": 144723.11,
"balance": 20776.73
},
{
"description": "Landscaping",
"contract_amount": 233885.3,
"percent_complete": ... | {
"contract_sum": 468042.72,
"retainage_pct": 0.05,
"prior_cumulative": {
"Masonry": 120736.43,
"Landscaping": 93053.39,
"Demolition": 29776.22,
"Door Frames": 10913.26
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 6756.21,
"applied_amount": 8107.45
}... | 23c5d01f277f3e820ba3587a6fb37ffed0438c158878b347ead263c58f02eef4 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "CO_EXCEEDED",
"severity": "HIGH",
"line": "CO CO-001",
"observed": "applied 8107.45 > approved 6756.21",
"corrected": "applied <= 6756.21",
"citation": "CO CO-001",
"correction": "cap applied to the approved entitlement"
... | 97ec1da1f4d6e75639b332ca3702ec7e8eb2183afcb8939eaef211881b566c13 | 0.5 | benchmark |
pay-777-187868962 | 777 | {
"lines": [
{
"description": "Electrical",
"contract_amount": 76056.48,
"percent_complete": 0.606,
"this_period": 4370.2,
"cumulative": 46095.57,
"balance": 29960.91
},
{
"description": "Door Frames",
"contract_amount": 91388.92,
"percent_complete": 0... | {
"contract_sum": 715852.06,
"retainage_pct": 0.05,
"prior_cumulative": {
"Electrical": 41725.37,
"Door Frames": 74951.98,
"Fire Protection": 17004.93,
"Plumbing": 196996.63
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 35702.9,
"applied_amount": 0
}
... | 7563ce9cc7ee0d50b50a62b5dea29cf50e9d48777bd034e4002b353f737e9b94 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "RETAINAGE_ERROR",
"severity": "MEDIUM",
"line": "G702 (4)",
"observed": "less retainage 22897.2",
"corrected": "less retainage 22397.2",
"citation": "G702 / 5% retainage",
"correction": "restate retainage as 22397.2"
}... | a6cd4bbd825ee1eea4e12754674c0f9623bbdb7fe1e4d9b3245399363d98d910 | 0.08 | benchmark |
pay-777-886307318 | 777 | {
"lines": [
{
"description": "Drywall",
"contract_amount": 298141.5,
"percent_complete": 0.265,
"this_period": 5223.02,
"cumulative": 78915.37,
"balance": 219226.13
},
{
"description": "Glass & Glazing",
"contract_amount": 386013.17,
"percent_complete... | {
"contract_sum": 1861197.06,
"retainage_pct": 0.1,
"prior_cumulative": {
"Drywall": 73692.35,
"Glass & Glazing": 279647.99,
"Tile": 135462.73,
"Electrical": 170615.88,
"Concrete - Foundation": 56003.54,
"Speculaing": 39681.59,
"Door Frames": 42766.56
},
"change_orders": [
{
... | b09d66902dc2c7109c63c0a2ddd30ee579e156bb3253dceb6a1ca4b27a303d24 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "OVERPAYMENT",
"severity": "HIGH",
"line": "Door Frames",
"observed": "cumulative 262336 > contract 238487",
"corrected": "cumulative <= 238487",
"citation": "G703 line 7",
"correction": "reduce cumulative to the contract a... | 9e5bfd601d1e7ee028dcf640f24d1d81223a5221594a77ae05c8277a9c2cd635 | 0.51 | benchmark |
pay-777-770396523 | 777 | {
"lines": [
{
"description": "Demolition",
"contract_amount": 317985.81,
"percent_complete": 0.525,
"this_period": 44426.05,
"cumulative": 166885.25,
"balance": 151100.56
},
{
"description": "Masonry",
"contract_amount": 313010.87,
"percent_complete":... | {
"contract_sum": 1566305.81,
"retainage_pct": 0.05,
"prior_cumulative": {
"Demolition": 122459.2,
"Masonry": 210452.09,
"Drywall": 91489.85,
"Concrete - Foundation": 55365.87,
"Tile": 40507.82,
"Sitework": 81953.98,
"Speculaing": 187485.61
},
"change_orders": [
{
"number... | 6be4bc64b9aa4765ba00e76b31a6ce85a1941015e34e51e6dc6acce05e5af6c2 | {
"verdict": "PASS",
"exceptions": []
} | 9ca055f380761a33d304825fae8218432962edc9216ba39bb4065d23dd61f4d3 | 0.01 | benchmark |
pay-777-677409940 | 777 | {
"lines": [
{
"description": "Insulation",
"contract_amount": 154208.66,
"percent_complete": 0.75,
"this_period": 25510.79,
"cumulative": 115679.98,
"balance": 38528.68
},
{
"description": "Paint",
"contract_amount": 172996.21,
"percent_complete": 0.2... | {
"contract_sum": 1184418.91,
"retainage_pct": 0.1,
"prior_cumulative": {
"Insulation": 90169.19,
"Paint": 30210.12,
"Glass & Glazing": 16687.46,
"Fire Protection": 54173.44,
"HVAC": 95714.45,
"Masonry": 197805.9
},
"change_orders": [
{
"number": "CO-001",
"approved_amo... | d7b2501600c92d95eff1a44f1d451e81572a9e13cf8df2e06b647e8ffaa0e5d2 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "TOTAL_MISMATCH",
"severity": "HIGH",
"line": "G702 (2)",
"observed": "sum of cumulative 617085 vs completed+stored 617085",
"corrected": "completed+stored = 617085",
"citation": "G702 / G703",
"correction": "tie completed+... | d48b0eb9e90a2472297183d4de85ebb3b85956140223e0d343002a517170144f | 0.83 | benchmark |
pay-777-755954997 | 777 | {
"lines": [
{
"description": "Plumbing",
"contract_amount": 31874.09,
"percent_complete": 0.31,
"this_period": 882.17,
"cumulative": 9887.27,
"balance": 21986.82
},
{
"description": "HVAC",
"contract_amount": 285801.25,
"percent_complete": 0.296,
... | {
"contract_sum": 1123888.72,
"retainage_pct": 0.1,
"prior_cumulative": {
"Plumbing": 9005.1,
"HVAC": 65197.56,
"Drywall": 122793.18,
"Glass & Glazing": 125124.57,
"Millwork": 39190.33,
"Paint": 11426.51
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 742... | 45c008c5b47f850db671caeea66b20e6e097bd13e0f03c2a68638f3c86791fbd | {
"verdict": "FLAG",
"exceptions": [
{
"type": "TOTAL_MISMATCH",
"severity": "HIGH",
"line": "G702 (2)",
"observed": "sum of cumulative 441848 vs completed+stored 442848",
"corrected": "completed+stored = 441848",
"citation": "G702 / G703",
"correction": "tie completed+... | ea462f3e8146654123d8eb342501cf9af04800e6a2797e455e529f36b3216a88 | 0.45 | benchmark |
pay-777-315193920 | 777 | {
"lines": [
{
"description": "Landscaping",
"contract_amount": 103315.09,
"percent_complete": 0.663,
"this_period": 10447.61,
"cumulative": 68520.36,
"balance": 34794.73
},
{
"description": "Demolition",
"contract_amount": 391659.66,
"percent_complete... | {
"contract_sum": 1618730.84,
"retainage_pct": 0,
"prior_cumulative": {
"Landscaping": 58072.75,
"Demolition": 208036.37,
"Drywall": 36695.56,
"Tile": 73409.25,
"Millwork": 31681.8,
"Structural Steel": 69173.32,
"Glass & Glazing": 179067.36,
"Speculaing": 103772.36,
"Masonry": ... | b4744426c93c21202ffb2dc42c45f4dfbb4b30152174ad288fec30da6ae8f869 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "OVERPAYMENT",
"severity": "HIGH",
"line": "Masonry",
"observed": "cumulative 89067.4 > contract 80970.4",
"corrected": "cumulative <= 80970.4",
"citation": "G703 line 9",
"correction": "reduce cumulative to the contract am... | 6d391b7d530b03457f7c5bdd243b021b1483c87b99770d89c15893fdc4d6b6de | 0.46 | benchmark |
pay-777-405810306 | 777 | {
"lines": [
{
"description": "Roofing",
"contract_amount": 363845.36,
"percent_complete": 0.364,
"this_period": 20684.72,
"cumulative": 132459.24,
"balance": 231386.12
},
{
"description": "Door Frames",
"contract_amount": 131276.43,
"percent_complete"... | {
"contract_sum": 1160769.99,
"retainage_pct": 0.1,
"prior_cumulative": {
"Roofing": 111774.52,
"Door Frames": 30622.03,
"Speculaing": 37276.18,
"Electrical": 79445.1,
"HVAC": 13017.58,
"Sitework": 87501.84,
"Glass & Glazing": 72812.44
},
"change_orders": [
{
"number": "C... | 6e0eb42c3ee97be52576603b62020b6fba20f127010aa40a91b99acde70d2af1 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PRIOR_PAYMENT_ERROR",
"severity": "MEDIUM",
"line": "G702 (8)",
"observed": "current due 73569.4",
"corrected": "current due 72819.4",
"citation": "G702 (8)",
"correction": "restate current due as 72819.4"
}
]
} | e9a9880a192242ebadbb1155be917884f0377002e0fe9fae52bd6d8043d7fe15 | 0.25 | benchmark |
pay-777-691090484 | 777 | {
"lines": [
{
"description": "Roofing",
"contract_amount": 310778.62,
"percent_complete": 0.268,
"this_period": 5234.64,
"cumulative": 83354.65,
"balance": 227423.97
},
{
"description": "Speculaing",
"contract_amount": 74040.68,
"percent_complete": 0.... | {
"contract_sum": 1472566.73,
"retainage_pct": 0.1,
"prior_cumulative": {
"Roofing": 78120.01,
"Speculaing": 23845.21,
"HVAC": 176964.27,
"Elevator": 76972.69,
"Drywall": 58723.84,
"Insulation": 104891.61
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 34... | 875d4be6a7d634579d06918e1e6194ecc544c8520ec36a8f06c9573dc292777c | {
"verdict": "FLAG",
"exceptions": [
{
"type": "RETAINAGE_ERROR",
"severity": "MEDIUM",
"line": "G702 (4)",
"observed": "less retainage 62531.9",
"corrected": "less retainage 62531.9",
"citation": "G702 / 10% retainage",
"correction": "restate retainage as 62531.9"
... | fee31cdcdc97b4b12fafd8b6ec2968a96c32828ef18d23dd8c6e8d481cba6c03 | 1 | benchmark |
pay-777-671108648 | 777 | {
"lines": [
{
"description": "Landscaping",
"contract_amount": 258070.15,
"percent_complete": 0.805,
"this_period": 54120.93,
"cumulative": 207731.16,
"balance": 50338.99
},
{
"description": "Insulation",
"contract_amount": 201234.71,
"percent_complet... | {
"contract_sum": 1327117.37,
"retainage_pct": 0.1,
"prior_cumulative": {
"Landscaping": 153610.23,
"Insulation": 75380.28,
"Roofing": 277179.74,
"Sitework": 148234.92,
"Speculaing": 119761.94
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 17162.77,
"a... | 3fc049823ec5cf07b1c55503eb8dbd3e244df4870328fe737914faf7c9f24c56 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "RETAINAGE_ERROR",
"severity": "MEDIUM",
"line": "G702 (4)",
"observed": "less retainage 94392.6",
"corrected": "less retainage 93892.6",
"citation": "G702 / 10% retainage",
"correction": "restate retainage as 93892.6"
... | 4266a50737760a9cf625d39492fa41090c7f333628b12f659d691d0c2a939c9f | 0.59 | benchmark |
pay-777-167771201 | 777 | {
"lines": [
{
"description": "Speculaing",
"contract_amount": 170190.7,
"percent_complete": 0.576,
"this_period": 23146.48,
"cumulative": 98068.57,
"balance": 72122.13
},
{
"description": "Electrical",
"contract_amount": 171699.45,
"percent_complete":... | {
"contract_sum": 759569.44,
"retainage_pct": 0.1,
"prior_cumulative": {
"Speculaing": 74922.09,
"Electrical": 132598.52,
"Millwork": 15629.84,
"Sitework": 174278.02,
"Landscaping": 53112.3
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 39486.86,
"appl... | 5ff2c6ed9f25db43e5e735da5fd05172b42a605124091dd2639cadcb3824ca2c | {
"verdict": "FLAG",
"exceptions": [
{
"type": "OVERPAYMENT",
"severity": "HIGH",
"line": "Landscaping",
"observed": "cumulative 132228 > contract 120207",
"corrected": "cumulative <= 120207",
"citation": "G703 line 5",
"correction": "reduce cumulative to the contract a... | 196f0f829d07f420cb3580d3f3ff790ffbda56ad46e669334cfd147f3d858b72 | 0.91 | benchmark |
pay-777-905268106 | 777 | {
"lines": [
{
"description": "Sitework",
"contract_amount": 121180.74,
"percent_complete": 0.213,
"this_period": 7329.55,
"cumulative": 25843.61,
"balance": 95337.13
},
{
"description": "Tile",
"contract_amount": 389250.17,
"percent_complete": 0.845,
... | {
"contract_sum": 1656721.09,
"retainage_pct": 0.05,
"prior_cumulative": {
"Sitework": 19014.06,
"Tile": 254421.47,
"Masonry": 38872.59,
"Demolition": 70175.56,
"Concrete - Foundation": 70305.96,
"Electrical": 47537.5,
"Insulation": 103003.19,
"Glass & Glazing": 16530.39
},
"ch... | ff00e995ec1cfdd69dd366248d0faf492b09c98e9cd547660f10634c3e186c25 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "MATH_ERROR",
"severity": "HIGH",
"line": "Sitework",
"observed": "this-period 7329.55, cumulative 25843.6, prior 19014.1",
"corrected": "this-period 6829.55",
"citation": "G703 line 1",
"correction": "restate this-period a... | 669483be0710e65869803b696d9f52bd590eab3478ff7ef99a2a428d4217afdc | 0.21 | benchmark |
pay-777-920292098 | 777 | {
"lines": [
{
"description": "Demolition",
"contract_amount": 268125.03,
"percent_complete": 0.388,
"this_period": 27114.34,
"cumulative": 103949.09,
"balance": 164175.94
},
{
"description": "Millwork",
"contract_amount": 115042.59,
"percent_complete"... | {
"contract_sum": 1456584.22,
"retainage_pct": 0.1,
"prior_cumulative": {
"Demolition": 76834.75,
"Millwork": 31093.54,
"Fire Protection": 222445.86,
"Masonry": 75163.39,
"Insulation": 44755.36,
"Roofing": 155362.06,
"Speculaing": 31294.66
},
"change_orders": [
{
"number"... | c2aeb1c6aa3f35600361aa1c42db842fe4aa4516c5888a5cafa7f188c4c3664b | {
"verdict": "PASS",
"exceptions": []
} | 2b43bcdaa96a331356c61499301a77fce341cea5411ff41432e7a172ccf6c260 | 0.71 | benchmark |
pay-777-355393992 | 777 | {
"lines": [
{
"description": "Fire Protection",
"contract_amount": 350267.39,
"percent_complete": 0.303,
"this_period": 26726.77,
"cumulative": 106070.37,
"balance": 244197.02
},
{
"description": "Concrete - Foundation",
"contract_amount": 141134.98,
... | {
"contract_sum": 2461611.51,
"retainage_pct": 0.05,
"prior_cumulative": {
"Fire Protection": 79343.6,
"Concrete - Foundation": 80553.73,
"Electrical": 16526.69,
"Plumbing": 89791.74,
"Roofing": 52450.7,
"Millwork": 130112.31,
"Tile": 182284.23,
"Paint": 171717.18,
"Door Frames... | 31e1d63ac9b7addf508bdbfe8d2027528391146d940108ae75c35bb881c2b77e | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PRIOR_PAYMENT_ERROR",
"severity": "MEDIUM",
"line": "G702 (8)",
"observed": "current due 194038",
"corrected": "current due 194038",
"citation": "G702 (8)",
"correction": "restate current due as 194038"
},
{
... | 873938966b43fdf334136c4cf2b36d719066fcc5ca62c9cd40194e87288ddc4e | 0.83 | benchmark |
pay-777-740560660 | 777 | {
"lines": [
{
"description": "Plumbing",
"contract_amount": 323079.9,
"percent_complete": 1.05,
"this_period": 21370.02,
"cumulative": 89249.5,
"balance": 233830.4
},
{
"description": "Insulation",
"contract_amount": 393120.3,
"percent_complete": 0.77... | {
"contract_sum": 1681398.44,
"retainage_pct": 0.1,
"prior_cumulative": {
"Plumbing": 67879.48,
"Insulation": 259567.07,
"HVAC": 3755.48,
"Tile": 141225.8,
"Roofing": 120103.64,
"Landscaping": 94722.34,
"Elevator": 94299.85,
"Glass & Glazing": 21161.58
},
"change_orders": [
... | a881320869b8b6fb62c65324a2fbd8fdbc794ee7fe2b44956d3425f3681c0002 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PERCENT_OVERSTATED",
"severity": "LOW",
"line": "Plumbing",
"observed": "% complete 1.050",
"corrected": "<= 1.0",
"citation": "G703 line 1",
"correction": "cap percent complete at 100%"
}
]
} | b6e4ddde49d60526b5b95570046e4046b8fffa5f7be3564f53b14c9f96b29fe1 | 0.56 | benchmark |
pay-777-499380107 | 777 | {
"lines": [
{
"description": "Drywall",
"contract_amount": 396007.58,
"percent_complete": 0.337,
"this_period": 17450.1,
"cumulative": 133563.43,
"balance": 262444.15
},
{
"description": "Insulation",
"contract_amount": 164931.49,
"percent_complete": ... | {
"contract_sum": 2036642.69,
"retainage_pct": 0.1,
"prior_cumulative": {
"Drywall": 116113.33,
"Insulation": 115829.53,
"Electrical": 172577.37,
"Landscaping": 59155.38,
"Glass & Glazing": 18440.24,
"Speculaing": 19078.15,
"Door Frames": 211647.15,
"Structural Steel": 40362.22,
... | e12f20a72c79af4ff81a451f54ad859c65d697e35ceed64da5879880395f24f3 | {
"verdict": "PASS",
"exceptions": []
} | 513ab296df13aa28408515719f5e9d2eb521d6768d2f922f9b286782a6107087 | 0.26 | benchmark |
pay-777-440926605 | 777 | {
"lines": [
{
"description": "Roofing",
"contract_amount": 50944.18,
"percent_complete": 0.316,
"this_period": 3064.03,
"cumulative": 16103.39,
"balance": 34840.79
},
{
"description": "Fire Protection",
"contract_amount": 47543.87,
"percent_complete":... | {
"contract_sum": 1062164.74,
"retainage_pct": 0.1,
"prior_cumulative": {
"Roofing": 13539.36,
"Fire Protection": 22639.83,
"Door Frames": 138320.72,
"Sitework": 42210.17,
"Plumbing": 154837.17
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 20050.87,
"... | d827983aafe79d8a1a4e9a17f1a27264a5e9eea3592b8ae91d600a1880baf4c7 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "MATH_ERROR",
"severity": "HIGH",
"line": "Roofing",
"observed": "this-period 3064.03, cumulative 16103.4, prior 13539.4",
"corrected": "this-period 2564.03",
"citation": "G703 line 1",
"correction": "restate this-period as... | b5099e7b3bfe6881120693aa7373efae100828cc405589cada0ca8b226a88ff7 | 0.4 | benchmark |
pay-777-040432119 | 777 | {
"lines": [
{
"description": "Electrical",
"contract_amount": 357673.37,
"percent_complete": 1.001,
"this_period": 32632.52,
"cumulative": 193944.09,
"balance": 163729.28
},
{
"description": "Glass & Glazing",
"contract_amount": 157770.23,
"percent_co... | {
"contract_sum": 1423421.23,
"retainage_pct": 0.05,
"prior_cumulative": {
"Electrical": 161311.58,
"Glass & Glazing": 60520.62,
"Demolition": 15532.53,
"Speculaing": 4320.87,
"Structural Steel": 131938.31,
"Elevator": 92657.98,
"Drywall": 212275.65
},
"change_orders": [
{
... | 52ef3cbb1e531fa247c2d3a5268034b3e121aeb7984506b5ba1821e63d819286 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "MATH_ERROR",
"severity": "HIGH",
"line": "Electrical",
"observed": "this-period 32632.5, cumulative 193944, prior 161312",
"corrected": "this-period 32632.5",
"citation": "G703 line 1",
"correction": "restate this-period a... | f76898ed8967749e20ebffd915df28297d6b31e1760314ca674a058c1ae2c9e2 | 0.89 | benchmark |
pay-777-640531067 | 777 | {
"lines": [
{
"description": "Structural Steel",
"contract_amount": 195032.43,
"percent_complete": 0.805,
"this_period": 19582.99,
"cumulative": 156972.67,
"balance": 38059.76
},
{
"description": "Fire Protection",
"contract_amount": 130346.67,
"perce... | {
"contract_sum": 1441095.78,
"retainage_pct": 0.1,
"prior_cumulative": {
"Structural Steel": 137389.68,
"Fire Protection": 58851.81,
"Masonry": 189604.77,
"Tile": 193303.43,
"Sitework": 122919.37,
"Door Frames": 10971.92,
"Glass & Glazing": 45144.33
},
"change_orders": [
{
... | 684f84e0fc1eef9659b033098377eb7ee979811742997514057bb2969de3de6f | {
"verdict": "FLAG",
"exceptions": [
{
"type": "CO_EXCEEDED",
"severity": "HIGH",
"line": "CO CO-001",
"observed": "applied 11949.2 > approved 9957.64",
"corrected": "applied <= 9957.64",
"citation": "CO CO-001",
"correction": "cap applied to the approved entitlement"
... | a4256c647066f87250776ff4977914c399609b0d687b4b03da177cadfdec4ddf | 0.41 | benchmark |
pay-777-510749469 | 777 | {
"lines": [
{
"description": "Masonry",
"contract_amount": 106416.97,
"percent_complete": 0.267,
"this_period": 7046.43,
"cumulative": 28365.76,
"balance": 78051.21
},
{
"description": "Glass & Glazing",
"contract_amount": 342332.6,
"percent_complete"... | {
"contract_sum": 1700075.26,
"retainage_pct": 0.1,
"prior_cumulative": {
"Masonry": 21319.33,
"Glass & Glazing": 50429.27,
"Structural Steel": 17306.27,
"Speculaing": 209466.26,
"Electrical": 30367.21,
"Sitework": 96070.28,
"Door Frames": 44228.5,
"Demolition": 137120.49
},
"c... | bfcd31ce43f74f4b005cb453f69eda3afc2a510dd8a772422b5fc4764322fdbd | {
"verdict": "FLAG",
"exceptions": [
{
"type": "OVERPAYMENT",
"severity": "HIGH",
"line": "Demolition",
"observed": "cumulative 279064 > contract 253695",
"corrected": "cumulative <= 253695",
"citation": "G703 line 8",
"correction": "reduce cumulative to the contract am... | bd60f19f99b0ad40412b3a7ac040029c28d3001132a435336be74c84b8599032 | 0.06 | benchmark |
pay-777-767240256 | 777 | {
"lines": [
{
"description": "HVAC",
"contract_amount": 177038.07,
"percent_complete": 0.462,
"this_period": 22726.54,
"cumulative": 81832.65,
"balance": 95205.42
},
{
"description": "Roofing",
"contract_amount": 52837.13,
"percent_complete": 0.554,
... | {
"contract_sum": 445076.17,
"retainage_pct": 0.05,
"prior_cumulative": {
"HVAC": 59106.11,
"Roofing": 26712.82,
"Tile": 69724.74,
"Masonry": 17345.59
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 16953.37,
"applied_amount": 0
}
],
"waiver_amount"... | 705130a72dface2324e38c222660658d0fbf9877f7ac50055d1002219f6f770a | {
"verdict": "FLAG",
"exceptions": [
{
"type": "TOTAL_MISMATCH",
"severity": "HIGH",
"line": "G702 (2)",
"observed": "sum of cumulative 219560 vs completed+stored 220560",
"corrected": "completed+stored = 219560",
"citation": "G702 / G703",
"correction": "tie completed+... | a49ea591545be9dc6152effa116aa69ca9bf0ae4bafb7c72340e3540451db45a | 0.14 | benchmark |
pay-777-439256423 | 777 | {
"lines": [
{
"description": "Sitework",
"contract_amount": 38163.57,
"percent_complete": 0.744,
"this_period": 2275.93,
"cumulative": 28398.08,
"balance": 9765.49
},
{
"description": "Demolition",
"contract_amount": 172474.65,
"percent_complete": 0.7... | {
"contract_sum": 825536.4,
"retainage_pct": 0,
"prior_cumulative": {
"Sitework": 26122.15,
"Demolition": 114393.47,
"Tile": 41793.59,
"Plumbing": 91252.45,
"Drywall": 31126.43,
"Roofing": 93269.16
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 30084.21,... | 4fa12b026239d1a5c686fa5e1b4e5218919768a0109c12621f7ac6e10f3a8af4 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PRIOR_PAYMENT_ERROR",
"severity": "MEDIUM",
"line": "G702 (8)",
"observed": "current due 96215.8",
"corrected": "current due 95465.8",
"citation": "G702 (8)",
"correction": "restate current due as 95465.8"
}
]
} | 1ea53a748e9561f6f6eeef33b512b2f898aabd51d063382a67b78571adfe1081 | 0.14 | benchmark |
pay-777-681208715 | 777 | {
"lines": [
{
"description": "Demolition",
"contract_amount": 353095.02,
"percent_complete": 0.584,
"this_period": 35339.86,
"cumulative": 206103.39,
"balance": 146991.63
},
{
"description": "Masonry",
"contract_amount": 374581.52,
"percent_complete":... | {
"contract_sum": 2393768.69,
"retainage_pct": 0.1,
"prior_cumulative": {
"Demolition": 170763.53,
"Masonry": 150253.34,
"Sitework": 18601.09,
"Concrete - Foundation": 165322.12,
"Structural Steel": 41244.76,
"Fire Protection": 74528.75,
"HVAC": 168537.95,
"Tile": 205552.87,
"E... | ee1dfa644bff2dcefc3723b1219cb54a05824f4036547763e13a0083588f59b0 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "CO_EXCEEDED",
"severity": "HIGH",
"line": "CO CO-001",
"observed": "applied 27736.9 > approved 23114.1",
"corrected": "applied <= 23114.1",
"citation": "CO CO-001",
"correction": "cap applied to the approved entitlement"
... | 2b4cd5a509e97cccb25dfbfadbbdafda09c9397df44cc2dfdb4cf4cf42726d9b | 0.72 | benchmark |
pay-777-450017478 | 777 | {
"lines": [
{
"description": "Speculaing",
"contract_amount": 264106.89,
"percent_complete": 0.846,
"this_period": 37194.85,
"cumulative": 223314.84,
"balance": 40792.05
},
{
"description": "Electrical",
"contract_amount": 171370.93,
"percent_complete... | {
"contract_sum": 1897428.24,
"retainage_pct": 0,
"prior_cumulative": {
"Speculaing": 186119.99,
"Electrical": 49139.91,
"Elevator": 147510.1,
"Plumbing": 220900.29,
"Structural Steel": 163920.62,
"Concrete - Foundation": 188267.58,
"Tile": 7838.29,
"Fire Protection": 56467.42
},... | 0dd9a00eef8e4f4900819689335349d81a22e41ddc87ffe9a0c6dcc9b5410ade | {
"verdict": "FLAG",
"exceptions": [
{
"type": "CO_EXCEEDED",
"severity": "HIGH",
"line": "CO CO-001",
"observed": "applied 46440 > approved 38700",
"corrected": "applied <= 38700",
"citation": "CO CO-001",
"correction": "cap applied to the approved entitlement"
}
... | 64e91d9c944c184fc37c90366029dc4dda117ad189f6a06aa26809ed31548b63 | 0.16 | benchmark |
pay-777-801809405 | 777 | {
"lines": [
{
"description": "Door Frames",
"contract_amount": 28505.57,
"percent_complete": 0.194,
"this_period": 1074.17,
"cumulative": 5543.76,
"balance": 22961.81
},
{
"description": "Insulation",
"contract_amount": 369148.1,
"percent_complete": 0... | {
"contract_sum": 1902384.62,
"retainage_pct": 0.05,
"prior_cumulative": {
"Door Frames": 4469.59,
"Insulation": 188381.69,
"Elevator": 105953.86,
"Landscaping": 137065.15,
"Plumbing": 29953.42,
"Roofing": 226229.13,
"Sitework": 132067.01
},
"change_orders": [
{
"number":... | 51feaeb3763c5752a77a434411c9713c3f0092fbd81e4bebc93204f5aca4146c | {
"verdict": "PASS",
"exceptions": []
} | f31b6d245c13a91bc703fb643fb5cda3f0cd20c7fe92bf395c55d3e4b2761eff | 0.84 | benchmark |
pay-777-058950105 | 777 | {
"lines": [
{
"description": "Fire Protection",
"contract_amount": 139350.2,
"percent_complete": 0.763,
"this_period": 7851.29,
"cumulative": 106314.15,
"balance": 33036.05
},
{
"description": "Plumbing",
"contract_amount": 27462.64,
"percent_complete... | {
"contract_sum": 1489036.27,
"retainage_pct": 0.05,
"prior_cumulative": {
"Fire Protection": 98462.86,
"Plumbing": 11253.94,
"Landscaping": 95878.22,
"Roofing": 37197.46,
"Insulation": 82967.52,
"Door Frames": 122471.32,
"Electrical": 174827.11,
"Millwork": 39066.56,
"Tile": 6... | 95aea381dd693cb90f65579e2abb6787c80f39d5b7a1ce840950a5da608d12c5 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "TOTAL_MISMATCH",
"severity": "HIGH",
"line": "G702 (2)",
"observed": "sum of cumulative 786902 vs completed+stored 787902",
"corrected": "completed+stored = 786902",
"citation": "G702 / G703",
"correction": "tie completed+... | b819a1228a1957e62466de3c8b0d6bd8ee7ee94d6b08a0d52be138ee79f3ab03 | 0.55 | benchmark |
pay-777-406263595 | 777 | {
"lines": [
{
"description": "Speculaing",
"contract_amount": 69995.57,
"percent_complete": 0.725,
"this_period": 14532.59,
"cumulative": 50731.74,
"balance": 19263.83
},
{
"description": "Demolition",
"contract_amount": 357670.12,
"percent_complete":... | {
"contract_sum": 886003.77,
"retainage_pct": 0.1,
"prior_cumulative": {
"Speculaing": 36199.15,
"Demolition": 118855.29,
"Insulation": 97301.79,
"Concrete - Foundation": 10774.16,
"Millwork": 36805.83
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 34473.06,... | 802a478d6533211abcaf0f24fb632e9cb061eb227d51031bc800497054b790dd | {
"verdict": "FLAG",
"exceptions": [
{
"type": "TOTAL_MISMATCH",
"severity": "HIGH",
"line": "G702 (2)",
"observed": "sum of cumulative 371103 vs completed+stored 372103",
"corrected": "completed+stored = 371103",
"citation": "G702 / G703",
"correction": "tie completed+... | 4d33ad0dd1bda9fa9d1e1c37dcc7701a9141aec5243b8e0eecdfcae0021ad972 | 0.2 | benchmark |
pay-777-014382905 | 777 | {
"lines": [
{
"description": "Speculaing",
"contract_amount": 36248.17,
"percent_complete": 0.404,
"this_period": 4066.92,
"cumulative": 14638.69,
"balance": 21609.48
},
{
"description": "Plumbing",
"contract_amount": 195604.15,
"percent_complete": 0.... | {
"contract_sum": 1366030.9,
"retainage_pct": 0,
"prior_cumulative": {
"Speculaing": 10571.77,
"Plumbing": 119967.33,
"Sitework": 110827.53,
"Roofing": 150542.87,
"Insulation": 53326.47,
"Landscaping": 194308.65
},
"change_orders": [
{
"number": "CO-001",
"approved_amou... | 7dbea16cb5a19a097f6edc0612d048d3de3f22536851acc903d73a96ea5d0ff5 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "DOUBLE_COUNT",
"severity": "MEDIUM",
"line": "Speculaing",
"observed": "listed 2x at 36248.2",
"corrected": "listed once",
"citation": "G703",
"correction": "remove the duplicated line"
}
]
} | a4edb92a9f80cd8417f840cfb9b88c78965e8b92fbfc52fd5b78a817db5a00e2 | 0.18 | benchmark |
pay-777-147488105 | 777 | {
"lines": [
{
"description": "Millwork",
"contract_amount": 272065.7,
"percent_complete": 0.892,
"this_period": 55424.22,
"cumulative": 242717.94,
"balance": 29347.76
},
{
"description": "Sitework",
"contract_amount": 265079.48,
"percent_complete": 0.... | {
"contract_sum": 1605247.83,
"retainage_pct": 0,
"prior_cumulative": {
"Millwork": 187293.73,
"Sitework": 37386.37,
"Insulation": 76251.47,
"Tile": 62399.14,
"HVAC": 264635.3,
"Electrical": 32980.11,
"Paint": 26572.57,
"Demolition": 148445.69
},
"change_orders": [
{
... | 4e6c3cc793af8d57e7bf3fd8c1857beb0879259f4b23d51a540563eccf5d335c | {
"verdict": "FLAG",
"exceptions": [
{
"type": "MATH_ERROR",
"severity": "HIGH",
"line": "Millwork",
"observed": "this-period 55424.2, cumulative 242718, prior 187294",
"corrected": "this-period 55424.2",
"citation": "G703 line 1",
"correction": "restate this-period as ... | c8a8e8279484406d8f0bb04b6c207ee01d59612d7ddc9ae6169b1e9bf33e922b | 0.61 | benchmark |
pay-777-078658896 | 777 | {
"lines": [
{
"description": "Speculaing",
"contract_amount": 207495.56,
"percent_complete": 0.82,
"this_period": 37855.53,
"cumulative": 170097.79,
"balance": 37397.77
},
{
"description": "HVAC",
"contract_amount": 205339.34,
"percent_complete": 0.29... | {
"contract_sum": 982338.77,
"retainage_pct": 0.1,
"prior_cumulative": {
"Speculaing": 132242.26,
"HVAC": 46908.03,
"Tile": 7660.41,
"Roofing": 58440.12,
"Plumbing": 87003.27
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 20242.78,
"applied_amount": 0
... | 62d971f17f91e8091072e72897553088cff16149cee7acfbf7df1689d196c924 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "DOUBLE_COUNT",
"severity": "MEDIUM",
"line": "Speculaing",
"observed": "listed 2x at 207496",
"corrected": "listed once",
"citation": "G703",
"correction": "remove the duplicated line"
}
]
} | a16ac9e5836f6a6713a2672c79f7c3500c3d75f338bc578772b828b03d050ef7 | 0.42 | benchmark |
pay-777-993119183 | 777 | {
"lines": [
{
"description": "Electrical",
"contract_amount": 34367.34,
"percent_complete": 0.688,
"this_period": 5747.63,
"cumulative": 23628.32,
"balance": 10739.02
},
{
"description": "Demolition",
"contract_amount": 143665,
"percent_complete": 0.3... | {
"contract_sum": 713840.17,
"retainage_pct": 0.05,
"prior_cumulative": {
"Electrical": 17880.69,
"Demolition": 44560.84,
"Speculaing": 80836.5,
"Drywall": 125148.06,
"Plumbing": 14528.28
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 16665.49,
"applie... | 69b3397791fb9407a2f0165c22b6cbf8dc51f417225dd74f292f35aa855e2c66 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "TOTAL_MISMATCH",
"severity": "HIGH",
"line": "G702 (2)",
"observed": "sum of cumulative 315583 vs completed+stored 316583",
"corrected": "completed+stored = 315583",
"citation": "G702 / G703",
"correction": "tie completed+... | 16f0f917dbc6a7b88952c974d50ef8035a946d205107ea8bbe741373dac8675d | 0.55 | benchmark |
pay-777-439357490 | 777 | {
"lines": [
{
"description": "Tile",
"contract_amount": 198751.41,
"percent_complete": 0.871,
"this_period": 18879.75,
"cumulative": 173035.17,
"balance": 25716.24
},
{
"description": "Fire Protection",
"contract_amount": 342742.16,
"percent_complete"... | {
"contract_sum": 2008178.43,
"retainage_pct": 0.05,
"prior_cumulative": {
"Tile": 154155.42,
"Fire Protection": 140937,
"Door Frames": 27159.05,
"Sitework": 17937.05,
"Landscaping": 143798.78,
"Speculaing": 244528.59,
"Elevator": 253641.2,
"Plumbing": 163688.1,
"Structural Ste... | c358dd257cf5d589ac85fe4c6e5c3e00aba7c62ea70b608725a211788b14f5e5 | {
"verdict": "PASS",
"exceptions": []
} | 06b308542cadb65d2046b8bcbfcd227785d7fc88b58a86b6d52e3bc90e411a11 | 0.47 | benchmark |
pay-777-607244149 | 777 | {
"lines": [
{
"description": "Millwork",
"contract_amount": 149367.72,
"percent_complete": 0.158,
"this_period": 4630.73,
"cumulative": 23608.61,
"balance": 125759.11
},
{
"description": "HVAC",
"contract_amount": 133103.86,
"percent_complete": 0.233,... | {
"contract_sum": 1792628.38,
"retainage_pct": 0.1,
"prior_cumulative": {
"Millwork": 18977.89,
"HVAC": 27446.54,
"Demolition": 43701.17,
"Masonry": 90336.18,
"Structural Steel": 41828.02,
"Fire Protection": 33355.9,
"Glass & Glazing": 116957.82,
"Elevator": 141681.59,
"Specula... | d125797a40b9049436927b467939e539237b658ac408abb7f68b80e62c51c2b4 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "MATH_ERROR",
"severity": "HIGH",
"line": "Millwork",
"observed": "this-period 4630.73, cumulative 23608.6, prior 18977.9",
"corrected": "this-period 4630.72",
"citation": "G703 line 1",
"correction": "restate this-period a... | 192d56b87645f81cdd18834a1b7bb758898681d82fab36f0b42e5895916daad4 | 0.95 | benchmark |
pay-777-181825367 | 777 | {
"lines": [
{
"description": "Masonry",
"contract_amount": 307371.28,
"percent_complete": 0.536,
"this_period": 25352.74,
"cumulative": 164864.86,
"balance": 142506.42
},
{
"description": "Elevator",
"contract_amount": 262549.94,
"percent_complete": 0... | {
"contract_sum": 1160116.79,
"retainage_pct": 0.1,
"prior_cumulative": {
"Masonry": 139512.12,
"Elevator": 63549.65,
"Glass & Glazing": 140312.31,
"Roofing": 89390.26,
"Door Frames": 73840.52,
"Millwork": 18443.06
},
"change_orders": [
{
"number": "CO-001",
"approved_a... | 1458e2d69f7e596c2e23e1045a08fa076d2946ce6da231022451e3dd46b6c3fb | {
"verdict": "PASS",
"exceptions": []
} | 378b16edf188da07bdd9bd0c11071b3c8dc675b4df4748f6ded7f92ec459e957 | 0.44 | benchmark |
pay-777-933289525 | 777 | {
"lines": [
{
"description": "Fire Protection",
"contract_amount": 322672.66,
"percent_complete": 0.728,
"this_period": 56195.61,
"cumulative": 234811.48,
"balance": 87861.18
},
{
"description": "Concrete - Foundation",
"contract_amount": 289734.76,
"... | {
"contract_sum": 1993766.18,
"retainage_pct": 0.1,
"prior_cumulative": {
"Fire Protection": 179115.87,
"Concrete - Foundation": 171199.59,
"Structural Steel": 4253.13,
"Door Frames": 73052.35,
"Roofing": 90640.85,
"Paint": 58222.83,
"Drywall": 55620.5,
"Landscaping": 65783.02,
... | 42b059e49769c9b930c6cd117a4b34b92a53aab7772ab676b58d3daca1d91755 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "MATH_ERROR",
"severity": "HIGH",
"line": "Fire Protection",
"observed": "this-period 56195.6, cumulative 234811, prior 179116",
"corrected": "this-period 55695.6",
"citation": "G703 line 1",
"correction": "restate this-per... | 8bd03c3a809b16e47cbbaa6318d69703d87cda413cc4f8610ea1d84f03c113b8 | 0.39 | benchmark |
pay-777-079045462 | 777 | {
"lines": [
{
"description": "Landscaping",
"contract_amount": 139871.84,
"percent_complete": 0.633,
"this_period": 13145.67,
"cumulative": 88544.96,
"balance": 51326.88
},
{
"description": "Plumbing",
"contract_amount": 20591.62,
"percent_complete": ... | {
"contract_sum": 1378602.85,
"retainage_pct": 0.05,
"prior_cumulative": {
"Landscaping": 75399.29,
"Plumbing": 12132.09,
"Elevator": 128621.88,
"Demolition": 25653.2,
"Roofing": 151945.81,
"HVAC": 26683.03,
"Fire Protection": 81272.25,
"Millwork": 11032.67
},
"change_orders": ... | 260cc57e0fbe82e934232fc12edc8bece9d75f0e072ce7bf315eb5e8bf904dc9 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "OVERPAYMENT",
"severity": "HIGH",
"line": "Millwork",
"observed": "cumulative 29526.6 > contract 26842.3",
"corrected": "cumulative <= 26842.3",
"citation": "G703 line 8",
"correction": "reduce cumulative to the contract a... | 1b0246243bc7c81e3333e93c425126c759053a61f51b04e11f95219b524a1151 | 0.05 | benchmark |
pay-777-240788055 | 777 | {
"lines": [
{
"description": "Drywall",
"contract_amount": 113233.78,
"percent_complete": 0.211,
"this_period": 5131.77,
"cumulative": 23908.9,
"balance": 89324.88
},
{
"description": "Plumbing",
"contract_amount": 246243.24,
"percent_complete": 0.172... | {
"contract_sum": 950846.42,
"retainage_pct": 0.1,
"prior_cumulative": {
"Drywall": 18777.13,
"Plumbing": 36100.55,
"Concrete - Foundation": 88669.54,
"Structural Steel": 168261.42
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 20887.32,
"applied_amount": ... | 64f7fd2adde3e7fda959fee302812aa6870e39568a814d13f9181fa9c9513fd9 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PRIOR_PAYMENT_ERROR",
"severity": "MEDIUM",
"line": "G702 (8)",
"observed": "current due 54684.3",
"corrected": "current due 53934.3",
"citation": "G702 (8)",
"correction": "restate current due as 53934.3"
},
{
... | 47b57af2b474bd85e5947d32a5e3b38852ea9221fd9375b66dd409e3ecd151ca | 0.4 | benchmark |
pay-777-682334048 | 777 | {
"lines": [
{
"description": "Plumbing",
"contract_amount": 178096.27,
"percent_complete": 0.311,
"this_period": 13909.43,
"cumulative": 55342.6,
"balance": 122753.67
},
{
"description": "Structural Steel",
"contract_amount": 240416.6,
"percent_comple... | {
"contract_sum": 723940.2,
"retainage_pct": 0.1,
"prior_cumulative": {
"Plumbing": 41433.17,
"Structural Steel": 66433.33,
"Masonry": 16891.06,
"Roofing": 109895.23,
"Speculaing": 31562.77
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 22234.43,
"appl... | 0037515b38f9256f6eab0fa3bcd73b3178ea1cfb4e0ed6c139ff71aa7e063898 | {
"verdict": "PASS",
"exceptions": []
} | c440c70093534056661f814ea7322789238bb03ce5ff2bdd02912750c7089563 | 0.96 | benchmark |
pay-777-708425998 | 777 | {
"lines": [
{
"description": "Glass & Glazing",
"contract_amount": 332742.95,
"percent_complete": 0.273,
"this_period": 24652.27,
"cumulative": 90818.61,
"balance": 241924.34
},
{
"description": "Door Frames",
"contract_amount": 224490.6,
"percent_com... | {
"contract_sum": 2120863.98,
"retainage_pct": 0.1,
"prior_cumulative": {
"Glass & Glazing": 66166.34,
"Door Frames": 149922.34,
"Masonry": 25765.91,
"Electrical": 200274.14,
"Fire Protection": 127654.94,
"Insulation": 193959.44,
"Drywall": 126482.79,
"Structural Steel": 28483.21,
... | f1d6748706419a04279b3ae14fa0bcf938cc6334975a1e5739bac7d9b97506b6 | {
"verdict": "PASS",
"exceptions": []
} | 3dd79a7834767e83079d0238f59fc2f87b5e46f3853c5a37c999701ffcf17e57 | 0.96 | benchmark |
pay-777-019722118 | 777 | {
"lines": [
{
"description": "Electrical",
"contract_amount": 33352.85,
"percent_complete": 0.315,
"this_period": 810.73,
"cumulative": 10513.18,
"balance": 22839.67
},
{
"description": "Roofing",
"contract_amount": 207517,
"percent_complete": 0.541,
... | {
"contract_sum": 1743233.49,
"retainage_pct": 0.05,
"prior_cumulative": {
"Electrical": 9702.45,
"Roofing": 102316.13,
"Structural Steel": 262371.76,
"Demolition": 220157.53,
"Tile": 84112.5,
"Insulation": 250214.66,
"Speculaing": 74669.79,
"Sitework": 18749.45
},
"change_orde... | d962122a1a692c789471485c26e693f6280abdb2fb6cef049a28a398b6335d60 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "OVERPAYMENT",
"severity": "HIGH",
"line": "Sitework",
"observed": "cumulative 94557.6 > contract 85961.4",
"corrected": "cumulative <= 85961.4",
"citation": "G703 line 8",
"correction": "reduce cumulative to the contract a... | ffc2e289e57fa7375782c52a8e95f41540245ac98a5e0afc2b13174c7233ca62 | 0.96 | benchmark |
pay-777-741356679 | 777 | {
"lines": [
{
"description": "Electrical",
"contract_amount": 80487.96,
"percent_complete": 0.168,
"this_period": 2182.08,
"cumulative": 13524.69,
"balance": 66963.27
},
{
"description": "Drywall",
"contract_amount": 22737.08,
"percent_complete": 0.27... | {
"contract_sum": 796552.38,
"retainage_pct": 0,
"prior_cumulative": {
"Electrical": 11342.61,
"Drywall": 4752.76,
"Millwork": 75152.74,
"Door Frames": 130805.72,
"Fire Protection": 122864.51
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 32869.74,
"ap... | b1af63131ee8bd4ebcc51b1e24a01bac6f4fb635a15fe5ef66104302943fd8a5 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "CO_EXCEEDED",
"severity": "HIGH",
"line": "CO CO-001",
"observed": "applied 39443.7 > approved 32869.7",
"corrected": "applied <= 32869.7",
"citation": "CO CO-001",
"correction": "cap applied to the approved entitlement"
... | 4645b5d5bd34fad7a1f2caff1a0329c62991888e476ee0c6043de3a8bfd398e4 | 0.73 | benchmark |
pay-777-455635536 | 777 | {
"lines": [
{
"description": "Sitework",
"contract_amount": 257415.57,
"percent_complete": 0.416,
"this_period": 7816.32,
"cumulative": 107091.26,
"balance": 150324.31
},
{
"description": "Elevator",
"contract_amount": 59413.36,
"percent_complete": 0.... | {
"contract_sum": 1162501.39,
"retainage_pct": 0.05,
"prior_cumulative": {
"Sitework": 99274.94,
"Elevator": 37912.81,
"Roofing": 53087.83,
"Structural Steel": 6937.16,
"Insulation": 120017.96,
"Concrete - Foundation": 51478.8
},
"change_orders": [
{
"number": "CO-001",
... | 889cccc1f844758c83c9a0eeac060c1b22d5ac0fca9bc4063b79fa0bd40544ae | {
"verdict": "PASS",
"exceptions": []
} | c13a66383698dfd3d7774f8b672bfcc75ca83820034ce1415238e322fab6314e | 0.23 | benchmark |
pay-777-317271525 | 777 | {
"lines": [
{
"description": "Drywall",
"contract_amount": 112699.74,
"percent_complete": 0.589,
"this_period": 19175.71,
"cumulative": 66426.35,
"balance": 46273.39
},
{
"description": "Demolition",
"contract_amount": 217974.4,
"percent_complete": 0.... | {
"contract_sum": 1338278.51,
"retainage_pct": 0.1,
"prior_cumulative": {
"Drywall": 47250.65,
"Demolition": 136081.41,
"Insulation": 81943.42,
"Paint": 254451.7,
"Electrical": 32650.56,
"Concrete - Foundation": 32110.97,
"Glass & Glazing": 87602.96
},
"change_orders": [
{
... | 9fbdba5783831ac60645c2f181228a0b7191d2449f56a977341862542e0ab084 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "MATH_ERROR",
"severity": "HIGH",
"line": "Drywall",
"observed": "this-period 19175.7, cumulative 66426.4, prior 47250.7",
"corrected": "this-period 19175.7",
"citation": "G703 line 1",
"correction": "restate this-period as... | b81c4b9e44cc5eb18585330fd1d374c39261656f51030aee3f544031c3ef2f69 | 0.76 | benchmark |
pay-777-074000848 | 777 | {
"lines": [
{
"description": "Drywall",
"contract_amount": 41507.67,
"percent_complete": 0.417,
"this_period": 4297.11,
"cumulative": 17290.01,
"balance": 24217.66
},
{
"description": "Masonry",
"contract_amount": 387810.6,
"percent_complete": 0.671,
... | {
"contract_sum": 1556620.09,
"retainage_pct": 0.05,
"prior_cumulative": {
"Drywall": 12992.9,
"Masonry": 193924.02,
"Insulation": 58377.91,
"Glass & Glazing": 33088.96,
"Plumbing": 75364.36,
"Roofing": 86694.25
},
"change_orders": [
{
"number": "CO-001",
"approved_amou... | 851f1018b952170a7c0819b102315c493fb0dc019096cbbbfaf3f910f9c9104f | {
"verdict": "FLAG",
"exceptions": [
{
"type": "TOTAL_MISMATCH",
"severity": "HIGH",
"line": "G702 (2)",
"observed": "sum of cumulative 596994 vs completed+stored 597994",
"corrected": "completed+stored = 596994",
"citation": "G702 / G703",
"correction": "tie completed+... | 03f930955b99d3a64e27ee127b93959ba1d6b4dde1b6dac6af95fcba9149078b | 0.24 | benchmark |
pay-777-075757477 | 777 | {
"lines": [
{
"description": "Structural Steel",
"contract_amount": 394408.67,
"percent_complete": 0.86,
"this_period": 51481.74,
"cumulative": 339286.51,
"balance": 55122.16
},
{
"description": "Fire Protection",
"contract_amount": 292569.26,
"percen... | {
"contract_sum": 1660840.76,
"retainage_pct": 0.1,
"prior_cumulative": {
"Structural Steel": 287804.77,
"Fire Protection": 106538.67,
"Demolition": 78956.61,
"Drywall": 149028.31,
"Electrical": 35729.54,
"Concrete - Foundation": 9635.96,
"Door Frames": 86272.99
},
"change_orders":... | 6f7cae3f828005d7612254ac0b0db987cdeb089cd431acc71b01fa2853978833 | {
"verdict": "PASS",
"exceptions": []
} | 76abe07e701687c6ed536e082a888eed7a117bace95c6078f85f19c2b78c8033 | 0.39 | benchmark |
pay-777-657636352 | 777 | {
"lines": [
{
"description": "Paint",
"contract_amount": 52844.13,
"percent_complete": 0.566,
"this_period": 5242.91,
"cumulative": 29890.7,
"balance": 22953.43
},
{
"description": "Speculaing",
"contract_amount": 36253.78,
"percent_complete": 0.644,
... | {
"contract_sum": 879792.9,
"retainage_pct": 0,
"prior_cumulative": {
"Paint": 24647.79,
"Speculaing": 19612.32,
"Masonry": 37494.01,
"Drywall": 76101.07,
"Concrete - Foundation": 266784.07,
"Tile": 54222.49
},
"change_orders": [
{
"number": "CO-001",
"approved_amount":... | 0f3cb326cd48bae1bc9bc05d0b5615a426bd886fc7a9c86050ceb6595a0c9884 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "DOUBLE_COUNT",
"severity": "MEDIUM",
"line": "Paint",
"observed": "listed 2x at 52844.1",
"corrected": "listed once",
"citation": "G703",
"correction": "remove the duplicated line"
}
]
} | 8530a44a296ab4b8d79f87da5fc74acd95f34c3745c040582189c07850f6b2e3 | 0.8 | benchmark |
pay-777-074356791 | 777 | {
"lines": [
{
"description": "Fire Protection",
"contract_amount": 322285.93,
"percent_complete": 0.63,
"this_period": 16554.9,
"cumulative": 203126.79,
"balance": 119159.14
},
{
"description": "Plumbing",
"contract_amount": 214194.58,
"percent_comple... | {
"contract_sum": 2067414.32,
"retainage_pct": 0.05,
"prior_cumulative": {
"Fire Protection": 186571.89,
"Plumbing": 55021.46,
"Insulation": 17982.6,
"Tile": 267627.37,
"Door Frames": 165288.38,
"Roofing": 97688.18,
"Elevator": 4136.46,
"Millwork": 20146.62,
"Drywall": 191162.9... | 3a518ec2d121b96ba8ffe280e3622ef53d60584a47cb333fe3662aa10bf25fe7 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "OVERPAYMENT",
"severity": "HIGH",
"line": "Drywall",
"observed": "cumulative 433421 > contract 394019",
"corrected": "cumulative <= 394019",
"citation": "G703 line 9",
"correction": "reduce cumulative to the contract amoun... | 4821fb7cf03717113398d9385afeb367afdcec2fa2def09d4a03752636dd5a7b | 0.54 | benchmark |
pay-777-636991309 | 777 | {
"lines": [
{
"description": "Glass & Glazing",
"contract_amount": 377768.23,
"percent_complete": 0.305,
"this_period": 11312.31,
"cumulative": 115350.86,
"balance": 262417.37
},
{
"description": "Plumbing",
"contract_amount": 47183.45,
"percent_compl... | {
"contract_sum": 1509414.62,
"retainage_pct": 0.05,
"prior_cumulative": {
"Glass & Glazing": 104538.55,
"Plumbing": 25259.21,
"Landscaping": 140317.14,
"Demolition": 44043.04,
"Tile": 134001.78,
"Sitework": 178944.48
},
"change_orders": [
{
"number": "CO-001",
"approve... | 26e77b26043e627e6a4ade616e4508e8fbc9d65832477565d82754086e14d344 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "MATH_ERROR",
"severity": "HIGH",
"line": "Glass & Glazing",
"observed": "this-period 11312.3, cumulative 115351, prior 104539",
"corrected": "this-period 10812.3",
"citation": "G703 line 1",
"correction": "restate this-per... | 935811b08eb5f8dc18f478bbdecd6ec380ee390df4634776ad4cfe4d845410b6 | 0.58 | benchmark |
pay-777-199142867 | 777 | {
"lines": [
{
"description": "Demolition",
"contract_amount": 141976.19,
"percent_complete": 0.403,
"this_period": 12077.13,
"cumulative": 57278.11,
"balance": 84698.08
},
{
"description": "Paint",
"contract_amount": 155402.75,
"percent_complete": 0.5... | {
"contract_sum": 1423551.25,
"retainage_pct": 0.05,
"prior_cumulative": {
"Demolition": 45200.98,
"Paint": 69579.08,
"Fire Protection": 166104.1,
"Glass & Glazing": 183731.46,
"Speculaing": 57067.76,
"Millwork": 46198.76,
"Elevator": 10308.07
},
"change_orders": [
{
"num... | 77cd42fe7bb77fe2c80f79e0a67860e43ae55b923960dab7eb1d8b04e0aa499d | {
"verdict": "PASS",
"exceptions": []
} | 57563db1c2a412fc070ee3ad84d2c03bc6577a218fafe50d01dacd271aed28df | 0.99 | benchmark |
pay-777-002474843 | 777 | {
"lines": [
{
"description": "Electrical",
"contract_amount": 138535.76,
"percent_complete": 0.703,
"this_period": 24837.16,
"cumulative": 97443.29,
"balance": 41092.47
},
{
"description": "Insulation",
"contract_amount": 372919.52,
"percent_complete"... | {
"contract_sum": 1031386.7,
"retainage_pct": 0.1,
"prior_cumulative": {
"Electrical": 72606.13,
"Insulation": 149471,
"Millwork": 42738.57,
"Speculaing": 32061.86,
"Roofing": 116620.21,
"Concrete - Foundation": 8980.57
},
"change_orders": [
{
"number": "CO-001",
"appro... | b237d19fb1ee2baa41a4d7da45c32811a4b9ccd5bea2a2e4a5507080242e3ada | {
"verdict": "PASS",
"exceptions": []
} | 6cec87138e70ef18d836a3b36987e0803a2c4837c5eca4c89a43d0200fe4adbf | 0.18 | benchmark |
pay-777-711096540 | 777 | {
"lines": [
{
"description": "Tile",
"contract_amount": 149684.08,
"percent_complete": 1.05,
"this_period": 13453.31,
"cumulative": 96176.65,
"balance": 53507.43
},
{
"description": "Elevator",
"contract_amount": 272943.4,
"percent_complete": 0.83,
... | {
"contract_sum": 1065634.36,
"retainage_pct": 0,
"prior_cumulative": {
"Tile": 82723.34,
"Elevator": 172900.43,
"Paint": 52267.88,
"Door Frames": 227772,
"Glass & Glazing": 45562.95
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 25850.82,
"applied_amo... | e7b3adc22950736d412d9053bb3fb0c86b75867c3e521e6075396cf7f371b9bf | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PERCENT_OVERSTATED",
"severity": "LOW",
"line": "Tile",
"observed": "% complete 1.050",
"corrected": "<= 1.0",
"citation": "G703 line 1",
"correction": "cap percent complete at 100%"
},
{
"type": "DOUBLE_COUN... | 845e8d5d3882c10c8ef1b9a4e3f5f77028af5e3f360961d11b444e6ce9fb3713 | 0.22 | benchmark |
pay-777-636991560 | 777 | {
"lines": [
{
"description": "Structural Steel",
"contract_amount": 147404.78,
"percent_complete": 0.81,
"this_period": 13394.46,
"cumulative": 119470.25,
"balance": 27934.53
},
{
"description": "Electrical",
"contract_amount": 332491.69,
"percent_com... | {
"contract_sum": 1154870.1,
"retainage_pct": 0.1,
"prior_cumulative": {
"Structural Steel": 106075.79,
"Electrical": 129612.85,
"Plumbing": 99196.65,
"Demolition": 8750.28,
"Roofing": 68059.16
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 15634.54,
"... | 74f022bee320fb4e83e2de2498a6c6e33df5bd2cef38c3cb7121f59e8932b28e | {
"verdict": "FLAG",
"exceptions": [
{
"type": "DOUBLE_COUNT",
"severity": "MEDIUM",
"line": "Structural Steel",
"observed": "listed 2x at 147405",
"corrected": "listed once",
"citation": "G703",
"correction": "remove the duplicated line"
}
]
} | 144aab1631df2b05cdd17ae70114ed9a7cb102f204ad11384ffcea2ae9cf1e87 | 0.31 | benchmark |
pay-777-578958955 | 777 | {
"lines": [
{
"description": "Millwork",
"contract_amount": 20999.98,
"percent_complete": 1.05,
"this_period": 2863.06,
"cumulative": 15877.29,
"balance": 5122.69
},
{
"description": "Masonry",
"contract_amount": 114147.64,
"percent_complete": 0.595,
... | {
"contract_sum": 1017737.42,
"retainage_pct": 0,
"prior_cumulative": {
"Millwork": 13014.23,
"Masonry": 62344.62,
"HVAC": 213032.73,
"Electrical": 36636.36,
"Plumbing": 145531.93,
"Structural Steel": 64863.06
},
"change_orders": [
{
"number": "CO-001",
"approved_amount... | 4a4362ec6c18e99a589a95ac8258c0c284bc08a0a5d6331c461cfc6baf1f9d9c | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PERCENT_OVERSTATED",
"severity": "LOW",
"line": "Millwork",
"observed": "% complete 1.050",
"corrected": "<= 1.0",
"citation": "G703 line 1",
"correction": "cap percent complete at 100%"
},
{
"type": "TOTAL_M... | 381ebbd0cbd379ad856aba55c284cc14a476543d6bbfd92c8f1b4cd4a4657280 | 0.38 | benchmark |
pay-777-102778334 | 777 | {
"lines": [
{
"description": "Roofing",
"contract_amount": 348838.55,
"percent_complete": 0.171,
"this_period": 12579.69,
"cumulative": 59714.61,
"balance": 289123.94
},
{
"description": "Plumbing",
"contract_amount": 358776.95,
"percent_complete": 0.... | {
"contract_sum": 1342622.35,
"retainage_pct": 0.05,
"prior_cumulative": {
"Roofing": 47134.92,
"Plumbing": 230245.39,
"Fire Protection": 26227.43,
"Paint": 82474.89,
"Structural Steel": 15370.12,
"Millwork": 46199.84,
"Demolition": 10985.44
},
"change_orders": [
{
"numbe... | d48c7816aa473bc3439e7892b4b2d21cbdc1b8b8172410f2f815d69fc0a089dd | {
"verdict": "PASS",
"exceptions": []
} | b33bea05bf22f68a7c038629b89e8beba7d7ade4151cd918fc0be3060a0f5d89 | 0.85 | benchmark |
pay-777-734875269 | 777 | {
"lines": [
{
"description": "Sitework",
"contract_amount": 195805.35,
"percent_complete": 1.001,
"this_period": 14722.77,
"cumulative": 95003.5,
"balance": 100801.85
},
{
"description": "Demolition",
"contract_amount": 388641.88,
"percent_complete": ... | {
"contract_sum": 1551267.12,
"retainage_pct": 0,
"prior_cumulative": {
"Sitework": 80280.73,
"Demolition": 223347.75,
"Electrical": 50352.57,
"Glass & Glazing": 86814.46,
"Masonry": 13183.1,
"Paint": 195046.83,
"Fire Protection": 43226.69
},
"change_orders": [
{
"number"... | ce9d9fcb9a1a1e96dcb77c47bd4f2a255db15132ed8e98afcf010e2d9e951f8d | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PERCENT_OVERSTATED",
"severity": "LOW",
"line": "Sitework",
"observed": "% complete 1.001",
"corrected": "<= 1.0",
"citation": "G703 line 1",
"correction": "cap percent complete at 100%"
},
{
"type": "WAIVER_... | 1a41b0237255c974ba437573256efe11c26f126769abb022fb677357fae11710 | 0.64 | benchmark |
pay-777-101987336 | 777 | {
"lines": [
{
"description": "Elevator",
"contract_amount": 226202.6,
"percent_complete": 0.776,
"this_period": 27312.41,
"cumulative": 175503.91,
"balance": 50698.69
},
{
"description": "Insulation",
"contract_amount": 153317.41,
"percent_complete": ... | {
"contract_sum": 1017259.82,
"retainage_pct": 0.1,
"prior_cumulative": {
"Elevator": 148191.5,
"Insulation": 83534.13,
"Landscaping": 188794.97,
"Door Frames": 195356.35
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 8486.13,
"applied_amount": 0
}
]... | 8b11f7959d96173a42bacec64774df61d2ed70931d03e10079d2839f8f4a343b | {
"verdict": "PASS",
"exceptions": []
} | aedc286d9296071af25709387dccea22cfb569031629887e5252431f0e2a7a62 | 0.32 | benchmark |
pay-777-649099920 | 777 | {
"lines": [
{
"description": "Insulation",
"contract_amount": 398382.08,
"percent_complete": 0.519,
"this_period": 36505.18,
"cumulative": 206875.49,
"balance": 191506.59
},
{
"description": "Demolition",
"contract_amount": 109681.43,
"percent_complet... | {
"contract_sum": 1346122.66,
"retainage_pct": 0,
"prior_cumulative": {
"Insulation": 170370.31,
"Demolition": 80102.64,
"Glass & Glazing": 56018.9,
"Sitework": 147330.85,
"Electrical": 174864.14,
"Door Frames": 15975.39
},
"change_orders": [
{
"number": "CO-001",
"appr... | 6ba312444e9b3f40de3dc425c5f15d3b76703fb43d567ef01f2328f8700eb377 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "OVERPAYMENT",
"severity": "HIGH",
"line": "Door Frames",
"observed": "cumulative 48925.6 > contract 44477.8",
"corrected": "cumulative <= 44477.8",
"citation": "G703 line 6",
"correction": "reduce cumulative to the contrac... | e69d860f97810a6707de1fe1864f87c97b44f6fb3d3247f6c020fc9d000f7d5f | 0.61 | benchmark |
pay-777-857604225 | 777 | {
"lines": [
{
"description": "Roofing",
"contract_amount": 100990.53,
"percent_complete": 1.001,
"this_period": 3545.62,
"cumulative": 25237.52,
"balance": 75753.01
},
{
"description": "Millwork",
"contract_amount": 255541.58,
"percent_complete": 0.81... | {
"contract_sum": 1247787.57,
"retainage_pct": 0.1,
"prior_cumulative": {
"Roofing": 21691.9,
"Millwork": 169743.12,
"Landscaping": 26954.17,
"Drywall": 170561.71,
"Masonry": 25709.64,
"Plumbing": 105086.83,
"Paint": 39242.19,
"Insulation": 40176.89
},
"change_orders": [
{
... | c8d73ddd928aa053e3c16f07a2d2332217f9667b45bd9ac838174338bf24535c | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PERCENT_OVERSTATED",
"severity": "LOW",
"line": "Roofing",
"observed": "% complete 1.001",
"corrected": "<= 1.0",
"citation": "G703 line 1",
"correction": "cap percent complete at 100%"
}
]
} | c0b4a3f083546c1aa767731261eb132c23d2d5e4ff7a3c004ae1b8e9ad3c9aa3 | 0.69 | benchmark |
pay-777-412534383 | 777 | {
"lines": [
{
"description": "Sitework",
"contract_amount": 82743.33,
"percent_complete": 0.706,
"this_period": 6894.44,
"cumulative": 58445.02,
"balance": 24298.31
},
{
"description": "Speculaing",
"contract_amount": 109888.86,
"percent_complete": 0.... | {
"contract_sum": 1464212.11,
"retainage_pct": 0.05,
"prior_cumulative": {
"Sitework": 51550.58,
"Speculaing": 38332.84,
"Roofing": 43887.32,
"Concrete - Foundation": 9607.36,
"Plumbing": 50949.82,
"Masonry": 68735.96,
"Door Frames": 102284.58,
"Electrical": 42325.12,
"Tile": 1... | 25807d8141a049c7d35458c21571677946317675e0df079371843af56b4375e0 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "CO_EXCEEDED",
"severity": "HIGH",
"line": "CO CO-001",
"observed": "applied 42321.7 > approved 35268.1",
"corrected": "applied <= 35268.1",
"citation": "CO CO-001",
"correction": "cap applied to the approved entitlement"
... | aed3c5952e0b32a4197cd30264e73ba1d33a3e7f20be54575ebe5d76a7404859 | 0.59 | benchmark |
pay-777-504098317 | 777 | {
"lines": [
{
"description": "Door Frames",
"contract_amount": 67665.79,
"percent_complete": 0.51,
"this_period": 3689.95,
"cumulative": 34490.97,
"balance": 33174.82
},
{
"description": "Plumbing",
"contract_amount": 289394.44,
"percent_complete": 0.... | {
"contract_sum": 724694.62,
"retainage_pct": 0.1,
"prior_cumulative": {
"Door Frames": 30801.02,
"Plumbing": 79084.49,
"Speculaing": 76595,
"Fire Protection": 7133.5
},
"change_orders": [
{
"number": "CO-001",
"approved_amount": 33822.19,
"applied_amount": 0
}
],
... | 52ea8cee4efcbe7d32361bd053a4b6a09b39a178d9b8bf9f00fd1ab0204b0767 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "WAIVER_MISSING",
"severity": "MEDIUM",
"line": "waivers",
"observed": "requested 28499 > waiver coverage 14249.5",
"corrected": "waiver coverage >= 28499",
"citation": "waiver packet",
"correction": "obtain waiver covering... | c7d2a1ff67bd0d8473cec4b20a161d41bf5c2253f2ef4db1dfa8f5034a378a52 | 0.33 | benchmark |
pay-777-951748594 | 777 | {
"lines": [
{
"description": "Tile",
"contract_amount": 94128.09,
"percent_complete": 1.001,
"this_period": 13104.43,
"cumulative": 56286.17,
"balance": 37841.92
},
{
"description": "Fire Protection",
"contract_amount": 343076.18,
"percent_complete": ... | {
"contract_sum": 1534018.39,
"retainage_pct": 0,
"prior_cumulative": {
"Tile": 43181.74,
"Fire Protection": 151646.55,
"Sitework": 125930.24,
"Masonry": 98109.69,
"HVAC": 58592.78,
"Concrete - Foundation": 172004.68,
"Insulation": 89310.87
},
"change_orders": [
{
"number... | 61564916a7ae63048757bbd2a39f0bbcbe7a6b654b0c285b4dea0217e41fbc1d | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PERCENT_OVERSTATED",
"severity": "LOW",
"line": "Tile",
"observed": "% complete 1.001",
"corrected": "<= 1.0",
"citation": "G703 line 1",
"correction": "cap percent complete at 100%"
}
]
} | 10cbb33ffe456384aa1191f01aa09a892c8809957625fcf067b8d5937f6d9ddb | 0.97 | benchmark |
pay-777-957834061 | 777 | {
"lines": [
{
"description": "Paint",
"contract_amount": 72299.28,
"percent_complete": 0.552,
"this_period": 5579.85,
"cumulative": 39913.34,
"balance": 32385.94
},
{
"description": "Glass & Glazing",
"contract_amount": 66331.25,
"percent_complete": 0... | {
"contract_sum": 1438817.52,
"retainage_pct": 0.1,
"prior_cumulative": {
"Paint": 34333.5,
"Glass & Glazing": 54417.85,
"Landscaping": 85004.8,
"Concrete - Foundation": 22590.19,
"Fire Protection": 38783.98,
"Roofing": 147034.35,
"Sitework": 190009.3,
"Elevator": 97066.41
},
"... | e59fbd70b103cbb73545796aab5190ef1fe8937a3040f4b13fb574f6c5b4a70c | {
"verdict": "FLAG",
"exceptions": [
{
"type": "MATH_ERROR",
"severity": "HIGH",
"line": "Paint",
"observed": "this-period 5579.85, cumulative 39913.3, prior 34333.5",
"corrected": "this-period 5579.84",
"citation": "G703 line 1",
"correction": "restate this-period as 5... | eb1bd45a45c8b089c14ae773cdf8f60648770db7e4073d03e06d18fc124f18c4 | 0.83 | benchmark |
pay-777-116644982 | 777 | {
"lines": [
{
"description": "Paint",
"contract_amount": 128510.64,
"percent_complete": 0.414,
"this_period": 15880.83,
"cumulative": 53161.2,
"balance": 75349.44
},
{
"description": "Drywall",
"contract_amount": 383741.96,
"percent_complete": 0.829,
... | {
"contract_sum": 1295581.81,
"retainage_pct": 0.05,
"prior_cumulative": {
"Paint": 37280.37,
"Drywall": 257943.2,
"Landscaping": 77729.23,
"Masonry": 82449.79,
"Plumbing": 107522.54,
"Fire Protection": 57247.16
},
"change_orders": [
{
"number": "CO-001",
"approved_amou... | fe5ec96db6d58846fc41531119ac4a619fbc2d815d2b2a758bef2b327e3ae277 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "WAIVER_MISSING",
"severity": "MEDIUM",
"line": "waivers",
"observed": "requested 140477 > waiver coverage 70238.6",
"corrected": "waiver coverage >= 140477",
"citation": "waiver packet",
"correction": "obtain waiver coveri... | b2b469692ea934a224f960d0171bfcae104a77c2fe2e525f315ba62a43922e6d | 0.36 | benchmark |
pay-777-225248085 | 777 | {
"lines": [
{
"description": "Demolition",
"contract_amount": 175344.96,
"percent_complete": 0.864,
"this_period": 34505.61,
"cumulative": 151497.25,
"balance": 23847.71
},
{
"description": "Tile",
"contract_amount": 92223.57,
"percent_complete": 0.85... | {
"contract_sum": 1418181.3,
"retainage_pct": 0,
"prior_cumulative": {
"Demolition": 116991.64,
"Tile": 56555.89,
"Paint": 45520.95,
"Plumbing": 104646.89,
"Door Frames": 107043.73,
"HVAC": 205311.24,
"Fire Protection": 20281.45
},
"change_orders": [
{
"number": "CO-001",... | 7330bfe1cb2324d1758cb3f66813569683fe5629e8d6128a3f12d200a748ca61 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "OVERPAYMENT",
"severity": "HIGH",
"line": "Fire Protection",
"observed": "cumulative 34033.9 > contract 30939.9",
"corrected": "cumulative <= 30939.9",
"citation": "G703 line 7",
"correction": "reduce cumulative to the con... | 20cb754c748b0b1759a78eb358c00535a652748d11525a6b194acf6fb04c6f56 | 0.11 | benchmark |
pay-777-049463542 | 777 | {
"lines": [
{
"description": "Structural Steel",
"contract_amount": 361258.57,
"percent_complete": 0.183,
"this_period": 11915.81,
"cumulative": 66259.85,
"balance": 294998.72
},
{
"description": "Demolition",
"contract_amount": 127118.11,
"percent_co... | {
"contract_sum": 990014.26,
"retainage_pct": 0.05,
"prior_cumulative": {
"Structural Steel": 54344.04,
"Demolition": 39181.87,
"Paint": 48200.84,
"Concrete - Foundation": 24618.32,
"Electrical": 64977.55,
"Sitework": 3132.83
},
"change_orders": [
{
"number": "CO-001",
... | 37df702bb54b6a42ce6e62efb82ba4afe4a568aeb81f57291b352ade14790843 | {
"verdict": "FLAG",
"exceptions": [
{
"type": "PRIOR_PAYMENT_ERROR",
"severity": "MEDIUM",
"line": "G702 (8)",
"observed": "current due 38773.7",
"corrected": "current due 38773.7",
"citation": "G702 (8)",
"correction": "restate current due as 38773.7"
}
]
} | f28efaa8605a862dfac203185f494233018bc77110a8c56f1823708580c50336 | 0.68 | benchmark |
Gold tasks and the held-out eval. The study is on the collection.
| Config | n | What |
|---|---|---|
benchmark |
1000 | Held-out eval, seed 777. Never in train. |
train_handseeded |
223 | Mix matched to the eval, including PASS. |
train_ornith |
58 | Ornith-1.5 proposals that passed the oracle. |
train_blended |
281 | Both of the above. |
Leakprobe vs benchmark: exact signature overlap 0.
| curriculum | train n | sw-recall | precision | exact |
|---|---|---|---|---|
| hand-seeded | 223 | 0.318 [0.290, 0.347] | 0.308 [0.279, 0.337] | 0.178 |
| Ornith-only | 58 | 0.241 [0.214, 0.268] | 0.111 [0.098, 0.124] | 0.084 |
| blend | 281 | 0.334 [0.306, 0.363] | 0.374 [0.342, 0.406] | 0.228 |
The evals config has all 15 published rows (full size, equal-N@58 random and stratified, clean equal-N@18) with their CIs, so the tables in the post are reproducible without rerunning anything:
from datasets import load_dataset
evals = load_dataset("caiotheodoro/plumb", "evals", split="train")
[r for r in evals if r["group"] == "full_size"]
Raw per-prediction dumps live at data/evals/eval-{handseeded,ornith,blended}.json and PATH_A_RESULTS.json. Those are artifacts, not configs; fetch them with hf_hub_download.
CIs: 10k bootstrap, seed 11. Adapters: handseeded · ornith · blended. N=18 mix/error and pow-* / leaked-anchor grows are not here.
from datasets import load_dataset
bench = load_dataset("caiotheodoro/plumb", "benchmark", split="train")
Apache-2.0. Synthetic pay applications, not real contractor filings.